87
Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634 This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Facility Assessment Report Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors Campus Summary Main 1934 384,200 $13,752,211 4 6-Classroom Modular 0 7,060 $240,971 1 6-Classroom Modular 0 7,060 $240,759 1 SITE $1,849,288 Campus Total $16,083,228 398,320 Building: Main Category: Building Exterior Item - Type Quantity Unit Rank Cost Location Group Comments Entrance Entrance Control - Audio and Video #1- E- Main 6 EA 1 $702 Entrance Control - Audio and Video #7- NW 6 EA 1 $702 Exterior Doors - Exterior AMP Door #1- E- Main 6 EA 6 $4,044 Exterior Doors - Exterior AMP Door #18- SE 6 EA 2 $1,348 Exterior Doors - Exterior AMP Door #2- NE 6 EA 2 $1,348 Exterior Doors - Exterior FRP Door #10- SW 6 EA 2 $1,263 Exterior Doors - Exterior FRP Door #11- SW 6 EA 2 $1,263 Exterior Doors - Exterior FRP Door #12- S 6 EA 2 $1,263 Exterior Doors - Exterior FRP Door #17- S 6 EA 2 $1,263 Exterior Doors - Exterior FRP Door #3- N 6 EA 2 $1,263 Exterior Doors - Exterior FRP Door #4- NE 6 EA 2 $1,263 Exterior Doors - Exterior FRP Door #5- NE- BR 6 EA 1 $631 Exterior Doors - Exterior FRP Door #6- NW 6 EA 2 $1,263 Exterior Doors - Exterior FRP Door #7- NW 6 EA 2 $1,263 Exterior Doors - Exterior FRP Door #8- NW 6 EA 2 $1,263 Exterior Doors - Exterior FRP Door #9-W 6 EA 2 $1,263 Exterior Doors - Exterior Steel Door #4.2- Garage 6 EA 1 $481 Exterior Doors - Exterior Steel Door Roof access doors 6 EA 5 $2,403 Page 1 of 87 STEINMETZ HS Assessment Date: 11/20/14

Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.

Facility Assessment Report

Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors

Campus Summary

Main 1934 384,200 $13,752,2114

6-Classroom Modular 0 7,060 $240,9711

6-Classroom Modular 0 7,060 $240,7591

SITE $1,849,288

Campus Total $16,083,228398,320

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Entrance Control - Audio and Video #1- E- Main 6EA1 $702

Entrance Control - Audio and Video #7- NW 6EA1 $702

Exterior Doors - Exterior AMP Door #1- E- Main 6EA6 $4,044

Exterior Doors - Exterior AMP Door #18- SE 6EA2 $1,348

Exterior Doors - Exterior AMP Door #2- NE 6EA2 $1,348

Exterior Doors - Exterior FRP Door #10- SW 6EA2 $1,263

Exterior Doors - Exterior FRP Door #11- SW 6EA2 $1,263

Exterior Doors - Exterior FRP Door #12- S 6EA2 $1,263

Exterior Doors - Exterior FRP Door #17- S 6EA2 $1,263

Exterior Doors - Exterior FRP Door #3- N 6EA2 $1,263

Exterior Doors - Exterior FRP Door #4- NE 6EA2 $1,263

Exterior Doors - Exterior FRP Door #5- NE- BR 6EA1 $631

Exterior Doors - Exterior FRP Door #6- NW 6EA2 $1,263

Exterior Doors - Exterior FRP Door #7- NW 6EA2 $1,263

Exterior Doors - Exterior FRP Door #8- NW 6EA2 $1,263

Exterior Doors - Exterior FRP Door #9-W 6EA2 $1,263

Exterior Doors - Exterior Steel Door #4.2- Garage 6EA1 $481

Exterior Doors - Exterior Steel Door Roof access doors 6EA5 $2,403

Page 1 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 2: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Exterior Doors - Overhead Rolling/ Garage Door #2.5- N- Book Rm #115 6EA1 $1,433

Exterior Doors - Overhead Rolling/ Garage Door #4.1- Garage 6EA1 $1,433

Exterior Doors - Overhead Rolling/ Garage Door #4.3- Garage 6EA1 $1,433

Exterior Doors - Side lite #5- NE- BR 6EA1 $313

Exterior Doors - Transom Lite #1- E- Main 6EA6 $1,880

Exterior Doors - Transom Lite #10- SW 6EA2 $627

Exterior Doors - Transom Lite #11- SW 6EA2 $627

Exterior Doors - Transom Lite #12- S 6EA4 $1,253

Exterior Doors - Transom Lite #17- S 6EA2 $627

Exterior Doors - Transom Lite #18- SE 6EA2 $627

Exterior Doors - Transom Lite #2- NE 6EA2 $627

Exterior Doors - Transom Lite #2.5- N- Book Rm #115 6EA2 $627

Exterior Doors - Transom Lite #3- N 6EA2 $627

Exterior Doors - Transom Lite #4- NE 6EA2 $627

Exterior Doors - Transom Lite #6- NW 6EA4 $1,253

Exterior Doors - Transom Lite #7- NW 6EA2 $627

Exterior Doors - Transom Lite #8- NW 6EA2 $627

Exterior Doors - Transom Lite #9-W 6EA4 $1,253

Exterior Stairs - Concrete #1- E- Main 6LF370 $30,254

Exterior Stairs - Concrete #18- SE 6LF128 $10,466

Exterior Stairs - Concrete #2- NE 6LF48 $3,925

Exterior Stairs - Concrete #2- NE spalling5LF80 $8,766

Exterior Stairs - Concrete #3- N cracks5LF10 $1,096

Exterior Stairs - Stone #1- E- Main 6LF24 $2,712

Exterior Stairs - Stone #17- S open joints & cracks5LF88 $23,863

Exterior Stairs - Stone #18- SE 6LF6 $678

Exterior Stairs - Stone #2- NE 6LF6 $678

Exterior Stairs - Stone #3- N 6LF80 $9,039

Stair Handrail - Steel_Stair Handrail #1- E- Main 6LF100 $867

Stair Handrail - Steel_Stair Handrail #17- S 6LF10 $87

Stair Handrail - Steel_Stair Handrail #18- SE 6LF33 $286

Stair Handrail - Steel_Stair Handrail #2- NE 6LF32 $277

Stair Handrail - Steel_Stair Handrail #3- N 6LF8 $69

Foundation

Foundation - Concrete Entire Building 7LF2,050 $0

Foundation - Concrete Entire Building Seepage6LF20 $3,884

Foundation - Concrete Entire Building Seepage6LF40 $7,769

Page 2 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 3: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Foundation

Foundation - Concrete Entire Building Seepage6LF10 $0

Foundation - Concrete Entire Building Seepage6LF10 $0

Superstructure - Steel with Clay Tile Arch Entire Building 7SF384,120 $0

Lighting

Exterior Lighting - Parapet or Roof Mounted Entire Building 6EA13 $6,975

Exterior Lighting - Wall Mounted Entire Building 6EA44 $12,705

Roof System

Cell Tower N Roof 6EA1 $736

Chimney - Brick Chimney- Concrete/ Mortar Liner N Roof No liner, has straps6LF140 $133,656

Coping - Metal Service Garage Roof 6LF116 $3,726

Coping - Stone Center Roof 6LF408 $13,104

Coping - Stone E Roof 6LF335 $10,759

Coping - Stone Green House Roof 6LF110 $3,533

Coping - Stone Low S Roof 6LF50 $1,606

Coping - Stone N Roof 6LF1,078 $34,623

Coping - Stone S Roof 6LF1,080 $34,687

Coping - Stone W Roof 6LF805 $25,855

Downspouts - Exterior Downspouts Service Garage Roof 6LF10 $332

Downspouts - Interior Downspouts Center Roof 6LF208 $6,913

Downspouts - Interior Downspouts E Roof 6LF256 $8,508

Downspouts - Interior Downspouts Green House Roof 6LF34 $1,130

Downspouts - Interior Downspouts Low S Roof 6LF10 $332

Downspouts - Interior Downspouts N Courtyard Roof 6LF40 $1,329

Downspouts - Interior Downspouts N Roof 6LF312 $10,369

Downspouts - Interior Downspouts S Courtyard Roof 6LF40 $1,329

Downspouts - Interior Downspouts S Roof 6LF312 $10,369

Downspouts - Interior Downspouts W Roof 6LF384 $12,762

Parapet - 16" - 30" Height Center Roof 6LF408 $16,301

Parapet - 16" - 30" Height E Roof 6LF305 $12,186

Parapet - 16" - 30" Height Green House Roof 6LF110 $4,395

Parapet - 16" - 30" Height Low S Roof 6LF50 $1,998

Parapet - 16" - 30" Height N Roof 6LF968 $38,676

Parapet - 16" - 30" Height S Roof 6LF970 $38,756

Parapet - 16" - 30" Height W Roof 6LF665 $26,570

Parapet - Parapet > 30" E Roof 6LF30 $1,918

Parapet - Parapet > 30" N Roof 6LF110 $7,031

Page 3 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 4: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Roof System

Parapet - Parapet > 30" S Roof 6LF110 $7,031

Parapet - Parapet > 30" W Roof 6LF140 $8,949

Roof Structure - Steel with Clay Tile Arch Center Roof 7SF10,110 $0

Roof Structure - Steel with Clay Tile Arch E Roof 7SF6,167 $0

Roof Structure - Steel with Clay Tile Arch Green House Roof 7SF690 $0

Roof Structure - Steel with Clay Tile Arch Low S Roof 7SF136 $0

Roof Structure - Steel with Clay Tile Arch N Courtyard Roof 7SF1,782 $0

Roof Structure - Steel with Clay Tile Arch N Roof 7SF27,158 $0

Roof Structure - Steel with Clay Tile Arch S Courtyard Roof 7SF1,782 $0

Roof Structure - Steel with Clay Tile Arch S Roof 7SF25,926 $0

Roof Structure - Steel with Clay Tile Arch Service Garage Roof 7SF835 $0

Roof Structure - Steel with Clay Tile Arch W Roof 7SF25,055 $0

Roof - Modified Bitumen Center Roof 6SF10,110 $95,129

Roof - Modified Bitumen E Roof 6SF6,167 $58,028

Roof - Modified Bitumen Green House Roof Not accessible6SF690 $6,492

Roof - Modified Bitumen Low S Roof Not accessible6SF136 $1,280

Roof - Modified Bitumen N Courtyard Roof 6SF1,782 $16,768

Roof - Modified Bitumen N Roof Some minor water ponding6SF27,158 $255,540

Roof - Modified Bitumen S Courtyard Roof Off Room 2276SF1,782 $16,768

Roof - Modified Bitumen S Roof 6SF25,926 $243,948

Roof - Modified Bitumen Service Garage Roof 6SF835 $7,857

Roof - Modified Bitumen W Roof Some water ponding6SF25,055 $235,753

Walls

Cheek-Wall - Concrete Entire Building 6SF64 $656

Cheek-Wall - Concrete Entire Building 6SF32 $328

Cheek-Wall - Concrete Entire Building 6SF32 $328

Cheek-Wall - Stone Entire Building Gaps5SF80 $1,904

Cheek-Wall - Stone Entire Building 6SF80 $820

Cheek-Wall - Stone Entire Building 6SF208 $2,133

Cheek-Wall - Stone Entire Building 6SF80 $820

Cheek-Wall - Stone Entire Building 6SF80 $820

Cornice - Masonry Projecting Limestone Entire Building 6LF2,050 $71,089

Exterior Walls - Brick Entire Building Vertical cracking at pler5SF4 $95

Exterior Walls - Brick Entire Building 6SF106,600 $716,459

Exterior Walls - Stone-Cast Entire Building Some open joints6SF4,100 $27,556

Exterior Walls - Stone-Cast Entire Building Spalling4SF4 $726

Exterior Walls - Stone-Cut Entire Building Stone sills at windows6SF2,900 $19,491

Page 4 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 5: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Walls

Windows

Guard - Guards perforated Entire Building / 1st Floor Some rust occuring6SF9,548 $121,927

Lintels - Steel Entire Building 6LF3,388 $98,350

Lintels - Stone Entire Building 6LF696 $0

Skylite - Glass Double-Pane Entire Building 6SF450 $10,753

Skylite - Glass Single-Pane Entire Building 6SF190 $4,540

Skylite - Glass Single-Pane Entire Building 6SF168 $4,014

Windows - Decorative Entire Building 6SF260 $1,941

Windows - Sash Aluminum Double-pane Entire Building 6SF31,467 $234,889

Windows - Wood- Double-pane Entire Building 6SF912 $6,808

Building Exterior Subtotal: $2,908,678

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Automatic Transfer Switch Basement Location: Storage Room6EA1 $408

Automatic Transfer Switch Basement Location: Storage Room6EA1 $408

Emergency A/C Power - Auditoium and Aisle Lighting Entire Building / 1st Floor 6SF2,711 $1,434

Emergency A/C Power - Corridors and Stairs Entire Building 6SF53,790 $16,153

Emergency A/C Power - Gym Entire Building / 3rd Floor 6SF16,526 $6,144

Emergency A/C Power - Lunchrooms Entire Building / 1st Floor 6SF9,933 $3,693

Emergency A/C Power - Multipurpose Room Entire Building / 1st Floor 6SF1,226 $456

Emergency A/C Power - Pool Entire Building / 2nd Floor 6SF3,176 $1,181

Emergency A/C Power - Students Toilets Entire Building 6SF4,003 $1,488

Emergency Battery Packs - Auditoium and Aisle Lighting 1st, 2nd and 3rd Floor / 1st Floor Non Functional When Tested (Includes Auditorium & 2nd Floor Balcony)

6EA14 $2,835

Emergency Battery Packs - Gym 1st, 2nd and 3rd Floor / 3rd Floor Non Functional When Tested 6EA3 $608

Emergency Battery Packs - Pool 1st, 2nd and 3rd Floor / 2nd Floor 6EA2 $405

Emergency Generator- Outdoor- Diesel - 60 - 100 KW North Countyard / North Courtyard 7EA1 $0

Exit Signs - Auditoium Entire Building / 1st Floor Included Auditorium & 2nd Floor Balcony (Bulb Out 1st Floor in one sign)

7EA9 $0

Exit Signs - Corridors and Stairs Entire Building 7EA28 $0

Exit Signs - Gym Entire Building / 3rd Floor One Lens Broken7EA7 $0

Exit Signs - Gym Entire Building / 3rd Floor One Lens Broken6EA1 $157

Exit Signs - Lunchroom Entire Building / 1st Floor Includes Serving Area7EA4 $0

Page 5 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 6: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Exit Signs - Multipurpose Room Entire Building / 1st Floor 7EA6 $0

Exit Signs - Pool Entire Building / 2nd Floor Non Functional When Tested2EA2 $1,136

Security System - CCTV Entire Building 6SF384,200 $115,375

Security System - Intrusion Detection Entire Building 5SF384,200 $384,584

Main Service

Independent Electrical Service for emergency power Basement and 1st Floor / 1st Floor Location: Electrical Room7EA1 $0

Independent Electrical Service for emergency power Basement and 1st Floor / Basement Location: Electrical Room7EA1 $0

Main Electrical Service - 1600 A 120/208/3PH Basement 6EA1 $5,641

Main Electrical Service - 1600 A 277/480/3PH Basement 7EA1 $0

Main Electrical Service - 2001 to 3000 A 120/240/3PH Basement 6EA1 $10,867

PA System Entire Building 6SF384,200 $126,363

Power Distribution

Lighting and Power Panels - 100 A Entire Building / 1st Floor Location: Corridor (Main)7EA1 $0

Lighting and Power Panels - 100 A Entire Building / 2nd Floor Location: Room 2257EA1 $0

Lighting and Power Panels - 100 A Entire Building / 2nd Floor Location: Room 2167EA1 $0

Lighting and Power Panels - 100 A Entire Building / 2nd Floor Location: Main Corridor4EA1 $4,849

Lighting and Power Panels - 100 A Entire Building / 2nd Floor Location: Room 2147EA1 $0

Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Main Corridor7EA1 $0

Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Girl's Gym7EA1 $0

Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Room 3164EA1 $4,849

Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Main Corridor7EA1 $0

Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Room 3234EA1 $4,849

Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Main Corridor7EA1 $0

Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Room 3204EA1 $4,849

Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Room 3144EA1 $4,849

Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Girl's Gym7EA1 $0

Lighting and Power Panels - 100 A Entire Building / Basement Location: Mechanical Chase7EA1 $0

Lighting and Power Panels - 100 A Entire Building / Basement Location: Electrical Room7EA1 $0

Lighting and Power Panels - 100 A Entire Building / Basement Location: Storage Room7EA1 $0

Lighting and Power Panels - 100 A Entire Building / Basement Location: Mechanical Chase7EA1 $0

Lighting and Power Panels - 100 A Entire Building / Basement Location: Mechanical Chase7EA1 $0

Lighting and Power Panels - 100 A Entire Building / Boiler Room 4EA1 $4,849

Lighting and Power Panels - 100 A Entire Building / Boiler Room 4EA1 $4,849

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Room 1147EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Room 1127EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Corridor (Main) CCT: 13 & 14 Blank Covers Missing

7EA1 $0

Page 6 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 7: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Power Distribution

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Room 1227EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Corridor (Main)7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Corridor (Main)7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Kitchen4EA1 $6,578

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Room 1147EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Corridor (Main)7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Kitchen4EA1 $6,578

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Kitchen4EA1 $6,578

Lighting and Power Panels - Above 100 A Entire Building / 2nd Floor Location: Pool7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Basement Location: Electrical Room7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Basement Location: Mechanical Chase (CCT No. 2 & No. 8 Tripped)

6EA1 $497

Lighting and Power Panels - Above 100 A Entire Building / Basement Location: Electrical Room7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Boiler Room 7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Boiler Room 7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Electrical Room 7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Electrical Room 7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Electrical Room 7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Electrical Room7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Electrical Room7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Electrical Room7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Electrical Room7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Storage Room7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement LOcation: Mechanical Chase6EA1 $528

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase (Side Cover Off & Wires are Exposed)

6EA1 $528

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Electrical Room7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Boiler Room 7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Boiler Room 4EA1 $13,694

Main Distribution Panels - Less than 400 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0

Main Distribution Panels - Less than 400 amp Entire Building / Mechanical Room 7EA1 $0

Main Distribution Panels - Less than 400 amp Entire Building / Mechanical Room 7EA1 $0

Transformers - 120/240 - 120/208 Entire Building / Basement Location: Electrical Room7EA1 $0

Page 7 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 8: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Power Distribution

Transformers - 120/240 - 120/208 Entire Building / Basement Location: Electrical Room7EA1 $0

Transformers - 120/240 - 120/208 Entire Building / Basement Location: Electrical Room7EA1 $0

Electrical System Subtotal: $748,263

Building: Main

Category: Safty System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Fire Alarm

Fire Alarm Panel Basement Services & Links all three buildings together4EA1 $49,477

Fire Alarm Strobe Lights Basement / Entire Building 4SF384,200 $521,936

Fire Alarm_System Basement / Entire Building 4SF384,200 $763,674

Safty System Subtotal: $1,335,087

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Conditioning

Chemical Pot Feeder Mechanical Room and Roof / Mechanical Room

Location: Upper Level - Boiler Room6EA1 $725

Chiller-Water Cooled- Cetrifugal - 100-200 tons Mechanical Room and Roof /

Mechanical Room

Location: Upper Level - Boiler Room6EA1 $9,010

Chiller-Water Cooled- Cetrifugal - 100-200 tons Mechanical Room and Roof /

Mechanical Room

Location: Upper Level - Boiler Room6EA1 $9,010

Condensing Unit- Roof Mounted - 11-20 tons Lower Roof 5EA1 $11,065

Condensing Unit- Roof Mounted - 11-20 tons Lower Roof 5EA1 $11,065

Condensing Unit- Roof Mounted - 5-10 tons Lower Roof Serves: ROTC (Room 128)5EA1 $9,590

Cooling Tower - Closed Cell Mechanical Room and Roof / Roof 201 to 300 Tons6EA2 $9,938

Glycol Feed Mechanical Room and Roof / Mechanical Room

Location: Upper Level - Boiler Room6EA1 $490

Pipes - Chilled Water Pipe- Steel Mechanical Room and Roof / Entire Building

Location: Upper Level - Boiler Room6LF895 $1,689

Pressure Fill System Mechanical Room and Roof /

Mechanical Room

Location: Upper Level - Boiler Room6EA1 $1,405

Air Handling Systems

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 15001 - 25000 cfm

Basement 6EA1 $5,788

Page 8 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 9: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Handling Systems

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils -

15001 - 25000 cfm

Basement 6EA1 $5,788

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 15001 - 25000 cfm

Basement 6EA1 $5,788

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 15001 - 25000 cfm

Basement 6EA1 $5,788

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 15001 - 25000 cfm

Basement 6EA1 $5,788

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 25001 - 35000 cfm

Basement 6EA1 $6,511

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils -

25001 - 35000 cfm

Basement 6EA1 $6,511

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 25001 - 35000 cfm

Basement 6EA1 $6,511

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 25001 - 35000 cfm

Basement 6EA1 $6,511

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 8001 - 15000 cfm

Basement 6EA1 $4,341

Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 8001 - 15000 cfm

Basement 6EA1 $4,341

Air Intake Basement / Roof 6EA11 $63,411

Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788

Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788

Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788

Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788

Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788

Auxiliaries - 25001 - 35000 cfm Basement 6EA1 $6,511

Auxiliaries - 25001 - 35000 cfm Basement 6EA1 $6,511

Auxiliaries - 25001 - 35000 cfm Basement 6EA1 $6,511

Auxiliaries - 25001 - 35000 cfm Basement 6EA1 $6,511

Auxiliaries - 8001 - 15000 cfm Basement 6EA1 $4,341

Auxiliaries - 8001 - 15000 cfm Basement 6EA1 $4,341

Fan Coil Unit- Celing Mounted - Electric 1st Floor 4EA3 $27,448

Indoor Return Fans- Centrifugal Squirrel Cage - Greater than 20000

CFM

Boiler Room 6EA1 $2,433

Indoor Return Fans- Centrifugal Squirrel Cage - Less than 5000 CFM Boiler Room 6EA1 $1,282

Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591

Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591

Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591

Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591

Page 9 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 10: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Handling Systems

Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591

Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591

Return Duct Work - Indoor- Vertical Shaft and Ducts Basement / Entire Building 6LF350 $0

Roof Top Unit-Multi Zone-Roof Mounted- Gas Heating and DX Cooling w/ Self Contained Compressor - 31 - 45 tons

Roof Condensate Drain Frozen, No Trap & No Drain Line

7EA1 $0

Zone Dampers Basement 6EA127 $105,795

Boiler Systems

Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 151 - 200 HP

Boiler Room 6EA1 $2,545

Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 151 - 200

HP

Boiler Room 6EA1 $2,545

Chemical Feed System Boiler Room 6EA1 $1,078

Combustion Dampers Boiler Room 6EA3 $1,227

Condensate Pump Boiler Room / Basement Location: Passage Way6EA1 $2,021

Condensate Pump Boiler Room / Entire Building 6EA5 $10,105

Feed Water Pumps and Tank Boiler Room 6EA1 $2,545

Feed Water Pumps and Tank Boiler Room 4EA1 $92,964

Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - 151 - 200 HP

Boiler Room 6EA1 $2,545

Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - 151 - 200 HP

Boiler Room 6EA1 $2,545

Piping - Steam Pipe- Steel Boiler Room / Entire Building 5LF2,000 $29,973

Steam Traps Boiler Room / Basement Leaking & Malfunctioning5EA170 $223,533

Heat Exchangers

Heat Exchanger - Steam to Hot Water Shell Type Mechanical Room MBH = 40786EA1 $0

Heating Devices

Cabinet Heaters - With Steam Coil Entire Building 4EA4 $15,405

Cabinet Heaters - With Steam Coil Entire Building 6EA6 $2,140

Fin Tube - Hot Water Entire Building / 1st Floor 4LF4 $643

Fin Tube - Hot Water Entire Building 6LF68 $642

Radiators - Steam Entire Building Leaking & Corrosion Present5EA2 $3,351

Radiators - Steam Entire Building 6EA73 $20,280

Unit Heater - Electric Entire Building Yard Storage6EA5 $1,389

Wall Heater - Electric Entire Building Includes: Restrooms, Storage Rooms, Electrical/Mechanical Rooms, Kitchen etc.

