25
May 15, 2020 DATE: J. W. Cheatham, LLC Russell Engineering , Inc . Hardrives of Delray , Inc . Ranger Construction Industries , Inc. Rosso Site Development, Inc . Ryan Incorporated Southern Bergeron Land Development, Inc. Ric-Man International, Inc. TO: Department of Engineering and Public Works P . O. Box 21229 West Palm Beach, FL 33416 - 1229 ( 561) 684 - 4000 FAX : ( 561) 684 - 4050 www. pbcgov. com Morton L . Rose , P.E . , Director , Roadway Production Div. FROM: AWARD RECOMMENDATION LYONS RD, N. OF LWDD L-14 CANAL TO LAKE WORTH RD & LYONS RD, LAKE WORTH RD TO S. OF LWDD L-ll CANAL PALM BEACH COUNTY PROJECT NOS. 2010504B & 2007500A RE: Palm Beach County Board of County Commissioners Based on bid results and EBO compliance review, Engineering & Public Works recommends award of the above referenced contract to J. W. Cheatham, LLC. Dave Kerner , Mayor Robert S. Weinroth, Vice Mayor The enclosed Award Recommendation will be posted at the Engineering & Public Works Department / Roadway Production Division reception area on the 3rd Floor at 2300 North Jog Road, West Palm Beach, Florida on May 18 , 2020. If your office wishes to protest the award recommendation, you may do so by addressing your protest to Ms . Kathleen M. Scarlett, Director , Palm Beach County Purchasing Department, 50 South Military Trail, West Palm Beach, Florida 33415. Failure to submit a protest to the Director of Purchasing within five ( 5) business days after posting of the Award Recommendation, as prescribed in Section 2- 55(b) of the Palm Beach County Code , shall constitute a waiver of proceedings under the referenced County Code. Hal R. Valeche Gregg K. Weiss Mary Lou Berger Melissa McKinlay Mack Bernard County Administrator Verdenia C. Baker We thank you for your continued interest in bidding Palm Beach County projects . David Ricks, P . E. , County Engineer Tanya N. McConnell , P . E . , Deputy County Engineer Steve Carrier , P .E . , Assistant County Engineer Yelizaveta Herman, Assistant County Attorney Kathleen M. Scarlett , Director , Purchasing Department Holly B. Knight , P . E . , Contracts Section Manager , Roadway Production Div . Kathleen O. Farrell , P .E. , 5 - Year Road Program Mgr , Roadway Prod . Div . Basher Khan, P . E . , Project Engineer , Roadway Production ec : Mark Tomlinson, Director , Construction Coordination Vanessa Jagoo , Office Manager , Roadway Production Division Saman Rohani , Utility Coordinator , Roadway Production Division Anthony Montero , Office of the Inspector General Angela Smith, Small Business Development Specialist II, OEBO An Equal Opportunity Affirmative Action Employer " F: \ ROADWAY\PRO\ 20 W\ 20I 0504B - LYONS RD. , N. OF LWDD L - 14 CANAL TO LAKE WORTH RD\5 - AWARDMNTENT AND REJECT LETTERS \CONTRACTOR POSTING OF NOTICE OF INTENT TO AWARD . DOC printed on sustainable and recycled paper

Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

May 15, 2020DATE:

J.W. Cheatham, LLCRussell Engineering, Inc.Hardrives of Delray, Inc.Ranger Construction Industries, Inc.Rosso Site Development, Inc.Ryan Incorporated SouthernBergeron Land Development, Inc.Ric-Man International, Inc.

TO:

Department of Engineeringand Public Works

P.O. Box 21229

West Palm Beach, FL 33416-1229(561) 684-4000

FAX: (561) 684-4050

www.pbcgov.com

Morton L. Rose, P.E., Director, Roadway Production Div.FROM:

AWARD RECOMMENDATIONLYONS RD, N. OF LWDD L-14 CANAL TO LAKEWORTH RD & LYONS RD, LAKE WORTH RD TOS. OF LWDD L-ll CANALPALM BEACH COUNTY PROJECT NOS. 2010504B& 2007500A

RE:

Palm Beach CountyBoard of CountyCommissioners Based on bid results and EBO compliance review, Engineering & Public

Works recommends award of the above referenced contract to J.W.Cheatham, LLC.Dave Kerner, Mayor

Robert S. Weinroth, Vice MayorThe enclosed Award Recommendation will be posted at the Engineering &Public Works Department / Roadway Production Division reception area onthe 3rd Floor at 2300 North Jog Road, West Palm Beach, Florida on May 18,2020. If your office wishes to protest the award recommendation, you maydo so by addressing your protest to Ms. Kathleen M. Scarlett, Director, PalmBeach County Purchasing Department, 50 South Military Trail, West PalmBeach, Florida 33415. Failure to submit a protest to the Director ofPurchasing within five (5) business days after posting of the AwardRecommendation, as prescribed in Section 2-55(b) of the Palm Beach CountyCode, shall constitute a waiver of proceedings under the referenced CountyCode.

Hal R. Valeche

Gregg K. Weiss

Mary Lou Berger

Melissa McKinlay

Mack Bernard

County Administrator

Verdenia C. BakerWe thank you for your continued interest in bidding Palm Beach Countyprojects.

David Ricks, P.E., County EngineerTanya N. McConnell, P.E., Deputy County EngineerSteve Carrier, P.E., Assistant County EngineerYelizaveta Herman, Assistant County AttorneyKathleen M. Scarlett, Director, Purchasing DepartmentHolly B. Knight, P.E., Contracts Section Manager, Roadway Production Div.Kathleen O. Farrell, P.E., 5-Year Road Program Mgr, Roadway Prod. Div.Basher Khan, P. E., Project Engineer, Roadway Production

ec:

Mark Tomlinson, Director, Construction CoordinationVanessa Jagoo, Office Manager, Roadway Production DivisionSaman Rohani, Utility Coordinator, Roadway Production DivisionAnthony Montero, Office of the Inspector GeneralAngela Smith, Small Business Development Specialist II, OEBO

“An Equal OpportunityAffirmative Action Employer"

F:\ROADWAY\PRO\20W\20I 0504B- LYONS RD., N. OF LWDD L-14 CANAL TO LAKE WORTH RD\5 - AWARDMNTENT AND REJECTLETTERS\CONTRACTOR POSTING OF NOTICE OF INTENT TO AWARD.DOC

printed on sustainableand recycled paper

Page 2: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

AWARD RECOMMENDATION

PROJECT NOS: 2010504B & 2007500ATITLE: LYONS ROAD. N. OF LWDD L-14 CANAL TO LAKE WORTH ROAD & LYONSROAD. LAKE WORTH ROAD TO S. OF LWDD L-l1 CANAL

TOTAL AMOUNT OF BIDLIST OF BIDDERS FROMLOWEST TO HIGHEST

$7,153,789.08J.W. Cheatham, LLC *

$7,689,949.10Russell Engineering, Inc.

$8,300,000.67Hardrives of Delray Beach, Inc.

$8,494,000.00Ranger Construction Industries, Inc.$8,910,596.93Rosso Site Development, Inc.

$8,999,951.00Ryan Incorporated Southern

$9,115,000.00Bergeron Land Development, Inc.

$9,551,565.95Ric-Man International, Inc.

*Palm Beach County Engineering & Public Works recommends award to J.W. Cheatham, LLC,the lowest responsive, responsible bidder meeting EBO requirements.

REMARKS: SEE THE ATTACHED COMPLIANCE REVIEW FROM THE OFFICE OFEQUAL BUSINESS OPPORTUNITY.

Page 3: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

DATE: May 14, 2020 TO: Holly B. Knight, P.E., Contracts Section Manager FROM: Angela D. Smith, Small Business Development Specialist III Office of Equal Business Opportunity SUBJECT: Compliance Review on Project No.: 2010504B &

2007500A – Lyons Road, N. of LWDD L-14 Canal to Lake Worth Road & Lyons Road, Lake Worth Road to S. of LWDD L-11 Canal

_______________________________________________________________________________________ The following bids, opened by the Department of Engineering and Public Works on May 7, 2020, have been evaluated according to the provisions set forth for the Affirmative Procurement Initiative (API) for Construction: 13% minimum mandatory SBE participation, established for the above-mentioned solicitation. The percentages are calculated on the amount less contingency, there is no rounding. Non-SBE team members’ participation are not counted toward the API.

__________________________________________________________________________________ Bidder #1: J.W. Cheatham, LLC 7396 Westport Place West Palm Beach, FL 33413 Phone: 561-471-4100 Total Bid Amount: $7,153,789.08 Amount Less Contingency: $6,990,607.50 SBE Prime: NO Total API Achieved: 17 % TEAM EBO STATUS EXP. DATE PERCENTAGE DAWSON-WILLIAMS, INC. SBE 2/23/2023 17% ________________________________________________________________________ Bidder #2: Russell Engineering, Inc. 2530 SW 36th Street Ft. Lauderdale, FL 33312 Phone: (954) 321-9336 Total Bid Amount: $7,689,949.10 Amount Less Contingency: $7,522,346.60 SBE Prime: NO Total API Achieved: 29.8% TEAM EBO STATUS EXP. DATE PERCENTAGE ALL PHASE, INC. S/MBE 5/25/2020 12.7% DAWSON-WILLIAMS, INC. SBE 2/23/2023 17.1%

Page 4: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

________________________________________________________________ Bidder #3: Hardrives of Delray, Inc. 2101 South Congress Avenue Delray Beach, FL 33445 Phone: (561) 278-0456 Total Bid Amount: $8,300,000.67 Amount Less Contingency: $8,119,442.68 SBE Prime: NO Total API Achieved: 27.4% TEAM EBO STATUS EXP. DATE PERCENTAGE PATHWAY ENTERPRISES SBE 5/7/2021 11.6% DAWSON-WILLIAMS SBE 2/23/2020 15.8% SIGNAL TECHNOLOGY, INC. NON-SBE ________________________________________________________________________ Bidder #4: Ranger Construction Industries, Inc. 101 Sansbury’s Way West Palm Beach, FL 33411 Phone: (561) 793-9400 Total Bid Amount: $8,494,000.00 Amount Less Contingency: $8,355,424.88 SBE Prime: NO Total API Achieved: 13.22% TEAM EBO STATUS EXP. DATE PERCENTAGE WM D ADEIMY JR., INC. SBE 3/21/2023 11.16% Sirdar Trucking, Inc. S/MBE 2/23/2023 2.06%

_______________________________________________________________________ Bidder #5: Rosso Site Development 1302 S. J Street Lake Worth, FL 33460 Phone: (561) 689-0889 Total Bid Amount: $8,910,596.93 Amount Less Contingency: $8,759,063.38 SBE Prime: YES Total API Achieved: 28.2% TEAM EBO STATUS EXP. DATE PERCENTAGE ROSSO SITE DEVELOPMENT SBE 1/21/2022 28.2% RANGER CONSTRUCTION NON-SBE -- -- CARR CONSTRUCTION NON-SBE -- -- SOUTHEAST HIGHWAY GUARDRAIL NON-SBE -- --

Page 5: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

NATURE’S KEEPER, INC. NON-SBE -- -- EVERGLADES CONTRACTING NON-SBE -- -- ATLAS SURVEYING & MAPPING NON-SBE -- -- ________________________________________________________________________ Bidder #6: Ryan Incorporated 1700 South Powerline Road Deerfield Beach, FL 33442 Phone: (954) 427-5599 Total Bid Amount: $8,999,951.00 Amount Less Contingency: $8,773,420.00 SBE Prime: NO Total API Achieved: .74%1 TEAM EBO STATUS EXP. DATE PERCENTAGE WM. D. ADEIMY, JR., INC. SBE 3/21/2023 10.6%2 AGRICULTURAL LAND SERVICES S/WBE 11/3/2022 .48% ALL COUNTY PAVING NON-SBE TRU TRUCKING S/MBE 10/26/2022 2.3%3 S.E. HIGHWAY & GUARDRAIL NON-SBE NTCS NAT TRAFFIC CONTROL NON-SBE CAULIFIELD & WHEELER NON-SBE TREECYLCE LAND CLEARING SBE 1/28/2021 .26% MOT PLANS, INC. NON-SBE AUSTIN TUPLE TRUCKING, INC. NON-SBE ________________________________________________________________________ Bidder #7: Bergeron Land Development, Inc. 19612 S.W. 69th Place Fort Lauderdale, FL 33332 Phone: (954) 680-6100 Total Bid Amount: $9,115,000.00 Amount Less Contingency: $8,947,469.60 SBE Prime: NO Total API Achieved: 14.97%

1 Ryan Incorporated Southern is non-responsive to the API, see footnotes 2 and 3. 2 The schedule 2 for Wm.D. Adeimy, Jr., Inc. on the team for Ryan Incorporated Southern indicated “multiple items” the item description area. There are no identifiable services this SBE would be providing, therefore, no credit toward the API will be given. 3 The Schedule 2 for Tru Trucking, Inc. on the team for Ryan Incorporated Southern indicated Multiple line items in the item description area. There are no identifiable services this S/MBE would be providing, therefore, no credit toward the API will be given.

Page 6: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

TEAM EBO STATUS EXP. DATE PERCENTAGE PATHWAY ENTERPRISES, INC. SBE 6/30/2022 10.6% RITZEL MASON, INC. SBE 4/9/2022 1.1% RADISE INTERNATIONAL S/MBE 12/12/2020 .50% AGRICULTURAL LAND SERVICES S/WBE 11/3/2022 .47% UTILITY SUPPLY ASSOCIATES SBE 8/21/2022 2.3% ________________________________________________________________________ Bidder #8: Ric-Man International, Inc. 1545 NW 27th Avenue Pompano Beach, FL Phone: (954) 426-1042 Total Bid Amount: $9,551,565.95 Amount Less Contingency: $9,393,843.55 SBE Prime: NO Total API Achieved: 13.2% TEAM EBO STATUS EXP. DATE PERCENTAGE MATADOR CONSTRUCTION S/MBE 1/15/2023 13.2% EVALUATION:

Bidder #1, J.W. Cheatham, LLC is the lowest responsive bidder to the API of 13% minimum mandatory SBE participation.

