8/6/2019 Checklist (Filled)
1/18
APPENDIX I
(I) BASIC INFORMATION
Name Of The Project Shri Shantinagar Residential
complex
[by Sura na Mutha Bhansali
Developers]
Location/ site alternative under
consideration
Survey no. 63/A, 63/1/3A, 63/A/4 at
Kondhwa Budurk, near VIT hostel,
Pune, Maaharashtra
Size of the project Total plot area available fordevelopment:40,500 m2
Total area under coverage: 6757.44
m2
And BUA is 46704.24 m2
Expected Cost Of the Project Total cost of project: INR 26 crore
80 lakhs
Screening Category Activity under Item 8(a) of the EIA
Notification of 14th September 2006
(II) Activity
1. Construction, operation or decommissioning of the Project
Involving actions, which will cause physical changes in the locality
(Topography, land use, changes in water bodies, etc.)
S.
No.
Information/Checklist
confirmation
Yes/n
o
Details thereof (with
approximatequantities/rates, wherever
possible) with source of
information data
1.1 Permanent or temporary
change in land use, land
cover or topography
Yes The proposal pertains to
building a residential
complex. As per
8/6/2019 Checklist (Filled)
2/18
including increase in
intensity of land use (with
respect to loval land use
plan)
development plan of Pune
Municipal Corporation
sanctioned by State
Government, the plot under
reference is in Residentialzone. The Conceptual Plan,
Site Plan, Layout Plan and
Parking Plan are enclosed
vide Annexur-I to Annexure
IV respectively with this
application.
1.2 Clearance of existing Land,
vegetation and building?
No No clearance of existing trees
required. Existing trees shall
be included in green belt of
project area.1.3 Creation of new land uses? No Poposed development is in
conformity with the approved
development plan if Pune
Municipal Corporation.
1.4 Pre-construction
investigation eg. Borehole,
soil testing?
Yes No bore well water usage is
proposed during operation
phase and as well as
construction phase.
1.5 Construction works The project is categorized asa whole site development as
per PMC jurisdiction. The
proposal is as follows: all
area in m2
Total plot area =
40,500.00m2
Less 10% open space =
3778.86m2
Total BUA = 467-4.24m2
1.6 Demolition work No At present the land is lying
unutilized, vacant and
therefore demolition work is
not envisaged.
1.7 Temporary sites used foe Yes No housing at site. The
8/6/2019 Checklist (Filled)
3/18
construction works or
housing of construction
workers?
workers from nearby area of
Pune shall be engaged in
construction activity.
1.8 Above ground buildings,
structures or earthworksincluding linear structures,
cut and fill or excavations.
Yes Excavation for foundation is
prominent activity. Thedebris, soil and rubble
removed would be used as
filling material for leveling
and for road construction.
1.9 Underground works
including mining or
tunneling?
No Not applicable as the
proposal pertains to
construction of residential
complex.
1.10 Reclamation works? No Not appliacable.
1.11 Dredging? No Not applicable.1.12 Offshore structures No Not applicable.
1.13 Production and
manufacturing process?
No Not applicable as the
proposal pertains to
construction of residential
complex.
1.14 Facilities for storage of
goods or materials?
No Primary storage Godown will
be provided for storage of
construction materials on
site.1.15 Facilities for treatment or
disposal of solid waste or
liquid effluents?
Yes Sewage Treatment Plant will
be provided.
Refer annexure VII
The project proponents have
proposed arrangement to
collect solid waste as a part
of waste management.
Organic waste converters
system used for solid waste
management.
1.16 Facilities for long term
housing of operational
workers?
No Not applicable since this is a
construction project.
1.17 New road, rail or sea traffic
during construction or
Yes There will be some increase
in road traffic:
8/6/2019 Checklist (Filled)
4/18
operation?
Construction phase: 7-8
trucks/day, JCB Poclain may
ply once or twice a day.
Operation phase: the
development will not have
major impact on traffic
pattern. Internal roads will be
well constructed to manage
traffic. Area is developed
with proper road
infrastructure.
1.18 New road, rail, airwaterborne or other
transport infrastructure
including new or altered
routes and stations, ports,
airports etc?
Yes Railway: Pune railwaystation on Central Railway is
at a distance of 10 km.
Roadway: Pune Satara
Highway is 4-5 km from site.
Airway: Lohegaon Airport is
around 30 kms from site.
1.19 New or diverted
transmission lines or
pipelines?
