Upload
vanphuc
View
263
Download
0
Embed Size (px)
Citation preview
CHEROKEEPIPELINEENGINEERING,DESIGNANDCONSTRUCTION
PROJECTDESCRIPTIONProjectscopeincluded:ENGlobal furnishedallengineering,designandconstructionas-builtservicesforanew34mile,24-inchnaturalgaspipelinefromFt.Lupton,ColoradototheCherokeePowerPlantinCommerceCity,Colorado.Thisnewpipelinewillprovidenaturalgastothenew569MWgasturbine(2015startup)beinginstalledatthepowerplant.
PROJECTACCOMPLISHMENTS•Underbudget•Onschedule•SuccessfulexecutionofseveralHDDcrossings
Office:[email protected]
SCOPEOFWORKWorkexecutedincluded:• Designbasis• Routeinvestigationandselections• Construction,materialsand
equipmentspecifications• Populationclassandhigh
consequenceareaimpactdetermination
• Trafficcontrolplans• Constructionscopeofwork• Equipmentdatasheetsandbillof
materials• ProcessflowandP&IDs• Alignmentsheetsandtemporaryuse
areas• Crossingandboredesigns• Mechanicalandelectrical
engineeringanddesigns• Tie-in,cleaning,dryingandpurging
procedures• As-builtdatacollectionand
processing• As-builtsurvey