Page 7: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. Units Unit Price Unit Price Unit Price Amount Unit Price Amount

ROADWAY ITEMSMOBILIZATION 1 LS 834,394.59$ 625,000.00$ 509,410.00$ 509,410.00$ 555,013.00$ 555,013.00$

MAINTENANCE OF TRAFFIC (INCL. PEDESTRIAN MOT) (PHASE A) 1 LS 288,106.48$ 625,000.00$ 310,075.00$ 310,075.00$ 313,055.00$ 313,055.00$

MAINTENANCE OF TRAFFIC (INCL. PEDESTRIAN MOT) (PHASE B) 1 LS 78,987.45$ 625,000.00$ 35,000.00$ 35,000.00$ 113,055.00$ 113,055.00$

CLEARING AND GRUBBING (PHASE A) 1 LS 422,987.13$ 625,000.00$ 614,868.00$ 614,868.00$ 213,055.00$ 213,055.00$

CLEARING AND GRUBBING (PHASE B) 1 LS 139,172.69$ 625,000.00$ 68,000.00$ 68,000.00$ 113,055.00$ 113,055.00$

FLOATING TURBIDITY BARRIER 110 LF 1,888.98$ 8.85$ 10.00$ 1,100.00$ 12.00$ 1,320.00$

REGULAR EXCAVATION 7,288 CY 55,443.46$ 11.28$ 10.00$ 72,880.00$ 8.00$ 58,304.00$

CANAL EXCAVATION (SEE SP's) 782 CY 9,803.35$ 22.71$ 10.00$ 7,820.00$ 28.00$ 21,896.00$

EMBANKMENT (COMPACTED IN PLACE) 28,424 CY 367,131.49$ 18.79$ 10.00$ 284,240.00$ 12.00$ 341,088.00$

CANAL EMBANKMENT (COMPACTED IN PLACE) 1,082 CY 12,072.42$ 20.00$ 10.00$ 10,820.00$ 23.00$ 24,886.00$

TYPE B STABILIZATION (LBR 40) (12") 66,353 SY 385,676.81$ 7.23$ 3.45$ 228,917.85$ 2.50$ 165,882.50$

OPTIONAL BASE GROUP 1 (DRIVEWAYS AND TURNOUTS) 843 SY 17,580.77$ 10.50$ 12.05$ 10,158.15$ 28.50$ 24,025.50$

OPTIONAL BASE GROUP 7 59,483 SY 790,231.66$ 14.26$ 12.05$ 716,770.15$ 15.00$ 892,245.00$

OPTIONAL BASE GROUP 13 2,581 SY 60,014.70$ 29.58$ 24.30$ 62,718.30$ 20.00$ 51,620.00$

MILL EXISTING ASPHALT PAVEMENT (1" AVG. THICK) 8,431.2 SY 27,390.86$ 3.97$ 3.05$ 25,715.16$ 3.00$ 25,293.60$

MISCELLANEOUS ASPHALT PAVEMENT 2.1 TN 1,022.18$ 239.68$ 500.00$ 1,050.00$ 500.00$ 1,050.00$

SUPERPAVE ASPHALT CONCRETE (TRAFFIC LEVEL C) 5,434 TN 577,837.98$ 160.60$ 92.00$ 499,928.00$ 130.00$ 706,420.00$

STRUCTURAL OVERBUILD (TYPE SP)(TRAFFIC LEVEL C) 1,615 TN 198,291.72$ 144.95$ 101.50$ 163,922.50$ 138.00$ 222,870.00$

ASPHALTIC CONCRETE FRICTION COURSE(1.0") (FC-9.5) RUBBER 4,526 TN 695,872.50$ 180.32$ 124.75$ 564,618.50$ 148.00$ 669,848.00$

CLASS I CONCRETE (ENDWALLS) 1.56 CY 8,929.91$ 1,340.00$ 8,958.00$ 13,974.48$ 8,500.00$ 13,260.00$

CLASS I CONCRETE (GRAVITY WALL) 315 CY 183,982.44$ 1,135.00$ 477.00$ 150,255.00$ 600.00$ 189,000.00$

CLASS II CONCRETE (ENDWALLS) 40.1 CY 96,908.37$ 500.00$ 2,950.00$ 118,295.00$ 3,000.00$ 120,300.00$

REINFORCING STEEL 3,193 LB 3,596.12$ 1.00$ 0.55$ 1,756.15$ 0.25$ 798.25$

CONTROL STRUCTURES 1 EA 10,580.05$ 20,141.96$ 10,188.00$ 10,188.00$ 13,000.00$ 13,000.00$

INLETS (CURB) (TYPE P-1), >10 1 EA 12,428.49$ 12,000.00$ 11,302.00$ 11,302.00$ 11,550.00$ 11,550.00$

INLETS (CURB) (TYPE P-5) 13 EA 67,341.59$ 8,324.56$ 4,140.00$ 53,820.00$ 4,250.00$ 55,250.00$

INLETS (CURB) (TYPE P-6) 11 EA 56,687.32$ 12,910.01$ 4,080.00$ 44,880.00$ 4,250.00$ 46,750.00$

INLETS (CURB) (TYPE P-6), >10 1 EA 8,013.94$ 15,000.00$ 5,965.00$ 5,965.00$ 6,150.00$ 6,150.00$

INLETS (CURB) (TYPE P-9) (PARTIAL) 1 EA 3,414.53$ 3,950.00$ 3,065.00$ 3,065.00$ 3,000.00$ 3,000.00$

INLETS (CURB) (TYPE P-9) 3 EA 14,797.95$ 5,490.00$ 3,921.00$ 11,763.00$ 4,000.00$ 12,000.00$

INLETS (CURB) (TYPE J-1), >10 1 EA 13,373.32$ 10,000.00$ 12,355.00$ 12,355.00$ 12,831.00$ 12,831.00$

Item #

31

26

27

28

29

30

8

9

10

21

22

23

24

25

16

17

18

19

20

1

2

3

4

5

11

12

13

14

15

6

7

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

Average of Bid Items for All Bidders Engineer's Estimate J.W. CHEATHAM, LLC. RUSSELL ENGINEERING, INC.

Page 1 of 19

Page 8: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. Units Unit Price Unit Price Unit Price Amount Unit Price AmountItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

Average of Bid Items for All Bidders Engineer's Estimate J.W. CHEATHAM, LLC. RUSSELL ENGINEERING, INC.

INLETS (CURB) (TYPE J-2), >10 1 EA 14,423.25$ 10,000.00$ 13,690.00$ 13,690.00$ 13,000.00$ 13,000.00$

INLETS (CURB) (TYPE J-5) 2 EA 14,954.06$ 7,950.00$ 6,645.00$ 13,290.00$ 6,500.00$ 13,000.00$

INLETS (CURB) (TYPE J-6) 2 EA 15,060.31$ 6,300.00$ 6,550.00$ 13,100.00$ 6,500.00$ 13,000.00$

INLETS (DITCH BOTTOM) (TYPE C) 11 EA 41,428.23$ 3,710.00$ 2,935.00$ 32,285.00$ 3,000.00$ 33,000.00$

INLETS (DITCH BOTTOM) (TYPE C) (J BOTTOM) 5 EA 31,226.22$ 5,700.00$ 5,804.00$ 29,020.00$ 5,500.00$ 27,500.00$

INLETS (DITCH BOTTOM) (TYPE C) PARTIAL 3 EA 6,717.23$ 3,350.00$ 846.00$ 2,538.00$ 825.00$ 2,475.00$

INLETS (DITCH BOTTOM) (TYPE D) 1 EA 4,813.24$ 7,000.00$ 4,575.00$ 4,575.00$ 4,500.00$ 4,500.00$

INLETS (DITCH BOTTOM) (TYPE D) (J BOTTOM) 1 EA 5,971.07$ 6,210.00$ 5,533.00$ 5,533.00$ 5,500.00$ 5,500.00$

INLETS (CLOSED FLUME) TYPE 1 12 EA 86,978.19$ 3,135.00$ 6,461.00$ 77,532.00$ 6,250.00$ 75,000.00$

MANHOLE (TYPE P- 8) 1 EA 5,492.51$ 3,713.00$ 5,341.00$ 5,341.00$ 5,250.00$ 5,250.00$

MANHOLE (TYPE P-8) PARTIAL 2 EA 6,483.26$ 3,765.00$ 3,058.00$ 6,116.00$ 3,000.00$ 6,000.00$

MANHOLE (TYPE P-7) 1 EA 5,146.56$ 6,900.00$ 4,013.00$ 4,013.00$ 4,000.00$ 4,000.00$

MANHOLE (TYPE 7) PARTIAL 1 EA 3,614.87$ 4,700.00$ 1,905.00$ 1,905.00$ 1,850.00$ 1,850.00$

MANHOLE (TYPE J-7) 2 EA 15,416.10$ 7,210.00$ 7,816.00$ 15,632.00$ 8,000.00$ 16,000.00$

MANHOLE (TYPE J-7) (PARTIAL) 8 EA 27,687.67$ 2,750.00$ 3,188.00$ 25,504.00$ 3,250.00$ 26,000.00$

ADJUST INLETS 7 EA 12,283.15$ 3,012.00$ 1,154.00$ 8,078.00$ 1,150.00$ 8,050.00$

ADJUST MANHOLES 6 EA 6,718.41$ 1,380.00$ 1,154.00$ 6,924.00$ 1,150.00$ 6,900.00$

PIPE CULVERT (15") (STORM) 104 LF 8,489.00$ 85.00$ 32.00$ 3,328.00$ 32.00$ 3,328.00$

PIPE CULVERT (18") (STORM) 2,950 LF 211,444.94$ 154.46$ 48.75$ 143,812.50$ 48.00$ 141,600.00$

PIPE CULVERT (24") (STORM) 1,017 LF 91,442.28$ 160.00$ 67.50$ 68,647.50$ 65.00$ 66,105.00$

PIPE CULVERT (30") (STORM) 286 LF 35,192.30$ 170.00$ 95.75$ 27,384.50$ 95.00$ 27,170.00$

PIPE CULVERT (60") (STORM) 32 LF 12,873.16$ 290.00$ 445.00$ 14,240.00$ 450.00$ 14,400.00$

PIPE CULVERT (72") (STORM) 132 LF 74,335.80$ 400.00$ 665.00$ 87,780.00$ 650.00$ 85,800.00$

A2000 (PVC PIPE) (8") 26 LF 1,163.21$ 100.00$ 54.50$ 1,417.00$ 55.00$ 1,430.00$

A2000 (PVC PIPE) (12") 66 LF 2,534.81$ 110.00$ 30.25$ 1,996.50$ 30.00$ 1,980.00$

STORM SEWER PUMPING (EXIST) (24" OR LESS) (SEE SP'S) 2,040 LF 12,706.65$ 15.34$ 3.00$ 6,120.00$ 6.00$ 12,240.00$

STORM SEWER PUMPING (> 24" TO 48") (SEE SP'S) 5,730 LF 44,787.11$ 20.00$ 3.50$ 20,055.00$ 7.00$ 40,110.00$

STORM SEWER PUMPING (> 48") (SEE SP'S) 242 LF 6,229.99$ 30.00$ 7.50$ 1,815.00$ 36.50$ 8,833.00$

MITERED END SECTION (ROUND) (18") 3 EA 8,197.38$ 1,410.00$ 4,364.00$ 13,092.00$ 4,250.00$ 12,750.00$

CONCRETE CURB TYPE D 74 LF 1,712.27$ 22.00$ 18.00$ 1,332.00$ 22.00$ 1,628.00$

CONCRETE CURB & GUTTER TYPE F 30,907 LF 494,821.07$ 27.75$ 13.20$ 407,972.40$ 14.50$ 448,151.50$

CONCRETE SHOULDER GUTTER 128 LF 4,030.56$ 30.00$ 23.50$ 3,008.00$ 32.50$ 4,160.00$

61

62

63

56

57

58

59

60

51

52

53

54

55

46

47

48

49

50

41

42

43

44

45

36

37

38

39

40

32

33

34

35

Page 2 of 19

Page 9: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. Units Unit Price Unit Price Unit Price Amount Unit Price AmountItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

Average of Bid Items for All Bidders Engineer's Estimate J.W. CHEATHAM, LLC. RUSSELL ENGINEERING, INC.

