    APPENDIX I

    (I) BASIC INFORMATION

    Name Of The Project Shri Shantinagar Residential

    complex

    [by Sura na Mutha Bhansali

    Developers]

    Location/ site alternative under

    consideration

    Survey no. 63/A, 63/1/3A, 63/A/4 at

    Kondhwa Budurk, near VIT hostel,

    Pune, Maaharashtra

    Size of the project Total plot area available fordevelopment:40,500 m2

    Total area under coverage: 6757.44

    m2

    And BUA is 46704.24 m2

    Expected Cost Of the Project Total cost of project: INR 26 crore

    80 lakhs

    Screening Category Activity under Item 8(a) of the EIA

    Notification of 14th September 2006

    (II) Activity

    1. Construction, operation or decommissioning of the Project

    Involving actions, which will cause physical changes in the locality

    (Topography, land use, changes in water bodies, etc.)

    S.

    No.

    Information/Checklist

    confirmation

    Yes/n

    o

    Details thereof (with

    approximatequantities/rates, wherever

    possible) with source of

    information data

    1.1 Permanent or temporary

    change in land use, land

    cover or topography

    Yes The proposal pertains to

    building a residential

    complex. As per

  • 8/6/2019 Checklist (Filled)

    2/18

    including increase in

    intensity of land use (with

    respect to loval land use

    plan)

    development plan of Pune

    Municipal Corporation

    sanctioned by State

    Government, the plot under

    reference is in Residentialzone. The Conceptual Plan,

    Site Plan, Layout Plan and

    Parking Plan are enclosed

    vide Annexur-I to Annexure

    IV respectively with this

    application.

    1.2 Clearance of existing Land,

    vegetation and building?

    No No clearance of existing trees

    required. Existing trees shall

    be included in green belt of

    project area.1.3 Creation of new land uses? No Poposed development is in

    conformity with the approved

    development plan if Pune

    Municipal Corporation.

    1.4 Pre-construction

    investigation eg. Borehole,

    soil testing?

    Yes No bore well water usage is

    proposed during operation

    phase and as well as

    construction phase.

    1.5 Construction works The project is categorized asa whole site development as

    per PMC jurisdiction. The

    proposal is as follows: all

    area in m2

    Total plot area =

    40,500.00m2

    Less 10% open space =

    3778.86m2

    Total BUA = 467-4.24m2

    1.6 Demolition work No At present the land is lying

    unutilized, vacant and

    therefore demolition work is

    not envisaged.

    1.7 Temporary sites used foe Yes No housing at site. The

  • 8/6/2019 Checklist (Filled)

    3/18

    construction works or

    housing of construction

    workers?

    workers from nearby area of

    Pune shall be engaged in

    construction activity.

    1.8 Above ground buildings,

    structures or earthworksincluding linear structures,

    cut and fill or excavations.

    Yes Excavation for foundation is

    prominent activity. Thedebris, soil and rubble

    removed would be used as

    filling material for leveling

    and for road construction.

    1.9 Underground works

    including mining or

    tunneling?

    No Not applicable as the

    proposal pertains to

    construction of residential

    complex.

    1.10 Reclamation works? No Not appliacable.

    1.11 Dredging? No Not applicable.1.12 Offshore structures No Not applicable.

    1.13 Production and

    manufacturing process?

    No Not applicable as the

    proposal pertains to

    construction of residential

    complex.

    1.14 Facilities for storage of

    goods or materials?

    No Primary storage Godown will

    be provided for storage of

    construction materials on

    site.1.15 Facilities for treatment or

    disposal of solid waste or

    liquid effluents?

    Yes Sewage Treatment Plant will

    be provided.

    Refer annexure VII

    The project proponents have

    proposed arrangement to

    collect solid waste as a part

    of waste management.

    Organic waste converters

    system used for solid waste

    management.

    1.16 Facilities for long term

    housing of operational

    workers?

    No Not applicable since this is a

    construction project.

