2
Chiyoda’s World Wide LNG Project Experiences www.chiyoda-corp.com 17030200 Minato Mirai Grand Central Tower 4-6-2, Minatomirai, Nishi-ku, Yokohama 220-8765, Japan Chiyoda Corporation CHIYODA Mid-Scale LNG The solution for monetization of gas resource OVER 40% Plant capacity awarded since 2005 Company Overview Selected in the FTSE4Good index series As of March, 2017Over 65 years of project experience in more than 100 countries No.1 Over Refinery Constructed 800 Over Projects in Other Fields 1,800 Trains Constructed 42 168 Over Petrochemicals / Chemicals Constructed 500 Backlog FY 2015 USD 11.8 Billion Over Employees 8,200 LNG Receiving Terminal 75 New Orders FY 2015 USD 6.2 Billion 40 % LNG Completed Projects based on LNG production in last Decade MTPA of LNG World’s LNG Contractor **43 trains, 172 million tons of LNG RasGas Train 1&2 RasGas 1995 Qatargas Train 1&2 Qatargas 1996 Qatargas Train 3 Qatargas 1998 RasGas Train 3/4 RasGas (II) 2000, 2003, 2005 Qatargas Debottlenecking Train 1/2/3 Qatargas 2003, 2004, 2005 RasGas Train 5 RasGas (II) 2004, 2006 Qatargas II Train 4&5 Qatargas (II) 2004, 2008, 2009 RasGas Train 6/7 RasGas (3) 2004, 2009 Qatargas 3/4 Train 6&7 Qatar Petroleum & ConocoPhillips Qatar Ltd. 2005, Qatargas 2010 Qatargas Plateau Maintenance Qatargas 2014 ADGAS Train 1&2 ADGAS 1972, 1976 ADGAS Train 3 ADGAS 1991, 1994 Oman Train 1&2 Oman LNG 2000 Oman Train 3 Shell Global Solutions 2001, 2002 Qalhat LNG Qalhat LNG 2005 Yamal LNG Yamal LNG 2013, YSakhalin Train 1&2 Shell Global Solutions 2001 Sakhalin Energy 2008 Sakhalin Train 3 Shell Global Solutions 2016 Ras Laffan, Qatar Das Island, U.A.E. Freeport Train 1&2 FLNG Liquefaction FLNG Liquefaction2 Freeport Train3 FLNG Liquefaction3 Freeport, USA Qalhat, Oman Arrow Energy LNG Shell Global Solutions 2012 Gladstone, Australia Petronas Train 9 Petronas 2013 Bintulu, Malaysia LNG Canada LNG Canada 2015 Kitimat, Canada Sabetta, Russia Sakhalin Island, Russia Cameron LNG Cameron LNG Hackberry, USA Trinidad LNG Atlantic LNG 1995 La Brea, Trinidad Tobago Petrobras FLNG Petrobras 2010 Santos Basin, Brazil Gassi Touil LNG Sonatrach 2015 Arzew, Algeria Egypt LNG Union Fenosa 2001 Damietta, Egypt Nigeria Train 1 Nigeria LNG 1994 Nigeria Train 7 Nigeria LNG 2006 Bonny Island, Nigeria Bontang LNG Train-E PERTAMINA 1989 Bontang LNG Train-F PERTAMINA 1993 Bontang LNG Train-G PERTAMINA 1997 Bontang LNG Train-I PERTAMINA 2001 Bontang, Indonesia Arun LNG Train 4&5 PERTAMINA 1983 Arun, Indonesia Mozambique LNG Anadarko 2015 Mozambique FLNG Eni 2015 Cabo Delgado, Mozambique Ongoing Projects 35 FEED/PS projects 26 EPC projects ** Tangguh LNG PERTAMINA 2001 Tangguh LNG Train 3 BP 2016, Tangguh, Indonesia Ichthys Train 1&2 INPEX Browse 2011 INPEX Operations Darwin, Australia Golden Pass LNG Golden Pass Products Sabine Pass, USA Scarborough FLNG Esso Australia Resources 2013, 2015 Scarborough, Australia Browse LNG Woodside Energy 2013 James Price Point, Australia Abadi Floating LNG INPEX Masela 2014 Masela, Indonesia PNG LNG Train 1&2 ExxonMobil 2009 Esso Highlands 2014 Port Moresby, PNG USD 4.0 Billion Revenues FY 2015