ENGRAVING CURB FACE 12 EA 6,735.00$ 264.48$ 400.00$ 4,800.00$ 400.00$ 4,800.00$

TRAFFIC SEPARATOR CONCRETE (SPECIAL) (VARIABLE WIDTH) 1,217 SY 82,354.39$ 80.00$ 84.80$ 103,201.60$ 75.00$ 91,275.00$

CONCRETE SIDEWALK (4" THICK) 8,144 SY 340,714.42$ 72.90$ 33.40$ 272,009.60$ 38.50$ 313,544.00$

CONCRETE SIDEWALK (6" THICK) (DRIVEWAY) 498 SY 24,855.18$ 87.71$ 37.10$ 18,475.80$ 45.00$ 22,410.00$

COLOR TREATED & STAMPED CONCRETE (SEE SP's) 602 SY 49,513.75$ 86.52$ 82.70$ 49,785.40$ 55.00$ 33,110.00$

PIPE GUIDERAIL (STEEL) 1,602 LF 104,326.25$ 164.00$ 65.70$ 105,251.40$ 50.00$ 80,100.00$

RIP-RAP (RUBBLE) 296 TN 50,386.97$ 82.41$ 279.30$ 82,672.80$ 170.00$ 50,320.00$

GUARDRAIL 64 LF 3,496.48$ 20.00$ 21.15$ 1,353.60$ 30.00$ 1,920.00$

END ANCHORAGE ASSEMBLIES (TYPE II) 1 EA 1,736.64$ 1,500.00$ 1,806.00$ 1,806.00$ 1,000.00$ 1,000.00$

END ANCHORAGE ASSEMBLIES (TYPE CRT) 2 EA 6,869.39$ 2,921.00$ 2,964.00$ 5,928.00$ 3,000.00$ 6,000.00$

TYPE B FENCE (6' HIGH) (W/TOP RAIL) BLACK VINYL CLAD 709 LF 23,363.32$ 44.00$ 24.50$ 17,370.50$ 25.00$ 17,725.00$

RELOCATE EXISTING FENCE (INCLUDES GATE) 1,173 LF 19,272.39$ 20.00$ 12.80$ 15,014.40$ 16.50$ 19,354.50$

RELOCATE EXISTING FENCE GATE 1 EA 842.06$ 1,500.00$ 1,215.00$ 1,215.00$ 1,000.00$ 1,000.00$

SOD 20,084 SY 87,064.14$ 2.80$ 2.15$ 43,180.60$ 4.50$ 90,378.00$

6" PVC CONDUIT IRRIGATION SLEEVE (SCH 80) (SEE SP'S) 1,385 LF 37,287.66$ 5.90$ 28.60$ 39,611.00$ 22.50$ 31,162.50$

TREE SPADE UNITS 3 EA 5,141.25$ 500.00$ 1,500.00$ 4,500.00$ 2,500.00$ 7,500.00$

PALM RELOCATION UNITS 5 EA 4,070.31$ 1,250.00$ 500.00$ 2,500.00$ 1,000.00$ 5,000.00$

SEED AND MULCH 5,593 SY 10,423.95$ 1.60$ 0.52$ 2,908.36$ 1.25$ 6,991.25$

2-2" PVC CONDUITS (SCH 40) TRAFFIC W/ F/O CABLE 7,898 LF 167,407.98$ 6.00$ 6.05$ 47,782.90$ 9.00$ 71,082.00$

TRAFFIC PULL BOX (SMALL) 21 EA 17,054.10$ 1,300.00$ 513.00$ 10,773.00$ 900.00$ 18,900.00$

TRAFFIC PULL BOX (LARGE) 4 EA 7,119.39$ 2,360.00$ 1,372.00$ 5,488.00$ 1,700.00$ 6,800.00$

SUBTOTAL (ROADWAY)

81

82

83

84

76

77

78

79

80

71

72

73

74

75

66

67

68

69

70

64

65

6,528,334.60$ 7,008,953.60$

Page 3 of 19

Page 10: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. Units Unit Price Unit Price Unit Price Amount Unit Price AmountItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

Average of Bid Items for All Bidders Engineer's Estimate J.W. CHEATHAM, LLC. RUSSELL ENGINEERING, INC.

SIGNALIZATION PAY ITEMS85 630-2-11-2 2" PVC (SCH 40) UNDERGROUND CONDUIT 400 LF 6,549.00$ 8.25$ 13.80$ 5,520.00$ 13.50$ 5,400.00$

86 630-2-11-2A ADDITIONAL 2" PVC (SCH 40) CONDUIT, IN OPEN TRENCH 250 LF 1,026.88$ 2.15$ 1.80$ 450.00$ 1.80$ 450.00$

87 630-2-12-2-5 5-2" (HDPE SDR 11) UNDER PAVEMENT CONDUIT (DIRECTIONAL BORE) 320 LF 11,422.80$ 28.80$ 34.00$ 10,880.00$ 33.50$ 10,720.00$

88 630-2-12-2-6 6-2" (HDPE SDR 11) UNDER PAVEMENT CONDUIT (DIRECTIONAL BORE) 300 LF 11,718.75$ 29.80$ 38.00$ 11,400.00$ 37.00$ 11,100.00$

89 630-2-14-2 2" RIGID CONDUIT HOT DIPPED GALVANIZED CONDUIT SURFACE MOUNTED 20 LF 696.08$ 12.10$ 32.00$ 640.00$ 32.00$ 640.00$

90 632-7-1-19G SIGNAL CABLE (SPAN LENGTH 751' - Greater) 1 PI 6,163.41$ 7,300.00$ 5,947.00$ 5,947.00$ 6,000.00$ 6,000.00$

91 632-7-1-4A PEDESTRIAN SIGNAL CABLE - 4 CONDUCTOR 1 PI 1,354.95$ 1,242.00$ 1,124.00$ 1,124.00$ 1,100.00$ 1,100.00$

92 632-7-1-7A PEDESTRIAN SIGNAL CABLE - 7 CONDUCTOR 1 PI 2,014.41$ 2,516.00$ 1,060.00$ 1,060.00$ 1,050.00$ 1,050.00$

93 632-7-6 SIGNAL CABLE, REMOVE - IN INTERSECTION 1 PI 1,117.78$ 1,397.00$ 1,346.00$ 1,346.00$ 1,300.00$ 1,300.00$

94 635-2-12-A PULL BOX (17" x 30" x 12"D) HEAVY DUTY COVERS (TIER 15) 21 EA 19,541.55$ 796.00$ 1,028.00$ 21,588.00$ 1,000.00$ 21,000.00$

95 635-2-12-C PULL BOX (30" x 48" x 24"D) HEAVY DUTY SPLIT COVERS (ITS) (TIER 15) 2 EA 3,790.91$ 1,690.00$ 1,844.00$ 3,688.00$ 1,800.00$ 3,600.00$

96 639-1-123 ELECTRICAL POWER SERVICE NO METER BASE (UNDERGROUND) 1 AS 2,298.15$ 878.00$ 1,028.00$ 1,028.00$ 1,000.00$ 1,000.00$

97 639-2-1-3 ELECTRICAL SERVICE WIRE (SIGLE PHASE 3-WIRE, TRIPLEX) 240 LF 1,006.20$ 2.56$ 4.15$ 996.00$ 4.00$ 960.00$

98 639-3-11 ELECTRICAL SERVICE DISCONNECT (BREAKER BOX, SHEET T 6.2 OF PBC STANDARDS) 1 EA 1,707.30$ 398.00$ 1,495.00$ 1,495.00$ 1,500.00$ 1,500.00$

99 641-2-12-12 PRESTRESSED CONCRETE POLE (12' TYPE P-II ) 1 EA 1,435.50$ 827.00$ 1,050.00$ 1,050.00$ 1,000.00$ 1,000.00$

100 646-1-11 ALUMINUM SIGNALS POLE, PEDESTAL WITH TRANSFORMER BASE (8 FEET ABOVE GROUND) 6 EA 8,559.95$ 706.00$ 1,632.00$ 9,792.00$ 1,600.00$ 9,600.00$

101 646-1-60 ALUMINUM SIGNALS POLE, REMOVE 8 EA 2,152.57$ 707.00$ 170.00$ 1,360.00$ 165.00$ 1,320.00$

102 649-21-15 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, SINGLE 70' 1 EA 61,693.05$ 43,750.00$ 60,100.00$ 60,100.00$ 62,548.00$ 62,548.00$

103 649-21-21 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, SINGLE 78' 2 EA 124,429.63$ 55,425.00$ 60,100.00$ 120,200.00$ 63,125.00$ 126,250.00$

104 649-26-03 STEEL MAST ARM ASSEMBLY, REMOVE, SHALLOW FOUNDATION-BOLT ON ATTACHMENT 3 EA 7,554.14$ 2,328.00$ 2,364.00$ 7,092.00$ 2,350.00$ 7,050.00$

105 649-26-07 REMOVE ARM AND ATTACHMENT FROM EXISTING MAST ARM ASSEMBLY, POLE REMAIN 1 EA 1,360.93$ 3,900.00$ 1,018.00$ 1,018.00$ 990.00$ 990.00$

106 650-1-13 TRAFFIC SIGNAL HEAD ALUMINUM (3-SECTION, 1-WAY) INCLUDES BACKPLATES 13 AS 13,639.37$ 854.00$ 1,050.00$ 13,650.00$ 1,000.00$ 13,000.00$

107 650-1-15 TRAFFIC SIGNAL HEAD ALUMINUM (5-SECTION, 1-WAY) INCLUDES BACKPLATES 2 AS 3,156.30$ 1,460.00$ 1,632.00$ 3,264.00$ 1,600.00$ 3,200.00$

108 653-191 PEDESTRIAN SIGNAL - COUNT DOWN (1-WAY) ALUMINUM 6 EA 3,662.61$ 604.00$ 668.00$ 4,008.00$ 650.00$ 3,900.00$

109 653-1-60 PEDESTRIAN SIGNAL, REMOVE PED SIGNAL 6 EA 1,158.25$ 174.00$ 42.40$ 254.40$ 42.50$ 255.00$

110 660-4-10-B6 VIDEO IMAGE DETECTION 6 - CAMERA SYSTEM (ITERIS) COMPLETE. 1 EA 40,517.78$ 37,000.00$ 38,383.00$ 38,383.00$ 38,000.00$ 38,000.00$

111 660-4-60 VEHICLE DETECTION SYSTEM-VIDEO, REMOVE 4 EA 3,670.14$ 349.00$ 678.00$ 2,712.00$ 170.00$ 680.00$

112 665-1-11 PEDESTRIAN DETECTOR (PUSH BUTTON) 6 EA 1,229.42$ 125.00$ 151.00$ 906.00$ 150.00$ 900.00$

Page 4 of 19

Page 11: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. Units Unit Price Unit Price Unit Price Amount Unit Price AmountItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

Average of Bid Items for All Bidders Engineer's Estimate J.W. CHEATHAM, LLC. RUSSELL ENGINEERING, INC.

113 670-5-110-B TRAFFIC CONTROLLER ASSEMBLY (TYPE 6) AS PER NAZTEC 1 AS 35,174.20$ 24,010.00$ 35,415.00$ 35,415.00$ 35,000.00$ 35,000.00$

114 670-5-600 TRAFFIC CONTROLLER ASSEMBLY, REMOVE CONTROLLER WITH CABINET 1 AS 916.68$ 1,397.00$ 678.00$ 678.00$ 650.00$ 650.00$

115 690-15 REMOVE INTERNALY ILLUMINATED SIGN 4 EA 1,181.20$ 175.00$ 339.00$ 1,356.00$ 335.00$ 1,340.00$

116 700-3-201 SIGN PANEL, FURNISH AND INSTALL OVERHEAD MOUNT, UP TO 12 SF 5 EA 10,472.75$ 9,000.00$ 668.00$ 3,340.00$ 650.00$ 3,250.00$

117 700-5-22 INTERNALLY ILLUMINATED SIGN (8') FLUORESCENT 2 EA 6,581.45$ 1,736.00$ 3,540.00$ 7,080.00$ 3,500.00$ 7,000.00$

SUBTOTAL (SIGNALIZATION)

PBC WATER UTILITY ITEMSADJUST VALVE BOX (INCLUDING CONCRETE COLLAR) 38 EA 27,591.56$ 450.00$ 757.00$ 28,766.00$ 725.00$ 27,550.00$

CONCRETE SLAB 0.74 CY 1,171.28$ 1,000.00$ 767.00$ 567.58$ 750.00$ 555.00$

EXISTING WATER SERVICE AND METER TO BE RELOCATED 1 EA 1,819.94$ 1,500.00$ 2,420.00$ 2,420.00$ 2,350.00$ 2,350.00$

EXISTING WATER METER TO BE RELOCATED 4 EA 4,239.18$ 1,300.00$ 1,266.00$ 5,064.00$ 1,250.00$ 5,000.00$

RELOCATE FIRE HYDRANT 2 EA 3,828.49$ 5,100.00$ 1,606.00$ 3,212.00$ 1,600.00$ 3,200.00$

ADJUST FIRE HYDRANT 1 EA 2,033.39$ 2,000.00$ 3,162.00$ 3,162.00$ 3,100.00$ 3,100.00$

DEFLECT W.M W/FITTINGS (<12") 5 EA 31,879.47$ 5,000.00$ 6,970.00$ 34,850.00$ 6,750.00$ 33,750.00$

ADJUST AIR RELEASE VALVE 4 EA 4,482.25$ 1,400.00$ 577.00$ 2,308.00$ 555.00$ 2,220.00$

ADJUST MANHOLE (UTILITIES) 3 EA 3,190.36$ 1,400.00$ 1,154.00$ 3,462.00$ 1,125.00$ 3,375.00$

RELOCATE BACKFLOW PREVENTER 1 EA 2,769.24$ 1,500.00$ 2,309.00$ 2,309.00$ 2,250.00$ 2,250.00$

8" DUCTILE IRON PIPE FOR POTABLE WATER MAIN INSTALLATION 60 LF 8,638.58$ 32.00$ 225.00$ 13,500.00$ 220.00$ 13,200.00$

CONNECT TO EXISTING 12" POTABLE WATER MAIN 1 EA 3,606.72$ 2,800.00$ 3,225.00$ 3,225.00$ 3,150.00$ 3,150.00$

F&I DUCTILE IRON COMPACT FITTINGS W/REACTION BLOCKING OR THRUST RESTRAINTS F 0.5 TN 9,307.55$ 10,000.00$ 23,320.00$ 11,660.00$ 23,000.00$ 11,500.00$

8" TO 12" JOINT RESTRAINT GASKET (FIELD LOCK OR FAST GRIP) 1 EA 582.62$ 140.00$ 735.00$ 735.00$ 700.00$ 700.00$

8" TO 12" MECHANICAL JOINT RESTRAINT FOR DUCTILE IRON PIPE 6 EA 3,321.86$ 450.00$ 308.00$ 1,848.00$ 305.00$ 1,830.00$

RESTRAINT EXISTING 8" TO 12" PVC PRESSURE PIPE JOINTS 25 EA 19,253.06$ 1,200.00$ 558.00$ 13,950.00$ 550.00$ 13,750.00$

8" GATE VALVE & VALVE BOX 1 EA 2,790.75$ 1,380.00$ 3,845.00$ 3,845.00$ 3,800.00$ 3,800.00$

FIRE HYDRANT ASSEMBLY WITH CAPTIVATOR CAP, 6" GATE VALVE & ANCHOR TEE ASSEMBL 1 EA 7,027.67$ 6,000.00$ 8,478.00$ 8,478.00$ 8,250.00$ 8,250.00$

SAMPLE POINTS ON FIRE HYDRANTS 2 EA 1,120.64$ 500.00$ 355.00$ 710.00$ 350.00$ 700.00$

SHORT SINGLE 5/8" METER SERVICE (1-1/2" PVC) (UP TO 10' LONG) 1 EA 2,588.91$ 1,250.00$ 2,665.00$ 2,665.00$ 3,650.00$ 3,650.00$

DENSITY TEST 5 EA 1,117.34$ 30.00$ 100.00$ 500.00$ 52.50$ 262.50$

REMOVAL/PLUG OF EXISTING WATER SERVICE PIPING 140 LF 3,431.75$ 20.00$ 22.75$ 3,185.00$ 28.00$ 3,920.00$

AS BUILT RECORD DRAWINGS 1 LS 8,364.25$ 2.00$ 1,000.00$ 1,000.00$ 7,500.00$ 7,500.00$

SUBTOTAL (UTILITY)

CONTINGENCY ITEMS (PBC WATER UTILITY ITEMS)

139

140

134

135

136

137

138

129

130

131

132

133

124

125

126

127

128

119

120

121

122

123

118

378,820.40$ 381,753.00$

151,421.58$ 155,562.50$

Page 5 of 19

Page 12: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. Units Unit Price Unit Price Unit Price Amount Unit Price AmountItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

Average of Bid Items for All Bidders Engineer's Estimate J.W. CHEATHAM, LLC. RUSSELL ENGINEERING, INC.