    1.17 New road, rail or sea traffic

    during construction or

    Yes There will be some increase

    in road traffic:

  • 8/6/2019 Checklist (Filled)

    4/18

    operation?

    Construction phase: 7-8

    trucks/day, JCB Poclain may

    ply once or twice a day.

    Operation phase: the

    development will not have

    major impact on traffic

    pattern. Internal roads will be

    well constructed to manage

    traffic. Area is developed

    with proper road

    infrastructure.

    1.18 New road, rail, airwaterborne or other

    transport infrastructure

    including new or altered

    routes and stations, ports,

    airports etc?

    Yes Railway: Pune railwaystation on Central Railway is

    at a distance of 10 km.

    Roadway: Pune Satara

    Highway is 4-5 km from site.

    Airway: Lohegaon Airport is

    around 30 kms from site.

    1.19 New or diverted

    transmission lines or

    pipelines?

    No No such measure needs to be

    undertaken and hence not

    applicable.1.20 Impoundments, damming,

    culverting, realignment or

    other changes to the

    hydrology of watercourses

    or aquifers?

    No There are no naturally

    occurring aquifers or flowing

    water course at the given site.

    1.21 Stream crossing? No Not applicable as there is no

    stream crossing.

    1.22 Abstraction or transfers of

    water from ground or

    surface waters?

    Yes As mentioned earlier, there is

    no proposal for ground water.

    The proponents haveproposed for rain water

    harvesting system which will

    recharge ground water.

    1.23 Changes in water bodies or

    the land surface affecting

    drainage or run-off?

    No Not applicable

  • 8/6/2019 Checklist (Filled)

    5/18

    1.24 Transport of personnel or

    materials for construction,

    operation or

    decommissioning?

    Yes Daily movements of 20

    trucks in predicted for

    transporting raw material.

    The earthwork dug during the

    process shall be utilized andthere is no decommissioning

    involved in the project.

    1.25 Long-term dismantling or

    decommissioning or

    restoration works?

    No Not applicable since there is

    no dismantling or

    decommissioning involved in

    the project.

    1.26 Ongoing activity during

    decommissioning which

    could have an impact on the

    environment?

    No Not applicable since there is

    no decommissioning.

    1.27 Influx of people to an area

    in either temporarily or

    permanently?

    Yes Proposed project will be

    residential complex and there

    will be permanent population

    residing at project place and

    the environmental impact

    will be directly proportional

    to the occupancy.

    1.28 Introduction of alien

    species?

    No The proponents have

    proposed for landscaping /green belt development of

    local and exotic species

    around the periphery of the

    whole site and in the garden

    space in the center of the

    proposed buildings. Also

    open spaces in the northern

    and southern corners of site

    shall be developed as green

    zone. Open space in the southwestern corner shall be used

    to build temple. Details of

    green belt are provided vide

    Annexure-X

    1.29 Loss of native species or

    genetic diversity?

    No No clearance of vegetation

    required and the existing

  • 8/6/2019 Checklist (Filled)

    6/18

    trees will be added in to

    proposed green belt.

    1.30 Any other actions? No Not applicable.

    2. Use of Natural resources for construction ot operation of the

    Project (such as lan, waterm materials or energy, especially any

    resources which are non-renewable or in short suppy):

    S.no. Information/checklist

    confirmation

    Yes/No Details thereof (with

    approximate quantities/

    rates, wherever possible)

    2.1 Land especially undevelopedor agricultural land (ha) No Not applicable as land isleveled with no major

    undulations and lying

    vacant.

    2.2 Water (expected source &

    competing user) unit: KLD

    Yes Construction phase: water

    supply required during

    construction is about 80

    cum/day. The total water

    requirement will be met

    through PMC water supply

    system.Operation phase: the total

    water requirement is 400m2.

    The water budget is

    enclosed as Annexure-VI.

    The total water requirement

    will be met through PMC

  • 8/6/2019 Checklist (Filled)

    7/18

    water supply system.

    2.3 Minerals (mt) No Not applicable.

    2.4 Construction material- stone,

    aggregates, sand / soil

    (expected)

    Yes Please refer Annexure-IX

    2.5 Forests and timber (source

    MT)

    No Not applicable.