No No such measure needs to be
undertaken and hence not
applicable.1.20 Impoundments, damming,
culverting, realignment or
other changes to the
hydrology of watercourses
or aquifers?
No There are no naturally
occurring aquifers or flowing
water course at the given site.
1.21 Stream crossing? No Not applicable as there is no
stream crossing.
1.22 Abstraction or transfers of
water from ground or
surface waters?
Yes As mentioned earlier, there is
no proposal for ground water.
The proponents haveproposed for rain water
harvesting system which will
recharge ground water.
1.23 Changes in water bodies or
the land surface affecting
drainage or run-off?
No Not applicable
8/6/2019 Checklist (Filled)
5/18
1.24 Transport of personnel or
materials for construction,
operation or
decommissioning?
Yes Daily movements of 20
trucks in predicted for
transporting raw material.
The earthwork dug during the
process shall be utilized andthere is no decommissioning
involved in the project.
1.25 Long-term dismantling or
decommissioning or
restoration works?
No Not applicable since there is
no dismantling or
decommissioning involved in
the project.
1.26 Ongoing activity during
decommissioning which
could have an impact on the
environment?
No Not applicable since there is
no decommissioning.
1.27 Influx of people to an area
in either temporarily or
permanently?
Yes Proposed project will be
residential complex and there
will be permanent population
residing at project place and
the environmental impact
will be directly proportional
to the occupancy.
1.28 Introduction of alien
species?
No The proponents have
proposed for landscaping /green belt development of
local and exotic species
around the periphery of the
whole site and in the garden
space in the center of the
proposed buildings. Also
open spaces in the northern
and southern corners of site
shall be developed as green
zone. Open space in the southwestern corner shall be used
to build temple. Details of
green belt are provided vide
Annexure-X
1.29 Loss of native species or
genetic diversity?
No No clearance of vegetation
required and the existing
8/6/2019 Checklist (Filled)
6/18
trees will be added in to
proposed green belt.
1.30 Any other actions? No Not applicable.
2. Use of Natural resources for construction ot operation of the
Project (such as lan, waterm materials or energy, especially any
resources which are non-renewable or in short suppy):
S.no. Information/checklist
confirmation
Yes/No Details thereof (with
approximate quantities/
rates, wherever possible)
2.1 Land especially undevelopedor agricultural land (ha) No Not applicable as land isleveled with no major
undulations and lying
vacant.
2.2 Water (expected source &
competing user) unit: KLD
Yes Construction phase: water
supply required during
construction is about 80
cum/day. The total water
requirement will be met
through PMC water supply
system.Operation phase: the total
water requirement is 400m2.
The water budget is
enclosed as Annexure-VI.
The total water requirement
will be met through PMC
8/6/2019 Checklist (Filled)
7/18
water supply system.
2.3 Minerals (mt) No Not applicable.
2.4 Construction material- stone,
aggregates, sand / soil
(expected)
Yes Please refer Annexure-IX
2.5 Forests and timber (source
MT)
No Not applicable.
2.6 Energy including electricity
and fuels (source, competing
users)
Unit: fuel (MT), energy
(MW)
Yes Construction phase: 170-
190 units/day from MSEB
for a tenure of one and a
half years
Operation phase:
154KW/building
From MSEB (MSEDCL)
Power back-up: 1000 KVApower back up will be
provided through DG sets
for lift and common area.
2.7 Any other natural resources No Not applicable.
3. Use, storage, transport, handling or production of substances or
materials which could be harmful to human health ot the
environment or raise concerns about actual or perceived risks to
human health.
S.NO. Information/checklist
confirmation
Yes/No Details thereof (with
approximate
quantites/rates, wherever
possible) with source of
information data
8/6/2019 Checklist (Filled)
8/18
3.1 Use of substances or
materials, which are
hazardous (as oer MSIHC
rules) to human health or the
environment (flora, faunaand water supplies)
No Not applicable
3.2 Changes in occurrence of
disease or affect disease
vectors (eg. Insects or water
borne diseases)
No Not applicable
3.3 Affect the welfare of people
eg. By changing living
conditions?
No Not applicable
3.4 Vulnerable groups of people
2ho could be affected by theproject eg. Hospital patient,
children, etc.
No Not applicable
3.5 Any other causes No Not applicable
4. Production of solid wastes during construction or operation ordecommissioning (MT/Month)
S.NO. Information/checklist
confirmation
Yes/No Details thereof (with
approximate
quantites/rates, wherever
possible) with source of
information data.
4.1 Spoil, overburden or mine
wastes
No Excavation debris will be
ised as filler material.