SUPPORT AND PROTECT WM & APPURTANCES (<12") 260 LF 7,350.85$ 7,500.00$ 21.00$ 5,460.00$ 21.50$ 5,590.00$

SUPPORT AND PROTECT FM & APPURTANCES (<2") 300 LF 7,646.63$ 8,000.00$ 21.00$ 6,300.00$ 21.50$ 6,450.00$

SUBTOTAL (UTILITY)

CONTINGENCY ITEMS (ROADWAY)FLOWABLE FILL 75 CY 13,869.66$ 276.69$ 100.00$ 7,500.00$ 155.00$ 11,625.00$

CLASS 1 CONCRETE (MISCELLANEOUS) 10 CY 4,614.23$ 332.00$ 300.00$ 3,000.00$ 235.00$ 2,350.00$

PREMIUM FOR CONFLICT CONDITION (SEE SP'S) 1 EA 11,783.06$ 4,419.71$ 6,360.00$ 6,360.00$ 5,000.00$ 5,000.00$

CHANGEABLE (VARIABLE MESSAGE) SIGN (NON MOT) 112 ED 2,122.68$ 41.79$ 15.00$ 1,680.00$ 10.00$ 1,120.00$

TRAFFIC CONTROL OFFICER (NON MOT) 120 HR 15,082.50$ 66.34$ 50.00$ 6,000.00$ 55.00$ 6,600.00$

STORM SEWER CLEANING (EXIST.) (24" OR LESS) (SEE SP'S) 2,040 LF 15,205.65$ 10.11$ 3.50$ 7,140.00$ 6.50$ 13,260.00$

STORM SEWER CLEANING (EXIST.) ( > 24" TO 48") (SEE SP'S) 5,730 LF 72,190.84$ 57.10$ 8.10$ 46,413.00$ 13.00$ 74,490.00$

STORM SEWER CLEANING (EXIST.) ( > 48") (SEE SP'S) 242 LF 5,925.07$ 57.10$ 9.75$ 2,359.50$ 32.50$ 7,865.00$

TEMPORARY FENCE 600 LF 9,583.50$ 18.00$ 5.00$ 3,000.00$ 15.55$ 9,330.00$

SUBTOTAL (CONTINGENCY)

TOTAL BID

149

150

151

144

145

146

147

148

141

142

143

11,760.00$ 12,040.00$

83,452.50$

7,153,789.08$

131,640.00$

7,689,949.10$

Page 6 of 19

Page 13: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. Units

ROADWAY ITEMSMOBILIZATION 1 LS

MAINTENANCE OF TRAFFIC (INCL. PEDESTRIAN MOT) (PHASE A) 1 LS

MAINTENANCE OF TRAFFIC (INCL. PEDESTRIAN MOT) (PHASE B) 1 LS

CLEARING AND GRUBBING (PHASE A) 1 LS

CLEARING AND GRUBBING (PHASE B) 1 LS

FLOATING TURBIDITY BARRIER 110 LF

REGULAR EXCAVATION 7,288 CY

CANAL EXCAVATION (SEE SP's) 782 CY

EMBANKMENT (COMPACTED IN PLACE) 28,424 CY

CANAL EMBANKMENT (COMPACTED IN PLACE) 1,082 CY

TYPE B STABILIZATION (LBR 40) (12") 66,353 SY

OPTIONAL BASE GROUP 1 (DRIVEWAYS AND TURNOUTS) 843 SY

OPTIONAL BASE GROUP 7 59,483 SY

OPTIONAL BASE GROUP 13 2,581 SY

MILL EXISTING ASPHALT PAVEMENT (1" AVG. THICK) 8,431.2 SY

MISCELLANEOUS ASPHALT PAVEMENT 2.1 TN

SUPERPAVE ASPHALT CONCRETE (TRAFFIC LEVEL C) 5,434 TN

STRUCTURAL OVERBUILD (TYPE SP)(TRAFFIC LEVEL C) 1,615 TN

ASPHALTIC CONCRETE FRICTION COURSE(1.0") (FC-9.5) RUBBER 4,526 TN

CLASS I CONCRETE (ENDWALLS) 1.56 CY

CLASS I CONCRETE (GRAVITY WALL) 315 CY

CLASS II CONCRETE (ENDWALLS) 40.1 CY

REINFORCING STEEL 3,193 LB

CONTROL STRUCTURES 1 EA

INLETS (CURB) (TYPE P-1), >10 1 EA

INLETS (CURB) (TYPE P-5) 13 EA

INLETS (CURB) (TYPE P-6) 11 EA

INLETS (CURB) (TYPE P-6), >10 1 EA

INLETS (CURB) (TYPE P-9) (PARTIAL) 1 EA

INLETS (CURB) (TYPE P-9) 3 EA

INLETS (CURB) (TYPE J-1), >10 1 EA

Item #

31

26

27

28

29

30

8

9

10

21

22

23

24

25

16

17

18

19

20

1

2

3

4

5

11

12

13

14

15

6

7

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

Unit Price Amount Unit Price Amount Unit Price Amount

812,405.00$ 812,405.00$ 840,000.00$ 840,000.00$ 1,889,327.81$ 1,889,327.81$

94,600.00$ 94,600.00$ 445,000.00$ 445,000.00$ 223,121.87$ 223,121.87$

141,800.00$ 141,800.00$ 44,000.00$ 44,000.00$ 17,044.57$ 17,044.57$

87,588.00$ 87,588.00$ 595,892.92$ 595,892.92$ 422,993.08$ 422,993.08$

275,616.00$ 275,616.00$ 41,000.00$ 41,000.00$ 25,495.38$ 25,495.38$

11.00$ 1,210.00$ 22.00$ 2,420.00$ 22.38$ 2,461.80$

3.50$ 25,508.00$ 5.70$ 41,541.60$ 8.66$ 63,114.08$

5.00$ 3,910.00$ 30.00$ 23,460.00$ 3.79$ 2,963.78$

23.00$ 653,752.00$ 11.00$ 312,664.00$ 11.83$ 336,255.92$

8.00$ 8,656.00$ 11.00$ 11,902.00$ 7.76$ 8,396.32$

4.20$ 278,682.60$ 5.60$ 371,576.80$ 5.45$ 361,623.85$

15.05$ 12,687.15$ 61.00$ 51,423.00$ 10.14$ 8,548.02$

10.50$ 624,571.50$ 12.85$ 764,356.55$ 12.38$ 736,399.54$

16.63$ 42,922.03$ 23.50$ 60,653.50$ 29.09$ 75,081.29$

2.91$ 24,534.79$ 3.65$ 30,773.88$ 3.68$ 31,026.82$

500.00$ 1,050.00$ 500.00$ 1,050.00$ 420.00$ 882.00$

112.60$ 611,868.40$ 87.00$ 472,758.00$ 96.60$ 524,924.40$

115.00$ 185,725.00$ 110.00$ 177,650.00$ 120.75$ 195,011.25$

155.00$ 701,530.00$ 136.00$ 615,536.00$ 152.25$ 689,083.50$

9,300.00$ 14,508.00$ 1,203.46$ 1,877.40$ 3,002.97$ 4,684.63$

495.00$ 155,925.00$ 610.00$ 192,150.00$ 728.57$ 229,499.55$

3,061.00$ 122,746.10$ 2,005.00$ 80,400.50$ 1,247.34$ 50,018.33$

0.55$ 1,756.15$ 0.01$ 31.93$ 1.05$ 3,352.65$

10,572.69$ 10,572.69$ 11,450.00$ 11,450.00$ 10,619.72$ 10,619.72$

11,728.61$ 11,728.61$ 13,465.00$ 13,465.00$ 11,782.29$ 11,782.29$

4,294.79$ 55,832.27$ 5,275.00$ 68,575.00$ 4,791.19$ 62,285.47$

4,233.86$ 46,572.46$ 5,385.00$ 59,235.00$ 4,728.28$ 52,011.08$

6,189.79$ 6,189.79$ 10,880.00$ 10,880.00$ 9,236.71$ 9,236.71$

3,211.46$ 3,211.46$ 2,290.00$ 2,290.00$ 3,969.80$ 3,969.80$

4,069.04$ 12,207.12$ 4,810.00$ 14,430.00$ 5,311.16$ 15,933.48$

12,822.37$ 12,822.37$ 14,610.00$ 14,610.00$ 12,668.15$ 12,668.15$

HARDRIVES OF DELRAY, INC. D/B/A HARDRIVES, INC. ROSSO SITE DEVELOPMENT, INC. RANGER CONSTRUCTION

INDUSTRIES, INC.

Page 7 of 19

Page 14: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. UnitsItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

INLETS (CURB) (TYPE J-2), >10 1 EA

INLETS (CURB) (TYPE J-5) 2 EA

INLETS (CURB) (TYPE J-6) 2 EA

INLETS (DITCH BOTTOM) (TYPE C) 11 EA

INLETS (DITCH BOTTOM) (TYPE C) (J BOTTOM) 5 EA

INLETS (DITCH BOTTOM) (TYPE C) PARTIAL 3 EA

INLETS (DITCH BOTTOM) (TYPE D) 1 EA

INLETS (DITCH BOTTOM) (TYPE D) (J BOTTOM) 1 EA

INLETS (CLOSED FLUME) TYPE 1 12 EA

MANHOLE (TYPE P- 8) 1 EA

MANHOLE (TYPE P-8) PARTIAL 2 EA

MANHOLE (TYPE P-7) 1 EA

MANHOLE (TYPE 7) PARTIAL 1 EA

MANHOLE (TYPE J-7) 2 EA

MANHOLE (TYPE J-7) (PARTIAL) 8 EA

ADJUST INLETS 7 EA

ADJUST MANHOLES 6 EA

PIPE CULVERT (15") (STORM) 104 LF

PIPE CULVERT (18") (STORM) 2,950 LF

PIPE CULVERT (24") (STORM) 1,017 LF

PIPE CULVERT (30") (STORM) 286 LF

PIPE CULVERT (60") (STORM) 32 LF

PIPE CULVERT (72") (STORM) 132 LF

A2000 (PVC PIPE) (8") 26 LF

A2000 (PVC PIPE) (12") 66 LF

STORM SEWER PUMPING (EXIST) (24" OR LESS) (SEE SP'S) 2,040 LF

STORM SEWER PUMPING (> 24" TO 48") (SEE SP'S) 5,730 LF

STORM SEWER PUMPING (> 48") (SEE SP'S) 242 LF

MITERED END SECTION (ROUND) (18") 3 EA

CONCRETE CURB TYPE D 74 LF

CONCRETE CURB & GUTTER TYPE F 30,907 LF

CONCRETE SHOULDER GUTTER 128 LF

61

62

63

56

57

58

59

60

51

52

53

54

55

46

47

48

49

50

41

42

43

44

45

36

37

38

39

40

32

33

34

35

Unit Price Amount Unit Price Amount Unit Price Amount

HARDRIVES OF DELRAY, INC. D/B/A HARDRIVES, INC. ROSSO SITE DEVELOPMENT, INC. RANGER CONSTRUCTION

INDUSTRIES, INC.