4EA30 $32,476

Mechanical Plumbing

Chilled Water Pump - 21 - 50 HP Mechanical Room 6EA2 $2,485

Page 10 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 11: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Mechanical Plumbing

Condensate-Steel or Galvanized Entire Building 4LF1,890 $616,297

Condenser Pump - 21 - 50 HP Mechanical Room 6EA2 $2,485

Daul Temperature Pump - 10 - 20 HP Basement and Mechanical Room /

Basement

6EA9 $11,181

Daul Temperature Pump - 21 - 50 HP Basement and Mechanical Room / Mechanical Room

6EA2 $2,485

Hydronic Supply and Return - Steel Entire Building 6LF3,976 $305,264

Temperature Control

DDC System Entire Building 6SF384,200 $219,762

Thermostats - DDC Entire Building 7EA101 $0

Ventilation

Exhaust Fans- Indoor - 1501 - 8000 CFM Entire Building Under Roof Deck6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Lower Roof Above: Boiler Room6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Lower Roof Above: Boiler Room6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Lower Roof Unit Disconnected (No Longer Used)4EA1 $4,245

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Lower Roof 6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Roof 6EA2 $1,185

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Roof 6EA1 $592

Lab Exhaust Hood Entire Building / 1st Floor Location: Room 1147EA2 $0

Lab Exhaust Hood Entire Building / 3rd Floor Location: Room 3207EA1 $0

Roof Mounted Duct Work Entire Building / Roof 6LF30 $11,371

Type I Exhaust Hood- Culinary Arts Entire Building / 1st Floor Kitchen Hood6EA1 $1,248

Type I Exhaust Hood- Kitchen Entire Building / 1st Floor Diswasher Hood6EA1 $1,248

Mechanical System Subtotal: $2,033,396

Building: Main

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Hot Water

Electric Heater - Less than 20 KW 1st Floor Kitchen6EA1 $682

Gas Heater - 150000 - 300000 BTU/HR 1st Floor and Boiler Room / 1st Floor Location: Kitchen6EA1 $310

Gas Heater - 300001 - 600000 BTU/HR 1st Floor and Boiler Room / Boiler Room Location: Boiler Room7EA2 $0

Gas Heater - Less than 150000 BTU/HR 1st Floor and Boiler Room / 1st Floor Location: Kitchen (Pwr Vent: U9E75334 PVC

Vent)

6EA1 $310

Hot Water Storage Tank_Gas - 201 - 500 Gallons 1st Floor and Boiler Room / Boiler Room Approx: 250/Tank7EA2 $0

Page 11 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 12: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Piping

Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF384,200 $76,917

Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF384,200 $93,399

Domestic Piping-Cold Water Risers Entire Building 6SF384,200 $71,423

Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF384,200 $60,435

Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF384,200 $71,423

Domestic Piping-Hot Water Return Lines Entire Building 6SF384,200 $54,941

Domestic Piping-Hot Water Return Risers Entire Building 6SF384,200 $54,941

Sanitary Piping Entire Building 6SF384,200 $351,620

Storm Piping Entire Building 6SF384,200 $335,138

Vent Piping Entire Building 6SF384,200 $258,221

Pool Systems

Pool Drain Piping Basement Leaking & Corrosion Present6LF100 $2,863

Pool Filtration System including Pump Basement Leaking & Corrosion Present6EA1 $12,330

Pool Hot Water Heater - Gas Fired Basement 6EA1 $310

Pool Supply and Return Piping Basement Leaking & Corrosion Present6LF200 $9,610

Pumps

Pumps - Domestic Booster Pump-Duplex Basement, Boiler Room, Mechanical

Room / Mechanical Room

Location: Pump Room6EA1 $1,977

Pumps - Sump-Simplex Basement, Boiler Room, Mechanical Room / Basement

Location: Mechanical Chase6EA1 $745

Pumps - Sump-Simplex Basement, Boiler Room, Mechanical Room / Boiler Room

6EA1 $745

Pumps - Sump-Simplex Basement, Boiler Room, Mechanical Room / Mechanical Room

Location: Pump Room6EA1 $745

Plumbing System Subtotal: $1,459,082

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #101 (Regular Classroom)

AC Units 1st Floor 6EA1 $496

Casework 1st Floor 6LF10 $253

Ceiling - Lay-in 1st Floor 6SF742 $2,228

Doors - Transom Window 1st Floor 6SF9 $152

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Wood 1st Floor 6SF742 $5,231

Page 12 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 13: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #101 (Regular Classroom)

Lighting - Pendent/Surface 1st Floor 7EA15 $0

Marker Board 1st Floor 7LF24 $0

Walls - Plaster/Drywall 1st Floor damage throughout5SF1,188 $9,004

Classroom #103 (Regular Classroom)

Casework 1st Floor 6LF8 $202

Ceiling - Lay-in 1st Floor 6SF729 $2,189

Doors - Transom Window 1st Floor 6SF16 $271

Doors - Wood Doors inclu hw 1st Floor 6EA2 $602

Floor - Wood 1st Floor 6SF729 $5,139

Lighting - Lay-in 1st Floor 7EA15 $0

Marker Board 1st Floor 7LF22 $0

Walls - Plaster/Drywall 1st Floor 6SF1,028 $2,837

Classroom #105 (Regular Classroom)

Casework 1st Floor 6LF8 $202

Ceiling - Lay-in 1st Floor 6SF756 $2,270

Doors - Transom Window 1st Floor 6SF16 $271

Doors - Wood Doors inclu hw 1st Floor 6EA2 $602

Floor - Wood 1st Floor 6SF756 $5,330

Lighting - Lay-in 1st Floor 7EA15 $0

Marker Board 1st Floor 7LF22 $0

Walls - Plaster/Drywall 1st Floor 6SF1,030 $2,843

Classroom #107 (Regular Classroom)

Casework 1st Floor 6LF8 $202

Ceiling - Lay-in 1st Floor 6SF727 $2,183

Doors - Transom Window 1st Floor 6SF16 $271

Doors - Wood Doors inclu hw 1st Floor 6EA2 $602

Floor - Wood 1st Floor 6SF727 $5,125

Lighting - Lay-in 1st Floor data boxes coming off wall7EA15 $0

Marker Board 1st Floor 7LF22 $0

Walls - Plaster/Drywall 1st Floor 6SF1,033 $2,851

Classroom #109 (Regular Classroom)

Casework 1st Floor 6LF8 $202

Ceiling - Lay-in 1st Floor 6SF724 $2,174

Ceiling - Lay-in 1st Floor cracks / stains5SF5 $40

Doors - Transom Window 1st Floor 6SF16 $271

Page 13 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 14: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #109 (Regular Classroom)

Doors - Wood Doors inclu hw 1st Floor 6EA2 $602

Floor - Wood 1st Floor 6SF729 $5,139

Lighting - Lay-in 1st Floor 7EA15 $0

Marker Board 1st Floor 7LF22 $0

Walls - Plaster/Drywall 1st Floor 6SF1,028 $2,837

Classroom #111 (Regular Classroom)

Casework 1st Floor 6LF8 $202

Ceiling - Lay-in 1st Floor 6SF918 $2,757

Ceiling - Lay-in 1st Floor stained5SF5 $40

Doors - Transom Window 1st Floor 6SF16 $271

Doors - Wood Doors inclu hw 1st Floor 6EA2 $602

Floor - Wood 1st Floor 6SF923 $6,507

Lighting - Lay-in 1st Floor 7EA15 $0

Marker Board 1st Floor 7LF22 $0

Walls - Plaster/Drywall 1st Floor 6SF1,169 $3,226

Classroom #112 (Science Lab Level 1)

Casework 1st Floor 6LF133 $3,359

Ceiling - Lay-in 1st Floor 6SF1,148 $3,447

Doors - Transom Window 1st Floor 6SF10 $169

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Eye Wash Station 1st Floor 6EA1 $336

Floor - Tile/Sheet 1st Floor 6SF1,138 $1,139

Floor - Tile/Sheet 1st Floor bubbling up / loose5SF10 $58

Fume Hood 1st Floor 6EA1 $816

Gas Line 1st Floor 6EA8 $4,073

Lighting - Lay-in 1st Floor not workig4EA1 $336

Lighting - Lay-in 1st Floor 7EA23 $0

Marker Board 1st Floor 7LF10 $0

Science Lab Shower 1st Floor 6EA1 $379

Walls - Plaster/Drywall 1st Floor 6SF1,190 $3,284

Work Sink 1st Floor 6EA10 $3,790

Classroom #113 (Computer Lab)

AC Units 1st Floor 6EA1 $496

Casework 1st Floor 6LF10 $253

Ceiling - Splined 1st Floor 6SF767 $625

Ceiling - Splined 1st Floor water damaged5SF6 $58

Page 14 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 15: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #113 (Computer Lab)

Doors - Transom Window 1st Floor 6SF9 $152

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Concrete 1st Floor 6SF773 $409

Lighting - Pendent/Surface 1st Floor 7EA18 $0

Marker Board 1st Floor 7LF6 $0

Walls - Plaster/Drywall 1st Floor 6SF380 $1,049

Walls - Structural Glazed Tile 1st Floor 6SF1,404 $4,417

Work Sink 1st Floor 6EA1 $379

Classroom #114 (Science Lab Level 1)

Casework 1st Floor 6LF123 $3,106

Ceiling - Lay-in 1st Floor 6SF1,100 $3,303

Doors - Transom Window 1st Floor 6SF16 $271

Doors - Wood Doors inclu hw 1st Floor 6EA2 $602

Eye Wash Station 1st Floor 6EA1 $336

Floor - Tile/Sheet 1st Floor 6SF1,100 $1,101

Fume Hood 1st Floor 6EA1 $816

Gas Line 1st Floor 6EA23 $11,710

Lighting - Lay-in 1st Floor 7EA12 $0

Marker Board 1st Floor 7LF10 $0

Science Lab Shower 1st Floor 6EA1 $379

Walls - Plaster/Drywall 1st Floor 6SF1,145 $3,160

Walls - Plaster/Drywall 1st Floor hole5SF5 $26

Work Sink 1st Floor 6EA14 $5,306

Classroom #115 (Store Room)

Ceiling - Splined 1st Floor 6SF1,489 $1,214

Doors - Transom Window 1st Floor 6SF1,489 $25,211

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Concrete 1st Floor 6SF1,489 $788

Lighting - Pendent/Surface 1st Floor 7EA20 $0

Walls - Structural Glazed Tile 1st Floor 6SF2,728 $8,582

Classroom #116 (Regular Classroom)

Casework 1st Floor 6LF6 $152

Ceiling - Lay-in 1st Floor 6SF540 $1,622

Doors - Transom Window 1st Floor 6SF8 $135

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF540 $1,181

Page 15 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 16: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #116 (Regular Classroom)

Lighting - Lay-in 1st Floor 7EA12 $0

Marker Board 1st Floor 6LF15 $321

Walls - Plaster/Drywall 1st Floor 6SF807 $2,227

Walls - Plaster/Drywall 1st Floor cracks / holes5SF5 $26

Classroom #121 JROTC (Other Instructional Use)

Casework 1st Floor 6LF12 $303

Ceiling - Lay-in 1st Floor 6SF1,333 $4,003

Ceiling - Lay-in 1st Floor water damaged 5SF5 $40

Doors - Transom Window 1st Floor 6SF36 $610

Doors - Wood Doors inclu hw 1st Floor 6EA4 $1,204

Floor - Wood 1st Floor 6SF1,338 $9,433

Lighting - Lay-in 1st Floor 7EA26 $0

Marker Board 1st Floor 7LF24 $0

Walls - Plaster/Drywall 1st Floor 6SF525 $1,449

Walls - Plaster/Drywall 1st Floor NO OCCUPANCY PLACARD CARD POSTED 6SF1 $4

Walls - Structural Glazed Tile 1st Floor 6SF1,050 $3,303

Classroom #127 (Computer Lab)

Ceiling - Splined 1st Floor 6SF932 $760

Doors - Wood Doors inclu hw 1st Floor 6EA4 $1,204

Floor - Tile 1st Floor damaged5SF15 $86

Floor - Tile 1st Floor 6SF932 $2,039

Lighting - Pendent/Surface 1st Floor 7EA8 $0

Marker Board 1st Floor 7LF3 $0

Walls - Plaster/Drywall 1st Floor 6SF1,433 $3,955

Walls - Structural Glazed Tile 1st Floor 6SF192 $604

Classroom #130 (Regular Classroom)

Casework 5th Floor 6LF8 $202

Ceiling - Lay-in 5th Floor 6SF732 $2,198

Ceiling - Lay-in 5th Floor stained / cracked5SF10 $80

Chalk Board 5th Floor 4LF8 $734

Doors - Transom Window 5th Floor 6SF16 $271

Doors - Wood Doors inclu hw 5th Floor 6EA2 $602

Floor - Tile 5th Floor 6SF737 $1,612

Floor - Tile 5th Floor cracked / missing tiles5SF5 $29

Lighting - Lay-in 5th Floor outlet junction box damaged7EA15 $0

Marker Board 5th Floor 7LF22 $0

Page 16 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 17: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #130 (Regular Classroom)

Walls - Plaster/Drywall 5th Floor 6SF1,071 $2,956

Classroom #132 (Regular Classroom)

Casework 1st Floor 6LF8 $202

Ceiling - Lay-in 1st Floor 6SF787 $2,363

Ceiling - Lay-in 1st Floor cracked5SF5 $40

Doors - Transom Window 1st Floor 6SF16 $271

Doors - Wood Doors inclu hw 1st Floor 6EA2 $602

Floor - Tile 1st Floor 6SF792 $1,733

Lighting - Lay-in 1st Floor Not working4EA1 $336

Lighting - Lay-in 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF22 $0

Walls - Plaster/Drywall 1st Floor 6SF1,079 $2,978

Classroom #201 (Computer Lab)

AC Units 2nd Floor 6EA2 $991

AC Units 2nd Floor missing covers & not working4EA2 $12,173

Casework 2nd Floor 6LF64 $1,616

Ceiling - Splined 2nd Floor 6SF1,489 $1,214

Doors - Transom Window 2nd Floor 6SF27 $457

Doors - Wood Doors inclu hw 2nd Floor 6EA3 $903

Floor - Tile 2nd Floor 6SF1,489 $3,258

Lighting - Pendent/Surface 2nd Floor 7EA32 $0

Marker Board 2nd Floor 7LF8 $0

Walls - Plaster/Drywall 2nd Floor 6SF2,272 $6,270

Classroom #202 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF9 $152

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 6SF742 $1,623

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,188 $3,279

Classroom #203 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Page 17 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 18: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #203 (Regular Classroom)

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Tile 2nd Floor 6SF742 $1,623

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor damaged5SF1 $5

Walls - Plaster/Drywall 2nd Floor 6SF1,187 $3,276

Classroom #204 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Pendent/Surface 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,176 $3,246

Classroom #205 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Pendent/Surface 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 7SF1,200 $0

Classroom #206 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,188 $3,279

Page 18 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 19: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #207 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312

Classroom #208 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,188 $3,279

Classroom #209 (Computer Lab)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312

Classroom #211 (Computer Lab)

AC Units 2nd Floor 6EA1 $496

Casework 2nd Floor 6LF15 $379

Ceiling - Lay-in 2nd Floor 6SF1,155 $3,468

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Tile 2nd Floor 6SF394 $862

Floor - Wood 2nd Floor 6SF761 $5,365

Lighting - Pendent/Surface 2nd Floor 7EA23 $0

Lighting - Pendent/Surface 2nd Floor not working5EA1 $183

Marker Board 2nd Floor 7LF6 $0

Page 19 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 20: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #211 (Computer Lab)

Storage/ Closet 2nd Floor ceiling has water damage5SF120 $1,936

Walls - Plaster/Drywall 2nd Floor 6SF1,585 $4,374

Walls - Plaster/Drywall 2nd Floor wall is damaged where room was opened up to

adjoining room

5SF5 $26

Work Sink 2nd Floor skreen printing sink6EA1 $379

Classroom #212 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Plaster/Drywall 2nd Floor 6SF742 $2,568

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Tile 2nd Floor 6SF717 $1,569

Floor - Tile 2nd Floor damaged5SF25 $144

Lighting - Pendent/Surface 2nd Floor 7EA12 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,460 $4,029

Classroom #213 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor water stains5SF3 $24

Ceiling - Lay-in 2nd Floor 6SF739 $2,219

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312

Classroom #214 (Science)

Casework 2nd Floor 6LF18 $455

Ceiling - Lay-in 2nd Floor 6SF1,065 $3,198

Doors - Transom Window 2nd Floor 6SF9 $152

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile/Sheet 2nd Floor 6SF1,065 $1,066

Lighting - Lay-in 2nd Floor 7EA21 $0

Marker Board 2nd Floor 7LF26 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,441 $3,977

Work Sink 2nd Floor 6EA3 $1,137

Page 20 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 21: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #215 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312

Classroom #216 (Science)

Casework 2nd Floor 6LF64 $1,616

Ceiling - Lay-in 2nd Floor 6SF1,039 $3,120

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Tile/Sheet 2nd Floor 6SF1,039 $1,040

Lighting - Lay-in 2nd Floor 7EA21 $0

Marker Board 2nd Floor 7LF30 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,095 $3,022

Work Sink 2nd Floor 6EA3 $1,137

Classroom #218 (Regular Classroom)

Casework 2nd Floor 6LF6 $152

Ceiling - Lay-in 2nd Floor 6SF550 $1,652

Doors - Transom Window 2nd Floor 6SF9 $152

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 6SF550 $1,203

Lighting - Lay-in 2nd Floor 7EA12 $0

Marker Board 2nd Floor 7LF26 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,034 $2,854

Classroom #220 (Computer Lab)

AC Units 2nd Floor 6EA1 $496

Casework 2nd Floor 6LF15 $379

Ceiling - Lay-in 2nd Floor 6SF925 $2,778

Chalk Board 2nd Floor 4LF3 $275

Doors - Transom Window 2nd Floor 6SF9 $152

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Tile 2nd Floor 6SF925 $2,024

Lighting - Lay-in 2nd Floor 7EA20 $0

Page 21 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 22: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #220 (Computer Lab)

Marker Board 2nd Floor 7LF16 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,381 $3,811

Walls - Plaster/Drywall 2nd Floor damaged5SF10 $51

Classroom #221 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312

Classroom #222 (Computer Lab)

AC Units 2nd Floor no cover4EA1 $6,086

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Chalk Board 2nd Floor 4LF8 $734

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF20 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312

Classroom #224 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF9 $152

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312

Classroom #225 (Regular Classroom)

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor 6SF742 $2,228

Doors - Transom Window 2nd Floor 6SF9 $152

Page 22 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 23: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #225 (Regular Classroom)

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 6SF742 $1,623

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,188 $3,279

Classroom #226 (Regular Classroom)

AC Units 2nd Floor no cover4EA1 $6,086

Casework 2nd Floor 6LF10 $253

Ceiling - Lay-in 2nd Floor water damage5SF2 $16

Ceiling - Lay-in 2nd Floor 6SF740 $2,222

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF742 $5,231

Lighting - Lay-in 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF24 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312

Classroom #227 (Computer Lab)

AC Units 2nd Floor 6EA1 $496

Ceiling - Lay-in 2nd Floor 6SF1,084 $3,255

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF1,084 $7,642

Lighting - Lay-in 2nd Floor 7EA20 $0

Marker Board 2nd Floor 7LF16 $0

Walls - Plaster/Drywall 2nd Floor 6SF936 $2,583

Walls - Structural Glazed Tile 2nd Floor 6SF900 $2,831

Wireless System 2nd Floor 6EA1 $372

Classroom #228 (Computer Lab)

AC Units 2nd Floor 6EA1 $496

Ceiling - Lay-in 2nd Floor 6SF1,084 $3,255

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Wood 2nd Floor 6SF1,084 $7,642

Lighting - Lay-in 2nd Floor 7EA20 $0

Marker Board 2nd Floor 7LF16 $0

Walls - Plaster/Drywall 2nd Floor 6SF936 $2,583

Page 23 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 24: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #228 (Computer Lab)

Walls - Structural Glazed Tile 2nd Floor 6SF800 $2,517

Wireless System 2nd Floor 6EA1 $372

Classroom #300 (Computer Lab)

AC Units 3rd Floor 6EA1 $496

Casework 3rd Floor 6LF22 $556

Ceiling - Lay-in 3rd Floor 6SF1,016 $3,051

Chalk Board 3rd Floor 4LF4 $367

Doors - Transom Window 3rd Floor 6SF9 $152

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF1,016 $7,163

Lighting - Lay-in 3rd Floor 7EA24 $0

Marker Board 3rd Floor 7LF14 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,413 $3,900

Classroom #301 (Regular Classroom)

Ceiling - Lay-in 3rd Floor Cracks5SF2 $16

Ceiling - Lay-in 3rd Floor 6SF728 $2,186

Chalk Board 3rd Floor 4LF5 $459

Doors - Transom Window 3rd Floor Broken, missing glass panel5SF10 $423

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF730 $5,146

Lighting - Lay-in 3rd Floor 6EA15 $1,785

Marker Board 3rd Floor 7LF23 $0

Storage/ Closet 3rd Floor 6SF20 $145

Walls - Plaster/Drywall 3rd Floor 6SF1,188 $3,279

Classroom #302 (Regular Classroom)

Casework 3rd Floor 6LF10 $253

Ceiling - Lay-in 3rd Floor water damaged5SF3 $24

Ceiling - Lay-in 3rd Floor 6SF742 $2,228

Doors - Transom Window 3rd Floor 6SF18 $305

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF742 $5,231

Lighting - Lay-in 3rd Floor 7EA15 $0

Marker Board 3rd Floor 7LF24 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,200 $3,312

Page 24 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 25: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #303 (Regular Classroom)

Ceiling - Lay-in 3rd Floor 6SF550 $1,652

Doors - Transom Window 3rd Floor 6SF10 $169

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF550 $3,877

Lighting - Lay-in 3rd Floor 6EA15 $1,785

Marker Board 3rd Floor 7LF23 $0

Storage/ Closet 3rd Floor 6SF20 $145

Walls - Plaster/Drywall 3rd Floor 6SF1,030 $2,843

Classroom #304 (Regular Classroom)

Casework 3rd Floor 6LF10 $253

Ceiling - Lay-in 3rd Floor 6SF742 $2,228

Chalk Board 3rd Floor 4LF6 $551

Doors - Transom Window 3rd Floor 6SF18 $305

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF742 $5,231

Lighting - Lay-in 3rd Floor 7EA15 $0

Marker Board 3rd Floor 7LF30 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,186 $3,273

Walls - Plaster/Drywall 3rd Floor efflorecense & damaged5SF14 $71

Classroom #305 (Regular Classroom)

Ceiling - Lay-in 3rd Floor Cracks5SF8 $64

Ceiling - Lay-in 3rd Floor 6SF542 $1,628

Doors - Transom Window 3rd Floor 6SF10 $169

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF550 $3,877

Lighting - Lay-in 3rd Floor 6EA13 $1,547

Storage/ Closet 3rd Floor 6SF20 $145

Walls - Plaster/Drywall 3rd Floor 6SF1,030 $2,843

Classroom #306 (Regular Classroom)

Casework 3rd Floor 6LF10 $253

Ceiling - Lay-in 3rd Floor 6SF742 $2,228

Ceiling - Lay-in 3rd Floor water damaged5SF5 $40

Doors - Transom Window 3rd Floor 6SF18 $305

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF742 $5,231

Lighting - Lay-in 3rd Floor 7EA14 $0

Page 25 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 26: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #306 (Regular Classroom)