Chiyoda’s World Wide OVER 40% LNG Project Experiences · PDF fileChiyoda’s World Wide LNG Project Experiences 17030200 Minato Mirai Grand Central Tower 4-6-2, ... Tangguh LNG Train

  • Upload
    trannhi

  • View
    223

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Chiyoda’s World Wide OVER 40% LNG Project Experiences · PDF fileChiyoda’s World Wide LNG Project Experiences 17030200 Minato Mirai Grand Central Tower 4-6-2, ... Tangguh LNG Train

Chiyoda’s World Wide LNG Project Experiences

www.chiyoda-corp.com17030200

Minato Mirai Grand Central Tower4-6-2, Minatomirai, Nishi-ku, Yokohama 220-8765, Japan

Chiyoda Corporation

CHIYODA

Mid-ScaleLNGThe solution for monetization of gas resource

OVER 40%

*:Plant capacity awarded since 2005

Company Overview

Selected in the FTSE4Good index series

〔As of March, 2017〕

Over 65 years of project experience in more than 100 countries

No.1Over

RefineryConstructed

800

Over

Projectsin Other Fields

1,800

Trains Constructed42168

Over

Petrochemicals /Chemicals Constructed

500Backlog FY 2015

USD

11.8Billion

Over

Employees

8,200

LNG ReceivingTerminal

75

New Orders FY 2015

USD

6.2Billion

40% LNG

Completed

Projects based on LNGproduction in last Decade

MTPA of LNGWorld’s

LNG Contractor

**:43 trains, 172 million tons of LNG

■RasGas Train 1&2�RasGas 1995

■Qatargas Train 1&2�Qatargas 1996

■Qatargas Train 3�Qatargas 1998

■RasGas Train 3/4�RasGas (II) 2000, 2003, 2005

■Qatargas Debottlenecking Train 1/2/3�Qatargas 2003, 2004, 2005

■RasGas Train 5�RasGas (II) 2004, 2006

■Qatargas II Train 4&5 �Qatargas (II) 2004, 2008, 2009

■RasGas Train 6/7 �RasGas (3) 2004, 2009

■Qatargas 3/4 Train 6&7�Qatar Petroleum & ConocoPhillips Qatar Ltd. 2005,�Qatargas 2010

■Qatargas Plateau Maintenance�Qatargas 2014

■ADGAS Train 1&2�ADGAS 1972, 1976

■ADGAS Train 3�ADGAS 1991, 1994

■Oman Train 1&2�Oman LNG 2000

■Oman Train 3�Shell Global Solutions 2001, 2002■Qalhat LNG�

Qalhat LNG 2005

■Yamal LNG �Yamal LNG 2013, ★

■YSakhalin Train 1&2Shell Global Solutions 2001Sakhalin Energy 2008

■Sakhalin Train 3Shell Global Solutions 2016

Ras Laffan, Qatar

Das Island, U.A.E.