14,206.65$ 14,206.65$ 15,800.00$ 15,800.00$ 13,789.31$ 13,789.31$

6,896.69$ 13,793.38$ 7,900.00$ 15,800.00$ 6,954.53$ 13,909.06$

6,797.26$ 13,594.52$ 8,020.00$ 16,040.00$ 6,873.99$ 13,747.98$

3,045.33$ 33,498.63$ 4,010.00$ 44,110.00$ 3,539.29$ 38,932.19$

6,023.55$ 30,117.75$ 6,875.00$ 34,375.00$ 5,069.40$ 25,347.00$

877.82$ 2,633.46$ 1,945.00$ 5,835.00$ 2,518.78$ 7,556.34$

4,748.01$ 4,748.01$ 4,355.00$ 4,355.00$ 4,987.89$ 4,987.89$

5,742.34$ 5,742.34$ 3,900.00$ 3,900.00$ 5,793.22$ 5,793.22$

6,705.58$ 80,466.96$ 5,775.00$ 69,300.00$ 7,543.88$ 90,526.56$

5,543.47$ 5,543.47$ 5,445.00$ 5,445.00$ 4,680.59$ 4,680.59$

3,174.17$ 6,348.34$ 2,290.00$ 4,580.00$ 2,490.85$ 4,981.70$

4,087.78$ 4,087.78$ 6,300.00$ 6,300.00$ 4,471.70$ 4,471.70$

8,111.88$ 8,111.88$ 2,290.00$ 2,290.00$ 2,492.11$ 2,492.11$

1,977.82$ 3,955.64$ 10,200.00$ 20,400.00$ 6,760.58$ 13,521.16$

3,309.34$ 26,474.72$ 2,290.00$ 18,320.00$ 2,600.33$ 20,802.64$

1,197.90$ 8,385.30$ 2,750.00$ 19,250.00$ 805.98$ 5,641.86$

1,197.90$ 7,187.40$ 860.00$ 5,160.00$ 805.98$ 4,835.88$

33.18$ 3,450.72$ 148.00$ 15,392.00$ 63.82$ 6,637.28$

50.58$ 149,211.00$ 92.50$ 272,875.00$ 73.58$ 217,061.00$

70.35$ 71,545.95$ 112.00$ 113,904.00$ 89.46$ 90,980.82$

99.39$ 28,425.54$ 140.00$ 40,040.00$ 110.26$ 31,534.36$

462.00$ 14,784.00$ 400.00$ 12,800.00$ 303.29$ 9,705.28$

689.70$ 91,040.40$ 475.00$ 62,700.00$ 400.50$ 52,866.00$

56.60$ 1,471.60$ 28.00$ 728.00$ 35.81$ 931.06$

31.36$ 2,069.76$ 34.00$ 2,244.00$ 38.14$ 2,517.24$

7.70$ 15,708.00$ 3.45$ 7,038.00$ 8.23$ 16,789.20$

9.90$ 56,727.00$ 6.00$ 34,380.00$ 10.58$ 60,623.40$

29.70$ 7,187.40$ 34.00$ 8,228.00$ 31.75$ 7,683.50$

4,529.01$ 13,587.03$ 1,635.00$ 4,905.00$ 2,311.67$ 6,935.01$

20.57$ 1,522.18$ 27.00$ 1,998.00$ 25.54$ 1,889.96$

18.36$ 567,452.52$ 14.50$ 448,151.50$ 17.52$ 541,490.64$

33.12$ 4,239.36$ 41.00$ 5,248.00$ 32.29$ 4,133.12$

Page 8 of 19

Page 15: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. UnitsItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

ENGRAVING CURB FACE 12 EA

TRAFFIC SEPARATOR CONCRETE (SPECIAL) (VARIABLE WIDTH) 1,217 SY

CONCRETE SIDEWALK (4" THICK) 8,144 SY

CONCRETE SIDEWALK (6" THICK) (DRIVEWAY) 498 SY

COLOR TREATED & STAMPED CONCRETE (SEE SP's) 602 SY

PIPE GUIDERAIL (STEEL) 1,602 LF

RIP-RAP (RUBBLE) 296 TN

GUARDRAIL 64 LF

END ANCHORAGE ASSEMBLIES (TYPE II) 1 EA

END ANCHORAGE ASSEMBLIES (TYPE CRT) 2 EA

TYPE B FENCE (6' HIGH) (W/TOP RAIL) BLACK VINYL CLAD 709 LF

RELOCATE EXISTING FENCE (INCLUDES GATE) 1,173 LF

RELOCATE EXISTING FENCE GATE 1 EA

SOD 20,084 SY

6" PVC CONDUIT IRRIGATION SLEEVE (SCH 80) (SEE SP'S) 1,385 LF

TREE SPADE UNITS 3 EA

PALM RELOCATION UNITS 5 EA

SEED AND MULCH 5,593 SY

2-2" PVC CONDUITS (SCH 40) TRAFFIC W/ F/O CABLE 7,898 LF

TRAFFIC PULL BOX (SMALL) 21 EA

TRAFFIC PULL BOX (LARGE) 4 EA

SUBTOTAL (ROADWAY)

81

82

83

84

76

77

78

79

80

71

72

73

74

75

66

67

68

69

70

64

65

Unit Price Amount Unit Price Amount Unit Price Amount

HARDRIVES OF DELRAY, INC. D/B/A HARDRIVES, INC. ROSSO SITE DEVELOPMENT, INC. RANGER CONSTRUCTION

INDUSTRIES, INC.

1,100.00$ 13,200.00$ 340.00$ 4,080.00$ 420.00$ 5,040.00$

104.00$ 126,568.00$ 39.50$ 48,071.50$ 45.06$ 54,838.02$

42.00$ 342,048.00$ 47.75$ 388,876.00$ 37.54$ 305,725.76$

83.80$ 41,732.40$ 48.00$ 23,904.00$ 46.38$ 23,097.24$

92.00$ 55,384.00$ 85.00$ 51,170.00$ 85.79$ 51,645.58$

68.19$ 109,240.38$ 71.00$ 113,742.00$ 65.09$ 104,274.18$

200.00$ 59,200.00$ 107.00$ 31,672.00$ 70.51$ 20,870.96$

19.95$ 1,276.80$ 23.00$ 1,472.00$ 20.96$ 1,341.44$

1,072.72$ 1,072.72$ 1,965.00$ 1,965.00$ 1,789.37$ 1,789.37$

2,832.50$ 5,665.00$ 3,225.00$ 6,450.00$ 2,936.04$ 5,872.08$

26.51$ 18,795.59$ 38.00$ 26,942.00$ 35.61$ 25,247.49$

23.11$ 27,108.03$ 15.00$ 17,595.00$ 14.53$ 17,043.69$

1,360.00$ 1,360.00$ 595.00$ 595.00$ 555.45$ 555.45$

2.19$ 43,983.96$ 3.75$ 75,315.00$ 4.09$ 82,143.56$

30.00$ 41,550.00$ 26.00$ 36,010.00$ 13.78$ 19,085.30$

550.00$ 1,650.00$ 2,830.00$ 8,490.00$ 630.00$ 1,890.00$

550.00$ 2,750.00$ 1,130.00$ 5,650.00$ 262.50$ 1,312.50$

0.53$ 2,964.29$ 2.60$ 14,541.80$ 1.46$ 8,165.78$

28.00$ 221,144.00$ 30.00$ 236,940.00$ 8.82$ 69,660.36$

1,035.10$ 21,737.10$ 1,110.00$ 23,310.00$ 1,014.70$ 21,308.70$

2,208.42$ 8,833.68$ 2,370.00$ 9,480.00$ 1,913.35$ 7,653.40$

7,487,271.13$ 7,821,215.88$ 8,236,173.06$

Page 9 of 19

Page 16: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. UnitsItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

SIGNALIZATION PAY ITEMS85 630-2-11-2 2" PVC (SCH 40) UNDERGROUND CONDUIT 400 LF

86 630-2-11-2A ADDITIONAL 2" PVC (SCH 40) CONDUIT, IN OPEN TRENCH 250 LF

87 630-2-12-2-5 5-2" (HDPE SDR 11) UNDER PAVEMENT CONDUIT (DIRECTIONAL BORE) 320 LF

88 630-2-12-2-6 6-2" (HDPE SDR 11) UNDER PAVEMENT CONDUIT (DIRECTIONAL BORE) 300 LF

89 630-2-14-2 2" RIGID CONDUIT HOT DIPPED GALVANIZED CONDUIT SURFACE MOUNTED 20 LF

90 632-7-1-19G SIGNAL CABLE (SPAN LENGTH 751' - Greater) 1 PI

91 632-7-1-4A PEDESTRIAN SIGNAL CABLE - 4 CONDUCTOR 1 PI

92 632-7-1-7A PEDESTRIAN SIGNAL CABLE - 7 CONDUCTOR 1 PI

93 632-7-6 SIGNAL CABLE, REMOVE - IN INTERSECTION 1 PI

94 635-2-12-A PULL BOX (17" x 30" x 12"D) HEAVY DUTY COVERS (TIER 15) 21 EA

95 635-2-12-C PULL BOX (30" x 48" x 24"D) HEAVY DUTY SPLIT COVERS (ITS) (TIER 15) 2 EA

96 639-1-123 ELECTRICAL POWER SERVICE NO METER BASE (UNDERGROUND) 1 AS

97 639-2-1-3 ELECTRICAL SERVICE WIRE (SIGLE PHASE 3-WIRE, TRIPLEX) 240 LF

98 639-3-11 ELECTRICAL SERVICE DISCONNECT (BREAKER BOX, SHEET T 6.2 OF PBC STANDARDS) 1 EA

99 641-2-12-12 PRESTRESSED CONCRETE POLE (12' TYPE P-II ) 1 EA

100 646-1-11 ALUMINUM SIGNALS POLE, PEDESTAL WITH TRANSFORMER BASE (8 FEET ABOVE GROUND) 6 EA

101 646-1-60 ALUMINUM SIGNALS POLE, REMOVE 8 EA

102 649-21-15 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, SINGLE 70' 1 EA

103 649-21-21 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, SINGLE 78' 2 EA

104 649-26-03 STEEL MAST ARM ASSEMBLY, REMOVE, SHALLOW FOUNDATION-BOLT ON ATTACHMENT 3 EA

105 649-26-07 REMOVE ARM AND ATTACHMENT FROM EXISTING MAST ARM ASSEMBLY, POLE REMAIN 1 EA

106 650-1-13 TRAFFIC SIGNAL HEAD ALUMINUM (3-SECTION, 1-WAY) INCLUDES BACKPLATES 13 AS

107 650-1-15 TRAFFIC SIGNAL HEAD ALUMINUM (5-SECTION, 1-WAY) INCLUDES BACKPLATES 2 AS

108 653-191 PEDESTRIAN SIGNAL - COUNT DOWN (1-WAY) ALUMINUM 6 EA

109 653-1-60 PEDESTRIAN SIGNAL, REMOVE PED SIGNAL 6 EA

110 660-4-10-B6 VIDEO IMAGE DETECTION 6 - CAMERA SYSTEM (ITERIS) COMPLETE. 1 EA

111 660-4-60 VEHICLE DETECTION SYSTEM-VIDEO, REMOVE 4 EA

112 665-1-11 PEDESTRIAN DETECTOR (PUSH BUTTON) 6 EA

Unit Price Amount Unit Price Amount Unit Price Amount

HARDRIVES OF DELRAY, INC. D/B/A HARDRIVES, INC. ROSSO SITE DEVELOPMENT, INC. RANGER CONSTRUCTION

INDUSTRIES, INC.

14.78$ 5,912.00$ 15.75$ 6,300.00$ 13.65$ 5,460.00$

2.37$ 592.50$ 2.50$ 625.00$ 1.79$ 447.50$

27.97$ 8,950.40$ 30.00$ 9,600.00$ 33.60$ 10,752.00$

29.45$ 8,835.00$ 31.75$ 9,525.00$ 37.80$ 11,340.00$

52.43$ 1,048.60$ 56.00$ 1,120.00$ 31.50$ 630.00$

6,181.75$ 6,181.75$ 6,643.00$ 6,643.00$ 5,890.50$ 5,890.50$

1,672.63$ 1,672.63$ 1,800.00$ 1,800.00$ 1,113.00$ 1,113.00$

3,139.28$ 3,139.28$ 3,370.00$ 3,370.00$ 1,050.00$ 1,050.00$

1,090.71$ 1,090.71$ 1,170.00$ 1,170.00$ 1,333.50$ 1,333.50$

1,113.90$ 23,391.90$ 1,200.00$ 25,200.00$ 1,018.50$ 21,388.50$

2,432.64$ 4,865.28$ 2,610.00$ 5,220.00$ 1,827.00$ 3,654.00$

4,078.69$ 4,078.69$ 4,380.00$ 4,380.00$ 1,018.50$ 1,018.50$

3.94$ 945.60$ 4.20$ 1,008.00$ 4.10$ 984.00$

2,502.86$ 2,502.86$ 2,690.00$ 2,690.00$ 1,480.50$ 1,480.50$

2,099.53$ 2,099.53$ 2,255.00$ 2,255.00$ 1,039.50$ 1,039.50$

1,739.27$ 10,435.62$ 1,865.00$ 11,190.00$ 1,617.00$ 9,702.00$

363.57$ 2,908.56$ 390.00$ 3,120.00$ 168.00$ 1,344.00$

64,361.41$ 64,361.41$ 62,650.00$ 62,650.00$ 59,535.00$ 59,535.00$

62,540.00$ 125,080.00$ 65,000.00$ 130,000.00$ 62,653.50$ 125,307.00$

3,028.86$ 9,086.58$ 3,250.00$ 9,750.00$ 2,341.50$ 7,024.50$

2,181.40$ 2,181.40$ 2,340.00$ 2,340.00$ 1,008.00$ 1,008.00$

1,093.96$ 14,221.48$ 1,175.00$ 15,275.00$ 1,039.50$ 13,513.50$

1,432.20$ 2,864.40$ 1,540.00$ 3,080.00$ 1,617.00$ 3,234.00$

739.98$ 4,439.88$ 795.00$ 4,770.00$ 661.50$ 3,969.00$

145.43$ 872.58$ 155.00$ 930.00$ 42.00$ 252.00$

49,913.72$ 49,913.72$ 47,125.00$ 47,125.00$ 38,020.50$ 38,020.50$

1,454.27$ 5,817.08$ 1,560.00$ 6,240.00$ 168.00$ 672.00$

250.23$ 1,501.38$ 265.00$ 1,590.00$ 147.00$ 882.00$

Page 10 of 19

Page 17: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. UnitsItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

113 670-5-110-B TRAFFIC CONTROLLER ASSEMBLY (TYPE 6) AS PER NAZTEC 1 AS

114 670-5-600 TRAFFIC CONTROLLER ASSEMBLY, REMOVE CONTROLLER WITH CABINET 1 AS

115 690-15 REMOVE INTERNALY ILLUMINATED SIGN 4 EA

116 700-3-201 SIGN PANEL, FURNISH AND INSTALL OVERHEAD MOUNT, UP TO 12 SF 5 EA

117 700-5-22 INTERNALLY ILLUMINATED SIGN (8') FLUORESCENT 2 EA

SUBTOTAL (SIGNALIZATION)

PBC WATER UTILITY ITEMSADJUST VALVE BOX (INCLUDING CONCRETE COLLAR) 38 EA

CONCRETE SLAB 0.74 CY

EXISTING WATER SERVICE AND METER TO BE RELOCATED 1 EA

EXISTING WATER METER TO BE RELOCATED 4 EA

RELOCATE FIRE HYDRANT 2 EA

ADJUST FIRE HYDRANT 1 EA

DEFLECT W.M W/FITTINGS (<12") 5 EA

ADJUST AIR RELEASE VALVE 4 EA

ADJUST MANHOLE (UTILITIES) 3 EA

RELOCATE BACKFLOW PREVENTER 1 EA

8" DUCTILE IRON PIPE FOR POTABLE WATER MAIN INSTALLATION 60 LF

CONNECT TO EXISTING 12" POTABLE WATER MAIN 1 EA

F&I DUCTILE IRON COMPACT FITTINGS W/REACTION BLOCKING OR THRUST RESTRAINTS F 0.5 TN

8" TO 12" JOINT RESTRAINT GASKET (FIELD LOCK OR FAST GRIP) 1 EA

8" TO 12" MECHANICAL JOINT RESTRAINT FOR DUCTILE IRON PIPE 6 EA

RESTRAINT EXISTING 8" TO 12" PVC PRESSURE PIPE JOINTS 25 EA

8" GATE VALVE & VALVE BOX 1 EA

FIRE HYDRANT ASSEMBLY WITH CAPTIVATOR CAP, 6" GATE VALVE & ANCHOR TEE ASSEMBL 1 EA

SAMPLE POINTS ON FIRE HYDRANTS 2 EA

SHORT SINGLE 5/8" METER SERVICE (1-1/2" PVC) (UP TO 10' LONG) 1 EA

DENSITY TEST 5 EA

REMOVAL/PLUG OF EXISTING WATER SERVICE PIPING 140 LF

AS BUILT RECORD DRAWINGS 1 LS

SUBTOTAL (UTILITY)

CONTINGENCY ITEMS (PBC WATER UTILITY ITEMS)

139

140

134

135

136

137

138

129

130

131

132

133

124

125

126

127

128

119

120

121

122

123

118

Unit Price Amount Unit Price Amount Unit Price Amount

HARDRIVES OF DELRAY, INC. D/B/A HARDRIVES, INC. ROSSO SITE DEVELOPMENT, INC. RANGER CONSTRUCTION

INDUSTRIES, INC.