4.2 Municipal waste (domestic
and/or commercial wastes)
Yes Solid Waste Generation:
Construction phase: The
sub-stratum removed will
be used for back filling the
plinth/foundation. A part of
8/6/2019 Checklist (Filled)
9/18
construction waste, which
is suitable for landfill, will
be used for road making
and as fill material. The
proponents will utilizebalance as fill material in
other construction sites in
close vicinity.
Operation phase: The
solid waste, quantity wise it
is 1327kg/day; considering
biodegradable approx. 740
kg/dat shall be directed for
Organic waste converters(OWS) system. Remaining
442 kg/day rrest qualifies
as Municipal solid waste
hence it is proposed to be
directed to municipal waste
site through collection
dumpers of PMC. Please
refer Annexure-VII
4.3 Hazardous wastes (as perhazardous waste
management rules)
No Not applicable as therewould be no generation of
hazardous waste.
4.4 Other industrial process
wastes
No Not applicable.
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other
sludge from effluent
treatment
No Sludge generated will be
biodegradable and will be
used as manure in garden.
4.7 Construction or demolition
wastes
Yes construction waste will be
used for roads and as fillmaterial for leaving and
road, pathway construction.
4.8 Redundant machinery or
equipment
No Not applicable
4.9 Contaminated soils or other No Not applicable.
8/6/2019 Checklist (Filled)
10/18
materials
4.10 Agricultural wastes No Not applicable.
5. Release of pollutants or ant hazardous, toxic or noxious
substances to air (kg/hr)
S.N
O.
Information/checklist
confirmation
Yes/
No
Details thereof (with
approximate
quantities/rates, wherever
possible) with source of
information data
5.1 Emissions from combustionof fossil fuels from stationary
or mobile sources
Yes Vehicular movement andenergy back up DG sets and
other home appliances like Air
conditioner will be source of
air pollution.
Refer Annexure VIII
5.2 Emissions from production
processes
No Not applicable
5.3 Emissions from material
handling including storage ortransport
No Not applicable as use of ready
mix concrete containing flyash is envisaged for
construction.
5.4 Emissions from construction
activities including plant and
equipment
No Dust emissions may occur
during excavation and
earthwork. Appropriate
barriers would be provided to
prevent the spread of dust into
the atmosphere. Water
sprinkling shall also be done to
pertain the dust level topermissible one.
5.5 Dust or odours from handling
of material including
construction materials,
sewage and waste.
No Not applicable
8/6/2019 Checklist (Filled)
11/18
5.6 Emissions from burning of
waste in open air (eg. Slash
materials, construction
debris)
No No burning of waste at site
will be carried out. As
described earlier, the bio-
degradable waste will be used
for OWC, the sludge from STPwill be used as manure for
gardening and the non-
biodegradable waste will be
disposed off through
municipal waste disposal
facility. There will be
ansolutely no burning of
waste.
5.8 Emissions from incineration
of waste
No Not applicable
5.9 Emissions from any other
sources
No Not applicable as this project
pertains to construction of
residential complex.
6. Generation of noise and vibration and emissions of light and heat:
S.NO. Information/checklist
confirmation
Yes/No Details thereof (with
approximate
quantities/rates, wherever
possible) with source of
information data
6.1 From operation of
equipment eg engines,
ventilation plant, crushers
Yes
Construction phase: The
main source of noise
pollution will be the
machinery used forconstruction and vehicular
movement. The construction
site will be covered from the
sides and hence noise will
not spread to surrounding
8/6/2019 Checklist (Filled)
12/18
Operation phase: During
operation phase the only
source of noise will be
vehicular traffic an DG sets.
It is important that the DGsets would be utilized only
during failure of electricity
and of course the DG sets
shall be provided with
acoustic enclosure which
will make them quiet
equipment to an acceptable
level.
6.2 From industrial or similar
process
No Not appliacable
6.3 From construction or
demolition
Yes Due to construction
machinery/vehicle
movement. However, site is
vacant and no demolition is
involved.
6.4 From blasting or piling No Not applicable as no blastin
is proposed.
6.5 From construction or
operational traffic
Yes During the construction
activity, trucks, dumpersand other vehicles would be
generating the noise.