Marker Board 3rd Floor 7LF24 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,200 $3,312

Classroom #307 (Regular Classroom)

Casework 3rd Floor 6LF15 $379

Ceiling - Plaster/Drywall 3rd Floor 6SF550 $1,903

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Doors - Transom Window 3rd Floor 6SF9 $152

Floor - Wood 3rd Floor 6SF550 $3,877

Lighting - Pendent/Surface 3rd Floor 7EA8 $0

Marker Board 3rd Floor 7LF16 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,191 $3,287

Walls - Tile Ceramic/ Porcelain 3rd Floor backsplash6SF24 $54

Work Sink 3rd Floor 6EA1 $379

Classroom #308 (Regular Classroom)

Casework 3rd Floor 6LF10 $253

Ceiling - Lay-in 3rd Floor 6SF742 $2,228

Doors - Transom Window 3rd Floor 6SF18 $305

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF742 $5,231

Lighting - Lay-in 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF48 $0

Walls - Plaster/Drywall 3rd Floor cracked5SF6 $31

Walls - Plaster/Drywall 3rd Floor 6SF1,194 $3,295

Classroom #310 (Regular Classroom)

Casework 3rd Floor 6LF10 $253

Ceiling - Lay-in 3rd Floor 6SF742 $2,228

Ceiling - Lay-in 3rd Floor water damaged5SF22 $176

Doors - Transom Window 3rd Floor 6SF18 $305

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF742 $5,231

Lighting - Lay-in 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF24 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,980 $5,465

Walls - Plaster/Drywall 3rd Floor water damaged5SF20 $102

Page 26 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 27: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #311 (Art Room)

AC Units 3rd Floor cover missing4EA1 $6,086

Casework 3rd Floor 6LF42 $1,061

Ceiling - Plaster/Drywall 3rd Floor peeling throughout5SF1,255 $11,504

Chalk Board 3rd Floor 4LF10 $918

Doors - Transom Window 3rd Floor glass is broken5SF9 $381

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor missing tiles5SF15 $86

Floor - Tile 3rd Floor 6SF1,255 $2,746

Instructional Surface 3rd Floor 6LF18 $606

Kiln 3rd Floor 6EA2 $4,642

Lighting - Pendent/Surface 3rd Floor 7EA20 $0

Marker Board 3rd Floor 7LF40 $0

Walls - Plaster/Drywall 3rd Floor crack5SF3 $15

Walls - Plaster/Drywall 3rd Floor 6SF1,797 $4,960

Walls - Tile Ceramic/ Porcelain 3rd Floor backsplash6SF40 $90

Work Sink 3rd Floor 6EA1 $379

Classroom #312 (Regular Classroom)

Casework 3rd Floor 6LF10 $253

Ceiling - Plaster/Drywall 3rd Floor 6SF742 $2,568

Doors - Transom Window 3rd Floor 6SF9 $152

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor damaged throughout5SF742 $3,332

Lighting - Pendent/Surface 3rd Floor 7EA12 $0

Marker Board 3rd Floor 7LF24 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,417 $3,911

Classroom #313 (Art Room)

Casework 3rd Floor 6LF34 $859

Ceiling - Lay-in 3rd Floor 6SF855 $2,568

Chalk Board 3rd Floor 4LF15 $1,377

Doors - Transom Window 3rd Floor 6SF18 $305

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF855 $6,028

Lighting - Lay-in 3rd Floor 7EA20 $0

Marker Board 3rd Floor 7LF6 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,308 $3,610

Walls - Tile Ceramic/ Porcelain 3rd Floor backsplash6SF12 $27

Page 27 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 28: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #313 (Art Room)

Work Sink 3rd Floor 6EA1 $379

Classroom #314 (Science)

Casework 3rd Floor 6LF18 $455

Ceiling - Lay-in 3rd Floor 6SF1,059 $3,180

Ceiling - Plaster/Drywall 3rd Floor water damaged5SF6 $55

Doors - Transom Window 3rd Floor 6SF9 $152

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Eye Wash Station 3rd Floor 6EA1 $336

Floor - Tile/Sheet 3rd Floor 6SF1,065 $1,066

Lighting - Lay-in 3rd Floor 7EA21 $0

Lighting - Wall Mounted 3rd Floor approx 10-12 outlets don't work5EA1 $169

Marker Board 3rd Floor 7LF26 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,441 $3,977

Work Sink 3rd Floor 6EA3 $1,137

Classroom #315 (Art Room)

Casework 3rd Floor 6LF34 $859

Ceiling - Lay-in 3rd Floor 6SF855 $2,568

Ceiling - Lay-in 3rd Floor water damaged5SF10 $80

Chalk Board 3rd Floor 4LF15 $1,377

Doors - Transom Window 3rd Floor 6SF18 $305

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF855 $6,028

Lighting - Lay-in 3rd Floor 7EA20 $0

Marker Board 3rd Floor 7LF6 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,308 $3,610

Walls - Tile Ceramic/ Porcelain 3rd Floor sink backsplash6SF12 $27

Work Sink 3rd Floor 6EA1 $379

Classroom #316 (Science)

Casework 3rd Floor 6LF64 $1,616

Ceiling - Lay-in 3rd Floor 6SF1,039 $3,120

Doors - Transom Window 3rd Floor 6SF18 $305

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Eye Wash Station 3rd Floor 6EA1 $336

Floor - Tile/Sheet 3rd Floor 6SF1,039 $1,040

Lighting - Lay-in 3rd Floor 7EA21 $0

Lighting - Wall Mounted 3rd Floor Of 56 outlets on the desk, only 8 of them work5EA1 $169

Page 28 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 29: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #316 (Science)

Walls - Plaster/Drywall 3rd Floor 6SF1,463 $4,038

Work Sink 3rd Floor 6EA3 $1,137

Classroom #318 (Regular Classroom)

Casework 3rd Floor 6LF6 $152

Ceiling - Lay-in 3rd Floor 6SF550 $1,652

Doors - Transom Window 3rd Floor 6SF9 $152

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF550 $1,203

Lighting - Lay-in 3rd Floor 7EA12 $0

Marker Board 3rd Floor 7LF26 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,034 $2,854

Classroom #319 (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Casework 3rd Floor 6LF15 $379

Ceiling - Lay-in 3rd Floor 6SF710 $2,132

Chalk Board 3rd Floor 4LF4 $367

Doors - Transom Window 3rd Floor 6SF9 $152

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor damaged throughout5SF710 $3,188

Lighting - Lay-in 3rd Floor 7EA15 $0

Marker Board 3rd Floor 7LF24 $0

Walls - Plaster/Drywall 3rd Floor damaged5SF13 $66

Walls - Plaster/Drywall 3rd Floor 6SF1,320 $3,643

Classroom #320 (Science)

Casework 3rd Floor 6LF50 $1,263

Ceiling - Plaster/Drywall 3rd Floor water damaged5SF10 $125

Ceiling - Plaster/Drywall 3rd Floor 6SF908 $3,142

Chalk Board 3rd Floor 4LF36 $3,305

Doors - Transom Window 3rd Floor 6SF9 $152

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Eye Wash Station 3rd Floor 6EA1 $336

Floor - Tile 3rd Floor 6SF908 $1,987

Floor - Tile 3rd Floor damaged5SF10 $58

Gas Line 3rd Floor 6EA3 $1,527

Lighting - Pendent/Surface 3rd Floor 7EA16 $0

Storage/ Closet 3rd Floor 6SF100 $725

Page 29 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 30: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #320 (Science)

Walls - Plaster/Drywall 3rd Floor 6SF1,616 $4,460

Walls - Plaster/Drywall 3rd Floor damaged 5SF2 $10

Work Sink 3rd Floor 1 sink has a broken faucet 6EA3 $1,137

Classroom #321 (Regular Classroom)

Ceiling - Lay-in 3rd Floor 6SF705 $2,117

Ceiling - Lay-in 3rd Floor Water damage5SF10 $80

Doors - Transom Window 3rd Floor 6SF20 $339

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF715 $5,041

Lighting - Chandelier, Incandescent 3rd Floor 6EA15 $7,163

Marker Board 3rd Floor 7LF23 $0

Storage/ Closet 3rd Floor 6SF20 $145

Walls - Plaster/Drywall 3rd Floor 6SF1,150 $3,174

Walls - Plaster/Drywall 3rd Floor Water damage, peeling5SF25 $128

Classroom #322 (Science Classroom)

AC Units 3rd Floor 6EA1 $496

Ceiling - Plaster/Drywall 3rd Floor 6SF1,072 $3,710

Chalk Board 3rd Floor 4LF24 $2,203

Doors - Transom Window 3rd Floor 6SF10 $169

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile/Sheet 3rd Floor 6SF1,072 $1,073

Lighting - Chandelier, Incandescent 3rd Floor 6EA20 $9,551

Storage/ Closet 3rd Floor 6SF66 $479

Walls - Plaster/Drywall 3rd Floor 6SF1,310 $3,615

Work Sink 3rd Floor 6EA2 $758

Classroom #323 (Regular Classroom)

Ceiling - Lay-in 3rd Floor 6SF725 $2,177

Doors - Transom Window 3rd Floor 6SF20 $339

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF725 $5,111

Lighting - Lay-in 3rd Floor 6EA15 $1,785

Marker Board 3rd Floor 7LF23 $0

Storage/ Closet 3rd Floor 6SF20 $145

Walls - Plaster/Drywall 3rd Floor 6SF1,185 $3,270

Page 30 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 31: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #325 (Regular Classroom)

Ceiling - Lay-in 3rd Floor 6SF1,086 $3,261

Chalk Board 3rd Floor 4LF36 $3,305

Doors - Transom Window 3rd Floor 6SF20 $339

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF1,086 $7,656

Lighting - Lay-in 3rd Floor 6EA23 $2,736

Marker Board 3rd Floor 7LF13 $0

Storage/ Closet 3rd Floor 6SF20 $145

Walls - Plaster/Drywall 3rd Floor 6SF1,450 $4,002

Classroom #326 (Computer Lab)

AC Units 3rd Floor 6EA2 $991

Casework 3rd Floor 6LF22 $556

Ceiling - Lay-in 3rd Floor water damage on ceiling5SF3 $24

Ceiling - Lay-in 3rd Floor 6SF827 $2,483

Chalk Board 3rd Floor 4LF16 $1,469

Doors - Transom Window 3rd Floor 6SF18 $305

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF830 $5,851

Lighting - Lay-in 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF16 $0

Walls - Plaster/Drywall 3rd Floor damaged5SF4 $20

Walls - Plaster/Drywall 3rd Floor 6SF1,309 $3,613

Classroom #328 (Regular Classroom)

AC Units 3rd Floor 6EA2 $991

Ceiling - Lay-in 3rd Floor 6SF1,100 $3,303

Doors - Transom Window 3rd Floor 6SF20 $339

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Tile/Sheet 3rd Floor 6SF1,100 $1,101

Lighting - Chandelier, Incandescent 3rd Floor 6EA30 $14,327

Marker Board 3rd Floor 7LF24 $0

Storage/ Closet 3rd Floor 6SF30 $218

Walls - Plaster/Drywall 3rd Floor 6SF146 $403

Classroom #330 (Computer Lab)

Ceiling - Lay-in 3rd Floor 6SF1,100 $3,303

Doors - Transom Window 3rd Floor 6SF20 $339

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Page 31 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 32: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #330 (Computer Lab)

Floor - Wood 3rd Floor 6SF1,100 $7,755

Lighting - Lay-in 3rd Floor 6EA24 $2,855

Marker Board 3rd Floor 7LF23 $0

Storage/ Closet 3rd Floor 6SF20 $145

Walls - Plaster/Drywall 3rd Floor 6SF1,460 $4,029

Wireless System 3rd Floor 6EA1 $372

Classroom #332 (Regular Classroom)

Casework 3rd Floor 6LF10 $253

Ceiling - Lay-in 3rd Floor damaged5SF2 $16

Ceiling - Lay-in 3rd Floor 6SF740 $2,222

Doors - Transom Window 3rd Floor 6SF18 $305

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF742 $5,231

Lighting - Lay-in 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF24 $0

Walls - Plaster/Drywall 3rd Floor damaged5SF15 $77

Walls - Plaster/Drywall 3rd Floor 6SF1,185 $3,270

Classroom #333 (Computer Lab)

AC Units 3rd Floor 6EA1 $496

Ceiling - Lay-in 3rd Floor 6SF645 $1,937

Doors - Transom Window 3rd Floor 6SF10 $169

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF645 $4,547

Lighting - Lay-in 3rd Floor 6EA16 $1,904

Walls - Plaster/Drywall 3rd Floor 6SF1,112 $3,069

Walls - Plaster/Drywall 3rd Floor Water damage5SF5 $26

Wireless System 3rd Floor 6EA1 $372

Classroom #353 (Regular Classroom)

Ceiling - Lay-in 3rd Floor 6SF550 $1,652

Doors - Transom Window 3rd Floor 6SF10 $169

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF550 $3,877

Lighting - Lay-in 3rd Floor 6EA12 $1,428

Storage/ Closet 3rd Floor 6SF20 $145

Walls - Plaster/Drywall 3rd Floor 6SF1,030 $2,843

Page 32 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 33: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #355 (Regular Classroom)

Casework 3rd Floor 6LF6 $152

Ceiling - Lay-in 3rd Floor 6SF550 $1,652

Doors - Transom Window 3rd Floor 6SF9 $152

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF550 $3,877

Lighting - Lay-in 3rd Floor 7EA12 $0

Marker Board 3rd Floor 7LF16 $0

Walls - Plaster/Drywall 3rd Floor 6SF996 $2,749

Walls - Tile Ceramic/ Porcelain 3rd Floor 6SF27 $61

Classroom #357 (Art Room)

Casework 3rd Floor 6LF6 $152

Ceiling - Plaster/Drywall 3rd Floor 6SF515 $1,782

Ceiling - Plaster/Drywall 3rd Floor peeling & water damaged5SF35 $437

Doors - Steel Doors incl hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF550 $3,877

Lighting - Pendent/Surface 3rd Floor 7EA8 $0

Marker Board 3rd Floor 7LF24 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,213 $3,348

Walls - Plaster/Drywall 3rd Floor damaged5SF3 $15

Classroom #399 (Computer Lab)

AC Units 3rd Floor 6EA1 $496

Ceiling - Lay-in 3rd Floor 6SF950 $2,853

Chalk Board 3rd Floor 4LF4 $367

Doors - Transom Window 3rd Floor 6SF10 $169

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF950 $6,697

Lighting - Lay-in 3rd Floor 6EA24 $2,855

Marker Board 3rd Floor 7LF14 $0

Storage/ Closet 3rd Floor 6SF20 $145

Walls - Plaster/Drywall 3rd Floor 6SF1,356 $3,742

Wireless System 3rd Floor 6EA1 $372

Classroom #400 (Music Room)

Casework 4th Floor 6LF30 $758

Ceiling - Lay-in 4th Floor 6SF1,800 $5,405

Chalk Board 4th Floor 4LF16 $1,469

Doors - Wood Doors inclu hw 4th Floor 6EA2 $602

Page 33 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 34: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #400 (Music Room)

Floor - Wood 4th Floor 6SF1,800 $12,690

Lighting - Lay-in 4th Floor 7EA35 $0

Marker Board 4th Floor 7LF32 $0

Walls - Plaster/Drywall 4th Floor 6SF2,249 $6,207

Classroom #401 (Music Room)

Casework 4th Floor 6LF30 $758

Ceiling - Lay-in 4th Floor 6SF1,800 $5,405

Doors - Wood Doors inclu hw 4th Floor 6EA2 $602

Floor - Tile 4th Floor 6SF1,796 $3,929

Floor - Tile 4th Floor damaged5SF4 $23

Lighting - Lay-in 4th Floor 7EA35 $0

Marker Board 4th Floor 7LF26 $0

Walls - Plaster/Drywall 4th Floor 6SF2,249 $6,207

Classrooms Subtotal: $1,037,457

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

AC Unit 1st - 102 Principle 6EA1 $496

Ceiling - Lay-in 1st - 102 Principle 6SF373 $1,120

Doors - Wood Doors inclu hw 1st - 102 Principle 6EA1 $301

Floor - Carpet 1st - 102 Principle 6SF373 $795

Lighting - Lay-in 1st - 102 Principle 5 - recessed cans7EA9 $0

Power Distribution 1st - 102 Principle 6EA2 $4,250

Storage/ Closet 1st - 102 Principle 6SF7 $51

Walls - Plaster/Drywall 1st - 102 Principle 6SF625 $1,725

Walls - Plaster/Drywall 1st - 102 Principle wood paneling6SF260 $851

AC Unit 1st - 104 Main Office 6EA2 $991

Ceiling - Lay-in 1st - 104 Main Office 6SF898 $2,697

Doors - Side-lite 1st - 104 Main Office 6SF40 $669

Doors - Transom Window 1st - 104 Main Office 6SF48 $813

Doors - Wood Doors inclu hw 1st - 104 Main Office 6EA2 $602

Floor - Carpet 1st - 104 Main Office 6SF688 $1,466

Floor - Tile 1st - 104 Main Office 6SF210 $459

Page 34 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 35: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Lighting - Lay-in 1st - 104 Main Office 7EA18 $0

Power Distribution 1st - 104 Main Office 6EA8 $16,999

Storage/ Closet 1st - 104 Main Office 6SF34 $247

Walls - Plaster/Drywall 1st - 104 Main Office 6SF2,266 $6,254

AC Unit 1st - 104A 6EA2 $991

Ceiling - Lay-in 1st - 104A 6SF415 $1,246

Doors - Transom Window 1st - 104A 6SF8 $135

Doors - Wood Doors inclu hw 1st - 104A 6EA1 $301

Floor - Carpet 1st - 104A 6SF415 $884

Lighting - Lay-in 1st - 104A 7EA6 $0

Power Distribution 1st - 104A 6EA12 $25,499

Storage/ Closet 1st - 104A 6SF31 $225

Walls - Plaster/Drywall 1st - 104A 6SF1,558 $4,300

Work SInk 1st - 104A 6EA1 $508

AC Unit 1st - 106A-B 6EA1 $496

Ceiling - Lay-in 1st - 106A-B 6SF305 $916

Doors - Transom Window 1st - 106A-B 6SF8 $135

Doors - Wood Doors inclu hw 1st - 106A-B 6EA1 $301

Floor - Carpet 1st - 106A-B 6SF305 $650

Lighting - Lay-in 1st - 106A-B 7EA7 $0

Power Distribution 1st - 106A-B 6EA12 $25,499

Storage/ Closet 1st - 106A-B 6SF3 $22

Walls - Plaster/Drywall 1st - 106A-B 6SF1,050 $2,898

Ceiling - Lay-in 1st - 112A inside 112 6SF304 $913

Doors - Wood Doors inclu hw 1st - 112A inside 112 6EA2 $602

Floor - Tile/Sheet 1st - 112A inside 112 6SF304 $304

Lighting - Lay-in 1st - 112A inside 112 7EA7 $0

Power Distribution 1st - 112A inside 112 6EA20 $42,498

Storage/ Closet 1st - 112A inside 112 6SF46 $334

Walls - Plaster/Drywall 1st - 112A inside 112 6SF755 $2,084

Work SInk 1st - 112A inside 112 6EA1 $508

Ceiling - Lay-in 1st - 114A inside 114 6SF127 $381

Doors - Wood Doors inclu hw 1st - 114A inside 114 6EA1 $301

Floor - Tile/Sheet 1st - 114A inside 114 6SF127 $127

Lighting - Lay-in 1st - 114A inside 114 7EA3 $0

Power Distribution 1st - 114A inside 114 6EA6 $12,749

Walls - Plaster/Drywall 1st - 114A inside 114 6SF329 $908

Page 35 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 36: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Work SInk 1st - 114A inside 114 6EA1 $508

AC Unit 1st - 118 6EA1 $496

Ceiling - Lay-in 1st - 118 6SF726 $2,180

Doors - Transom Window 1st - 118 6SF16 $271

Doors - Wood Doors inclu hw 1st - 118 6EA2 $602

Floor - Carpet 1st - 118 6SF726 $1,547

Lighting - Lay-in 1st - 118 7EA16 $0

Power Distribution 1st - 118 6EA8 $16,999

Storage/ Closet 1st - 118 6SF89 $645

Walls - Plaster/Drywall 1st - 118 radiator coming off wall6SF1,209 $3,337

Ceiling - Lay-in 1st - 120A 6SF188 $565

Doors - Transom Window 1st - 120A 6SF8 $135

Doors - Wood Doors inclu hw 1st - 120A 6EA1 $301

Floor - Carpet 1st - 120A 6SF188 $401

Lighting - Lay-in 1st - 120A 7EA4 $0

Power Distribution 1st - 120A 6EA6 $12,749

Walls - Plaster/Drywall 1st - 120A 6SF627 $1,730

Ceiling - Lay-in 1st - 120B 6SF210 $631

Doors - Transom Window 1st - 120B 6SF8 $135

Doors - Wood Doors inclu hw 1st - 120B 6EA1 $301

Floor - Carpet 1st - 120B 6SF210 $447

Lighting - Lay-in 1st - 120B 7EA4 $0

Power Distribution 1st - 120B 6EA8 $16,999

Walls - Plaster/Drywall 1st - 120B 6SF639 $1,764

AC Unit 1st - Assistant Principle 1 inside 120A 6EA1 $496

Ceiling - Lay-in 1st - Assistant Principle 1 inside 120A 6SF93 $279

Doors - Wood Doors inclu hw 1st - Assistant Principle 1 inside 120A 6EA1 $301

Floor - Carpet 1st - Assistant Principle 1 inside 120A 6SF93 $198

Lighting - Lay-in 1st - Assistant Principle 1 inside 120A 7EA2 $0

Power Distribution 1st - Assistant Principle 1 inside 120A 6EA4 $8,500

Walls - Plaster/Drywall 1st - Assistant Principle 1 inside 120A 6SF443 $1,223

AC Unit 1st - Assistant Principle 2 inside 120A 6EA1 $496

Ceiling - Lay-in 1st - Assistant Principle 2 inside 120A 6SF96 $288

Doors - Wood Doors inclu hw 1st - Assistant Principle 2 inside 120A 6EA1 $301

Floor - Carpet 1st - Assistant Principle 2 inside 120A 6SF96 $205

Lighting - Lay-in 1st - Assistant Principle 2 inside 120A 7EA2 $0

Power Distribution 1st - Assistant Principle 2 inside 120A 6EA2 $4,250

Page 36 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 37: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Walls - Plaster/Drywall 1st - Assistant Principle 2 inside 120A 6SF448 $1,236

Ceiling - Lay-in 1st - Assistant Principle inside 120B 6SF108 $324

Doors - Side-lite 1st - Assistant Principle inside 120B 6SF30 $502

Doors - Wood Doors inclu hw 1st - Assistant Principle inside 120B 6EA1 $301

Floor - Carpet 1st - Assistant Principle inside 120B 6SF108 $230

Lighting - Lay-in 1st - Assistant Principle inside 120B 7EA2 $0

Power Distribution 1st - Assistant Principle inside 120B 6EA2 $4,250

Walls - Plaster/Drywall 1st - Assistant Principle inside 120B 6SF294 $811

AC Unit 1st - Attendance Office inside 106A-B 6EA1 $496

Ceiling - Lay-in 1st - Attendance Office inside 106A-B 6SF251 $754

Doors - Wood Doors inclu hw 1st - Attendance Office inside 106A-B 6EA1 $301

Floor - Carpet 1st - Attendance Office inside 106A-B 6SF251 $535

Lighting - Lay-in 1st - Attendance Office inside 106A-B 7EA4 $0

Power Distribution 1st - Attendance Office inside 106A-B 6EA6 $12,749

Walls - Plaster/Drywall 1st - Attendance Office inside 106A-B 6SF476 $1,314

Walls - Plaster/Drywall 1st - Attendance Office inside 106A-B wood paneling6SF225 $737