43,968.07$ 43,968.07$ 40,730.00$ 40,730.00$ 35,080.50$ 35,080.50$

1,163.41$ 1,163.41$ 1,250.00$ 1,250.00$ 672.00$ 672.00$

290.40$ 1,161.60$ 310.00$ 1,240.00$ 336.00$ 1,344.00$

690.90$ 3,454.50$ 740.00$ 3,700.00$ 661.50$ 3,307.50$

3,575.78$ 7,151.56$ 3,843.00$ 7,686.00$ 3,507.00$ 7,014.00$

785.84$ 29,861.92$ 630.00$ 23,940.00$ 959.91$ 36,476.58$

797.50$ 590.15$ 2,520.00$ 1,864.80$ 708.00$ 523.92$

2,512.32$ 2,512.32$ 1,430.00$ 1,430.00$ 1,837.21$ 1,837.21$

1,314.42$ 5,257.68$ 800.00$ 3,200.00$ 747.94$ 2,991.76$

1,667.10$ 3,334.20$ 2,290.00$ 4,580.00$ 1,680.85$ 3,361.70$

3,281.38$ 3,281.38$ 960.00$ 960.00$ 1,593.70$ 1,593.70$

7,232.50$ 36,162.50$ 5,960.00$ 29,800.00$ 2,644.65$ 13,223.25$

598.95$ 2,395.80$ 870.08$ 3,480.32$ 1,613.47$ 6,453.88$

1,197.90$ 3,593.70$ 660.00$ 1,980.00$ 1,424.72$ 4,274.16$

2,395.80$ 2,395.80$ 5,615.00$ 5,615.00$ 834.08$ 834.08$

233.45$ 14,007.00$ 95.00$ 5,700.00$ 42.86$ 2,571.60$

3,348.18$ 3,348.18$ 5,445.00$ 5,445.00$ 3,385.60$ 3,385.60$

24,200.00$ 12,100.00$ 9,340.00$ 4,670.00$ 39,710.82$ 19,855.41$

762.08$ 762.08$ 200.00$ 200.00$ 567.84$ 567.84$

320.06$ 1,920.36$ 200.00$ 1,200.00$ 751.09$ 4,506.54$

578.60$ 14,465.00$ 615.00$ 15,375.00$ 889.38$ 22,234.50$

3,991.38$ 3,991.38$ 1,785.00$ 1,785.00$ 2,834.62$ 2,834.62$

8,798.40$ 8,798.40$ 6,100.00$ 6,100.00$ 5,509.92$ 5,509.92$

355.81$ 711.62$ 525.00$ 1,050.00$ 1,062.73$ 2,125.46$

2,765.52$ 2,765.52$ 1,945.00$ 1,945.00$ 2,455.77$ 2,455.77$

275.00$ 1,375.00$ 34.00$ 170.00$ 131.25$ 656.25$

29.70$ 4,158.00$ 8.00$ 1,120.00$ 26.15$ 3,661.00$

10,450.00$ 10,450.00$ 11,315.00$ 11,315.00$ 1,449.00$ 1,449.00$

425,889.96$ 433,572.00$ 379,463.00$

168,237.99$ 132,925.12$ 143,383.75$

Page 11 of 19

Page 18: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. UnitsItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

SUPPORT AND PROTECT WM & APPURTANCES (<12") 260 LF

SUPPORT AND PROTECT FM & APPURTANCES (<2") 300 LF

SUBTOTAL (UTILITY)

CONTINGENCY ITEMS (ROADWAY)FLOWABLE FILL 75 CY

CLASS 1 CONCRETE (MISCELLANEOUS) 10 CY

PREMIUM FOR CONFLICT CONDITION (SEE SP'S) 1 EA

CHANGEABLE (VARIABLE MESSAGE) SIGN (NON MOT) 112 ED

TRAFFIC CONTROL OFFICER (NON MOT) 120 HR

STORM SEWER CLEANING (EXIST.) (24" OR LESS) (SEE SP'S) 2,040 LF

STORM SEWER CLEANING (EXIST.) ( > 24" TO 48") (SEE SP'S) 5,730 LF

STORM SEWER CLEANING (EXIST.) ( > 48") (SEE SP'S) 242 LF

TEMPORARY FENCE 600 LF

SUBTOTAL (CONTINGENCY)

TOTAL BID

149

150

151

144

145

146

147

148

141

142

143

Unit Price Amount Unit Price Amount Unit Price Amount

HARDRIVES OF DELRAY, INC. D/B/A HARDRIVES, INC. ROSSO SITE DEVELOPMENT, INC. RANGER CONSTRUCTION

INDUSTRIES, INC.

22.00$ 5,720.00$ 12.50$ 3,250.00$ 18.18$ 4,726.80$

22.00$ 6,600.00$ 8.00$ 2,400.00$ 11.41$ 3,423.00$

114.95$ 8,621.25$ 212.00$ 15,900.00$ 123.48$ 9,261.00$

357.50$ 3,575.00$ 830.00$ 8,300.00$ 152.88$ 1,528.80$

5,500.00$ 5,500.00$ 6,304.00$ 6,304.00$ 13,400.48$ 13,400.48$

14.52$ 1,626.24$ 11.00$ 1,232.00$ 12.60$ 1,411.20$

550.00$ 66,000.00$ 58.00$ 6,960.00$ 69.00$ 8,280.00$

6.60$ 13,464.00$ 4.75$ 9,690.00$ 8.23$ 16,789.20$

13.07$ 74,891.10$ 7.00$ 40,110.00$ 15.12$ 86,637.60$

33.00$ 7,986.00$ 10.50$ 2,541.00$ 15.12$ 3,659.04$

41.03$ 24,618.00$ 16.00$ 9,600.00$ 4.10$ 2,460.00$

12,320.00$ 5,650.00$ 8,149.80$

8,910,596.93$

143,427.32$

8,300,000.67$

100,637.00$

8,494,000.00$

206,281.59$

Page 12 of 19

Page 19: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. Units

ROADWAY ITEMSMOBILIZATION 1 LS

MAINTENANCE OF TRAFFIC (INCL. PEDESTRIAN MOT) (PHASE A) 1 LS

MAINTENANCE OF TRAFFIC (INCL. PEDESTRIAN MOT) (PHASE B) 1 LS

CLEARING AND GRUBBING (PHASE A) 1 LS

CLEARING AND GRUBBING (PHASE B) 1 LS

FLOATING TURBIDITY BARRIER 110 LF

REGULAR EXCAVATION 7,288 CY

CANAL EXCAVATION (SEE SP's) 782 CY

EMBANKMENT (COMPACTED IN PLACE) 28,424 CY

CANAL EMBANKMENT (COMPACTED IN PLACE) 1,082 CY

TYPE B STABILIZATION (LBR 40) (12") 66,353 SY

OPTIONAL BASE GROUP 1 (DRIVEWAYS AND TURNOUTS) 843 SY

OPTIONAL BASE GROUP 7 59,483 SY

OPTIONAL BASE GROUP 13 2,581 SY

MILL EXISTING ASPHALT PAVEMENT (1" AVG. THICK) 8,431.2 SY

MISCELLANEOUS ASPHALT PAVEMENT 2.1 TN

SUPERPAVE ASPHALT CONCRETE (TRAFFIC LEVEL C) 5,434 TN

STRUCTURAL OVERBUILD (TYPE SP)(TRAFFIC LEVEL C) 1,615 TN

ASPHALTIC CONCRETE FRICTION COURSE(1.0") (FC-9.5) RUBBER 4,526 TN

CLASS I CONCRETE (ENDWALLS) 1.56 CY

CLASS I CONCRETE (GRAVITY WALL) 315 CY

CLASS II CONCRETE (ENDWALLS) 40.1 CY

REINFORCING STEEL 3,193 LB

CONTROL STRUCTURES 1 EA

INLETS (CURB) (TYPE P-1), >10 1 EA

INLETS (CURB) (TYPE P-5) 13 EA

INLETS (CURB) (TYPE P-6) 11 EA

INLETS (CURB) (TYPE P-6), >10 1 EA

INLETS (CURB) (TYPE P-9) (PARTIAL) 1 EA

INLETS (CURB) (TYPE P-9) 3 EA

INLETS (CURB) (TYPE J-1), >10 1 EA

Item #

31

26

27

28

29

30

8

9

10

21

22

23

24

25

16

17

18

19

20

1

2

3

4

5

11

12

13

14

15

6

7

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

Unit Price Amount Unit Price Amount Unit Price Amount

69,000.00$ 69,000.00$ 850,000.00$ 850,000.00$ 1,150,000.91$ 1,150,000.91$

133,000.00$ 133,000.00$ 455,000.00$ 455,000.00$ 331,000.00$ 331,000.00$

57,000.00$ 57,000.00$ 180,000.00$ 180,000.00$ 44,000.00$ 44,000.00$

431,500.00$ 431,500.00$ 675,000.00$ 675,000.00$ 343,000.00$ 343,000.00$

185,000.00$ 185,000.00$ 224,215.15$ 224,215.15$ 181,000.00$ 181,000.00$

26.00$ 2,860.00$ 22.00$ 2,420.00$ 12.00$ 1,320.00$

6.00$ 43,728.00$ 2.00$ 14,576.00$ 17.00$ 123,896.00$

6.00$ 4,692.00$ 3.50$ 2,737.00$ 14.00$ 10,948.00$

4.00$ 113,696.00$ 17.50$ 497,420.00$ 14.00$ 397,936.00$

3.00$ 3,246.00$ 9.50$ 10,279.00$ 17.00$ 18,394.00$

13.00$ 862,589.00$ 5.50$ 364,941.50$ 6.80$ 451,200.40$

12.00$ 10,116.00$ 18.50$ 15,595.50$ 9.60$ 8,092.80$

19.00$ 1,130,177.00$ 11.50$ 684,054.50$ 13.00$ 773,279.00$

28.00$ 72,268.00$ 16.50$ 42,586.50$ 28.00$ 72,268.00$

3.25$ 27,401.40$ 3.75$ 31,617.00$ 2.70$ 22,764.24$

600.00$ 1,260.00$ 424.00$ 890.40$ 450.00$ 945.00$

125.00$ 679,250.00$ 97.50$ 529,815.00$ 110.00$ 597,740.00$

145.00$ 234,175.00$ 122.00$ 197,030.00$ 130.00$ 209,950.00$

190.00$ 859,940.00$ 154.00$ 697,004.00$ 170.00$ 769,420.00$

3,600.00$ 5,616.00$ 1,730.00$ 2,698.80$ 9,500.00$ 14,820.00$

600.00$ 189,000.00$ 572.00$ 180,180.00$ 590.00$ 185,850.00$

2,100.00$ 84,210.00$ 1,770.00$ 70,977.00$ 3,200.00$ 128,320.00$

5.00$ 15,965.00$ 1.00$ 3,193.00$ 0.60$ 1,915.80$

12,000.00$ 12,000.00$ 7,110.00$ 7,110.00$ 9,700.00$ 9,700.00$

14,100.00$ 14,100.00$ 17,300.00$ 17,300.00$ 8,200.00$ 8,200.00$

7,500.00$ 97,500.00$ 5,990.00$ 77,870.00$ 5,200.00$ 67,600.00$

7,400.00$ 81,400.00$ 6,050.00$ 66,550.00$ 5,100.00$ 56,100.00$

11,400.00$ 11,400.00$ 8,490.00$ 8,490.00$ 5,800.00$ 5,800.00$

5,500.00$ 5,500.00$ 2,780.00$ 2,780.00$ 3,500.00$ 3,500.00$

7,300.00$ 21,900.00$ 5,250.00$ 15,750.00$ 4,800.00$ 14,400.00$

15,300.00$ 15,300.00$ 17,300.00$ 17,300.00$ 9,100.00$ 9,100.00$

BERGERON LAND DEVELOPMENT, INC. RIC-MAN INTERNATIONAL, INC. RYAN INCORPORATED

SOUTHERN

Page 13 of 19

Page 20: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. UnitsItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

