CHHATTISGARH MINERAL DEVELOPMENT CORPORATION
LTD.
(GOVT. OF C.G., U / T)
RESETTLEMENT & REHABILITATION PLAN
FOR
SHANKARPUR (BHATGAON II) & EXTN. COAL PROJECT
AT
BISRAMPUR COALFIELD
DISTT. - SURGUJA (C.G.)
NOVEMBER 2009
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 2
RESETTLEMENT & REHABILITATION PLAN
FOR
SHANKARPUR (BHATGAON II) & EXTENSION
COAL PROJECT
AT
BISRAMPUR COALFIELD
DISTT. - SURGUJA (C.G.)
NOVEMBER 2009
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 3
INDEX
S.N. DETAIL PAGE NO.
1 ABBRIVIATION 7-10
2 LIST OF MAPS 10
3 LIST OF TABLES 10-12
4 LIST OF CHARTS 13-14
5 CHAPTER – I, GENERAL INTRODUCTION & OBJECTIVES 15-25
6 1.1 District Surguja 16
7 1.2 District Administration 16
8 1.3 District Statistics 17
9 1.4 The Land 18
10 1.5 Agriculture 18
11 1.6 Double Crop Area 18-19
12 1.6.1 Pattern of Crop Distribution 19-20
13 1.7 District Population 20-22
14 1.8 Forest Area 22-23
15 1.9 Project Area 23
16 1.10 Climate 24
17 1.11 Objectives 24-25
18 CHAPTER –II, PROJECT INTRODUCTION 27-64
19 2.1 CMDC
(Chhattisgarh Mineral Development Corporation) 27
20 2.2 Shankarpur (Bhatgaon II) & EXTN. Coal Block 27-28
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 4
S.N. DETAIL PAGE NO.
21 2.3 Objects and Project Description 28-29
22 2.4 Project Background 29-30
23 2.5 About the Company 30
24 2.6 Project Time Frame 30
25 2.7 Brief Project Description 30-36
26 2.8 Fault zones 37-44
27 2.9 Excavation Workshop 44
28 2.10 E and M workshop 45-47
29 2.11 Demarcation of the Project & detail OF area affected 47
30 2.12 Area of project village 48
31 2.13 Description of coal seams 49-51
32 2.14 Description and quality of coal seams 51-54
33 2.15 Summary of seam parameters 54-56
34 2.16 Summary of seam parameters 56
35 2.17 Seam III Bottom (Co-relatable with seam L6 in
Bhatgaon Ext.) 57-58
36 2.18 Summary of seam parameters 58-61
37 2.19 Summary of seam parameters 61
38 2.20 Other local seams in Bhatgaon Ext. 62
39 2.21 Coal reserve 62-63
40 2.22 Geo-mining Parameters 64
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 5
S.N. DETAIL PAGE NO.
41 2.23 Workable seams its thickness, depth etc. 64
42 CHAPTER - III, SOCIO-ECONOMIC STATUS OF THE
PROJECT AFFECTED PEOPLE 66-130
43 3.1 Survey Methodology 66
44 3.2 Social status of the project affected area 66-99
45 3.3 Additional information related R&R policy 2005 of Govt.
of C.G. 100-103
46 3.4 Present status and infrastructure of the project area 104-113
47 3.5 Key Issues-Project Affected People 113-114
48 3.6 Baseline 114-116
49 3.7 Visual Status of the Project Area 117-130
50 CHAPTER – IV, PROJECT IMPACT 132-145
51 4.1 - Details of the area affected 132-145
52 CHAPTER –V, REHABILITATION SCHEME 147-165
53 5.1-. Justification for displacement 147
54 5.2. Social Welfare activities and Development Plan for the
Project affected area 147-148
55 5.3 Employment and other Opportunities 149
56 5.4 Approval and Implementation 149
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 6
S.N. DETAIL PAGE NO.
57 5.5 Definitions 149-150
58 5.6 Compensation 151-153
59 5.7 Land Matters 153-155
60 5.8 Employment and other facilities 156
61 5.9 Self Employment in Agriculture 156-157
62 5.10 Training 157-160
63 5.11 Self Employment Opportunities: 160-161
64 5.12 Details of the land identified for resettlement of the PAP 161-162
65 5.13 Main features of Resettlement Colony 162-162
66 5.14 Monitoring Committees 163-164
67 5.15 Redressal of Grievances 164-165
68 5.16 Implementation Schedule / Execution time frame 165
69 CHAPTER VI, BENEFITS AND REHABILITATION COST 166-217
70 6.1 Direct Benefit from the Project 167-168
71 6.2 Indirect Benefit from the Project 168
72 6.3 Rehabilitation Cost 168-217
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 7
ABBRIVIATION
S.N. Short Name Detail
1 ADLT_LT_CT Number of Adult literacy Class/Centre
2 ADLT_LT_CT Number of Adult literacy Class/Centre
3 ALL_DISP Number of Allopathic Dispensary
4 ALL_HOSP Number of Allopathic Hospital
5 ALL_HOSP Number of Allopathic Hospital
6 ANFO
7 Annex Annexere
8 APP_FP Approach - Foot Path
9 APP_MR Approach - Mud Road
10 APP_NAVCAN Approach - Navigable Canal
11 APP_NAVRIV Approach - Navigable River
12 APP_NW Approach - Navigable water-way other than river or canal
13 APP_PR Approach - Paved Road
14 Approx. Approximate
15 AREA_NA_CU Area not available for cultivation
16 AYU_DISP Number of Ayurvedic Dispensary
17 AYU_HOSP Number of Ayurvedic Hospital
18 AYU_HOSP Number of Ayurvedic Hospital
19 BH.No. Bore Whole Number
20 BLOCK_CODE C.D. BLOCK
21 BS_FAC Bus services
22 BSG
23 BT
24 C.G. Chhattishgarh Government
25 CANAL Canal (C)
26 CANAL_GOVT Government Canal
27 CANAL_GOVT Government Canal
28 CANAL_PVT Private Canal
29 CANAL_PVT Private Canal
30 CBBT
31 Chote bade jhadh ka jungle
Revenue Forest
32 CHP
33 CHW Number of Community Health workers
34 CMDC
35 CMPDIL
36 COLLEGE Number of Collage
37 CSEB Chhattishgarh State Electricity Board
38 CULT_WASTE Culturable waste (including gauchar and groves)
39 Cum/T Cubic Metre/Ton
40 CV Cumulative Value
41 CWC Number of Child Welfare Centre
42 Deg Degree
43 DHS
44 DIA Dia meter
45 DIST_CODE District Code
46 DRNK_WAT_F Drinking Water facility (A/NA)
47 E Engineering
48 EDU_FAC Educational facilities (A/NA)
49 Extn. Extension
50 F Female
51 FC
52 FRL
53 FWC_CNTR Number of Family Welfare Centre
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 8
S.N. Short Name Detail
54 G.C.V
55 GR
56 GSI Geological Survey of India
57 H_CNTR Number of Health Centre
58 Ha. Hactere
59 HANDPUMP Handpumb (HP)
60 HEMM
61 Higher sc Higher Secondary
62 HOM_DISP Number of Homeopathic Dispensary
63 HOM_HOSP Number of Homeopathic Hospital
64 HOM_HOSP Number of Homeopathic Hospital
65 HP Horse power
66 IND_SCH Number of Industrial School
67 IND_SCH Number of Industrial School
68 IND_SCH Number of Industrial School
69 Kcal/Kg Kilo Calore/Kilo Gram
70 Kg/Cum Kilogram/Cubic Metre
71 KL Kilo Letre
72 KLD Kilo Litre/Day
73 Km Kilo meter
74 LAKE Lake (L)
75 LAKE_IRR Lake
76 LAND_FORES Forest
77 LAND_FORES Forest
78 LMVs Light Motar Vehicles
79 LNC Learn Nature Consultant
80 LPD/Capita Litre/Day/Capita
81 lps Litre per second
82 M Mechanical
83 M Male
84 M. Meter
85 M_HOME Number of Maternity Home
86 M_SCH Number of Middle School
87 MAGAZINE Magazine (indicate M, if arrived)
88 Max Maximum
89 Mbgl Meter below ground level
90 Mcum Million Cubic Meter
91 MCW_CNTR Number of Maternity and Child Welfare Centre
92 MDO
93 MECL
94 MECL
95 MEDI_FAC Medical facilities (A/NA)
96 MEDI_FAC Medical facilities (A/NA)
97 Min Minimum
98 MM Mili meter
99 MOC
100 MT Million Ton
101 Mte
102 MTPA Million Ton/Annum
10 MTPA
104 MTY Million Ton/Year
105 N_HOME Number of Nursing Home
106 Nos. Numbers
107 OBC Other Backward Caste
108 OCP Open cost project
109 OTH_CNTR Number of Other medical facilities
110 OTH_IRR Others
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 9
S.N. Short Name Detail
111 OTH_IRR Others
112 OTH_SCH Number of Other educational facilities
113 OTH_SCH Number of Other educational facilities
114 OTHER Other drinking water sources (O)
115 P_D Population Density Total population- Persons
116 P_SCH Number of Primary School
117 PF Protected forest
118 PH_CNTR Number of Primary Health Centre
119 PHS_CNT Number of Primary Health Sub Centre
120 POWER_SUPL Power supply (A/NA)
113 PRING Spring (S)
114 Qu. Quintal
115 R&R Rehabitation And Resettlement
116 RANG_STAU If not available, provide the Range Code
117 RBH
118 RF Reserved forest
119 RIVER River Water(R)
120 RIVER_IRR River
123 RIVER_IRR River
124 RMP Number of Registered Private Medical Practiotioners
125 ROM
126 Rs. Indian rupee
127 RS_FAC Railways services
128 S_S_SCH Number of Senior Secondary School
129 S_SCH Number of Secondary School
130 SC Shedule Caste
131 SC_F Scheduled Castes population- Females
132 SC_F Scheduled Castes population- Female
133 SC_M Scheduled Castes population- Males
134 SC_M Scheduled Castes population- Males
135 SC_P Scheduled Castes population- Persons
136 SECL South Eastern Caol Field Limited
137 SMP Number of Subsidised Medical Practitioners
138 SOU_SUMM Source of Drinking Water during Summer (indicate code from above)
139 Sq.feet Square feet
140 Sq.Km Square Kilometre
141 ST Shedule Tribal
142 ST_CODE State Code
143 ST_F Scheduled Tribes population- Females
144 ST_F Scheduled Tribes population- Females
145 ST_M Scheduled Tribes population- Males
146 ST_M Scheduled Tribes population- Males
147 ST_P Scheduled Tribes population- Persons
148 T Ton
149 T_F - Females
150 T_HH Number of Households
151 T_M Total population- Males
152 T_P Total population
153 TANK Tank Water (TK)
154 TANK_IRR Tank
155 TANK_IRR Tank
156 TAP Tap Water (T)
157 TB_CLN Number of T.B. Clinic
158 THSIL_CODE Tahsil/Taluk Code
159 TOT_EXP Total Expenditure
160 TOT_INC Total Income
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 10
S.N. Short Name Detail
161 TOT_IRR Total Irrigated Area
162 TOT_IRR Total Irrigated Area
163 TPP Ton/Day
164 TR_SCH Number of Taining School
165 TR_SCH Number of Taining School
167 TR_SCH Number of Taining School
168 TUBEWELL Tubewell Water (TW)
169 TW_W_EL Tube-well (with electricity)
170 TW_W_EL Tube-well (with electricity)
171 TW_WO_EL Tube-well (without electricity)
172 TW_WO_EL Tube-well (without electricity)
173 UN_DISP Number of Unani Dispensary
174 UN_HOSP Number of Unani Hospital
175 UN_HOSP Number of Unani Hospital
176 UN_IRR Unirrigated Area
177 VHV
178 VILL_NAME VILLAGE NAME
179 VM
180 Vm(Dmmf)
181 W_FALL Waterfall
182 W_P Working Population of the village
183 WELL Well Water (W)
184 WELL_W_EL Well (with electricity)
185 WELL_W_EL Well (with electricity)
186 WELL_WO_EL Well (without electricity)
187 WELL_WO_EL Well (without electricity)
LIST OF MAPS
SL.No. Name /Detail Page No.
1 Project Area-I 23
2 Project Area-II 48
LIST OF TABLES
SL.No. Name /Detail Page No.
1 Administrative Setup 16
2 Administrative Units & Area 17
3 Area under Different Crops 19
4 District Population 20
5 Details of Drilling in the Block- I 29
6 Details of Drilling in the Block- II 29
7 Geological succession, Hasdo-Arand coalfield Chhattisgarh 31
8 Sequence of coal seams in Shankarpur coal block 35
9 Details of Exploration 35-36
10 Reserves Allotted Block Boundaries 37-38
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 11
SL.No. Name /Detail Page No.
11 Reserves Outside the Allotted Block Boundaries 38
12 Total Reserves 38
13 Basic project parameters 39
14 Geo-mining characteristics 39
15 System Parameters(Dragline Application) 39-40
16 System Parameters (Shovel-Dumper Operation) 41
17 System Parameters (Coal Winning Operation) 41
18 Main Mining Equipment 41
19 Proposed Water Consumption of the Project 46-47
20 Extension Coal Block 50-51
21 Range of proximate analysis-I 52
22 Ultimate Analysis-I 53
23 Hard Grove Index-I 53
24 Ash Analysis-I 53-54
25 Proximate Analysis-I 55
26 Ultimate Analysis in %-I 55-56
27 Range of proximate analysis-II 57-58
28 Ultimate Analysis-II 58
29 Ash Analysis-II 58
30 Proximate Analysis-II 59
31 Ultimate Analysis in %-II 60
32 Hard Grove Index-II 60
33 Ash Analysis-III 60
34 Local seams in Bhatgaon Ext 62
35 Coal Reserve in Shankarpur 62-63
36 Workable seams, Thickness and Depth 64
37 Demographic Profile of Project Affected Villages 67-68
38 Affected Population 68
39 Educational Profile 75-79
40 Number of Persons Involved In Different Occupations 80
41 Cultivation Practices in Project Impacted Villages 83
42 Livestock Rearing In Project Impacted Villages 84
43 Income Levels in Project Affected Villages 85-86
44 Asset Ownership 88-89
45 Number of Destitute and Dependants in Project Affected People 90
46 SC/ST in Project Impacted Villages 92
47 Infrastructure Availability-Project Impacted Villages 95
48 Facilities of Drinking Water Supply 96
49 Educational Institutes Within And Near The Village 97-98
50 Community Facilities 98
51 Festivals and Fairs 99
52 Details Of Social Group Matrix Of Affected Families 100
53 Classification of Khatedars based on Land Holding 101
54 Classification of Khatedars based on Percentage land acquired 102-103
55 Area, Population of the Project Area 104
56 Health and Education of the Project Area 107
57 Water and Infrastructure of the study 109
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 12
SL.No. Name /Detail Page No.
58 Production of the Project area 111
59 Irrigation Facility of the Project area 112
60 Land Use of the Project area 112
61 Displaced Khatedars whose House is being affected 114
62 Villages to Be Affected Due To Project 132
63 Revenue Land To Be Acquired - I 133
64 Revenue Land To Be Acquired -II 134
65 Forest land (revenue record) –II 136
66 Details of the Loss of Structure 138
67 Project displaced persons and land losers 139-140
68 Village Wise Details Of Disturbed Population 141-142
69 Assets: (Drinking Water) 144
70 Implementation of Rehabilititation Plan 152-153
71 Land Matters 153
72 Details of size land to be allotted to be each Khatedars 155
73 Size of plot of land to be alloted 155
74 Rehabilitation Cost Village Mayapur 169-171
75 Rehabilitation Cost, Village Shankarpur 173-176
76 Rehabilitation Cost, Village Bojha 178-181
77 Rehabilitation Cost, Village Songara 183-186
78 Rehabilitation Cost, Village Mohanpur 188-190
79 Rehabilitation Cost, Village Sakalpur 192-195
80 Rehabilitation Cost, Village Tulsi 197-200
81 Rehabilitation Cost, Village Dharampur 202-205
82 Rehabilitation Cost, Village Kotya 207-210
83 Rehabilitation Cost, All Villages Total 212-215
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 13
LIST OF CHART
SL.No. Name /Detail Page No.
1 Area under Different Crops 19
2 District Population of Surguja. 21
3 District Population of Surguja in %. 22
4 Area of Project Villages (In Ha.) 48
5 Number of House Holds in Project Area 67
6 Affected Villages Population 68
7 Details of Social group Matrix of Affected Population 69
8 Social group Affected Families 69
9 Destitute and Dependents 70
10 Destitute and Dependents in % 70
11 Project Affected People, Average Sex Ratio in % 71
12 Illiteracy Level in Age Group Wise 72
13 Illiteracy Level in numbers 73
14 Illiteracy Level in % 73
15 Persons Occupations 81
16 Persons Occupations in % 82
17 Income Levels 86
18 Income Levels: % of House Holds 87
19 Asset Ownership 89
20 Destitute and Dependants in Project Affected People 90
21 Destitute and Dependants in % 91
22 SC/ST in Project Impacted Villages 93
23 Population in project Affected Villages 94
24 Drinking Water Supply 96
25 Percentages of land holding 102
26 Area, Population of the Project Area 105
27 Village wise Area (in Ha.) 105
28 Total Household 106
29 Health and Education of the Project Area 107
30 Project Area and Medical Facility 108
31 Water and Infrastructure of the Study 109
32 Water Facility of the Project Area 110
33 Land Use of the Project area 113
34 Revenue land to be acquired I 133
35 Revenue land to be acquired II 134
36 Abstract of Land To Be Acquired 134
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 14
SL.No. Name /Detail Page No.
37 Abstract of Land to Be Acquired in % 135
38 Revenue Forest Land to Be Acquired 136
39 Revenue Forest Land to Be Acquired in % 137
40 Loss of Structure 138
41 Loss of Structure in % 139
42 Project displaced persons and land losers 140
43 Project displaced persons and land losers in % 141
44 Disturbed Population 142
45 Disturbed Population in % 143
46 Mayapur Rehabilitation expenditures 172
47 Mayapur Rehabilitation expenditures in % 172
48 Shankarpur Rehabilitation expenditures 177
49 Shankarpur Rehabilitation expenditures in % 177
50 Bojha Rehabilitation expenditures 182
51 Bojha Rehabilitation expenditures in % 182
52 Songara Rehabilitation expenditures 187
53 Songara Rehabilitation expenditures in % 187
54 Mohanpur Rehabilitation expenditures 191
55 Mohanpur Rehabilitation expenditures in % 191
56 Sakalpur Rehabilitation expenditures 196
57 Sakalpur Rehabilitation expenditures in % 196
58 Tulsi Rehabilitation expenditures 201
59 Tulsi Rehabilitation expenditures in % 201
60 Dharampur Rehabilitation expenditures 206
61 Dharampur Rehabilitation expenditures in % 206
62 Kotya Rehabilitation expenditures 211
63 Kotya Rehabilitation expenditures in % 211
64 All Villages Rehabilitation expenditures 216
65 All Villages Rehabilitation expenditures in % 216
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 15
CHAPTER – 1
INTRODUCTION OF AREA
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 16
CHAPTER – I
GENERAL INTRODUCTION & OBJECTIVES
1.1 DISTRICT SURGUJA
The project is situated within district Sarguja. It is located in the northern part of
chhattisgarh state of India. Borders of Uttar Pradesh, Jharkhand, and Orissa states are
adjoining to the district. This district has over extension between south-eastern parts of
Vindhyachal-Baghelkhand region of peninsular India. It lies between 23o 37‘ 25‘‘ to 24o 6‘
17‘‘ north latitude and 81o 34‘40‘‘ to 84o 4‘40‘‘ east longitude. 244.62 km long east to west
and 167.37 broad North to South. The district has an area of about 16034 sqr km.
1.2 DISTRICT ADMINISTRATION:
The head of district administration, collector, governs the district through 19 blocks
in Surguja district, in which, most of the blocks are tribal blocks i.e. Rajpur, Lundra,
Sitapur, Batouli, Mainpat, Wadrafnagar, Pratappur, Ramchandrapur, Balrampur, Kusami,
Shankergarh, Lakhanpur, Bhaiyathan, Ramanujganj, Premnagar, Ambikapur, Udaypur,
Surajpur and Odagi. The administrative setup of the district is as under-
Table: - 1.1, Administrative Setup
NO NAME NUMBERS
1 Tehsil 09
2 Blocks 19
3 Revenue Circle 27
4 Patwari Halka 296
5 Gram Panchayat 977
6 Revenue Villages 1772
7 Police Reserve Center 27
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 17
1.3 DISTRICT STATISTICS:
Table: - 1.2, Administrative Units & Area
S.No. Development Block Panchayat. Total Village
1. Ambikapur 78 122
2. Lakhanpur 62 98
3. Udaypur 44 91
4. Ramanujnagar 66 76
5. Surajpur 100 121
6. Premnagar 32 47
7. Bhaiyathan 61 90
8. Odagi 60 99
9. Rajpur 53 86
10. Lundra 66 112
11. Sitapur 36 49
12. Batouli 39 54
13. Mainpat 31 46
14. Wadrafnagar 72 121
15. Pratappur 75 115
16. Ramachandrapur 68 113
17. Balrampur 51 124
18. Kusmi 56 105
19. Shankergarh 40 89
District. Surguja 1090 1758
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 18
1.4 THE LAND
The land has been classified into 6 categories. About 41.67% of the total area is
actually developed for agriculture, while about 5.70% remains under fallow lands. Again
about 11.44% of the land may be brought under cultivation by improving the techniques
and reclamation of the marginal area. About 1.27% is barren and uncultivable while
33.09% is in the form of forest, 6.83% land is developed for building, roads etc.
1.5 AGRICULTURE
About 90% of the working population depends on agriculture, in which 50.36% of
working population is engaged in cultivation and 12.77% are agriculture labourer. The rest
working population is occupied in other works.
Agriculture is directly connected with land and water resources. In Surguja, the
percentage concentration of cultivated land is maximum in central zone of the district
stretching East to West direction. In North and south, the percentage of concentration
decreases, because of several factors. The uplands and high lands are mostly covered
with rocky wastelands, infertile soil, woods and scrubs, sloppy and forested area.
Unavailability of water for irrigation over most of area, improper drainage system, difficulty
in digging wells due to rocky basement, poor means of communication, transportations are
hurdles in the path of extension of cultivated land.
1.6 DOUBLE CROP AREA
Double crop area is generally associated with water supply, natural or artificial and
the pressure of population. Wherever the physical condition permits the pressure more
over the land and two crops are raised in a year from the same field. As result, a particular
pattern of use of land resources emerges, which helps in the delineation of planning
regions on the basis of present available resources and the limit of their utilization. Of
course there is no uniformity in the distribution of double cropped area.
Thus most of the concentration is found in two patches
i. Ramanujganj block
ii. Ambikapur & Central North-East of Lundra , Rajpur, Shankargarh, Wadrafnagar and
Pratappur blocks.
Almost whole of the central plain has got medium to relatively high value with few
exceptions due to local condition. In this part, during summer most of the area remains
uncultivated. Only in Ambiakpur block some concentration of double crop area developed
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 19
due to irrigation facilities. The per capita land is declining due to the increased rural
population which can be fed by increasing the per acre output through bringing more
cultivated land under double crop system by extending irrigation facilities and using better
fertilizers and better technique .
1.6.1 Pattern of Crop Distribution
The assessment of physical condition for different crops helps in arranging them so
as to derive the optimum return of it. The production of land provided to different crops
depends upon physical suitability of soil and availability of water etc.
Roughly 41.67% out of the total geographical area is under cultivation. The relative
importance of different crops can be studied from the following table and pie chart.
Table: - 1.3, Area under Different Crops
Crops Cereals Oil Seeds Pulses Fruits/Vegetables Others
% of Total shown
area 75.75 12.45
9.88 1.51 0.41
Chart: - 1.1, Area under Different Crops
AREA UNDER DIFFERENT CROPS
Oil Seeds
14%
Fruits/Vegetable
s
2%
Cereals
84%
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 20
The above chart shows the percentage of different crop under the area distributed.
Cereals are predominant followed by oilseeds and pulses, but fruits and vegetables are
more important. The distributions of crop, in terms of % are as follows:
1. Cereals -84%.
2. Oil seeds -14%
3. Fruits / vegetables -2%
1.7 DISTRICT POPULATION
Table: - 1.4, District Population
Person Male Female Total
Population -Total 1,000,050 972,044 1,972,094
Population - Rural 928,009 906,904 1,834,913
Population - Urban 72,041 65,140 137,181
Population (0-6) 191,193 186,740 377,936
SC Population 47,931 46,906 94,837
ST Population 541,949 534,720 1,076,669
Number of literates 547,006 326,453 873,459
Number of illiterates 453,044 645,591 1,098,635
Total workers 554,457 427,584 982,041
Main workers 460,649 144,364 605,013
Marginal workers 93,808 283,220 377,028
Non workers 445,593 544,460 990,053
Cultivators 317,081 193,348 510,429
Agricultural laborers 136,327 206,266 342,593
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 21
Chart: - 1.2, District Population of Surguja.
The above table denotes the population of different sectors of surguja district.
The total population 1972094,the population of rural is 1834913,the population of
urban is 137181,the population (0-6) is 377936,the population of SC is 94837,the
population of ST is 1,076,669,the population of literates is 873,459 and of illiterates is
1,098,635,the population of total worker is 982041,the population of main workers is
605,013,the population of marginal workers is 377,028,the population of non workers is
990,053,the population of cultivators 510,429,the population of Agricultural laborers is
342,593.
DISTRICT POPULATION OF SURGUJA
1,000,050928,009
72,041
191,193
47,931
541,949453,044
554,457460,649
93,808
317,081
136,327
326,453
645,591
445,593
547,006
283,220
144,364
193,348206,266
544,460427,584
534,720
46,906
186,740
65,140
906,904972,044
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
Pop
ulat
ion
-Tot
al
Pop
ulat
ion
- Rur
al
Pop
ulat
ion
- Urb
an
Pop
ulat
ion
(0-6
)
SC P
opul
ation
ST
Pop
ulat
ion
Num
ber o
f lite
rate
s
Num
ber o
f illite
rate
s
Tota
l wor
kers
Main
wor
kers
Mar
gina
l wor
kers
Non
wor
kers
Cultiv
ator
s
Agr
icul
tura
l lab
orer
s
VARIABLES
NU
MB
ER
S
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 22
Chart: - 1.3, District Population of Surguja in %.
The above chart shows the population of different sector of surguja district.the
percentage of population in rural area a compared to urban area is uppermost that is 16%
and 1% respectively. The population (0-6) is 3%, population of SC is lowest as compared
to ST population that is 1% and 10% respectively. Majority of illiterates population is 10%
and that of literates is 8%.percentage of total workers is 9%.the percentage of main
workers is maximum as compared to non workers that is 3% and 9%.the percentage of
cultivators is 5% and that of agricultural laborers is 3%.
1.8 FOREST AREA
About 58% of the area in the district lies under forests. The total geographical area
being 18,188.44 sq km. and the forest occupy 10,849.+079 sq Km. the flora of Nazzul and
other areas are changing frequently with the human activities and land-use.
In Surguja rainfall varies between 100-200 cms, mean annual temperature260C-
270C and humidity 60-80% resulting monsoon deciduous forests. The tree of such forests
shed their leaves during spring a dearly summer when the storage of water is more acute.
Reductions of sub-soil water table not enough to allow the trees to keep their leaves all the
year-round. These forests are the most important forests, yielding commercial timberland
various other forest products of high value.
DISTRICT POPULATION OF SURGUJA IN %
Main workers
7%
SC Population
1%
Total workers
11%
Population - Rural
19%
Agricultural
laborers
4%
Marginal workers
4%
Non workers
11%
Population (0-6)
4%
ST Population
12%Number of
literates
9%
Population -
Urban
1%
Number of
illiterates
12%
Cultivators
5%
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 23
FOREST AREA (Sq.Km.)
Geographical Area
(Area in sq. K.m)
Forest Area (Area in sq. K.m)
Total Forest Reserved
Forest
Unreserved
Forest Uncategorized Forest
27037.053 14948.963 5621.252 8311.207 1016.509(55.29%)
1.9 PROJECT AREA
The Project is proposed in 9 villages of block Surajpur and Ambikapur.Two villages
namely Tulsi and Mohanpur falls within the block Ambikapur and rest 7villages Sakalpur ,
Shankarpur,Mayapur, Bojha,Dharampur, Songara and Koteya comes within the
administrative boundary of block Surajpur.
The geographical location of the project area is shown in the following map.
Map: - 1.1, Project Area
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 24
1.10 CLIMATE: The climate of district is characterized by a hot summer and well distributed rainfall
during the monsoon season. With its general monsoonal character, the region according to
thornthwait's classification falls in the Tropical Thermal belt assigns it the grassland type
character.
Climate, soil and biotic factors are the functions of natural vegetation. According to
Trewartha's classification the Surguja falls in AW class which is based on temperature and
vegetation. The symbol AW denotes Tropical Swanah region. The chief feature of this
climate is long dry period average monthly temperature rising over 18 0C, through
maximum summer temperature may even go up to 46 0C. In winter the temperature will not
go below 18 0C .The monsoon bring sufficient rains.
The location on tropic of cancer results tropical climate with high pressure belt
throughout the year, but due to its height above MSL controls its high temperature. The
district is about 700 km from ocean therefore oceanic effect still remains zero , Whereas
it's location in southward of Himalaya is about 500 km which protects it against cold winds
blowing from Northern belt.
1.11 OBJECTIVES :-
The main purpose of the rehabilitation policy is to extend appropriate compensation
and at the same time making such arrangements for their dwelling and employment so as
to make their position equal to or better as before the project. For this purpose specific
provisions have been made for the following:-
Allocation of alternative land and /or appropriate compensation for their acquired
land and other immovable assets before displacement of affected person from
the project.
Establishing well planned accommodation for such families which are affected
by project and whose accommodation is required as per the ―An Ideal
Rehabilitation Policy 2007 of State of Chhattisgarh (As amended)‖.
To make arrangements for employment to the one eligible member of project
affected families as per the ―An Ideal Rehabilitation Policy 2007 of State of
Chhattisgarh (As amended)‖..
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 25
To make arrangements of supervision and monitoring of rehabilitation works in
order to ensure that the rehabilitation of the project affected persons/families
shall be according to the ―An Ideal Rehabilitation Policy 2007 of State of
Chhattisgarh (As amended)‖.
DEFINITION:-
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 26
CHAPTER – 2
INTRODUCTION OF THE PROJECT
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 27
CHAPTER – II
PROJECT INTRODUCTION
2.1 CMDC (CHHATTISGARH MINERAL DEVELOPMENT CORPORATION)
Chhattisgarh is known to be the richest State in the country in terms of mineral
wealth. The state-owned Chhattisgarh Mineral Development Corporation(CMDC), singly or
in joint venture, undertakes scientific exploration, commercial exploitation and viable
trading of minerals in the State and ensures that the natural wealth which the state is
endowed with, is transformed efficiently into prosperity for its people, in general and the
country at large.
Ministry of Coal (MOC), Govt. of India, in its memorandum no. 13016/8/2007-CA-1
dt. 25 July 2007, allocated Shankarpur (Bhtgaon II) & Extn. Coal block under the
Government company dispensation for commercial extraction of coal by CMDC
themselves or with its participation through a separate company which shall be
necessarily a Government company eligible to do coal mining as per the provisions of Coal
Mines (Nationalization) Act 1973. The Company such formed shall be free to sell its
produced coal except to the consumers of Coal India Limited/SCCL against their existing
linkages.
Chhattisgarh Mineral Development Corporation Ltd. (CMDC Ltd.) has its registered
office at Sona Khan Bhawan, Ring Road No.-1, Raipur, and Chhattisgarh. PIN: 492006
2.2 SHANKARPUR (BHATGAON II) & EXTN. COAL BLOCK
The block is situated in the Bisrampur Coalfield in the command area of South
Eastern Coalfields Limited. The block is spread over a combined area of 33.63 sq.km with
a geological reserve of 80.13 million tones.
The co-ordinates of the block are:
Latitude - 23°16‘54‖ N (south boundary) to 23°21‘54‖ N (North boundary)
Longitude - 83°03‘00‖ E (West boundary) to 83°08‘06‖E (East boundary)
Topo-sheet No. 64 M/3
The coal block is 22 kms North East of Bisrampur town and the nearest railway
station is Ambikapur on the South East Central Railway which is approximately 27 kms
away from the block. The state highway no. 5 connecting Ambikapur and Varanasi passes
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 28
over the western part of the coal block. Ambikapur is also the district town of the Surguja
district.