    2.6 Energy including electricity

    and fuels (source, competing

    users)

    Unit: fuel (MT), energy

    (MW)

    Yes Construction phase: 170-

    190 units/day from MSEB

    for a tenure of one and a

    half years

    Operation phase:

    154KW/building

    From MSEB (MSEDCL)

    Power back-up: 1000 KVApower back up will be

    provided through DG sets

    for lift and common area.

    2.7 Any other natural resources No Not applicable.

    3. Use, storage, transport, handling or production of substances or

    materials which could be harmful to human health ot the

    environment or raise concerns about actual or perceived risks to

    human health.

    S.NO. Information/checklist

    confirmation

    Yes/No Details thereof (with

    approximate

    quantites/rates, wherever

    possible) with source of

    information data

  • 8/6/2019 Checklist (Filled)

    8/18

    3.1 Use of substances or

    materials, which are

    hazardous (as oer MSIHC

    rules) to human health or the

    environment (flora, faunaand water supplies)

    No Not applicable

    3.2 Changes in occurrence of

    disease or affect disease

    vectors (eg. Insects or water

    borne diseases)

    No Not applicable

    3.3 Affect the welfare of people

    eg. By changing living

    conditions?

    No Not applicable

    3.4 Vulnerable groups of people

    2ho could be affected by theproject eg. Hospital patient,

    children, etc.

    No Not applicable

    3.5 Any other causes No Not applicable

    4. Production of solid wastes during construction or operation ordecommissioning (MT/Month)

    S.NO. Information/checklist

    confirmation

    Yes/No Details thereof (with

    approximate

    quantites/rates, wherever

    possible) with source of

    information data.

    4.1 Spoil, overburden or mine

    wastes

    No Excavation debris will be

    ised as filler material.

    4.2 Municipal waste (domestic

    and/or commercial wastes)

    Yes Solid Waste Generation:

    Construction phase: The

    sub-stratum removed will

    be used for back filling the

    plinth/foundation. A part of

  • 8/6/2019 Checklist (Filled)

    9/18

    construction waste, which

    is suitable for landfill, will

    be used for road making

    and as fill material. The

    proponents will utilizebalance as fill material in

    other construction sites in

    close vicinity.

    Operation phase: The

    solid waste, quantity wise it

    is 1327kg/day; considering

    biodegradable approx. 740

    kg/dat shall be directed for

    Organic waste converters(OWS) system. Remaining

    442 kg/day rrest qualifies

    as Municipal solid waste

    hence it is proposed to be

    directed to municipal waste

    site through collection

    dumpers of PMC. Please

    refer Annexure-VII

    4.3 Hazardous wastes (as perhazardous waste

    management rules)

    No Not applicable as therewould be no generation of

    hazardous waste.

    4.4 Other industrial process

    wastes

    No Not applicable.

    4.5 Surplus product No Not applicable

    4.6 Sewage sludge or other

    sludge from effluent

    treatment

    No Sludge generated will be

    biodegradable and will be

    used as manure in garden.

    4.7 Construction or demolition

    wastes

    Yes construction waste will be

    used for roads and as fillmaterial for leaving and

    road, pathway construction.

    4.8 Redundant machinery or

    equipment

    No Not applicable

    4.9 Contaminated soils or other No Not applicable.

  • 8/6/2019 Checklist (Filled)

    10/18

    materials

    4.10 Agricultural wastes No Not applicable.

    5. Release of pollutants or ant hazardous, toxic or noxious

    substances to air (kg/hr)

    S.N

    O.

    Information/checklist

    confirmation

    Yes/

    No

    Details thereof (with

    approximate

    quantities/rates, wherever

    possible) with source of

    information data

    5.1 Emissions from combustionof fossil fuels from stationary

    or mobile sources

    Yes Vehicular movement andenergy back up DG sets and

    other home appliances like Air

    conditioner will be source of

    air pollution.

