CHEW VALLEY SCHOOL PERFORMING ARTS BUILDING FEASIBILITY REPORT September 2013
CONTENTS
1.0 Executive Summary
2.0 Brief
3.0 Precedent studies
4.0 Location options
5.0 Outline building design
6.0 Consultation
7.0 Cost Plan
8.0 Programme
9.0 Next Steps
Appendices
Appendix A: LPA consultation correspondence
Appendix B Retractable seating information
1.0 Executive Summary
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
Following the appointment of The Bush Consultancy in May 2013, this report sets out the
development of the feasibility proposals for a new Performing Arts Building at Chew Valley School.
Currently the proposals have been developed in order to gain stakeholder comment, both from local
residents and community groups as well as the Local Planning Authority. However, these proposals
should be considered as preliminary layout and massing studies that have been prepared in order to
allow debate on location and general aesthetics principles outline costplan purposes. From the Local
Planning Authority (LPA) consultation process it has been established that the principle and design
proposals are identified in this report are acceptable in principle, however the issue of location.
However, in terms of the building’s location, there will need to be more extensive justification
arguments put forward for the school’s preferred location option, including possible strategic
masterplan for the site as a whole (through review and agreement, this may be limited to identifying
buildings that are likely to be retained / removed).
2.0 Brief
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
Introduction
This development aims to improve the current delivery of performing arts at the school, and also
create an opportunity to provide access to wider community facilities at Chew Valley School site,
and thereby building on the site’s current community focus as part of a sustainable and long term
vision.
Requirements of the school:
The school requires appropriate space to deliver and promote the performing arts elements of the
curriculum, which is currently being compromised by current accommodation.
Current issues with existing performance space within the school
Hall is used for many things - Assemblies, Concerts, Productions, Festivals, PE, Dance,
Examinations and School Dinners.
Multiple use unsatisfactory for all users.
1950s design - refurbishment unlikely to produce significant improvement.
Requirements of the community
There are many community users of the hall who also need a modern facility
There are additional community needs which could be met by a ‘Hub’
The Arts can bring the community together
Local groups could, subject to stakeholder consultation and design development, include
Singing Groups, Dance Groups, Amateur Dramatic Groups, Film night uses, and also the
Library Service.
The Chew Valley is not well provided for in terms of local amenities.
Whilst the principle focus of the building will be associated with the performing arts, the flexible use
of the building and it’s relationship with the community is important. Consequently, the needs of the
community (that have a positive, harmonious and practical relationship with the core activities of
the building) should be further explored through the feasibility stage of the project.
Principle facility requirements
A flexible auditorium to seat up to 300, with retractable ‘bleacher’ style seating. Flexibility
should include possible sub-division or reduction in size (maybe by means of suitable tracked
curtain system).
Designed for Proscenium Arch, Thrust Stage and in the round performances
Lighting and Sound Box
A Dance Studio/Rehearsal Space (potential dual function with main auditorium).
Box Office
Café Servery and Foyer that can be used for performances and also for other possible events
associated with the building’s community use.
Possible teaching / bookable rooms to foyer space, depending on design arrangement of this
volume.
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
Community space – the scope and nature of this use will be developed through stakeholder
engagement.
Storage
Green Room – for performers, including changing / dressing room accommodation.
In overall terms the building should make a statement about the value of creativity and performance
at the school and in the local community.
The building, through it’s facilities and design should promote access for all.
Location
Various locations on the school site should be considered at feasibility stage, though the following
criteria should be considered:
The building should be accessible to the local community, in a manner that does not impact
unduly on other school site activities or operations.
The development should ensure that he building does not compromise future development
of the school site (or indeed itself be compromised by such development).
Sustainability
There is currently no BREEAM requirement for the development, though the proposed development
should consider integration and promotion of renewable energy sources and create a building with
minimal operating costs.
Access and WC facilities are totally unsuitable
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
Accommodation schedule and phasing approach
The design should reflect the fact that the proposed building is, due to likely funding limitations, to
be developed in a phased manner:
Phase 1
Phase 1
Foyer / Library space (double height space) 100sqm
Box Office, including wc’s 100sqm*
Servery and Storage 50sqm*
100 seat Auditorium (double height space) 150sqm
Green Room 100sqm
500sqm
*May generate larger overall floor area if a mezzanine level is introduced for teaching / bookable
community space.
Phase 2
Further development and extension for Performing Arts and/or community
Foyer / Library space (double height space) 100sqm
Box Office, including wc’s 100sqm
Servery and Storage 50sqm
290 seat Auditorium(double height space) 300sqm
Green Room 100sqm
Additional practice studio space 100sqm
750sqm
The following diagram explains the proposed adjacencies relationships anticipated for the building.
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
Budget
A provisional budget of £1250 / sqm is targeted for the construction costs, which therefore
generates a circa £950,000 construction cost
3.0 Precedent Studies
The following images provide possible design references for the external and internal appearance of
the building
Hayesfield School theatre and Bath Spa Roper theatre were visited during the preparation of this
report and the following images indicate the type of auditorium space planned for the building.
Key issues at for the auditorium spaces at these theatres were noted as:
WC to green room (not shared) – not provided at Hayesfield school theatre and deemed a
mistake.
Retractable bleacher and subdivision makes space very flexible
High doors into back stage area
Theatre storage for equipment / workshop type space considered useful
Gantry walkways – query over whether this is a useful part of operational / experience for
students?
4.0 Location options
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
Location options
In considering locations for the proposed facilities, the following considerations have been made:
Access for school and also community use
Impact on current site accommodation
Impact on potential future development of the site (a consideration due to the age and quality of
the main school buildings)
Impact on the character and setting of the school, including the rural nature of the site.
In consideration of this criteria, three location options have been reviewed as noted on the
accompanying drawings:
Location 1 - to the east of the main school buildings
Advantages:
Performance space will be visible from the public highway and main entrance drive
The building will be close to parking for visitors with accessibility needs
The location allows for possible future expansion
The location does not compromise possible future development of the school site
There will be a close relationship with the music block facilities
Disadvantages:
There will be the loss of an existing mature tree (though this will be replaced with new tree
planting on the site)
Location 2 – adjoining the current music block
Advantages:
Physical connection to music block facilities
Disadvantages:
Would require demolition of the former caretaker accommodation and consequential loss of
counselling service accommodation, attendance officer space and SEN classroom in this
building.
View / approach to the family centre will be compromised
Performing arts building will not be clearly visible from the approach to and within the site.
Will require internal amendments to the music block
Loss of a group of mature trees adjacent to the music block and former caretaker dwelling.
Location 3 – remodelling / expansion of the current hall / auditorium.
Advantages:
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
Re-use of existing accommodation, thereby limiting extent of new building footprint
Disadvantages:
Existing hall facility would not be available during development period
Compromise to daylighting of existing adjoining spaces
Performing arts building will not be clearly visible from the approach to and within the site.