The area is generally plain land - topography having occasional mounds. The
surface elevation ranges from 512m above Mean Sea Level (MSL) to 558m above Mean
Sea Level (MSL). Galphuli nala flows from south to north in the southern part of the coal
block. The nala forms the western boundary of the northern extension of the block. A
number of small seasonal tributaries end up into the nala which finally meets the westerly
flowing Mahan river in the north side of the block.
A number of small seasonal tributaries join the Galphuli nala. This ultimately meets
the westerly flowing Mahan River in the north which controls the drainage of the region.
The climate is tropical. The minimum and maximum temperatures hover around 2°-
4°C and 35°C, respectively, in winter while temperature in summer varies between 16° Min
to 45° Max.. Meteorology data suggests the average annual rainfall as 1436mm.
2.3 OBJECTS AND PROJECT DESCRIPTION
(i) OBJECTIVE OF THE PROJECT
The project is to produce coal from the block and cater to coal requirement of
prospective consumers on commercial basis.
The main objective of the project is to supply coal to the 1000 MW Power project of
the JV Company (ICPL) of IFFCO & CSEB and to supply coal to the local steel / sponge
iron / cement industries located within the state of Chhattisgarh.
The rated capacity of the project as envisaged in the mining plan is 2.0 Million
Tonnes per annum (MTPA) of which 1.8 MTPA shall be produced by opencast method
and the underground mine is envisaged to give an output of 0.2 MTPA.
The coal block and its immediate surroundings are free from any mining activities
and the coal seams are totally virgin. Some mines of SECL are, however, in operation, in
some distance (3-10 Kms) from the block.
Detailed exploration has already been carried out by competent agencies and
status of drilling in the block and other follow-up actions are tabulated below:
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 29
Table: - 2.1, Details of Drilling in the Block –I
Exploration
Agency
Bore hole
series
Drilling Type of
exploration
Status of
documentation No. of
BHs
Meterage
drilled
GSI BSG 7 1675.86 Regional All data
incorporated in
geological reports
MECL BT 123 11094.25 Detailed
CMPDIL CBBT 100 9900.70 Detailed
Total 230 22670.81
Table: - 2.1, Details of Drilling in the Block –II
Item of work Bhatgaon-II Bhatgaon Extn. Total block
i) Geological mapping
(R.F 1:4000)
21.2 sq.km 12.43 sq.km 33.63 sq.km
ii) Topographic survey
(R.F 1:4000)
21.2 sq.km 12.43 sq.km 33.63 sq.km
iii) Core drilling 12770.11m*
(130 bore holes)
9900.70
(100 bore holes)
22670.81m
(230 bore holes)
2.4 PROJECT BACKGROUND
Chhattisgarh Mineral Development Corporation Ltd. envisages the establishment of
a captive opencast coal mine over the land of villages Shankarpur, Koteya,Bojha,
Mayapur, Mohanpur, Shakalpur, Songara, Dharampur in District Sarguja, Chhattisgarh.
The coal mine will operate within the "Shankarpur Block". The annual coal production is
likely to be about 6.0 million tonnes per annum (MTPA). M/s. Chhattisgarh Mineral
Development Corporation Ltd. (CMDC Ltd.) is intending to supply coal to the 1000 MW
Power plant of ICPL, a JV company of the IFFCO & CSEB at a distance of 6 km from the
mine site.
The block has an estimated 317.00 million tonnes (MT) of net in-situ proved
geological reserves of which 252.08 MT will be mineable. CMDC Ltd. will acquire land
outside the block boundary also to meet the requirement of OB dumping and area for
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 30
some facilities. In this area outside the allotted block boundary about 0.06 MT of coal
reserves are indicated.
The detailed exploration in Shankarpur Block of Hasdo - Arand Coal field has
established the presence of four regionally persistent and co relatable coal seams via.
Seam – V, IV, III and II occurring in descending order. A local seam designated as seam
L-1 occurs between seams II and II A in the block. Also, a thin coal band occurs above
seam V in few boreholes in the block. The general dip of the beds is southerly, the amount
being 5 to 8. The average run of the mine (ROM) coal is non-coking E grade.
2.5 ABOUT THE COMPANY
Chhattisgarh Mineral Development Corporation Ltd. (CMDC Ltd.) has its registered
office at Sona Khan Bhawan, Ring Road No.-1, Raipur, and Chhattisgarh. CMDC Ltd. is a
wholly owned Chhattisgarh State Government Undertaking. It intends to mine the
Shankarpur Central Block for supplying coal to the 1000 MW power project of the JV
company of IFFCO & CSEB at Premnagar in District – Surguja (C.G.) .
2.6 PROJECT TIME FRAME
As per the time schedule provided by ministry of Coal Govt. of India. The production
has to be started within 36 months from the date of allocation of the coal block. Ministry
has allocated Shankarpur Coal Block to CMDC on 14.08.2003 so the project has to be
started by the end of August 2006. But to delay in handing over of the geological report by
CMPDI the project has delayed for almost 2 years. Now the new target for the starting of
project has been fixed as April 2008.
2.7 BRIEF PROJECT DESCRIPTION:
(a) Regional geology
(i) General
The Hasdo-Arand coalfield extends over an area of about 1200 Sq.km between
latitudes 22°39' to 20°57' (N) and Longitudes 82°21' to 83°39'(E), covering Korba and
Surguja districts of the Chhattisgarh state.
The Hasdo-Arand coalfield is bounded on the north by a vast stretch of Talchir rocks and
gneisses, on the east by the Main Pat Plateau, while coal measures of Trans-Mand sector
and Mand-Raigarh coalfields lie to the south and south east of it, respectively. The Korba
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 31
coalfield lies to the south west of the Hasdo-Arand coalfield separated by a vast stretch of
Kamthi and Talchir formations rocks. This coal basin is a part of the Son-Mahanadi master
Gondwana basin and has a prominent fault along the major part of its southern periphery
bringing Talchir formation and Precambrian rocks in juxtaposition with Barakars, while
towards north, the coal measures rest conformably on the Talchir sediments.
The generalised geological sequence of the coalfield is given in Table 2.2
Table 2.2:- Geological succession, Hasdo-Arand coalfield Chhattisgarh (From GSI bulletin, series a. No. 45)
Age Formation Lithology
Recent ………….. Soil and Alluvium
…..…….Unconformity ………
Cretaceous Deccan Trap Basic Flows and Dykes
Upper
Supra Barakar Sandstones, Ferruginous shales
Permian Beds (Kamthi ?) Buff cherty sandstone and a few
To Lr. Triassic (?) (200 m +) Pebble bands
…...….Disconformity………
Barakar carbonaceous Feldspathic Sandstone,
(30 m – 400 m +) Shale and coal seams with
boulder conglomerate at base
Permian Karharbari (100m) Sandstone, shale with coal
Upper carboniferous
to Lr. Permian (?)
Talchir (100m –15m) Diamictite, green sandstones,
Khaki-green shales
……….Unconformity……...
Precambrian Porphyritic granite, gneisses and
quartzites.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 32
The Hasdo-Arand coalfield is highly rugged in the southern part. Within the
coalfield, the Raigarh Pahar (966 m) and the Mahesh Pahar (938 m) stand out in bold
relief from the surrounding plain, the general elevation of which varies from 457 m to 548
m above MSL. The rugged terrain to the south is dissected by deep gorges. In the valleys
Talchirs are exposed.
Within the coal seams, numerous occurrences of sandstone dyke have been reported
(Chowdhary and Basu, 1969). In width, the dykes range from a mere stringer to as much
as a metre. These sand stone dykes point to emplacement of sands in hydro-plastic
stages along the fracture and weak planes in the coal seams.
(ii) Structure
The Hasdo-Arand Coalfield shows a broad similarity of structural set-up with that of
the adjoining Korba Coalfield. The southern boundary of the coalfield is delineated by an
east-west boundary fault, which brings the coal measures in juxtaposition with the
Precambrian and Talchir rocks on the south. Near the boundary fault, the Barakar
sandstones are highly silicified and have given rise to continuous ridges. Along the
northern boundary of the coalfield, the coal measures rest conformably on the Talchir
Formation. As such, the basin shows a half-graben configuration.
The general dip of the beds is southerly, the amount being 5° to 8°. In the vicinity of
the southern boundary fault, a reversal of dip towards north is recorded. Locally, the beds
show low rolling dips. The unevenness of the basement topography is manifested as
hummocky inliers of Precambrian rocks within the Gondwana Formations. In the eastern
part the strike swings towards NW-SE. Similar swing in the strike is also recorded from the
Salaigot and Sitipakhna areas in the western part of the coalfield.
(iii) Coal seams
The available surface and sub-surface data of Hasdo-Arand Coalfield have
established the existence of six correlatable coal seams viz. V/Ketma, IV/Morga,
III/Dhajag, II/Bisrar and IIA/Paturia, I/Sagbari, in descending order. Besides, at least six
thin local coal seams, one occurring between seams IV/Morga and III/Dhajag, another
occurring between seams II/Bisrar and II/Paturia while the next four local coal seams
occurring below Seam I (Bottom)/Sagbari are locally persistent. These local coal seams
occurring below seam II/Bisrar have been numbered as L-5 to L-1 descending order.
(b) Local Geology
The block is mostly covered by soil and alluvium of residual nature. Only the
Barakars are exposed in Shankarpur Central block and is free from dolerite and mica-
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 33
peridotite intrusions as in none of the boreholes drilled by MECL in the block or during
geological mapping, these have been noticed.
(i) Description of formation
The description of different geological formations encountered in boreholes drilled
by MECL in the block is given below.
Soil/Alluvium
Shankarpur Central block is mostly covered with soil, ranging in thickness from 0.00
to 6.00 m. and is of residual nature. It is generally yellowish to brownish in colour.
Weathered Mantle
The weathered mantle constitutes the soil and the weathered rocks belonging to
Barakar Formation. The depth of the weathered mantle within the block ranges from 6.00
to 36.40 m.
Barakars
Barakars shows transitional contract with the underlying Talchir Formation.
Barakers comprise dominantly of sandstones with subordinate shales, carbonaceous
shale and coal seams. The sandstones are generally grayish, medium grained to gritty
with kaolinised feldspar as cementing material and are friable in nature. The shales are
rather insignificant in the sedimentary column and are grayish in colour. Coal seams from
prominent horizons within the sandstone dominated cycles. The Barakars have been
intersected in all the boreholes drilled in the block and its thickness varies from 12.00 m. to
236.50 m.
(ii) Structure of the block
Vast areas in the northern, western and central parts of the block are free from any
structural disturbance as the faults are mostly located in the eastern and southern parts of
the block.
The strike of the coal seams is N 72° E-S 72° W near southern-eastern corner,
becomes almost E-W in the southern part, takes a swing westward as N 55° W-S 55° E in
the south-western part and becomes almost N-S in the western part. The strike than takes
a gradual swing eastward and becomes N 22° - 32° E to S 22° - 32° W in the north-
western part, and becomes almost E-W in the north-central part of the block.
The dip of the coal seams varies within narrow limit i.e. from 0° to 5.4°. The beds
are almost flat/horizontal at the centre of the basin. The maximum dip of 5.4° is observed
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 34
over a very small area in the eastern part between faults F.3 and F.5. However, over vast
area in the southern, western, northern, eastern and central parts, the beds dip between 2°
to 3°.
Due to formation of bowl shaped basin in the south central region of the block, the
base of which is elongated in almost E-W direction and cut-off at the eastern end due to a
major fault (F.3), the coal seams show centripetal dips (towards the centre from all sides
except eastern side). Thus the coal seams show northerly dip in southern part, easterly dip
in western part and southerly dip in northern part of the block.
(iii) Fault
The Shankarpur Central block is traversed by seven normal, gravity faults
designated as fault F1 to F7 from north to south and one minor slip (MS-1) for seam III in
borehole MTC-57 to explain reduction in seam thickness.
These faults are confined roughly to the eastern half of the block. Out of seven
faults, only one fault (F3) is major, high intensity, fault with throw increasing upto 120 m
and is intersected in borehole No. MTC-64 at the depth of 231.35 m. All other faults are
low intensity faults with throw upto 24 m. Two faults (F1 and F6) have southerly throw, 3
faults (F2, F4 and F7) have northerly throw, while fault F5 has easterly throw. Fault F3
shows northerly throw in northern part and easterly throw in the eastern part of the block.
(c) Description of coal Seam
The detailed exploration in Shankarpur Central block of Hasdo-Arand Coalfield has
established the presence of four regionally persistent and co relatable coal seams viz.
seam – V, IV, III and II occurring in descending order. In addition to the above, a local
seam designated as seam L-1 occurs between Seams-IV and III and one between Seams
II and IIA in the block. Moreover an impersistent, thin coal band also occurs above Seam V
in few boreholes in the block. All these seams occur within Barakar column.
Among all the seams present in the block only the three seams viz V. IV and III
have attained workability in the block. Of all the seams, Seam III is the most persistent and
highly developed and occurs throughout the block, generally in two sections separated by
prominent shale parting of 0.40 m to 0.80 m thickness. The upper part is designated as
Section III (Top) and the lower part as Section III (Bottom). Only in 12 boreholes (MTC-10,
14, 62, 70, 76, 98, 115, 122, 131, MTW-6, MT-12 and 25), the parting between the Top
and Bottom sections of the seam III exceeds 1.0 m. and as these boreholes are spread
over large area and do not together form any continuous appreciable area/zone except
around a few boreholes in north-eastern part.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 35
Seams V and IV are also persistent and show good development in the block.
It was noticed in the initial boreholes that that seams below III have mostly not
developed/attained workable thickness in the block similar to that of nearby Gidmuri and
Paturia blocks.
The sequence of coal seams in Shankarpur Central Block is given in Table 2.3
Table: - 2.3, Sequence of coal seams in Shankarpur coal block
Sequence of
Seam/parting
Ranges of Thickness
(m)
Range of Parting
Thickness
No. of
Intersections
Min Max Min Max
V Parting 0.16
(MTC-81)
2.45
(MTC-19)
12.46
(MTC-71)
24.76
(MTC-13)
122
IV Parting 0.25
(MTC-33)
5.10
(MTC-71)
0.48
(MTC-43)
4.81
(MTC-151)
143
Local (L-I)
Parting
0.09
(MTC-89)
1.90
(MTC-53)
25.78
(MTC-69)
34.56
(MTC-58)
130
III (Merged)*
Parting
7.05
(MTC-137)
10.29
(HAT-27)
13.15
(MTW-5)
18.89
(MT-15)
189
II Parting 0.10
(MT-10)
0.62
(MTW-5)
34.06
(MT-15)
39.25
(MTW-5)
5
II A Parting 0.05
(MTC-2)
1.23
(MT-10)
- - 9
* Including sections III (Top) and III (Bottom)
(d) Details of Exploration
The details of the exploratory work undertaken in the block have been presented in the
Table 2.4
Table: - 2.4, Details of Exploration
Sl.No. Item of work Work done
1. Geological Mapping 24.0 Sq.km
2. Surveying
(a) Determination of R.L. of boreholes
(MECL)
158 Bhs. (MTW-1 to 6 and
MTC-1 to 152)
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 36
Sl.No. Item of work Work done
(b) Determination of co-ordinates of
boreholes (MECL)
158 Bhs. (MTW-1 to 6 and
MTC-1 to 152
(c) Topographic Survey (R.F. 1:4000) with
2.0 m. contour interval
24.0 Sq.km.
3. Exploratory drilling
(a) Present phase MECL 16296.15 m. in 158 Bhs. (MTW-
1 to 6 and MTC-1 to 152)
(b) Old boreholes MECL 2189.50 m. in 21 Bhs.
GSI 4668.45 m. in 13 Bhs. (HAT-4,
6, 7, 8, 9, 20, 21, 22, 25 to 28
and 32)
Total 23154.10 m. in 192 Bhs.
4. Geological Core Logging 16296.15 m. in 158 Bhs. (MTW-
1 to 6 and MTC-1 to 152)
5. Coal Core sampling 1642.90m in 152 boreholes
6. Chemical Analysis
(a) Band-by-band 1642.90 in 152 Boreholes
(b) Seam overall (at 60% Rh and 40°C) 391 nos. from 63 boreholes
(c) Special Test For GCV, HGI, Ash analysis,
AFT and Ultimate analysis
7. Physico-Mechanical tests (at CMPDIL,
Ranchi Lab.)
One borehole (MTC-141)
8. Geophysical logging 4524.00 m. in 37 boreholes
(e) Reserve estimation
(i) Method of reserve estimation
Seam correlations have been used to identify the seam roof and seam floor and
generate the seam roof and floor grids along with the structural interpretations.
Thicknesses used for reserve estimation are based on borehole-by-borehole, seam
wise assessment of workable thick nesses. These thick nesses have been used to model
the thickness grids of coal seams for reserve assessment.
The minimum workable thickness for the estimation of reserves of individual seam
has been considered as 0.05 m.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 37
2.8 Fault zones
Fault zones were modeled and coal within the heave interval excluded from reserve
estimates.
2.8.1 Weathering and sub crop
Coal occurring within the weathered portion of the sequence was excluded from
reserve estimates.
No reserves have been estimated for seams II, Local and IIA due to their poor
development in the block.
An overall deduction of 10% is applied to the gross tonnage estimated for each
sector to arrive at the net-in-situ reserves of coal to account for unforeseen data gaps,
wash out zones, abrupt change in seam thickness etc.
2.8.2 Area considered for reserve estimation
For all the seams, the up dip limit and the down dip limit for the purpose of reserve
calculation have been taken as per the details given below and the reserves have been
estimated within the limits of the Shankarpur Central block.
The up dip limit has been fixed by the in crop of the floor of each seam. The down-dip limit
is the block boundary.
A. Reserves within the allotted block boundaries
Table: - 2.5, Reserves Allotted Block Boundaries
1. Net in-situ proved geological reserves 317.33 Mt.
2. Net in-situ proved geological reserves not considered for mining
in the 45 m mine periphery
(a) Along in crop 0.02 mt.
(b) Along Western mine boundary 4.73 mt
(c) Along South-Eastern mine boundary 3.47 mt
(d) Along Dip side mine boundary 2.01 mt.
Sub Total (A.2) 10.23 mt
3. Net in-situ proved geological reserves Blocked in the batter
(a) Along in crop batter 0.02 mt
(b) Along western batter 11.66 mt
(c) Along South-Eastern batter 8.95 mt.
(d) Along Dip side batter 6.43 mt.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 38
Sub Total (A.3) 27.06 mt.
4. Total net in-situ proved geological reserves not considered for
mining (A2 + A3)
37.29 mt
5. Mineable Reserves (A1-A4) 280.04 mt.
6. Mining Losses @ 10% of (A5) 28.00 mt.
7. Extractable Reserves (A5-A6) 252.04 mt.
B. Reserves outside the allotted block boundaries
Table: - 2.6, Reserves Outside the Allotted Block Boundaries
1. Indicated geological reserves considered outside the allotted
block boundaries
0.06 mt.
2. Indicated geological reserves blocked in the batter 0.016 mt.
3. Mineable Reserves (B1-B2) 0.044 mt.
4. Mining Losses @ 10% of (B3) 0.004 mt.
5. Extractable Reserves (B3-B4) 0.04 mt.
C. Total Reserves
Table: - 2.7, Total Reserves
1. Geological Reserves (A1 + B1) 317.39 mt.
2. Mineable Reserves (A5-B3) 280.084 mt.
3. Extractable Reserves (A7+B5) 252.08 mt.
The extractable reserve base of 252.08 million tonnes of coal, assessed based on
the Geological Report on Exploration for Coal, Shankarpur Central Block (Non-CIL)
prepared by MEC, will sustain a mine life for a period of 45 years for a production capacity
of 6 MTY.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 39
The basic Project Parameters of the proposed mining block are given in Table 2.8
Table: - 2.8, Basic project parameters
Sl.No. Parameters Unit Value
1. Geological Reserves of Shankarpur Central Block Mt 317.33
2. Extractable reserves in the delineated Mining Block Mt 252.08
3. Average Coal quality Grade E
4. Volume OB Mcum 1714.14
5. Stripping ratio Cum/t 6.80
6. Target Capacity Mt 6.00
7. Mine life Year 45.
(f) Mining
Geo-mining characteristics of the block are given in Table 2.9
Table: - 2.9, Geo-mining characteristics
Sl.No. Particulars Unit Min Max Usual
1.0 Strata thickness
1.1 Soil m. 0.5 6.0 3.08
1.2 OB m. 12.94 97.95 58.26
1.3 Seam thickness m.
Seam V 0.47 2.45 1.47
Seam IV 0.51 4.23 2.05
Seam IIIT 0.73 3.70 2.70
Seam IIIB 2.47 7.40 5.59
1.4 Parting m.
Between Seam IV and Seam V 12.12 24.76 17.57
Between Seam IIIT and Seam IV 28.81 53.61 34.20
Between Seam IIIB and Seam IIIT 0.14 3.02 0.64
2.0 Seam Gradient deg 0.5 5.4 2-3
3.0 Specific Gravity
OB T/cum - - 2.20
Coal T/cum
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 40
Sl.No. Particulars Unit Min Max Usual
Seam V - - 1.67
Seam IV - - 1.64
Seam IIIT - - 1.55
Seam IIIB - - 1.57
4.0 Coal Quality
Seam V - - Grade F
Seam IV - - Grade E
Seam IIIT - - Grade E
Seam IIIB - - Grade E
(i) Mining method
Selection of mining method, mining equipment and layout for this project are based
on the geo-mining characteristics, site conditions, target capacity and optimisation of
mining operations.
The most suitable mining technology for opencast mining will be using a combination of
Draglines and Truck and Shovel system, considering the following:
(a) Gentle gradient of seam floor, viz. 2° - 3°.
(b) Average thickness of the parting between seam III and overlying Seam IV
being of the order of 30-35 m, which can be very easily handled by
dragline with side casting.
(c) Least cost of production
Shovel dumper system for higher benches and dragline on the parting above seam
III has been proposed, as this is most suitable under the given geo-mining conditions.
(ii) Sequence of mining
The mine will start from the in crop and gradually advance to dip side. The mine will
be worked in two pits, Eastern and Western. The draglines will start from central sump and
proceed towards flanks. A central haul road of 70 m width has been proposed in each pit
which divides the mine into two flanks or sections. The coal of seam III will be transported
up to the receiving pit through the central haul road. The average gradient of central haul
road will be 1 in 16. Coal from the upper seams will be transported through the flank haul
roads.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 41
(iii) Mining system
Considering the geo-mining characteristics of the deposit, the mine is proposed to
be worked by dragline and shovel-dumper combination of mining systems. Overburden
bench immediately above seam III is proposed to be handled by dragline. The height of
dragline overburden bench will vary as per coal exposure requirement. The rest of
overburden/parting is proposed to be excavated by shovel dumper combination. The coal
from all the three seams is proposed to be extracted by shovel and transported to
receiving pit by coal body rear dumpers. The proposed mining system parameters are as
follows:
Table: - 2.10, System Parameters (Dragline Application)
Sl. No. Particulars Unit Value
1. Bench height M 20-35
2. Working bench width M Upto 70
3. Non-working bench width M 30
4. Bench slope Deg 70
5. Blast hole dia MM 250
6. Inclination of blast-holes - Vertical
7. Powder factor Kg/cum 0.60
Table: - 2.11, System Parameters (Shovel-Dumper Operation)
Sl. No. Particulars Unit Value
1. Bench height M Upto 15
2. Working bench width M Upto 70
3. Non-working bench width M 30
4. Bench slope Deg 60-70
5. Blast hole dia MM 160-250
6. Inclination of blast-holes - Vertical
7. Powder factor Kg/cum 0.30
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 42
Table: - 2.12, System Parameters (Coal Winning Operation)
Sl. No. Particulars Unit Value
1. Bench height M Upto 8
2. Working bench width M Upto 70
3. Non-working bench width M 30
4. Bench slope Deg 70-80
5. Blast hole dia MM 160
6. Inclination of blast-holes - Vertical
7. Powder factor Kg/cum 0.20
(g) Blasting
The standard practice involving the electric detonators for the initiation of detonating
cord, detonating relays to achieve hole-to-hole delays, use of Heavy ANFO, slurry or
emulsion explosives as the column charge will be used for Blasting.
Blast hole drills of 250 mm and 160 mm dia will be used for drilling in OB/partings
and coal benches.
(h) Main Mining Equipment
The likely requirement of main mining equipment to be deployed in the project for
achieving the target capacity of coal production is as given in Table 2.13
Table: - 2.13, Main Mining Equipment
Sl. No. Equipment Size Population
Overburden
1. Walking Draglines 24/96 2
2. Rope/Hydraulic Shovels 10 cum 5
3. Hydraulic Shovels 4.5 cum 1
4. Rear Dumpers 100 T 35
5. Rear Dumpers 35 T 6
6. RBH Drills 250 mm 9
7. RBH Drills 160 mm 1
8. Dozers 850 HP 2
9. Dozers 320 HP 7
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 43
Sl. No. Equipment Size Population
Coal
1. Hydraulic Shovels 4.5 cum 3
2. Rear Dumpers 35 T 21
3. RBH Drills 160 mm 3
4. Dozers 320 HP 2
5. Wheel Dozers 350 HP 4
Common
1. FE Loader 5-6 cum 2
2. FE Loader 1-2 cum 1
3. Dozers 320 HP 1
4. Water Sprinkler 28 KL 3
5. Hydraulic Backhoe 1.0 cum 2
6. Tipping Trucks 8 T 4
7. Mobile Cranes 40/18/8 T 3
(i) Mineral Beneficiation
The average ROM coal is non-coking E Grade. No beneficiation is proposed.
(j) Site and Services
CMDC, as owner and operator of the Shankarpur opencast mine; will provide the
infrastructure necessary for its operations and for the well being of its workforce. It is also
expected to provide infrastructure improvement for the local community. Among the
infrastructure that will be provided are roads, workshops and stores, water management
structures and machinery, potable and industrial water supplies, offices, communications,
housing for the workforce, housing for people displaced by mining activities, and transport
to and from work for most employees.
It will be necessary to relocate the Bilaspur-Ambikapur State Highway which
traverses the block. In additional to this, some unmetalled roads and cart tracks
connecting the villages to the state highway and traversing the Shankarpur will also need
to be diverted/relocated.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 44
Since the production from Shankarpur opencast mine is largely for captive use,
there may be some sharing of facilities with the power plant.
(i) Coal handling facilities
The CHP has been designed to handle 6.00 mt per annum. It is proposed to
transport coal from face to receiving pit by rear dumpers. Primary crusher has been
provided for sizing of ROM coal from 1200 mm to 200 mm and then secondary crusher will
crush the coal from 200 mm to –100 mm. Sized coal will be transported to the power plant
by conveyors. Necessary facilities like dust control system; plant cleaning system, etc. has
also been envisaged.
(ii) Mine facilities
For maintenance and repair of equipment deployed in the project, workshop facility
has been envisaged.
Facility planning required for workshop of opencast project of 6.0 MTY capacity has
been done to meet maintenance requirement of equipment and storage of spares, sub-
assemblies and consumables.
Facility planning is based on following scope of services:
2.9 Excavation Workshop
- Preventive Maintenance
(a) Daily maintenance, routine lubrication and bi-weekly washing of equipment
(b) Inspection
(c) Incidental minor repairs of assemblies and sub-assemblies of mining and mechanical
equipment i.e. dumper, dozer, shovel, RBH drill, etc.
- Scheduled Maintenance
- Medium repair and replacement of assemblies and sub-assemblies.
- Mobile repair and maintenance facilities with maintenance crew for field equipment at
site.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 45
2.10 E and M workshop
- Minor repair, medium repair and replacement of components, assemblies and sub-
assemblies of CHP equipment, pumps and other electrical and mechanical equipment.
- Daily washing of LMVs and washing of equipment assemblies and sub-assemblies as
and when required.
- Periodical lubrication.
- Repairs and replacement of components / assemblies for LMV.
- Minor and medium repair of switch gears, motors, self-starters and other electrical
equipment.
- Battery charging facilities and reconditioning of batteries.
A combined complex has been envisaged for HEMM, E and M workshop and stores
(iii) Power supply, fuel consumption and communication system
Heavy Earth Moving Machines consume significant power in open cast project
(OCP). Coal handling Plant including crushing and material handling facilities, mine
dewatering, workshop, offices, colony, etc. add to the total power demand of the project.
On achieving the targeted coal production and commissioning of dragline, shovels, drills,
coal handling plant, workshop and main pumps, the power demand of the OCP is
expected to touch the maximum demand.
It is proposed that the opencast project will get power from CSEB substation and
power will be distributed at 33 kV to the project. The fuel consumption will be for diesel-
operated machinery to the tune of 64.2 TPD for three shift working.
Illumination
The lighting systems is envisaged to cover:
- Mine Area
- Mine Haul Road
- Coal handling facility
- Workshop
- Auxiliary buildings and electrical rooms
- Buildings perimeter
- Yard and roads
- Administration building and offices
- Colony
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 46
Communication and Management Information System
For effective management of different production and service units and for ensuring
safety, the following communication facilities will be provided:
- Surface Mine Communication System
- Mine Management Information System
- Internet
- LAN
(iv) Civil construction
In view of about 45 years of life of the project, the residential and service buildings
will be built to permanent specifications.
The Service Buildings include community buildings like dispensary, primary school,
officers‘ and staff rest houses, clubs, post office, bank, shopping center, community center
etc. apart from offices, workshop and stores, sub-stations, dragline/shovel erection yard,
magazine and other statutory buildings like canteen, first aid center, rest shelter, training
centers, pit head bath etc.
Potable water required for the colony and the water required for the industrial and
fire-fighting purposes will be stored in the colony and industrial bulk reservoirs
respectively. It has been considered that from these colony and industrial bulk reservoirs,
water would be distributed to the points of consumption through water supply networks.
A centralized sewage plant will consist of sewage pumping station, aeration tank,
settling tank, sludge drying beds etc. with all necessary electrical and mechanical
equipment.
(k) Manpower
The annual working days will be 330 days. Number of shifts in a day will be 3 of 8
hours each. Approximately 1,300 persons will be required for operation of the mine.
(l) Water Requirement
This is an opencast mine, hence the predominant water requirement will be for
sprinkling. The break up of the water requirement for the project is given in Table 2.14
Table: - 2.14, Proposed Water Consumption of the Project
Sl.No. Use Qty. (KLD) Remarks
A. Mine
1 Sprinkling 409 68.19 KLD / MTPA of coal
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 47
Sl.No. Use Qty. (KLD) Remarks
2 Workshop 8* 2 KLD / HEMM and others
3 Drinking and sanitation 58.5 45 lpd / capita
Sub Total 475.5
B. Peripheral villages 20.0 Lump sum
C. Colony 615.0 910 families x 5 x 135 lpd
GRAND TOTAL 1110.5
Total water being circulated in workshop is 40 KLD. 32 KLD will be re-used after oil
& grease removal. Hence, 8 KLD make up water will be required. Vehicles will be washed
every 3rd or 4th day only.
2.11 DEMARCATION OF THE PROJECT & DETAIL OF AREA AFFECTED
(Corresponding to Section 1.2 & 1.5 of Annex -2 of CG Model R&R Policy -2005)
A. Demarcation of the Project
The Shankarpur block is situated in the western half of the Hasdo-Arand Coalfield.
Administratively, the block falls in Surguja district of Chhattisgarh and is about 66 km SW
of Ambikapur, the district headquarter. Bilaspur town is about 157 km SW of the block.
The Shankarpur Block covers an area of about 24.0 Sq.km. and is situated in the
western half of the Hasdo-Arand Coalfield, about 6 km north of Gidmuri block. The area
falls in the Survey of India Topo-sheet Nos. 64J/9 & 64J/13 of R.F. 1:50000 (however, the
major part falls in the former and a small part in the east in the later)
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 48
Map:-2.1, Project Area -II
2.12 AREA OF PROJECT VILLAGE
The village area falling within project as per the census 2001 is depicted through
the following bar chart;
Chart: - 2.1, Area of Project Villages (In Ha.)
The legal boundary of 9 villages covers 4328 ha. area out of which 3363 ha. falls
within the Coal Block.
438
603
304 291
584
956
544
731
407
0
200
400
600
800
1000
1200
IN H
AC
.
VILLAGES
AREA IN HA.
