Factory for the production of motor oil,industrial oil, antifreeze and related products

• Fully equiped,ready to work immediately• Capacity: 12,000 MT per year.• Meet requirements of ISO 9001,ISO 14001 and ISO 17025. • It’s located in the industrial zone of Vrcin,

next to the highway E-75 (Belgrade-Nais),17km south of Belgrade DC.

Page 3: CHEMOL presentation

Land and infrastructure

• The total area of the site on which the factory is located amounts 5200 m2

• The site is fenced, has a spacious parking area, night lighting, guardhouse and video surveillance

• Traffic inside the complex is projected circularly, through the entry and exit gates• In addition to the power supply from the electrical networks has installed three phase

generator / OP 45KVA

• Factory is 500m far from the highway exit

• All necessary permits and approvals for use are an integral part of the documentation of the factory and enable performance of activities immediately .

Page 4: CHEMOL presentation

Land and infrastructure

Page 5: CHEMOL presentation

Buildings

Factory complex consists of the following facilities :

• The administration building 270 m2 +100 m2 (attic) area• The Raw materials warehouse of approximately 130 m2 area• Production hall of approximately 400 m2 area• Five vertical storage tanks (heated,thermo-isolated) with total volume of 500 m3

• Finished products warehouse 450 m2area• Approximately 1000 m2 open storage space • All facilities have all the necessary permits ( building , utility ...).

Page 6: CHEMOL presentation

The Administrative building

The Administrative building area is 270m2 + 100 m2 and consists of : 8 offices A fully equipped laboratory for testing oil and antifreeze Kitchenette Two toilets with showers

The building is equipped with water heating system, central heating, tel. connections,internet ...

All offices are air-conditioned,fully equipped with furniture and all the necessary funds for the operation .

Page 7: CHEMOL presentation

The Administrative building

Page 8: CHEMOL presentation

The Laboratory Within the administrative building there is a very well equipped laboratory

for testing base oils,additives,motor and industrial oils, antifreeze and related products.

The laboratory is divided into three parts ( three rooms ) and it containsa laboratory Instruments which cover about 30 tests

all according to ISO 17025.

Page 9: CHEMOL presentation

The Raw materials warehouse

The Raw materials warehouse is approximately 130 m2 area with two

additional metal galleries of 60 m2 area for storage of light materials.

Page 10: CHEMOL presentation

The Production hallProduction hall has an area of approximately 400 m2 and it meets the highest standards.

It has installed two oil blenders with a capacity of 5000 lit each,one oil blender with capacity of 2000 lit and one antefreeze and water-soluble products blender with capacity of 2000 lit.

Also there is installed the heating plant 450KW which heats the whole complex,including hot water, central heating, technological processesheating and all reservoirs heating.

Heating fluid is a thermal oil.

Page 11: CHEMOL presentation

The Production hall

Page 12: CHEMOL presentation

The Heating plant

Page 13: CHEMOL presentation

Storage tanksBeside the production hall there is five heated,thermo-isolated storage tanks: Two storage tanks of 50m3 volume One storage tank of 100m3 volume Two storage tank of 150m3 volume

Page 14: CHEMOL presentation

The Finished products warehouse

Finished products warehouse area is 450m2.Within the warehouse there's office with toillet.The warehouse has two entrances-exits.

Page 15: CHEMOL presentation

contact person : Nebojša Maleševiće-mail:[email protected]@gmail.comTel. +381 (63) 221-618