■Freeport Train 1&2FLNG LiquefactionFLNG Liquefaction2 ★

■Freeport Train3FLNG Liquefaction3 ★

Freeport, USA

Qalhat, Oman

■Arrow Energy LNG�Shell Global Solutions2012

Gladstone, Australia

■Petronas Train 9�Petronas 2013

Bintulu, Malaysia

■LNG Canada�LNG Canada 2015

Kitimat, Canada

Sabetta, Russia

Sakhalin Island, Russia

■Cameron LNGCameron LNG ★

Hackberry, USA

■Trinidad LNG�Atlantic LNG 1995

La Brea, Trinidad Tobago

■Petrobras FLNG�Petrobras 2010

Santos Basin, Brazil

■Gassi Touil LNG�Sonatrach 2015

Arzew, Algeria

■Egypt LNG�Union Fenosa 2001

Damietta, Egypt

■Nigeria Train 1�Nigeria LNG 1994

■Nigeria Train 7�Nigeria LNG 2006

Bonny Island, Nigeria

■Bontang LNG Train-EPERTAMINA 1989■Bontang LNG Train-F

PERTAMINA 1993■Bontang LNG Train-G

PERTAMINA 1997■Bontang LNG Train-I

PERTAMINA 2001

Bontang, Indonesia

■Arun LNG Train 4&5PERTAMINA 1983

Arun, Indonesia

■Mozambique LNG �Anadarko 2015

■Mozambique FLNG �Eni 2015

Cabo Delgado, Mozambique

★:Ongoing Projects

35 FEED/PS projects26 EPC projects **

■Tangguh LNG�PERTAMINA 2001

■Tangguh LNG Train 3 BP 2016, ★

Tangguh, Indonesia

■Ichthys Train 1&2�INPEX Browse 2011�INPEX Operations ★

Darwin, Australia

■Golden Pass LNGGolden Pass Products ★

Sabine Pass, USA

■Scarborough FLNG�Esso Australia Resources 2013, 2015

Scarborough, Australia■Browse LNG�

Woodside Energy 2013

James Price Point, Australia

■Abadi Floating LNGINPEX Masela 2014

Masela, Indonesia

■PNG LNG Train 1&2ExxonMobil 2009�Esso Highlands 2014

Port Moresby, PNG

USD

4.0Billion

Revenues FY 2015

Page 2: Chiyoda’s World Wide OVER 40% LNG Project Experiences · PDF fileChiyoda’s World Wide LNG Project Experiences 17030200 Minato Mirai Grand Central Tower 4-6-2, ... Tangguh LNG Train

Definitions for LNG plant size include small, mid and large plants. Many base load LNG plants for international LNG trading in recent years are large size having a production capacity of 3 to 5 million tons per annum (MTPA) to take advantage of economies of scale. Mega LNG plants of 8 MTPA production capacity are in operation in Qatar to liquefy the natural gas from the super large gas field.Conversely, mini or small scale LNG plants of less than 1 MTPA production capacity are in operation for the LNG supply chain in local and domes-tic areas. An LNG peak shaving plant is o n e application of a mini LNG Plant.

Mid-sized LNG plants, with production capacities in the 1 to 2 MTPA range, to develop medium size gas fields and medium size LNG value chains, have the following advantages;

>> Easier to step in due to smaller investment costs and smaller risks>> Easier to secure long-term product off-takers>> Increased chances of new player the participation

What is Mid-sized LNG?

LNG projects require many stages including long design, procure-ment and construction periods. Investors constantly seek to recov-er costs in the shortest time.

Chiyoda Mid-sized LNG delivers faster LNG production, shortens payback periods and delivers additional gains for investors, by:

>> Seamless Pre-EPC & EPC>> Standardized Design>> Modularized Design

Fastest Project Delivery

Chiyoda provides three standard design packages for mid-sized LNG plants, each delivering signif-icant schedule improvements:

>> 1.0 MTPA Production Class>> 1.5 MTPA Production Class>> 2.0 MTPA Production Class

Standard Design

Modular ConstructionConstruction schedule and cost largely depend on the site location in terms of climate condition, regulations, environmental requirement, labor availability and cost etc. To minimize such uncer-tainties, Chiyoda provides Modular Construction design as a standard design package.

The liquefaction facility consists of a Compressor / Driver module, a Heat Exchanger module and Air-cooler/Pipe-rack modules

Optimized design is embedded into the standard design package to realize the lowest CAPEX considering minimum plant layout, minimum pipping/cable length and minimum construction work volume without compromising HSSE standards, constructability, operability and maintain-ability. The standard design packages are developed on the basis of Chiyoda’s original “LNG Design Standard & Specification”, which are based on the philosophy of “fit for purpose” and “necessary and sufficient for safe and reliable continuous operation”.

Lowest CAPEX

Each plant consists of a gas treating section (Inlet Facility), Acid Gas Removal, Dehydration, Mercu-ry Removal and Liquefaction where the treated gas is liquefied by refrigeration. Suitable liquefac-tion technology is selected depending on produc-tion capacity.

For 1 and 1.5 MTPA plants, the Single Mixed Refrigerant (SMR) process is applied because of its simple plant configuration and low investment cost.

For 2 MTPA plants, a Propane Pre-cooled Mixed Refrigerant (C3-MR) process is applied because of its improved energy efficiency.

Both liquefaction processes are licensed by Air Products and Chemicals Inc. who supply a special heat exchanger for the liquefaction process.

LNG Production, Receiving & Regasification Plants

Chiyoda provides comprehensive Support toClients from Feasibility, FEED, EPC and O&Mfor the entire LNG business value chain.

LNG Business Value Chain

Liquefaction Process Technology

Liquefaction Facility 3D ModelModular Construction

Fast Path to Best Solution

Liquefaction Process Technology