Mayapur Bojha Songara Shankarpur Shakalpur Koteya Dharampur Tulsi Mohanpur
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 49
2.13 DESCRIPTION OF COAL SEAMS
Exploration in the southern part (Bhatgaon-II) of the allocated block revealed the
presence of five co-relatable horizons as seam-III top, III bottom, II, L1 and I named after
the GSI nomenclature in Songara area. Detailed exploration in the Extension part
(northern) revealed the existence of ten coal horizons which includes the above older
seams as well as younger horizons. Although sequences of the coal seams remain same
for both northern and southern parts, the nomenclature of the seams is different. The
nomenclature and sequence of coal seams in Bhatgaon-II (southern part) and Extension
(northern part) block as recorded in the GR is given below:
Nomenclature of coal seams
Bhatgaon-II Bhatgaon Extension (Bojha)
--- IX
--- L8
--- L7 Top
--- L7 Bottom
III Top VIII
III Bottom L6
--- VII
II L5
L1 VI
I V
Out of the five coal seams in Bhatgaon II, three seams i.e. III top, II and L1 are
persistent and considered for reserve estimation. Seam III Bottom and I are im-persistent
and thin. Similarly out of the ten seams in the Extension block, only three seams i.e VIII,
L6 and VI are persistent and developed. In the Shankarpur (Bhatgaon-II) and Extension
coal block, the coal seams occurring in the south part of the block i.e. III Top, III Bottom, II,
L1 and I are correlated with coal seams VIII, L6, L5, VI and V respectively occurs in the
northern part of the block as per GR. The seams VIII, L6 and VI are persistent and
considered for reserve estimation. The other seams are im-persistent and not considered
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 50
for reserve estimation. The sequence of coal seams with parting and thickness as
recorded from drilling data in both Bhatgaon-II and Extension coal block are given below.
Table: - 2.15, Sequence of Coal Seams Intersected In Bhatgaon-Ii & Extension Coal
Block
Bhatgaon-II Extension (north part) Bhatgaon-II (south part)
Seam Thickness No. of B.Hs
intersected
Seam Thickness No. of B.Hs
intersected Parting Min Max Parting Min Max
IX Top 0.38 0.85 5
Parting 2.26 4.25 5
IX
Middle
0.10 1.04 7
Parting 1.40 2.17 7
IX
Bottom
0.40 5.08 8
Parting 16.6
0
20.25 5
L8 0.05 1.70 23
Parting 11.7
4
21.70 17
L7 Top 0.05 1.30 33
Parting 2.04 9.28 28
L7
Bottom
0.05 2.00 45
Parting 6.40 15.27 46
VIII 0.29 3.50 65 III Top 0.45 2.93 76
Parting 1.76 9.06 59 Parting 2.24 8.00 --
L6 0.06 2.20 61 III Bottom 0.06 1.20 70
Parting 20.1
6
28.30 13 Parting 14.85 40.29 --
VII 0.02 0.63 18 --- --- --- ---
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 51
Bhatgaon-II Extension (north part) Bhatgaon-II (south part)
Seam Thickness No. of B.Hs
intersected
Seam Thickness No. of B.Hs
intersected Parting Min Max Parting Min Max
Parting 4.10 11.28 11 --- --- --- ---
L5 0.05 1.40 65 II 0.02 2.61 103
Parting 16.2
0
25.37 53 Parting 10.51 46.13 --
VI 0.03 2.00 80 L1 0.03 1.84 62
Parting 28.9
0
39.01 16 Parting 18.39 44.32 _
V 0.05 0.45 18 I 0.02 1.13 50
2.14 DESCRIPTION AND QUALITY OF COAL SEAMS:
The description of the coal seams in ascending order i.e. from oldest to the
youngest occurring within block is given below.
Seam-I (Co-relatable with Seam-V in Bhatgaon Ext. )
It is the oldest coal seam in the block and occurs below the Seam L1(Co-relatable with V
in Extension) with a parting range of 28.90m to 39.01m in the northern part and 18.39m to
44.32m in the southern part of the block. The seam has been encountered in 68 bore
holes. It is poorly developed, im-persistent and occurs in isolated patches. It has not
attained workable thickness anywhere in the block, hence of no economic importance in
the block.
Seam L-1 (Co-relatable with Seam VI in Bhatgaon-II Ext )
This coal seam is developed in the northern part (Bhatgaon-II extension) and northern as
well as eastern portion in the south (Bhatgaon-II).
Bore hole intersected – 142 nos.
Depth of intersection
Roof Floor FRL
i) Shallowest - 44.00m (CBBT-43) 45.00m 496.73m
ii) Deepest -134.00m (CBBT-70) 134.35 389.34m
Stratigraphic position
SeaProject area-1(VI) occurs below seam II (seam L-5) and above seam I (Seam V)
Parting with underlying seam
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 52
Minimum-18.39m (BT-98), Maximum-44.32m (BT-43)
Seam thickness – ranges from 0.03m to 2.00m.
Incrop The seam does not in crop within the block.
Roof & floor The roof is represented by medium to coarse grained sandstone with
subordinate shale. The floor is represented by sandy shale and medium to coarse grained
sandstone.
Dirt bands The seam is devoid of dirt band. However, one dirt band is seen in a few bore
holes in thickness from 0.04m to 0.33m.
Proximate analysis
Table: - 2.16, Range of proximate analysis –I (on 60% RH and 49oC)
Parameters No. of Bore
Holes
considered
Range Remarks
Minimum Maximum
Moisture % 104 5.17 10.24
Ash % 104 6.4 48.61
VM % 54 25.00 41.60
FC % 54 39.40 54.90
UHV (kcal/kg) 104 1478 6847
Grade 104 G A Mostly D to A.
G.C.V (kcal/kg) 55 4645 6718
Long flame
characteristics
23 B4 B5 Predominant B5
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 53
Table: - 2.17, Ultimate Analysis - I
Parameters No. of Bore Holes considered
Range in %
Minimum Maximum
Carbon 13 49.4 81.2
Hydrogen 13 2.8 5.0
Nitrogen 13 0.9 1.7
Sulphur 13 0.30 0.70
Oxygen 11 5.1 13.9
Total sulphur 1 0.60 ---
VM (dmmf) 17 27.2 32.0
CV(Kcal/kg) (dmmf) 50 7543 7889
Table: - 2.18, Hard Grove Index (HGI) - I
No. of Bore
Holes
Seam thickness range Nature of
sample
Range
Minimum Maximum Minimum Maximum
7 0.90m 1.85m Bcs/I30 37 61
Ash Fusion Temp. Range (oC) No of BHs Range
i. Initial Deformation Temperature (I.D.T) 9 1080 to >1400
ii. Hemi spherical Temperature (H.T.) 9 >1400
iii. Flow Temperature (F.T) 9 >1400
Ash Analysis (Constituents %)
Table: - 2.19, Ash Analysis -I
BH
no. SiO2 Al2O3 Fe2O3 TiO2 P2O5 SO3 CaO MgO MnO4
Alk.by
diff
BT-18 60.47 28.36 4.68 1.86 0.05 0.54 1.69 1.37 --- 0.98
CBBT-
22 53.12 29.87 6.86 2.00 0.22 0.34 3.58 2.01 0.04 1.96
CBBT-
51 50.40 30.57 8.71 2.00 0.27 0.22 3.02 1.45 0.04 2.00
CBBT- 58.00 29.30 4.43 1.50 0.02 0.18 4.70 1.85 0.04 1.66
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 54
BH
no. SiO2 Al2O3 Fe2O3 TiO2 P2O5 SO3 CaO MgO MnO4
Alk.by
diff
57
CBBT-
75 57.06 27.86 7.46 2.00 0.31 0.28 2.68 0.96 0.02 1.40
2.15 Summary of seam parameters
i. Coal seam L1 (seam VI) is developed in the northern and eastern part of Bhatgaon II,
where as it is not developed in the south-east and south-west area (west of state highway)
within the entire block boundary. It has been intersected in 142 bore holes. The seam
does not in-crop within the block.
ii. The thickness of the seam ranges from 0.03m to 2.0m. The predominant
thickness range is 0.50m to 1.50m
iii. The total reserve of the seam within the block is 18.581 Mte., out of which proved
reserve is of 17.447 Mte and indicated reserve is of 1.134 Mte. The grade ranges from A
to E, but 89% of total reserves are of A to C grade.
Coal seam II (Co-relatable with Seam L-5)
This coal seams is developed in the southern part of the block (Bhatgaon-II) only.
Borehole intersected – 168 nos.
Depth of intersection Roof Floor FRL
i) Shallowest - 13.66m 13.88m 524.40m
ii) Deepest - 116.35m 116.55m 410.52m
Stratigraphic position
Seam L5 occurs below seam VII in the northern part of the block where as its
equivalent seam II in the southern part occurs below Seam III bottom (Co-relatable with
L6) as there is no seam in the south part equivalent to Seam VII. It occurs above seam L1.
Parting with underlying seam
Minimum -10.51m (BT-55) Maximum -33.08m (BT-83)
Thickness - Thickness ranges from 0.05m to 2.61m.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 55
In-crop - The seam in-crops within the block.
Roof & floor - The roof is represented by medium to coarse grained sandstone. The floor
is representing by shale and sandy shale.
Dirt bands In most part the seam is devoid of any dirt band. However, only one band
ranging in thickness from 0.03 m to 0.13m has been observed in about 10 bore holes in
the southern part.
Table:-2.20, Proximate Analysis - I
Parameters No. of BHS
considered
Range Remarks
Minimum Maximum
Moisture % 113 4.92 9.5
Ash % 113 7.2 40.36
VM % 40 24.9 38.9
FC % 40 34.0 54.4
UHV (kcal/kg) 113 2614 7118
Grade 113 F A Predominant
grade A to B.
G.C.V (kcal/kg) 36 5227 6624
Long flame
characteristics of coal
group
6 B5 B5
Table:-2.21, Ultimate Analysis in % - I
Parameters % No. of BHs
considered
Range
Minimum Maximum
Carbon 9 51.9 80.4
Hydrogen 9 3.1 4.9
Nitrogen 9 1 1.6
Sulphur 9 0.3 0.6
Oxygen 5 9.1 12.7
VM % (dmmf) 1 36.1 ---
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 56
Parameters % No. of BHs
considered
Range
Minimum Maximum
CV (Kcal/kg) (dmmf) 30 7648 7895
Hard Grove Index (HGI)
The value of HGI in one bore hole only is 43.
Ash Fusion Temp. Range (oC) No. of B H Range
i. Initial Deformation Temperature (I.D.T) 7 1060 to >1400
ii. Hemi spherical Temperature (H.T.) 7 1180 to >1400
iii. Flow Temperature (F.T) 7 1200 to >1400
2.16 Summary of seam parameters
Coal seam II (co-relatable with seam L5) is encountered in 168 bore holes in the
block. The seam is persistently developed in the southern part whereas L5 is not
developed. However it has attained mineable thickness in isolated patches. It in-crops
within the block.
In the southern part (Seam II of Bhatgaon-II) the thickness of the seam ranges from
0.02m to 2.61m. out of 106 bore holes intercepting the seam in the southern part seam
thickness of 0.90m and above have been recorded in 47 bore holes.
The total reserve of the block in the southern part (Bhatgaon-II) is 13.751 Mte
which includes proved reserve of 9.930 mte and indicated reserve of 3.821 Mte The grade
ranges from A to E. However, 96% of the reserve belongs to A to C grade. Coal reserve
in the northern part (Bhatgaon-II Extension) has not been estimated because of erratic
behavior of the seam as it is im-persistent and of less thickness.
Seam VII occurs above L5 with a parting range of 4.10m to 11.28m in the northern
part (Bhatgaon-II Extension) of the block. Its co-relatable seam is not seen in the southern
part of the block (Bhatgaon-II). It has been encountered in 18 bore holes only with a
thickness range of 0.02m to 0.63m. In view of this unworkable thickness and economic
insignificance no attempt has been made to assess the reserve of the seam.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 57
2.17 Seam III Bottom (Co-relatable with seam L6 in Bhatgaon Ext.)
This coal seam is moderately developed in the northern part of the block (Bhatgaon-II
Extension) as L6 whereas IIIBottom is not developed
Bore hole intersected – 133 nos.
Depth of intersection Roof Floor FRL
Shallowest 6.00m 6.40m 514.84m
Deepest 101.08m 101.80m 423.40m
Stratigraphic position
Seam L-6 (III Bottom) occurs below seam VIII (seam III Top in the southern part) and
above seam VII where as its equivalent, III bottom occurs above seam II in the southern
part.
Parting with underlying seam
Minimum- 14.85m (BT-1) Maximum - 40.29m (BT-66)
Seam thickness – The thickness of the coal seam ranges from 0.06m to 2.20m.
In-crop The seam in-crops within the block in the northern and south - western parts.
Roof & floor The roof is represented by medium to coarse grained sandstone and the
floor is represented by shale and sandy shale.
Dirt bands The coal seam occurring in the northern part is devoid of any dirt bands.
However, only one band ranging in thickness from 0.03m to 0.10m is seen a few bore
holes in the southern part.
Table:-2.22, Proximate analysis - II
Parameters No. of BHS
considered
Range Remarks
Minimum Maximum
Moisture % 41 6.80 9.20
Ash % 41 9.80 21.10
VM % 41 27.60 32.30
FC % 41 37.30 49.50
UHV (kcal/kg) 41 5024 6429
Grade 41 C A Mostly A
G.C.V (kcal/kg) 41 4990 6453
Long flame 13 B4 B5 B5
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 58
Table:-2.23, Ultimate Analysis -II
Parameters No. of BHs
considered
Range %
Minimum Maximum
Carbon 7 51.00 79.60
Hydrogen 7 2.90 5.10
Nitrogen 7 1.00 1.70
Sulphur 7 0.30 0.50
Oxygen 7 5.70 13.70
Total sulphur 1 0.60 ---
VM % (dmmf) 10 35.80 40.40
CV (Kcal/kg) (dmmf) 39 7555 7861
Hard Grove Index (HGI)
The HGI ranges from 45 to 48 as determined in two boreholes.
Ash Fusion Temp. No. of BHs Range (oC)
i. Initial Deformation Temperature (I.D.T) 4 1120 to >1400
ii. Hemi spherical Temperature (H.T.) 4 >1400
iii. Flow Temperature (F.T) 4 >1400
Table: - 2.24, Ash Analysis (Constituents %) - II
BH no. SiO2 Al2O3 Fe2O3 TiO2 P2O5 SO3 CaO MgO Mn3O4 Alkby
dif
BT-18 63.43 27.91 4.82 1.75 0.05 0.48 1.04 0.65 --- 0.87
CBBT-
51
56.56 23.59 10.43 2.00 0.48 0.17 4.14 1.45 0.04 1.14
2.18 Summary of seam parameters
i. Coal seam L6 (co relatable with IIIB in Bhatgaon-II in the southern part of the
block) has been intersected in 133 bore holes within the entire block. Although it
is a persistent seam, it attains workable thickness in some area in the northern
part and in isolated bore holes / patches in the southern part of the block. The
coal seam is in-crops within the block.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 59
ii. The thickness of the seam ranges from 0.06m to 2.20m and the predominant
thickness ranges from 0.50m to 1.20m.
The coal reserve of the seam has been calculated for the northern part (Bhatgaon-II
Extension) of the block only. The reserve calculation for the southern part (Bhatgaon-II)
has not been done due to poor development of the seam. The total coal reserve of the
seam (L6 in the northern part) is 7.089 Mte which includes 6.889 Mte of proved reserve
and 0.200 Mte of indicated reserve.
The grade of the coal ranges from A to C out of which about 76% of reserve is of B
grade.
Seam III Top (Co relatable with seam VIII )
It is the most important and persistent seam in the block and attains workable thickness
over major part of the area.
Bore hole intersected – 143 nos.
Depth of intersection Roof Floor FRL
i) Shallowest - 6.80m 7.60m 525.56m
ii) Deepest - 96.90m 97.93m 427.27m
Stratigraphic position
Seam IIITop (VIII) is the top most seam. Seam VIII occurs above the seam L6 and
below L7
Parting with underlying seam
Minimum - 1.76m Maximum - 9.06m
Seam thickness – The thickness range is from 0.29m to 3.50m. The most prevalent range
is from 1.50m to 2.50m.
In-crop - The seam in-crops within the block.
Roof & floor The roof is represented by medium to coarse grained sandstone and the
floor is represented by shale and sandstone.
Dirt bands Three dirt bands ranging in thickness 0.05m to 0.33m are seen in a few bore
holes within the block.
Table: - 2.24, Proximate analysis -II
Parameters No. of BHS
considered
Range Remarks
Minimum Maximum
Moisture % 131 5.0 9.42
Ash % 131 9.88 43.6
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 60
Parameters No. of BHS
considered
Range Remarks
Minimum Maximum
VM % 71 17.2 40.3
FC % 71 33.7 54.5
UHV (kcal/kg) 131 2124 6268
Grade 131 G A mostly grade E - B
G.C.V (kcal/kg) 66 3580 5864
Long flame 29 B5 B4 Predominant B4
Table: - 2.25, Ultimate Analysis - II
Parameters No. of BHs
considered
Range %
Minimum Maximum
Carbon 20 41.6 81.3
Hydrogen 20 2.2 5.0
Nitrogen 20 0.8 1.7
Sulphur 20 0.2 0.7
Oxygen 13 5.3 10.3
Total sulphur 1 --- 0.5
VM % (dmmf) 24 27.6 39.1
CV (Kcal/kg) (dmmf) 61 7362 7751
Table: - 2.26, Hard Grove Index (HGI) - II
Area No. of BHS
considered
Seam
thickness
Sample Range
Minimum Maximum
Northern part
of the block
11 1.25m to
2.70m
Bcs / I30 39 55
Ash Fusion Temp. Range (oC) No. of BH Range
i. Initial Deformation Temperature (I.D.T) 17 1080 to >1400
ii. Hemi spherical Temperature (H.T.) 17 >1400
iii. Flow Temperature (F.T) 17 >1400
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 61
Table: - 2.27, Ash Analysis (Constituents %) -III
BH no. SiO2 Al2O3 Fe2O3 TiO2 P2O5 SO3 CaO MgO Mn3O4 Alk.
diff
BT-18 61.20 28.04 4.90 1.81 0.04 0.05 1.32 1.17 --- 1.02
CBBT-
25
62.56 27.82 1.71 2.00 0.32 0.14 2.46 2.01 0.01 0.97
CBBT-
68
59.44 24.83 6.00 1.50 0.42 0.41 4.70 1.45 0.03 1.22
CBBT-
75
61.14 24.71 6.43 2.00 0.31 0.17 2.46 0.88 0.03 1.87
CBBT-
105
63.22 21.96 6.28 1.50 0.26 0.20 2.80 2.01 0.03 1.87
2.19 Summary of seam parameters
i. Coal seam VIII (co relatable with III Top in the Bhatgaon-II in southern part of the
block) is quite persistent and developed within the block. It is in-crop in the southern
and central parts of the block. It has been intersected in 143 nos of bore holes within the
block.
ii. The thickness of the seam ranges from 0.29m to 3.50m. In 129 boreholes the thickness
of the coal seam is found to be more than 0.90m.
III. The total coal reserve of the seam is 40.714 Mte which includes 40.116 Mte of
proved reserve and 0.598 Mte of indicated reserve. The grade of coal ranges from G to A.
However 91% of coal reserve comes within C, D & E grade.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 62
2.20 Other local seams in Bhatgaon Ext.
Besides the aforesaid coal seams, there are 5 younger coal seams/ sections (L7
bottom , L7 top, L8, IX bottom & IX top) which have developed in the northern part
(Bhatgaon-II Extension) of the allotted coal block. Because of their im-persistency, low
thickness etc the reserve estimate has not been done. Brief description of these coal
seams is as follows:
Table: - 2.28, Local seams in Bhatgaon Ext
Name of
the seam
No of holes
intersecte
d
Thickness
range m
Dirt band
thickness m
(nos)
No. of holes
where seam
+0.9 m thick
Av grade
of coal
IX Top 5 0.38 -- 0.85 (2) Nil F/G
IX Bottom 08 0.4 – 5.08 0.2 – 0.5(4) 3 E
L8 24 0.15 – 1.7 ---------- 5 D
L7 Top 34 0.05 – 1.3 0.06–
0.10(1)
5 D
L7 Bottom 46 0.05 – 2.0 0.15 m(1) 12 C
2.21 COAL RESERVE
Coal reserves are estimated for L1, II and III Top of southern part and VI, L6 and
VIII in the northern part by MECL and CMPD Iand according to GR prepared by these
organizations reserves are as follows:
Seam wise and grade wise coal reserve in Shankarpur (Bhatgaon-II) & extension
coal block.
Table: - 2.29, Coal Reserve in Shankarpur (Fig. Mte)
A. Bhatgaon-II (Southern part) B. Bhatgaon-II Ext.(Northern part) Grand total (A + B)
Gr.
Coal seams Total
(A)
Coal seams Total
(B) III T II L1 VIII L6 VI
A --- 2.31
(0.86)
0.31 2.62
(0.86)
--- 0.70 8.10
(0.51)
8.80
(0.51)
11.42
(1.37)
B 2.12 4.97
(2.77)
3.08 10.17
(2.77)
--- 5.19
(0.20)
1.75
(0.63)
6.94
(0.83)
17.11
(3.60)
C 4.53 2.10
(0.19)
1.99 8.62
(0.19)
1.80
(0.13)
1.01 0.18 2.99
(0.13)
11.61
(0.32)
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 63
A. Bhatgaon-II (Southern part) B. Bhatgaon-II Ext.(Northern part) Grand total (A + B)
Gr.
Coal seams Total
(A)
Coal seams Total
(B) III T II L1 VIII L6 VI
D 9.89 0.40 1.58 11.87 11.02
(0.46)
--- 0.03 11.05
(0.46)
22.92
(0.46)
E 5.09 0.15 0.42 5.66 4.10
(0.01)
--- --- 4.10
(0.01)
9.76
(0.01)
F 0.69 --- --- 0.69 0.83 --- --- 0.83 1.52
G --- --- --- --- 0.04 --- --- 0.04 0.04
22.32
---
9.93
(3.82)
7.38
---
39.63
(3.82)
17.79
(0.60)
6.90
(0.20)
10.06
(1.13)
34.75
(1.93)
74.38
(5.75)
Total 22.32 13.75 7.38 43.45 18.39 7.10 11.19 36.68 80.13
Figures in the parenthesis are indicated reserves, rest are proved reserves.
In the northern part of the block (Bhatgaon Extension) for reserve estimation,
minimum thickness of the coal seam has been taken as 0.50m. The total reserve within
the seam thickness of 0.50m to 0.90m is 6.502 Mte in the GR. In the southern part
(Bhatgaon-II) the reserve estimation in the GR has been done based on the seam
thickness of 0.90m and above
Note:
1. The coal seams III Top/VIII, II and L6 are in-cropping.
2. Seams are thin and their extents are inconsistent.
3. The 8.11% and 20.81% reserves are in 0.5 to 0.9m and 0.9 to 1.2m thickness area
respectively.
4. There are total fourteen faults F1 to F14 with throw ranging from 5m to 45m
5. From the above it may be concluded that the property is neither good for opencast, nor
for underground.
However, with conservation aspect in mind, the best option, as proposed in the mining
plan, is to work with four quarries and one underground mine.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 64
2.22 Geo-mining Parameters
The geological parameters of coal seams considered for reserve and mining in geological
report are as follows:-
Total block area = 33.63 sq.km
Total geological reserve = 80.13Mte
Coal reserves per sq. km = 2.4Mte(approx)
Total extractable reserve = 55.15 Mte
Vol. of OB to be removed = 924.43 Mcum
Average stripping ratio = 16.76 cum/Te of coal
Target capacity = 2 MTPA
Life of mine = 32 years
2.23 Workable seams its thickness, depth etc. are as follows:
Table :- 2.30,Workable seams, Thickness and Depth
Bhatgaon-II Bhatgaon Extn.
Seam/
Parting Thickness
Range in m
Depth
Range in
metres
Seam/
Parting
Thickness
Range in
metres
Depth
Range in
metres
III Top 0.45---2.93 8 --- 62 VIII 0.29---3.5 7---97
Parting 17.15—49.49 Parting 1.79---9.06
II 0.02----2.61 14---95 L6 0.06---2.20 6---102
Parting 10.51---33.08 Parting 40.53---67
L1 0.3----1.84 46---115 VI 0.03---2.0 44---134
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 65
CHAPTER – 3
SOCIO-ECONOMIC STATUS
OF
THE PROJECT AFFECTED PEOPLE
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 66
CHAPTER III
SOCIO-ECONOMIC STATUS OF THE PROJECT AFFECTED PEOPLE
The district Surguja has ample resources including; Land, Water, Forest, Animals to
support the socio-economic fabric of the area. The socio-economic status of the particular
villages, where project is proposed is stated on the basis of primary and secondary data
collected. These data will also act as a base line data to assess and monitor the economic
progress and livelihood level of the project affected people.
Assessment of the strengths and weaknesses in their existing socio-economic set
up would form the basis of formulating an appropriate rehabilitation plan.
(Corresponding to Section 1.6 Annex -2 of CG Model R&R Policy -2005)
3.1 SURVEY METHODOLOGY
A 100% socio-economic survey was conducted in all 9 project-impacted villages
viz., Shankarpur, Mohanpur, Songara, Bojha, Dharampur, Shakalpur, Koteya, Mayapur
and Tulsi. The land use survey was also conducted in these villages. To collect the
primary data a form is designed as per the project specific need. The form consists of
Table, Text and Questionnaire.
After collecting the data in each village, group discussion with project affected
people was organized to find out the data related to community and to sample cross
check, the data collected during the household survey. Apart from this these group
discussions were taken as a tool for identifying their present situation in order to assess
their needs and priorities. The survey was conducted in between August 09 and November
09.
3.2 SOCIAL STATUS OF THE PROJECT AFFECTED AREA
3.2.1 DEMOGRAPHY
The population density in the study area is 2.44 persons per Ha. The male
population constitutes 53 %. There are average 907 females per 1000 males. SC
percentage is 10 while ST constitutes bulk of population 51%. OBC are only 22%. The
average literacy is 36.13%, which is quite low. The literacy among women is still poorer at
29.74%. The demographic profile of the affected villages is given in Table 3.1
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 67
3.2.2 HOUSE HOLDS IN PROJECT AREA
The village Songara has highest number of House Holds in the project area while
Shankarpur has lowest. The comparative details of other villages are as under.
Chart: - 3.1, Number of House Holds in Project Area
Source: Socio-Economic Survey by LNC, August 09 to November 09
The village wise population details are tabulated as under;
Table: - 3.1, Demographic Profile of Project Affected Villages
Village Female Male Total Sex Ratio
1 2 3 4 5
Mayapur 515 596 1111 864
Bojha 879 1071 1950 821
Songara 1217 1354 2571 899
Mohanpur 425 429 854 991
Shankarpur 220 213 433 1033
Kotaya 883 954 1837 926
Sakalpur 798 827 1625 965
Tulsi 907 1037 1944 875
Dharampur 421 531 952 793
Total 6265 7012 13277 893
Source: Socio-Economic Survey by LNC, August 09 to November 09
Mayapur Bojha Songara Mohanpur Shankarpur Kotaya Sakalpur Tulsi Dharampur
Series1 287 442 509 170 105 467 387 380 242
0
100
200
300
400
500
600
Axi
s Ti
tle
NUMBER OF HOUSEHOLDS IN PROJECT AREA
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 68
The status of social fabric in terms of population in number is given in the following
table;
Table: - 3.2, Affected Population
Village General OBC SC ST Total
Nos. % Nos. % Nos. % Nos. % Nos. %
Maya 162 15% 0 0% 50 5% 899 81% 1111 100%
Bhoja 480 25% 437 22% 426 22% 607 31% 1950 100%
Songara 534 21% 86 3% 421 16% 1530 60% 2571 100%
Mohanpur 28 3% 201 24% 9 1% 616 72% 854 100%
Shankarpur 19 4% 10 2% 0 0% 404 93% 433 100%
Kotaya 640 35% 353 19% 230 13% 614 33% 1837 100%
Sakalpur 345 21% 892 55% 50 3% 338 21% 1625 100%
Tulsi 34 2% 613 32% 150 8% 1147 59% 1944 100%
Dharampur 56 6% 258 27% 10 1% 628 66% 952 100%
Source: Socio-Economic Survey by LNC, August 09 to November 09
The villages coming within the project area have major inhabitants belonging to ST
category i.e. 51% of the whole population. The population of OBC is next to ST i.e. 22%.
SC are only 10% in the project area. General category people are mere i.e. 17%. Extent of
population of different category can be adjudged through the following pie chart.
Chart: - 3.2, Affected Villages Population
Source: Socio-Economic Survey by LNC, August 09 to November 09
GENERAL17%
OBC22%
SC10%
ST51%
POPULATION IN PROJECT AFFECTED VILLAGES
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 69
Comparative details of project affected population
Chart: - 3.3, Details of Social group Matrix of Affected Population
Source: Socio-Economic Survey by LNC, August 09 to November 09
The status of people residing in village grouped in to families in the project affected
area is tabulated and comparative status is shown in the following bart chart.
Chart: - 3.4, Social group Affected Families
Source: Socio-Economic Survey by LNC, August 09 to November 09
899
607
1530
616
404
614
338
1147
628
50
426 421
9 0
230
50150
100
437
86201
10
353
892
613
258162
480534
28 19
640
345
34 56
0
200
400
600
800
1000
1200
1400
1600
1800
NU
MB
ER
S
VILLAGES
DETAILS OF SOCIAL GROUP MATRIX OF AFFECTED POPULATION
Scheduled tribe Scheduled cast OBC General
BojhaDharamp
urKoteya Mayapur
Mohanpur
sakalpurshankarp
urSongara Tulsi
OBC 92 57 86 34 207 2 17 117
Other 118 27 160 48 4 82 4 99 8
SC 94 1 56 12 3 11 86 32
ST 138 157 165 227 129 87 99 307 223
Grand Total 442 242 467 287 170 387 105 509 380
0
100
200
300
400
500
600 SOCIAL GROUP OF AFFECTED FAMILIES
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 70
The village wise destitute and dependents in the project impacted area is shown in
the following bar chart along with the detail table
Chart: - 3.5, Destitute and Dependents
Source: Socio-Economic Survey by LNC, August 09 to November 09
Out of total destitute and dependents 56% are disables/infirm and rest 44% are
unsupported destitute. The graphical representation is given in the following pie chart.
Chart: - 3.6, Destitute and Dependents in %
Source: Socio-Economic Survey by LNC, August 09 to November 09
The average sex ratio in the project area in terms of % is 53% male and rest 47% is
female. The extent is depicted through following chart.
Mayapur Bojha SongaraMohanp
urShankarp
urKotaya Sakalpur Tulsi
Dharampur
Total
Unsupported destitutes 0 0 15 4 0 0 3 10 5 37
Disabled / infirm 1 2 10 4 1 8 4 8 10 48
0
10
20
30
40
50
60
NU
MB
ER
DESTITUTES AND DEPENDENTS
Unsupported destitutes
44%
Disabled / infirm56%
DESTITUTE AND DEPENDANTS IN %
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 71
Chart: - 3.7, Project Affected People, Average Sex Ratio in %
Source: Socio-Economic Survey by LNC, August 09 to November 09
3.2.3 Literacy and Education Status
Literacy levels in the project-impacted villages are quite low as compared to the
state (65.18%) and national average (65.38%). Educational status is poor in the villages.
The Socio-Economic Survey of the villagers revealed that 18% of the people were
educated only up till the primary levels, 11% up till the middle leveli and 4% have
completed only High School level i.e. 10th level of schooling. 2% have reached up to 12th
level of education known as higher secondary. Only 1% people in the Project Area are
graduate. The people do not have access to any technical or professional training that can
help them to get other jobs. There is awareness about print media such as newspapers.
There are 20 subscribers of News Paper in Sonagara village and no subscriber in any
other village within project affected area.
The following bar chart reveals that illiteracy level is less in the age group below
than 18 years. This is gradually increasing in the higher age group. It gives an impression
47%
53%
PROJECT AFFECTED PEOPLE : AVERGE SEX RATIO IN %
Total
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 72
that people are becoming more aware on the education and literacy rate is going to
improve gradually in future.
Chart: - 3.8, Illiteracy Level in Age Group Wise
Source: Socio-Economic Survey by LNC, August 09 to November 09
The following graph results that maximum extent of population is educated up to
primary level only. Gradually extent of education level is decreasing from Middle to
Graduate level. They need awareness on the benefit of higher education.