Access concerns in relation to parking / existing changes in levels within the building
The location potentially compromises possible future development of the school site – this is
the oldest building on site and one of two earmearked for demolition and replacement
under the BSF programme.
Loss of two existing mature trees.
Following review with the school, the current preference is to develop location 1 as the favoured site
for the new facilities.
G2
CHEW LANE
FB2
92092.40m2
Site Area:
UP UP
UP
UP
UP
UP
Plantrm
Lift
Kiln
Room
Art
Lobby
Store
6th Form Common Room
Drama
Stage
Hall/gymnasium
Kitchen
Room
Art
room
teaching
General
room
teaching
General
room
teaching
General
room
teaching
General
teaching
general
6th Form
classroom
Drama
room
teaching
General
station
Elec sub
room
teaching
General
Technology
Food
Technology
Food
Mini Soccer Pitch
Existing Cricket Nets
Pitch 4
Pitch 1
Station
Pumping
MJK
1:500 @A1
2882/ (L) 010
CHEW VALLEY SCHOOL - PERFORMING ARTS BUILDING
June 13
EXISTING SITE PLAN
EXISTING SITE PLAN
C
REV NOTE DATE BY Checked DRAWN PROJECT
SCALE DRAWING
DATE NUMBER REVISION
REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked
T B CONSULTANCYUSHHE
0117F0117Telephone ax
[email protected] - www.thebushconsultancy.com
5.20 Paintworks, Bath Road, Bristol, BS4 3EH.
316 0570 316 0571
CO
PY
RIG
HT R
ev D
00/054
Music
Practice = P
GROUND FLOOR 00
BLOCK 029
00/001
00/002
00/003
00/004
00/005
00/006
00/007
00/008
00/009
00/010
00/01100/012
00/013
00/014
NEW MUSIC BLOCK
380
Music classroom
372
Recital
384
P
373 374
383382
381
P
375
office
376
377
P
378385
379
00/076
00/075
00/074 00/073
00/078
00/077133
134
135
136137
138P
P P
P
00/00100/004
00/005
00/006
296295
294
293
299 Lift
Kiln
SERVICE
ART ROOM
MEETING ROOM
MALE WC
OFFICE
DIS WC
STORE
CORRIDOR
STORE
LOBBY
FEMALE WC
VENDING
LOBBY
CIRCULATION / EXHIBITION SPACE
STAIR 2
SOCIAL / CAFE SPACE
DIS WC
STORE
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
00/001
00/002
00/003
00/004
00/005
00/006
UP
UP
UP
BL
OC
K 27
GR
OU
ND
FL
OO
R 00
327
328
329
33
0
331
UP
00/001
00/002 00/003
00/00400/005
00/006
00/007
00/008
00/009
00/010
00/01100/012
00/013
00/014
00/015
00/016
00/017
00/01800/019
00/020
00/021
00/038
00/023
00/02400/025
00/026
00/027
00/028
00/02900/030
00/031
00/032
00/033
00/034
00/045
00/036
00/037
00/03500/052
00/039
00/051
00/050
00/049
00/048
00/040
00/046 00/044
00/04700/043
00/042
00/041
BLOCK 18
18/02
18/01
00/022
S3
1
2
3
3
4
56
7
9 10
25 26 27
36
22
23
24
24A
24B
37 29
28
3
13
14
1516
17
18
11
12
19 21A
21
20
30
31
36
33
40
41
42
39
56
57
55
54
53
52
51
50
4946
47
48
38
3435
32
43
44
45
ScienceScience
Science
6th Form
Science
Prep
Science
Science
Science
Plant
Science
Theory
Special Needs
classroom
Reception
MI
SecHead
repro
Special
Needs
Resources/reproGT
Science
Science
Science
Prep
8
290
291
S8
292
320
S7
321
322
S6
317
318
UP
00/010
00/00800/009
00/005 00/007
00/006
00/004
00/003
00/002
00/001
00/01500/014
00/01100/012
00/013 00/016
16/01
16/02
274 277
275 276
278
279
273
270
269
267265
268
266
272280
271
Sports Hall
Change
sh
Squash Squash
Fitness
room
340
341
M M
MM
F F
FF
F M
staff
342
343
344
345
346
347
348
349
350
351
PE
office
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
office
369
plant
H
00/001
00/002
00/006
00/007
00/008
00/009
00/010
00/011
00/012
00/013 00/014
15/01
15/02
00/005
00/003
STORE
TEXTILES ROOM
DARKROOM
STORE
Coats
Coats
PLANT
251
253
252
250
249
259
258256
257
260
245
248
247246
254
255
261
262
264A
263
264
Res materials
Multi
Media
Multi
Media
Staff
Prep
Resistant Materials
Multi
Media
Lt
Tech
MJK
2882/ (L) 005
CHEW VALLEY SCHOOL - PERFORMING ARTS BUILDING
June 13
C
REV NOTE DATE BY Checked DRAWN PROJECT
SCALE DRAWING
DATE NUMBER REVISION
REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked
T B CONSULTANCYUSHHE
0117F0117Telephone ax
[email protected] - www.thebushconsultancy.com
5.20 Paintworks, Bath Road, Bristol, BS4 3EH.
316 0570 316 0571
CO
PY
RIG
HT R
ev D
EXISTING SITE PHOTOGRAPHSnts
caretaker dwelling, looking south east from entrance drive towards music block and former View 2, looking south east from entrance driveView 1
, looking south east across car parkView 3 , looking south east from car park towards former caretaker dwelling and family centreView 4
, looking towards music blockView 5 , looking north towards current hall / auditorium View 6 , interior of current hall / auditoriumView 7
G2
CHEW LANE
FB2
92092.40m2
Site Area:
UP UP
UP
UP
UP
UP
Plantrm
Lift
Kiln
Room
Art
Lobby
Store
6th Form Common Room
Drama
Stage
Hall/gymnasium
Kitchen
Room
Art
room
teaching
General
room
teaching
General
room
teaching
General
room
teaching
General
teaching
general
6th Form
classroom
Drama
room
teaching
General
station
Elec sub
room
teaching
General
Technology
Food
Technology
Food
Mini Soccer Pitch
Existing Cricket Nets
Pitch 4
Pitch 1
Station
Pumping
CHEW VALLEY SCHOOL - PERFORMING ARTS BUILDING
2882/ (L) 015
MJK
1:250 @A1
June 13
PROPOSED LOCATION OPTIONS
C
REV NOTE DATE BY Checked DRAWN PROJECT
SCALE DRAWING
DATE NUMBER REVISION
REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked
T B CONSULTANCYUSHHE
0117F0117Telephone ax
[email protected] - www.thebushconsultancy.com
5.20 Paintworks, Bath Road, Bristol, BS4 3EH.
316 0570 316 0571
CO
PY
RIG
HT R
ev D
OPTION 2LOCATION
OPTION 3LOCATION
OPTION 1LOCATION
Draft for comment 26.06.13
Practice = P
GROUND FLOOR 00
BLOCK 029
00/001
00/002
00/003
00/004
00/005
00/006
00/007
00/008
00/009
00/010
00/01100/012
00/013
00/014
NEW MUSIC BLOCK
380
Music classroom
372
Recital
384
P
373 374
383382
381
P
375
office
376
377
P
378385
379
00/076
00/075
00/074 00/073
00/078
00/077133
134
135
136137
138
Music
Practice = P
P
P P
P
01/04
BLOCK 05
00/001
00/002
00/003
00/004
00/005
00/006
298
297
296295
294
293
299 Lift
Kiln
Art
SERVICE
ART ROOM
MEETING ROOM
MALE WC
DIS WC
STORE
CORRIDOR
STORE
LOBBY
FEMALE WC
VENDING
LOBBY
CIRCULATION / EXHIBITION SPACE
STAIR 2
SOCIAL / CAFE SPACE
DIS WC
STORE
394
395
396
397
398
399
400
401
402
403
404
405
406
407
409
410
UP
00/001
00/002 00/003
00/00400/005
00/006
00/007
00/008
00/009
00/010
00/01100/012
00/013
00/014
00/015
00/016
00/017
00/01800/019
00/020
00/021
00/038
00/023
00/02400/025
00/026
00/027
00/028
00/02900/030
00/031
00/032
00/033
00/034
00/045
00/036
00/037
00/03500/052
00/039
00/051
00/050
00/049
00/048
00/040
00/046 00/044
00/04700/043
00/042
00/041
BLOCK 18
18/02
18/01
00/022
S3
16/02
1
2
3
3
4
56
7
9 10
25 26 27
36
22
23
24
24A
24B
37 29
28
3
13
14
1516
17
18
11
12
19 21A
21
20
30
31
36
33
40
41
42
39
56
57
55
54
53
52
51
50
4946
47
48
38
3435
32
43
44
45
ScienceScience
Science
6th Form
Science
Prep
Science
Science
Science
Plant
Science
Theory
Special Needs
classroom
Reception
MI
SecHead
reproSpecial
Needs
Resources/reproGT
Science
Science
Science
Prep
8
290
291
S8
292
320
S7
321
322
S6
317
318
16/02
H
00/001
00/002
00/006
00/007
00/008
00/009
00/010
00/011
00/012
00/013 00/014
BLOCK 15
15/01
15/02
00/005
00/003
STORE
TEXTILES ROOM
DARKROOM
STORE
Coats
Coats
PLANT
251
253
252
250
249
259
258256
257
260
245
248
247246
254
255
261
262
264A
263
264
Res materials
Multi
Media
Multi
Media
Staff
Prep
Resistant Materials
Multi
Media
Lt
Tech
UP
BLOCK 16
00/010
00/00800/009
00/005 00/007
00/006
00/004
00/003
00/002
00/001
00/01500/014
00/01100/012
00/013 00/016
16/01
16/02
15/02
274 277
275 276
278
279
273
270
269
267265
268
266
272280
271
Sports Hall
Change
sh
Squash Squash
Fitness
room
340
341
M M
MM
F F
FF
F M
staff
342
343
344
345
346
347
348
349
350
351
PE
office
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
office
369
plant
UP
UP
UP
Stage
Hall/gymnasium
Kitchen
Pitch 4
CHEW VALLEY SCHOOL - PERFORMING ARTS BUILDING
2882/ (L) 016
MJK
1:200 @A1
June 13
PROPOSED LOCATION OPTION 1
PROPOSED SITE LOCATION 1
- WOULD REQUIRE THE REMOVAL OF 1 EXISTING TREE.
C
REV NOTE DATE BY Checked DRAWN PROJECT
SCALE DRAWING
DATE NUMBER REVISION
REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked
T B CONSULTANCYUSHHE
0117F0117Telephone ax
[email protected] - www.thebushconsultancy.com
5.20 Paintworks, Bath Road, Bristol, BS4 3EH.
316 0570 316 0571
CO
PY
RIG
HT R
ev D
ADVANTAGES
DISADVANTAGES
- CLOSE RELATIONSHIP WITH MUSIC BLOCK
DEVELOPMENT OF THE SCHOOL- DOES NOT COMPROMISE POTENTIAL FUTURE
OF THE FACILITIESFUTURE EXPANSION- THE LOCATION PROVIDES THE OPPORTUNITY FOR
WITH ACCESSIBILITY NEEDS.- IT IS CLOSE TO EXISTING PARKING FOR VISITORS
PUBLIC HIGHWAY.- PERFORMANCE CENTRE WILL BE VISIBLE FROM THE
Draft for comment 26.06.13
00/054
00/001
00/002
00/003
00/004
00/005
00/006
00/007
00/008
00/009
00/010
00/01100/01200/014
NEW MUSIC BLOCK
380
Music classroom
372
384
P
373 374
383382
381
P
375
office
376
377
P
378385
379
00/001
00/002
00/003
00/004
00/005
00/006
UP
UP
UP
327
328
329
330
331
CHEW VALLEY SCHOOL - PERFORMING ARTS BUILDING
2882/ (L) 017
MJK
1:200 @A1
June 13
PROPOSED LOCATION OPTION 2
PROPOSED SITE LOCATION 2
- PHYSICAL CONNECTION TO EXISTING MUSIC BLOCK.
C
REV NOTE DATE BY Checked DRAWN PROJECT
SCALE DRAWING
DATE NUMBER REVISION
REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked
T B CONSULTANCYUSHHE
0117F0117Telephone ax
[email protected] - www.thebushconsultancy.com
5.20 Paintworks, Bath Road, Bristol, BS4 3EH.
316 0570 316 0571
CO
PY
RIG
HT R
ev D
ADVANTAGES
DISADVANTAGES
Draft for comment 26.06.13
CARETAKER DWELLING / MUSIC BLOCK- LOSS OF A GROUP OF MATURE TREES ADJACENT
MUSIC BLOCK.PLANT ROOM TO BE CONSTRUCTED FOR THE EXISTING - WOULD REQUIRE INTERNAL AMENDMENTS AND A NEW
COMMUNITY USE.AND SO ENTRANCE IS NOT PROMINENT AND VISIBLE FOR VISIBLE ON APPROACH TO VISITORS FROM DRIVEWAY, - PERFORMING ARTS BUILDING WILL NOT BE CLEARLY
(ROAD TO WILL REQUIRE RE-ALIGNING)- VIEW / APPROACH TO CHILDRENS CENTRE COMPROMISED
RE-BUILDING)CARETAKERS HOUSE. (AND ACCOMMODATION WILL REQUIRE - WOULD REQUIRE THE DEMOLITION OF THE FORMER
ROOM
GREEN
FOYER
AUDITORIUM
MALE WCFEMALE WC
STAIR
PLANT
STORE
SE
RV
ER
YB
OX O
FFIC
E
A-WC
STORE
STORE
Practice = P
GROUND FLOOR 00
BLOCK 029
00/001
00/002
00/003
00/004
00/005
00/006
00/007
00/008
00/009
00/010
00/01100/012
00/013
00/014
NEW MUSIC BLOCK
380
Music classroom
372
Recital
384
P
373 374
383382
381
P
375
office
376
377
P
378385
379
00/076
00/075
00/074 00/073
00/078
00/077133
134
135
136137
138P
P P
P
UP
UP
UP
UP
6th Form Common Room
Drama
Stage
Hall/gymnasium
Kitchen
room
teaching
General
teaching
general
6th Form
Kitchen
00/001
00/002
00/003
00/004
00/005
00/006
UP
UP
UP
BL
OC
K 27
GR
OU
ND
FL
OO
R 00
327
328
329
330
331
UP
UP
UP
UP
6th Form Common Room
Drama
Stage
Hall/gymnasium
Kitchen
room
teaching
General
room
teaching
General
teaching
general
6th Form
room
teaching
General
CHEW VALLEY SCHOOL - PERFORMING ARTS BUILDING
2882/ (L) 017
MJK
1:200 @A1
June 13
PROPOSED LOCATION OPTION 3
PROPOSED SITE LOCATION 3
- REUSING EXISTING HALL BY EXTENDING IT.
