Charging Progress - Copy

Embed Size (px)

Citation preview

  • 8/3/2019 Charging Progress - Copy

    1/12

    Open

    Close

    Compressor1

    Compressor 2

    Red tube to

    H.Press

    S.Valve

    Blue tube to

    L.Press

    S.Valve

    Yellow tube

    to Gas

    Cylinder

    A

    B

    A

    B

    A

    B

    Low Pressure Service valve

    Low Pressure Service valve

    Pressure Gauge Preparation Cylinder Gas PreparationChargingGas For Compressor 1

    * Pressure Gauge during charging conditi

    PSI scale

    Before Compressor 1 Running :

    * 1st step charging prosces with openValve for

    charging , set until 50 psi ( Comp1 ) us

    gas

    * Close High Pressure valve

    * Do the same way for Low P.Gauge Val

    use ethylene gas

    * Close High Pressure valve

    Start On the machine

    * Comp 1 running , charging for L.Press

    7 psi , High Pressure until 210 ~ 215 Ps

    Thermostate set to - 30 degree after r

    Compressor 2 will be run* Comp 2 running , see the pressure ga

    charging again if gas pressure not eno

    L . Pressure until 10 ~ 12 psi , during

    from L.Pressure make sure High press

    indicate gas pressure as below :

    H. Pressure until 275 ~ 290 Psi

    Wait until normal condition and reach te

    chamber , in case pressure condition eac

    down/ decrease , do the same way for ch

    comp2.

    Flow Process for charging Gas

  • 8/3/2019 Charging Progress - Copy

    2/12

    Open

    Close

    Low Pressure

    Gauge

    High Pressure

    Gauge

    ChargingGas For Compressor 2

    n showing in

    ow P.Gauge

    e propylene

    e ( Comp 2 )

    re valve until

    i

    each set point

    ge &

    ugh for

    dd the gas

    re gauge

    mperature

    h compressor is

    arging comp1 /

    * Pressure Gaugeduring charging condition showing in

    PSI scale

    Before Compressor 1 Running :

    * 1st step charging prosces with open Low P.Gauge

    Valve for charging , Close High Pressure valve

    set until 50 psi ( Comp1 ) use propylene gas

    * Do the same way for Low P.Gauge Valve ( Comp 2 )

    use ethylene gas

    Start On the machine

    * Comp 1 running , charging for L.Pressure valve until

    7 psi , High Pressure until 210 ~ 215 Psi

    Thermostate set to - 30 degree after reach set pointCompressor 2 will be run

    * Comp 2 running , see the pressure gauge &

    charging again if gas pressure not enough for

    L . Pressure until 10 ~ 12 psi , during add the gas

    from L.Pressure make sure High pressure gauge

    indicate gas pressure as below :

    H. Pressure until 275 ~ 290 Psi

    Wait until normal condition and reach temperature

    chamber , in case pressure condition each compressor is

    down/ decrease , do the same way for charging comp1 /

    comp2.

    Machine

    S

    Prepa

    1. Pressure Gauge

    2. Cylinder Gas :

    - Prophylene

    - Ethylene

    Connect Fle

    service

    1. Red to H.Pre

    2 . Blue to L.Pre

    3. Yellow to Cy

    Mac

    St

    cond

  • 8/3/2019 Charging Progress - Copy

    3/12

    omplete

    t

    e for :

    / Manifold

    ible Hose to

    valve :ssure

    ssure

    nder Gas

    hine

    p

    ition

    Step 1.

    - Open L.Pressure gauge valve

    - Close H.Pressure gauge valve

    - Add gas until 50 psi ( indicated )

    Comp 1 ( Prophylene Gas )

    Comp 2 ( Ethylene Gas )

    Start On

    Machine

    Pressure Gauge

    Check

    Comp1

    L.P = 7 Psi

    H.P = 210 Psi

    Comp2

    L.P = 10 psi

    H.P = 275 psi

    Add Gas from L.Pressure valve

    Comp1 / Comp 2

    ( Depend on pressure condition )

    do the same procedure on step 1

    During machine

    run condtion gas

    pressure will be

    reduce

    Machine

    monitoring

    condition

    Yes

    No

    Yes

    No

    Stop Machine

  • 8/3/2019 Charging Progress - Copy

    4/12

    Name Picture Serial Number / Type

    Mechanical Booster Pump :