    Refer Annexure VIII

    5.2 Emissions from production

    processes

    No Not applicable

    5.3 Emissions from material

    handling including storage ortransport

    No Not applicable as use of ready

    mix concrete containing flyash is envisaged for

    construction.

    5.4 Emissions from construction

    activities including plant and

    equipment

    No Dust emissions may occur

    during excavation and

    earthwork. Appropriate

    barriers would be provided to

    prevent the spread of dust into

    the atmosphere. Water

    sprinkling shall also be done to

    pertain the dust level topermissible one.

    5.5 Dust or odours from handling

    of material including

    construction materials,

    sewage and waste.

    No Not applicable

  • 8/6/2019 Checklist (Filled)

    11/18

    5.6 Emissions from burning of

    waste in open air (eg. Slash

    materials, construction

    debris)

    No No burning of waste at site

    will be carried out. As

    described earlier, the bio-

    degradable waste will be used

    for OWC, the sludge from STPwill be used as manure for

    gardening and the non-

    biodegradable waste will be

    disposed off through

    municipal waste disposal

    facility. There will be

    ansolutely no burning of

    waste.

    5.8 Emissions from incineration

    of waste

    No Not applicable

    5.9 Emissions from any other

    sources

    No Not applicable as this project

    pertains to construction of

    residential complex.

    6. Generation of noise and vibration and emissions of light and heat:

    S.NO. Information/checklist

    confirmation

    Yes/No Details thereof (with

    approximate

    quantities/rates, wherever

    possible) with source of

    information data

    6.1 From operation of

    equipment eg engines,

    ventilation plant, crushers

    Yes

    Construction phase: The

    main source of noise

    pollution will be the

    machinery used forconstruction and vehicular

    movement. The construction

    site will be covered from the

    sides and hence noise will

    not spread to surrounding

  • 8/6/2019 Checklist (Filled)

    12/18

    Operation phase: During

    operation phase the only

    source of noise will be

    vehicular traffic an DG sets.

    It is important that the DGsets would be utilized only

    during failure of electricity

    and of course the DG sets

    shall be provided with

    acoustic enclosure which

    will make them quiet

    equipment to an acceptable

    level.

    6.2 From industrial or similar

    process

    No Not appliacable

    6.3 From construction or

    demolition

    Yes Due to construction

    machinery/vehicle

    movement. However, site is

    vacant and no demolition is

    involved.

    6.4 From blasting or piling No Not applicable as no blastin

    is proposed.

    6.5 From construction or

    operational traffic

    Yes During the construction

    activity, trucks, dumpersand other vehicles would be

    generating the noise.

    6.6 From lighting or cooling

    systems

    No Not applicable

    6.7 From any other source No Not applicable

    7. Risks of contaminating of land or water from releases of

    pollutants into the ground or into the sewers, surface waters,groundwater, coastal waters or the sea:

    S.No. Information/checklist

    confirmation

    Yes/No Details thereof (with

    approximate

    quantities/rates, wherever

  • 8/6/2019 Checklist (Filled)

    13/18

    possible) with source of

    information data

    7.1 From handling, storage, use

    or spillage of hazardous

    materials

    No Not applicable as there

    would be no storage,

    transport or handling ofhazardous material

    7.2 From discharge of sewage or

    other effluents to water or

    the land (expected mode and

    place of discharge)

    No A provision of STP to treat

    sewage generated in the

    complex. The treated

    sewage from STP will be

    utilized for gardening &

    surplus if any would be

    disposed off into the sewer

    line of the Municipal

    Corporation Of Pune. Thus,there will be no impact on

    the surface/ground water

    regime due to the sewage

    generated in the complex.

    7.3 By deposition of pollutants

    emitted to air into the land or

    into the water

    No 1. New trees along with few

    indigenous shrubs shall be

    planted in the project area to

    prevent air & noise

    pollution.2. Sewage treatment plant

    will be provided.

    3. DG sets will beprovided

    with acoustic enclosures.