C
REV NOTE DATE BY Checked DRAWN PROJECT
SCALE DRAWING
DATE NUMBER REVISION
REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked
T B CONSULTANCYUSHHE
0117F0117Telephone ax
[email protected] - www.thebushconsultancy.com
5.20 Paintworks, Bath Road, Bristol, BS4 3EH.
316 0570 316 0571
CO
PY
RIG
HT R
ev D
ADVANTAGES
DISADVANTAGES
Draft for comment 26.06.13
- LOSS OF TWO EXISTING TREES
- LEVEL ISSUES WITHIN THE EXISTING ACCOMMODATION
- POTENTIAL FUTURE EXPANSION NOT POSSIBLE
COMPROMISED.- FUTURE DEVELOPMENT OF THE SCHOOL POTENTIALLY
CLOSE TO THE ENTRANCE OF THE PERFORMANCE CENTRE.- ACCESSIBLE PARKING SPACES COULD NOT BE LOCATED
FROM THE PUBLIC HIGHWAY.- PERFORMING ARTS BUILDING WILL NOT BE VISIBLE
NATURAL LIGHT FROM EDUCATION SPACES.EXISTING BUILDINGS TO BE FILLED IN REMOVING - THE NEW CONSTRUCTION WOULD REQUIRE WINDOWS ON
THE SCHOOL DURING CONSTRUCTION.- EXISTING HALL WOULD NOT BE ABLE TO BE USED BY
AUDITORIUM
FOYER
STAIR
PLANT
STOREA-WC
MALE WC
ROOM
GREEN
FEMALE WC
BOX OFFICE
Practice = P
GROUND FLOOR 00
BLOCK 029
00/001
00/002
00/003
00/004
00/005
00/006
00/007
00/008
00/009
00/010
00/01100/012
00/013
00/014
NEW MUSIC BLOCK
380
Music classroom
372
Recital
384
P
373 374
383382
381
P
375
office
376
377
P
378385
379
00/076
00/075
00/074 00/073
00/078
00/077133
134
135
136137
138P
P P
P
5.0 Outline Building Design
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
The following descriptions reflect the proposed treatment for the preferred Location 1 option, with
three layout options considered:
Option 1 – single storey only
Option 2 – Single storey, though with the option to expand to first floor accommodation in
two stages.
Option 3 – Two storey, single phase building.
Building layout
The plan is arranged around two principle requirements of the brief:
Flexible performing and teaching spaces in the form of the focal auditorium and ancillary
studio spaces
Flexible reception foyer space, that as well as providing a suitable entrance reception and
breakout space for performance events also creates an adaptable community space that can
be used by a range groups.
The entrance foyer forms the focal point to the entrance approach to the building, with this space
being flanked by the ‘support / servant’ wc, box office and server spaces. From the foyer access can
be gained into the main auditorium. Wc accommodation has been sized to allow adequate floor area
for larger, latter phase occupation.
The auditorium is a double height space, allowing the incorporation of raked, retractable seating,
which may be arranged in parallel rows or in a series of radiating rows around a ‘thrust stage’,
depending upon further detailed briefing, discussion and agreement. This space will also include an
AV control room to the rear of the space, which can be accessed from the main auditorium (via the
raked seating) or from the adjacent first floor accommodation. As well as being used as one main
space, the auditorium can also be sub divided so as to be independently used by smaller groups for
either performance or other community activities.
To one side of the auditorium is located the green room, which can provide space for performers
during productions, but also be used as a secondary rehearsal area by the school, or indeed other
groups.
Options for first floor accommodation
As noted above options two and three indicate possible first floor accommodation provided further
studio space which can be accessed from the main foyer space or alternatively independently,
thereby allowing dual use of the building by different groups if necessary. Option two could be
delivered through a phased construction arrangement, though the massing of the option three
arrangements indicates a single phase of construction.
Massing / elevation proposals
The accommodation within the building is reflected in the massing of the building, with the main
two storey volume of the auditorium and foyer providing the most prominent form. A glazed
treatment to the foyer providing views into this space on the approach to the building from the main
entrance drive and also allows users of the building to have view out to the rural setting. The
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
enclosure to the foyer and auditorium takes the form of a simple enclosing metal clad planes,
reflecting a contemporary interpretation of an agricultural barn structure.
The balance of the accommodation to the right of the main foyer provides support spaces in the
form of box office and wc and green room accommodation, and as such these facades are expressed
in a more subservient form, with face brickwork to match the main school buildings. At first floor
level further performance studio spaces are provides, with a glazed treatment, allowing views in and
out of the building and allowing the buildings function to be expressed.