6.6 From lighting or cooling
systems
No Not applicable
6.7 From any other source No Not applicable
7. Risks of contaminating of land or water from releases of
pollutants into the ground or into the sewers, surface waters,groundwater, coastal waters or the sea:
S.No. Information/checklist
confirmation
Yes/No Details thereof (with
approximate
quantities/rates, wherever
8/6/2019 Checklist (Filled)
13/18
possible) with source of
information data
7.1 From handling, storage, use
or spillage of hazardous
materials
No Not applicable as there
would be no storage,
transport or handling ofhazardous material
7.2 From discharge of sewage or
other effluents to water or
the land (expected mode and
place of discharge)
No A provision of STP to treat
sewage generated in the
complex. The treated
sewage from STP will be
utilized for gardening &
surplus if any would be
disposed off into the sewer
line of the Municipal
Corporation Of Pune. Thus,there will be no impact on
the surface/ground water
regime due to the sewage
generated in the complex.
7.3 By deposition of pollutants
emitted to air into the land or
into the water
No 1. New trees along with few
indigenous shrubs shall be
planted in the project area to
prevent air & noise
pollution.2. Sewage treatment plant
will be provided.
3. DG sets will beprovided
with acoustic enclosures.
Refer EMP for further
details
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term
build up of pollutants in the
environment from thesesources?
No Not applicable
8. Risk of accidents during construction or operation of the project,
which could affect human health or the environment:
8/6/2019 Checklist (Filled)
14/18
S.No. Information/checklist
confirmation
Yes/No Details thereof (with
approximate
quantites/rates, wherever
possible) with source ofinformation data
8.1 From explosions, spillages,
fires etc from storage
handling, use or production
of hazardous substances
No Not applicable
8.2 From any other sources No Not applicable
8.3 Could the project be affected
by natural disasters causing
environmental damage (Eg.
Floods, earthquakes, etc)
No The area is not subject to
flooding as per Disaster
Management Plan prepared
by PMC
9. Factors which should be considered (such as consequential
development) which could lead to environmental effects or the
potential for cumulative impacts with other existing or planned
activities in the locality:
S.No. Information/checklist
confirmation
Yes/No Details thereof (with
approximatequantites/rates, wherever
possible)with source of
information data
9.1 Lead to development of
supporting. Facilities,
ancillary development
stimulated by development
stimulated by the project
which could have impact on
the environmentEg: supporting infrastructure
Housing
development
Extractive
industries
No Not applicable
The site and nearby areas
are developed with good
supportive infrastructure.
8/6/2019 Checklist (Filled)
15/18
Supply
industries
other
9.2 Lead to after-use of the site ,
which could have an impacton the environment
No Not applicable
9.3 Set a precedent for later
developments
No Not applicable
9.4 Have cumulative effects due
to proximity to other existing
or planned projects with
similar effects
No Not applicable
(II) ENVIRONMENTAL SENSITIVITY
S.NO. AREAS NAME/ Aerial distance (within
8/6/2019 Checklist (Filled)
16/18
IDENTITY 15km)
Proposed project
location boundary
1 areas protected under
international conventions,national or local
legislation for their
ecological, landscape,
cultural or other related
value
No such
areas
Not applicable. The site is
located in the developingarea of Pune City
2 Areas which are
important or sensitive for
ecological reasons-
wetlands, water courses
or other water bodies,coastal zome, biosphere,
mountains, forests
No such
areas
Not applicable. The
project is located in the
developing area of Pune
City.
3 Areas used by protected,
important or sensitive
species of flora or fauna
for breeding, nesting,
foraging, resting, over
winteringm migration
No such
areas
Not applicable. The
project is located in the
developing area of Pune
City.
4 Inland, coastal, marine or underground waters No Not applicable
5 State/ National
boundaries
No Not applicable
6 Routes or facilities used
by the public for access to
recreation or other tourist,
pilgrim area
Yes Project site is well
connected to various ways
of Pune
7 Defence installation No Not applicable
8 Densely populated or
built-up area
Yes Project located is in
residential and
Commercial zone of Pune
City.
9 Areas occupied by
sensitive man-made land
uses (hospitals, schools,
No Not applicable
8/6/2019 Checklist (Filled)
17/18
places of worship, etc)
10 Areas containing
important, high quality or
scarce resources (ground
water resources, surfaceresources forestry,
agricultur, fisheries,
tourism, minerals)
No Not applicable
11 Areas already subjected
to pollution or
environmental damage.
( Those where existing
legal environmental
standards are exceeded)
None Not applicable
12 Areas susceptible tonatural hazard which
could cause the project to
present environmental
problems (earthquakes,
subsidence, landslides,
erosion, flooding or
extreme or adverse
climatic conditions)
None Not applicable
8/6/2019 Checklist (Filled)
18/18