M F Total M F Total M F Total M F Total M F Total
< 18 yrs 18 to 25 yrs > 25 to 35 yrs > 35 to 50 yrs > 50 yrs
27 16 43 31 5 36 16 2 18 4 0 475 66 141
13150 181 64
19 83 52 9 61 14 3 1713 7 20
100
53153
50
1666 28
8 36 3 1 4
290 261 551
276
209
485204
75
27999
27126 29
7 36
677 606 1283
189
213
402
233
121
354202
72
274 127
17
144
360 343 703
410
7071117
650
898
1548977
9351912 550
4841034
1131 1035 2166
0 0 0 0 0 0 0 0 0 0 0 0
AGE GROUP WISE LITERACY IN NUMBER
Graduation High School Higher Sc Middle Primary Illiterate Unknown
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 73
Chart: - 3.9, Illiteracy Level in numbers
Source: Socio-Economic Survey by LNC, August 09 to November 09
Literacy in whole population of project affected area in terms of % and extent is
depicted in the following pie chart.
Chart: - 3.9, Illiteracy Level in %
Source: Socio-Economic Survey by LNC, August 09 to November 09
M F Total
Total
78 23 101336 147 483194 85 279898
579 1477
14281029
2457
29473367 6314
1131 1035 2166
LITERACY IN NUMBER
Graduation High School Higher Sc Middle Primary Illiterate Unknown
Graduation1%
High School
4%Higher Sc
2% Middle 11%
Primary18%
Illiterate48%
Unknown16%
LITERACY IN %
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 74
The above piechart explains the population of literacy in terms of % where the
population of illiterates is 48% and the graduates are 1%. The chart further reveals that
the 18% people residing in project affected area are educated up to primary level, like wise
11% up to Middle level, 4% up to High School level, 2% up to Higher secondary level and
only 1 % are up to Gradauation level. The education level of 16% population is unknown
because, they are under age or non respondent.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 75
Village wise and age class wise education level in number is tabulated in the following table.
Table: - 3.3, Educational Profile
Education Level/
Villages < 18 yrs 18 to 25 yrs > 25 to 35 yrs > 35 to 50 yrs > 50 yrs Total
M F T M F T M F T M F T M F T M F T
Mayapur
Graduation 1 1 1 0 1
Illiterate 24 38 62 47 91 138 84 105 189 107 57 164 33 19 52 295 310 605
Primary 88 69 157 31 22 53 7 7 14 6 2 8 1 1 133 100 233
Middle 15 18 33 22 17 39 11 3 14 3 3 51 38 89
High 3 3 6 7 1 8 2 2 5 5 1 1 18 4 22
Higher Sc 6 6 3 1 4 3 1 4 1 1 13 2 15
Unknown 85 60 145 85 60 145
Sub-Total 215 188 403 113 131 244 108 116 224 124 60 184 36 19 55 596 514 1110
Bojha
Graduation 6 4 10 10 1 11 4 1 5 20 6 26
Illiterate 24 21 45 33 64 97 53 103 156 102 137 239 67 75 142 279 400 679
Primary 123 106 229 32 54 86 61 41 102 49 24 73 40 7 47 305 232 537
Middle 64 63 127 67 37 104 42 25 67 32 6 38 10 1 11 215 132 347
High 19 9 28 32 4 36 18 7 25 23 5 28 6 2 8 98 27 125
Higher Sc 3 1 4 18 8 26 14 3 17 10 10 1 1 46 12 58
Unknown 108 70 178 108 70 178
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 76
Education Level/
Villages < 18 yrs 18 to 25 yrs > 25 to 35 yrs > 35 to 50 yrs > 50 yrs Total
M F T M F T M F T M F T M F T M F T
Sub-Total 341 270 611 188 171 359 198 180 378 220 173 393 12
4 85 209 1071 879 1950
Songara
Graduation 1 1 7 11 18 6 3 9 7 7 3 3 24 14 38
Illiterate 51 55 106 90 138 228 143 190 333 201 170 371 12
4 95 219 609 648 1257
Primary 91 79 170 21 28 49 36 25 61 27 16 43 22 3 25 197 151 348
Middle 52 29 81 43 25 68 28 7 35 15 7 22 5 4 9 143 72 215
High 6 8 14 23 18 41 12 4 16 10 10 3 3 54 30 84
Higher Sc 2 1 3 21 16 37 10 3 13 3 4 7 1 1 37 24 61
Unknown 290 278 568 290 278 568
Sub-Total 493 450 943 205 236 441 235 232 467 263 197 460 15
8
10
2 260 1354 1217 2571
Mohanpur
Graduation 1 1 1 0 1
Illiterate 18 20 38 20 36 56 29 50 79 64 74 138 22 26 48 153 206 359
Primary 45 38 83 18 22 40 10 1 11 12 6 18 5 5 90 67 157
Middle 29 30 59 9 9 18 11 3 14 4 1 5 3 3 56 43 99
High 12 16 28 10 3 13 7 7 4 4 33 19 52
Higher Sc 11 4 15 1 1 4 4 15 5 20
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 77
Education Level/
Villages < 18 yrs 18 to 25 yrs > 25 to 35 yrs > 35 to 50 yrs > 50 yrs Total
M F T M F T M F T M F T M F T M F T
Unknown 81 85 166 81 85 166
Sub-Total 185 189 374 69 74 143 57 55 112 88 81 169 30 26 56 429 425 854
Shankarpu
r
Illiterate 5 10 15 7 14 21 15 27 42 28 33 61 20 24 44 75 108 183
Primary 21 27 48 13 7 20 8 8 12 2 14 8 1 9 62 37 99
Middle 12 16 28 10 9 19 6 2 8 2 2 1 1 31 27 58
High 1 2 3 3 2 5 1 1 1 1 6 4 10
Higher Sc 1 1 1 0 1
Unknown 38 44 82 38 44 82
Sub-Total 77 99 176 33 32 65 31 29 60 43 35 78 29 25 54 213 220 433
Kotaya
Graduation 3 3 4 1 5 1 1 2 1 1 9 2 11
Illiterate 43 45 88 43 67 110 69 115 184 126 139 265 73 85 158 354 451 805
Primary 133 128 261 26 26 52 31 15 46 29 8 37 17 4 21 236 181 417
Middle 45 41 86 26 33 59 42 15 57 17 6 23 3 3 133 95 228
High 16 12 28 22 12 34 13 13 4 2 6 4 1 5 59 27 86
Higher Sc 1 4 5 22 4 26 8 1 9 2 2 1 1 33 10 43
Unknown 130 117 247 130 117 247
Sub-Total 368 347 715 142 142 284 167 147 314 179 156 335 98 91 189 954 883 1837
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 78
Education Level/
Villages < 18 yrs 18 to 25 yrs > 25 to 35 yrs > 35 to 50 yrs > 50 yrs Total
M F T M F T M F T M F T M F T M F T
Sakalpur
Graduation 2 2 3 3 5 0 5
Illiterate 31 40 71 56 101 157 65 93 158 102 87 189 62 58 120 316 379 695
Primary 91 89 180 17 20 37 24 14 38 25 3 28 10 2 12 167 128 295
Middle 40 39 79 41 36 77 35 9 44 10 2 12 1 1 2 127 87 214
High 12 7 19 19 3 22 9 3 12 3 3 43 13 56
Higher Sc 1 1 2 3 7 10 4 4 8 8 16
Unknown 161 183 344 161 183 344
Sub-Total 336 359 695 138 167 305 140 119 259 140 92 232 73 61 134 827 798 1625
Tulsi
Graduation 2 1 3 5 5 5 5 3 3 15 1 16
Illiterate 78 56 134 66 124 190 105 126 231 139 161 300 79 66 145 467 533 1000
Primary 63 60 123 27 27 54 43 15 58 33 9 42 23 23 189 111 300
Middle 27 22 49 43 33 76 18 6 24 11 4 15 5 1 6 104 66 170
High 4 4 8 11 4 15 1 5 6 2 2 4 18 15 33
Higher Sc 6 6 17 14 31 9 6 15 5 2 7 37 22 59
Unknown 207 159 366 207 159 366
Sub-Total 387 302 689 169 202 371 181 158 339 193 178 371 10
7 67 174 1037 907 1944
Dharampu
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 79
Education Level/
Villages < 18 yrs 18 to 25 yrs > 25 to 35 yrs > 35 to 50 yrs > 50 yrs Total
M F T M F T M F T M F T M F T M F T
r
Graduation 2 2 1 1 3 0 3
Illiterate 86 58 144 48 72 120 87 89 176 108 77 185 70 36 106 399 332 731
Primary 22 10 32 4 7 11 13 3 16 9 2 11 1 1 49 22 71
Middle 6 3 9 15 10 25 11 5 16 5 1 6 1 1 38 19 57
High 2 5 7 4 3 7 1 1 7 8 15
Higher Sc 2 2 1 1 2 1 1 2 4 2 6
Unknown 31 39 70 31 39 70
Sub-Total 147 115 262 73 92 165 115 98 213 124 81 205 72 36 108 531 422 953
Total 2549 231
9
486
8
113
0
124
7
237
7
123
2
113
4
236
6
137
4
105
3
242
7
72
7
51
2
123
9 7012 6265 13277
Source: Socio-Economic Survey by LNC, August 09 to November 09
M – Male; F – Female; T – Total.
1. Primary level refers schooling up to class V. 2. idle level refers to schooling up to class VIII. 3. Metric level refers to schooling up to
class X. 4. Unknown figure is 2166 against a total of 13,277 corresponds to children who‘s age up to 10 yrs.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 80
3.2.4 Occupational Profile
Type of Occupations
Occupations other than cultivation are also being practiced in the villages. The
number of persons involved in various occupations is listed in table 3.4
Table :- 3.4, Number of Persons Involved In Different Occupations
Occupation Mayapur Bojha Songara Mohanpur Shankarpur Kotaya Sakalpur Tulsi Dharampur Total
Agriculture 289 321 423 164 72 374 275 307 151 2376
Business 1 31 12 1 1 8 33 1 2 90
Service 3 18 24 3 0 7 9 16 2 82
Others 2 91 58 4 35 82 73 68 88 501
Grand Total 295 461 517 172 108 471 390 392 243 3049
Source: Socio-Economic Survey by LNC, August 09 to November 09
The analysis of occupation pattern through the follwing graph reveales that main
occupation is agriculture. Very few people are self employed in business taking advantage
of strategic location of their village on the main road or linkage with remote area. The
people of village Bojha, Songara and Sakalpur are doing buisiness ahead to other villages
and a quite satisfacoty number of prople are in Service from Bojha, Songara and Tulsi.
The following graph explains about occupation practises in Mayapur ,Bojha,
Songara, Mohanpur, Shankarpur, Kotaya, Sakalpur, Tulsi and Dharampur villages .The
maximum number of people in the the villages are involved in agriculture.The villagers are
also involved in otherfields like bussiness, service and other activity for their livelihood.
The villages that are actively participating in agriculture are Songhara , Kotaya, Bojha and
Tulsi. The second occcupation is bussiness in which Sakalpur, Bojha ,Songara are more
active. The service is in the third order and the people of Songara, Tulsi ,Bojha are far
ahead than rest of the project affected villages. There are not any family earning from
service in Shankarpur village.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 81
The Shankarpur village has least people involoved in agriculutre sector. There is less
buisiness oportunity in mayapur, mohanpur, shankalpur and tulsi being situated in the
remote area.
Chart: - 3.10, Persons Occupations
Source: Socio-Economic Survey by LNC, August 09 to November 09
Chart: - 3.10.1, OCCUPATION PATTERN
Source: Socio-Economic Survey by LNC, August 09 to November 09
PERSONS OCCUPATIONS
289321
423
164
72
374
275307
151
131 12 1 1 8
331 23 18 24
3 0 7 9 16 21
050
100
150200250300
350400450
May
apur
Bojha
Son
gara
Moh
anpu
r
Sha
nkar
pur
Kot
aya
Sak
alpu
r
Tulsi
Dha
ram
pur
VILLAGES
NU
MB
ER
S
Agriculture Business Service Others
Mayapur
Bojha SongaraMohan
purShankar
purKotaya
Sakalpur
TulsiDharam
purAVERA
GE
Agriculture 97.97 69.63 81.82 95.35 66.67 79.41 70.51 78.32 62.14 77.98
Business 0.34 6.72 2.32 0.58 0.93 1.70 8.46 0.26 0.82 2.46
Service 1.02 3.90 4.64 1.74 0.00 1.49 2.31 4.08 0.82 2.22
Others 0.68 19.74 11.22 2.33 32.41 17.41 18.72 17.35 36.21 17.34
0.00
20.00
40.00
60.00
80.00
100.00
120.00
OC
UP
ATI
ON
%
OCCUPATION IN %(WITHIN ALL SECTOR OF OCCUPATION)
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 82
The above graph displays the occupation pattern in the village. The chart 3.10
narates about the number of persons in a particular occupation within project affected
villages, while the chart 3.10.1 displys about the percentage of people involoved in the
particular type of occupation within village. Comparision of both generates interesting
results like: in agriculture sector number of people involved is highest in Songara village
but the % of people is highest at Mayapur village.
The Chart no. 3.10.1 creates the base line for occupational pattern in the project
affected area.
Chart: - 3.11, Persons Occupations in %
Source: Socio-Economic Survey by LNC, August 09 to November 09
The above pie chart explains about the people involvement in occupation practices
in the villages in terms of % among all the project affected villages. The village Songara
has highest share (16%) and ahead to kotaya(15%) and Bojha. The village Dharampur
shows the persons occupation 8% which is comparatively less than Mayapur that is 10%.
Tulsi and Sakalpur have equal share i.e. 13%. The people of Shankarpur and Mohanpur
villages are at the last in series having people occupation 4% and 6% respectively.
The share of villages in occupation is almost in tune to the size of population except
the villages situated in remote area, lacking educational and linkage facility in comparison
to other project affected villages.
PERSONS OCCUPATIONS IN % Mayapur
10%Dharampur
8%Tulsi
13%
Sakalpur
13%
Kotaya
15%Shankarpur
4%
Mohanpur
6%
Bojha
15%
Songara
16%
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 83
3.2.5 Cultivation Practices
Agriculture being the dominant activity in the villages, a brief profile of the cultivation
practices has been presented below. Cultivation is done in both the seasons i.e. Rabi and
Kharif subject to availability of rainwater or irrigation facilities. Table 3.5 shows the major
crops that are grown in the villages. Rice is the most favoured crop in either season.
Focused group discussion with the people revealed that the pattern and quantity of rains
control the productivity and yield of the crops.
Table: - 3.5, Cultivation Practices in Project Impacted Villages
Desc
rip
tio
n
Mayapur
Bojh
a
Son
gara
Moha
np
ur
Sha
nkarp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Average Wage Rate in Rs./Day
90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00
Kharif Crops in Quintal /anum
1866 2652 3054 1020 630 2400 2280 1460 3040 18402
Rabi Crops in Quintal / anum
229 353 407 136 84 309 304 193 373 2388
Average Fertilizer use in quintal / anum
450 180 450 140 140 860 325 300 100 2945
Average Pesticide use Liters / anum
15 5 14 5 5 21 8 8 3 84
Source of irrigation
Rain water
Rain water
Rain water
Rain water
Rain water
Rain water
Rain water
Rain water
Rain water
Rain water
Source: Group Discussions with villagers,by LNC, Oct 2009
Note : - General practice in villages is payment of Rs 60-70 in cash & Rest is paid in terms
of Food.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 84
3.2.6 Supplementary income sources
Other small activities are practiced in the villages that are either seasonal or all
around the year as supplementary income sources. Such activities include:
1) Collection of Tendu Patta.
2) Collection of leaves for pattal making
3) Livestock rearing for sale of eggs, chicken, meat and milk.
4) Sale of Mahua flowers (Rs. 4-5/kg) (sold in haat)
5) Sale of sal seed (Rs 3-4/kg) (hot weather only) 10-12 kg/ season (sold in
haat)
3.2.7 Livestock rearing
Table 3.6 gives the village wise details of livestock rearing information collected
through group discussion from villagers.
Table: - 3.6, Livestock Rearing In Project Impacted Villages
De
sc
rip
tio
n
Ma
yap
ur
Bo
jha
So
ng
ara
Mo
ha
np
ur
Sh
an
karp
ur
Ko
taya
Sa
kalp
ur
Tuls
i
Dh
ara
mp
ur
To
tal
A. Livestock
Cows in Number 100 400 800 50 100 150 100 500 500 2700
Buffaloes in Number 20 50 125 5 100 60 50 100 60 570
Poultry in Number
100 300 100 100 200 40 150 4000 5000 9990
Sheep and Goats in Number
200 200 700 150 150 100 200 1200 800 3700
Pigs in Number
0 50 0 0 0 0 0 0 0 50
B. Milk (Avg)
Production (lit/day
/animal) 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
Sale price, Rs./ Kg 20 20 20 20 20 20 20 20 20 20
Fish
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 85
De
sc
rip
tio
n
Ma
yap
ur
Bo
jha
So
ng
ara
Mo
ha
np
ur
Sh
an
karp
ur
Ko
taya
Sa
kalp
ur
Tuls
i
Dh
ara
mp
ur
To
tal
ProductionKg/annum
100. 1000 1100
Sale price Rs. /Kg 60 60 60
Meat
Production(Kg)
4… 4…. 8… 3…. 3.5…. 2…. 4… 30…. 20… 78.5
Sale price /Kg
Rs.200 Rs.200 Rs.200 Rs.200 Rs.180 Rs.200 Rs.200 Rs.190 Rs.160 Rs.190
Source: Group Discussions with villagers,by LNC Oct 2009
The data is based on group discussion only. Actual counting of live stock has not
been done. Eggs neither sold in villages nor demanded by the villagers on price. The
products of livestock‘s are not marketed on regular basis. It is occasionally purchased /
sold at the time of festival etc.
3.2.8 Income
Despite having main and subsidiary occupations, the average income earned by the
villagers is very low. It can be seen from table 3.7. Most of the families earn approximately
Rs. 2000-3000 / month. The expenditure is close to the same amount leaving no scope for
saving. Seasonal nature of all occupation is the primary reason for such low incomes.
Table: - 3.7, Income Levels in Project Affected Villages
Number of households
Village Annual income
Mayapur Bojha Songara Mohanpur Shankarpur
Kotaya Sakalpur Tulsi Dharampur
Total
less than Rs. 10,000 61 64 28 41 1 101 71 1 12 380
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 86
Number of households
Village Annual income
Mayapur Bojha Songara Mohanpur Shankarpur
Kotaya Sakalpur Tulsi Dharampur
Total
Rs. 10,000 & above but less than 50,000
224 357 461 126 103 353 309 376 219 2528
Rs. 50,000 & above but less than 100,000
2 21 15 3 1 5 7 2 8 64
Above Rs. 100,000 0 0 5 0 0 8 0 1 3 17
Total 287 442 509 170 105 467 387 380 242 2989
Source: Socio-Economic Survey by LNC, August 09 to November 09
Chart: - 3.11, Income Levels
Source: Socio-Economic Survey by LNC, August 09 to November 09
61 6428 41
1
10171
1 12
224
357
461
126103
353
309
376
219
221 15 3 1 5 7 2 8
0
50
100
150
200
250
300
350
400
450
500
NU
MB
ER
of
ho
uselh
old
VILLAGES
INCOME LEVEL
<10000 10001-50000 50001-100000 >100000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 87
The above graph reveals the income levels of the number of household in the
project affected area. The average income earned by the villagers is very low due to
seasonal occupation.The maximum number of families earning more than 10000 and up to
50000 are from the village Songara. The number of people in the villages whose income
is less than Rs. 10000, First Block are 380 among which the maximum number of people
are from Kotaya and Sakalpur and the lowest number of household are from
Tulsi,Shankarpur and Dharampur.In the Second Block of income,the number of household
are 2528 among which the high number of households are from Songara, Tulsi, and
Kotaya and the lowest number of household are from Shankarpur and Dharampur.The
Third Block of income has 64 faimilies, among which the maximum number of household
are from Bojha and songara and the lowest number of people are from
Shankarpur,Mayapur and Tulsi.The last Fourth Block of income is above Rs.100000 in
which the highest number of people are from Kotaya and the lowest possible are from
Tulsi.
Chart: - 3.11, Income Levels: % of House Holds
Source: Socio-Economic Survey by LNC, August 09 to November 09
13%
85%
2% 0%
INCOME LEVEL : % OF HOUSE HOLDS
<10000 10001-50000 50001-100000 >100000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 88
The pie-chart shown above explains the income level of household in project
affected area in terms of %.The pie-chart further reveals that the income earn by the
villager‘s under Rs.10001 -50000 is 85% which is uppermost as compared to the second
block of income of household which is less than Rs. 10000(13%).Only 2% families comes
under the third block i.e. Rs. 50001-100000.
3.2.9 Assets
Asset ownership is poor in the villages (Table 3.1.8). About 15% of the population in
Shankarpur owns a radio and an equal number owns television. Almost 43% of Songara
owns radio and 25 houses have television. 5 households in Shankarpur have telephone
facility. Cycle is the major mode of transportation. Bullock cart is another major mode of
transportation. Some people in Shankarpur and Songara own two wheelers. There are 11
cars/Jeep and 8 tractors in Shankarpur. Buses are also available for public transportation.
These assets gives picture of income of a family.
Table: - 3.8, Asset Ownership
Number of households
Assets
Ma
yap
ur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Radios in Number 28 40 50 17 10 38 35 24 40 282
Televisions in
Number 05 08 25 03 02 19 07 07 09 085
Telephones in
Number 08 16 25 05 05 15 12 14 16 116
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 89
Number of households
Assets
Ma
yap
ur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Cycles in Number 155 235 265 85 53 212 235 174 260 1674
Two wheelers in
Number 05 05 30 03 03 12 04 05 13 080
Cars/Jeeps in
Number 00 03 11 00 00 00 02 02 01 019
Tractors in Number 00 01 08 01 01 02 00 02 01 016
Source: Group Discussions with villagers, by LNC October 2009
Chart: - 3.11, Asset Ownership
Source: Socio-Economic Survey by LNC, August 09 to November 09
ASSET OWNERSHIP
2840
50
17 10
38 3524
40
5 825
3 219
7 7 98 16 255 5 15 12 14 16
155
235
265
85
53
212235
174
260
5 5
30
3 3 12 4 5 130 3 11
0 0 0 2 2 10 1 8 1 1 2 0 2 1
0
50
100
150
200
250
300
May
apur
Bojha
Songa
ra
Moh
anpu
r
Shank
arpu
r
Kotay
a
Sakalpu
r
Tulsi
Dha
ram
pur
VILLAGES
NU
MB
ER
S
Radios Televisions Telephones Cycles Two wheelers Cars/Jeeps Tractors
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 90
The above Graph explains about the asset ownership in the project affected villages
i.e. Mayapur, Bojha, Songara, Mohanpur, Shankarpur, Kotaya, Sakalpur, Tulsi and
Dharampur.The maximum number of households having cycle are Songara
,Dharampur,Tulsi and Bojha. The radio and television has its presence in all villages. Still
radio is very much popular as tool of entertainment compared to television. The mode of
communication is telephone, Songara has the highest number and the least are found in
the Shankarpur and Mohanpur. Songara village have the highest number of car/jeep and
tractors as compared to other villages.
The above assests have been taken as indicator of income level in the
assessment of individual family income.
3.2.10 Profile of Vulnerable Population
Table 3.1.9A gives the number of destitute and dependents in the villages. Majority
of population is schedule tribes. Shankarpur has highest unsupported destitute/widows
Table: - 3.9, Number of Destitute and Dependants in Project Affected People
Mayapur
Bojha Songara
Mohanpur
Shankarpur
Kotaya Sakalpur Tulsi Dharampur
Total
Unsupported
destitutes 0 0 15 4 0 0 3 10 5 37
Disabled / infirm 1 2 10 4 1 8 4 8 10 48
Source: Group Discussions with villagers,by LNC, October 2009
Chart: - 3.11, Destitute and Dependants in Project Affected People
Source: Socio-Economic Survey by LNC, August 09 to November 09
0 0
15
40 0
3
105
37
1 2
10
41
84
8 10
48
0
10
20
30
40
50
60
NU
MB
ER
S
VILLAGES
DESTITUTE AND DISABLED IN PROJECT AFFECTED PEOPLE
Unsupported destitutes Disabled / infirm
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 91
The above Graph reveals about the destitute and dependent in the project
affected area. Unsuppoted destitute in project affected area are maximum in the villages
Songara and Tulsi.The disabled/infirm people are highest in are dharampur and songara.
The least number of destitues and disabled are in the village of mayapur,shankarpur and
bojha.
Chart: - 3.12, Destitute and Dependants in %
Source: Socio-Economic Survey by LNC, August 09 to November 09
The above piechart explains about the destitute and dependents in terms of % in
the project affected area. Disabled people are more than the unsupported destitute.
Schedule Tribe population is dominant in all villages except 3 villages i.e. Kotaya
and Shakalpur. General population in Kotaya and OBC in Shakalpur are in greater number
than ST. Bhoja, Songara and Kotaya have more than 10% population of Schedule Cast.
Details of other population is given in the following table, 3.10 .
DESTITUTE AND DEPENDANTS IN %
Disabled /
infirm
56%
Unsupported
destitutes
44%
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 92
Table: - 3.10, SC/ST in Project Affected Villages
Village General OBC SC
Population
ST
Population
Total
Nos. % Nos. % Nos. % Nos. % Nos. %
Maya 162 15% 0 0% 50 5% 899 81% 1111 100%
Bhoja 480 25% 437 22% 426 22% 607 31% 1950 100%
Songara 534 21% 86 3% 421 16% 1530 60% 2571 100%
Mohanpur 28 3% 201 24% 9 1% 616 72% 854 100%
Shankarpur 19 4% 10 2% 0 0% 404 93% 433 100%
Kotaya 640 35% 353 19% 230 13% 614 33% 1837 100%
Sakalpur 345 21% 892 55% 50 3% 338 21% 1625 100%
Tulsi 34 2% 613 32% 150 8% 1147 59% 1944 100%
Dharampur 56 6% 258 27% 10 1% 628 66% 952 100%
Source: Socio-Economic Survey by LNC, August 09 to November 09
The predominant tribe in this region is Gond. The following bar chart reveals that
Songara and Tulsi is inhabited by the considerable population belonging to ST. Bhoja and
Songara have largest number of Schedule Cast population among all the villages.
Comparative status of SC and ST can be adjudged through the following graph.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 93
Chart: - 3.12, SC/ST in Project Affected Villages
Source: Socio-Economic Survey by LNC, August 09 to November 09
The extent of different types of population within the project affected villages is
depicted in the following pie chart. The major population belongs to ST category i.e. 51%
of the whole population. The population of OBC is next to ST i.e. 22%. SC is only 10% in
the project area. The pople belonging to general category people are lowest i.e. 17%.
Chart: - 3.13, Population in project Affected Villages
Source: Socio-Economic Survey by LNC, August 09 to November 09
The comparative details of population status of all villages coming in the project
affected area are depicted through following bar chart.
50
426 421
9 0
23050
15010
899
607
1530
616
404
614
338
1147
628
0200400600800
10001200140016001800
NU
MB
ER
S
VILLAGES
SC / ST IN PROJECT AFFECTED VILLAGES
SC Population ST Population
GENERAL17%
OBC22%
SC10%
ST51%
POPULATION IN PROJECT AFFECTED VILLAGES
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 94
Chart: - 3.13.1 Population in project Affected Villages
Source: Socio-Economic Survey by LNC, August 09 to November 09
3.2.11 Health Issues
Malaria is the major disease prevalent in the project-impacted villages in the past 2
years. It is also one of the major causes of deaths. Allopathic and ayurvedic treatments are
available. A primary health center is available in Shankarpur village, which is also referred
to as ‗hospital‘ by villagers.
3.2.12 Infrastructure Accessibility for Project Affected people
Electricity is used only for household purposes. The medical facility is insufficient as
only one hospital is present in Shankarpur. There are no Animal Husbandry facilities in the
area and even higher education facility is unavailable in the study area. The details of
Infrastructure to support their life style and bring-up livelihood status in tabulated in the
following table 3.11.
162
480 534
28 19
640
345
34 560
437
86201
10
353
892
613
258
50
426 421
9 0
230
50150
10
899
607
1530
616
404
614
338
1147
628
0200400600800
10001200140016001800
NU
MB
ER
S
VILLAGES
DEMOGRAPHY OF PROJECT AFFECTED VILLAGES
General OBC SC Population ST Population
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 95
Table: - 3.11, Infrastructure Availability-Project Impacted Villages
Facilities
Ma
yap
ur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Weekly Hat
(Bazar) 0 1 1 0 0 0 1 0 1 4
Communication
Post office 0 0 1 0 0 1 0 0 0 2
Pucca road No No No No Yes No Yes Yes Yes
Kachcha road Yes Yes Yes Yes Yes Yes Yes Yes Yes
Banks etc.
Co-operative
societies 0 0 1 0 0 1 0 0 0 02
Others
Seed/Fertiliser
outlet 0 0 1 0 0 0 0 2 0 03
Community
Centre 0 0 1 0 0 0 0 0 0 01
Fair Price Shop 2 0 2 1 0 0 1 1 1 8
Flour mill 1 1 3 0 0 3 2 0 0 10
Source: Group Discussions with villagers by LNC, October 2009
Note: The data corresponds to Numbers of Facility available in Villages.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 96
3.2.13 Water Supply
There are no tapped water facilities in any of the villages. Wells, handpump
and ponds are the major source of water supply. In Bojha and Songara, there are few
Ponds; the primary source is well water.
Table: - 3.12, Facilities of Drinking Water Supply
So
urc
e
Mayapur
Bojh
a
Son
gara
Moha
np
ur
Sha
nkarp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Well water
9 4 20 4 18 18 7 4 14 98
Hand pump
6 10 11 7 4 10 8 4 2 62
Pond 0 1 1 0 0 0 0 0 2 4
Source: Group Discussions with villagers by LNC, October 2009
Chart: - 3.13, Drinking Water Supply
Source: Group Discussions with villagers by LNC, October 2009
The above Graph reveals the comparative status of present facilities of
drinking water supply in the project affected area. The maximum number of
households in the overall villages is dependent on well for drinking water. The second
source of drinking water is hand pump and the last facility for drinking water is pond
which is in few villages.
9
4
20
4
18 18
74
14
610 11
74
108
42
0 1 1 0 0 0 0 02
05
10152025
NU
MB
ER
S
VILLAGES
FACILITIES OF DRINKING WATER SUPPLY
Well water Hand pump Pond
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 97
Ground water table is normal as given in the following table 3.13.1
Table 3.13.1
Depth of water level (m below ground)
Sea
so
n
Mayapur
Bojh
a
Son
gara
Moha
np
ur
Sha
nkarp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Post Monsoon
Pre Mansoon
3.2.14 Sanitation
There are no toilets and open defecation is practiced in all the project affected
villages. There are few water sealed toilets in Songara only. These are mostly in
government quarters only.
3.2.15 Health Infrastructure
There is one primary health center only in Shankarpur. The nearest
Government Hospital and medicine outlet is 18 kms away from Shankarpur in
Premnagar.
3.2.16 Educational Infrastructure
All villages have a primary school to cater to their needs independently. The
village Songara have highest level of schooling facility i.e. Higher Secondary School
among all the villages. Kotaya have one High School. There is sufficient shooling
facility in the project affected area. The students have to move on an average 25 km.
from their village to Ambikapur for their higher studies in college.
Table:- 3.13, Educational Institutes
Insti
tute
s
Ma
yapur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Primary School
2 4 6 1 1 3 4 3 2 26
Middle school
1 2 3 1 1 2 1 1 1 13
Secondary School
0 0 0 0 0 1 0 0 0 01
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 98
Insti
tute
s
Ma
yapur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Higher Secondary
School 0 0 1 0 0 0 0 0 0 01
Source: Group Discussions with villagers by LNC, October 2009
3.2.17 Social Organizations/ Community Structures
The Tribal people are socially bonded by the religion and relegios places.
Every village has atleast one temple. The villages having large population and
economically sound status than other project affected villages have more number of
temples.
Mahila mandals are induced organizations from the government through
various schemes and projects running by different line departments. Anganwadis are
as per the norms of government. The Bhajan/Kirtan Mandali are social groups
created by themselves. The village wise available community facilities are tabulated
in the following table, 3.13.