MJK
1:100 @A1
C
REV NOTE DATE BY Checked DRAWN PROJECT
SCALE DRAWING
DATE NUMBER REVISION
REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked
T B CONSULTANCYUSHHE
0117F0117Telephone ax
[email protected] - www.thebushconsultancy.com
5.20 Paintworks, Bath Road, Bristol, BS4 3EH.
316 0570 316 0571
CO
PY
RIG
HT R
ev D
2882/ (L) 051
DRAFT FOR COMMENT - 17.06.13
0 1 2 3 4 5 10m
PROPOSED FLOOR PLAN - Gross internal floor area = 520sqm PROPOSED PART SITE PLAN
PROPOSED MAIN ENTRANCE ELEVATION (North West) PROPOSED SIDE ELEVATION (South West)
CHEW VALLEY SCHOOL - PERFORMING ARTS BUILDING
June 13
STORE
FOYER
STORE BOX OFFICE
AUDITORIUM
GREEN ROOM / STUDIOMALE WCFEMALE WC
and studio spaceDotted line indicates future expansion of Auditorium
PLANT
SERVERY
STORE
stepsAV room only accessible from auditorium seating
storey)AND PRINCIPLE ELEVATIONS - OPTION 1 (single
PLANSITE PART PLAN, FLOOR PROPOSED
(104 seats shown)
UP
UP
UP
Stage
Hall/gymnasium
Kitchen
room
teaching
General
teaching
general
6th Form
room
teaching
General
Mini Soccer Pitch
Pitch 4
GROUND FLOOR 00
BLOCK 029
00/001
00/002
00/003
00/004
00/005
00/006
00/007
00/008
00/009
00/010
00/01100/012
00/013
00/014
NEW MUSIC BLOCK
380
Music classroom
372
384
P
373 374
383382
381
P
375
office
376
377
P
378385
379
00/076
00/077133
134
P
00/001
00/002
00/003
00/004
00/005
00/006
UP
UP
UP
BL
OC
K
27
GR
OU
ND
FL
OO
R
00
327
328
32
9
330
331
PROPOSED PERFORMING ARTS BUILDING CHEW VALLEY SCHOOLOPTION 1
View looking at development site from North-East as existing
View looking at development site from North-East Option 1
MJK
1:100 @A1
C
REV NOTE DATE BY Checked DRAWN PROJECT
SCALE DRAWING
DATE NUMBER REVISION
REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked
T B CONSULTANCYUSHHE
0117F0117Telephone ax
[email protected] - www.thebushconsultancy.com
5.20 Paintworks, Bath Road, Bristol, BS4 3EH.
316 0570 316 0571
CO
PY
RIG
HT R
ev D
2882/ (L) 052
DRAFT FOR COMMENT - 17.06.13
0 1 2 3 4 5 10m
PROPOSED FLOOR PLAN - Gross internal floor area = 520sqm PROPOSED PART SITE PLAN
PROPOSED MAIN ENTRANCE ELEVATION (North West) PROPOSED SIDE ELEVATION (South West)
CHEW VALLEY SCHOOL - PERFORMING ARTS BUILDING
June 13
LOBBY
FOYER
STORE BOX OFFICE
AUDITORIUM
GREEN ROOM / STUDIOMALE WCFEMALE WC
walkway abovedotted line indicates gallery /
and studio spaceDotted line indicates future expansion of Auditorium
(for first floor accommodation)STAIRESCAPE
option for first floor teaching space accommodation
first floor storage / teaching space
PLANT
SERVERY
STORE
STAIR
LIFT
first floor AV Control room space
AND PRINCIPLE ELEVATIONS - OPTION 2 (two storey)PLANSITE PART PLAN, FLOOR PROPOSED
to provide access to first floorstair and lift incorporated so as
teaching space on the other side of the foyer)to be would phase second and room, control
AV auditoium to access / servery the over be delovered in two phases (i.e. first phase would
be could accommodation floor first - Note
(104 seats shown)
extent)/ arrangement floor first possible of indication
accommodation (refer to Option 3 floor plan for space teaching floor first for option
UP
UP
UP
Stage
Hall/gymnasium
Kitchen
room
teaching
General
room
teaching
General
teaching
general
6th Form
room
teaching
General
Mini Soccer Pitch
Pitch 4
00/001
00/002
00/003
00/004
00/005
00/006
00/007
00/008
00/009
00/010
00/01100/012
00/013
00/014
NEW MUSIC BLOCK
380
Music classroom
372
384
P
373 374
383382
381
P
375
office
376
377
P
378385
379
00/077133
134
00/001
00/002
00/003
00/004
00/005
00/006
UP
UP
UP
BL
OC
K
27
GR
OU
ND
FL
OO
R
00
32
7
32
8
32
9
33
0
33
1
MJK
1:100 @A1
C
REV NOTE DATE BY Checked DRAWN PROJECT
SCALE DRAWING
DATE NUMBER REVISION
REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked REV NOTE DATE BY Checked
T B CONSULTANCYUSHHE
0117F0117Telephone ax
[email protected] - www.thebushconsultancy.com
5.20 Paintworks, Bath Road, Bristol, BS4 3EH.
316 0570 316 0571
CO
PY
RIG
HT R
ev D
2882/ (L) 052
DRAFT FOR COMMENT - 17.06.13
0 1 2 3 4 5 10m
PROPOSED FLOOR PLAN - Gross internal floor area = 520sqm
PROPOSED MAIN ENTRANCE ELEVATION (North West) PROPOSED SIDE ELEVATION (South West)
CHEW VALLEY SCHOOL - PERFORMING ARTS BUILDING
June 13
LOBBY
FOYER
STORE BOX OFFICE
AUDITORIUM
GREEN ROOM / STUDIOMALE WCFEMALE WC
walkway abovedotted line indicates gallery /
and studio spaceDotted line indicates future expansion of Auditorium
first floor storage / teaching space
PLANT
SERVERY
STORE
STAIR
LIFT
PROPOSED FIRST FLOOR PLAN
OPTION 3 (two storey)PROPOSED FLOOR PLANS AND PRINCIPLE ELEVATIONS -
(104 seats shown)
(for first floor accommodation)ESCAPE STAIR
(void)
(void)
OFFICE / MEETING ROOM
AV CONTROL ROOM
(dotted lines indicating possible subdivision)STUDIO / TEACHING SPACE
6.0 Consultation
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
The following consultation has taken place:
Pre application submission to Local Planning Authority,
Following a pre application consultation submission, the following comments on the proposals set
out in sections 4 and 5:
Principle of development
There would be no in principle objection to the erection of a performing arts building on this site
given its MEDS designation, that said, Policy GB.3 only allows for “limited infilling and/or
redevelopment” and as discussed, whilst I note the school has a preference for a standalone unit
(option 1) this would require robust justification as it could not be classed as “infilling”.
I understand that it is an intention of the school to remodel/replace many of the existing outdated
buildings in the future as part of a comprehensive redevelopment, therefore I appreciate that it
makes more sense to position a new building in a location where it could assimilate with future
developments rather than potentially being removed and replaced as part of a future scheme. This
argument should be made to support or justify a new standalone unit however I would recommend
that this argument is tied to a more comprehensive masterplan for the site (so as to avoid the
potential for piecemeal development). I am unaware of a masterplan for this site however it would
be beneficial to present one if option 1 is to be progressed.
In the absence of a masterplan for the site, the Council would seek to steer the development closer to
the existing range of buildings and as such would be more likely to support either options 2 or 3 (as
presented).
I note that the new building could potentially be offered as a community facility for use outside of
school hours. In terms of accessibility, site security and the provision of a community facility, I would
consider option 2 (the new building added to the existing music block) to be preferable.
Option 3 (remodelling and expanding the current auditorium) is most likely to have the least impact
on the wider area however in terms of accessibility to the public and the potential that it would itself
be replaced in due course as part of any wider masterplan makes this a less preferable option.