AC Unit 1st - Principle Assistant 6EA1 $496

Ceiling - Lay-in 1st - Principle Assistant 6SF192 $577

Doors - Wood Doors inclu hw 1st - Principle Assistant 6EA2 $602

Floor - Carpet 1st - Principle Assistant 6SF192 $409

Lighting - Lay-in 1st - Principle Assistant 7EA4 $0

Power Distribution 1st - Principle Assistant 6EA5 $10,624

Storage/ Closet 1st - Principle Assistant 6SF18 $131

Walls - Plaster/Drywall 1st - Principle Assistant 6SF587 $1,620

AC Unit 1st- Rm 199A- Special Ed Meeting Rm cover missing 4EA1 $6,086

Ceiling - Lay-in 1st- Rm 199A- Special Ed Meeting Rm 6SF102 $306

Ceiling - Lay-in 1st- Rm 199A- Special Ed Meeting Rm water damaged5SF6 $48

Doors - Wood Doors inclu hw 1st- Rm 199A- Special Ed Meeting Rm 6EA1 $301

Floor - Tile 1st- Rm 199A- Special Ed Meeting Rm 6SF108 $236

Lighting - Lay-in 1st- Rm 199A- Special Ed Meeting Rm 7EA4 $0

Power Distribution 1st- Rm 199A- Special Ed Meeting Rm 6EA4 $8,500

Walls - Plaster/Drywall 1st- Rm 199A- Special Ed Meeting Rm 6SF468 $1,292

AC Unit 1st- 108 6EA2 $991

Ceiling - Lay-in 1st- 108 6SF1,160 $3,483

Doors - Transom Window 1st- 108 6SF16 $271

Doors - Wood Doors inclu hw 1st- 108 6EA2 $602

Floor - Carpet 1st- 108 6SF1,160 $2,472

Page 37 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 38: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Lighting - Lay-in 1st- 108 7EA25 $0

Power Distribution 1st- 108 6EA20 $42,498

Storage/ Closet 1st- 108 6SF9 $65

Walls - Plaster/Drywall 1st- 108 interior wall partitions with wood paneling6SF472 $1,546

Walls - Plaster/Drywall 1st- 108 6SF1,611 $4,446

AC Unit 1st- 127A- Teacher Work Room 6EA4 $1,982

Ceiling - Splined 1st- 127A- Teacher Work Room 6SF2,003 $1,633

Ceiling - Splined 1st- 127A- Teacher Work Room damaged5SF30 $290

Doors - Transom Window 1st- 127A- Teacher Work Room 6SF1 $17

Doors - Wood Doors inclu hw 1st- 127A- Teacher Work Room 6EA2 $602

Floor - Tile 1st- 127A- Teacher Work Room 6SF2,033 $4,448

Lighting - Pendent/Surface 1st- 127A- Teacher Work Room 7EA22 $0

Power Distribution 1st- 127A- Teacher Work Room 6EA22 $46,747

Walls - Plaster/Drywall 1st- 127A- Teacher Work Room 6SF2,624 $7,242

Walls - Structural Glazed Tile 1st- 127A- Teacher Work Room 6SF924 $2,907

Ceiling - Splined 1st- Kitchen Manager's Office 6SF111 $90

Doors - Side-lite 1st- Kitchen Manager's Office 6SF9 $150

Doors - Transom Window 1st- Kitchen Manager's Office 6SF9 $152

Doors - Wood Doors inclu hw 1st- Kitchen Manager's Office 6EA1 $301

Floor - Tile 1st- Kitchen Manager's Office 6SF111 $243

Lighting - Pendent/Surface 1st- Kitchen Manager's Office 7EA2 $0

Power Distribution 1st- Kitchen Manager's Office 6EA6 $12,749

Walls - Plaster/Drywall 1st- Kitchen Manager's Office 6SF546 $1,507

Ceiling - Lay-in 1st- Rm 100A- Police Office 6SF239 $718

Doors - Wood Doors inclu hw 1st- Rm 100A- Police Office 6EA1 $301

Floor - Carpet 1st- Rm 100A- Police Office 6SF239 $509

Lighting - Pendent/Surface 1st- Rm 100A- Police Office 7EA3 $0

Power Distribution 1st- Rm 100A- Police Office 6EA6 $12,749

Walls - Plaster/Drywall 1st- Rm 100A- Police Office 6SF1,137 $3,138

Ceiling - Lay-in 1st- Rm 100B- Security Office 6SF239 $718

Doors - Wood Doors inclu hw 1st- Rm 100B- Security Office 6EA1 $301

Floor - Carpet 1st- Rm 100B- Security Office 6SF239 $509

Lighting - Pendent/Surface 1st- Rm 100B- Security Office 7EA3 $0

Power Distribution 1st- Rm 100B- Security Office 6EA6 $12,749

Walls - Plaster/Drywall 1st- Rm 100B- Security Office 6SF1,137 $3,138

AC Unit 1st- Rm 113A- Lab office 6EA1 $496

Ceiling - Splined 1st- Rm 113A- Lab office appears to be water damaged5SF8 $77

Page 38 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 39: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Ceiling - Splined 1st- Rm 113A- Lab office 6SF405 $330

Doors - Wood Doors inclu hw 1st- Rm 113A- Lab office 6EA1 $301

Floor - Concrete 1st- Rm 113A- Lab office 6SF413 $219

Lighting - Pendent/Surface 1st- Rm 113A- Lab office 7EA8 $0

Power Distribution 1st- Rm 113A- Lab office 6EA8 $16,999

Storage/ Closet 1st- Rm 113A- Lab office 6SF377 $2,733

Walls - Plaster/Drywall 1st- Rm 113A- Lab office 6SF410 $1,132

Walls - Plaster/Drywall 1st- Rm 113A- Lab office appears to be water damaged5SF10 $51

Walls - Structural Glazed Tile 1st- Rm 113A- Lab office 6SF916 $2,882

AC Unit 1st- Rm 123- ROTC Office 6EA1 $496

Ceiling - Lay-in 1st- Rm 123- ROTC Office 6SF138 $414

Doors - Wood Doors inclu hw 1st- Rm 123- ROTC Office 6EA2 $602

Floor - Wood 1st- Rm 123- ROTC Office 6SF138 $973

Lighting - Lay-in 1st- Rm 123- ROTC Office 7EA2 $0

Power Distribution 1st- Rm 123- ROTC Office 6EA8 $16,999

Storage/ Closet 1st- Rm 123- ROTC Office 6SF36 $261

Walls - Metal Panel 1st- Rm 123- ROTC Office wood panel6SF320 $2,389

Walls - Plaster/Drywall 1st- Rm 123- ROTC Office 6SF160 $442

Ceiling - Splined 1st- Rm 124B- Vacant Office 6SF154 $126

Doors - Wood Doors inclu hw 1st- Rm 124B- Vacant Office 6EA1 $301

Floor - Carpet 1st- Rm 124B- Vacant Office 6SF129 $275

Floor - Tile 1st- Rm 124B- Vacant Office 6SF25 $55

Lighting - Chandelier, Incandescent 1st- Rm 124B- Vacant Office ceiling fans with lights7EA2 $0

Power Distribution 1st- Rm 124B- Vacant Office 6EA4 $8,500

Walls - Plaster/Drywall 1st- Rm 124B- Vacant Office 6SF780 $2,153

Work SInk 1st- Rm 124B- Vacant Office 6EA1 $508

AC Unit 1st- Rm 125- Engineer's Office missing cover4EA1 $6,086

Ceiling - Plaster/Drywall 1st- Rm 125- Engineer's Office 6SF349 $1,208

Doors - Wood Doors inclu hw 1st- Rm 125- Engineer's Office 6EA2 $602

Floor - Concrete 1st- Rm 125- Engineer's Office 6SF122 $65

Floor - Wood 1st- Rm 125- Engineer's Office 6SF227 $1,600

Lighting - Pendent/Surface 1st- Rm 125- Engineer's Office 7EA4 $0

Power Distribution 1st- Rm 125- Engineer's Office 6EA8 $16,999

Storage/ Closet 1st- Rm 125- Engineer's Office 6SF11 $80

Walls - Plaster/Drywall 1st- Rm 125- Engineer's Office 6SF1,259 $3,475

Ceiling - Plaster/Drywall 1st- Rm 136A 6SF81 $280

Doors - Wood Doors inclu hw 1st- Rm 136A 6EA1 $301

Page 39 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 40: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Floor - Tile 1st- Rm 136A 6SF81 $177

Lighting - Pendent/Surface 1st- Rm 136A 7EA1 $0

Power Distribution 1st- Rm 136A 6EA2 $4,250

Storage/ Closet 1st- Rm 136A The part on map labeled as Rm 136 is actually storage.

6SF294 $2,132

Walls - Plaster/Drywall 1st- Rm 136A 6SF450 $1,242

Ceiling - Plaster/Drywall 1st- Rm 136B 6SF81 $280

Doors - Wood Doors inclu hw 1st- Rm 136B 6EA1 $301

Floor - Tile 1st- Rm 136B 6SF81 $177

Lighting - Pendent/Surface 1st- Rm 136B 7EA1 $0

Power Distribution 1st- Rm 136B 6EA2 $4,250

Walls - Plaster/Drywall 1st- Rm 136B 6SF450 $1,242

AC Unit 1st- Rm 167- Parent's Room 6EA2 $991

Ceiling - Splined 1st- Rm 167- Parent's Room water stained tiles5SF16 $155

Ceiling - Splined 1st- Rm 167- Parent's Room 6SF400 $326

Doors - Wood Doors inclu hw 1st- Rm 167- Parent's Room 6EA1 $301

Floor - Tile 1st- Rm 167- Parent's Room 6SF416 $910

Lighting - Pendent/Surface 1st- Rm 167- Parent's Room 7EA4 $0

Power Distribution 1st- Rm 167- Parent's Room 6EA6 $12,749

Walls - Plaster/Drywall 1st- Rm 167- Parent's Room 6SF637 $1,758

Walls - Structural Glazed Tile 1st- Rm 167- Parent's Room 6SF180 $566

AC Unit 1st- Rm 177- Utility 6EA2 $991

Ceiling - Splined 1st- Rm 177- Utility 6SF416 $339

Floor - Tile 1st- Rm 177- Utility 6SF416 $910

Lighting - Pendent/Surface 1st- Rm 177- Utility 7EA4 $0

Power Distribution 1st- Rm 177- Utility 6EA6 $12,749

Walls - Plaster/Drywall 1st- Rm 177- Utility 6SF637 $1,758

Walls - Plaster/Drywall 1st- Rm 177- Utility peeling & a hole5SF5 $26

Walls - Structural Glazed Tile 1st- Rm 177- Utility 6SF180 $566

Ceiling - Lay-in 1st- Rm 199- Special Ed 6SF475 $1,426

Doors - Transom Window 1st- Rm 199- Special Ed 6SF9 $152

Doors - Wood Doors inclu hw 1st- Rm 199- Special Ed 6EA1 $301

Floor - Tile 1st- Rm 199- Special Ed cracked5SF25 $144

Floor - Tile 1st- Rm 199- Special Ed 6SF450 $985

Lighting - Lay-in 1st- Rm 199- Special Ed 7EA10 $0

Power Distribution 1st- Rm 199- Special Ed 6EA10 $21,249

Walls - Plaster/Drywall 1st- Rm 199- Special Ed 6SF963 $2,658

Ceiling - Plaster/Drywall 1st- Student Services 6SF270 $934

Page 40 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 41: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Doors - Wood Doors inclu hw 1st- Student Services 6EA2 $602

Floor - Tile 1st- Student Services damaged5SF5 $29

Floor - Tile 1st- Student Services 6SF265 $580

Lighting - Lay-in 1st- Student Services recessed cans7EA4 $0

Lighting - Pendent/Surface 1st- Student Services 7EA4 $0

Power Distribution 1st- Student Services 6EA10 $21,249

Storage/ Closet 1st- Student Services 6SF364 $2,639

Walls - Plaster/Drywall 1st- Student Services 6SF786 $2,169

Ceiling - Plaster/Drywall 2nd Floor - Coach's Office 6SF302 $1,045

Doors - Wood Doors inclu hw 2nd Floor - Coach's Office 6EA1 $301

Floor - Tile/Sheet 2nd Floor - Coach's Office 6SF302 $302

Lighting - Pendent/Surface 2nd Floor - Coach's Office 6EA2 $248

Power Distribution 2nd Floor - Coach's Office 6EA6 $12,749

Storage/ Closet 2nd Floor - Coach's Office 6SF30 $218

Walls - Plaster/Drywall 2nd Floor - Coach's Office 6SF903 $2,492

Ceiling - Lay-in 2nd Floor - Pool Office 6SF155 $465

Doors - Steel Doors incl hw 2nd Floor - Pool Office 6EA1 $301

Floor - Tile 2nd Floor - Pool Office 6SF155 $339

Lighting - Lay-in 2nd Floor - Pool Office 6EA2 $238

Power Distribution 2nd Floor - Pool Office 6EA4 $8,500

Walls - Structural Glazed Tile 2nd Floor - Pool Office 6SF400 $1,258

AC Unit 2nd- Rm 211A- Digital Media Office not on a dedicated circuit4EA1 $6,086

Ceiling - Lay-in 2nd- Rm 211A- Digital Media Office 6SF274 $823

Doors - Side-lite 2nd- Rm 211A- Digital Media Office 6SF9 $150

Doors - Wood Doors inclu hw 2nd- Rm 211A- Digital Media Office 6EA1 $301

Floor - Wood 2nd- Rm 211A- Digital Media Office 6SF274 $1,932

Lighting - Lay-in 2nd- Rm 211A- Digital Media Office 7EA2 $0

Power Distribution 2nd- Rm 211A- Digital Media Office 6EA8 $16,999

Walls - Plaster/Drywall 2nd- Rm 211A- Digital Media Office 6SF731 $2,017

Ceiling - Lay-in 2nd- Rm 219- Art Therapy 6SF367 $1,102

Doors - Transom Window 2nd- Rm 219- Art Therapy 6SF9 $152

Doors - Wood Doors inclu hw 2nd- Rm 219- Art Therapy 6EA1 $301

Floor - Tile/Sheet 2nd- Rm 219- Art Therapy damaged5SF3 $17

Floor - Tile/Sheet 2nd- Rm 219- Art Therapy 6SF364 $364

Lighting - Lay-in 2nd- Rm 219- Art Therapy 7EA8 $0

Power Distribution 2nd- Rm 219- Art Therapy 6EA18 $38,248

Walls - Plaster/Drywall 2nd- Rm 219- Art Therapy 6SF1,027 $2,834

Page 41 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 42: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

AC Unit 2nd- Rm 220A- Social Studies Office 6EA1 $496

Ceiling - Lay-in 2nd- Rm 220A- Social Studies Office 6SF338 $1,015

Ceiling - Lay-in 2nd- Rm 220A- Social Studies Office water stained6SF8 $33

Doors - Transom Window 2nd- Rm 220A- Social Studies Office 6SF9 $152

Doors - Wood Doors inclu hw 2nd- Rm 220A- Social Studies Office 6EA1 $301

Floor - Tile 2nd- Rm 220A- Social Studies Office damaged5SF13 $75

Floor - Tile 2nd- Rm 220A- Social Studies Office 6SF333 $729

Lighting - Lay-in 2nd- Rm 220A- Social Studies Office 7EA5 $0

Power Distribution 2nd- Rm 220A- Social Studies Office 6EA8 $16,999

Walls - Plaster/Drywall 2nd- Rm 220A- Social Studies Office 6SF1,027 $2,834

Ceiling - Plaster/Drywall 2nd- Rm 224A- EFI Office 6SF214 $741

Doors - Transom Window 2nd- Rm 224A- EFI Office 6SF18 $305

Doors - Wood Doors inclu hw 2nd- Rm 224A- EFI Office 6EA2 $602

Floor - Tile 2nd- Rm 224A- EFI Office 6SF214 $468

Lighting - Pendent/Surface 2nd- Rm 224A- EFI Office 7EA2 $0

Power Distribution 2nd- Rm 224A- EFI Office 6EA6 $12,749

Storage/ Closet 2nd- Rm 224A- EFI Office 121SqFt was a restroom, but plumbing has been dismantled & room is used for storage

6SF144 $1,044

Walls - Plaster/Drywall 2nd- Rm 224A- EFI Office 6SF949 $2,619

AC Unit 2nd- Rm 229- Social Work Office not on a dedicated circuit4EA1 $6,086

Ceiling - Lay-in 2nd- Rm 229- Social Work Office damaged5SF8 $64

Ceiling - Lay-in 2nd- Rm 229- Social Work Office 6SF306 $919

Doors - Transom Window 2nd- Rm 229- Social Work Office 6SF9 $152

Doors - Wood Doors inclu hw 2nd- Rm 229- Social Work Office 6EA1 $301

Floor - Tile 2nd- Rm 229- Social Work Office 6SF314 $687

Lighting - Lay-in 2nd- Rm 229- Social Work Office 7EA6 $0

Power Distribution 2nd- Rm 229- Social Work Office 6EA8 $16,999

Walls - Plaster/Drywall 2nd- Rm 229- Social Work Office 6SF864 $2,385

AC Unit 2nd- Rm 230- Teacher Work Room cover missing4EA1 $6,086

Ceiling - Lay-in 2nd- Rm 230- Teacher Work Room 6SF367 $1,102

Doors - Transom Window 2nd- Rm 230- Teacher Work Room 6SF9 $152

Doors - Wood Doors inclu hw 2nd- Rm 230- Teacher Work Room 6EA1 $301

Floor - Tile 2nd- Rm 230- Teacher Work Room damaged5SF4 $23

Floor - Tile 2nd- Rm 230- Teacher Work Room 6SF363 $794

Lighting - Lay-in 2nd- Rm 230- Teacher Work Room 7EA6 $0

Power Distribution 2nd- Rm 230- Teacher Work Room 6EA8 $16,999

Walls - Plaster/Drywall 2nd- Rm 230- Teacher Work Room 6SF1,027 $2,834

Ceiling - Plaster/Drywall 3rd- 2nd Boy's PE Office (331A) 6SF204 $706

Page 42 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 43: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Doors - Side-lite 3rd- 2nd Boy's PE Office (331A) 6SF18 $301

Doors - Wood Doors inclu hw 3rd- 2nd Boy's PE Office (331A) 6EA1 $301

Floor - Tile 3rd- 2nd Boy's PE Office (331A) damaged throughout5SF204 $916

Lighting - Pendent/Surface 3rd- 2nd Boy's PE Office (331A) 7EA2 $0

Power Distribution 3rd- 2nd Boy's PE Office (331A) 6EA6 $12,749

Walls - Plaster/Drywall 3rd- 2nd Boy's PE Office (331A) 6SF675 $1,863

Work SInk 3rd- 2nd Boy's PE Office (331A) not working5EA1 $1,508

Ceiling - Plaster/Drywall 3rd- Boy's PE Office peeling5SF2 $25

Ceiling - Plaster/Drywall 3rd- Boy's PE Office 6SF275 $952

Doors - Side-lite 3rd- Boy's PE Office 6SF9 $150

Doors - Wood Doors inclu hw 3rd- Boy's PE Office 6EA2 $602

Floor - Wood 3rd- Boy's PE Office 6SF277 $1,953

Lighting - Pendent/Surface 3rd- Boy's PE Office 7EA2 $0

Power Distribution 3rd- Boy's PE Office 6EA10 $21,249

Walls - Plaster/Drywall 3rd- Boy's PE Office 6SF675 $1,863

Ceiling - Plaster/Drywall 3rd- Girls Gym Office/Kitchen 6SF201 $696

Doors - Side-lite 3rd- Girls Gym Office/Kitchen 6SF18 $301

Doors - Wood Doors inclu hw 3rd- Girls Gym Office/Kitchen 6EA1 $301

Floor - Wood 3rd- Girls Gym Office/Kitchen 6SF201 $1,417

Lighting - Pendent/Surface 3rd- Girls Gym Office/Kitchen 7EA2 $0

Power Distribution 3rd- Girls Gym Office/Kitchen 6EA8 $16,999

Walls - Plaster/Drywall 3rd- Girls Gym Office/Kitchen 6SF585 $1,615

Work SInk 3rd- Girls Gym Office/Kitchen 6EA1 $508

Ceiling - Plaster/Drywall 3rd- Girl's PE Office peeling5SF20 $250

Ceiling - Plaster/Drywall 3rd- Girl's PE Office 6SF257 $889

Doors - Side-lite 3rd- Girl's PE Office 6SF9 $150

Doors - Wood Doors inclu hw 3rd- Girl's PE Office 6EA2 $602

Floor - Wood 3rd- Girl's PE Office 6SF277 $1,953

Lighting - Pendent/Surface 3rd- Girl's PE Office 7EA2 $0

Power Distribution 3rd- Girl's PE Office 6EA14 $29,748

Walls - Plaster/Drywall 3rd- Girl's PE Office 6SF675 $1,863

Ceiling - Plaster/Drywall 3rd- Rm 309- Art Work Room 6SF367 $1,270

Doors - Transom Window 3rd- Rm 309- Art Work Room 6SF9 $152

Doors - Wood Doors inclu hw 3rd- Rm 309- Art Work Room 6EA1 $301

Floor - Tile 3rd- Rm 309- Art Work Room damaged throughout5SF367 $1,648

Lighting - Pendent/Surface 3rd- Rm 309- Art Work Room 7EA4 $0

Power Distribution 3rd- Rm 309- Art Work Room outlets not working5EA6 $23,110

Page 43 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 44: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Power Distribution 3rd- Rm 309- Art Work Room 6EA4 $8,500

Walls - Plaster/Drywall 3rd- Rm 309- Art Work Room 6SF1,027 $2,834

AC Unit 3rd- Rm 319A- Math Office not on a dedicated circuit4EA1 $6,086

Ceiling - Lay-in 3rd- Rm 319A- Math Office 6SF368 $1,105

Doors - Transom Window 3rd- Rm 319A- Math Office 6SF9 $152

Doors - Wood Doors inclu hw 3rd- Rm 319A- Math Office 6EA1 $301

Floor - Tile 3rd- Rm 319A- Math Office damaged throughout5SF368 $1,652

Lighting - Lay-in 3rd- Rm 319A- Math Office 7EA5 $0

Power Distribution 3rd- Rm 319A- Math Office 6EA8 $16,999

Walls - Plaster/Drywall 3rd- Rm 319A- Math Office 6SF864 $2,385

Ceiling - Lay-in 4th- Rm 400A- Orchestra Office 6SF167 $502

Floor - Tile 4th- Rm 400A- Orchestra Office 6SF167 $365

Lighting - Lay-in 4th- Rm 400A- Orchestra Office 7EA4 $0

Power Distribution 4th- Rm 400A- Orchestra Office 6EA6 $12,749

Walls - Plaster/Drywall 4th- Rm 400A- Orchestra Office 6SF530 $1,463

Work SInk 4th- Rm 400A- Orchestra Office 6EA1 $508

Ceiling - Lay-in 4th- Rm 401A- Band Office 6SF167 $502

Floor - Tile 4th- Rm 401A- Band Office 6SF167 $365

Lighting - Lay-in 4th- Rm 401A- Band Office 7EA4 $0

Power Distribution 4th- Rm 401A- Band Office 6EA6 $12,749

Walls - Plaster/Drywall 4th- Rm 401A- Band Office 6SF530 $1,463

Work SInk 4th- Rm 401A- Band Office 6EA1 $508

Ceiling - Plaster/Drywall 6SF106 $367

Doors - Steel Doors incl hw 6EA2 $602

Floor - Tile 6SF106 $232

Lighting - Pendent/Surface 6EA1 $124

Power Distribution 6EA4 $8,500

Walls - Plaster/Drywall 6SF535 $1,477

Auditorium & Theater

Ceiling - Lay-in 1st- Rm 122 Small Auditorium 6SF1,570 $4,715

Ceiling - Lay-in 1st- Rm 122 Small Auditorium water stained5SF10 $80

Ceiling - Plaster/Drywall 1st- Rm 122 Small Auditorium water damaged above stage5SF5 $158