Table: - 3.13, Community Facilities
Fac
ilit
ies
Ma
yap
ur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
ka
rpu
r
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Mahila
mandal 2 2 18 3 0 8 2 3 1 39
Anganwadi 3 5 6 2 2 6 5 3 4 36
Bhajan
mandali/Kir
tan
0 0 0 0 1 2 1 2 1 07
Temples 1 4 7 1 1 2 1 1 1 18
Hospital 0 1 1 0 0 0 0 0 0 02
Rest house 0 0 1 0 0 0 0 0 0 01
Source: Group Discussions with villagers by LNC, October 2009
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 99
The village Songara is situated at national high way and every department /
Organisation approaches to motivate the people / women. Because of high
motivation level, village Songara has extra ordinary high numbers of Mahila Mandals.
3.2.18 Festivals and fairs
Table 3.14 lists the festivals in the villages. The whole village participates in
such functions. The festivals are main source of entertainment for the villagers.
These types of activity also strengthen their social bonding to each other. The level of
celebration and involvement of people in different types of festivals is tabulated in the
following table 3.14.
Table: - 3.14, Festivals
Festivals Community
involved/
purpose
Month/
Season
Durati
on
Approximate strength of
gathering/Location
Navakhai Whole (new Agri
season)
July-Aug 1 day Whole village and
surrounding villages
Pausa Purnima Death of Kans
(uncle of lord
Krishna)
Nov-Dec 1 day Kirtan Mandals and their
spectators
Holi Death of Holika Feb / march 1 day Whole village
Deepawali Prayer to Godess
Laxmi
October/
November
1 day Whole village
Independence
day
Prayer
independence
song
August 15, 26
January
1 day Whole village
Dusshera Death of Ravan October 1 day Whole village
Visvakarma Prayer of the tools 1 day Whole village
Source: Group Discussions with villagers by LNC, Oct-09
Note : - 1. Festival Karma is celebrated at mayapur, sankarpur, and Dharampur by about 400 people.
2. Independence day is celebrated at all eduvcational institutions
situated in the project affected area. .
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 100
3.3 ADDITIONAL INFROMATIONS RELATED R&R POLICY 2005 OF GOVT. OF C.G.
3.3.1 Project affected Population
The details of Project Affected population are given in the following table, 3.15. The
data is based on the socio-economic survey done for this specific project. The major share
lies with the Schedule Tribe population.
Table: - 3.15, Details of Social Group Matrix of Project Affected Families
(Including Encroachers)
So
cia
l g
rou
p/c
aste
Ma
yapur
Bo
jha
So
ng
ara
Mo
ha
np
ur
Sh
an
karp
ur
Ko
taya
Sa
kalp
ur
Tuls
i
Dh
ara
mp
ur
Tota
l
%
Scheduled
tribe 899 607 1530 616 404 614 338 1147 628 6783 51%
Scheduled
cast 50 426 421 9 0 230 50 150 10 1346 10%
OBC
0 437 86 201 10 353 892 613 258 2850 21%
General
162 480 534 28 19 640 345 34 56 2298 17%
Total
1111 1950 2571 854 433 1837 1625 1944 952 13277 100%
Source: Socio-Economic Survey by LNC, August 09 to November 09
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 101
3.3.1.1 Project affected Khatedars (Land Holders)
The details of Project Affected Khatedars (Land Holders) is tabulated in the
following table, 3.16. There are total 1956 land holders in the project affected area.
The revenue records reveals that maximum land holders are residing in village
Bhoja i.e. 648 and minimum in village Shakalpur. The details can be adjudged from
the following table.
Table: - 3.16,
Classification of Khatedars based on Quantity of Land Holding -(Including Encroachers)
Cla
ss
/ca
te
go
ry
Ma
yap
ur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Land up to
0.5 Ha 175 400 157 44 44 27 2 1 68 918
Between 0.5
HA and 2
Ha
147 204 181 72 51 14 1 5 79 754
2 Ha and
above 56 44 110 23 31 4 16 284
Total 378 648 448 139 126 45 3 6 163 1956
Source: Land Records made available by project proponent.
Numbers of Khatedars are not equal to Nos of households, because the people
residing in one household have 1 khata or more than 1 khata or even no khata (land
holding). (Khatedar means a person having a piece of land or numbers of land holding in
his own name.) A family may comprise of any one or more khatedars or even it may have
not any one khatedar.
3.3.1.2 Land Area wise % of Project affected Khatedars (Land Holders)
The pie chart generated from the table no. 3.16 reveals that major population have
small land pieces i.e up to 0.5 ha. Only. The extent of land holdings can be adjudged from
the following graph.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 102
Chart, 3.14 Percentages of Landholdings
Source: Land Records made available by project proponent.
3.3.1.2 Land Acquisition wise % of Project affected Khatedars (Land Holders)
Followig table no. 3.17 incorporates the number of landholders (Khatedar) with
respect to the area of land to be acquired from their whole land in possesion.
Table: - 3.17, Classification of Khatedars based on Percentage land acquired (Including Enchroachers)
Qty
. o
f la
nd
to a
cq
uir
e
in %
Ma
yap
ur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
100% 378 605 371 113 109 44 2 3 124 1749
Between
75% and
100%
0 18 47 15 14 0 0 0 22 116
Between
50% and
75%
0 12 14 5 2 0 0 0 8 41
Between 0 4 9 4 0 0 1 1 6 25
Land up to 0.5 Ha47%
Between 0.5 HA and 2 Ha
39%
2 Ha and above14%
KHATEDAR % BASED ON QUANTITY OF LAND HOLDINGS
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 103
Qty
. o
f la
nd
to a
cq
uir
e
in %
Ma
yap
ur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
25% and
50%
Less than
25% 0 9 7 2 1 1 0 2 3 25
Total 378 648 448 139 126 45 3 6 163 1956
Source: Land Records made available by project proponent.
Chart, 3.15 Percentages of Landholdings
Source: Land Records made available by project proponent.
The above pie chart reveals that whole lands of 90% of Project Affected Land
Holders are proposed for acquisition. There are 6% of land holders whos land between
75% to less than 100% is comin within project area. Other details can be adjudged from
the graph it self.
Whole Land90%
Between 75% and 100%
6%
Between 50% and 75%2% Between 25% and
50%1%
Less than 25%1%
Khatedars in %, based on Percentage of land to be acquired
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 104
3.4 PRESENT STATUS AND INFRASTRUCTURE OF THE PROJECT AREA
( AS PER THE CENSUS 2001)
There are 9 villages falling in the project area. The details of Demography, Literacy,
health, irrigation facilities, land use, electricity, agricultural production, and village level
infrastructures are tabulated in the following tables as a base line.
3.4.1 AREA, POPULATION
The villages coming within the project area are under the administrative control of
Tahsil ,Pratappur and district Surguja.
Table: - 3.18, Area, Population of the Project Area
S.N
o.
VIL
L_
NA
ME
AR
EA
To
tal H
ou
se
Ho
ld
To
tal
Po
pu
lation
To
tal M
ale
Wo
rkin
g
Po
pu
lation
To
tal F
em
ale
SC
Po
pu
lation
SC
Ma
le
SC
Fe
male
ST
Po
pu
lation
ST
Ma
le
ST
Fe
ma
le
1
Mayapur
(Mendardand) 438 166 932 462 197 470 2 1 1 843 418 425
2 Bojha 603 345 1567 803 271 764 270 144 126 540 271 269
3 Songara 304 450 2374 1209 137 1165 20 9 11 1628 816 812
4
Shankarpur
(Lipgi) 291 62 343 168 131 175 0 0 0 316 158 158
5
Shakalpur
(Semariya) 584 317 1604 770 263 834 60 33 27 570 266 304
6 Koteya 956 355 1685 868 430 817 172 97 75 587 298 289
7 Dharampur 544 244 1239 648 245 591 10 7 3 709 375 334
8 Tulsi 731 280 1400 695 329 705 130 55 75 772 399 373
9 Mohanpur 407 146 733 366 183 367 0 0 0 546 276 270
Total 4858 2365 11877 5989 2186 5888 664 346 318 6511 3277 3234
Source: - Census of India 2001.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 105
The total area of the villages falling within the project area is 4423 ha. The toal
population is 10735. The other detail can be adjusted through the graph.
.
Chart: - 3.14, Area, Population of the Project Area
Source: - Census of India 2001.
The above Graph explains about the details of demography of the project affected
area.
Chart: - 3.15, Village wise Area (in Ha.)
Source: - Census of India 2001.
AREA AND POPULATION OF THE STUDY AREA
4423
2138
10735
2186
5430 5305
534 291 243
5758
2891 2867
0
2000
4000
6000
8000
10000
12000
AREA T_HH T_P W_P T_M T_F SC_P SC_M SC_F ST_P ST_M ST_F
AREA,POPULATION
NU
MB
ER
S
438
603
304 291
584
956
544
731
407
0
200
400
600
800
1000
1200
IN H
A.
VILLAGES
AREA IN HA.
Mayapur Bojha Songara Shankarpur Shakalpur Koteya Dharampur Tulsi Mohanpur
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 106
Kotaya is the village having the maximum area while on the other hand Shankarpur
village has minimum area within the project area. Area of other village comparatively can
be seen in the above graph.
Chart: - 3.16, Total Household
Source: - Census of India 2001.
The above Graph Reveals about the Total Households of 9 villages under the
Project affected Area. The Graph further explains about the village, Songara and Koteya
having the maximum Number of households in project area. While on the other hand,
Shankarpur and Mohanpur having the less Number of Household under the project
affected Area.
TOTAL HOUSEHOLDS
166
345
450
62
317355
244280
146
050
100150200250
300350400450500
May
apur
Bojha
Son
gara
Sha
nkar
pur
Sha
kalpur
Kot
eya
Dha
ram
pur
Tulsi
Moh
anpu
r
VILLAGES
NU
MB
ER
S
Mayapur Bojha Songara Shankarpur Shakalpur Koteya Dharampur Tulsi Mohanpur
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 107
3.4.2 HEALTH AND EDUCATION
Table: - 3.19, Health and Education of the Project Area
S.N
o.
VIL
L_
NA
ME
Ed
uca
tio
na
l
facili
tie
s
Pri
ma
ry S
ch
oo
l
Mid
dle
Sch
oo
l
Se
co
nd
ary
Sch
ool
Se
nio
r
Se
co
nd
ary
Sch
ool
Me
dic
al
facili
tie
s
Allo
path
ic
Dis
pen
sa
ry
Ma
tern
ity a
nd
Ch
ild W
elfa
re
Ce
ntr
e
Ch
ild W
elfa
re
Ce
ntr
e
Pri
ma
ry H
ealth
Ce
ntr
e
1 Mayapur
(Mendardand) 1 2 0 0 0 2 0 0 0 0
2 Bojha 1 5 1 0 0 2 0 0 0 0
3 Songara 1 1 1 1 1 1 0 0 0 1
4 Shankarpur
(Lipgi) 1 1 0 0 0 2 0 0 0 0
5 Shakalpur
(Semariya) 1 1 1 0 0 2 0 0 0 0
6 Koteya 1 1 1 0 0 2 0 0 0 0
7 Dharampur 1 3 1 1 0 1 1 1 1 1
8 Tulsi 1 1 1 0 0 2 0 0 0 0
9 Mohanpur 1 1 0 0 0 2 0 0 0 0
Total 9 16 6 2 1 16 1 1 1 2
Source: - Census of India 2001.
.
Chart: - 3.17, Health and Education of the Project Area
Source: - Census of India 2001.
16
5
21
16
1 12
0
2
4
6
8
10
12
14
16
18
P_SCH M_SCH S_SCH S_S_SCH MEDI_FACMCW_CNTR CWC PH_CNTR
NU
MB
ER
S
HEALTH , EDUCATION
HEALTH AND EDUCATION OF THE STUDY AREA
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 108
The above Graph explains about Health and Education of the project affected area.The
Education facility explained above are:-Primary school-16 in Numbers , Middle school – 5
in Numbers , secondary school -2 , Senior secondary school -1.There are Total 16
Medical facility as well child welfare centre in the projected area .
Chart: - 3.18, Project Area and Medical Facility
Source: Census of India 2001
The above Graphs from Cart No. 3.17 to 3.18 explains about the Medical Facility of
9 villages under the project affected area. As shown in the Graph, Mayapur, Bojha, Tulsi
and Shankarpur have the Medical Facilities related to allopathy while on the other hand
Songara and dharampur have the less Number of medical Facilities. Village Dharampur
and songara also provides the facility of Welfare and Health centre.
PROJECT AREA, MEDICAL FACILITY
2 2
1
2 2 2
1
2 2
0 0 0 0 0 0
1
0 00 0 0 0 0 0
1
0 00 0 0 0 0 0
1
0 00 0
1
0 0 0
1
0 0
0
0.5
1
1.5
2
2.5
Maya
pur
Bojha
Songara
Shankarp
ur
Shakalp
ur
Koteya
Dharam
purTul
si
Moha
npur
VILLAGES
NU
MB
ER
S
MEDI_FAC ALL_DISP MCW_CNTR CWC PH_CNTR
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 109
3.4.3 WATER AND INFRASTRUCTURE
Table: - 3.20, Water and other Infrastructure in the project affected village S
.No
.
VIL
L_
NA
ME
Dri
nkin
g W
ate
r
facili
ty
We
ll W
ate
r
Tu
be
We
ll
Ha
nd
pum
p
Ap
pro
ach
-
Pa
ve
d R
oa
d
Ap
pro
ach
-
Mu
d R
oa
d
Ap
pro
ach
-
Fo
ot
Pa
th
Po
we
r sup
ply
Ele
ctr
icity fo
r
all
pu
rposes
1 Mayapur
(Mendardand) 1 1 0 1 0 1 0 1 1
2 Bojha 1 1 0 1 0 1 0 1 1
3 Songara 1 1 1 1 1 1 0 1 1
4 Shankarpur
(Lipgi) 1 1 0 1 0 1 0 1 1
5 Shakalpur
(Semariya) 1 1 0 1 1 1 0 1 1
6 Koteya 1 1 0 1 1 0 0 1 1
7 Dharampur 2 0 0 0 0 1 0 1 1
8 Tulsi 1 1 0 0 0 1 0 1 0
9 Mohanpur 1 1 0 1 0 0 1 1 0
Total 10 8 1 7 3 7 1
Source: - Census of India 2001.
Chart: - 3.19, Water-Infrastructure within Project Affected Area
Source: - Census of India 2001.
.
10
8
1
8
1
3
7
2
10
8
0
2
4
6
8
10
12
NU
MB
ER
S
WATER, INFRASTUCTURE
WATER AND INFRASTUCTURE OF THE STUDY AREA
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 110
The Graph shown above explains about the drinking water facility available in the
project area. The facility of Drinking water and power supply is quite adequate. The Graph
shown above also reveals about the Electricity facilities in the project affected villages. The
Facility of Power Supply is adequate and equal in all villages of the project area of project
The power suppy was not therein villages Tulsi and Mohanpur, during 2001..
Chart: - 3.20, Water Facility of the Project Area
SOURCE: - CENSUS OF INDIA 2001
The above Graph explains about the drinking water facility available in the villages
falling under the project. Dharampur have sufficient Drinking water facility as compared to
the other villages under the project area. The facility of Tubewell is only found in Songara.
The facility of Well and tubewell is quite common in all villages under the project affected
Area.
1 1 1 1 1 1
2
1 11 1 1 1 1 1
0
1 1
0 0
1
0 0 0 0 0 0
1 1 1 1 1 1
0 0
1
0
0.5
1
1.5
2
2.5
NU
MB
ER
S
VILLAGES
PROJECT AREA, WATER FACILITY
DRNK_WAT_F WELL TUBEWELL HANDPUMP
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 111
3.4.4 PROJECT AREA, PRODUCTION
The villagers of the villages coming under the project area also produce other
goods other than agricultural items. Beside agriculture they make mats, bamboo pots,
earhen pots and brooms. Village wise details are given in the following table no. 3.20.
Table: - 3.20, Production, except Agricultural items in project affected Project area
S.No. VILL_NAME Manufactured Item No. 1
Manufactured Item No. 2
Manufactured Item No. 3
Land
Forest
(Revenue
Forest)
1
Mayapur
(Mendardand)
2 Bojha
3 Songara MATS BAMBOO POTS
4
Shankarpur
(Lipgi) MATS BAMBOO POTS
5
Shakalpur
(Semariya) MATS BAMBOO POTS
EARTHEN
POTS
6 Koteya MATS BROOM
FOREST
PRODUCTS
7 Dharampur MATS MAT
8 Tulsi 16
9 Mohanpur 10
Total 26
Source: - Census of India 2001.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 112
3.4.5 PROJECT AREA, IRRIGATION FACILITY
Table: - 3.21, Irrigation Facility of the Project area
S.No. VILL_NAME Canal Govt.
Well (without electricity)
Well (with electricity )
Tube-well (without
electricity) Tank River Other
1
Mayapur
(Mendardand) 0 0 7 0 0 7 6
2 Bojha 0 2 0 0 1 7 7
3 Songara 0 17 0 10 0 0 0
4
Shankarpur
(Lipgi) 0 4 0 5 0 0 5
5
Shakalpur
(Semariya) 0 14 0 0 0 0 24
6 Koteya 0 2 12 0 0 0 10
7 Dharampur 0 9 0 11 2 0 0
8 Tulsi 7 2 0 0 0 0 0
9 Mohanpur 0 2 0 0 0 0 0
Total 7 52 19 26 3 14 52
Source: - Census of India 2001.
3.4.6 PROJECT AREA, LAND USE
Table: - 3.22, Land Use of the Project area
S.No. VILL_NAME Total Irrigated
Area Unirrigated Area
Cultivable waste Land
Area not available for cultivation
1
Mayapur
(Mendardand) 20 295 75 48
2 Bojha 17 414 124 48
3 Songara 27 50 180 47
4 Shankarpur (Lipgi) 14 205 58 14
5 Shakalpur (Semariya) 38 354 163 29
6 Koteya 24 552 276 104
7 Dharampur 22 348 147 27
8 Tulsi 9 468 204 34
9 Mohanpur 2 192 102 101
Total 173 2878 1329 452
Source: - Census of India 2001.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 113
Chart: - 3.22, Land Use of the Project area
Source: - Census of India 2001.
The Graph shown above explains about the Land use of 9 villages falling under the
project Area. Land forest denotes the revenue forest available in the village, which is found
in only Tulsi and Mohanpur .The other villages are devoid of revenue forest. The utilization
of land by Koteya is used at the best level as compared to the other villages of the project
Area. The Use of land in Mohanpur is least as compared to the other project Area.
3.5 Key Issues-Project Affected People
The major issues related to the project affected people include:
First, low educational levels accompanied with no specialized skill development.
Due to the likely loss of livelihood of the villagers due to the project, their economic
situation is likely to be adversely affected temporarily. Provision of adequate training so as
to make them capable for employment in mines or other self employment mechanisms is
therefore, a must.
Second, majority of the villagers are below poverty line. This is the result of an
unsteady income. Agricultural operations are rain fed and therefore, the yield is dependent
on monsoons. There are no occupational diversifications. Subsidiary occupations such as
collection of leaves from forest areas are the only available options. Dependency on
community resources is therefore, very high.
0 0 0 0 0 0 016 10
75
124
180
58
163
276
147
204
102
48 48 47
1429
104
27 34
101
0
50
100
150
200
250
300
NU
MB
ER
S
VILLAGES
LAND USE OF THE PROJECT AREA
LAND_FORES CULT_WASTE AREA_NA_CU
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 114
Third, the status of women is very poor. Since these villages are likely to be
relocated away from their existing settlements, women are likely to feel the impact of
relocation adversely. Due to relocation they are likely to lose their community resources
and any income from it. Therefore, adequate mitigation measures are required to address
this issue.
Fourth, the existing availability and accessibility to infrastructure (physical and
social) is poor. All the houses are kuchha (except one) and there are minimal or no
sanitary provisions. Also, the source of water supply is not safe. Provision of infrastructure
is therefore, a critical element as part of resettlement planning.
3.5.1 Details of Displaced families whose House is being affected
A. Details of khatedars whose house is being acquired for the Project is given in the Table
-3.5.1
Table: - 3.23, Displaced Khatedars whose House is being affected (Including Enchroachers)
Cate
go
ry
Ma
ya
pu
r
Bo
jha
So
ng
ara
Mo
han
pu
r
Sh
an
ka
rpu
r
Ko
taya
Sa
ka
lpu
r
Tu
lsi
Dha
ram
pu
r
To
tal
Home stead on private land 378 126 504
Total 378 126 504
Source: Land Records made available by project proponent.
3.6 BASELINE:- Above Studies Following baseline is the result of study of analysis which denotes present condition of the villages during the year 2009. 3.6.1 Area
The Project affected village Area is 4423 ha. as per Census 2001, while only
2624.18 Ha. area is being taken in the project.
Number of Total Households are 2138 as per the Census 2001, while during the
socio-economic survey it is 2989.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 115
3.6.2 Population
The total population of the study Area is 10735 as per the Census 2001; while
during the socio-economic survey it is 13277.
The working population is 2186 as per the Census 2001, while during socio -
economic survey it is 3049.
The ratio of male and female population is 1000:983 as per the Census 2001, while
during socio - economic survey it is 1000:893.
3.6.3 Health
The Health under the study area of Project comprises of medical facilities -16 In
numbers as per the Census 2001, while during socio - economic survey it is 18 in
Numbers.
Number of Maternity and child welfare centre -5 in numbers as per the Census
2001, while during socio - economic survey it is 15 in Numbers.
3.6.4 Education
The Educational facilities which are provided under the study area of project are the
primary school-16 in numbers as per the Census 2001, while during socio -
economic survey it is 26 in Numbers.
Middle school-5 In numbers as per the Census 2001, while during socio - economic
survey it is 13 in Numbers.
Secondary school -2 in numbers as per the Census 2001, while during socio -
economic survey it is 3 in Numbers.
Senior Secondary school-1 In numbers as per the Census 2001, while during socio
- economic survey it is 2 in Numbers.
3.6.5 Power & Water facilities
The water facilities under the study area of project comprises of the drinking water
facility that is 10 in numbers as per the Census 2001, while during socio - economic
survey it is 164 in Numbers.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 116
The Number of well in the area is 8 in numbers as per the Census 2001, while
during socio - economic survey it is 98 in Numbers.
Handpump are 8 in Number as per the Census 2001, while during socio -
economic survey it is 62 in Numbers.
Well, Handpumpand and pond are the main sourse of drinking water for the
households.
3.6.6 Production
Production other than agriculture in the project affected villages is only items from
Bamboo, earthen pots and mats.
3.6.7 Landuse
The land as per the census 2001, comprises of Irrigated-167 in Ha, Unirrigated-
2617 in Ha, Cultivated- 1210 Ha, and waste land not used for cultivation- 399 in Ha,
under the project affected area which is used for the purpose of livelihood of the
household.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 117
3.7 VISUAL STATUS OF THE PROJECT AREA
3.7.1 INFRASTRUCTRE
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 118
3.7.2 INFRASTRUCTURE
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 119
3.7.3 INFRASTRUCTURE
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 120
3.7.4 INFRASTRUCTURE
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 121
3.7.5 INFRASTRUCTURE
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 122
3.7.6 INFRASTRUCTURE
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 123
3.7.7 INFRASTRUCTURE
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 124
3.7.8 AFFECTED AREA
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 125
3.7.9 AFFECTED AREA
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 126
3.7.10 AFFECTED AREA
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 127
3.7.11 AFFECTED AREA
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 128
3.7.12 STATUS OF FAMILY
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 129
3.7.13 STATUS OF VILLAGES
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 130
3.7.14 STATUS OF VILLAGES
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 131
CHAPTER – 4
PROJECT IMPACT
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 132
CHAPTER – IV
PROJECT IMPACT
4.1 DETAILS OF THE AREA AFFECTED
(i) Project impact on area
33.63 sq. km is the area of the allotted block while the PROJECT AREA is 33.32 sq.
Km. The proposed mine lease area covers the habitation and lands of 9 villages. Table 4.1
lists the identified villages.
Table: - 4.1, Villages to Be Affected Due To Project
Status Name of village Anticipated Social Impact
Within Project
Boundary-
relocation and/or
acquisition
Mayapur
Shankarpur
Loss of village land (habitation and
agricultural);
Displacement of population;
Songara
Bojha
Mohanpur
Dharampur
Shakalpur
Koteya
Tulsi
Loss of livelihood due to loss of
agricultural land.
The whole village land of Shankarpur and Mayapur will be acquired due to open
cast mining. Agricultural land of Songara, Bojha, Mohanpur, Dharampur, Shakalpur,
Koteya and Tulsi village will only be acquired. The Abadi area of these villages will not be
taken in the project.
(ii) LOSS OF LAND
The entire inhabited portion of the villages Mayapur and Shankarpur are falling
within the project area. The agricultural land of village Songara, Bojha, Mohanpur,
Dharampur, Shakalpur, Tulsi and Koteya is also falling within the Project Area. Land use of
both agricultural, non-agricultural, waste land will be changed due to the project.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 133
(A) REVENUE LAND
The Table 4.2 gives the extent of land loss in each village. Private agriculture land
(single crop rain fed or two crop irrigated) and house hold land (Abadi) would be affected.
The household area tabulated in the following table is the Abadi area in possession of
residents. It is included in the village area.
TABLE:- 4.2-I, REVENUE LAND TO BE ACQUIRED
(A) REVENUE LAND (AREA IN HECT.)
SL. NO VILLAGE GOVT. LAND
( INCLUDES
REVENUE FOREST)
PRIVATE LAND TOTAL
(col. 3 + col 4) AGRICULTURE
(INCLUDES ADIVASI AND
NON ADIVASI PVT. LAND)
HOUSE HOLD
1 2 3 4 5 6
1 Mayapur 113.04 419.26 45.64 532.30
2 Bojha 147.37 431.65 -- 579.02
3 Songara 191.14 638.0 -- 829.14
4 Mohanpur 41.64 181.13 -- 222.77
5 Shankarpur 49.06 171.41 25.20 220.47
6 Kotaya 22.83 29.38 -- 52.21
7 Sakalpur 0.58 0.84 -- 1.42
8 Tulsi 5.33 3.44 -- 8.77
9 Dharampur 46.37 131.71 -- 178.08
TOTAL 617.37 2006.82 70.84 2624.18
Source: Govt. Land Records & Socio-Economic Survey by LNC, August 09 to November 09
CHART: - 4.1-I, REVENUE LAND TO BE ACQUIRED
Source: Govt. Land Records & Socio-Economic Survey by LNC, August 09 to November 09
Mayapur Bojha Songara Mohanpur Shankarpur Koteya Sakalpur Tulsi Dharampur
Govt. Land 113.04 147.37 191.14 41.64 49.06 22.83 0.58 5.33 46.37
Agriculture 419.26 431.65 638 181.13 171.41 29.38 0.84 3.44 131.71
0
100
200
300
400
500
600
700
Axis
Title
REVENUE LAND TO BE ACQUIRED(AREA IN HECT.)
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 134
The above Graph explains about the comparative status of Land to be required for
the project. There are 9 villages falling under this project. The project is aquiring residential
area of two villages that is Mayapur and Shankarpur.The Govt. Land and agricultural land
of the villages Songara, Bojha and Mohanpur will be aquired more as compared to Kotya,
Tulsi and Sakalpur. The Sakalpur is the least affected village.
CHART: - 4.2-II, REVENUE LAND TO BE ACQUIRED
ADIVASI LAND (ST) NON-ADIVASI
LAND
CHHOTE JHAD KA
JUNGLE
OTHER GOVT.
LAND
TOTAL AREA
1289.34 717.48 467.97 149.39 2624.18
CHART: - 4.2-I, REVENUE LAND TO BE ACQUIRED
Source: Govt. Land Records & Socio-Economic Survey by LNC, August 09 to November 09
CHART: - 4.2.1, PERSENTAGE OF REVENUE LAND TO BE ACQUIRED
Source: Govt. Land Records & Socio-Economic Survey by LNC, August 09 to November 09
0
1000
2000
3000
Adivasi Land (ST)
Non-Adivasi Land
Chhote Jhad ka jungle
Other Govt. Land
Total Area
1289.34717.48
467.97149.39
2624.18
Revenue Land to be Acquired
Adivasi Land (ST) Non-Adivasi Land Chhote Jhad ka jungle Other Govt. Land Total Area
Adivasi Land (ST)49%
Non-Adivasi Land 27%
Chhote Jhad ka jungle 18%
Other Govt. Land 6%
Revenue Land to be Acquired in %
Adivasi Land (ST) Non-Adivasi Land Chhote Jhad ka jungle Other Govt. Land
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 135
The Pie-chart shown above explains about the Revenue Land to be acquired under
the project area in terms of %. The area of agricultural land (76%) comprises of Adivasi
and non adivasi private land is maximum as compared to the Revenue Forest Land 18%
(Chhote Jhad ka Jungle) and Govt. land (6%) to be aquired under the project area.
Chart: - 4.3, House Hold area to be Acquired in %
Source: Socio-Economic Survey by LNC, August 09 to November 09
The above Pie-chart explains about the distribution of house hold area to be
acquired. Out of total house hold land proposed to be acquired Mayapur and Shankarpur
holds 64% and 36% respectively. This area in included in total village area to be acquired.
(B) REVENUE FOREST LAND
The project area does not contain any forest area under the possession of the
forest department i.e. R.F. / P.F./Orange area/National Park/ Sanctuary. This has only
Chote Bade Jhar ke Jungle under the possession and control of revenue department. The
village wise revenue forest area is gien in the following Table no. 4.2.
64%
36%
HOUSE HOLD AREA TO BE ACQUIRED IN %
Mayapur Shankarpur
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 136
Table: - 4.2, Revenue Forest land to be acquired
SL. NO VILLAGE CHHOTE BADE JHAR KE
JUNGLE
1 2 3
1 Mayapur 97.18
2 Bojha 97.62
3 Songara 146.43
4 Mohanpur 24.30
5 Shankarpur 35.72
6 Kotaya 22.42
7 Sakalpur 0.39
8 Tulsi 4.06
9 Dharampur 39.85
TOTAL 467.97
Source: Land Records made available by project proponent
CHART: - 4.4, REVENUE FOREST LAND TO BE ACQUIRED
Source: Land Records made available by project proponent
REVENUE FOREST LAND TO BE ACQUIRED
97.18 97.62
146.43
24.335.72
22.42
0.39 4.06
39.85
020406080
100120140160
May
apur
Bojha
Songa
ra
Moh
anpu
r
Shank
arpu
r
Kotay
a
Sakalpu
r
Tulsi
Dha
ram
pur
VILLAGES
NU
MB
ER
S
Mayapur Bojha Songara Mohanpur Shankarpur Kotaya Sakalpur Tulsi Dharampur
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 137
The above Graph shows comparative status about the Revenue forest land to be
acquired under the project affected area. Revenue forest of Songara, Bojha and Mayapur
are more than Tulsi, Sakalpur, Kotaya and Mohanpur.
CHART: - 4.5, REVENUE FOREST LAND TO BE ACQUIRED IN %
Source: Land Records made available by project proponent
The above Pie-chart explains about the Revenue Forest to be acquired under the
project Area in terms of percentage. Songara (30%), Mayapur (21%), Bojha (21%) and
Dharampur (9%) have the maximum area of revenue forest to be acquired under the
project as compared to Shankarpur, Mohanpur, Kotaya and Tulsi. The Sakalpur has
negligible quantity of revenue forest land proposed for acquisition.
(iii) LOSS OF STRUCTURES
The number of structures that would be affected due to the project are given in
Table 4.3. The existing housing conditions in the villages are very poor. Kuchcha houses
are predominant.
REVENUE FOREST LAND TO BE ACQUIRED IN %
Sakalpur
0%Kotaya
5%
Tulsi
1%Dharampur
9% Mayapur
21%
Bojha
21%
Mohanpur
5%
Shankarpur
8%
Songara
30%
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 138
TABLE: - 4.3, DETAILS OF THE LOSS OF STRUCTURE
T
ype
of S
tructu
re
Ma
yap
ur
Bo
jha
So
ng
ara
Mo
ha
np
ur
Sh
an
karp
ur
Ko
taya
Sa
kalp
ur
Tuls
i
Dh
ara
mp
ur
To
tal
A. Private
Structures
Residential 287 0 0 0 105 0 0 0 0 392
B. Community Structures
School 3 0 0 0 1 0 0 0 0 4
Temple 1 0 0 0 1 0 0 0 0 2
Anganwadi 3 0 0 0 2 0 0 0 0 5
Panchayat Bhawan
1 0 0 0 0 0 0 0 0 01
Source: Socio-Economic Survey and Group Discussion By Lnc, August 09 To November 09
Chart: - 4.6, Loss of Structure
Source: Socio-Economic Survey and Group Discussion by Lnc, August 09 to November 09
392
4 2 5 10
100
200
300
400
500
Residential School Temple Anganwadi Panchayat Bhawan
NO
. o
f S
tru
ctu
res
LOSS OF STRUCTURE
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 139
The above graph shows the loss of structure under the project affected Area. The
losses of Residential structures are maximum with respect to community structures.