In essence, I am content that an argument in favour of any one of the options presented. Clearly
option 1 is the preferred option for the schools needs however as stated, I am of the opinion that this
is going to require considerably more justification given its disconnection from the existing buildings.
Design
With regard to the indicative elevations drawing, I am content with the contemporary approach and
am satisfied that a building of the size, scale, mass and appearance as shown could assimilate well in
this site. It would be helpful as and when an application is made he palette of materials to be used
including manufacture references if know, this could reduce the need for a materials condition.
The Council would actively encourage the use of sustainable construction techniques as well as the
use of renewable energy sources within any proposed development.
Trees
I note that one of the key characteristics of this site is the tree coverage which helps to reduce the
overall impact of the school on the wider area. Whilst there are no tree preservation orders on any of
the trees on site it would be advisable to present an arboricultural method statement to help support
any application that may result in the loss of any trees. I note option 1 would see the removal of a
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
single tree, I do not foresee this being an issue however any mitigation planting would be welcomed.
Landscaping in general could be dealt with by condition however I would always recommend putting
forward as much detail up front in order to reduce the need for conditions.
Ecology
Although the application site is not covered by any statutory designations it is within the 2km of a
SSSI - the Chew Valley Lake. Given this proximity, and given the rural nature of the wider surrounding
area and the level of trees on site it is possible that bats and other protected species are active in this
area. For any application on this site I would recommend producing at least a phase 1 habitat survey
to help inform the development. It would also be advisable to detail the level and type of any external
lighting so as to ensure any ecology interests in and around the site are not adversely harmed.
Visual amenities of the area
In general I have no issue with the overall concept and feel that the proposed development could
enhance the visual amenities of the area. The site is well screened from the wider area and the size of
the proposed building – in any of the locations presented – is unlikely to adversely harm rural
character or the openness of the green belt.
Residential amenity
Given the proximity of the nearest residential property I am content that the proposed development
would not raise any substantial issues in respect of the amenities of adjoining residents.
Highway Safety and Access
I am content that the scale of the proposed development would not adversely prejudice highway
safety by increasing the number of vehicles entering the site. The general site access arrangements
conform to the prevailing standards and I do not foresee there being any in principle highway issues.
The level of on-site parking is adequate and well established.
I note the potential to offer the use of the new building as a community facility, it would be beneficial
if you could include details of how this use may take place (i.e. the level and frequency of intended
use as well as possible times of use). Our Highway Development Officer will want to be content that
any public use is not going to prejudice the level of parking on site or access and highway safety.
I would recommend including within any planning application a draft construction management plan
including details of times of deliveries, contractor parking and indicative vehicle sizes, this will reduce
the need for a condition to submit a plan prior to the commencement of development.
Summary
Having considered this pre-application, I am content with the general principle of the development
however would advise that the comments and recommendations above are taken into account in the
submission of any future application.
These comments create a favourable context for development of the feasibility proposals, though
there is clearly an amount of work to be carried out, the extent of which will depend on the location
option pursued. Should Option 1 (standing separate to the main school buildings) there will need to
be more detailed and extensive site wide analysis and justification arguments put forward as part of
the planning application. In this regarding it is noted that the Building School’s for the Future
feasibility report previously carried out by Bath+NES for the comprehensive redevelopment of the
school does identify various buildings, including the block containing the current hall, to be
demolished, which would create a strong starting point for justifying not developing this area for a
new performing arts facility.
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
However, it should be noted that this information may require further, more detailed substantiation,
and even then, there will be a risk that Planning Consent is not granted.
Local resident / community stakeholder engagement:
Chew Valley partnership have been consulted, though no specific comments have been
raised.
Local residents / school community stakeholder event, with the following comments raised
7.0 Costplan
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
Development cost for single storey building option
Construction costs
Ground floor 515sqm
Main building construction costs (assume £1,350 Cost / sqm*) £695,250
*this rate is higher than original briefing allowance in order to make provision for more extensive
glazing to foyer and potentially first floor accommodation, though as with costplan generally will be
reviewed in more detailed development of the proposals
Fit out
Subject to further briefing and design work, the following suggested allowances are made for the
auditorium space (155sqm / 104 seats)
Audio Visual: £215/m2 extra over £33,325
Acoustic Treatment: £95/m2 extra over £14,725
Retractable seating: £225/seat £23,400
Additional costs for auditorium space £71,450
External works £30,000
Total construction costs £796,700
Project team costs (allow 12%) £95,604
Contingency (allow 10%) £79,670
Total development costs £971,974
Exclusions
General furniture and equipment, including servery counter/ associated equipment
IT network cabling / equipment
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
Development cost for two storey building option
Construction costs
Ground floor 515sqm
First floor (includes foyer spaces, but excludes auditorium) 360sqm
Total 875sqm
Main building construction costs (assume £1,350 Cost / sqm) £1,181,250
Fit out
Subject to further briefing and design work, the following suggested allowances are made for the
auditorium space (155sqm / 104 seats)
Audio Visual: £215/m2 extra over £33,325
Acoustic Treatment: £95/m2 extra over £14,725
Retractable seating: £225/seat £23,400
Additional costs for auditorium space £71,450
External works £30,000
Total construction costs £1,282,700
Project team costs (allow 12%) £153,924
Contingency (allow 10%) £128,270
Total development costs £1,564,894
Exclusions
General furniture and equipment, including servery counter/ associated equipment
IT network cabling / equipment
8.0 Programme
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
The following provisional key milestones are proposed assuming a single phase of construction (for a
two storey building), and also pending funding being made available
Design development of proposals September-December 2013
Planning application January – March 2014
Detailed design development March – May 2013
Tender to contractors June- July 2014
Construction period August 2014-May 2015
Opening of Performing arts building Summer 2015
9.0 Next steps
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
The following issues are to be progressed during the next stage of the project:
Commission supporting surveys and reports:
o Topographical survey
o Arboricultural report
o Ecology report
Progress Design development of planning application and supporting material
Continue stakeholder engagement in the lead up to a planning application submission.
Confirm detailed design briefing for auditorium space, and in particular the audio visual
requirements.
Define detailed costplan information
Develop costplan information in more detail, including assessment of possible value
engineering items in order to align school aspirations with budget.
Appendices
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
APPENDIX A
Local Planning Authority pre application correspondence
The following letter confirms the views and issues of the Planning Officer in response to the location
and design proposals set out in this feasibility report.