Ceiling - Plaster/Drywall 1st- Rm 122 Small Auditorium 6SF620 $5,169

Ceiling - Splined 1st- Rm 122 Small Auditorium 6SF500 $408

Ceiling - Splined 1st- Rm 122 Small Auditorium water damaged5SF6 $58

Doors - Wood Doors inclu hw 1st- Rm 122 Small Auditorium 6EA4 $1,204

Floor - Carpet 1st- Rm 122 Small Auditorium 6SF2,086 $4,445

Page 44 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 45: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Auditorium & Theater

Floor - Wood 1st- Rm 122 Small Auditorium stage & hallway6SF625 $4,406

Lighting - Chandelier, Incandescent 1st- Rm 122 Small Auditorium 7EA5 $0

Lighting - Lay-in 1st- Rm 122 Small Auditorium 7EA32 $0

Lighting - Pendent/Surface 1st- Rm 122 Small Auditorium 7EA2 $0

Lighting - Wall Mounted 1st- Rm 122 Small Auditorium cove lighting7EA36 $0

Main Floor Seating 1st- Rm 122 Small Auditorium 6EA142 $24,696

Sound System 1st- Rm 122 Small Auditorium 6EA1 $10,721

Stage 1st- Rm 122 Small Auditorium 6SF425 $2,455

Stage Curtain 1st- Rm 122 Small Auditorium 6EA4 $0

Stage Lighting System 1st- Rm 122 Small Auditorium 6EA1 $8,077

Stage-Stairs - Wood 1st- Rm 122 Small Auditorium 6LF20 $235

Walls - Concrete Block 1st- Rm 122 Small Auditorium NO OCCUPANCY PLACARD POSTED5SF1 $10

Walls - Plaster/Drywall 1st- Rm 122 Small Auditorium 6SF5,406 $25,743

Clinic

Ceiling - Lay-in 1st- Rm 119- Nurse 6SF415 $1,246

Doors - Transom Window 1st- Rm 119- Nurse glass is broken5SF9 $381

Doors - Wood Doors inclu hw 1st- Rm 119- Nurse door hinges are broken & need replacing5EA1 $1,174

Floor - Tile/Sheet 1st- Rm 119- Nurse 6SF415 $415

Lighting - Lay-in 1st- Rm 119- Nurse 7EA10 $0

Walls - Plaster/Drywall 1st- Rm 119- Nurse 6SF907 $2,503

Gymnasia

Ceiling - Plaster/Drywall 2nd Floor - Weigh Room 6SF2,302 $12,707

Doors - Steel Doors incl hw 2nd Floor - Weigh Room 6EA2 $602

Floor - Weight/ Fitness Room Floor Matting 2nd Floor - Weigh Room 6SF2,302 $12,048

Lighting - Pendent/Surface 2nd Floor - Weigh Room 6EA30 $3,717

Storage/ Closet 2nd Floor - Weigh Room 6SF195 $1,414

Walls - Structural Glazed Tile 2nd Floor - Weigh Room 6SF2,495 $7,849

Ceiling - Plaster/Drywall 3rd- Rm 331 peeling 5SF100 $2,003

Ceiling - Plaster/Drywall 3rd- Rm 331 6SF10,535 $58,151

Doors - Transom Window 3rd- Rm 331 6SF36 $610

Doors - Wood Doors inclu hw 3rd- Rm 331 6EA2 $602

Floor - Concrete 3rd- Rm 331 balcony 6SF3,425 $1,812

Floor - Terrazzo 3rd- Rm 331 6SF99 $217

Floor - Wood 3rd- Rm 331 6SF7,110 $50,125

Lighting - Metal Halide/Sodium Vapor 3rd- Rm 331 7EA15 $0

Lighting - Pendent/Surface 3rd- Rm 331 7EA21 $0

Page 45 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 46: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Gymnasia

Scoreboards 3rd- Rm 331 6EA1 $2,244

Stage-Stairs - Terrazzo 3rd- Rm 331 stairs to balcony6LF25 $191

Storage/ Closet 3rd- Rm 331 peeling paint5SF404 $6,517

Storage/ Closet 3rd- Rm 331 6SF404 $2,929

Walls - Plaster/Drywall 3rd- Rm 331 Bench seating in balcony is for 228 people.

Occupancy card says 187 people may occupy

balcony.

5SF1 $8

Walls - Structural Glazed Tile 3rd- Rm 331 6SF7,014 $22,066

Bleacher Seating 3rd- Rm 334 Room for 88 people on balcony benches- occupany card allows up to 93.

6EA88 $2,547

Ceiling - Plaster/Drywall 3rd- Rm 334 6SF5,488 $30,293

Ceiling - Plaster/Drywall 3rd- Rm 334 water damage5SF25 $501

Doors - Wood Doors inclu hw 3rd- Rm 334 6EA2 $602

Floor - Concrete 3rd- Rm 334 balcony floor6SF1,450 $767

Floor - Wood 3rd- Rm 334 6SF4,063 $28,644

Lighting - Metal Halide/Sodium Vapor 3rd- Rm 334 7EA8 $0

Lighting - Pendent/Surface 3rd- Rm 334 7EA8 $0

Lighting - Pendent/Surface 3rd- Rm 334 cover missing6EA1 $124

Scoreboards 3rd- Rm 334 6EA1 $2,244

Storage/ Closet 3rd- Rm 334 Room is on otherside of hall. Minor peeling on ceiling

6SF328 $2,378

Walls - Structural Glazed Tile 3rd- Rm 334 6SF5,740 $18,058

Ceiling - Plaster/Drywall 3rd- Rm 336 6SF3,378 $18,646

Doors - Wood Doors inclu hw 3rd- Rm 336 6EA2 $602

Floor - Wood 3rd- Rm 336 6SF3,378 $23,815

Lighting - Metal Halide/Sodium Vapor 3rd- Rm 336 7EA8 $0

Lighting - Pendent/Surface 3rd- Rm 336 7EA3 $0

Storage/ Closet 3rd- Rm 336 door is broken6SF181 $1,312

Walls - Structural Glazed Tile 3rd- Rm 336 6SF5,148 $16,196

Kitchen

Ceiling - Lay-in 1st- Dishwashing Rm 6SF766 $2,300

Doors - Transom Window 1st- Dishwashing Rm 6SF18 $305

Doors - Wood Doors inclu hw 1st- Dishwashing Rm 6EA2 $602

Floor - Weight/ Fitness Room Floor Matting 1st- Dishwashing Rm Rubber Floor Tiles6SF766 $4,009

Lighting - Lay-in 1st- Dishwashing Rm 7EA12 $0

Walls - Structural Glazed Tile 1st- Dishwashing Rm 6SF1,111 $3,495

Ceiling - Lay-in 1st Floor 6SF1,693 $5,084

Doors - Transom Window 1st Floor 6SF18 $305

Page 46 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 47: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Kitchen

Doors - Wood Doors inclu hw 1st Floor 6EA2 $602

Floor - Tile 1st Floor 6SF1,693 $3,704

Lighting - Lay-in 1st Floor 7EA26 $0

Storage/ Closet 1st Floor 6SF569 $4,125

Walls - Structural Glazed Tile 1st Floor 6SF1,750 $5,506

Library

AC Unit 2nd Floor 6EA3 $1,487

Casework 2nd Floor 6LF144 $3,637

Ceiling - Plaster/Drywall 2nd Floor water damage5SF3 $37

Ceiling - Plaster/Drywall 2nd Floor 6SF357 $1,235

Ceiling - Splined 2nd Floor 6SF2,130 $1,736

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Carpet 2nd Floor 6SF2,202 $4,692

Floor - Tile 2nd Floor damaged throughout5SF144 $647

Lighting - Pendent/Surface 2nd Floor 7EA56 $0

Storage/ Closet 2nd Floor 6SF146 $1,059

Walls - Plaster/Drywall 2nd Floor 6SF2,723 $7,515

Locker/Shower Room

Accessories 1st- Kitchen Staff Locker Rm 6SF96 $376

Ceiling - Exposed 1st- Kitchen Staff Locker Rm 6SF143 $213

Ceiling - Plaster/ Drywall 1st- Kitchen Staff Locker Rm 6SF138 $478

Doors - Wood Doors inclu hw 1st- Kitchen Staff Locker Rm 6EA2 $602

Floor - Tile Ceramic/ Porcelain 1st- Kitchen Staff Locker Rm 6SF96 $203

Floor - Tile/Sheet 1st- Kitchen Staff Locker Rm 6SF185 $185

Lavatory 1st- Kitchen Staff Locker Rm 6EA1 $320

Lighting - Pendent/Surface 1st- Kitchen Staff Locker Rm 7EA4 $0

Partitions 1st- Kitchen Staff Locker Rm 6EA1 $297

Student Lockers - One Tier 1st- Kitchen Staff Locker Rm 6EA16 $1,485

Walls - Plaster/Drywall 1st- Kitchen Staff Locker Rm 6SF1,129 $3,116

Walls - Plaster/Drywall 1st- Kitchen Staff Locker Rm water damaged5SF15 $77

Walls - Tile Ceramic/ Porcelain 1st- Kitchen Staff Locker Rm 6SF18 $121

Walls - Tile Ceramic/ Porcelain 1st- Kitchen Staff Locker Rm Stone6SF78 $176

Water Closet 1st- Kitchen Staff Locker Rm 6EA1 $336

Ceiling - Plaster/ Drywall 1st- Rm 129- Custodial Staff Locker

Room

6SF314 $1,087

Doors - Transom Window 1st- Rm 129- Custodial Staff Locker Room

6SF9 $152

Page 47 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 48: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Locker/Shower Room

Doors - Wood Doors inclu hw 1st- Rm 129- Custodial Staff Locker

Room

6EA1 $301

Floor - Concrete 1st- Rm 129- Custodial Staff Locker Room

6SF314 $166

Lavatory 1st- Rm 129- Custodial Staff Locker Room

missing4EA1 $7,342

Lighting - Pendent/Surface 1st- Rm 129- Custodial Staff Locker Room

7EA3 $0

Partitions 1st- Rm 129- Custodial Staff Locker Room

missing doors5EA2 $1,502

Student Lockers - One Tier 1st- Rm 129- Custodial Staff Locker

Room

6EA4 $371

Student Lockers - Two Tier 1st- Rm 129- Custodial Staff Locker Room

6EA40 $1,857

Walls - Plaster/Drywall 1st- Rm 129- Custodial Staff Locker Room

6SF877 $2,420

Walls - Tile Ceramic/ Porcelain 1st- Rm 129- Custodial Staff Locker Room

stone6SF75 $169

Walls - Tile Ceramic/ Porcelain 1st- Rm 129- Custodial Staff Locker Room

6SF36 $241

Water Closet 1st- Rm 129- Custodial Staff Locker

Room

missing4EA2 $15,339

Accessories 2nd Floor 6SF5,010 $19,630

Accessories 2nd Floor 6SF1,650 $6,465

Benches, ped mounted 2nd Floor 6LF50 $5,444

Benches, ped mounted 2nd Floor 6LF315 $34,297

Ceiling - Plaster/ Drywall 2nd Floor peeling6SF5,010 $17,338

Ceiling - Plaster/ Drywall 2nd Floor 6SF1,650 $5,710

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor Drain 2nd Floor 6EA32 $33,893

Floor - Tile Ceramic/ Porcelain 2nd Floor 6SF5,010 $10,603

Floor - Tile/Sheet 2nd Floor 6SF1,650 $1,652

Lighting - Pendent/Surface 2nd Floor 6EA34 $4,212

Lighting - Pendent/Surface 2nd Floor 6EA16 $1,982

Showers 2nd Floor 6EA56 $17,439

Storage/ Closet 2nd Floor 6SF250 $1,813

Student Lockers - One Tier 2nd Floor 6EA476 $44,190

Student Lockers - One Tier 2nd Floor 6EA1,358 $126,071

Walls - Structural Glazed Tile 2nd Floor 6SF3,680 $11,577

Walls - Structural Glazed Tile 2nd Floor 6SF2,112 $6,644

Page 48 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 49: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Locker/Shower Room

Accessories 3rd- Boy's PE Coach Locker Rm 6SF127 $498

Ceiling - Plaster/ Drywall 3rd- Boy's PE Coach Locker Rm peeling5SF127 $1,213

Doors - Wood Doors inclu hw 3rd- Boy's PE Coach Locker Rm 6EA1 $301

Floor Drain 3rd- Boy's PE Coach Locker Rm 6EA2 $2,118

Floor - Tile Ceramic/ Porcelain 3rd- Boy's PE Coach Locker Rm 6SF127 $269

Lavatory 3rd- Boy's PE Coach Locker Rm 6EA1 $320

Lighting - Pendent/Surface 3rd- Boy's PE Coach Locker Rm 7EA1 $0

Partitions 3rd- Boy's PE Coach Locker Rm door is delaminating5EA1 $751

Showers 3rd- Boy's PE Coach Locker Rm 6EA1 $311

Student Lockers - One Tier 3rd- Boy's PE Coach Locker Rm 6EA8 $743

Urinals 3rd- Boy's PE Coach Locker Rm 6EA1 $336

Walls - Plaster/Drywall 3rd- Boy's PE Coach Locker Rm peeling5SF330 $2,501

Walls - Tile Ceramic/ Porcelain 3rd- Boy's PE Coach Locker Rm stone6SF117 $264

Walls - Tile Ceramic/ Porcelain 3rd- Boy's PE Coach Locker Rm stone- damaged5SF3 $63

Water Closet 3rd- Boy's PE Coach Locker Rm 6EA1 $336

Accessories 3rd- Girl's PE Coach Locker Rm 6SF127 $498

Ceiling - Plaster/ Drywall 3rd- Girl's PE Coach Locker Rm 6SF125 $433

Ceiling - Plaster/ Drywall 3rd- Girl's PE Coach Locker Rm water damaged5SF2 $26

Doors - Wood Doors inclu hw 3rd- Girl's PE Coach Locker Rm 6EA1 $301

Floor Drain 3rd- Girl's PE Coach Locker Rm 6EA2 $2,118

Floor - Tile Ceramic/ Porcelain 3rd- Girl's PE Coach Locker Rm 6SF126 $267

Floor - Tile Ceramic/ Porcelain 3rd- Girl's PE Coach Locker Rm hole in floor5SF1 $21

Lavatory 3rd- Girl's PE Coach Locker Rm 6EA1 $320

Lighting - Pendent/Surface 3rd- Girl's PE Coach Locker Rm 7EA1 $0

Partitions 3rd- Girl's PE Coach Locker Rm 6EA1 $297

Showers 3rd- Girl's PE Coach Locker Rm 6EA1 $311

Student Lockers - One Tier 3rd- Girl's PE Coach Locker Rm 6EA5 $464

Walls - Plaster/Drywall 3rd- Girl's PE Coach Locker Rm 6SF330 $911

Walls - Tile Ceramic/ Porcelain 3rd- Girl's PE Coach Locker Rm stone6SF120 $271

Water Closet 3rd- Girl's PE Coach Locker Rm 6EA1 $336

Lunch & Multipurpose Room

Ceiling - Splined 1st Floor 6SF5,424 $4,421

Ceiling - Splined 1st Floor missing &/or water damaged5SF79 $764

Doors - Wood Doors inclu hw 1st Floor 6EA11 $3,311

Floor - Tile 1st Floor 6SF5,503 $12,040

Lighting - Pendent/Surface 1st Floor 6EA48 $5,947

Walls - Plaster/Drywall 1st Floor 6SF1,930 $5,327

Page 49 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 50: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Lunch & Multipurpose Room

Walls - Structural Glazed Tile 1st Floor 6SF1,930 $6,072

Ceiling - Lay-in 1st- Rm 128- Alumni Hall water stains on tile5SF4 $32

Ceiling - Lay-in 1st- Rm 128- Alumni Hall 6SF1,222 $3,670

Doors - Wood Doors inclu hw 1st- Rm 128- Alumni Hall 6EA2 $602

Floor - Carpet 1st- Rm 128- Alumni Hall 6SF1,226 $2,612

Lighting - Lay-in 1st- Rm 128- Alumni Hall mix of lay-in & recessed cans7EA51 $0

Lighting - Wall Mounted 1st- Rm 128- Alumni Hall cove lights7EA32 $0

Storage/ Closet 1st- Rm 128- Alumni Hall 6SF193 $1,399

Walls - Metal Panel 1st- Rm 128- Alumni Hall Wood panel6SF1,212 $9,047

Walls - Plaster/Drywall 1st- Rm 128- Alumni Hall 6SF606 $1,672

Ceiling - Lay-in 1st- Servery 6SF1,015 $3,048

Ceiling - Splined 1st- Servery 6SF2,695 $2,197

Doors - Transom Window 1st- Servery 6SF18 $305

Doors - Wood Doors inclu hw 1st- Servery 6EA4 $1,204

Floor - Tile 1st- Servery 6SF3,710 $8,117

Lighting - Lay-in 1st- Servery 7EA20 $0

Lighting - Pendent/Surface 1st- Servery 7EA56 $0

Serving Line 1st- Servery 6LF180 $10,713

Walls - Plaster/Drywall 1st- Servery 6SF876 $2,418

Walls - Structural Glazed Tile 1st- Servery 6SF1,752 $5,512

Ceiling - Splined 1st- Teacher Lunchroom 6SF720 $587

Doors - Side-lite 1st- Teacher Lunchroom 6SF240 $4,012

Doors - Transom Window 1st- Teacher Lunchroom 6SF135 $2,286

Doors - Wood Doors inclu hw 1st- Teacher Lunchroom 6EA3 $903

Floor - Tile 1st- Teacher Lunchroom 6SF720 $1,575

Lighting - Pendent/Surface 1st- Teacher Lunchroom 7EA8 $0

Walls - Plaster/Drywall 1st- Teacher Lunchroom 6SF352 $971

Walls - Structural Glazed Tile 1st- Teacher Lunchroom 6SF705 $2,218

MDF_IDF

AC Unit 1st- Rm 126 missing cover4EA1 $6,086

Doors - Wood Doors inclu hw 1st- Rm 126 6EA1 $301

Finishes 1st- Rm 126 6SF265 $1,891

AC Unit 2nd- IDF inside room 220 6EA1 $496

Doors - Wood Doors inclu hw 2nd- IDF inside room 220 6EA2 $602

Finishes 2nd- IDF inside room 220 some floor ties missing or damaged6SF174 $1,242

Page 50 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 51: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Mechanical/ Service Rooms

Janitor's Closet 1st Floor 6SF73 $523

Mechanical/ Service Rooms 1st Floor 6SF310 $2,221

Mechanical/ Service Rooms 1st Floor Rm 117 Freight Elevator room has water damage

& peeling paint.

5SF366 $5,904

Storage Room 1st Floor 6SF703 $5,037

Vaults 1st Floor inside 104A & 113A & ROTC6SF664 $4,757

Janitor's Closet 2nd Floor 6SF21 $150

Janitor's Closet 2nd Floor water damaged ceiling5SF51 $823

Mechanical/ Service Rooms 2nd Floor elec closets6SF116 $831

Mechanical/ Service Rooms 2nd Floor Rm 217 Freight Elevator room has water damage

& peeling paint, plus door jamb & transom are

broken.

5SF366 $5,904

Storage Room 2nd Floor 6SF206 $1,476

Vaults 2nd Floor rm 216/2146SF148 $1,060

Air Intake Plenums 3rd Floor FAI6SF23 $142

Boiler Room 3rd Floor Chiller Room above Boiler Rm 6SF1,231 $8,819

Janitor's Closet 3rd Floor 6SF91 $652

Mechanical/ Service Rooms 3rd Floor Rm 317 Freight Elevator room has water damage & peeling paint & floor needs refinishing

5SF366 $5,904

Mechanical/ Service Rooms 3rd Floor Elec closet6SF116 $831

Storage Room 3rd Floor 6SF171 $1,225

Vaults 3rd Floor Rm 316/3146SF148 $1,060

Air Intake Plenums 4th Floor Fan room : located off balcony for Gym 3316SF516 $3,195

Mechanical/ Service Rooms 4th Floor Electric Closet by Rm 400 - damaged plaster 5SF41 $661

Vaults 4th Floor by Rm 4016SF43 $308

Air Intake Plenums Basement 6SF1,193 $7,387

Air Tunnel Basement several water stains along walls / floors6SF11,589 $71,758

Auditorium Plenums Basement 6SF2,021 $12,514

Boiler Room Basement 6SF3,434 $24,602

Crawl Space - Unfinished Basement 6SF22,595 $139,906

Interior Stairs Basement concrete / steel6LF80 $722

Mechanical/ Service Rooms Basement Switch Board room ceiling damaged / walls

peeling all over

5SF27,124 $437,521

Storage Room Basement 6SF3,711 $26,587

Storage Room Basement ROTC old riffle range (now storage) has minor

peeling at stairs wall & ceiling

6SF1,727 $12,373

Pool & Natatorium

Bleachers Seating/Plank Seating 2nd Floor 6EA5 $145

Page 51 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 52: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Pool & Natatorium

Ceiling - Lay-In 2nd Floor 6SF3,176 $9,538

Doors - Steel Doors incl hw 2nd Floor 6EA2 $602

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Concrete 2nd Floor 6SF3,176 $1,680

Lighting - Lay-in 2nd Floor 6EA12 $1,428

Pool Deck 2nd Floor 6SF1,666 $15,819

Pool Deck Drains 2nd Floor 6EA6 $2,532

Walls - Structural Glazed Tile 2nd Floor 6SF2,705 $8,510

Prep Room

Ceiling - Lay-in 3rd- Rm 314A 6SF144 $432

Doors - Side-lite 3rd- Rm 314A 6SF9 $150

Doors - Steel Doors incl hw 3rd- Rm 314A 6EA1 $301

Floor - Tile/Sheet 3rd- Rm 314A 6SF144 $144

Lighting - Lay-in 3rd- Rm 314A 7EA2 $0

Walls - Plaster/Drywall 3rd- Rm 314A 6SF545 $1,504

Work Sink 3rd- Rm 314A 6EA1 $379

Ceiling - Lay-in 3rd- Rm 316A 6SF144 $432

Doors - Side-lite 3rd- Rm 316A 6SF9 $150

Doors - Steel Doors incl hw 3rd- Rm 316A 6EA1 $301

Floor - Tile/Sheet 3rd- Rm 316A 6SF144 $144

Lighting - Lay-in 3rd- Rm 316A 7EA2 $0

Walls - Plaster/Drywall 3rd- Rm 316A 6SF545 $1,504

Work Sink 3rd- Rm 316A 6EA1 $379

Ceiling - Plaster/Drywall 3rd- Rm 320A damaged5SF197 $1,806

Doors - Side-lite 3rd- Rm 320A 6SF40 $669

Doors - Wood Doors inclu hw 3rd- Rm 320A 6EA2 $602

Floor - Tile/Sheet 3rd- Rm 320A 6SF197 $197

Lighting - Pendent/Surface 3rd- Rm 320A 7EA4 $0

Walls - Plaster/Drywall 3rd- Rm 320A 6SF728 $2,009

Work Sink 3rd- Rm 320A 6EA1 $379

Restroom

Accessories 1st- Boy's NE 6SF223 $2,057

Ceiling - Plaster/Drywall 1st- Boy's NE 6SF223 $772

Floor Drain 1st- Boy's NE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st- Boy's NE 6SF223 $472

Hand Dryer 1st- Boy's NE 6EA1 $230

Page 52 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 53: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Lavatory 1st- Boy's NE 6EA1 $320