Chart: - 4.7, Loss of Structure in %
Source: Socio-Economic Survey by LNC, August 09 to November 09
The pie –chart shown above explains about the loss of structure under the project
affected area in terms of %.There is a huge loss of structure in the Residential sector
(97%) and least in community sector Anganwadi (1%), Temple (1%) and School (1%).
(iv) DISPLACEMENT OF POPULATION
Total 6587 persons blonging to 1494 families in which 971 families are included as
per the definition of family by the state government. Sub families as per Chhattisgarh
government rehabilitation policy are sons>18 years. Total families including sub-families
are 2465.
TABLE: - 4.4, PROJECT DISPLACED PERSONS AND LAND LOSERS
(INCLUDING ENCROACHERS)
Village Number of Persons
Number of Families
Number of subfamilies*
1 2 3 4 5
Mayapur Displacees 1111 287 104
Bojha Only Land losers 948 202 194
Residential97%
School1%
Temple1%Anganwadi
1%
Panchayat Bhawan0%
LOSS OF STRUCTURE IN %
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 140
Village Number of Persons
Number of Families
Number of subfamilies*
Songara Only Land losers 1754 340 309
Mohanpur Only Land losers 684 132 65
Shankarpur Displacees 433 105 41
Sakalpur Only Land losers 20 3 3
Tulsi Only Land losers 22 6 3
Dharampur Only Land losers 572 145 140
Kotiya Only Land losers 1043 274 112
Combined Displacees 1544 392 145
Only Land losers 5043 1102 826
Total (Displacees + Land losers)
6587 1494 971
Source: Socio-Economic Survey by LNC, August 09 to November 09
The Number shown in column No 4 as number of families includes number of sub
families while the number of persons at column no. 3 corresponds to number of families at
column no. 4 only.
Chart: - 4.8, Project displaced persons and land losers
Source: Socio-Economic Survey by LNC, August 09 to November 09
1111948
1754
684
433
20 22
572
1043
287202
340
132 1053 6
145274
104194
309
65 41 3 3140 112
0
200
400
600
800
1000
1200
1400
1600
1800
2000
May
apu
r
Bo
jha
Son
gara
Mo
han
pu
r
Shan
karp
ur
Saka
lpu
r
Tuls
i
Dh
aram
pu
r
Ko
tiya
DisplaceesOnly Land losersOnly Land losersOnly Land losersDisplaceesOnly Land losersOnly Land losersOnly Land losersOnly Land losers
Nu
mb
ers
Displaced person and Land Losers
No of Persons No of Familes No of subfamiles
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 141
The Graph shown above explains about the Displaced persons and land losers of
the project area.There are 9 villages falling under the project. Only residents of Mayapur,
and Shankarpur will be displaced and residence of other villages are only land losers.
Chart: - 4.8, Project displaced persons and land losers in %
Source: Socio-Economic Survey by LNC, August 09 to November 09
The pie –chart shown above explains about the displaced persons and land losers
under the area of project in terms of % among all villages, displaced and land lossers.
Comparative extent is Songara(27%), Bojha(14%) , Dharampur(9%), koteya(16%) ,
mayapur(17%),Mohanpur (10%), Shankarpur(7%), Tulsi and Sakalpur have least quantity.
(v) DISPLACEMENT OF HOUSE HOLDS
Only residents of 2 villages Mayapur and Shankarpur are being affected. 99.55% of
Mayapur and 95.43% of the Shankarpur area of the whole village is coming under the
project. Total 392 families corresponding to 1544 persons will be displaced during the
execution of the project. Details are given in the following Table No. 4.5.
Table: - 4.5, Village Wise Details of to be displaced Population
S. NO. Village Effected Area Percentage
No of household No of person
1 2 3 4 5
1. Mayapur 99.55% 287 1111
2. Bojha 0% 0 0
3. Songara 0% 0 0
4. Mohanpur 0% 0 0
5. Shankarpur 95.43% 105 433
Displacees Mayapur17%
Only Land losers Bojha14%
Only Land losers Songara
27%
Only Land losers Mohanpur
10%
Displacees Shankarpur
7%
Only Land losers Sakalpur
0%
Only Land losers Tulsi0%
Only Land losers Dharampur
9%
Only Land losers Kotiya16%
Displaced person and Land Losers
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 142
S. NO. Village Effected Area Percentage
No of household No of person
6. Kotaya 0% 0 0
7. Sakalpur 0% 0 0
8. Tulsi 0% 0 0
9. Dharampur 0% 0 0
Total 95.89% 392 1544 Source: Socio-Economic Survey by LNC, August 09 to November 09
Note: 1. Column no 3, Percentage Based on Total Area / Required Area
government land records made available by project proponent.
2. The House appearing as one entity in village is shared by more than one
family. But, during the collection of data the area occupied by each family is
taken in to account.
3. The data in column no 4 and 5 is based on Socio-Economic Survey.
Chart: - 4.9, Disturbed Population
Source: Socio-Economic Survey by LNC, August 09 to November 09
The above Graph reveals about the comparative details of Disturbed Population
(Displacement of Households) within the project area.
287
0 0 0105
0 0 0 0
1111
0 0 0
433
0 0 0 00
200
400
600
800
1000
1200
NU
MB
ERS
DETAILS OF DISTURBED POPULATION
No of household No of person
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 143
Chart: - 4.9, Disturbed Population in %
Source: Socio-Economic Survey by LNC, August 09 to November 09
The above Pie-chart explains about the comparative status of disturbed population
within project area among Mayapur (73%) and Shankarpur (27%).
(vi) LOSS OF LIVELIHOOD
The villagers would lose their livelihood due to loss of land. Few villagers have
permanent employment. Most of them are dependent on cultivation. Several others are
engaged in labour or are providing services such as blacksmith, small businesses, etc.
Loss of land and displacement would therefore, result in loss of livelihood for all the
villagers.
Chart: - 4.10, Livelihood Loss
73%
0%
0%
0%
27%
0%
0%
0%
0%
DETAILS OF DISTURBED POPULATION
Mayapur Bojha Songara Mohanpur Shankarpur
Kotaya Sakalpur Tulsi Dharampur
0500
10001500200025003000
Total
Agriculture 2376
Business 90
Others 501
Grand Total 2967
Nu
mb
er
Livelihood Loss
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 144
The above graph reveals about the livelihood loss in different sectors due to the
project. Maximum people dependent on agriculture will loose their tool of livelihood. Other
sector includes the agricultural labour too along with the special service provider like,
barber, carpenter, blacksmith etc. The community engaged in the usiness will also loose
their livelihood. Total 2967 persons will loose their tools for the livelihood.
(vi) LOSS OF OTHER COMMUNITY ASSETS
Apart from loss of private assets, other community assets such as trees, wells,
ponds are also lost. Trees such as Jamun, Bamboo, Kendu, Aonla, Gamhar, Lemon,
IProject areai, Mahua, Munga, Sal, Mango, Kathal, Ber and other tree falling within the
Project Area will also be lost.
a. Drinking Water Infrastructre
Table: - 4.6, Drinking Water Infrastructre
So
urc
e
Ma
yap
ur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Well water
30 0 0 0 6 0 0 0 0 36
Hand pump
6 0 0 0 4 0 0 0 0 10
Source: Socio-Economic Survey by LNC, August 09 to November 09
b. Education Infrastructure
Table: - 4.7, Education Infrastructre
So
urc
e
Ma
yap
ur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
School 3 0 0 0 1 0 0 0 0 4
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 145
c. Community Infrastructure
Table: - 4.8, Community Infrastructre
So
urc
e
Ma
yap
ur
Bojh
a
So
ng
ara
Moha
np
ur
Sh
an
karp
ur
Kota
ya
Sakalp
ur
Tuls
i
Dhara
mpur
To
tal
Temple 1 0 0 0 1 0 0 0 0 2
Anganwadi 3 0 0 0 2 0 0 0 0 5
Panchayat Bhawan
1 0 0 0 0 0 0 0 0 1
Chart: - 4.11, Loss of Community Structures
The above table no. 4.6 to 4.8 narrates about the loss of drinking water and
structures avaialbe in the Mayapur and Shankarpur villages for community use. The
comparative status can be adjudged through the above bar chart no. 4.11.
46
4 25
1
0
10
20
30
40
50
Drinking Water School Temple Anganwadi Panchayat Bhawan
NO
. o
f S
tru
ctu
res
Loss of Community Structures
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 146
CHAPTER – 5
REHABILITATION SCHEME
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 147
CHAPTER –V
REHABILITATION SCHEME
5.1. Justification for displacement
It is a site-based project; Govt. of India Ministry of Coal has allocated Shankarpur
Coal Block to CMDC to supply coal to the 500/ 1000 MW thermal power station of CSEB /
ICPL . The 1000 MW power plant has been planed just at a distance of 6 KM from
Shankarpur Block by ICPL. As per the detail exploration carried out by MECL the
Shankarpur Block having total mineable reserves of 252 million tonnes, which is sufficient
for the requirement of the 1000 MW power plant of ICPL for a period of 45 years.
The development of Shankarpur Coal Block will assist the State in bringing down
deficit of electrical energy in the State. Since the power plant is planned at the pit head it
will also lower down the cost of production of per unit of electricity.
The establishment of the mine will mark the begging of industrialization in the area.
The facility such as health care, units, communication facility and the thermal power unit to
which this mine is captive will have significant positive impact of socio economic and
infrastructure in the area. The loss agriculture land for mining will change the economic
from farming based to secondary and tertiary activity based, proper and sensitive
resettlement and rehabilitation of displaced person can create more opportunities for
urbanization, education and self- employment. Care has been taken that no re-
displacement of the displacees shall taken place in near future.
5.2. Social Welfare activities and Development Plan for the Project affected area
CMDC feels its moral and social responsibility towards the society to develop the
social and living standard of the inhabitants, of not only that of Project affected families,
but also of the total area where the Project is coming up without disturbing their social
customs. With keeping this view in mind, CMDC plans to develop following infrastructures
in and in the nearby areas for the benefit of the residents of Prem Nagar Block, where the
Project is coming up.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 148
5.2.1. Health.
i). CMDC shall provide financial assistance to existing Hospital at Prem Nagar / Shiv
Nagar block for creating better medical facilities for the benefit of residents of the area.
ii). CMDC shall also conduct special Medical Camps in the affected villages for check-up
and provide medical assistance and distribution of medicines to the families of the
residents of the area.
5.2.2. Education.
i). CMDC shall provide financial assistance to existing schools for upgrading the
school building by adding Class-rooms, providing drinking water facilities, providing fans,
providing equipments for Science Laboratory, and playing equipments etc.
ii). CMDC shall allow admissions to the children of the affected villages in the school
opened in the CMDC Township.
5.2.3. Community Development.
i). CMDC shall help Village Panchayats of the affected villages for providing facilities like
drinking water, electrification, making of approach roads, repair & improvements in
Community Centers etc.
ii). CMDC shall have active participation in local functions of the area and provide possible
necessary help wherever necessary.
iii). CMDC shall provide Training to the members of displaced families in various fields
through Government organization for enhancing their income level.
2. CMDC shall allot one per cent of its net profits for the purpose of Social &
Community Development programs of the area.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 149
5.3 Employment and other Oportunities
On opening of mine, large number of employment opportunities, alterative job
opportunities and self employment opportunities will be available, not only in Shankarpur
(Bhatgaon II) Project, but also in ancillaries that will come up with the opening of mine.
Right from the developmental period, work will be available for skilled, semi skilled and
unskilled categories, mainly through big contractors and large companies associated with
development and operation of mine. Regular employment opportunities would be available
in progressive / phased manner, as the mine production starts and reaches to rated
production capacity. Anyone eligible member of a Project Affected /Displaced family will be
provided an employment as per their Skill, Qualification and Physical Fitness.
5.4 Approval and Implimentation
This rehabilitation plan/scheme will be put before the competent authority for
approval and a MOU ( Memorandom of Understanding) will be signed between CMDC and
District collector Sarguja (Ambikapur) as per the format given in appendex-3 of ―An Ideal
Rehabilitation Policy 2007 of State of Chhattisgarh (As amended).
5.5 Definitiions
1. Inhabitant: Ordinari ly inhabitant of the vil lages means person indulged
in agriculture work (farming & labors on own land or others)
while residing at village or artisan craft men or working person.
2. Affected person: Affected person means such person who lives generally at
least 3(Three) years prior to the date of notif ication under
section -4 (Four)of land acquisition act in the area which is needed
for the project and who has been doing business or any other work
for his livelihood or who has been forming on his own land or
others land for at least 3 years.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 150
3. Affected family: Affected family includes any affected person his wife/ husband
minor children and aged parents, widow mother or sister and
unmarried daughter dependent on the affected person.
4. Displaced person: Displaced person means any land owner, govt. lease holder
or owner of any property who has been displaced from his land or
property on account of acquisition of land including acquisition of
Abadi land.
5. Displaced family: Displaced family means any displaced person, his wife /
husband minor children and aged parents widow mother or
sister and unmarried daughter depended on affected person.
Major / adult son of the displaced person who has
come into the category of adult from the date of the
publication of notif ication under section 4(Four) of land
acquisition act, will be considered as a separate family.
6. Landless farmer: Land less farmers means such person who doesn't possess
any agriculture land in the name of any member of his house
and who works on others agricultural land.
7. Small farmer: Small farmer means such farmer who has 1 hectare un-irrigated
land or 0-50 Hectare irrigated land of his ownership or his family's
ownership.
8. Agricultural labor: Agricultural labor means such person who doesn't hold his
own agricultural land & works as a labor on other's agricultural land.
9. Service land of Kotwar: Service land of Kotwar means as such defined
Chhattisgarh land Revenue code 1959.
10. Landless family: Land less family means 'non-agricultural displaced family.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 151
5.6 Compensation
Compensation will be based on following criteria;
All families/people will be eligible for the compensation that comes
within one or more category defined in 5.3. of this document.
Government land encroacher, on the recommendation of district level
committee land and those encroachers who have been in scheduled
area before 1990.
For other construction work on the encroached land
before 1990.
Minimum sum of 50,000 per-acre for barren land 75,000 per acre for
non-irrigated (single crop) and 1,00,000 Rs./acre for irrigated
(Double crop) land.
No compensation shall be paid to Kotwars for Service Land but
they will be given Land in place of the acquired-land.
Compensation for Trees and infrastructures on the land will be
given as per the recommendation of committee constituted for
this specific purpose or as per the order of district collector.
Each displaced family, who is to be rehabilitated will be given
minimum a turn- sum aid of Rs. 11,000(Eleven Thousand) as
rehabilitation grant.
Displaced families having cattle will be transported to a new place
free of cost from the acquired area under the supervision of district
administration. If displaced family doesn't take privilege of the
transport, then he will be given minimum lump- sum grant of Rs
l,000 (One Thousand).
5.6.1 The inference for financial allocation for the implimnetation of rehabilitation plan
has been taken from the State Governemnet running project and sactioned
rehabilitation scheme for the Naya Raipur Development Authority. The
financial projection has been based on the per unit average cost of
rehabilitation of different components of the rehabilitation scheme as
tabulated in table no. -----. Lump sum unit rate is based on experience
inferred from existing status of the project area and their rehabilitation cost
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 152
at present situation/status. Unit for the different components of the scheme
is as under;
Table: -5.1, Implimnetation of Rehabilitation Plan
S.N. Item/Details of works Rate in Rs. Unit
1 Cost of Agriculture Land as per the Revenue
Authorities 1375000.00 / Ha.
2 Cost of Badi Land as per the Revenue Autorities 825000.00 / Ha.
3 Cost of Govt Revenue land as per the Revenue
Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha.
3.2 Other land 460000.00 / Ha.
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 / Tubewell
4.1.2 Deep 250 Feet 35475.00 / Tubewell
4.1.3 Deep 300 Feet 41975.00 / Tubewell
4.2 Well
4.2.1 10 Feet Dia & 35 Feet Deep :(Kachcha) 30000.00 / Well
4.2.2 10 Feet Dia & 35 Feet Deep :(Pucca) 45000.00 / Well
4.2.3 12 Feet Dia & 40 Feet Deep: (Kachcha) 35000.00 / Well
4.2.4 12 Feet Dia & 40 Feet Deep: (Pucca) 50000.00 / Well
5 Green Barrier Development Around of village 1800000.00 /Ha.
6 Cost on employment of 1 member of each project
affected family
6.1 Skilled 2% of Total Project affected Families = 4
@Rs. 7500/-month 7500.00 /person /year
6.2 Semi-skilled 10% of Total Project affected
Families = 21@Rs. 5000/-month 5000.00 /person /year
6.3 unskilled 88 % of Total Project affected Families
= 187@Rs. 3000/-month 3000.00 /person /year
7
If employment is not provided, then 1 shop at the cost of company or maximum Rs.100000/- for
agricultural land development at another place or Rs. 100000/- cash.
100000.00 /person
8 Technical training to eligible candidates i.e. 5% of
PA families = 14 persons 50000.00 /person
9 Compensation for houses
9.1 Kachcha Houses: 200.00 /Sq. Ft.
9.2 Pucca Houses: 367.00 /Sq. Ft.
9.3 Aahata Nirman: (Kachcha) 700.00 /meter
9.4 Aahata Nirman: (Pucca) 1300.00 /meter
9.5 Fencing work : 139.00 /Number
9.6 Barbed Wire: 6.00 /meter
9.7 Baramda : (Kachcha) 70.00 /Sq. Ft.
9.8 Baramda : (Pucca) 128.00 /Sq. Ft.
10 Grant for construction of house 100000.00 /family
11 Grant for animal shade 10000.00 /family
12 Rehabilitiation assistance 11000.00 /family
13 Transportation charges on material/luggage 1000.00 /family
14 Cost of trees on private land 1000.00 /tree
15 Capacity enhancement training to 1 member of
each project affected families. 20000.00 /family
16 Upgradation of existing schools and its moderate
furnishing, situated in nearby project area
16.1 Primary Schools 50000.00 /school
16.2 Middle Sachool 1000000.00 /school
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 153
S.N. Item/Details of works Rate in Rs. Unit
16.3 Mahila Mandal 1000000.00
16.4 Angan badi 75000.00
16.5 Temple 100000.00
16.6 Bhajan Mandli/ Kirtan Bhawan 75000.00
17 Incentive to meritorious students ; awards etc. 10000.00 L.S.
18 Assistance to handicaped, widow and old aged
people in project affected villages 100000.00 L.S.
19 Revolving fund for women empowerment in
project affected villages through SHG groups 100000.00 L.S.
20 Expenditure on developemnt of agriculture in
project affected villages through introduction of new or innovative technologies, drip irrigation etc.
500000.00 L.S.
21 Training to farmers for skill upgradation 100000.00 L.S.
22 Assistance in marketting of village handicraft 100000.00 L.S.
23 Road Development & Approch Road 1000000.00 L.S.
24 Street Light 1000000.00 L.S.
25 Drainage System 500000.00 L.S.
26 Assistance to industries based on fly ash, such
as fly ash bricks etc. L.S.
27 Organisation of health camps 200000.00 L.S.
28 Establishment of Agricultural Farm Complex for alternative employment to farmers who wish to
remain in agriculture allied sector 1000000.00 L.S.
29 Adoption of 1 ITI for generation of skilled man
power 10000000.00 L.S.
5.7 Land Matters
5.7.1 Any displaced family will be eligible for getting land / plot of minimum size as
specified below on the basis of income or required plot, under this concept
displaced family will be eligible for getting plot much larger then the existing.
In rural area displaced families will get plots free of cost as given bellow:
Table: -5.2, Land Matters
S.No. Category Size of the Plot
1. Landless Family 300 sq.mtrs.
2. Small /Marginal Farmer‘s Family 450 sq.mtrs.
3. Other Farmer‘s Family 600 sq.mtrs
5.7.2 If any displaced family wants plot, larger in size than-what is given as per above
standard then by paying additional/ extra sum he may be given that plot on
the basis of its availability.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 154
5.7.3 Procedure of determining price for -plots of all the families will be equal. If rate of the
new land plot is more than the rate of compensation given for land acquisition
then difference, in sum shall be given according to the directives of state
government.
5.7.4 One family would get one land plot.
5.7.5 Displaced families will be assisted for being beneficiary within prevailing
government plans for irrigation by well, bore or other means in
allotted land.
5.7.6 The Kotwar will be assisted to get allotment of plot & other facilities just like other
displaced people.
5.7.7 Displacees would be assisted to get loan for new building construction from HUDCO
or other financial agencies, if they need.
5.7.8 Those, displaced families whose commercial/ business place will be acquired will be
provided a place in new settlement by developing commercial / business land
tract there. In condition of resettlement a person who is only an occupant,
will be given abadi- land in new settlement moreover he will be given also
rehabilitation grant for that provided that he has been living there for at least
three year prior from the date of publication of the notification under section 4
or has been a legal tenant for at least one year.
5.7.9 Project affected families will be given priority in the allotment of commercial land /plot
shop in the project area.
5.7.10 All necessarily provision will be made for construction of religious place like Temple,
Mosque, Gurudwara, Church, funeral in new place, where displaces have to
be shifted.
5.7.11 Details of size Land to be allotted to each Khatedar in this specific project;
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 155
Table: 5.3, Details of size Land to be allotted to each Khatedar
S.No. Size of Land Category Mayapur Shankarpur Grand Total
1 2 3 4 5 6
1 Less Than 0.5 Hectare A 175 44 219
2 0.5 Hectare to 1 Hectare B 68 36 104
3 1 Hectare to 1.5 Hectare C 46 7 53
4 1.5 Hectare to 2 Hectare D 33 8 41
5 2 Hectare to 3 Hectare E 26 15 41
6 3 Hectare to 4 Hectare F 13 6 19
7 4 Hectare and above G 17 10 27
Grand Total 378 126 504
Source: Land Records made available by project proponent.
5.7.12 It has been ensured that minimum homestead is disturbed and the land of only
those Homestead will be displaced which is must for the Project. Details are
given in the following table no. ----
Table: 5.4, Size of Plot of Land to be allotted
S.No. Size of Plot Mayapur Shankarpur Grand Total
1 2 3 4 5
1 Up to 300 Sq mtrs 282 96 378
2 300 to 450 Sq mtrs 2 8 10
3 450 to 600 Sq mtrs 1 0 1
4 Above 600 Sq mtrs 2 1 3
Grand Total 287 105 392
Source: Socio-Economic Survey by LNC, August 09 to November 09
5.7.13 The displaced families whose houses will be affected due to acquisition of land for
the Project will be resettled before taking possession of their land in which
their houses are built.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 156
5.8 Employment and other facilities
5.8.1 Displaced family will be eligible, for employment (who has been land owner or lease
holder of acquired land undependably or jointly three year prior to the date of
publication-of Notification under section 4 of land acquisition act. A one
member of such displaced family will be provided employment as per their
eligibility and appropriateness.
5.8.2 At the time of providing employment at project work displaced family will be given
priority. The Priority of employment would be given in following order
(i) Whose 100% of agricultural land and house is acquired
(ii) Whose 100% of agricultural land is acquired
(iii) Whose more than 75% of agricultural land is acquired.
(iv) Whose more than 50% of agricultural land is acquired.
(v) Whose more than 25% of agricultural land is acquired.
(vi) Other displaced family.
5.8.3 The employment will be subject to his/her suitability as to Age verification, Medical
Fitness, Police verification of character & antecedents, Educational
qualifications, Training, Experience & skill required for the nature of job/ post.
5.9 Self Employment in Agriculture
5.9.1 Project affected people whose 75% or more land is acquired for the Project and are
otherwise eligible for employment, but are not interested in employment and
wish to take up agricultural activities else where would be given one time Cash
assistance of Rs.10000/- for development of land, and a one time Cash grant
of Rs.75000/-in lieu of employment.
5.9.2 Training to all eligible educated young people will be given to make them more
skilled for better employment in the project as per their educational
qualification.
5.9.3 Transit arrangement for displaced family working in the project will be made.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 157
5.9.4 Such displaced family who have an alternative of self employment in transport
business whether it is related to the, carriage of product or passenger
transport they will be given priority in transport constructs of project, and to
serve the purpose assistance to get transport vehicle will be given to them.
5.10 Training
5.10.1 Those member of displaced families who are eligible for getting employment in
projects but do not possess any necessary/ required technical qualification,
then in that condition they will be trained as per their educational qualification.
5.10.2 Project affected other people specially land less people will be given to develop
new skills in them and they will be given employment in accordance to their
eligibility, skill and physical fitness. These will also be assisted to get
employment in project generated created by the State Government.
5.10.3 Displaced families will be trained for self employment rooted plans (development of
dairy, poultry, fisheries, short college industry etc.) in accordance to their
interest. They will also be assisted to get loan from the related financial
institutions for their self employment.
5.10.4 Educated youth who qualify for ITI admission in the District of Surguja will be
provided financial assistance by way of meeting the expenses of the course
fee by CMDC for first five years of issue of Notification for Land acquisition for
the Project. This facility can be extended, if necessary, with or without some
modification in the scheme.
5.10.5 Educated wards from displaced family who qualify for admission in Diploma in
Engineering in the state of Chhattisgarh will be provided financial assistance
by way of meeting course fee by CMDC for first five years of issue of
Notification for Land acquisition for the Project. This facility can be extended, if
necessary, with or without some modification in the scheme.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 158
5.10.6 The villagers in the socio-economic survey also expressed their willingness to be
trained in differed skills so that they either are self-employed or can be
absorbed in other occupations. Several of these people will be trained in
activities such as basket making, small businesses, tailoring, etc. CMDC will
encourage self employment of the displaced families through training. CMDC
will arrange for training of interested persons for increasing their skills, through
government agencies like ITI or any other institution of Govt. of CG. The fields
selected for self employment during survey or as under:
(i) Dairy;
(ii) Poultry;
(iii) Mushroom Growing;
(iv) Medicinal Plants growing;
(v) Fruit Planting;
(vi) Vegetable Farming;
(vii) Floriculture;
(viii) Silviplasture (Resham keet Paalan);
(ix) Bee keeping;
(x) Achar,Jam,Jelly,Murabba,Paapar making;
(xi) Growing & precessing of spices;
(xii) Rope,Basket,Chatai making ;
(xiii) Bamboo crafting;
(xix) Wood crafting;
(xx) Agarbatti making;.
(xxi) Horticulture, etc.
5.10.7 Training in other areas will also be coordinated through the State Departments,
Government, wherein CMDC will provide financial assistance to the Project
Affected People required for the training.
5.10.8 Project Affected Persons shall also be provided training either in the CMDC ‗s
Training Centre or in any other organization in the technical field, wherever
necessary, to provide and develop their technical skill.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 159
5.10.9 The project affected persons will be motivated to get benefit of various self
employment schemes being organized by various Departments of the
Government. The self employment or profession will be provided financial
assistance by bank or Government Agency or non-government organization.
These schemes will be implemented by the following
Departments/Agencies:-
Chhattisgarh Khadi Evam Gramodyog Board
Jila Panchayat / Janpad Panchayat or Gram Panchayat.
District Industry and Trade Center
Veterinary and Fisheries Department
Mahila Evam Bal Vikas Nigam
Horticulture and Social Forestry Department
Sericulture Department
5.10.10 Workshop/ training will be organized for the self help groups working in project
area to facilitate them in joining in the project activities as per their eligibility,
skill.
5.10.11 Following nature of jobs will be offered to Cooperative Societies of Project affected
persons:-
a) Lifting shifting & sorting of material, e.g.,
i) Lifting & shifting of other civil material;
ii) Small Plant construction material;
iii) Stores Material, etc.
iv) Lifting & shifting of Coal;
v) Lifting shifting & sorting at coal yard .
b) Horticulture jobs, e.g.
i) Plantation in mine & Township area;
ii) Maintenance of Plants in mine & Township area;
c) Minor Civil jobs, e.g.
i) Removal & shifting of loose earth;
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 160
ii) Construction of boundary wall, drains etc.
d) Manpower supply to large Contractors;
e) Clearing of sites in the Mine and Township area;
f) General cleaning in Plant & Township area;
g) Transportation of civil material for contractors;
5.11 Self Employment Opportunities:
Besides, lot of self-employment opportunities will be available to Project affected
Persons, as given below.
i). Supply of milk in Mines canteen & Township residents. ii). Supply of vegetables in Mines canteen & Township residents. iii). Supply of provisions to Mines Canteen & Township residents. iv). Supply of confectionary items, e.g. Bread, biscuits, eggs etc. to Mines Canteen & Township residents v). Hotel & Restaurant. vi). General merchant Shop. vii). Sweets Shop. viii). Flour mill. ix). Supply and transporting of sand x). Tailoring shop. xi). Operating of Taxies/Autos. xii). Small Workshop for repairing of machines parts. xiii). Herbal medicinal plants & Jetropha plantation. xiv) Poultry farming. xv).Mushroom farming. xvi).Basket & rope making.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 161
xvii).Processing of medicinal & herbal plants, e.g. Alovera. xviii).Fruit growing. xix).Processing of Fruits, e.g. Jam, Jelly, Achar etc. xx).Plantation & marketing of Flowers. xxi).Supply of stationary items. xxii). Sheep, pigs, Bee keeping. xxiii).Sale & repair shop for electrical items. xxiv).Manufacturing of Bakery items. xxv). Supply of saplings for plantation. xxvi). Saplings of manures for plants & garden. xxvii). Auto Repair shop.
5.11.1 Any member of the displaced family is willing to establish industry of his own, then
they will be facilitated in land allotment in the adjacent/surrounding area as per
the project need for setting up an acilliary unit.
5.11.2 Displaced families will be provided medical facilities in project hospital and their
children will be provided facility while getting admission in project school on a nominal/
seasonal fee.
5.12 Details of the land identified for resettlement of the PAP
The land proposed for Resettlement Colony has been identified in Village ---------
Tahsil ---------------- District Surguja.The total land being acquired for the resettlement
colony ---------- Hectares of Private Land. Map of the proposed resettlement Colony is
attached.
It is ensured that;
1. No house is affected in the area of the Resettlement Colony.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 162
2. No public building is affected due to acquisition of private land in the area of
Resettlement Colony.
3. The proposed resettlement Colony can accommodate all displaced families.
5.13 Main features of Resettlement Colony
Resettlement colony for Displaced families is being designed in such a way that
displaced families will get better living standard than what they are getting presently.
Following facilities like water, road, and electricity community development places / public
buildings will be provided as below: -
5.13.1 Road: As per the requiredment.
5.13.2 Drinking water:- One hand pump will be provided in a cluster of about 20 house for
the purpose of supply of drinking water/domestic water.
5.13.3 Electrification:- Electric Poles on each road and lanes and electric connection will
be provide to each plot/ house in the Resettlement Colony. Bill for consumption of Power
for streetlights will be borne by the village Panchayat, and the bill for individual
consumption of electricity for domestic use will be borne by the resident user.
5.13.4 Community Structures / Public Building. All types of essential community
structures / Public Buildings such as Primary School, Secondary School, Primary Health
Centre, Panchayat Bhawan and Play ground will be constructed. The community centre
will be handed over to the Village Panchayat/ Society of the residents of Resettlement
Colony.
5.13.5 It is proposed to name this Resettlement Colony as ‗ New Shankarpur.‘
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 163
5.14 Monitoring Committees
Following Committees shall monitor Resettlement of displaced families.
a) State level Resettlement Committee.
1. Chief Minister of Chhattisgarh state Chairman 2. Leader of Opposition Party of CG State Assembly Member 3. Minister In charge of Ministry of Finance Member 4. Minister In charge of Ministry of resettlement Member 5. Minister In charge of Revenue Department Member 6. Minister In charge of Ministry of Law Member 7. Minister of Mineral Resources Member 8. Zila Panchayat Adhyaksh of Distt. Suguja Member 9. Member of Parliament/ Assembly Affected Area – Nominated by the Govt. of C.G. Member(s) 10. Chief Secretary, Govt. of C.G. Member 11. Secretary of Mineral Resources Deptt. Member 12. Managing Director of CMDC Special Invitee 13. Resettlement Commissioner of the state of C.G. Member Secretary
b) District level Resettlement Committee shall have following members.