Date: 8
th August 2013
Our Ref: 13/02755/PREAPP
Mr M Kendall The Bush Consultancy 5.20 Paintworks Bath Road Arnos Vale BS4 3EH Dear Mr Kendall Re: Chew Valley Comprehensive School
Please find attached your Pre-Application Advice Report, ref: 13/02755/PREAPP in respect of your query of the 27
th June 2013. I trust that this advice is of assistance to you but should you require anything
further, please do not hesitate to contact me. Please note that an invoice for the below response will be sent under separate cover to Mark Mallett of Chew Valley School as per your confirmation in line with the Council’s charging policy. Please note that the views expressed in this report represent an officer’s informal opinion only based on the information supplied and without consultation with statutory consultees or third parties. This advice is therefore not binding on any future decisions made by elected members of the council or under powers delegated to other officers. Yours Sincerely,
Rich Stott MA BSc (Hons) MRTPI Planning Officer Development Managment
Planning & Transport Development
Bath & North East Somerset Council P.O Box 5006, Bath, BA1 1JG
Telephone 01225 470000
(main switchboard)
www.bathnes.gov.uk
Email: [email protected]
Tel: 01225 477434
Making Bath & North East Somerset an
even better place to live, work and visit
1 Council:
Bath and North East
Somerset Council
Site Address:
Chew Valley Comprehensive School
Chew Lane
Chew Magna
Bristol
BS40 8QB
Ref No:
13/02755/PREAPP
2 Your proposal:
Erection of a proposed performing arts building
3 Things that you need to be aware of:
I note that there is a long planning history relating to the development of this site however having
reviewed the history I am not aware of any specific restrictions that could otherwise prejudice the
proposed development.
The site is located on land within the green belt however I note that the school is designated as a
Major Existing Development Site (MEDS) and as such policy allows for limited infilling and/or
redevelopment. This policy designation will be essential in the determination of any future
application and as such a sound planning argument will need be set out in light of the prevailing
policy (GB.3) in the Bath and North East Somerset Local Plan, including minerals and waste
policies, October 2007.
4 Planning Policies that you need to be aware of
The main planning policies that are relevant to your proposal include:
Bath & North East Somerset Local Plan including minerals and waste policies - adopted
October 2007
D.2: General design and public realm considerations
D.4: Townscape considerations
NE.4 Trees and Woodland Conservation
GB.1 Development in the Green Belt
GB.2 Visual Amenities of the Green Belt
GB.3 Major Existing Development Sites
T.24: General development control and access policy
T.26: On-site parking and servicing provision
Consideration will also been given to the Bath & North East Somerset Draft Core Strategy
December 2010 however only limited weight can be attached to this document until it is formally
adopted.
The National Planning Policy Framework will also be given significant weight as part of any
proposal
The site is located within a coal mining referral area. It would be advisable to consult with the Coal
Authority prior to submitting any application in order to define the extent of historic mining in the
area and establish the level of risk posed to any new development.
5 Our initial headline views about your proposal:
Principle of development
As discussed on the phone, there would be no in principle objection to the erection of a performing
arts building on this site given its MEDS designation, that said, Policy GB.3 only allows for “limited
infilling and/or redevelopment” and as discussed, whilst I note the school has a preference for a
standalone unit (option 1) this would require robust justification as it could not be classed as
“infilling”.
I understand that it is an intention of the school to remodel/replace many of the existing outdated
buildings in the future as part of a comprehensive redevelopment, therefore I appreciate that it
makes more sense to position a new building in a location where it could assimilate with future
developments rather than potentially being removed and replaced as part of a future scheme. This
argument should be made to support or justify a new standalone unit however I would recommend
that this argument is tied to a more comprehensive masterplan for the site (so as to avoid the
potential for piecemeal development). I am unaware of a masterplan for this site however it would
be beneficial to present one if option 1 is to be progressed.
In the absence of a masterplan for the site, the Council would seek to steer the development closer
to the existing range of buildings and as such would be more likely to support either options 2 or 3
(as presented).
I note that the new building could potentially be offered as a community facility for use outside of
school hours. In terms of accessibility, site security and the provision of a community facility, I
would consider option 2 (the new building added to the existing music block) to be preferable.
Option 3 (remodelling and expanding the current auditorium) is most likely to have the least impact
on the wider area however in terms of accessibility to the public and the potential that it would itself
be replaced in due course as part of any wider masterplan makes this a less preferable option.
In essence, I am content that an argument in favour of any one of the options presented. Clearly
option 1 is the preferred option for the schools needs however as stated, I am of the opinion that
this is going to require considerably more justification given its disconnection from the existing
buildings.
Design
With regard to the indicative elevations drawing, I am content with the contemporary approach and
am satisfied that a building of the size, scale, mass and appearance as shown could assimilate well
in this site. It would be helpful as and when an application is made he palette of materials to be
used including manufacture references if know, this could reduce the need for a materials
condition.
The Council would actively encourage the use of sustainable construction techniques as well as
the use of renewable energy sources within any proposed development.
Trees
I note that one of the key characteristics of this site is the tree coverage which helps to reduce the
overall impact of the school on the wider area. Whilst there are no tree preservation orders on any
of the trees on site it would be advisable to present an arboricultural method statement to help
support any application that may result in the loss of any trees. I note option 1 would see the
removal of a single tree, I do not foresee this being an issue however any mitigation planting would
be welcomed. Landscaping in general could be dealt with by condition however I would always
recommend putting forward as much detail up front in order to reduce the need for conditions.
Ecology
Although the application site is not covered by any statutory designations it is within the 2km of a
SSSI - the Chew Valley Lake. Given this proximity, and given the rural nature of the wider
surrounding area and the level of trees on site it is possible that bats and other protected species
are active in this area. For any application on this site I would recommend producing at least a
phase 1 habitat survey to help inform the development. It would also be advisable to detail the level
and type of any external lighting so as to ensure any ecology interests in and around the site are
not adversely harmed.
Visual amenities of the area
In general I have no issue with the overall concept and feel that the proposed development could
enhance the visual amenities of the area. The site is well screened from the wider area and the
size of the proposed building – in any of the locations presented – is unlikely to adversely harm
rural character or the openness of the green belt.
Residential amenity
Given the proximity of the nearest residential property I am content that the proposed development
would not raise any substantial issues in respect of the amenities of adjoining residents.
Highway Safety and Access
I am content that the scale of the proposed development would not adversely prejudice highway
safety by increasing the number of vehicles entering the site. The general site access
arrangements conform to the prevailing standards and I do not foresee there being any in principle
highway issues.
The level of on-site parking is adequate and well established.
I note the potential to offer the use of the new building as a community facility, it would be
beneficial if you could include details of how this use may take place (i.e. the level and frequency of
intended use as well as possible times of use). Our Highway Development Officer will want to be
content that any public use is not going to prejudice the level of parking on site or access and
highway safety.
I would recommend including within any planning application a draft construction management plan
including details of times of deliveries, contractor parking and indicative vehicle sizes, this will
reduce the need for a condition to submit a plan prior to the commencement of development.
Summary
Having considered this pre-application, I am content with the general principle of the development
however would advise that the comments and recommendations above are taken into account in
the submission of any future application.