INLETS (CURB) (TYPE J-2), >10 1 EA

INLETS (CURB) (TYPE J-5) 2 EA

INLETS (CURB) (TYPE J-6) 2 EA

INLETS (DITCH BOTTOM) (TYPE C) 11 EA

INLETS (DITCH BOTTOM) (TYPE C) (J BOTTOM) 5 EA

INLETS (DITCH BOTTOM) (TYPE C) PARTIAL 3 EA

INLETS (DITCH BOTTOM) (TYPE D) 1 EA

INLETS (DITCH BOTTOM) (TYPE D) (J BOTTOM) 1 EA

INLETS (CLOSED FLUME) TYPE 1 12 EA

MANHOLE (TYPE P- 8) 1 EA

MANHOLE (TYPE P-8) PARTIAL 2 EA

MANHOLE (TYPE P-7) 1 EA

MANHOLE (TYPE 7) PARTIAL 1 EA

MANHOLE (TYPE J-7) 2 EA

MANHOLE (TYPE J-7) (PARTIAL) 8 EA

ADJUST INLETS 7 EA

ADJUST MANHOLES 6 EA

PIPE CULVERT (15") (STORM) 104 LF

PIPE CULVERT (18") (STORM) 2,950 LF

PIPE CULVERT (24") (STORM) 1,017 LF

PIPE CULVERT (30") (STORM) 286 LF

PIPE CULVERT (60") (STORM) 32 LF

PIPE CULVERT (72") (STORM) 132 LF

A2000 (PVC PIPE) (8") 26 LF

A2000 (PVC PIPE) (12") 66 LF

STORM SEWER PUMPING (EXIST) (24" OR LESS) (SEE SP'S) 2,040 LF

STORM SEWER PUMPING (> 24" TO 48") (SEE SP'S) 5,730 LF

STORM SEWER PUMPING (> 48") (SEE SP'S) 242 LF

MITERED END SECTION (ROUND) (18") 3 EA

CONCRETE CURB TYPE D 74 LF

CONCRETE CURB & GUTTER TYPE F 30,907 LF

CONCRETE SHOULDER GUTTER 128 LF

61

62

63

56

57

58

59

60

51

52

53

54

55

46

47

48

49

50

41

42

43

44

45

36

37

38

39

40

32

33

34

35

Unit Price Amount Unit Price Amount Unit Price Amount

BERGERON LAND DEVELOPMENT, INC. RIC-MAN INTERNATIONAL, INC. RYAN INCORPORATED

SOUTHERN

16,500.00$ 16,500.00$ 17,400.00$ 17,400.00$ 11,000.00$ 11,000.00$

8,700.00$ 17,400.00$ 9,920.00$ 19,840.00$ 6,300.00$ 12,600.00$

8,900.00$ 17,800.00$ 10,300.00$ 20,600.00$ 6,300.00$ 12,600.00$

5,900.00$ 64,900.00$ 3,500.00$ 38,500.00$ 4,200.00$ 46,200.00$

7,700.00$ 38,500.00$ 7,290.00$ 36,450.00$ 5,700.00$ 28,500.00$

5,200.00$ 15,600.00$ 2,500.00$ 7,500.00$ 3,200.00$ 9,600.00$

6,400.00$ 6,400.00$ 4,240.00$ 4,240.00$ 4,700.00$ 4,700.00$

6,300.00$ 6,300.00$ 11,400.00$ 11,400.00$ 3,600.00$ 3,600.00$

9,200.00$ 110,400.00$ 9,550.00$ 114,600.00$ 6,500.00$ 78,000.00$

6,600.00$ 6,600.00$ 5,780.00$ 5,780.00$ 5,300.00$ 5,300.00$

5,400.00$ 10,800.00$ 3,020.00$ 6,040.00$ 3,500.00$ 7,000.00$

6,600.00$ 6,600.00$ 6,600.00$ 6,600.00$ 5,100.00$ 5,100.00$

5,300.00$ 5,300.00$ 3,470.00$ 3,470.00$ 3,500.00$ 3,500.00$

10,650.00$ 21,300.00$ 8,960.00$ 17,920.00$ 7,300.00$ 14,600.00$

6,200.00$ 49,600.00$ 3,250.00$ 26,000.00$ 3,600.00$ 28,800.00$

2,800.00$ 19,600.00$ 3,180.00$ 22,260.00$ 1,000.00$ 7,000.00$

2,500.00$ 15,000.00$ 530.00$ 3,180.00$ 760.00$ 4,560.00$

155.00$ 16,120.00$ 121.00$ 12,584.00$ 68.00$ 7,072.00$

97.00$ 286,150.00$ 90.00$ 265,500.00$ 73.00$ 215,350.00$

117.00$ 118,989.00$ 110.00$ 111,870.00$ 88.00$ 89,496.00$

153.00$ 43,758.00$ 151.00$ 43,186.00$ 140.00$ 40,040.00$

420.00$ 13,440.00$ 408.00$ 13,056.00$ 330.00$ 10,560.00$

570.00$ 75,240.00$ 485.00$ 64,020.00$ 570.00$ 75,240.00$

50.00$ 1,300.00$ 21.00$ 546.00$ 57.00$ 1,482.00$

52.00$ 3,432.00$ 26.50$ 1,749.00$ 65.00$ 4,290.00$

10.00$ 20,400.00$ 5.25$ 10,710.00$ 6.20$ 12,648.00$

12.00$ 68,760.00$ 6.25$ 35,812.50$ 7.30$ 41,829.00$

15.00$ 3,630.00$ 11.50$ 2,783.00$ 40.00$ 9,680.00$

1,710.00$ 5,130.00$ 1,860.00$ 5,580.00$ 1,200.00$ 3,600.00$

24.00$ 1,776.00$ 23.00$ 1,702.00$ 25.00$ 1,850.00$

16.00$ 494,512.00$ 19.00$ 587,233.00$ 15.00$ 463,605.00$

31.00$ 3,968.00$ 27.50$ 3,520.00$ 31.00$ 3,968.00$

Page 14 of 19

Page 21: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. UnitsItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

ENGRAVING CURB FACE 12 EA

TRAFFIC SEPARATOR CONCRETE (SPECIAL) (VARIABLE WIDTH) 1,217 SY

CONCRETE SIDEWALK (4" THICK) 8,144 SY

CONCRETE SIDEWALK (6" THICK) (DRIVEWAY) 498 SY

COLOR TREATED & STAMPED CONCRETE (SEE SP's) 602 SY

PIPE GUIDERAIL (STEEL) 1,602 LF

RIP-RAP (RUBBLE) 296 TN

GUARDRAIL 64 LF

END ANCHORAGE ASSEMBLIES (TYPE II) 1 EA

END ANCHORAGE ASSEMBLIES (TYPE CRT) 2 EA

TYPE B FENCE (6' HIGH) (W/TOP RAIL) BLACK VINYL CLAD 709 LF

RELOCATE EXISTING FENCE (INCLUDES GATE) 1,173 LF

RELOCATE EXISTING FENCE GATE 1 EA

SOD 20,084 SY

6" PVC CONDUIT IRRIGATION SLEEVE (SCH 80) (SEE SP'S) 1,385 LF

TREE SPADE UNITS 3 EA

PALM RELOCATION UNITS 5 EA

SEED AND MULCH 5,593 SY

2-2" PVC CONDUITS (SCH 40) TRAFFIC W/ F/O CABLE 7,898 LF

TRAFFIC PULL BOX (SMALL) 21 EA

TRAFFIC PULL BOX (LARGE) 4 EA

SUBTOTAL (ROADWAY)

81

82

83

84

76

77

78

79

80

71

72

73

74

75

66

67

68

69

70

64

65

Unit Price Amount Unit Price Amount Unit Price Amount

BERGERON LAND DEVELOPMENT, INC. RIC-MAN INTERNATIONAL, INC. RYAN INCORPORATED

SOUTHERN

960.00$ 11,520.00$ 530.00$ 6,360.00$ 340.00$ 4,080.00$

70.00$ 85,190.00$ 89.00$ 108,313.00$ 34.00$ 41,378.00$

54.00$ 439,776.00$ 37.50$ 305,400.00$ 44.00$ 358,336.00$

55.00$ 27,390.00$ 41.00$ 20,418.00$ 43.00$ 21,414.00$

90.00$ 54,180.00$ 86.50$ 52,073.00$ 81.00$ 48,762.00$

65.00$ 104,130.00$ 66.00$ 105,732.00$ 70.00$ 112,140.00$

185.00$ 54,760.00$ 180.00$ 53,280.00$ 170.00$ 50,320.00$

278.00$ 17,792.00$ 21.00$ 1,344.00$ 23.00$ 1,472.00$

2,450.00$ 2,450.00$ 1,810.00$ 1,810.00$ 2,000.00$ 2,000.00$

6,350.00$ 12,700.00$ 2,970.00$ 5,940.00$ 3,200.00$ 6,400.00$

40.00$ 28,360.00$ 36.00$ 25,524.00$ 38.00$ 26,942.00$

19.00$ 22,287.00$ 14.50$ 17,008.50$ 16.00$ 18,768.00$

850.00$ 850.00$ 561.00$ 561.00$ 600.00$ 600.00$

2.75$ 55,231.00$ 3.25$ 65,273.00$ 12.00$ 241,008.00$

32.00$ 44,320.00$ 26.50$ 36,702.50$ 36.00$ 49,860.00$

1,500.00$ 4,500.00$ 3,000.00$ 9,000.00$ 1,200.00$ 3,600.00$

1,500.00$ 7,500.00$ 1,060.00$ 5,300.00$ 510.00$ 2,550.00$

1.00$ 5,593.00$ 1.75$ 9,787.75$ 5.80$ 32,439.40$

8.20$ 64,763.60$ 17.50$ 138,215.00$ 62.00$ 489,676.00$

627.00$ 13,167.00$ 607.00$ 12,747.00$ 690.00$ 14,490.00$

1,605.00$ 6,420.00$ 1,270.00$ 5,080.00$ 1,800.00$ 7,200.00$

8,452,880.60$ 8,809,265.55$ 8,122,874.00$

Page 15 of 19

Page 22: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. UnitsItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

SIGNALIZATION PAY ITEMS85 630-2-11-2 2" PVC (SCH 40) UNDERGROUND CONDUIT 400 LF

86 630-2-11-2A ADDITIONAL 2" PVC (SCH 40) CONDUIT, IN OPEN TRENCH 250 LF

87 630-2-12-2-5 5-2" (HDPE SDR 11) UNDER PAVEMENT CONDUIT (DIRECTIONAL BORE) 320 LF

88 630-2-12-2-6 6-2" (HDPE SDR 11) UNDER PAVEMENT CONDUIT (DIRECTIONAL BORE) 300 LF

89 630-2-14-2 2" RIGID CONDUIT HOT DIPPED GALVANIZED CONDUIT SURFACE MOUNTED 20 LF

90 632-7-1-19G SIGNAL CABLE (SPAN LENGTH 751' - Greater) 1 PI

91 632-7-1-4A PEDESTRIAN SIGNAL CABLE - 4 CONDUCTOR 1 PI

92 632-7-1-7A PEDESTRIAN SIGNAL CABLE - 7 CONDUCTOR 1 PI

93 632-7-6 SIGNAL CABLE, REMOVE - IN INTERSECTION 1 PI

94 635-2-12-A PULL BOX (17" x 30" x 12"D) HEAVY DUTY COVERS (TIER 15) 21 EA

95 635-2-12-C PULL BOX (30" x 48" x 24"D) HEAVY DUTY SPLIT COVERS (ITS) (TIER 15) 2 EA

96 639-1-123 ELECTRICAL POWER SERVICE NO METER BASE (UNDERGROUND) 1 AS

97 639-2-1-3 ELECTRICAL SERVICE WIRE (SIGLE PHASE 3-WIRE, TRIPLEX) 240 LF

98 639-3-11 ELECTRICAL SERVICE DISCONNECT (BREAKER BOX, SHEET T 6.2 OF PBC STANDARDS) 1 EA

99 641-2-12-12 PRESTRESSED CONCRETE POLE (12' TYPE P-II ) 1 EA

100 646-1-11 ALUMINUM SIGNALS POLE, PEDESTAL WITH TRANSFORMER BASE (8 FEET ABOVE GROUND) 6 EA

101 646-1-60 ALUMINUM SIGNALS POLE, REMOVE 8 EA

102 649-21-15 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, SINGLE 70' 1 EA

103 649-21-21 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, SINGLE 78' 2 EA

104 649-26-03 STEEL MAST ARM ASSEMBLY, REMOVE, SHALLOW FOUNDATION-BOLT ON ATTACHMENT 3 EA

105 649-26-07 REMOVE ARM AND ATTACHMENT FROM EXISTING MAST ARM ASSEMBLY, POLE REMAIN 1 EA

106 650-1-13 TRAFFIC SIGNAL HEAD ALUMINUM (3-SECTION, 1-WAY) INCLUDES BACKPLATES 13 AS

107 650-1-15 TRAFFIC SIGNAL HEAD ALUMINUM (5-SECTION, 1-WAY) INCLUDES BACKPLATES 2 AS

108 653-191 PEDESTRIAN SIGNAL - COUNT DOWN (1-WAY) ALUMINUM 6 EA

109 653-1-60 PEDESTRIAN SIGNAL, REMOVE PED SIGNAL 6 EA

110 660-4-10-B6 VIDEO IMAGE DETECTION 6 - CAMERA SYSTEM (ITERIS) COMPLETE. 1 EA

111 660-4-60 VEHICLE DETECTION SYSTEM-VIDEO, REMOVE 4 EA

112 665-1-11 PEDESTRIAN DETECTOR (PUSH BUTTON) 6 EA

Unit Price Amount Unit Price Amount Unit Price Amount

BERGERON LAND DEVELOPMENT, INC. RIC-MAN INTERNATIONAL, INC. RYAN INCORPORATED

SOUTHERN

8.50$ 3,400.00$ 17.00$ 6,800.00$ 34.00$ 13,600.00$

2.00$ 500.00$ 15.00$ 3,750.00$ 5.60$ 1,400.00$

35.00$ 11,200.00$ 21.50$ 6,880.00$ 70.00$ 22,400.00$

42.00$ 12,600.00$ 24.50$ 7,350.00$ 72.00$ 21,600.00$

22.00$ 440.00$ 38.50$ 770.00$ 14.00$ 280.00$

4,375.00$ 4,375.00$ 6,070.00$ 6,070.00$ 8,200.00$ 8,200.00$

1,310.00$ 1,310.00$ 1,320.00$ 1,320.00$ 1,400.00$ 1,400.00$

1,666.00$ 1,666.00$ 1,880.00$ 1,880.00$ 2,900.00$ 2,900.00$

550.00$ 550.00$ 552.00$ 552.00$ 1,600.00$ 1,600.00$

448.00$ 9,408.00$ 736.00$ 15,456.00$ 900.00$ 18,900.00$

1,400.00$ 2,800.00$ 1,850.00$ 3,700.00$ 1,400.00$ 2,800.00$

1,150.00$ 1,150.00$ 4,740.00$ 4,740.00$ 990.00$ 990.00$

2.75$ 660.00$ 7.50$ 1,800.00$ 2.90$ 696.00$

1,550.00$ 1,550.00$ 1,990.00$ 1,990.00$ 450.00$ 450.00$

1,180.00$ 1,180.00$ 1,930.00$ 1,930.00$ 930.00$ 930.00$

950.00$ 5,700.00$ 1,210.00$ 7,260.00$ 800.00$ 4,800.00$

60.00$ 480.00$ 276.00$ 2,208.00$ 560.00$ 4,480.00$

63,150.00$ 63,150.00$ 56,200.00$ 56,200.00$ 65,000.00$ 65,000.00$

51,800.00$ 103,600.00$ 59,500.00$ 119,000.00$ 73,000.00$ 146,000.00$

1,400.00$ 4,200.00$ 2,210.00$ 6,630.00$ 3,200.00$ 9,600.00$

600.00$ 600.00$ 1,650.00$ 1,650.00$ 1,100.00$ 1,100.00$

1,025.00$ 13,325.00$ 1,050.00$ 13,650.00$ 960.00$ 12,480.00$

1,564.00$ 3,128.00$ 1,540.00$ 3,080.00$ 1,700.00$ 3,400.00$

523.00$ 3,138.00$ 166.00$ 996.00$ 680.00$ 4,080.00$

81.00$ 486.00$ 938.00$ 5,628.00$ 98.00$ 588.00$

59,000.00$ 59,000.00$ 12,700.00$ 12,700.00$ 41,000.00$ 41,000.00$

150.00$ 600.00$ 2,760.00$ 11,040.00$ 400.00$ 1,600.00$

150.00$ 900.00$ 386.00$ 2,316.00$ 140.00$ 840.00$

Page 16 of 19

Page 23: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. UnitsItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