1. Minister In charge of District Surguja Chairman 2. Zila Panchayat Adhyaksh Member 3. Member of Parliament/ Assembly Affected area – Nominated by the Govt. of CG. Member(s) 4. Sarpanch (s) of affected Villages where Ressettle is to be done Member(s) 5. District Mining Officer and In charge of Mining
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 164
of Distt. Surguja. Member(s) 6. Managing Director, CMDC Special Invitee 7. District Collector, Surguja district Member Secretary.
5.15 Redressal of Grievances: Grievance Redressal is an important component as it
ensures that R&R benefits reaches to the affected population. The R&R
committee would ensure that all the grievances of the PAPs are suitably
redressed. An effort will be made that all petty grievances are sorted there itself
when the grievance is submitted. Complicated grievances where other agencies
are involved, in that case the issue will be attempted to be sorted out in three
months by coordinating with proper agency.
Following mechanism is set up for redressal of grievances relating to
Rehabilitation & Resettlement of project-affected people.
1. Any dispute regarding Land ownership, area of Land, Type of Land etc.
Shall be settled by the Land Acquisition Officer/District Administration.
2. Any dispute regarding number of trees, type & size of trees, valuation of
trees in the land which is acquired for the Project shall be decided by the
Land Acquisition Officer in consultation with Tehsildar and concerned
departments i.e. Horticulture/Agriculture/Forest.
3. Valuation of House, well, Bari etc. will be decided by the Land Acquisition
Officer in consultation of Govt. approved Valuer or committee comprising
of technical experts.
4. Any grievance regarding eligibility of allotment of residential plots to
those families whose houses are acquired for the Project, facilities in the
Resettlement Colony will be monitored by the State level and District
level Committee. An Officer nominated by the MD CMDC, shall also be
associated in the monitoring Committee(s) for co-ordination of
resettlement of displaced families whose homestead is acquired for the
Project. In case of any capital expenditure, the nominated Officer shall
put up proposal for approval of MD through GM (Coal).
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 165
5. The Head of the Grievance Committee shall coordinate with State level
monitoring Committee, and the Member Secretary shall coordinate with
the District level monitoring Committee and Government agencies
regarding redressal of grievances and matters relating to Rehabilitation &
Resettlement of displaced persons/ families.
6. The Grievance Committee shall keep abreast the Managing Director
regarding grievances and their redressal every fortnightly
7. An officer shall be nominated by managing director for redressal of
grievances regarding Rehabilitation (i.e. employment /alternate job/
training etc.).
8. A Grievance Committee of CMDC consisting of following officers shall be
constituted by the Managing Director for monitoring redressal of
grievances.
a). GM Coal - Head of the Committee
b). Accounts Officer - Member
c). Civil Engineer/ Survey Officer - Member
d). Officer incharge of Ambikapur office - Member Secretary.
The committee will initially meet weekly to sort out petty grievances, and wherever
necessary will take approval of MD.
5.16 Implementation Schedule / Execution time frame:
A time schedule for the implementation of R&R activities has been taken as 3 years
from the date of approval R&R plan from Govt. of C.G. The R&R activities will be
correlated with the mining activities. The R&R implementation will be done in single phase
/4 phases as per the project requirement. Two complete villages viz., Shankarpur and
Mayapur need to be relocated.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 166
CHAPTER – 6 BENEFITS AND REHABILITATION COST
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 167
CHAPTER VI
BENEFITS AND REHABILITATION COST
The nation is suffering from the shortage of power. The Chhattisgarh State has rich
resources to meet this shortage of power up to some extent. The coal is major requiremet
for the generation of Thermal Power. The project is destined to harness the coal for
different uses in leisure and progress of the mankind. This will indirectly boost to the
energy sector and to economy of the India ultimately.
6.1 Direct Benefit from the Project:
Investment exceeding Rs 1600 crore shall be made by CMDC or its MDO
(Mine Developer cum Operator) and about Rs. 4500 Crore will be invested
by ICPL for putting a power plant in village Prem Nagar District Surguja in
the State of Chhattisgarh. This investment will raise the income of common
man residing in the near by villages and area.
Benefit from Revenue collection to State Exchequer through Royalty on coal,
taxes and duties, which would be approximately exceeding Rs. 100 cr. per
annum.
Revenue to CSEB: CSEB would be access to power at minimum cost, an
opportunity for enhancement in its revenue which is an added advantage to
Chhattisgarh Government.
Host of economic activities viz. transportation, hotel, banking, hospital,
education, construction industry and business, development of allied
industries etc. would be a great boom for Surguja Distt.
Agriculture and Horticulture: Largest scale plantation will be done by CMDC
around the periphery of dumps and mine.
Employment Generation through Vocational Training to Un-employed youth
and eligible persons would be imparted for self-employment.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 168
General Development: Activities focused for socio-economic development of
the rural family including education, health & hygiene are part of the project.
Eco friendly Mining Techniques will impart least impact on the environment.
6.2 Indirect Benefit from the Project:
Requirement of manpower for construction is expected to increase
progressively to approximately 5000 after reaching to its rated production
capacity and decline as the construction activity comes to an end.
Average employment over the 5-year period of development of mine will
be 2000.
This will be ensured that, project affected people will be the major
beneficiaries of increased economic activity and employment. This would
be done through training to improve their employability and through
promotion of self-employment and development of entrepreneurship.
Employment and increased income will in turn lead to a better quality of
life and further enhanced opportunities to participate in the new economic
opportunities created by opening and operating the 6 million tonnes coal
mine.
6.3 REHABILITATION COST
Rehabilitaion is a very painfull activity but essential for the nation‘s progress and
improvement in the life style of the existing population over any project area. The CMDC
will take care of all the, guidelines, principles, rules, regulations and acts laid by the state
or central government for proper rehabilitiation of project affected people.
Village wise activity and financial projection for rehabilitation of project affected
families/persons are tabulated below inference to above chapters. The cost calculation is
based on the rehabilitation scheme inforced by Naya Raipur Development Authority under
the aeiges of Housing and Environement Department Governemnt of Chhattisgarh.
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 169
6.3.1 VILLAGE MAYAPUR
Table: - 5.1, Rehabilitation Cost, Village Mayapur
S.N. Item/Details of works Village - Mayapur
Rate in Rs. Unit Quantity Amount in Rs. Remarks
1 Cost of Agriculture
Land as per the Revenue Authorities
1375000.00 / Ha. 419.26 576482500 Total Private Area to be acquired
2 Cost of Badi Land as
per the Revenue Autorities
825000.00 / Ha. 2.22 1831500 Total Private Area to be acquired
3 Cost of Govt Revenue
land as per the Revenue Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha. 97.18 89405600
3.2 Other land 460000.00 / Ha. 15.86 7295600
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 /
Tubewell 6 174600
4.1.2 Deep 250 Feet 35475.00 /
Tubewell 4 141900
4.1.3 Deep 300 Feet 41975.00 /
Tubewell 2 83950
4.2 Well
4.2.1 10 Feet Dia & 35 Feet
Deep :(Kachcha) 30000.00 / Well 4 120000
4.2.2 10 Feet Dia & 35 Feet
Deep :(Pucca) 45000.00 / Well 2 90000
4.2.3 12 Feet Dia & 40 Feet
Deep: (Kachcha) 35000.00 / Well 2 70000
4.2.4 12 Feet Dia & 40 Feet
Deep: (Pucca) 50000.00 / Well 1 50000
5 Green Barrier
Development Around of village
1800000.00 /Ha. 50 90000000
6 Cost on employment of
1 member of each project affected family
287
There are total 287 project
affected families
6.1
Skilled 2% of Total Project affected
Families = 4 @Rs. 7500/-month
7500 /person /year
6 45000
Recuring Cost 6.2
Semi-skilled 10% of Total Project affected Families = 21@Rs.
5000/-month
5000 /person /year
29 145000
6.3
unskilled 88 % of Total Project affected
Families = 187@Rs. 3000/-month
3000 /person /year
252 756000
7
If employment is not provided, then 1 shop at the cost of company
or maximum Rs.100000/- for agricultural land
development at another
100000 /person 287 28700000 One time cost
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 170
S.N. Item/Details of works Village - Mayapur
Rate in Rs. Unit Quantity Amount in Rs. Remarks
place or Rs. 100000/- cash.
8
Technical training to eligible candidates i.e. 5% of PA families = 14
persons
50000 /person 14 700000
9 Compensation for
houses
9.1 Kachcha Houses: 200 /Sq. Ft. 239570 47914000
9.2 Pucca Houses: 367 /Sq. Ft. 0 0
9.3 Aahata Nirman:
(Kachcha) 700 /meter 1290 903000
9.4 Aahata Nirman:
(Pucca) 1300 /meter 150 195000
9.5 Fencing work : 139 /Number 3 417
9.6 Barbed Wire: 6 /meter 960 5760
9.7 Baramda : (Kachcha) 70 /Sq. Ft. 38700 2709000
9.8 Baramda : (Pucca) 128 /Sq. Ft. 4350 556800
10 Grant for construction
of house 100000 /family 287 28700000
11 Grant for animal shade 10000 /family 216 2160000
12 Rehabilitiation
assistance 11000 /family 287 3157000
13 Transportation charges
on material/luggage 1000 /family 287 287000
14 Cost of trees on private
land 1000 /tree 6570 6570000
15
Capacity enhancement training to 1 member of each project affected
families.
20000 /family 287 5740000
16
Upgradation of existing schools and its
moderate furnishing, situated in nearby
project area
16.1 Primary Schools 500000 /school 2 1000000
16.2 Middle Sachool 1000000 /school 1 1000000
16.3 Mahila Mandal 1000000
2 2000000
16.4 Angan badi 75000
3 225000
16.5 Temple 100000
1 100000
16.6 Bhajan Mandli/ Kirtan
Bhawan 75000
0 0
17 Incentive to meritorious students ; awards etc.
10000 L.S.
10000
18
Assistance to handicaped, widow and
old aged people in project affected villages
100000 L.S.
100000
19
Revolving fund for women empowerment
in project affected villages through SHG
groups
100000 L.S.
100000
20 Expenditure on developemnt of
agriculture in project 500000 L.S.
500000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 171
S.N. Item/Details of works Village - Mayapur
Rate in Rs. Unit Quantity Amount in Rs. Remarks
affected villages through introduction of
new or innovative technologies, drip
irrigation etc.
21 Training to farmers for
skill upgradation 100000 L.S.
100000
22 Assistance in
marketting of village handicraft
100000 L.S.
100000
23 Road Development &
Approch Road 1000000 L.S.
20000000
24 Street Light 1000000 L.S.
100000
25 Drainage System 500000 L.S.
500000
26 Assistance to industries based on fly ash, such as fly ash bricks etc.
L.S.
27 Organisation of health
camps 200000 L.S.
200000
28
Establishment of Agricultural Farm
Complex for alternative employment to farmers who wish to remain in
agriculture allied sector
1000000 L.S.
1000000
29 Adoption of 1 ITI for generation of skilled
man power
L.S.
Net Total
922024627
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 172
Chart 6.1, Mayapur Rehabilitation Expenditure
The above Graph explains about the cost on rehabilitation of Mayapur village. The
Maximum Expenditure is on the purchase of land i.e, Rs. 6,750.15 lacs as compare to the
expenditure on Employment, Development and Compensation for house and
infrastructures.
Chart 6.2, Mayapur Rehabilitation Expenditure in %
The above Pie-Chart shows expenditure on Mayapur Rehabilitation in terms of
%.The Major portion will go on Purchase of land, i.e. 73%, next to it on Development &
Environement i.e. 10%, on Employment – 4% and on bulk infrastructure – 3% only. The
expenditure on other sector is very less.
213.30 24.00
931.58 900.00
27.35371.86
2.00
6,750.15
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Am
ou
nt
in L
acs
Type of Expenditure
Mayapur Rehabilitaion Expenditure
Bulk Infra.3%
Commu. develp.0%
Comp. for Hou. & Infrast.10%Develp. & Envor.
10%Education0%
Employeement 4%
Health0%
Purchase of Land73%
Mayapur Rehabilitation Expenditure
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 173
6.3.2 VILLAGE SHANKARPUR
Table: - 5.2, Rehabilitation Cost, Village Shankarpur
S.N. Item/Details of works Village - Shankarpur
Rate in Rs. Unit Quantity Amount in Rs. Remarks
1
Cost of Agriculture Land
as per the Revenue
Authorities
1375000.00 / Ha. 171.41 235688750
Total
Private
Area to be
acquired
2 Cost of Badi Land as per
the Revenue Autorities 825000.00 / Ha. 1.48 1221000
Total
Private
Area to be
acquired
3
Cost of Govt Revenue
land as per the Revenue
Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha. 35.72 32862400
3.2 Other land 460000.00 / Ha. 13.34 6136400
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 / Tubewell 4 116400
4.1.2 Deep 250 Feet 35475.00 / Tubewell 3 106425
4.1.3 Deep 300 Feet 41975.00 / Tubewell 2 83950
4.2 Well
4.2.1 10 Feet Dia & 35 Feet
Deep :(Kachcha) 30000.00 / Well 7 210000
4.2.2 10 Feet Dia & 35 Feet
Deep :(Pucca) 45000.00 / Well 2 90000
4.2.3 12 Feet Dia & 40 Feet
Deep: (Kachcha) 35000.00 / Well 6 210000
4.2.4 12 Feet Dia & 40 Feet
Deep: (Pucca) 50000.00 / Well 3 150000
5
Green Barrier
Development Around of
village
1800000.00 /Ha. 50 90000000
6 Cost on employment of 1
member of each project 105
There are
total 105
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 174
S.N. Item/Details of works Village - Shankarpur
Rate in Rs. Unit Quantity Amount in Rs. Remarks
affected family project
affected
families
6.1
Skilled 2% of Total
Project affected Families
= 4 @Rs. 7500/-month
7500 /person
/year 2 15000
Recuring
Cost 6.2
Semi-skilled 10% of
Total Project affected
Families = 21@Rs.
5000/-month
5000 /person
/year 11 55000
6.3
unskilled 88 % of Total
Project affected Families
= 187@Rs. 3000/-month
3000 /person
/year 92 276000
7
If employment is not
provided, then 1 shop at
the cost of company or
maximum Rs.100000/-
for agricultural land
development at another
place or Rs. 100000/-
cash.
100000 /person 433 43300000 One time
cost
8
Technical training to
eligible candidates i.e.
5% of PA families = 14
persons
50000 /person 22 1100000
9 Compensation for
houses
9.1 Kachcha Houses: 200 /Sq. Ft. 180308 36061600
9.2 Pucca Houses: 367 /Sq. Ft. 0 0
9.3 Aahata Nirman:
(Kachcha) 700 /meter 480 336000
9.4 Aahata Nirman: (Pucca) 1300 /meter 50 65000
9.5 Fencing work : 139 /Number 1 139
9.6 Barbed Wire: 6 /meter 350 2100
9.7 Baramda : (Kachcha) 70 /Sq. Ft. 14100 987000
9.8 Baramda : (Pucca) 128 /Sq. Ft. 1650 211200
10 Grant for construction of
house 100000 /family 433 43300000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 175
S.N. Item/Details of works Village - Shankarpur
Rate in Rs. Unit Quantity Amount in Rs. Remarks
11 Grant for animal shade 10000 /family 378 3780000
12 Rehabilitiation
assistance 11000 /family 433 4763000
13 Transportation charges
on material/luggage 1000 /family 433 433000
14 Cost of trees on private
land 1000 /tree 4365 4365000
15
Capacity enhancement
training to 1 member of
each project affected
families.
20000 /family 433 8660000
16
Upgradation of existing
schools and its moderate
furnishing, situated in
nearby project area
16.1 Primary Schools 500000 /school 1 500000
16.2 Middle Sachool 1000000 /school 1 1000000
16.3 Mahila Mandal 1000000
0
16.4 Angan badi 75000
2 150000
16.5 Temple 100000
1 100000
16.6 Bhajan Mandli/ Kirtan
Bhawan 75000
1 75000
17 Incentive to meritorious
students ; awards etc. 10000 L.S.
10000
18
Assistance to
handicaped, widow and
old aged people in
project affected villages
100000 L.S.
100000
19
Revolving fund for
women empowerment in
project affected villages
through SHG groups
100000 L.S.
100000
20
Expenditure on
developemnt of
agriculture in project
affected villages through
introduction of new or
innovative technologies,
500000 L.S.
500000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 176
S.N. Item/Details of works Village - Shankarpur
Rate in Rs. Unit Quantity Amount in Rs. Remarks
drip irrigation etc.
21 Training to farmers for
skill upgradation 100000 L.S.
100000
22 Assistance in marketting
of village handicraft 100000 L.S.
100000
23 Road Development &
Approch Road 1000000 L.S.
20000000
24 Street Light 1000000 L.S.
100000
25 Drainage System 500000 L.S.
500000
26
Assistance to industries
based on fly ash, such
as fly ash bricks etc.
L.S.
27 Organisation of health
camps 200000 L.S.
200000
28
Establishment of
Agricultural Farm
Complex for alternative
employment to farmers
who wish to remain in
agriculture allied sector
1000000 L.S.
1000000
29
Adoption of 1 ITI for
generation of skilled man
power
L.S.
Net Total
539120364
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 177
Chart 6.3, Shankarpur Rehabilitation Expenditure
The Maximum Expenditure is proposed on the purchase of land i.e, Rs. 2,759.09
lacs.
Chart 6.4, Shankarur Rehabilitation Expenditure
The above Pie-Chart Explain about the Shankarpur cost on rehabilitation in terms of
%. It is 51% on Purchase of land, Development –17%, Employment –10%, Compensation
for house and infrastructure – 18% and 4% on bulk infrastructure.
215.674.75
943.04 900.00
21.60
545.06
2.00
2,759.09
0
500
1,000
1,500
2,000
2,500
3,000
Am
ou
nt
in L
acs
Type of Expenditure
Shankarpur Rehabilitation Expenditure
Bulk Infra.4%
Commu. develp.0%
Comp. for Hou. & Infrast.18%
Develp. & Envor.17%
Education0%
Employeement 10%
Health0%
Purchase of Land51%
Shankarpur Rehabilitation Expenditure
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 178
Table: - 6.3, Rehabilitation Cost, Village Bojha
S.N. Item/Details of works Village - Bojha
Rate in Rs. Unit Quantity Amount in Rs. Remarks
1
Cost of Agriculture Land
as per the Revenue
Authorities
1375000.00 / Ha. 431.65 593518750
Total Private
Area to be
acquired
2
Cost of Badi Land as
per the Revenue
Autorities
825000.00 / Ha. 0 0
Total Private
Area to be
acquired
3
Cost of Govt Revenue
land as per the
Revenue Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha. 97.62 89810400
3.2 Other land 460000.00 / Ha. 49.75 22885000
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 /
Tubewell
4.1.2 Deep 250 Feet 35475.00 /
Tubewell
4.1.3 Deep 300 Feet 41975.00 /
Tubewell
4.2 Well
4.2.1 10 Feet Dia & 35 Feet
Deep :(Kachcha) 30000.00 / Well
4.2.2 10 Feet Dia & 35 Feet
Deep :(Pucca) 45000.00 / Well
4.2.3 12 Feet Dia & 40 Feet
Deep: (Kachcha) 35000.00 / Well
4.2.4 12 Feet Dia & 40 Feet
Deep: (Pucca) 50000.00 / Well
5
Green Barrier
Development Around
of village
1800000.00 /Ha. 50 90000000
6
Cost on employment of
1 member of each
project affected family
202
There are
total 202
project
affected
families
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 179
S.N. Item/Details of works Village - Bojha
Rate in Rs. Unit Quantity Amount in Rs. Remarks
6.1
Skilled 2% of Total
Project affected
Families = 4 @Rs.
7500/-month
7500 /person
/year 4 30000
Recuring
Cost 6.2
Semi-skilled 10% of
Total Project affected
Families = 21@Rs.
5000/-month
5000 /person
/year 20 100000
6.3
unskilled 88 % of Total
Project affected
Families = 187@Rs.
3000/-month
3000 /person
/year 178 534000
7
If employment is not
provided, then 1 shop at
the cost of company or
maximum Rs.100000/-
for agricultural land
development at another
place or Rs. 100000/-
cash.
100000 /person 202 20200000 One time
cost
8
Technical training to
eligible candidates i.e.
5% of PA families = 14
persons
50000 /person 10 500000
9 Compensation for
houses
9.1 Kachcha Houses: 200 /Sq. Ft. 0 0
9.2 Pucca Houses: 367 /Sq. Ft. 0 0
9.3 Aahata Nirman:
(Kachcha) 700 /meter
9.4 Aahata Nirman: (Pucca) 1300 /meter
9.5 Fencing work : 139 /Number
9.6 Barbed Wire: 6 /meter
9.7 Baramda : (Kachcha) 70 /Sq. Ft.
9.8 Baramda : (Pucca) 128 /Sq. Ft.
10 Grant for construction of
house 100000 /family 0 0
11 Grant for animal shade 10000 /family 0 0
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 180
S.N. Item/Details of works Village - Bojha
Rate in Rs. Unit Quantity Amount in Rs. Remarks
12 Rehabilitiation
assistance 11000 /family 0 0
13 Transportation charges
on material/luggage 1000 /family 0 0
14 Cost of trees on private
land 1000 /tree 9045 9045000
15
Capacity enhancement
training to 1 member of
each project affected
families.
20000 /family 0 0
16
Upgradation of existing
schools and its
moderate furnishing,
situated in nearby
project area
16.1 Primary Schools 500000 /school 0 0
16.2 Middle Sachool 1000000 /school 0 0
16.3 Mahila Mandal 1000000
16.4 Angan badi 75000
16.5 Temple 100000
16.6 Bhajan Mandli/ Kirtan
Bhawan 75000
17 Incentive to meritorious
students ; awards etc. 10000 L.S.
10000
18
Assistance to
handicaped, widow and
old aged people in
project affected villages
100000 L.S.
100000
19
Revolving fund for
women empowerment
in project affected
villages through SHG
groups
100000 L.S.
100000
20
Expenditure on
developemnt of
agriculture in project
affected villages through
introduction of new or
500000 L.S.
500000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 181
S.N. Item/Details of works Village - Bojha
Rate in Rs. Unit Quantity Amount in Rs. Remarks
innovative technologies,
drip irrigation etc.
21 Training to farmers for
skill upgradation 100000 L.S.
100000
22 Assistance in marketting
of village handicraft 100000 L.S.
100000
23 Road Development &
Approch Road 1000000 L.S.
20000000
24 Street Light 1000000 L.S.
100000
25 Drainage System 500000 L.S.
500000
26
Assistance to industries
based on fly ash, such
as fly ash bricks etc.
L.S.
27 Organisation of health
camps 200000 L.S.
200000
28
Establishment of
Agricultural Farm
Complex for alternative
employment to farmers
who wish to remain in
agriculture allied sector
1000000 L.S.
1000000
29
Adoption of 1 ITI for
generation of skilled
man power
L.S.
Net Total
849333150
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 182
Chart 6.5, Bojha Rehabilitation Expenditure
The above Graph explains about the rehabilitation cost for Bojha village. The
Maximum is on the purchase of land i.e, Rs. 7,062.14 lacs. Status of other sector can be
ajudged from the bar chart.
Chart 6.6, Bojha Rehabilitation Expenditure
The above Pie-Chart shows about the Rehabilitation expenditure for Bojha village in
terms of %. Maximum is on Purchase of land- i.e. 83%, Development –11%, Employment
–3%, Compensation for house and infrastructure –1% and on bulk infrastructure –2%.
206.00 3.00 90.45
900.00
5.10 224.64 2.00
7,062.14
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Am
ou
nt
in L
acs
Type of Expenditure
Bojha Rehabilitation Expenditure
Bulk Infra.2%
Commu. develp.0%
Comp. for Hou. & Infrast.
1%Develp. & Envor.
11%Education
0%
Employeement 3%
Health0%
Purchase of Land83%
Bojha Rehabilitation Expenditure
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 183
Table: - 6.4, Rehabilitation Cost, Village Songara
S.N. Item/Details of works
Village - Songara
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
1
Cost of Agriculture Land
as per the Revenue
Authorities
1375000.00 / Ha. 638 877250000
Total Private
Area to be
acquired
2 Cost of Badi Land as per
the Revenue Autorities 825000.00 / Ha. 0 0
Total Private
Area to be
acquired
3
Cost of Govt Revenue
land as per the Revenue
Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha. 146.43 134715600
3.2 Other land 460000.00 / Ha. 44.71 20566600
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 / Tubewell
4.1.2 Deep 250 Feet 35475.00 / Tubewell
4.1.3 Deep 300 Feet 41975.00 / Tubewell
4.2 Well
4.2.1 10 Feet Dia & 35 Feet
Deep :(Kachcha) 30000.00 / Well
4.2.2 10 Feet Dia & 35 Feet
Deep :(Pucca) 45000.00 / Well
4.2.3 12 Feet Dia & 40 Feet
Deep: (Kachcha) 35000.00 / Well
4.2.4 12 Feet Dia & 40 Feet
Deep: (Pucca) 50000.00 / Well
5
Green Barrier
Development Around of
village
1800000.00 /Ha. 50 90000000
6
Cost on employment of 1
member of each project
affected family
340
There are
total 340
project
affected
families
6.1 Skilled 2% of Total
Project affected Families 7500
/person
/year 7 52500
Recuring
Cost
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 184
S.N. Item/Details of works
Village - Songara
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
= 4 @Rs. 7500/-month
6.2
Semi-skilled 10% of Total
Project affected Families
= 21@Rs. 5000/-month
5000 /person
/year 34 170000
6.3
unskilled 88 % of Total
Project affected Families
= 187@Rs. 3000/-month
3000 /person
/year 299 897000
7
If employment is not
provided, then 1 shop at
the cost of company or
maximum Rs.100000/-
for agricultural land
development at another
place or Rs. 100000/-
cash.
100000 /person 340 34000000 One time
cost
8
Technical training to
eligible candidates i.e.
5% of PA families = 14
persons
50000 /person 17 850000
9 Compensation for
houses
9.1 Kachcha Houses: 200 /Sq. Ft. 0 0
9.2 Pucca Houses: 367 /Sq. Ft. 0 0
9.3 Aahata Nirman:
(Kachcha) 700 /meter
9.4 Aahata Nirman: (Pucca) 1300 /meter
9.5 Fencing work : 139 /Number
9.6 Barbed Wire: 6 /meter
9.7 Baramda : (Kachcha) 70 /Sq. Ft.
9.8 Baramda : (Pucca) 128 /Sq. Ft.
10 Grant for construction of
house 100000 /family 0 0
11 Grant for animal shade 10000 /family 0 0
12 Rehabilitiation assistance 11000 /family 0 0
13 Transportation charges
on material/luggage 1000 /family 0 0
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 185
S.N. Item/Details of works
Village - Songara
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
14 Cost of trees on private
land 1000 /tree 4560 4560000
15
Capacity enhancement
training to 1 member of
each project affected
families.
20000 /family 340 6800000
16
Upgradation of existing
schools and its moderate
furnishing, situated in
nearby project area
16.1 Primary Schools 500000 /school 0 0
16.2 Middle Sachool 1000000 /school 0 0
16.3 Mahila Mandal 1000000
16.4 Angan badi 75000
16.5 Temple 100000
16.6 Bhajan Mandli/ Kirtan
Bhawan 75000
17 Incentive to meritorious
students ; awards etc. 10000 L.S.
10000
18
Assistance to
handicaped, widow and
old aged people in
project affected villages
100000 L.S.
100000
19
Revolving fund for
women empowerment in
project affected villages
through SHG groups
100000 L.S.
100000
20
Expenditure on
developemnt of
agriculture in project
affected villages through
introduction of new or
innovative technologies,
drip irrigation etc.
500000 L.S.
500000
21 Training to farmers for
skill upgradation 100000 L.S.
100000
22 Assistance in marketting 100000 L.S.
100000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 186
S.N. Item/Details of works
Village - Songara
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
of village handicraft
23 Road Development &
Approch Road 1000000 L.S.
20000000
24 Street Light 1000000 L.S.
100000
25 Drainage System 500000 L.S.
500000
26
Assistance to industries
based on fly ash, such as
fly ash bricks etc.
L.S.
27 Organisation of health
camps 200000 L.S.
200000
28
Establishment of
Agricultural Farm
Complex for alternative
employment to farmers
who wish to remain in
agriculture allied sector
1000000 L.S.
1000000
29
Adoption of 1 ITI for
generation of skilled man
power
L.S.
Net Total
1192571700
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 187
Chart 6.7, Songarar Rehabilitation Expenditure
The above Graph make clear about the Rehabilitation Cost on Songara. The
Maximum Expenditure is proposed for purchase of land i.e, Rs. 10325.322 lacs.
Chart 6.8, Songara Rehabilitation Expenditure
The above Pie-Chart displays Rehabilitation expenditure in terms of %. It is 87% on
Purchase of land, Development –7%, Employment –4% and on bulk infrastructure –2%.
206 3 45.6900
5.1 438.695 2
10325.322
0
2,000
4,000
6,000
8,000
10,000
12,000
Am
ou
nt
in L
acs
Type of Expenditure
Songara Rehabilitation Expenditure
Bulk Infra.2%
Commu. develp.0%
Comp. for Hou. & Infrast.
0%
Develp. & Envor.7%
Education0%
Employeement 4%
Health0%
Purchase of Land87%
Songara Rehabilitation Expenditure
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 188
Table: - 6.5, Rehabilitation Cost, Village Mohanpur
S.N. Item/Details of works
Village - Mohanpur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
1 Cost of Agriculture Land
as per the Revenue Authorities
1375000.00 / Ha. 181.13 249053750
Total Private
Area to be acquired
2 Cost of Badi Land as per the Revenue Autorities
825000.00 / Ha. 0 0
Total Private
Area to be acquired
3 Cost of Govt Revenue
land as per the Revenue Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha. 24.3 22356000
3.2 Other land 460000.00 / Ha. 17.34 7976400
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 / Tubewell
4.1.2 Deep 250 Feet 35475.00 / Tubewell
4.1.3 Deep 300 Feet 41975.00 / Tubewell
4.2 Well
4.2.1 10 Feet Dia & 35 Feet
Deep :(Kachcha) 30000.00 / Well
4.2.2 10 Feet Dia & 35 Feet
Deep :(Pucca) 45000.00 / Well
4.2.3 12 Feet Dia & 40 Feet
Deep: (Kachcha) 35000.00 / Well
4.2.4 12 Feet Dia & 40 Feet
Deep: (Pucca) 50000.00 / Well
5 Green Barrier
Development Around of village
1800000.00 /Ha. 50 90000000
6 Cost on employment of 1 member of each project
affected family
132
There are total 132 project
affected families
6.1 Skilled 2% of Total
Project affected Families = 4 @Rs. 7500/-month
7500 /person /year
3 22500
Recuring Cost
6.2 Semi-skilled 10% of Total Project affected Families = 21@Rs. 5000/-month
5000 /person /year
13 65000
6.3 unskilled 88 % of Total
Project affected Families = 187@Rs. 3000/-month
3000 /person /year
116 348000
7
If employment is not provided, then 1 shop at the cost of company or
maximum Rs.100000/- for agricultural land
development at another place or Rs. 100000/-
cash.
100000 /person 132 13200000 One time
cost
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 189
S.N. Item/Details of works
Village - Mohanpur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
8
Technical training to eligible candidates i.e. 5% of PA families = 14
persons
50000 /person 7 350000
9 Compensation for houses
9.1 Kachcha Houses: 200 /Sq. Ft. 0 0
9.2 Pucca Houses: 367 /Sq. Ft. 0 0
9.3 Aahata Nirman:
(Kachcha) 700 /meter
9.4 Aahata Nirman: (Pucca) 1300 /meter
9.5 Fencing work : 139 /Number
9.6 Barbed Wire: 6 /meter
9.7 Baramda : (Kachcha) 70 /Sq. Ft.
9.8 Baramda : (Pucca) 128 /Sq. Ft.
10 Grant for construction of
house 100000 /family 0 0
11 Grant for animal shade 10000 /family 0 0
12 Rehabilitiation assistance 11000 /family 0 0
13 Transportation charges
on material/luggage 1000 /family 0 0
14 Cost of trees on private
land 1000 /tree 6105 6105000
15
Capacity enhancement training to 1 member of each project affected
families.