    Refer EMP for further

    details

    7.4 From any other sources No Not applicable

    7.5 Is there a risk of long term

    build up of pollutants in the

    environment from thesesources?

    No Not applicable

    8. Risk of accidents during construction or operation of the project,

    which could affect human health or the environment:

  • 8/6/2019 Checklist (Filled)

    14/18

    S.No. Information/checklist

    confirmation

    Yes/No Details thereof (with

    approximate

    quantites/rates, wherever

    possible) with source ofinformation data

    8.1 From explosions, spillages,

    fires etc from storage

    handling, use or production

    of hazardous substances

    No Not applicable

    8.2 From any other sources No Not applicable

    8.3 Could the project be affected

    by natural disasters causing

    environmental damage (Eg.

    Floods, earthquakes, etc)

    No The area is not subject to

    flooding as per Disaster

    Management Plan prepared

    by PMC

    9. Factors which should be considered (such as consequential

    development) which could lead to environmental effects or the

    potential for cumulative impacts with other existing or planned

    activities in the locality:

    S.No. Information/checklist

    confirmation

    Yes/No Details thereof (with

    approximatequantites/rates, wherever

    possible)with source of

    information data

    9.1 Lead to development of

    supporting. Facilities,

    ancillary development

    stimulated by development

    stimulated by the project

    which could have impact on

    the environmentEg: supporting infrastructure

    Housing

    development

    Extractive

    industries

    No Not applicable

    The site and nearby areas

    are developed with good

    supportive infrastructure.

  • 8/6/2019 Checklist (Filled)

    15/18

    Supply

    industries

    other

    9.2 Lead to after-use of the site ,

    which could have an impacton the environment

    No Not applicable

    9.3 Set a precedent for later

    developments

    No Not applicable

    9.4 Have cumulative effects due

    to proximity to other existing

    or planned projects with

    similar effects

    No Not applicable

    (II) ENVIRONMENTAL SENSITIVITY

    S.NO. AREAS NAME/ Aerial distance (within

  • 8/6/2019 Checklist (Filled)

    16/18

    IDENTITY 15km)

    Proposed project

    location boundary

    1 areas protected under

    international conventions,national or local

    legislation for their

    ecological, landscape,

    cultural or other related

    value

    No such

    areas

    Not applicable. The site is

    located in the developingarea of Pune City

    2 Areas which are

    important or sensitive for

    ecological reasons-

    wetlands, water courses

    or other water bodies,coastal zome, biosphere,

    mountains, forests

    No such

    areas

    Not applicable. The

    project is located in the

    developing area of Pune

    City.

    3 Areas used by protected,

    important or sensitive

    species of flora or fauna

    for breeding, nesting,

    foraging, resting, over

    winteringm migration

    No such

    areas

    Not applicable. The

    project is located in the

    developing area of Pune

    City.

    4 Inland, coastal, marine or underground waters No Not applicable

    5 State/ National

    boundaries

    No Not applicable

    6 Routes or facilities used

    by the public for access to

    recreation or other tourist,

    pilgrim area

    Yes Project site is well

    connected to various ways

    of Pune

    7 Defence installation No Not applicable

    8 Densely populated or

    built-up area

    Yes Project located is in

    residential and

    Commercial zone of Pune

    City.

    9 Areas occupied by

    sensitive man-made land

    uses (hospitals, schools,

    No Not applicable

  • 8/6/2019 Checklist (Filled)

    17/18

    places of worship, etc)

    10 Areas containing

    important, high quality or

    scarce resources (ground

    water resources, surfaceresources forestry,

    agricultur, fisheries,

    tourism, minerals)

    No Not applicable

    11 Areas already subjected

    to pollution or

    environmental damage.

    ( Those where existing

    legal environmental

    standards are exceeded)

    None Not applicable

    12 Areas susceptible tonatural hazard which

    could cause the project to

    present environmental

    problems (earthquakes,

    subsidence, landslides,

    erosion, flooding or

    extreme or adverse

    climatic conditions)

    None Not applicable

  • 8/6/2019 Checklist (Filled)