Lighting - Pendent/Surface 1st- Boy's NE 7EA4 $0

Partitions 1st- Boy's NE door missing5EA1 $751

Urinals 1st- Boy's NE 6EA5 $1,680

Walls - Plaster/Drywall 1st- Boy's NE 6SF153 $422

Walls - Tile Ceramic/ Porcelain 1st- Boy's NE 6SF606 $1,369

Water Closet 1st- Boy's NE 6EA1 $336

Accessories 1st- Boy's SE 6SF223 $2,057

Ceiling - Plaster/Drywall 1st- Boy's SE 6SF223 $772

Floor Drain 1st- Boy's SE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st- Boy's SE 6SF223 $472

Hand Dryer 1st- Boy's SE 6EA1 $230

Lavatory 1st- Boy's SE 6EA1 $320

Lighting - Pendent/Surface 1st- Boy's SE 7EA4 $0

Partitions 1st- Boy's SE 6EA2 $594

Urinals 1st- Boy's SE 6EA5 $1,680

Walls - Plaster/Drywall 1st- Boy's SE 6SF153 $422

Walls - Tile Ceramic/ Porcelain 1st- Boy's SE 6SF606 $1,369

Water Closet 1st- Boy's SE 6EA2 $672

Accessories 1st- Engineer Office 6SF149 $1,374

Ceiling - Plaster/Drywall 1st- Engineer Office 6SF149 $516

Doors - Wood Doors inclu hw 1st- Engineer Office 6EA1 $301

Floor Drain 1st- Engineer Office 6EA2 $2,118

Floor - Tile Ceramic/ Porcelain 1st- Engineer Office 6SF149 $315

Lavatory 1st- Engineer Office 6EA1 $320

Lighting - Pendent/Surface 1st- Engineer Office 7EA2 $0

Lighting - Wall Mounted 1st- Engineer Office 7EA1 $0

Partitions 1st- Engineer Office 6EA1 $297

Showers 1st- Engineer Office 6EA1 $311

Walls - Plaster/Drywall 1st- Engineer Office 6SF475 $1,311

Walls - Tile 1st- Engineer Office Stone6SF120 $263

Walls - Tile Ceramic/ Porcelain 1st- Engineer Office 6SF42 $95

Water Closet 1st- Engineer Office 6EA1 $336

Accessories 1st- Girl's NE 6SF294 $2,712

Ceiling - Plaster/Drywall 1st- Girl's NE 6SF294 $1,017

Floor Drain 1st- Girl's NE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st- Girl's NE 6SF294 $622

Page 53 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 54: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Hand Dryer 1st- Girl's NE 6EA2 $460

Lavatory 1st- Girl's NE 6EA1 $320

Lighting - Pendent/Surface 1st- Girl's NE 7EA5 $0

Partitions 1st- Girl's NE 6EA6 $1,782

Walls - Plaster/Drywall 1st- Girl's NE water damaged5SF5 $26

Walls - Plaster/Drywall 1st- Girl's NE 6SF195 $538

Walls - Tile Ceramic/ Porcelain 1st- Girl's NE 6SF586 $1,324

Water Closet 1st- Girl's NE 6EA7 $2,352

Accessories 1st- Girl's SE 6SF294 $2,712

Ceiling - Plaster/Drywall 1st- Girl's SE 6SF294 $1,017

Floor Drain 1st- Girl's SE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st- Girl's SE 6SF294 $622

Hand Dryer 1st- Girl's SE 6EA2 $460

Lavatory 1st- Girl's SE 6EA1 $320

Lighting - Pendent/Surface 1st- Girl's SE 7EA7 $0

Partitions 1st- Girl's SE 6EA5 $1,485

Walls - Plaster/Drywall 1st- Girl's SE 6SF246 $679

Walls - Tile Ceramic/ Porcelain 1st- Girl's SE 6SF607 $1,371

Water Closet 1st- Girl's SE 6EA6 $2,016

Accessories 1st- inside 102 Principle 6SF119 $1,098

Ceiling - Plaster/Drywall 1st- inside 102 Principle 6SF119 $412

Doors - Wood Doors inclu hw 1st- inside 102 Principle 6EA1 $301

Floor - Carpet 1st- inside 102 Principle 6SF119 $254

Lavatory 1st- inside 102 Principle 6EA1 $320

Lighting - Lay-in 1st- inside 102 Principle recessed cans7EA2 $0

Walls - Plaster/Drywall 1st- inside 102 Principle 6SF64 $177

Walls - Tile Ceramic/ Porcelain 1st- inside 102 Principle 6SF106 $239

Water Closet 1st- inside 102 Principle 6EA1 $336

Accessories 1st- Men's (across from Auditorium) 6SF105 $968

Ceiling - Plaster/Drywall 1st- Men's (across from Auditorium) 6SF105 $363

Doors - Wood Doors inclu hw 1st- Men's (across from Auditorium) 6EA2 $602

Floor - Tile 1st- Men's (across from Auditorium) 6SF105 $230

Floor - Tile Ceramic/ Porcelain 1st- Men's (across from Auditorium) 6SF170 $360

Hand Dryer 1st- Men's (across from Auditorium) 6EA1 $230

Lavatory 1st- Men's (across from Auditorium) 6EA2 $639

Lighting - Pendent/Surface 1st- Men's (across from Auditorium) 7EA3 $0

Partitions 1st- Men's (across from Auditorium) 6EA2 $594

Page 54 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 55: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Urinals 1st- Men's (across from Auditorium) 6EA2 $672

Walls - Plaster/Drywall 1st- Men's (across from Auditorium) 6SF975 $2,691

Walls - Tile Ceramic/ Porcelain 1st- Men's (across from Auditorium) Stone6SF172 $389

Water Closet 1st- Men's (across from Auditorium) 6EA2 $672

Accessories 1st- Men's (by EngineerOffice) 6SF112 $1,033

Ceiling - Plaster/Drywall 1st- Men's (by EngineerOffice) 6SF112 $388

Doors - Wood Doors inclu hw 1st- Men's (by EngineerOffice) 6EA1 $301

Floor Drain 1st- Men's (by EngineerOffice) 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st- Men's (by EngineerOffice) 6SF112 $237

Lavatory 1st- Men's (by EngineerOffice) 6EA1 $320

Lighting - Pendent/Surface 1st- Men's (by EngineerOffice) 7EA1 $0

Partitions 1st- Men's (by EngineerOffice) 6EA1 $297

Walls - Plaster/Drywall 1st- Men's (by EngineerOffice) 6SF611 $1,686

Water Closet 1st- Men's (by EngineerOffice) 6EA1 $336

Accessories 1st- Men's in Fire Panel Room paper towel holder falling off wall6SF26 $240

Ceiling - Plaster/Drywall 1st- Men's in Fire Panel Room 6SF26 $90

Doors - Wood Doors inclu hw 1st- Men's in Fire Panel Room 6EA1 $301

Floor - Tile Ceramic/ Porcelain 1st- Men's in Fire Panel Room 6SF26 $55

Lavatory 1st- Men's in Fire Panel Room 6EA1 $320

Lighting - Pendent/Surface 1st- Men's in Fire Panel Room 7EA1 $0

Lighting - Wall Mounted 1st- Men's in Fire Panel Room 7EA1 $0

Walls - Plaster/Drywall 1st- Men's in Fire Panel Room 6SF240 $662

Water Closet 1st- Men's in Fire Panel Room 6EA1 $336

Accessories 1st- Women's (across from Auditorium) 6SF105 $968

Ceiling - Plaster/Drywall 1st- Women's (across from Auditorium) 6SF275 $952

Doors - Wood Doors inclu hw 1st- Women's (across from Auditorium) 6EA2 $602

Floor - Tile 1st- Women's (across from Auditorium) 6SF101 $221

Floor - Tile 1st- Women's (across from Auditorium) damaged5SF4 $23

Floor - Tile Ceramic/ Porcelain 1st- Women's (across from Auditorium) 6SF170 $360

Hand Dryer 1st- Women's (across from Auditorium) 6EA1 $230

Lavatory 1st- Women's (across from Auditorium) 6EA2 $639

Lighting - Pendent/Surface 1st- Women's (across from Auditorium) 7EA3 $0

Partitions 1st- Women's (across from Auditorium) 6EA2 $594

Walls - Plaster/Drywall 1st- Women's (across from Auditorium) 6SF975 $2,691

Walls - Tile Ceramic/ Porcelain 1st- Women's (across from Auditorium) Stone6SF172 $389

Water Closet 1st- Women's (across from Auditorium) 6EA2 $672

Accessories 1st- Women's (by EngineerOffice) 6SF207 $1,909

Page 55 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 56: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Ceiling - Plaster/Drywall 1st- Women's (by EngineerOffice) 6SF207 $716

Doors - Wood Doors inclu hw 1st- Women's (by EngineerOffice) 6EA1 $301

Floor - Tile Ceramic/ Porcelain 1st- Women's (by EngineerOffice) 6SF207 $438

Lavatory 1st- Women's (by EngineerOffice) 6EA1 $320

Lighting - Pendent/Surface 1st- Women's (by EngineerOffice) 7EA2 $0

Partitions 1st- Women's (by EngineerOffice) 6EA2 $594

Walls - Plaster/Drywall 1st- Women's (by EngineerOffice) 6SF845 $2,332

Water Closet 1st- Women's (by EngineerOffice) 6EA2 $672

Accessories 2nd- Boy's NE 6SF223 $2,057

Ceiling - Plaster/Drywall 2nd- Boy's NE 6SF223 $772

Floor Drain 2nd- Boy's NE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd- Boy's NE 6SF223 $472

Hand Dryer 2nd- Boy's NE 6EA1 $230

Lavatory 2nd- Boy's NE 6EA1 $320

Lighting - Pendent/Surface 2nd- Boy's NE 7EA4 $0

Partitions 2nd- Boy's NE door missing5EA1 $751

Urinals 2nd- Boy's NE 6EA5 $1,680

Walls - Plaster/Drywall 2nd- Boy's NE 6SF153 $422

Walls - Tile Ceramic/ Porcelain 2nd- Boy's NE 6SF606 $1,369

Water Closet 2nd- Boy's NE 6EA1 $336

Accessories 2nd- Boy's SE 6SF223 $2,057

Ceiling - Plaster/Drywall 2nd- Boy's SE 6SF223 $772

Floor Drain 2nd- Boy's SE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd- Boy's SE 6SF223 $472

Hand Dryer 2nd- Boy's SE 6EA1 $230

Lavatory 2nd- Boy's SE 6EA1 $320

Lighting - Pendent/Surface 2nd- Boy's SE 7EA4 $0

Partitions 2nd- Boy's SE 6EA2 $594

Urinals 2nd- Boy's SE 6EA5 $1,680

Walls - Plaster/Drywall 2nd- Boy's SE 6SF153 $422

Walls - Tile Ceramic/ Porcelain 2nd- Boy's SE 6SF606 $1,369

Water Closet 2nd- Boy's SE 6EA1 $336

Water Closet 2nd- Boy's SE toilet out of order5EA1 $1,344

Accessories 2nd Floor - Girl's Locker Room Restroom 6SF282 $2,601

Ceiling - Plaster/Drywall 2nd Floor - Girl's Locker Room Restroom 6SF282 $976

Doors - Steel Doors incl hw 2nd Floor - Girl's Locker Room Restroom 6EA1 $301

Floor Drain 2nd Floor - Girl's Locker Room Restroom 6EA1 $1,059

Page 56 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 57: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Floor - Tile 2nd Floor - Girl's Locker Room Restroom 6SF282 $617

Hand Dryer 2nd Floor - Girl's Locker Room Restroom 6EA2 $460

Lavatory 2nd Floor - Girl's Locker Room Restroom 6EA2 $639

Lighting - Pendent/Surface 2nd Floor - Girl's Locker Room Restroom 6EA4 $496

Partitions 2nd Floor - Girl's Locker Room Restroom 6EA4 $1,188

Walls - Structural Glazed Tile 2nd Floor - Girl's Locker Room Restroom 6SF875 $2,753

Water Closet 2nd Floor - Girl's Locker Room Restroom 6EA4 $1,344

Accessories 2nd Floor- Hair Drying Room in Locker Room

6SF252 $2,324

Benches 2nd Floor- Hair Drying Room in Locker

Room

6LF15 $217

Ceiling - Plaster/Drywall 2nd Floor- Hair Drying Room in Locker

Room

6SF252 $872

Doors - Steel Doors incl hw 2nd Floor- Hair Drying Room in Locker Room

6EA1 $301

Floor - Tile 2nd Floor- Hair Drying Room in Locker Room

6SF252 $551

Hand Dryer 2nd Floor- Hair Drying Room in Locker Room

6EA14 $3,221

Lighting - Pendent/Surface 2nd Floor- Hair Drying Room in Locker

Room

6EA2 $248

Walls - Plaster/Drywall 2nd Floor- Hair Drying Room in Locker

Room

6SF825 $2,277

Accessories 2nd Floor 6SF123 $1,134

Accessories 2nd Floor 6SF118 $1,088

Accessories 2nd Floor 6SF340 $3,136

Ceiling - Plaster/Drywall 2nd Floor 6SF340 $1,177

Ceiling - Plaster/Drywall 2nd Floor 6SF123 $426

Ceiling - Plaster/Drywall 2nd Floor 6SF118 $408

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Floor Drain 2nd Floor 6EA4 $4,237

Floor Drain 2nd Floor 6EA1 $1,059

Floor Drain 2nd Floor 6EA1 $1,059

Floor - Tile 2nd Floor 6SF340 $744

Floor - Tile 2nd Floor 6SF123 $269

Floor - Tile 2nd Floor 6SF118 $258

Hand Dryer 2nd Floor 6EA2 $460

Hand Dryer 2nd Floor 6EA1 $230

Page 57 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 58: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Hand Dryer 2nd Floor 6EA1 $230

Lavatory 2nd Floor 6EA2 $639

Lavatory 2nd Floor 6EA3 $959

Lavatory 2nd Floor 6EA2 $639

Lighting - Lay-in 2nd Floor 6EA1 $119

Lighting - Lay-in 2nd Floor 6EA1 $119

Lighting - Pendent/Surface 2nd Floor 6EA4 $496

Partitions 2nd Floor 6EA2 $594

Partitions 2nd Floor 6EA1 $297

Partitions 2nd Floor 6EA2 $594

Showers 2nd Floor 6EA16 $4,983

Urinals 2nd Floor 6EA3 $1,008

Urinals 2nd Floor 6EA1 $336

Walls - Plaster/Drywall 2nd Floor 6SF288 $795

Walls - Plaster/Drywall 2nd Floor 6SF285 $787

Walls - Structural Glazed Tile 2nd Floor 6SF958 $3,014

Walls - Structural Glazed Tile 2nd Floor 6SF288 $906

Walls - Structural Glazed Tile 2nd Floor 6SF285 $897

Water Closet 2nd Floor 6EA2 $672

Water Closet 2nd Floor 6EA2 $672

Water Closet 2nd Floor 6EA1 $336

Accessories 2nd- Girl's NE 6SF294 $2,712

Ceiling - Plaster/Drywall 2nd- Girl's NE 6SF294 $1,017

Floor Drain 2nd- Girl's NE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd- Girl's NE 6SF294 $622

Hand Dryer 2nd- Girl's NE 6EA2 $460

Lavatory 2nd- Girl's NE 6EA1 $320

Lighting - Pendent/Surface 2nd- Girl's NE 7EA5 $0

Partitions 2nd- Girl's NE 6EA6 $1,782

Walls - Plaster/Drywall 2nd- Girl's NE 6SF200 $552

Walls - Tile Ceramic/ Porcelain 2nd- Girl's NE 6SF586 $1,324

Water Closet 2nd- Girl's NE 6EA7 $2,352

Accessories 2nd- Girl's SE 6SF294 $2,712

Ceiling - Plaster/Drywall 2nd- Girl's SE 6SF294 $1,017

Floor Drain 2nd- Girl's SE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd- Girl's SE 6SF294 $622

Hand Dryer 2nd- Girl's SE 6EA2 $460

Page 58 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 59: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Lavatory 2nd- Girl's SE 6EA1 $320

Lighting - Pendent/Surface 2nd- Girl's SE 7EA7 $0

Partitions 2nd- Girl's SE 6EA5 $1,485

Walls - Plaster/Drywall 2nd- Girl's SE 6SF246 $679

Walls - Tile Ceramic/ Porcelain 2nd- Girl's SE 6SF607 $1,371

Water Closet 2nd- Girl's SE 6EA6 $2,016

Accessories 2nd- Inside Rm 229 6SF60 $553

Ceiling - Plaster/Drywall 2nd- Inside Rm 229 6SF60 $208

Doors - Wood Doors inclu hw 2nd- Inside Rm 229 6EA1 $301

Floor Drain 2nd- Inside Rm 229 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd- Inside Rm 229 6SF60 $127

Lavatory 2nd- Inside Rm 229 6EA1 $320

Lighting - Pendent/Surface 2nd- Inside Rm 229 7EA1 $0

Partitions 2nd- Inside Rm 229 6EA1 $297

Walls - Plaster/Drywall 2nd- Inside Rm 229 6SF255 $704

Walls - Tile Ceramic/ Porcelain 2nd- Inside Rm 229 6SF96 $217

Water Closet 2nd- Inside Rm 229 6EA1 $336

Accessories 3rd- Boy's Gym Toilet 6SF107 $987

Ceiling - Plaster/Drywall 3rd- Boy's Gym Toilet 6SF107 $370

Doors - Wood Doors inclu hw 3rd- Boy's Gym Toilet 6EA1 $301

Floor Drain 3rd- Boy's Gym Toilet 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd- Boy's Gym Toilet 6SF107 $226

Lavatory 3rd- Boy's Gym Toilet 6EA1 $320

Lighting - Pendent/Surface 3rd- Boy's Gym Toilet 7EA1 $0

Partitions 3rd- Boy's Gym Toilet door is missing5EA1 $751

Urinals 3rd- Boy's Gym Toilet 6EA2 $672

Walls - Plaster/Drywall 3rd- Boy's Gym Toilet 6SF295 $814

Walls - Tile Ceramic/ Porcelain 3rd- Boy's Gym Toilet stone6SF120 $271

Water Closet 3rd- Boy's Gym Toilet 6EA1 $336

Accessories 3rd- Boy's NE 6SF223 $2,057

Ceiling - Plaster/Drywall 3rd- Boy's NE 6SF223 $772

Floor Drain 3rd- Boy's NE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd- Boy's NE 6SF223 $472

Hand Dryer 3rd- Boy's NE 6EA1 $230

Lavatory 3rd- Boy's NE 6EA1 $320

Lighting - Pendent/Surface 3rd- Boy's NE 7EA4 $0

Partitions 3rd- Boy's NE door missing5EA1 $751

Page 59 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 60: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Urinals 3rd- Boy's NE 6EA5 $1,680

Walls - Plaster/Drywall 3rd- Boy's NE 6SF153 $422

Walls - Tile Ceramic/ Porcelain 3rd- Boy's NE 6SF606 $1,369

Water Closet 3rd- Boy's NE 6EA1 $336

Accessories 3rd- Boy's SE 6SF223 $2,057

Ceiling - Plaster/Drywall 3rd- Boy's SE 6SF223 $772

Floor Drain 3rd- Boy's SE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd- Boy's SE 6SF223 $472

Hand Dryer 3rd- Boy's SE 6EA1 $230

Lavatory 3rd- Boy's SE 6EA1 $320

Lighting - Pendent/Surface 3rd- Boy's SE 7EA4 $0

Partitions 3rd- Boy's SE 6EA2 $594

Urinals 3rd- Boy's SE 6EA5 $1,680

Walls - Plaster/Drywall 3rd- Boy's SE 6SF153 $422

Walls - Tile Ceramic/ Porcelain 3rd- Boy's SE 6SF606 $1,369

Water Closet 3rd- Boy's SE 6EA2 $672

Accessories 3rd- Girl's NE 6SF294 $2,712

Ceiling - Plaster/Drywall 3rd- Girl's NE 6SF294 $1,017

Floor Drain 3rd- Girl's NE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd- Girl's NE 6SF294 $622

Hand Dryer 3rd- Girl's NE 6EA2 $460

Lavatory 3rd- Girl's NE 6EA1 $320

Lighting - Pendent/Surface 3rd- Girl's NE 7EA5 $0

Partitions 3rd- Girl's NE 6EA6 $1,782

Walls - Plaster/Drywall 3rd- Girl's NE 6SF200 $552

Walls - Tile Ceramic/ Porcelain 3rd- Girl's NE 6SF586 $1,324

Water Closet 3rd- Girl's NE 6EA7 $2,352

Accessories 3rd- Girl's SE 6SF294 $2,712

Ceiling - Plaster/Drywall 3rd- Girl's SE 6SF294 $1,017

Floor Drain 3rd- Girl's SE 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd- Girl's SE 6SF294 $622

Hand Dryer 3rd- Girl's SE 6EA2 $460

Lavatory 3rd- Girl's SE 6EA1 $320

Lighting - Pendent/Surface 3rd- Girl's SE 7EA7 $0

Partitions 3rd- Girl's SE 6EA5 $1,485

Walls - Plaster/Drywall 3rd- Girl's SE 6SF246 $679

Walls - Tile Ceramic/ Porcelain 3rd- Girl's SE 6SF607 $1,371

Page 60 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 61: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Water Closet 3rd- Girl's SE 6EA6 $2,016

Accessories 3rd- Men's 6SF127 $1,171

Ceiling - Plaster/Drywall 3rd- Men's 6SF126 $436

Ceiling - Plaster/Drywall 3rd- Men's peeling6SF1 $5

Doors - Transom Window 3rd- Men's 6SF1 $17

Doors - Wood Doors inclu hw 3rd- Men's 6EA1 $301

Floor Drain 3rd- Men's 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd- Men's 6SF127 $269

Lavatory 3rd- Men's 6EA1 $320

Lighting - Pendent/Surface 3rd- Men's 7EA1 $0

Lighting - Wall Mounted 3rd- Men's 7EA1 $0

Partitions 3rd- Men's 6EA2 $594

Urinals 3rd- Men's 6EA1 $336

Walls - Plaster/Drywall 3rd- Men's 6SF494 $1,363

Walls - Tile Ceramic/ Porcelain 3rd- Men's 6SF18 $41

Water Closet 3rd- Men's 6EA2 $672

Accessories 3rd- Women's 6SF196 $1,808

Ceiling - Plaster/Drywall 3rd- Women's 6SF196 $678

Doors - Transom Window 3rd- Women's 6SF1 $17

Doors - Wood Doors inclu hw 3rd- Women's 6EA1 $301

Floor - Tile Ceramic/ Porcelain 3rd- Women's 6SF196 $415

Lavatory 3rd- Women's 6EA1 $320

Lighting - Pendent/Surface 3rd- Women's 7EA2 $0

Lighting - Wall Mounted 3rd- Women's 7EA1 $0

Partitions 3rd- Women's 6EA2 $594

Walls - Plaster/Drywall 3rd- Women's 6SF557 $1,537

Walls - Vinyl Coated Gypsum Panel 3rd- Women's Stone6SF60 $166

Water Closet 3rd- Women's 6EA2 $672

Rooms (Other Than Classrooms) Subtotal: $3,171,126

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Lay-in 1st Floor 6SF11,547 $34,676

Ceiling - Plaster/Drywall 1st Floor 6SF7,444 $46,093

Page 61 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 62: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Plaster/Drywall 1st Floor 5SF10 $174