20000 /family 132 2640000
16
Upgradation of existing schools and its moderate
furnishing, situated in nearby project area
16.1 Primary Schools 500000 /school 0 0
16.2 Middle Sachool 1000000 /school 0 0
16.3 Mahila Mandal 1000000
16.4 Angan badi 75000
16.5 Temple 100000
16.6 Bhajan Mandli/ Kirtan
Bhawan 75000
17 Incentive to meritorious students ; awards etc.
10000 L.S.
10000
18
Assistance to handicaped, widow and
old aged people in project affected villages
100000 L.S.
100000
19
Revolving fund for women empowerment in project affected villages
through SHG groups
100000 L.S.
100000
20
Expenditure on developemnt of
agriculture in project affected villages through
introduction of new or innovative technologies,
drip irrigation etc.
500000 L.S.
500000
21 Training to farmers for 100000 L.S.
100000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 190
S.N. Item/Details of works
Village - Mohanpur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
skill upgradation
22 Assistance in marketting
of village handicraft 100000 L.S.
100000
23 Road Development &
Approch Road 1000000 L.S.
20000000
24 Street Light 1000000 L.S.
100000
25 Drainage System 500000 L.S.
500000
26 Assistance to industries
based on fly ash, such as fly ash bricks etc.
L.S.
27 Organisation of health
camps 200000 L.S.
200000
28
Establishment of Agricultural Farm
Complex for alternative employment to farmers who wish to remain in
agriculture allied sector
1000000 L.S.
1000000
29 Adoption of 1 ITI for
generation of skilled man power
L.S.
Net Total
414826650
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 191
Chart 6.8, Mohanpur Rehabilitation Expenditure
The above Graph gives a view on Rehabilitation expenditure of Mohanpur. The
Maximum amount is kept for purchase of land i.e, Rs. 2,793.86 lacs. The other sector
details can be seen in the graph.
Chart 6.9, Mohanpur Rehabilitation Expenditure in %
The above Pie-Chart elucidate on Rehabilitation cost on Mohanpur village in terms
of %. The break up of the expenditure proposed are Purchase of land-67%, Development
206.003.00 61.05
900.00
5.10177.26
2.00
2,793.86
0
500
1,000
1,500
2,000
2,500
3,000
Am
ou
nt
in L
acs
Type of Expenditure
Mohanpur Rehabilitation Expenditure
Bulk Infra.5%
Commu. develp.0%Comp. for Hou. &
Infrast.2%
Develp. & Envor.22%
Education0%
Employeement 4%
Health0%
Purchase of Land67%
Mohanpur Rehabilitation Expenditure
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 192
–22%, Employment –4%, Compensation for house and infrastructure –2% and bulk
infrastructure –5%.
Table: - 6.6, Rehabilitation Cost, Village Sakalpur
S.N. Item/Details of works
Village - Sakalpur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
1
Cost of Agriculture Land
as per the Revenue
Authorities
1375000.00 / Ha. 0.84 1155000
Total
Private Area
to be
acquired
2 Cost of Badi Land as per
the Revenue Autorities 825000.00 / Ha. 0 0
Total
Private Area
to be
acquired
3
Cost of Govt Revenue
land as per the Revenue
Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha. 0.39 358800
3.2 Other land 460000.00 / Ha. 0.19 87400
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 / Tubewell
4.1.2 Deep 250 Feet 35475.00 / Tubewell
4.1.3 Deep 300 Feet 41975.00 / Tubewell
4.2 Well
4.2.1 10 Feet Dia & 35 Feet
Deep :(Kachcha) 30000.00 / Well
4.2.2 10 Feet Dia & 35 Feet
Deep :(Pucca) 45000.00 / Well
4.2.3 12 Feet Dia & 40 Feet
Deep: (Kachcha) 35000.00 / Well
4.2.4 12 Feet Dia & 40 Feet
Deep: (Pucca) 50000.00 / Well
5
Green Barrier
Development Around of
village
1800000.00 /Ha. 50 90000000
6 Cost on employment of 1
member of each project 3
There are
total 3
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 193
S.N. Item/Details of works
Village - Sakalpur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
affected family project
affected
families
6.1
Skilled 2% of Total
Project affected Families
= 4 @Rs. 7500/-month
7500 /person
/year 0 0
Recuring
Cost 6.2
Semi-skilled 10% of Total
Project affected Families
= 21@Rs. 5000/-month
5000 /person
/year 0 0
6.3
unskilled 88 % of Total
Project affected Families
= 187@Rs. 3000/-month
3000 /person
/year 3 9000
7
If employment is not
provided, then 1 shop at
the cost of company or
maximum Rs.100000/- for
agricultural land
development at another
place or Rs. 100000/-
cash.
100000 /person 3 300000 One time
cost
8
Technical training to
eligible candidates i.e. 5%
of PA families = 14
persons
50000 /person 1 50000
9 Compensation for houses
9.1 Kachcha Houses: 200 /Sq. Ft. 0 0
9.2 Pucca Houses: 367 /Sq. Ft. 0 0
9.3 Aahata Nirman:
(Kachcha) 700 /meter
9.4 Aahata Nirman: (Pucca) 1300 /meter
9.5 Fencing work : 139 /Number
9.6 Barbed Wire: 6 /meter
9.7 Baramda : (Kachcha) 70 /Sq. Ft.
9.8 Baramda : (Pucca) 128 /Sq. Ft.
10 Grant for construction of
house 100000 /family 0 0
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 194
S.N. Item/Details of works
Village - Sakalpur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
11 Grant for animal shade 10000 /family 0 0
12 Rehabilitiation assistance 11000 /family 0 0
13 Transportation charges
on material/luggage 1000 /family 0 0
14 Cost of trees on private
land 1000 /tree 8760 8760000
15
Capacity enhancement
training to 1 member of
each project affected
families.
20000 /family 3 60000
16
Upgradation of existing
schools and its moderate
furnishing, situated in
nearby project area
16.1 Primary Schools 500000 /school 0 0
16.2 Middle Sachool 1000000 /school 0 0
16.3 Mahila Mandal 1000000
16.4 Angan badi 75000
16.5 Temple 100000
16.6 Bhajan Mandli/ Kirtan
Bhawan 75000
17 Incentive to meritorious
students ; awards etc. 10000 L.S.
10000
18
Assistance to
handicaped, widow and
old aged people in project
affected villages
100000 L.S.
100000
19
Revolving fund for women
empowerment in project
affected villages through
SHG groups
100000 L.S.
100000
20
Expenditure on
developemnt of
agriculture in project
affected villages through
introduction of new or
innovative technologies,
500000 L.S.
500000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 195
S.N. Item/Details of works
Village - Sakalpur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
drip irrigation etc.
21 Training to farmers for
skill upgradation 100000 L.S.
100000
22 Assistance in marketting
of village handicraft 100000 L.S.
100000
23 Road Development &
Approch Road 1000000 L.S.
20000000
24 Street Light 1000000 L.S.
100000
25 Drainage System 500000 L.S.
500000
26
Assistance to industries
based on fly ash, such as
fly ash bricks etc.
L.S.
27 Organisation of health
camps 200000 L.S.
200000
28
Establishment of
Agricultural Farm
Complex for alternative
employment to farmers
who wish to remain in
agriculture allied sector
1000000 L.S.
1000000
29
Adoption of 1 ITI for
generation of skilled man
power
L.S.
Net Total
123490200
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 196
Chart 6.10, SakalpurRehabilitation Expenditure
The above Graph explains about the Sakalpur Rehabilitation expenditure in
lacs.The Maximum Expenditure allocated for is for Development i.e, Rs. 900 lacs.
Chart 6.11, Sakalpur Rehabilitation Expenditure in %
The above Pie-Chart describes on Rehabilitation expenditure in terms of % for the
village Sakalpur. The major allocation is for Development –73%, Purchase of land-1%,
Employment –1%, Compensation for house and infrastructure –7% and on bulk
infrastructure –17%.
206.00
3.0087.60
900.00
5.10 15.19 2.00 16.01
0100200
300400500600
700800900
1,000
Am
ou
nt
in L
acs
Type of Expenditure
Sakalpur Rehabilitation Expenditure
Bulk Infra.17%Commu. develp.
0%
Comp. for Hou. & Infrast.
7%
Develp. & Envor.73%
Education1%
Employeement 1%
Health0%
Purchase of Land1%
Sakalpur Rehabilitation Expenditure
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 197
Table: - 6.7, Rehabilitation Cost, Village Tulsi
S.N. Item/Details of works
Village - Tulsi
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
1
Cost of Agriculture Land
as per the Revenue
Authorities
1375000.00 / Ha. 3.44 4730000
Total Private
Area to be
acquired
2 Cost of Badi Land as per
the Revenue Autorities 825000.00 / Ha. 0 0
Total Private
Area to be
acquired
3
Cost of Govt Revenue
land as per the Revenue
Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha. 4.06 3735200
3.2 Other land 460000.00 / Ha. 1.27 584200
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 / Tubewell
4.1.2 Deep 250 Feet 35475.00 / Tubewell
4.1.3 Deep 300 Feet 41975.00 / Tubewell
4.2 Well
4.2.1 10 Feet Dia & 35 Feet
Deep :(Kachcha) 30000.00 / Well
4.2.2 10 Feet Dia & 35 Feet
Deep :(Pucca) 45000.00 / Well
4.2.3 12 Feet Dia & 40 Feet
Deep: (Kachcha) 35000.00 / Well
4.2.4 12 Feet Dia & 40 Feet
Deep: (Pucca) 50000.00 / Well
5
Green Barrier
Development Around of
village
1800000.00 /Ha. 50 90000000
6
Cost on employment of 1
member of each project
affected family
6
There are
total 6 project
affected
families
6.1 Skilled 2% of Total
Project affected Families 7500
/person
/year 0 0 Recuring Cost
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 198
S.N. Item/Details of works
Village - Tulsi
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
= 4 @Rs. 7500/-month
6.2
Semi-skilled 10% of Total
Project affected Families
= 21@Rs. 5000/-month
5000 /person
/year 1 5000
6.3
unskilled 88 % of Total
Project affected Families
= 187@Rs. 3000/-month
3000 /person
/year 5 15000
7
If employment is not
provided, then 1 shop at
the cost of company or
maximum Rs.100000/-
for agricultural land
development at another
place or Rs. 100000/-
cash.
100000 /person 6 600000 One time cost
8
Technical training to
eligible candidates i.e.
5% of PA families = 14
persons
50000 /person 1 50000
9 Compensation for
houses
9.1 Kachcha Houses: 200 /Sq. Ft. 0 0
9.2 Pucca Houses: 367 /Sq. Ft. 0 0
9.3 Aahata Nirman:
(Kachcha) 700 /meter
9.4 Aahata Nirman: (Pucca) 1300 /meter
9.5 Fencing work : 139 /Number
9.6 Barbed Wire: 6 /meter
9.7 Baramda : (Kachcha) 70 /Sq. Ft.
9.8 Baramda : (Pucca) 128 /Sq. Ft.
10 Grant for construction of
house 100000 /family 0 0
11 Grant for animal shade 10000 /family 0 0
12 Rehabilitiation assistance 11000 /family 0 0
13 Transportation charges
on material/luggage 1000 /family 0 0
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 199
S.N. Item/Details of works
Village - Tulsi
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
14 Cost of trees on private
land 1000 /tree 10965 10965000
15
Capacity enhancement
training to 1 member of
each project affected
families.
20000 /family 6 120000
16
Upgradation of existing
schools and its moderate
furnishing, situated in
nearby project area
16.1 Primary Schools 500000 /school 0 0
16.2 Middle Sachool 1000000 /school 0 0
16.3 Mahila Mandal 1000000
16.4 Angan badi 75000
16.5 Temple 100000
16.6 Bhajan Mandli/ Kirtan
Bhawan 75000
17 Incentive to meritorious
students ; awards etc. 10000 L.S.
10000
18
Assistance to
handicaped, widow and
old aged people in
project affected villages
100000 L.S.
100000
19
Revolving fund for
women empowerment in
project affected villages
through SHG groups
100000 L.S.
100000
20
Expenditure on
developemnt of
agriculture in project
affected villages through
introduction of new or
innovative technologies,
drip irrigation etc.
500000 L.S.
500000
21 Training to farmers for
skill upgradation 100000 L.S.
100000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 200
S.N. Item/Details of works
Village - Tulsi
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
22 Assistance in marketting
of village handicraft 100000 L.S.
100000
23 Road Development &
Approch Road 1000000 L.S.
20000000
24 Street Light 1000000 L.S.
100000
25 Drainage System 500000 L.S.
500000
26
Assistance to industries
based on fly ash, such as
fly ash bricks etc.
L.S.
27 Organisation of health
camps 200000 L.S.
200000
28
Establishment of
Agricultural Farm
Complex for alternative
employment to farmers
who wish to remain in
agriculture allied sector
1000000 L.S.
1000000
29
Adoption of 1 ITI for
generation of skilled man
power
L.S.
Net Total
133514400
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 201
Chart 6.12, Tulsi Rehabilitation Expenditure
The Maximum Expenditure is proposed for development and environment i.e. Rs.
900 lacs. Other comparative details can be seen on the bar chart.
Chart 6.13, Tulsi Rehabilitation Expenditure in %
The above Pie-Chart Explain percent wise allocation of funds for the Rehbilitaion of
project affected villagers residing at Tulsi village. Break up of allocation is purchase of
land-7%, Development –67%, Employment –2%, Compensation for house and
infrastructure –8% and on bulk infrastructure –16%.
206
3
109.65
900
5.1 18.9 290.494
0100
200300400
500600700800
9001,000
Am
ou
nt
in L
acs
Type of Expenditure
Tulsi Rehabilitation Expenditure
Bulk Infra.16%
Commu. develp.0%
Comp. for Hou. & Infrast.
8%
Develp. & Envor.67%
Education0%
Employeement 2%
Health0%
Purchase of Land7%
Tulsi Rehabilitation Expenditure
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 202
Table: - 6.8, Rehabilitation Cost, Village Dharampur
S.N. Item/Details of works
Village - Dharampur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
1
Cost of Agriculture Land
as per the Revenue
Authorities
1375000.00 / Ha. 131.71 181101250
Total Private
Area to be
acquired
2 Cost of Badi Land as per
the Revenue Autorities 825000.00 / Ha. 0 0
Total Private
Area to be
acquired
3
Cost of Govt Revenue
land as per the Revenue
Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha. 39.85 36662000
3.2 Other land 460000.00 / Ha. 6.52 2999200
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 / Tubewell
4.1.2 Deep 250 Feet 35475.00 / Tubewell
4.1.3 Deep 300 Feet 41975.00 / Tubewell
4.2 Well
4.2.1 10 Feet Dia & 35 Feet
Deep :(Kachcha) 30000.00 / Well
4.2.2 10 Feet Dia & 35 Feet
Deep :(Pucca) 45000.00 / Well
4.2.3 12 Feet Dia & 40 Feet
Deep: (Kachcha) 35000.00 / Well
4.2.4 12 Feet Dia & 40 Feet
Deep: (Pucca) 50000.00 / Well
5
Green Barrier
Development Around of
village
1800000.00 /Ha. 50 90000000
6
Cost on employment of 1
member of each project
affected family
145
There are
total 145
project
affected
families
6.1 Skilled 2% of Total
Project affected Families 7500
/person
/year 3 22500 Recuring Cost
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 203
S.N. Item/Details of works
Village - Dharampur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
= 4 @Rs. 7500/-month
6.2
Semi-skilled 10% of Total
Project affected Families
= 21@Rs. 5000/-month
5000 /person
/year 15 75000
6.3
unskilled 88 % of Total
Project affected Families
= 187@Rs. 3000/-month
3000 /person
/year 127 381000
7
If employment is not
provided, then 1 shop at
the cost of company or
maximum Rs.100000/-
for agricultural land
development at another
place or Rs. 100000/-
cash.
100000 /person 145 14500000 One time cost
8
Technical training to
eligible candidates i.e.
5% of PA families = 14
persons
50000 /person 7 350000
9 Compensation for
houses
9.1 Kachcha Houses: 200 /Sq. Ft. 0 0
9.2 Pucca Houses: 367 /Sq. Ft. 0 0
9.3 Aahata Nirman:
(Kachcha) 700 /meter
9.4 Aahata Nirman: (Pucca) 1300 /meter
9.5 Fencing work : 139 /Number
9.6 Barbed Wire: 6 /meter
9.7 Baramda : (Kachcha) 70 /Sq. Ft.
9.8 Baramda : (Pucca) 128 /Sq. Ft.
10 Grant for construction of
house 100000 /family 0 0
11 Grant for animal shade 10000 /family 0 0
12 Rehabilitiation assistance 11000 /family 0 0
13 Transportation charges
on material/luggage 1000 /family 0 0
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 204
S.N. Item/Details of works
Village - Dharampur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
14 Cost of trees on private
land 1000 /tree 8160 8160000
15
Capacity enhancement
training to 1 member of
each project affected
families.
20000 /family 145 2900000
16
Upgradation of existing
schools and its moderate
furnishing, situated in
nearby project area
16.1 Primary Schools 500000 /school 0 0
16.2 Middle Sachool 1000000 /school 0 0
16.3 Mahila Mandal 1000000
16.4 Angan badi 75000
16.5 Temple 100000
16.6 Bhajan Mandli/ Kirtan
Bhawan 75000
17 Incentive to meritorious
students ; awards etc. 10000 L.S.
10000
18
Assistance to
handicaped, widow and
old aged people in
project affected villages
100000 L.S.
100000
19
Revolving fund for
women empowerment in
project affected villages
through SHG groups
100000 L.S.
100000
20
Expenditure on
developemnt of
agriculture in project
affected villages through
introduction of new or
innovative technologies,
drip irrigation etc.
500000 L.S.
500000
21 Training to farmers for
skill upgradation 100000 L.S.
100000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 205
S.N. Item/Details of works
Village - Dharampur
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
22 Assistance in marketting
of village handicraft 100000 L.S.
100000
23 Road Development &
Approch Road 1000000 L.S.
20000000
24 Street Light 1000000 L.S.
100000
25 Drainage System 500000 L.S.
500000
26
Assistance to industries
based on fly ash, such as
fly ash bricks etc.
L.S.
27 Organisation of health
camps 200000 L.S.
200000
28
Establishment of
Agricultural Farm
Complex for alternative
employment to farmers
who wish to remain in
agriculture allied sector
1000000 L.S.
1000000
29
Adoption of 1 ITI for
generation of skilled man
power
L.S.
Net Total
359860950
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 206
Chart 6.14, Dharmpur Rehabilitation Expenditure
The Maximum Expenditure is allocated for Purchase of land i.e, Rs. 2207.6245
lacs. Other sector wise details are comparatively shown in above bar chart.
Chart 6.15, Dharampur Rehabilitation Expenditure in %
The above Pie-Chart Explains on proposed Dharampur Rehabilitation expenditure
in terms of %. Maximum apportion is for Purchase of land-61%, Development –25%,
Employment –6%, Compensation for house and infrastructure –2% and bulk infrastructure
–6%.
2063 81.6
900
5.1193.285
2
2207.6245
0
500
1,000
1,500
2,000
2,500
Am
ou
nt
in L
acs
Type of Expenditure
Dharampur Rehabilitation Expenditure
Bulk Infra.6%
Commu. develp.0%
Comp. for Hou. & Infrast.
2%
Develp. & Envor.25%
Education0%
Employeement 6%
Health0%
Purchase of Land61%
Dharampur Rehabilitation Expenditure
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 207
Table: - 6.8, Rehabilitation Cost, Village Kotya
S.N. Item/Details of works
Village - Kotya
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
1
Cost of Agriculture Land
as per the Revenue
Authorities
1375000.00 / Ha. 29.38 40397500
Total Private
Area to be
acquired
2 Cost of Badi Land as per
the Revenue Autorities 825000.00 / Ha. 0 0
Total Private
Area to be
acquired
3
Cost of Govt Revenue
land as per the Revenue
Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha. 22.42 20626400
3.2 Other land 460000.00 / Ha. 0.41 188600
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 / Tubewell
4.1.2 Deep 250 Feet 35475.00 / Tubewell
4.1.3 Deep 300 Feet 41975.00 / Tubewell
4.2 Well
4.2.1 10 Feet Dia & 35 Feet
Deep :(Kachcha) 30000.00 / Well
4.2.2 10 Feet Dia & 35 Feet
Deep :(Pucca) 45000.00 / Well
4.2.3 12 Feet Dia & 40 Feet
Deep: (Kachcha) 35000.00 / Well
4.2.4 12 Feet Dia & 40 Feet
Deep: (Pucca) 50000.00 / Well
5
Green Barrier
Development Around of
village
1800000.00 /Ha. 50 90000000
6
Cost on employment of 1
member of each project
affected family
274
There are
total 274
project
affected
families
6.1 Skilled 2% of Total 7500 /person 5 37500 Recuring
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 208
S.N. Item/Details of works
Village - Kotya
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
Project affected Families
= 4 @Rs. 7500/-month
/year Cost
6.2
Semi-skilled 10% of Total
Project affected Families
= 21@Rs. 5000/-month
5000 /person
/year 27 135000
6.3
unskilled 88 % of Total
Project affected Families
= 187@Rs. 3000/-month
3000 /person
/year 242 726000
7
If employment is not
provided, then 1 shop at
the cost of company or
maximum Rs.100000/-
for agricultural land
development at another
place or Rs. 100000/-
cash.
100000 /person 274 27400000 One time cost
8
Technical training to
eligible candidates i.e.
5% of PA families = 14
persons
50000 /person 14 700000
9 Compensation for houses
9.1 Kachcha Houses: 200 /Sq. Ft. 0 0
9.2 Pucca Houses: 367 /Sq. Ft. 0 0
9.3 Aahata Nirman:
(Kachcha) 700 /meter
9.4 Aahata Nirman: (Pucca) 1300 /meter
9.5 Fencing work : 139 /Number
9.6 Barbed Wire: 6 /meter
9.7 Baramda : (Kachcha) 70 /Sq. Ft.
9.8 Baramda : (Pucca) 128 /Sq. Ft.
10 Grant for construction of
house 100000 /family 0 0
11 Grant for animal shade 10000 /family 0 0
12 Rehabilitiation assistance 11000 /family 0 0
13 Transportation charges
on material/luggage 1000 /family 0 0
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 209
S.N. Item/Details of works
Village - Kotya
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
14 Cost of trees on private
land 1000 /tree 14340 14340000
15
Capacity enhancement
training to 1 member of
each project affected
families.
20000 /family 274 5480000
16
Upgradation of existing
schools and its moderate
furnishing, situated in
nearby project area
16.1 Primary Schools 500000 /school 0 0
16.2 Middle Sachool 1000000 /school 0 0
16.3 Mahila Mandal 1000000
16.4 Angan badi 75000
16.5 Temple 100000
16.6 Bhajan Mandli/ Kirtan
Bhawan 75000
17 Incentive to meritorious
students ; awards etc. 10000 L.S.
10000
18
Assistance to
handicaped, widow and
old aged people in
project affected villages
100000 L.S.
100000
19
Revolving fund for
women empowerment in
project affected villages
through SHG groups
100000 L.S.
100000
20
Expenditure on
developemnt of
agriculture in project
affected villages through
introduction of new or
innovative technologies,
drip irrigation etc.
500000 L.S.
500000
21 Training to farmers for
skill upgradation 100000 L.S.
100000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 210
S.N. Item/Details of works
Village - Kotya
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
22 Assistance in marketting
of village handicraft 100000 L.S.
100000
23 Road Development &
Approch Road 1000000 L.S.
20000000
24 Street Light 1000000 L.S.
100000
25 Drainage System 500000 L.S.
500000
26
Assistance to industries
based on fly ash, such as
fly ash bricks etc.
L.S.
27 Organisation of health
camps 200000 L.S.
200000
28
Establishment of
Agricultural Farm
Complex for alternative
employment to farmers
who wish to remain in
agriculture allied sector
1000000 L.S.
1000000
29
Adoption of 1 ITI for
generation of skilled man
power
L.S.
Net Total
222741000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 211
Chart 6.16, Kotaya Rehabilitation Expenditure
The above Graph displays about comparative Rehabilitation expenditure on Kotaya
village. The Maximum Expenditure is allocated for Development i.e, Rs. 900 lacs and
subquentaly for Employment, Purchase of land, Bulk infrastructure, Compensation for
house and infrastructures etc.
Chart 6.17, Kotaya Rehabilitation Expenditure in %
The above Pie-Chart Explains about the Kotaya Rehabilitation expenditure in terms
of %. Break up of the same is Purchase of land-28%, Development –40%, Employment –
16%, Compensation for house and infrastructure –7% and on bulk infrastructure –9%.
206
3
143.4
900
5.1
355.785
2
612.125
0
100200300400
500600700
800900
1,000
Am
ou
nt
in L
acs
Type of Expenditure
Kotaya Rehabilitation Expenditure
Bulk Infra.9%
Commu. develp.0%
Comp. for Hou. & Infrast.
7%
Develp. & Envor.40%
Education0%
Employeement 16%
Health0%
Purchase of Land28%
Kotaya Rehabilitation Expenditure
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 212
Table: - 6.9 Rehabilitation Cost, All Villages Total
S.N. Item/Details of works
All Villages Total
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
1
Cost of Agriculture Land
as per the Revenue
Authorities
1375000.00 / Ha. 2006.82 2759377500
Total Private
Area to be
acquired
2 Cost of Badi Land as per
the Revenue Autorities 825000.00 / Ha. 3.7 3052500
Total Private
Area to be
acquired
3
Cost of Govt Revenue
land as per the Revenue
Autorities
3.1 Chhote jhad ka jungle 920000.00 / Ha. 467.97 430532400
3.2 Other land 460000.00 / Ha. 149.39 68719400
4 Cost of Water Facility
4.1 Tubewell
4.1.1 Deep 200 Feet 29100.00 /
Tubewell 10 291000
4.1.2 Deep 250 Feet 35475.00 /
Tubewell 7 248325
4.1.3 Deep 300 Feet 41975.00 /
Tubewell 4 167900
4.2 Well
4.2.1 10 Feet Dia & 35 Feet
Deep :(Kachcha) 30000.00 / Well 11 330000
4.2.2 10 Feet Dia & 35 Feet
Deep :(Pucca) 45000.00 / Well 4 180000
4.2.3 12 Feet Dia & 40 Feet
Deep: (Kachcha) 35000.00 / Well 8 280000
4.2.4 12 Feet Dia & 40 Feet
Deep: (Pucca) 50000.00 / Well 4 200000
5
Green Barrier
Development Around
of village
1800000.00 /Ha. 450 810000000
6
Cost on employment of
1 member of each
project affected family
1494
There are
total 1494
project
affected
families
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 213
S.N. Item/Details of works
All Villages Total
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
6.1
Skilled 2% of Total
Project affected Families
= 4 @Rs. 7500/-month
7500 /person
/year 30 225000
Recuring
Cost 6.2
Semi-skilled 10% of
Total Project affected
Families = 21@Rs.
5000/-month
5000 /person
/year 150 750000
6.3
unskilled 88 % of Total
Project affected Families
= 187@Rs. 3000/-month
3000 /person
/year 1314 3942000
7
If employment is not
provided, then 1 shop at
the cost of company or
maximum Rs.100000/-
for agricultural land
development at another
place or Rs. 100000/-
cash.
100000 /person 1822 182200000 One time cost
8
Technical training to
eligible candidates i.e.
5% of PA families = 14
persons
50000 /person 93 4650000
9 Compensation for
houses
9.1 Kachcha Houses: 200 /Sq. Ft. 419878 83975600
9.2 Pucca Houses: 367 /Sq. Ft. 0 0
9.3 Aahata Nirman:
(Kachcha) 700 /meter 1770 1239000
9.4 Aahata Nirman: (Pucca) 1300 /meter 200 260000
9.5 Fencing work : 139 /Number 4 556
9.6 Barbed Wire: 6 /meter 1310 7860
9.7 Baramda : (Kachcha) 70 /Sq. Ft. 52800 3696000
9.8 Baramda : (Pucca) 128 /Sq. Ft. 6000 768000
10 Grant for construction of
house 100000 /family 720 72000000
11 Grant for animal shade 10000 /family 594 5940000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 214
S.N. Item/Details of works
All Villages Total
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
12 Rehabilitiation
assistance 11000 /family 720 7920000
13 Transportation charges
on material/luggage 1000 /family 720 720000
14 Cost of trees on private
land 1000 /tree 72870 72870000
15
Capacity enhancement
training to 1 member of
each project affected
families.
20000 /family 1620 32400000
16
Upgradation of existing
schools and its
moderate furnishing,
situated in nearby
project area
16.1 Primary Schools 500000 /school 3 1500000
16.2 Middle Sachool 1000000 /school 2 2000000
16.3 Mahila Mandal 1000000
2 2000000
16.4 Angan badi 75000
5 375000
16.5 Temple 100000
2 200000
16.6 Bhajan Mandli/ Kirtan
Bhawan 75000
1 75000
17 Incentive to meritorious
students ; awards etc. 10000 L.S. 0 90000
18
Assistance to
handicaped, widow and
old aged people in
project affected villages
100000 L.S. 0 900000
19
Revolving fund for
women empowerment in
project affected villages
through SHG groups
100000 L.S. 0 900000
20
Expenditure on
developemnt of
agriculture in project
affected villages through
introduction of new or
500000 L.S. 0 4500000
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 215
S.N. Item/Details of works
All Villages Total
Rate in Rs. Unit Quantity Amount in
Rs. Remarks
innovative technologies,
drip irrigation etc.
21 Training to farmers for
skill upgradation 100000 L.S. 0 900000
22 Assistance in marketting
of village handicraft 100000 L.S. 0 900000
23 Road Development &
Approch Road 1000000 L.S. 0 9000000
24 Street Light 1000000 L.S. 0 9000000
25 Drainage System 500000 L.S. 0 4500000
26
Assistance to industries
based on fly ash, such
as fly ash bricks etc.
L.S. 0 2000000
27 Organisation of health
camps 200000 L.S. 0 1800000
28
Establishment of
Agricultural Farm
Complex for alternative
employment to farmers
who wish to remain in
agriculture allied sector
1000000 L.S. 0 9000000
29
Adoption of 1 ITI for
generation of skilled
man power
L.S. 0 10000000
Net Total
0 4606583041
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 216
Chart 6.18, All Villages Rehabilitation Expenditure
The above Graph displays comparative picture of Cost on Rehabilitation of Project
affected families. Maximum amount is kept for Purchase of land i.e, Rs. 32616.81 lacs.
The expenditure proposed for Development and environment is second to land purchase
head i.e. Rs. 8100 lacs. The cost allocated for Compensation for Houses and
Infrastructres and Employment is considerable i.e. Rs. 2493.97 lacs and 2360.67 lacs
respectively. Other sectoral budget allocation can be seen in the Bar Chart.
Chart 6.19, All Villages Rehabilitation Expenditure in%
The above Pie-Chart Explains about the cost on Rehabilitation of Project Affected
Families in terms of %. Comparative status can be adjudged through the above pie chart.
241.97 49.752493.97
8100.00
184.652360.67
18.00
32616.81
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
Am
ou
nt
in L
acs
Type of Expenditure
All Villages Rehabilitation Expenditure
Bulk Infra.1%
Commu. develp.0%Comp. for Hou. &
Infrast.5%
Develp. & Envor.18%
Education0%
Employeement 5%
Health0%
Purchase of Land71%
All Villages Rehabilitation Expenditure
Resettlement & Rehabilititation Plan For Shankarpur (Bhatgaon ii) & Extn. Coal Project
By: LNC, Raipur, D-8, Sector-2, Avanti Vihar Raipur, C.G. 0771-2443865. 217
Total Rehabilitaion cost: Rs. 460.65 crores
(Rs. Four Hundred Sixty Crores and Sixty Five Lacs Only)
Note: 1. The Rehabilitaion Plan and Scheme is based on ―An Ideal Rehabilitaion
Policy 2007 of State of Chhattisgarh (As amended)‖. The effort is taken to
provide better compensation/facilities better than the state government
policy, but in case of dispute the provision made/ given in ―An Ideal
Rehabilitaion Policy 2007 of State of Chhattisgarh (As amended)‖ would
prevail.
2. The details of Project Affected People with their profession & nature of
groups etc. is attached as;
Annexure - ‘A’
3. The List of families whose House is being displaced is is attached as;
Annexure-‘B’
4. Details of Land coming within the project area as per Revenue Record is
attached as;
Annexure-‘C’
4. R&R Plan shall be implemented as per guidelines of Govt. of
Chhattisgarh‘s: Model Rehabilitation & Resettlement Policy ―An Ideal
Rehabilitaion Policy 2007 of State of Chhattisgarh (As amended)‖. is
attached as;
Annexure-‘D’