113 670-5-110-B TRAFFIC CONTROLLER ASSEMBLY (TYPE 6) AS PER NAZTEC 1 AS

114 670-5-600 TRAFFIC CONTROLLER ASSEMBLY, REMOVE CONTROLLER WITH CABINET 1 AS

115 690-15 REMOVE INTERNALY ILLUMINATED SIGN 4 EA

116 700-3-201 SIGN PANEL, FURNISH AND INSTALL OVERHEAD MOUNT, UP TO 12 SF 5 EA

117 700-5-22 INTERNALLY ILLUMINATED SIGN (8') FLUORESCENT 2 EA

SUBTOTAL (SIGNALIZATION)

PBC WATER UTILITY ITEMSADJUST VALVE BOX (INCLUDING CONCRETE COLLAR) 38 EA

CONCRETE SLAB 0.74 CY

EXISTING WATER SERVICE AND METER TO BE RELOCATED 1 EA

EXISTING WATER METER TO BE RELOCATED 4 EA

RELOCATE FIRE HYDRANT 2 EA

ADJUST FIRE HYDRANT 1 EA

DEFLECT W.M W/FITTINGS (<12") 5 EA

ADJUST AIR RELEASE VALVE 4 EA

ADJUST MANHOLE (UTILITIES) 3 EA

RELOCATE BACKFLOW PREVENTER 1 EA

8" DUCTILE IRON PIPE FOR POTABLE WATER MAIN INSTALLATION 60 LF

CONNECT TO EXISTING 12" POTABLE WATER MAIN 1 EA

F&I DUCTILE IRON COMPACT FITTINGS W/REACTION BLOCKING OR THRUST RESTRAINTS F 0.5 TN

8" TO 12" JOINT RESTRAINT GASKET (FIELD LOCK OR FAST GRIP) 1 EA

8" TO 12" MECHANICAL JOINT RESTRAINT FOR DUCTILE IRON PIPE 6 EA

RESTRAINT EXISTING 8" TO 12" PVC PRESSURE PIPE JOINTS 25 EA

8" GATE VALVE & VALVE BOX 1 EA

FIRE HYDRANT ASSEMBLY WITH CAPTIVATOR CAP, 6" GATE VALVE & ANCHOR TEE ASSEMBL 1 EA

SAMPLE POINTS ON FIRE HYDRANTS 2 EA

SHORT SINGLE 5/8" METER SERVICE (1-1/2" PVC) (UP TO 10' LONG) 1 EA

DENSITY TEST 5 EA

REMOVAL/PLUG OF EXISTING WATER SERVICE PIPING 140 LF

AS BUILT RECORD DRAWINGS 1 LS

SUBTOTAL (UTILITY)

CONTINGENCY ITEMS (PBC WATER UTILITY ITEMS)

139

140

134

135

136

137

138

129

130

131

132

133

124

125

126

127

128

119

120

121

122

123

118

Unit Price Amount Unit Price Amount Unit Price Amount

BERGERON LAND DEVELOPMENT, INC. RIC-MAN INTERNATIONAL, INC. RYAN INCORPORATED

SOUTHERN

31,700.00$ 31,700.00$ 32,500.00$ 32,500.00$ 27,000.00$ 27,000.00$

300.00$ 300.00$ 1,020.00$ 1,020.00$ 1,600.00$ 1,600.00$

55.00$ 220.00$ 497.00$ 1,988.00$ 200.00$ 800.00$

10,800.00$ 54,000.00$ 546.00$ 2,730.00$ 2,000.00$ 10,000.00$

2,500.00$ 5,000.00$ 3,860.00$ 7,720.00$ 2,000.00$ 4,000.00$

850.00$ 32,300.00$ 371.00$ 14,098.00$ 730.00$ 27,740.00$

2,650.00$ 1,961.00$ 3,710.00$ 2,745.40$ 760.00$ 562.40$

1,500.00$ 1,500.00$ 1,410.00$ 1,410.00$ 1,100.00$ 1,100.00$

2,100.00$ 8,400.00$ 530.00$ 2,120.00$ 470.00$ 1,880.00$

2,150.00$ 4,300.00$ 2,020.00$ 4,040.00$ 2,300.00$ 4,600.00$

1,500.00$ 1,500.00$ 1,170.00$ 1,170.00$ 1,500.00$ 1,500.00$

10,800.00$ 54,000.00$ 4,450.00$ 22,250.00$ 6,200.00$ 31,000.00$

1,020.00$ 4,080.00$ 2,970.00$ 11,880.00$ 760.00$ 3,040.00$

1,550.00$ 4,650.00$ 636.00$ 1,908.00$ 760.00$ 2,280.00$

5,880.00$ 5,880.00$ 1,270.00$ 1,270.00$ 1,600.00$ 1,600.00$

99.00$ 5,940.00$ 76.50$ 4,590.00$ 160.00$ 9,600.00$

5,700.00$ 5,700.00$ 1,800.00$ 1,800.00$ 2,800.00$ 2,800.00$

13,050.00$ 6,525.00$ 5,300.00$ 2,650.00$ 11,000.00$ 5,500.00$

675.00$ 675.00$ 371.00$ 371.00$ 650.00$ 650.00$

675.00$ 4,050.00$ 1,270.00$ 7,620.00$ 600.00$ 3,600.00$

800.00$ 20,000.00$ 1,280.00$ 32,000.00$ 890.00$ 22,250.00$

2,050.00$ 2,050.00$ 2,120.00$ 2,120.00$ 1,900.00$ 1,900.00$

6,375.00$ 6,375.00$ 7,210.00$ 7,210.00$ 5,500.00$ 5,500.00$

725.00$ 1,450.00$ 849.00$ 1,698.00$ 260.00$ 520.00$

2,400.00$ 2,400.00$ 2,230.00$ 2,230.00$ 2,600.00$ 2,600.00$

75.00$ 375.00$ 1,000.00$ 5,000.00$ 120.00$ 600.00$

33.00$ 4,620.00$ 28.50$ 3,990.00$ 20.00$ 2,800.00$

8,500.00$ 8,500.00$ 25,000.00$ 25,000.00$ 1,700.00$ 1,700.00$

353,304.00$ 436,514.00$

159,170.40$ 135,322.40$

402,316.00$

187,231.00$

Page 17 of 19

Page 24: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Item Descrption Qty. UnitsItem #

BID TABULATIONSLYONS RD., N. OF LWDD l-14 CANAL TO LAKE WORTH RD., AND LYONS RD., LAKE WORTH ROAD

TO S. OF LWDD L-11 CANAL CONTRACTPBC PROJECT #2010504B & 2007500A

SUPPORT AND PROTECT WM & APPURTANCES (<12") 260 LF

SUPPORT AND PROTECT FM & APPURTANCES (<2") 300 LF

SUBTOTAL (UTILITY)

CONTINGENCY ITEMS (ROADWAY)FLOWABLE FILL 75 CY

CLASS 1 CONCRETE (MISCELLANEOUS) 10 CY

PREMIUM FOR CONFLICT CONDITION (SEE SP'S) 1 EA

CHANGEABLE (VARIABLE MESSAGE) SIGN (NON MOT) 112 ED

TRAFFIC CONTROL OFFICER (NON MOT) 120 HR

STORM SEWER CLEANING (EXIST.) (24" OR LESS) (SEE SP'S) 2,040 LF

STORM SEWER CLEANING (EXIST.) ( > 24" TO 48") (SEE SP'S) 5,730 LF

STORM SEWER CLEANING (EXIST.) ( > 48") (SEE SP'S) 242 LF

TEMPORARY FENCE 600 LF

SUBTOTAL (CONTINGENCY)

TOTAL BID

149

150

151

144

145

146

147

148

141

142

143

Unit Price Amount Unit Price Amount Unit Price Amount

BERGERON LAND DEVELOPMENT, INC. RIC-MAN INTERNATIONAL, INC. RYAN INCORPORATED

SOUTHERN

75.00$ 19,500.00$ 16.00$ 4,160.00$ 40.00$ 10,400.00$

66.00$ 19,800.00$ 14.00$ 4,200.00$ 40.00$ 12,000.00$

250.00$ 18,750.00$ 304.00$ 22,800.00$ 220.00$ 16,500.00$

250.00$ 2,500.00$ 886.00$ 8,860.00$ 680.00$ 6,800.00$

45,000.00$ 45,000.00$ 5,300.00$ 5,300.00$ 7,400.00$ 7,400.00$

60.00$ 6,720.00$ 11.50$ 1,288.00$ 17.00$ 1,904.00$

65.00$ 7,800.00$ 74.50$ 8,940.00$ 84.00$ 10,080.00$

15.00$ 30,600.00$ 8.25$ 16,830.00$ 6.80$ 13,872.00$

20.00$ 114,600.00$ 10.50$ 60,165.00$ 14.00$ 80,220.00$

30.00$ 7,260.00$ 31.00$ 7,502.00$ 34.00$ 8,228.00$

25.00$ 15,000.00$ 16.00$ 9,600.00$ 5.10$ 3,060.00$

141,285.00$ 148,064.00$

9,115,000.00$ 9,551,565.95$

8,360.00$ 22,400.00$ 39,300.00$

248,230.00$

8,999,951.00$

Page 18 of 19

Page 25: Cheatham LLC Construction Incorporated Southern Landdiscover.pbcgov.org/engineering/roadwayproduction... · AWARD RECOMMENDATION PROJECT NOS: 2010504B & 2007500A TITLE:LYONS ROAD

Note # PAY ITEM FOOTNOTES

1 MOT SHALL INCLUDE THE COST OF ANY TEMPORARY PAVEMENT, AND TEMPORARY CONC. BARRIERS AS REQUIRED.

2 ALL ITEMS SHALL INCLUDE COST TO FURNISH AND INSTALL UNLESS OTERWISE NOTED.

3 ALL STRUCTURES BOXES ARE 10 FEET OR LESS IN DEPTH UNLESS OTHERWISE NOTED.

4 OPTIONAL BASE GROUP AND ASPHALTIC CONCRETE ITEMS INCLUDE BITUMINOUS MATERIAL AND TACK COAT AS REQUIRED.

5 THE COST FOR "SAW CUT AND BUTT JOINT", AS REQUIRED, SHALL BE INCIDENTAL TO THE RELATED ASPHALT ITEM.

5 THE COST OF BREAKING INTO EXISTING STRUCTURES IS INCIDENTAL TO COST OF PIPE.

6 PREMIUM FOR CONFLICT CONDITION SHALL INCLUDE COSTS OF REQUIRED STEEL CASING, AS DIRECTED BY THE ENGINEER.

7 THE COST OF PIPE SHALL INCLUDE THE COST OF BACK FILLING REQUIRED OVER PIPE TO FINISHED GRADES AS SHOWN ON THE PLANS.

8 CONNECTION OF THE NEW GUARDRAIL TO THE EXISTING GUARDRAIL ARE INCLUDED IN THE WORK FOR "GUARDRAIL", LF.

9 TYPE B FENCE (6' HIGH) (W/TOP RAIL) BLACK VINYL CLAD INLCUDES 222 LF OF CONTINGENCY ITEMS.

10 CONTRACTOR SHALL COORDINATE WITH THE STREETSCAPE SECTION (561-684-4100) FOR LOCATIONS FOR THE RELOCATED TREES A MINIMUM OF 3 WEEKS PRIOR TO TREE RELOCATION OPERATIONS.

11

BID ITEM 660-4-10-B6 FURNISH & INSTALL A COMPLETE (ITERIS) 6-CAMERA VIDEO DETECTION SYSTEM PER FDOT AND PALM BEACH COUNTY SPECIFICATIONS. THIS ITEM WILL INCLUDE ALL CABINET EQUIPMENT (SHELF MOUNTED PROCESSORS, SUPPLEMENTAL INTERFACE HARDWARE, CABLING, OTHER CABINET SYSTEM COMPONENTS). THIS ITEM ALSO INCLUDES ALL OVERHEAD EQUIPMENT (SIX (6) CAMERAS, MOUNTING HARDWARE AND CABLING) AND ALL APPURTENANCES NECESSARY FOR A COMPLETE AND ACCEPTED INSTALLATION.

THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET.

THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS.

PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE.

Page 19 of 19