6 Information we consider is necessary to accompany your planning application:
Your application should include:
Application form – for full planning permission
Fee - £3850 (based on 750sqm floorspace at £385 per 75sqm)*
Site Location Plan 1:1250
Block Plan 1:500 (including tree root protection area)
Landscape plan (1:200/1:500)
Existing and proposed elevation drawings (1:50/1:100)
Existing and proposed floor plans (1:50/1:100)
Existing and proposed sections/levels (1:50/1:100)
Additional Information to support the application**:
Design and access statement
Photographs
Materials schedule
Draft Construction Management Plan
Transport assessment (as part of the D&A statement)
Phase 1 habitat survey
Details of external lighting
Details relating to the landscaping
Arboricultural survey + method statement (in respect of any trees to be removed and to
inform any tree protection measures required during construction)
Drainage assessment
Statement of Community Involvement
* the quoted fee is based on the information on the Council’s website and is correct as of the date
of this letter. It would be worth checking with the Planning Registration Team at the time of making
an application to confirm the fee.
**Please be advised that the above is not an exhaustive list and other surveys may be required
during the course of the application.
Case Officer: Rich Stott Date 8th August 2013
The Bush Consultancy Ltd., 5.20 Paintworks, Bath Road, Arnos Vale, Bristol BS4 3EH T 0117 316 0570 F 0117 316 0571 E first.last [email protected]
APPENDIX B
Retractable seating supplier information
The following details provide one example of the possible seating arrangement and type that may be
used in the auditorium.
Retractable Seating – Optional Items
Items applicable to both retractable upholstered bench seating and retractable platforms
and integral fold down chairs.
Retractable Upholstered Bench System Retractable Platforms & Integral Fold Down Chair System
Seat Covering Fabric standard range is Camira Fabrics, Main Line Plus range or Bradbury
Fabrics, Flamblend, colour to choice. Any alternative fabric can be used providing the
fabric complies with BS 5852 1990, source 0, 1 & 5 in respect of Fire Retardency.
Carpet to decks of the seating units is Burmatex Carpet, range 3230, colour to choice.
Alternative carpets can be used, if specified.
Integral electric power operation – see separate data sheet for information.
Demountable side curtains to mask off the
understructure of the seating units, when in
the open position. Curtains attach by
Velcro to the retractable seating under
structure. Curtains are available in a
range of different colours.
Retractable Seating – Optional Items SiS
Items available to Retractable Platform and integral fold down chairs systems only
Exposed underseat plywood panels in lieu
of standard upholstered finish. The
plywood panels are available in a wide
range of colours and provided added
durability to the underside of the seat
base.
Exposed polished plywood panel to the
rear of the seat back in lieu of standard
upholstered finish. Panels are available in
different colours. The top of the plywood
panel projects above the top of the
upholstered back to provide protection to
the fabric at that point.
Fixed fascia panels, complete with slot in
panel to the aisle position, to mask off the
seating units when in the closed position.
Panels can be either polished plywood or
laminated MDF. Seating systems with
fascia panels must always be provided
with a front rail or barrier for Health and
Safety reasons. Image shows a system
with laminated fascia panels are a front
barrier.
Fixed front barrier to the leading edge of
tier one of the retractable seating system.
the purpose of the barrier is to prevent
people sat in the front row from stepping
off at any point along the first tier, other
than the aisle position. It should be noted
that a front barrier can be provided
without fascia panels.
Retractable Seating – Optional Items SiS
Fixed front rail to the leading edge of tier one
of the seating system. Rail complies with
Building Regulations, in respect of a sphere of
100mm diameter cannot pass through the
body of the rail. Both the front rail and front
barrier are 800mm high above the tread level
of tier one, to enable the people sat in the
front row of chairs to have a line of sight over
the top of the rail.
Optional front rail design is to have a
perforated mesh panel in lieu of vertical rails.
Image shows a seating system in a closed
position with the fixed rail with the perforated
panels, slot in section of rail to the aisle
position and fixed front skirt, which masks off
the gap from the top of tier one to the floor.
Fold down chairs can be fitted with automatic
fully upholstered armrests. Mechanism folds
the armrests automatically when the chairs
are lowered on to the decks of the seating
system for storage.
Note: chairs with armrests must be provided at
a minimum 490mm centres to comply with
statutory regulations.
Seat numbers and row letters to the required
sequence.
PPRROODDUUCCTT GGUUIIDDEE && BBUUDDGGEETT PPRRIICCEE LLIISSTT –– JJAANNUUAARRYY 22001133
Retractable Seating
Specialists in Seating Ltd are able to offer alternative types of retractable seating for various
applications.
The above images illustrate a highly durable retractable bench type system with moulded
seating modules. This product is ideal for a sports hall or other areas of high usage.
Model Irwin retractable bench seating, complete with moulded seat modules, without
backrests - £95.00p per seat place
Options available
♦ Integral fold down backrests – timber or plastic
♦ Integral electric power operation
♦ Seat numbers and row letters
♦ Demountable side curtains
Price Guide – Retractable Seating Systems – Continued SiS
The above images illustrate our Model B850 retractable bench type system with continuous
upholstered bench seating and integral fold down backrests.
Model B850 retractable bench seating, complete with upholstered bench seats and integral
upholstered fold down backrests - £150.00p per seat place
Options available
♦ Integral electric power operation
♦ Alternative seat covering fabrics
♦ Demountable side curtains
♦ Seating units in a portable format
♦ Rear fixed platform for sound / lighting control or rear access
The above images illustrate our Model P850 retractable platform and individual fold down
upholstered chairs.
Model P850 retractable platforms, complete with upholstered fold down chairs without
armrests - £225.00p per seat place
Options available
♦ Integral electric power operation
♦ Alternative seat covering fabrics
♦ Demountable side curtains
♦ Seating units in a portable format
♦ Seat numbers and row letters
♦ Protective painted or polished plywood panels for seats and backs
♦ Automatic folding upholstered armrests
♦ Fixed front rail for Health & Safety compliance
♦ Rear fixed platform for sound / lighting control or rear access
Price Guide – Retractable Seating Systems – Continued SiS
The above images illustrate our Model P850 retractable platform and individual fold down
upholstered chairs, with integral continuous writing ledges.
Model P850 retractable platforms, complete with upholstered fold down chairs without
armrests and continuous writing ledges - £280.00p per seat place
Options available
♦ Integral electric power operation
♦ Alternative seat covering fabrics
♦ Demountable side curtains
♦ Seat numbers and row letters
♦ Protective painted or polished plywood panels for seats and backs
♦ Automatic folding upholstered armrests
♦ Alternative writing ledge laminates
♦ Gas strut system to assist with lifting the fold down chairs
Notes: The above figures are for guide / budgetary purposes only and do not constitute any
kind of offer. All firm quotations are provided after a site visit and agreement of
specification.
All prices allow for delivery and installation, but not VAT. Prices are generally based on
seating systems wall fixed, manually operated with 2Nº railed ends and 1Nº set of aisle steps.
Electric power operation can be added, but the cost of this depends on the numbers of
seating units and the arrangement of the seating units. A guide price for 2Nº seating units
that were bolted together to form one section, would be in the region of £6,000.00p. This
system requires a three phase and neutral power supply, rated at 20 amps, to operate the
retractable seating system.