Doors - Transom Window 1st Floor 6EA156 $2,641

Doors - Wood Doors include hw 1st Floor 6EA30 $9,030

Drinking Fountains - Single Fountain 1st Floor 6EA15 $4,136

Floor - Terrazzo 1st Floor 6SF5,114 $42,927

Floor - Tile/Sheet 1st Floor 5SF30 $173

Floor - Tile/Sheet 1st Floor 6SF14,033 $7,626

Lighting - Lay-in 1st Floor 7EA80 $0

Lighting - Pendent/Surface 1st Floor 7EA111 $0

Student Lockers - One Tier 1st Floor 6EA645 $59,879

Walls - Plaster/Drywall 1st Floor 6SF14,740 $65,342

Walls - Plaster/Drywall 1st Floor 5SF5 $50

Walls - Structural Glazed Tile 1st Floor 6SF15,313 $48,175

Walls - Tile Ceramic/ Porcelain 1st Floor 6SF1,332 $4,190

Ceiling - Lay-in 2nd Floor 6SF10,624 $31,904

Ceiling - Lay-in 2nd Floor 5SF30 $268

Ceiling - Plaster/Drywall 2nd Floor 6SF3,012 $18,650

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Doors - Transom Window 2nd Floor 6EA64 $1,084

Doors - Wood Doors include hw 2nd Floor 6EA8 $2,408

Drinking Fountains - Single Fountain 2nd Floor 5EA1 $1,180

Drinking Fountains - Single Fountain 2nd Floor 6EA13 $3,585

Floor - Terrazzo 2nd Floor 6SF1,500 $12,591

Floor - Tile/Sheet 2nd Floor 5SF20 $115

Floor - Tile/Sheet 2nd Floor 6SF14,160 $7,695

Lighting - Lay-in 2nd Floor 7EA80 $0

Lighting - Pendent/Surface 2nd Floor 7EA5 $0

Student Lockers - One Tier 2nd Floor 6EA907 $84,202

Walls - Plaster/Drywall 2nd Floor 6SF14,697 $65,152

Walls - Structural Glazed Tile 2nd Floor 6SF14,959 $47,061

Ceiling - Lay-in 3rd Floor 6SF11,231 $33,727

Ceiling - Lay-in 3rd Floor 5SF10 $89

Ceiling - Plaster/Drywall 3rd Floor 6SF5,390 $33,374

Ceiling - Plaster/Drywall 3rd Floor 5SF5 $87

Doors - Transom Window 3rd Floor 6EA64 $1,084

Doors - Wood Doors include hw 3rd Floor 6EA12 $3,612

Drinking Fountains - Single Fountain 3rd Floor 6EA11 $3,033

Page 62 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 63: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Drinking Fountains - Single Fountain 3rd Floor 5EA1 $1,180

Floor - Terrazzo 3rd Floor 6SF2,161 $18,140

Floor - Tile/Sheet 3rd Floor 6SF14,465 $7,860

Floor - Tile/Sheet 3rd Floor 5SF10 $58

Lighting - Lay-in 3rd Floor 7EA25 $0

Lighting - Pendent/Surface 3rd Floor 7EA174 $0

Student Lockers - One Tier 3rd Floor 6EA835 $77,518

Student Lockers - Two Tiers 3rd Floor 6EA80 $3,713

Walls - Plaster/Drywall 3rd Floor 6SF13,259 $58,777

Walls - Structural Glazed Tile 3rd Floor 6SF14,589 $45,897

Ceiling - Lay-in 4th Floor Only outside of Rm 400 & 4016SF60 $180

Floor - Tile/Sheet 4th Floor 6SF60 $33

Lighting - Lay-in 4th Floor 6EA2 $238

Walls - Plaster/Drywall 4th Floor 6SF500 $2,217

Safety

Camera Viewing Station 1st Floor IDF/MDF/Asst Principal/Security Desk/Principal6EA5 $3,413

Metal Dedector 1st Floor 2 at Main entrance & 1 at entrance by Rm1276EA3 $2,642

Security Cameras 1st Floor Interior, Not working5EA8 $5,502

Security Cameras 1st Floor 13 exterior & 115 interior6EA128 $24,837

Security Cameras 1st Floor Exterior6EA14 $2,717

Security Cameras 1st Floor Exterior, Not working5EA4 $2,751

Stairs

Ceiling - Plaster/Drywall Interior North of Balcony 6SF433 $3,170

Floor - Terrazzo Interior North of Balcony 6SF162 $1,360

Handrails Interior North of Balcony 6LF113 $979

Lighting - Pendent/Surface Interior North of Balcony 7EA4 $0

Stairs - Terrazzo Interior North of Balcony 6LF55 $510

Walls - Plaster/Drywall Interior North of Balcony 6SF659 $1,819

Walls - Structural Glazed Tile Interior North of Balcony 6SF659 $2,073

Ceiling - Plaster/Drywall Interior South of Balcony 6SF433 $3,170

Floor - Terrazzo Interior South of Balcony 6SF271 $2,275

Handrails Interior South of Balcony 6LF113 $979

Lighting - Pendent/Surface Interior South of Balcony 7EA4 $0

Stairs - Terrazzo Interior South of Balcony 6LF55 $510

Walls - Plaster/Drywall Interior South of Balcony 6SF659 $1,819

Walls - Structural Glazed Tile Interior South of Balcony 6SF659 $2,073

Page 63 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 64: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Stairs

Ceiling - Plaster/Drywall NE of Boys Gym 6SF211 $1,545

Floor - Terrazzo NE of Boys Gym 6SF191 $1,603

Handrails NE of Boys Gym 6LF174 $1,508

Lighting - Pendent/Surface NE of Boys Gym 7EA2 $0

Lighting - Wall Mounted NE of Boys Gym 7EA4 $0

Stairs - Terrazzo NE of Boys Gym 6LF90 $835

Walls - Plaster/Drywall NE of Boys Gym 6SF595 $1,642

Walls - Structural Glazed Tile NE of Boys Gym 6SF1,190 $3,744

Ceiling - Plaster/Drywall North of Main Vestibule 6SF529 $3,873

Floor - Terrazzo North of Main Vestibule 6SF366 $3,072

Handrails North of Main Vestibule 6LF180 $1,560

Lighting - Pendent/Surface North of Main Vestibule 7EA6 $0

Stairs - Terrazzo North of Main Vestibule 6LF80 $742

Walls - Plaster/Drywall North of Main Vestibule 6SF1,149 $3,171

Walls - Structural Glazed Tile North of Main Vestibule 6SF1,149 $3,615

Ceiling - Plaster/Drywall North 6SF433 $3,170

Floor - Terrazzo North 6SF271 $2,275

Handrails North 6LF113 $979

Lighting - Pendent/Surface North 7EA4 $0

Stairs - Terrazzo North 6LF55 $510

Walls - Plaster/Drywall North 6SF659 $1,819

Walls - Structural Glazed Tile North 6SF659 $2,073

Ceiling - Plaster/Drywall NW of Boys Gym 6SF92 $674

Floor - Tile NW of Boys Gym 6SF92 $50

Handrails NW of Boys Gym 6LF68 $589

Lighting - Pendent/Surface NW of Boys Gym 7EA2 $0

Stairs - Terrazzo NW of Boys Gym 6LF34 $316

Walls - Plaster/Drywall NW of Boys Gym 6SF320 $883

Walls - Structural Glazed Tile NW of Boys Gym 6SF1,020 $3,209

Ceiling - Plaster/Drywall SE of Girls Gym 6SF211 $1,545

Floor - Terrazzo SE of Girls Gym 6SF191 $1,603

Handrails SE of Girls Gym 6LF174 $1,508

Lighting - Pendent/Surface SE of Girls Gym 7EA2 $0

Lighting - Wall Mounted SE of Girls Gym 7EA4 $0

Stairs - Terrazzo SE of Girls Gym 6LF90 $835

Walls - Plaster/Drywall SE of Girls Gym 6SF595 $1,642

Walls - Structural Glazed Tile SE of Girls Gym 6SF1,190 $3,744

Page 64 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 65: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Stairs

Ceiling - Plaster/Drywall South 6SF433 $3,170

Floor - Terrazzo South 6SF271 $2,275

Handrails South 6LF113 $979

Lighting - Pendent/Surface South 7EA4 $0

Ceiling - Plaster/Drywall South of Main Vestibule 6SF529 $3,873

Floor - Terrazzo South of Main Vestibule 6SF366 $3,072

Handrails South of Main Vestibule 6LF180 $1,560

Lighting - Pendent/Surface South of Main Vestibule 7EA6 $0

Stairs - Terrazzo South of Main Vestibule 6LF80 $742

Walls - Plaster/Drywall South of Main Vestibule 6SF1,149 $3,171

Walls - Structural Glazed Tile South of Main Vestibule 6SF1,149 $3,615

Stairs - Terrazzo South 6LF55 $510

Walls - Plaster/Drywall South 6SF659 $1,819

Walls - Structural Glazed Tile South 6SF659 $2,073

Ceiling - Plaster/Drywall SW of Girls Gym 6SF56 $410

Floor - Terrazzo SW of Girls Gym 6SF56 $470

Handrails SW of Girls Gym 6LF18 $156

Lighting - Pendent/Surface SW of Girls Gym 7EA1 $0

Stairs - Terrazzo SW of Girls Gym 6LF14 $130

Walls - Plaster/Drywall SW of Girls Gym 6SF240 $662

Walls - Structural Glazed Tile SW of Girls Gym 6SF680 $2,139

Vertical Conveyance

Elevator - Freight Elevator 6EA1 $19,238

Building Interior Subtotal: $1,059,122

Total Building Cost $13,752,211

Building: 6-Classroom Modular

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Exterior Doors - Exterior Steel Door #13 - N 6EA2 $961

Exterior Doors - Exterior Steel Door #13 - N 6EA2 $961

Exterior Doors - Exterior Steel Door #14 - N 6EA2 $961

Exterior Doors - Exterior Steel Door #14 - N 6EA2 $961

Page 65 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 66: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Exterior Doors - Exterior Steel Door #15 - S 6EA2 $961

Exterior Doors - Exterior Steel Door #15 - S 6EA2 $961

Exterior Doors - Exterior Steel Door #16 - S 6EA2 $961

Exterior Doors - Exterior Steel Door #16 - S 6EA2 $961

Exterior Stairs - Concrete #15 - S 6LF15 $1,227

Exterior Stairs - Concrete #15 - S 6LF15 $1,227

Exterior Stairs - Concrete #16 - S 6LF15 $1,227

Exterior Stairs - Concrete #16 - S 6LF15 $1,227

Foundation

Foundation - Masonry Entire Building 7LF340 $0

Foundation - Masonry Entire Building 7LF340 $0

Foundation - Masonry Entire Building 7LF340 $0

Foundation - Masonry Entire Building 7LF340 $0

Superstructure - Steel Entire Building 7SF7,060 $0

Superstructure - Steel Entire Building 7SF7,060 $0

Superstructure - Steel Entire Building 7SF7,060 $0

Superstructure - Steel Entire Building 7SF7,060 $0

Lighting

Exterior Lighting - Wall Mounted Entire Building Replace fixtures-not working4EA10 $10,301

Exterior Lighting - Wall Mounted Entire Building Replace fixtures-not working4EA10 $10,301

Exterior Lighting - Wall Mounted Entire Building Replace fixtures-not working4EA10 $10,301

Exterior Lighting - Wall Mounted Entire Building Replace fixtures-not working4EA10 $10,301

Roof System

Coping - Metal Main Roof 6LF340 $10,920

Coping - Metal Main Roof 6LF340 $10,920

Coping - Metal Main Roof 6LF340 $10,920

Coping - Metal Main Roof 6LF340 $10,920

Downspouts - Exterior Downspouts Main Roof 6LF52 $1,728

Downspouts - Exterior Downspouts Main Roof 6LF52 $1,728

Downspouts - Exterior Downspouts Main Roof 6LF52 $1,728

Downspouts - Exterior Downspouts Main Roof 6LF52 $1,728

Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF7,060 $0

Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF7,060 $0

Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF7,060 $0

Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF7,060 $0

Roof - PVC Membrane Main Roof Some water ponding6SF7,060 $58,354

Page 66 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 67: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Roof System

Roof - PVC Membrane Main Roof Some water ponding6SF7,060 $58,354

Roof - PVC Membrane Main Roof Some water ponding6SF7,060 $58,354

Roof - PVC Membrane Main Roof Some water ponding6SF7,060 $58,354

Walls

Exterior Walls - Prefabricated Metal Panel Wall Entire Building 6SF4,420 $25,093

Exterior Walls - Prefabricated Metal Panel Wall Entire Building 6SF4,420 $25,093

Exterior Walls - Prefabricated Metal Panel Wall Entire Building 6SF4,420 $25,093

Exterior Walls - Prefabricated Metal Panel Wall Entire Building 6SF4,420 $25,093

Windows

Guard - Guards perforated Entire Building Rusting6SF320 $4,086

Guard - Guards perforated Entire Building Rusting6SF320 $4,086

Guard - Guards perforated Entire Building Rusting6SF320 $4,086

Guard - Guards perforated Entire Building Rusting6SF320 $4,086

Windows - Sash Aluminum Double-pane Entire Building 6SF320 $2,389

Windows - Sash Aluminum Double-pane Entire Building 6SF320 $2,389

Windows - Sash Aluminum Entire Building 6SF320 $2,389

Windows - Sash Aluminum Entire Building 6SF320 $2,389

Building Exterior Subtotal: $464,077

Building: 6-Classroom Modular

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Emergency Battery Packs - Corridors and Stairs Entire Building 6EA3 $608

Emergency Battery Packs - Corridors and Stairs Entire Building 6EA3 $608

Emergency Battery Packs - Corridors and Stairs Entire Building 6EA3 $608

Emergency Battery Packs - Corridors and Stairs Entire Building 6EA3 $608

Exit Signs - Corridors and Stairs 1st Floor 7EA2 $0

Exit Signs - Corridors and Stairs 1st Floor 7EA2 $0

Exit Signs - Corridors and Stairs Entire Building 7EA2 $0

Exit Signs - Corridors and Stairs Entire Building 7EA2 $0

Main Service

Independent Electrical Service for emergency power Mechanical Room 7EA1 $0

Independent Electrical Service for emergency power Mechanical Room 7EA1 $0

Page 67 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 68: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Main Service

PA System Entire Building Location: Main Office (Serves all three buildings)6SF7,060 $2,322

PA System Entire Building Location: Main Office (Serves all three buildings)6SF7,060 $2,322

PA System Entire Building Location: Main Office (Serves all three buildings)6SF7,060 $2,322

PA System Entire Building Location: Main Office (Serves all three buildings)6SF7,060 $2,322

Power Distribution

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6047EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6057EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6057EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: IDF Room 602 (Storage Closet)7EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: IDF Room 602 (Storage Closet)7EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6017EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6017EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6037EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6037EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Clalssroom 5017EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Clalssroom 5017EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classrrom 5027EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6047EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Loation: Classroom 5047EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: MDF Room 502, Storage Closet7EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: MDF Room 502, Storage Closet7EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5067EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5067EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5057EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classrrom 5027EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Loation: Classroom 5047EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6027EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5037EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5037EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classrom 6067EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classrom 6067EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6027EA1 $0

Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5057EA1 $0

Electrical System Subtotal: $11,718

Building: 6-Classroom Modular

Page 68 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 69: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Safty System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Fire Alarm

Fire Alarm Panel 1st Floor Services & Links all three buildings together6EA1 $6,406

Fire Alarm Panel 1st Floor Services & Links all three buildings together6EA1 $6,406

Fire Alarm Panel 1st Floor Services & Links all three buildings together6EA1 $6,406

Fire Alarm Panel 1st Floor Services & Links all three buildings together6EA1 $6,406

Fire Alarm Strobe Lights 1st Floor / Entire Building 6SF7,060 $2,524

Fire Alarm Strobe Lights 1st Floor / Entire Building 6SF7,060 $2,524

Fire Alarm Strobe Lights 1st Floor / Entire Building 6SF7,060 $2,524

Fire Alarm Strobe Lights 1st Floor / Entire Building 6SF7,060 $2,524

Fire Alarm_System 1st Floor / Entire Building 6SF7,060 $3,433

Fire Alarm_System 1st Floor / Entire Building 6SF7,060 $3,433

Fire Alarm_System 1st Floor / Entire Building 6SF7,060 $3,433

Fire Alarm_System 1st Floor / Entire Building 6SF7,060 $3,433

Sprinkler System

Sprinkler Heads Entire Building 7SF7,060 $0

Sprinkler Heads Entire Building 7SF7,060 $0

Sprinkler Heads Entire Building 7SF7,060 $0

Sprinkler Heads Entire Building 7SF7,060 $0

Sprinkler Piping Entire Building 6SF7,060 $1,312

Sprinkler Piping Entire Building 6SF7,060 $1,312

Sprinkler Piping Entire Building 6SF7,060 $1,312

Sprinkler Piping Entire Building 6SF7,060 $1,312

Wet Sprinkler System Entire Building 6SF7,060 $1,817

Wet Sprinkler System Entire Building 6SF7,060 $1,817

Wet Sprinkler System Entire Building 6SF7,060 $1,817

Wet Sprinkler System Entire Building 6SF7,060 $1,817

Safty System Subtotal: $61,968

Building: 6-Classroom Modular

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Temperature Control

Electric Thermostat Entire Building 6EA6 $0

Electric Thermostat Entire Building 6EA6 $0

Electric Thermostat Entire Building 6EA6 $0

Electric Thermostat Entire Building 6EA6 $0

Page 69 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 70: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Unit Ventilation

Unit Ventilators - Vertical Package Electric Heat & Self Contained

Cooling

Exterior walls One/Clasroom6EA6 $0

Unit Ventilators - Vertical Package Electric Heat & Self Contained Cooling

Exterior walls One/Clasroom6EA6 $0

Unit Ventilators - Vertical Package Electric Heat & Self Contained Cooling

Exterior walls One/Classroom6EA6 $0

Unit Ventilators - Vertical Package Electric Heat & Self Contained Cooling

Exterior walls One/Classroom6EA6 $0

Ventilation

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA7 $4,147

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA7 $4,147

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA2 $1,185

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA2 $1,185

Mechanical System Subtotal: $10,663

Building: 6-Classroom Modular

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Hot Water

Electric Heater - Less than 20 KW Mechanical Room Location: Storage Room6EA1 $682

Electric Heater - Less than 20 KW Mechanical Room Location: Storage Room6EA1 $682

Electric Heater - Less than 20 KW Mechanical Room Location: Storage Room6EA1 $682

Electric Heater - Less than 20 KW Mechanical Room Location: Storage Room6EA1 $682

Piping

Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF7,060 $1,413

Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF7,060 $1,413

Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF7,060 $1,413

Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF7,060 $1,413

Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF7,060 $1,716

Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF7,060 $1,716

Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF7,060 $1,716

Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF7,060 $1,716

Domestic Piping-Cold Water Risers Entire Building 6SF7,060 $1,312

Domestic Piping-Cold Water Risers Entire Building 6SF7,060 $1,312

Domestic Piping-Cold Water Risers Entire Building 6SF7,060 $1,312

Domestic Piping-Cold Water Risers Entire Building 6SF7,060 $1,312

Page 70 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 71: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Piping

Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF7,060 $1,111

Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF7,060 $1,111

Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF7,060 $1,111

Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF7,060 $1,111

Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF7,060 $1,312

Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF7,060 $1,312

Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF7,060 $1,312

Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF7,060 $1,312

Domestic Piping-Hot Water Return Lines Entire Building 6SF7,060 $1,010

Domestic Piping-Hot Water Return Lines Entire Building 6SF7,060 $1,010

Domestic Piping-Hot Water Return Lines Entire Building 6SF7,060 $1,010

Domestic Piping-Hot Water Return Lines Entire Building 6SF7,060 $1,010

Domestic Piping-Hot Water Return Risers Entire Building 6SF7,060 $1,010

Domestic Piping-Hot Water Return Risers Entire Building 6SF7,060 $1,010

Domestic Piping-Hot Water Return Risers Entire Building 6SF7,060 $1,010

Domestic Piping-Hot Water Return Risers Entire Building 6SF7,060 $1,010

Sanitary Piping Entire Building 6SF7,060 $6,461

Sanitary Piping Entire Building 6SF7,060 $6,461

Sanitary Piping Entire Building 6SF7,060 $6,461

Sanitary Piping Entire Building 6SF7,060 $6,461

Storm Piping Entire Building 6SF7,060 $6,158

Storm Piping Entire Building 6SF7,060 $6,158

Storm Piping Entire Building 6SF7,060 $6,158

Storm Piping Entire Building 6SF7,060 $6,158

Vent Piping Entire Building 6SF7,060 $4,745

Vent Piping Entire Building 6SF7,060 $4,745

Vent Piping Entire Building 6SF7,060 $4,745

Vent Piping Entire Building 6SF7,060 $4,745

Plumbing System Subtotal: $107,725

Building: 6-Classroom Modular

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #501 (Office)

Casework 1st Floor 6LF22 $556

Casework 1st Floor 6LF22 $556

Page 71 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 72: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #501 (Office)

Ceiling - Lay-in 1st Floor 6SF816 $2,450

Ceiling - Lay-in 1st Floor 6SF816 $2,450

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF816 $1,785

Floor - Tile 1st Floor 6SF816 $1,785

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF11 $0

Marker Board 1st Floor 7LF11 $0

Storage/ Closet 1st Floor 6SF71 $515

Storage/ Closet 1st Floor 6SF71 $515

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF845 $2,332

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF845 $2,332

Classroom #502 (Computer Lab)

Ceiling - Lay-in 1st Floor 6SF812 $2,438

Ceiling - Lay-in 1st Floor 6SF812 $2,438

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF812 $1,777

Floor - Tile 1st Floor 6SF812 $1,777

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF12 $0

Marker Board 1st Floor 7LF12 $0

Storage/ Closet 1st Floor IDP 6SF79 $573

Storage/ Closet 1st Floor IDP 6SF79 $573

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF842 $2,324

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF842 $2,324

Classroom #503 (Regular Classroom)

Ceiling - Lay-in 1st Floor 6SF812 $2,438

Ceiling - Lay-in 1st Floor 6SF812 $2,438

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF812 $1,777

Floor - Tile 1st Floor 6SF812 $1,777

Page 72 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 73: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #503 (Regular Classroom)

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF11 $0

Marker Board 1st Floor 7LF11 $0

Storage/ Closet 1st Floor 1 cracked ceiling tile6SF73 $529

Storage/ Closet 1st Floor 1 cracked ceiling tile6SF73 $529

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316

Classroom #504 (Regular Classroom)

Ceiling - Lay-in 1st Floor stains5SF5 $40

Ceiling - Lay-in 1st Floor stains5SF5 $40

Ceiling - Lay-in 1st Floor 6SF807 $2,423

Ceiling - Lay-in 1st Floor 6SF807 $2,423

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF812 $1,777

Floor - Tile 1st Floor 6SF812 $1,777

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF11 $0

Marker Board 1st Floor 7LF11 $0

Storage/ Closet 1st Floor 6SF81 $587

Storage/ Closet 1st Floor 6SF81 $587

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316

Classroom #505 (Regular Classroom)

Ceiling - Lay-in 1st Floor 6SF819 $2,459

Ceiling - Lay-in 1st Floor 6SF819 $2,459

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF814 $1,781

Floor - Tile 1st Floor 6SF814 $1,781

Page 73 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 74: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #505 (Regular Classroom)

Floor - Tile 1st Floor damaged - cracked / holes5SF5 $29

Floor - Tile 1st Floor damaged - cracked / holes5SF5 $29

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF11 $0

Marker Board 1st Floor 7LF11 $0

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Walls - Vinyl Coated Gypsum Panel 1st Floor corner damaged / unfinished5SF5 $37

Walls - Vinyl Coated Gypsum Panel 1st Floor corner damaged / unfinished5SF5 $37

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316

Classroom #506 (Regular Classroom)

Ceiling - Lay-in 1st Floor 6SF819 $2,459

Ceiling - Lay-in 1st Floor 6SF819 $2,459

Doors - Wood Doors inclu hw 1st Floor doesn't close properly5EA1 $1,174

Doors - Wood Doors inclu hw 1st Floor doesn't close properly5EA1 $1,174

Floor - Tile 1st Floor 6SF819 $1,792

Floor - Tile 1st Floor 6SF819 $1,792

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF11 $0

Marker Board 1st Floor 7LF11 $0

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF843 $2,327

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF843 $2,327

Classroom #601 (Regular Classroom)