    Model : B - 1A

    Ultimate Vacuum : 5 x 10-4

    Torr

    Displacement (50/60 Hz ) : 106/127 M3/h

    Rotation Speed (50/60 Hz) : 2.920/3.505 rpm

    Oil Capacity : 0.4 L

    Wight :

    BESTECH CO.LTD

    Motor Vacuum Pump :

    Model : BT 35A

    Pumping Speed : 600 L / min

    Ultimate Pressure : 5 X 10-4

    Torr

    Motor : 0.75 kw

    Oil Filling : 2.4 liter

    Including membran Filter & Clamp

    SENSOR

    TELEDYNE

    HASTING INSTRUMENT

    12~ 30 VDC - 0.7 W

    MADE IN USA

    Connector 15 pin

    TRANSFORMER

    INPUT : 380 V

    OUT PUT : 220 V

    CYCLE : 50 / 60 Hz

    ASIA POWER SUPPLY.CO

    POWER SUPPLY

    Model : WYSP - 15D0512A

    Input : AC 85 V ~ 264 V (50 /60Hz)

    Output : CH1 5VDC 2.0 A

    Output : CH2 12VDC 0.5 A

    MAGNETIC CONTACTOR

    MODEL : MEC

    TYPE : GMC - 12

    TOL (Thermal Over Load )

    MODEL : MEC

    TYPE : GTH - 22

    MINI TIMER

    MODEL : KEINO TIMING RELAY

    KTM - 1M

    VACUUM SYSTEM PART LIST

    Motor Vacuum Pump

    POWER SUPPLY

    MAGNETIC CONTACTOR

    Filament Sensor

    TRANSFORMER

  • 8/3/2019 Charging Progress - Copy

    5/12

    BUZZER AC

    PILOT LAMP AC

    POWER SWITCH AC

    EMERGENCY BUTTON AC

    USE FOR LIQUID TANK VACUUM PROCESS

    INDICATOR PANEL

    DEEP VACUUM PUMP

  • 8/3/2019 Charging Progress - Copy

    6/12

    Yes

    No

    No

    Yes

    Check For any leakage point

    ( Welding , Joint & other )

    Evacuation Process

    Gas volume

    Condition inCompressor

    Empety ..?

    Prepare

    Vacuum Pump set

    A & B

    Connect Flexible hose

    (A ) to Compressor

    Sevice Valve

    L.Pressure H.Pressure

    Connect Flexible hose

    (B ) to Liquid Tank

    Service Valve

    Empety Gas inCompressor

    TURN ON Vacuum

    Pump ( A )

    Closed Valve

    Liquid Tank

    TURN ON DEEP Vacuum

    pump ( B )

    Record Vacuum Time

    Open Valve

    Vacuum Pump ( A )

    Record Vacuum TIme

    Min : 3 Hrs

    With Vacuum Pressure

    Set : Min 5 Toor

    3 Hrs Vacuum Condition

    Reach

    Vacuum

    Pressure

    Closed Valve

    &

    Shut Off Vacuum

    Dismantle Hose

    Connection

    Vacuum Finish

    Vacuum

    Time

    Finish

    Closed Valve

    &

    Shut Off Vacuum

    Dismantle Hose

    Connection

    Vacuum Finish

    Yes

    No

  • 8/3/2019 Charging Progress - Copy

    7/12

  • 8/3/2019 Charging Progress - Copy

    8/12

    Vacuum Pump Set

    A

    Preparation for A

    Vacuum

    Preparation for B

    Vacuum

  • 8/3/2019 Charging Progress - Copy

    9/12

  • 8/3/2019 Charging Progress - Copy

    10/12

    Low Pressure

    Service valve

    DEEP Vacuum Pump

    Used for vacuum LIQUID TANK

    A1

    B

    B1

    Flexible Hose

    Valve Liquid Tank

    should be Closed

    Condition

    Valve for vacuum sucktion

    should be open

    Preparation for A

    Connect Compressor

    L.Pressure

    H.Pressure

  • 8/3/2019 Charging Progress - Copy

    11/12

  • 8/3/2019 Charging Progress - Copy

    12/12

    High PressureService valve

    Service Valve

    Preparation for B