Ceiling - Lay-in 1st Floor stains5SF5 $40

Ceiling - Lay-in 1st Floor 6SF812 $2,438

Ceiling - Lay-in 1st Floor 6SF812 $2,438

Ceiling - Lay-in 1st Floor stains5SF5 $40

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF817 $1,788

Floor - Tile 1st Floor 6SF817 $1,788

Page 74 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 75: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #601 (Regular Classroom)

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF11 $0

Marker Board 1st Floor 7LF11 $0

Storage/ Closet 1st Floor 6SF70 $508

Storage/ Closet 1st Floor 6SF70 $508

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316

Classroom #602 (Regular Classroom)

Ceiling - Lay-in 1st Floor 6SF817 $2,453

Ceiling - Lay-in 1st Floor 6SF817 $2,453

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF817 $1,788

Floor - Tile 1st Floor 6SF817 $1,788

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF8 $0

Marker Board 1st Floor 7LF8 $0

Storage/ Closet 1st Floor IDP - Stain at ceiing6SF82 $595

Storage/ Closet 1st Floor IDP - Stain at ceiing6SF82 $595

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF838 $2,313

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF838 $2,313

Classroom #603 (Regular Classroom)

Ceiling - Lay-in 1st Floor 6SF811 $2,435

Ceiling - Lay-in 1st Floor 6SF811 $2,435

Ceiling - Lay-in 1st Floor stained / cracked tiles5SF6 $48

Ceiling - Lay-in 1st Floor stained / cracked tiles5SF6 $48

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF817 $1,788

Floor - Tile 1st Floor 6SF817 $1,788

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF11 $0

Marker Board 1st Floor 7LF11 $0

Page 75 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 76: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #603 (Regular Classroom)

Storage/ Closet 1st Floor 6SF70 $508

Storage/ Closet 1st Floor 6SF70 $508

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF844 $2,329

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF844 $2,329

Classroom #604 (Regular Classroom)

Ceiling - Lay-in 1st Floor 6SF807 $2,423

Ceiling - Lay-in 1st Floor stained5SF10 $80

Ceiling - Lay-in 1st Floor stained5SF10 $80

Ceiling - Lay-in 1st Floor 6SF807 $2,423

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF817 $1,788

Floor - Tile 1st Floor 6SF817 $1,788

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF11 $0

Marker Board 1st Floor 7LF11 $0

Storage/ Closet 1st Floor ceiling tiles missing / stained6SF83 $602

Storage/ Closet 1st Floor ceiling tiles missing / stained6SF83 $602

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF840 $2,318

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF840 $2,318

Classroom #605 (Regular Classroom)

Ceiling - Lay-in 1st Floor 6SF817 $2,453

Ceiling - Lay-in 1st Floor 6SF817 $2,453

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF817 $1,788

Floor - Tile 1st Floor 6SF817 $1,788

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF11 $0

Marker Board 1st Floor 7LF11 $0

Page 76 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 77: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #605 (Regular Classroom)

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Student Lockers - Two Tiers 1st Floor 6EA30 $1,393

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF841 $2,321

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF841 $2,321

Classroom #606 (Regular Classroom)

Ceiling - Lay-in 1st Floor 6SF812 $2,438

Ceiling - Lay-in 1st Floor stains5SF5 $40

Ceiling - Lay-in 1st Floor stains5SF5 $40

Ceiling - Lay-in 1st Floor 6SF812 $2,438

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF817 $1,788

Floor - Tile 1st Floor 6SF817 $1,788

Lighting - Lay-in 1st Floor 7EA16 $0

Lighting - Lay-in 1st Floor 7EA16 $0

Marker Board 1st Floor 7LF11 $0

Marker Board 1st Floor 7LF11 $0

Student Lockers - Two Tiers 1st Floor 6EA10 $464

Student Lockers - Two Tiers 1st Floor 6EA10 $464

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF845 $2,332

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF845 $2,332

Classrooms Subtotal: $197,129

Building: 6-Classroom Modular

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Mechanical/ Service Rooms

Mechanical/ Service Rooms 1st Floor 6SF104 $745

Mechanical/ Service Rooms 1st Floor 6SF104 $745

Mechanical/ Service Rooms 1st Floor 6SF110 $788

Mechanical/ Service Rooms 1st Floor 6SF110 $788

Restroom

Accessories 1st - Mens 6SF154 $1,420

Accessories 1st - Mens 6SF154 $1,420

Accessories 1st - Mens 6SF154 $1,420

Page 77 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 78: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Accessories 1st - Mens 6SF154 $1,420

Ceiling - Plaster/Drywall 1st - Mens Vinyl Coated6SF149 $516

Ceiling - Plaster/Drywall 1st - Mens Vinyl coated6SF154 $533

Ceiling - Plaster/Drywall 1st - Mens stained5SF5 $62

Ceiling - Plaster/Drywall 1st - Mens Vinyl Coated6SF149 $516

Ceiling - Plaster/Drywall 1st - Mens stained5SF5 $62

Ceiling - Plaster/Drywall 1st - Mens Vinyl coated6SF154 $533

Doors - Wood Doors inclu hw 1st - Mens 6EA1 $301

Doors - Wood Doors inclu hw 1st - Mens 6EA1 $301

Doors - Wood Doors inclu hw 1st - Mens 6EA1 $301

Doors - Wood Doors inclu hw 1st - Mens 6EA1 $301

Floor Drain 1st - Mens 6EA1 $1,059

Floor Drain 1st - Mens 6EA1 $1,059

Floor Drain 1st - Mens 6EA1 $1,059

Floor Drain 1st - Mens 6EA1 $1,059

Floor - Tile/Sheet 1st - Mens 6SF154 $154

Floor - Tile/Sheet 1st - Mens 6SF154 $154

Floor - Tile/Sheet 1st - Mens 6SF154 $154

Floor - Tile/Sheet 1st - Mens 6SF154 $154

Hand Dryer 1st - Mens 6EA1 $230

Hand Dryer 1st - Mens 6EA1 $230

Hand Dryer 1st - Mens 6EA1 $230

Hand Dryer 1st - Mens 6EA1 $230

Lavatory 1st - Mens 6EA2 $639

Lavatory 1st - Mens 6EA2 $639

Lavatory 1st - Mens 6EA2 $639

Lavatory 1st - Mens 6EA2 $639

Lighting - Pendent/Surface 1st - Mens 7EA1 $0

Lighting - Pendent/Surface 1st - Mens 7EA1 $0

Lighting - Pendent/Surface 1st - Mens 7EA1 $0

Lighting - Pendent/Surface 1st - Mens 7EA1 $0

Partitions 1st - Mens 6EA1 $297

Partitions 1st - Mens 6EA1 $297

Partitions 1st - Mens 6EA1 $297

Partitions 1st - Mens 6EA1 $297

Urinals 1st - Mens damaged - covered5EA2 $2,688

Urinals 1st - Mens damaged - covered5EA2 $2,688

Page 78 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 79: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Urinals 1st - Mens Damaged / covered5EA1 $1,344

Urinals 1st - Mens Damaged / covered5EA1 $1,344

Urinals 1st - Mens 6EA1 $336

Urinals 1st - Mens 6EA1 $336

Walls - Vinyl Coated Gypsum Panel 1st - Mens 6SF436 $1,203

Walls - Vinyl Coated Gypsum Panel 1st - Mens 6SF436 $1,203

Walls - Vinyl Coated Gypsum Panel 1st - Mens 6SF436 $1,203

Walls - Vinyl Coated Gypsum Panel 1st - Mens 6SF436 $1,203

Water Closet 1st - Mens 6EA2 $672

Water Closet 1st - Mens 6EA2 $672

Water Closet 1st - Mens 6EA2 $672

Water Closet 1st - Mens 6EA2 $672

Accessories 1st - Womens 6SF176 $1,623

Accessories 1st - Womens 6SF176 $1,623

Accessories 1st - Womens 6SF176 $1,623

Accessories 1st - Womens 6SF176 $1,623

Ceiling - Plaster/Drywall 1st - Womens Vinyl Coated6SF176 $609

Ceiling - Plaster/Drywall 1st - Womens Vinyl Coated6SF176 $609

Ceiling - Plaster/Drywall 1st - Womens Vinyl Coated6SF176 $609

Ceiling - Plaster/Drywall 1st - Womens Vinyl Coated6SF176 $609

Doors - Wood Doors inclu hw 1st - Womens 6EA1 $301

Doors - Wood Doors inclu hw 1st - Womens 6EA1 $301

Doors - Wood Doors inclu hw 1st - Womens 6EA1 $301

Doors - Wood Doors inclu hw 1st - Womens 6EA1 $301

Floor Drain 1st - Womens 6EA1 $1,059

Floor Drain 1st - Womens 6EA1 $1,059

Floor Drain 1st - Womens 6EA1 $1,059

Floor Drain 1st - Womens 6EA1 $1,059

Floor - Tile/Sheet 1st - Womens 6SF176 $176

Floor - Tile/Sheet 1st - Womens 6SF176 $176

Floor - Tile/Sheet 1st - Womens 6SF176 $176

Floor - Tile/Sheet 1st - Womens 6SF176 $176

Hand Dryer 1st - Womens 6EA1 $230

Hand Dryer 1st - Womens 6EA1 $230

Hand Dryer 1st - Womens 6EA1 $230

Hand Dryer 1st - Womens 6EA1 $230

Lavatory 1st - Womens 6EA2 $639

Page 79 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 80: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Lavatory 1st - Womens 6EA2 $639

Lavatory 1st - Womens 6EA2 $639

Lavatory 1st - Womens 6EA2 $639

Lighting - Pendent/Surface 1st - Womens 7EA2 $0

Lighting - Pendent/Surface 1st - Womens 7EA2 $0

Lighting - Pendent/Surface 1st - Womens 7EA2 $0

Lighting - Pendent/Surface 1st - Womens 7EA2 $0

Partitions 1st - Womens 6EA3 $891

Partitions 1st - Womens 6EA3 $891

Partitions 1st - Womens 6EA3 $891

Partitions 1st - Womens 6EA3 $891

Walls - Vinyl Coated Gypsum Panel 1st - Womens 6SF471 $1,300

Walls - Vinyl Coated Gypsum Panel 1st - Womens 6SF471 $1,300

Walls - Vinyl Coated Gypsum Panel 1st - Womens 6SF468 $1,292

Walls - Vinyl Coated Gypsum Panel 1st - Womens 6SF468 $1,292

Water Closet 1st - Womens 6EA4 $1,344

Water Closet 1st - Womens 6EA4 $1,344

Water Closet 1st - Womens 6EA4 $1,344

Water Closet 1st - Womens 6EA4 $1,344

Rooms (Other Than Classrooms) Subtotal: $70,602

Building: 6-Classroom Modular

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Lay-in 1st Floor 5SF5 $45

Ceiling - Lay-in 1st Floor 5SF5 $45

Ceiling - Lay-in 1st Floor 6SF988 $2,967

Ceiling - Lay-in 1st Floor 6SF993 $2,982

Ceiling - Lay-in 1st Floor 6SF993 $2,982

Ceiling - Lay-in 1st Floor 6SF988 $2,967

Doors - Steel Doors incl hw 1st Floor 6EA4 $1,204

Doors - Steel Doors incl hw 1st Floor 6EA4 $1,204

Doors - Steel Doors incl hw 1st Floor 6EA4 $1,204

Doors - Steel Doors incl hw 1st Floor 6EA4 $1,204

Drinking Fountains - Single Fountain 1st Floor 6EA2 $551

Page 80 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 81: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Building: 6-Classroom Modular

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Drinking Fountains - Single Fountain 1st Floor 6EA2 $551

Drinking Fountains - Single Fountain 1st Floor 6EA2 $551

Drinking Fountains - Single Fountain 1st Floor 6EA2 $551

Floor - Tile/Sheet 1st Floor 6SF993 $540

Floor - Tile/Sheet 1st Floor 6SF993 $540

Floor - Tile/Sheet 1st Floor 6SF993 $540

Floor - Tile/Sheet 1st Floor 6SF993 $540

Lighting - Lay-in 1st Floor 7EA10 $0

Lighting - Lay-in 1st Floor 7EA10 $0

Lighting - Lay-in 1st Floor 7EA10 $0

Lighting - Lay-in 1st Floor 7EA10 $0

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF1,520 $4,195

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF1,520 $4,195

Walls - Vinyl Coated Gypsum Panel 1st Floor 5SF5 $38

Walls - Vinyl Coated Gypsum Panel 1st Floor 5SF5 $38

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF1,520 $4,195

Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF1,520 $4,195

Safety

Security Cameras Entire Building 6EA2 $388

Security Cameras Entire Building 6EA2 $388

Security Cameras Entire Building 6EA2 $388

Security Cameras Entire Building 6EA2 $388

Building Interior Subtotal: $39,575

Total Building Cost $963,458

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Athletic

Metal Bleachers East 6LF30 $1,338

Surface - Natural East SE6SF20,778 $17,233

Surface - Natural East Cinder, grass on the track, damaged curb5SF30,086 $45,604

Surface - Natural East NE6SF8,790 $8,422

Surface - Natural East 6SF102,830 $85,287

Page 81 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 82: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Athletic

Civil/Drainage

Civil/ Drainage - Catch Basin Entire Site 7EA14 $0

Civil/ Drainage - Site Drain Entire Site SW basement well; clogged5EA1 $1,379

Civil/ Drainage - Site Drain Entire Site Basement wells6EA3 $931

Civil/ Drainage - Site Manhole Entire Site 7EA24 $0

Fencing

Fencing - Chain Link Entire Site Baseball diamonds6LF378 $7,097

Fencing - Guard Rail Entire Site 6LF50 $578

Fencing - New Standard Ornamental Entire Site NW at parking lot; bent5LF6 $0

Fencing - New Standard Ornamental Entire Site 6LF3,160 $100,814

Landscape

Benches Entire Site E6EA6 $2,580

Irrigation Entire Site Numerous leaks4SF139,780 $629,639

Landscape - Grass Entire Site 6SF102,045 $84,636

Landscape - Hardscape- Asphalt Entire Site SW; cracks5SF15,878 $72,431

Landscape - Hardscape- Concrete Entire Site E6SF13,020 $67,213

Parkway trees Entire Site 7EA58 $0

Planting Beds/ Area Entire Site 6SF1,150 $1,891

Retaining Wall - Concrete Entire Site SW basement wells; spalling, cracks5SF1,200 $88,220

Retaining Wall - Concrete Entire Site 6SF10,338 $242,299

Trash Receptacles Entire Site 6EA10 $3,123

Parking Lot

Concrete Curbs N Lot 6LF15 $193

Concrete Curbs NW Lot 6LF90 $1,156

Lighting - Pole Mounted N Lot E site6EA10 $14,525

Surface - Asphalt N Lot 6SF14,064 $33,988

Surface - Asphalt W Lot Deterioration numerous alligator cracking was

occurring

4SF22,181 $175,088

Surface NW Lot 618,859 $0

Trash Compactor W Lot 6EA2 $0

Trash Enclosure - Chain Links W Lot Loose poles5SF392 $12,416

Trash Enclosure - Masonry W Lot 6SF1,188 $46,871

Vehicular Screening N Lot 6LF15 $1,181

Vehicular Screening NW Lot 6LF90 $7,086

Page 82 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 83: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Playground

Equipment - Pre K 3-5 NE 6EA1 $3,546

Equipment - Swingset NE 6EA1 $1,182

Surface - Wood Chips NE 6SF3,480 $7,017

Service Garage

Service Garage - Free-Standing NE 6SF831 $7,629

Sidewalks

Sidewalks - Internal Walks Entire Site 6LF805 $9,670

Sidewalks - Internal Walks Entire Site Exit 7; water ponding, pitting5LF155 $7,725

Sidewalks - Internal Walks Entire Site Main entrance; water ponding5LF110 $6,355

Sidewalks - Internal Walks Entire Site SW; cracks, pitting5LF50 $2,889

Sidewalks - Internal Walks Entire Site SW site; cracks5LF10 $578

Sidewalks - Perimeter Sidewalks Entire Site 6SF23,225 $46,164

Signage

Flag Pole - Flag Pole Entire Site 6EA2 $3,314

Monument - Building Mounted Cut Letter Sign Entire Site Door #1, Door #3, Door #8, Door #106EA4 $0

Site Subtotal: $1,849,288

Total Site Cost $1,849,288

Campus Total ² ³

² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost.

³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below.

¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report; by the time the report is compiled, they have been resolved.

$16,564,957

Definitions

● Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated.

Page 83 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 84: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

● Unit

means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,

depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and

additional work triggered by building codes.

means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).

● Cost

● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.

● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to

alleviate overcrowding; these are viewed as separate capital needs.

Page 84 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 85: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

Main

YYY4084216261011,255311311Art RoomArt Room 3rd Floor

YYY40252402631855313313Art RoomArt Room 3rd Floor

NYY40252402631855315315Art RoomArt Room 3rd Floor

NYY40421081631550307357Art RoomArt Room 3rd Floor

NYY404413234231773113113Laboratory/ShopComputer Lab 1st Floor

NYN400026124932127127Lunch RoomComputer Lab 1st Floor

YYY407224015018021,489201201LibraryComputer Lab 2nd Floor

NYY40561444031742209209Regular ClassroomComputer Lab 2nd Floor

YYY40722041162911,155211211Art RoomComputer Lab 2nd Floor

YYY405816874161925220220Regular ClassroomComputer Lab 2nd Floor

YYY40561444031742202222Other Instructional UseComputer Lab 2nd Floor

YYY405614430311,084227227Other Instructional UseComputer Lab 2nd Floor

YYY405614450311,084228228GymnasiumComputer Lab 2nd Floor

YYY403085621411,016300300Multi Purpose RoomComputer Lab 3rd Floor

YYY4052156110551830326326Regular ClassroomComputer Lab 3rd Floor

YYY409619264311,100330330Regular ClassroomComputer Lab 3rd Floor

YYY40387544261645300333Multi Purpose RoomComputer Lab 3rd Floor

YYY40751506013950300399Regular ClassroomComputer Lab 3rd Floor

YNN4010331034331,800400400Music RoomMusic Room 4th Floor

YNN4010331034331,800401401Music RoomMusic Room 4th Floor

YYN400030141,338ROTC121 JROTCSpecial ProgramOther Instructional Use 1st Floor

YYY40441082231742101101Regular ClassroomRegular Classroom 1st Floor

YNN40941882,218411729103103Regular ClassroomRegular Classroom 1st Floor

YYN40941882642756105105Regular ClassroomRegular Classroom 1st Floor

YYN40941882241727107107Regular ClassroomRegular Classroom 1st Floor

YYN40941881842729109109Regular ClassroomRegular Classroom 1st Floor

YYN40941882042923111111Regular ClassroomRegular Classroom 1st Floor

NYN4070141621540116116Regular ClassroomRegular Classroom 1st Floor

YYN40941882621742130130Regular ClassroomRegular Classroom 5th Floor

YYN40941882436792132132Regular ClassroomRegular Classroom 1st Floor

NYY40561444031742202202Regular ClassroomRegular Classroom 2nd Floor

YYY40561442231742203203Regular ClassroomRegular Classroom 2nd Floor

NYY40561442231742204204Regular ClassroomRegular Classroom 2nd Floor

YYN40561442231742205205Regular ClassroomRegular Classroom 2nd Floor

YYY40561442231742206206Regular ClassroomRegular Classroom 2nd Floor

YYY40561442231742207207Regular ClassroomRegular Classroom 2nd Floor

YYY40561442231742208208Regular ClassroomRegular Classroom 2nd Floor

Page 85 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 86: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

Main

YYY40561442231742212212Regular ClassroomRegular Classroom 2nd Floor

YYY40561442231742213213Regular ClassroomRegular Classroom 2nd Floor

YYY405614422111742215215Regular ClassroomRegular Classroom 2nd Floor

YYY4042108811550218218Regular ClassroomRegular Classroom 2nd Floor

YYY40561442231742221221Regular ClassroomRegular Classroom 2nd Floor

YYY40561444031742224224Regular ClassroomRegular Classroom 2nd Floor

NYY40561444031742225225Regular ClassroomRegular Classroom 2nd Floor

NYY40561442231742226226Regular ClassroomRegular Classroom 2nd Floor

YYY40961922641730301301Regular ClassroomRegular Classroom 3rd Floor

YYY40561442641742302302Regular ClassroomRegular Classroom 3rd Floor

YYY40721444831550303303Regular ClassroomRegular Classroom 3rd Floor

YYY40561442641742304304Regular ClassroomRegular Classroom 3rd Floor

YYY40751442831550305305Regular ClassroomRegular Classroom 3rd Floor

YYY40561442641742306306Regular ClassroomRegular Classroom 3rd Floor

YYY40421082231550307307Regular ClassroomRegular Classroom 3rd Floor

YYY40561442641742308308Regular ClassroomRegular Classroom 3rd Floor

YYY40561442631742310310Regular ClassroomRegular Classroom 3rd Floor

NYY40561442231742312312Regular ClassroomRegular Classroom 3rd Floor

YYY4042108821550318318Regular ClassroomRegular Classroom 3rd Floor

YYY405614422154710319319Regular ClassroomRegular Classroom 3rd Floor

YYY40961922631715321321Regular ClassroomRegular Classroom 3rd Floor

NYY40961922831725323323Regular ClassroomRegular Classroom 3rd Floor

NYY409619216511,086325325Regular ClassroomRegular Classroom 3rd Floor

YYY4014428832311,100328328Regular ClassroomRegular Classroom 3rd Floor

YYY40561442631742332332Regular ClassroomRegular Classroom 3rd Floor

YYY407214410831550303353Regular ClassroomRegular Classroom 3rd Floor

YYY40421082421550305355Regular ClassroomRegular Classroom 3rd Floor

YYY407018074521,065214214ScienceScience 2nd Floor

YYY408421674321,039216216ScienceScience 2nd Floor

NYY407018074521,065314314ScienceScience 3rd Floor

YYY408421674321,039316316ScienceScience 3rd Floor

NYY40701805431918320320ScienceScience 3rd Floor

NNN4012024012211,072322322Science ClassroomScience Classroom 3rd Floor

NYN40141282601001,148112112Science Lab Level 1Science Lab Level 1 1st Floor

YNN4014128268511,100114114Science Lab Level 1Science Lab Level 1 1st Floor

NYY407224015018021,489115115Regular ClassroomStore Room 1st Floor

Page 86 of 87STEINMETZ HS Assessment Date: 11/20/14

Page 87: Charles P Steinmetz College Preparatory HSschoolreports.cps.edu/Assessment_PDF_Detail_2015/1560D.pdf · Charles P Steinmetz College Preparatory HS 3030 N Mobile Ave Chicago, IL 60634

Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

6-Classroom Modular

NYN4032641000812-502Regular ClassroomComputer Lab 1st Floor

NYN4032641016816-501Regular ClassroomOffice 1st Floor

NYN4032641200812-503Regular ClassroomRegular Classroom 1st Floor

NYN4032641210812-504Regular ClassroomRegular Classroom 1st Floor

NYN4032641214819-505Regular ClassroomRegular Classroom 1st Floor

NYN4032641306819-506Regular ClassroomRegular Classroom 1st Floor

NYN4032641201817-601Regular ClassroomRegular Classroom 1st Floor

NYN40326424123817-602Regular ClassroomRegular Classroom 1st Floor

NYN4032641212817-603Regular ClassroomRegular Classroom 1st Floor

NYN4032641204817-604Regular ClassroomRegular Classroom 1st Floor

NYN4032641202817-605Regular ClassroomRegular Classroom 1st Floor

NYN4032641212817-606Regular ClassroomRegular Classroom 1st Floor