www.acps.k12.va.us

CIP Work Session #2FY 2015‐2024 Non‐Capacity

Project PlanJanuary14,2014

SchoolBoardWorkSession

Page 2: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us2

Essential Questions

• WhataretheproposedFY2015‐2024non‐capacityprojects?

• Whatfactorscontributedtotheprojectprioritization?

• WhatisthefundinggapwiththeCityCouncil’sFY2014‐2023ApprovedCIP?

Page 3: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us3

6 Project Categories1.AssetLossPrevention:

– Projectsthatpreventthelossofexistingassets.– Ex:AccessControl&SecurityManagement,UpgradeTransportationFacility

2.EcoCity:– “Greenovation”projectsthatreduceenergyuseandtheACPScarbonfootprint.

– Ex:Majorgreenroofmaintenance

3.EquipmentandSystemsReplacement:– Replacementofexistingbuildinginfrastructureandequipmentinexistingfacilities.

– Ex:HVACReplacement,ElevatorReplacement,Stormwatermanagement

Page 4: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us4

6 Project Categories

4.FacilityMaintenance:– Projectsbasedonindustry‐widemaintenancestandards.– Ex:Plumbing/RestroomUpgrades,SiteHardscapeRepairs,BuildingEnvelopeRepair

5.InstructionalEnvironment:– Projectstoimprovetheinstructionalenvironmentateachsite.– Ex:Interiorrenovations,ProjectPlanning

6.SharedProgramPriorities:– ProjectsundertakenincollaborationwithCityDepartmentssuchasRecreation,ParksandCulturalActivitiesandGeneralServices.

– Ex:ReplacebleachersatCoraKellyRecreationCenter

Page 5: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us5

Project Prioritization• Tier1

• BuildingEnvelope• HVAC/ClimateControl• Elevator• RoofReplacement

• Tier2• AccessControl• MasterKey• Stormwatermanagement• CodeCompliance• ProjectPlanning

• Tier3• Painting• Flooring• Playgrounds/SportsArea• Plumbing

Page 6: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us6

FY 2015‐2019 CIP Non‐Capacity BudgetFY2015$11.99millionFY2016$11.81millionFY2017$12.08millionFY2018$11.86millionFY2019$11.84millionTotal$59.58million

Page 7: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us7

CIP Funding‐ Non‐CapacityFY 2015‐2024

• FY2014‐2023SchoolBoardapprovednon‐capacitybudgetexceededtheCityCouncil’sallocationtoACPSby$38.9million

• Appliedprioritizationmethodologyandlevel‐loadingtomeetCityCouncilapprovedtotalnon‐capacityfortheten‐yearprogram

• Note:Forprojectionpurposes,theCityCouncil’sFY2024fundingisestimatedatthesamelevelasFY2023.

FY2014-2023 Final School

Board CIP- Non-Capacity

FY2014-2023 Final City

Council CIP-Non-Capacity

FY2015-2024 Resource-

Constrained CIP-Non-Capacity

Difference in FY15 RC Non‐Capacity and FY14 City Council Approved 

Non‐Capacity CIP

FY 2015 8,011,387 6,956,000 11,985,452 (5,029,452)

FY 2016 6,665,781 4,808,000 11,808,279 (7,000,279)

FY 2017 44,296,403 33,258,000 12,077,457 21,180,543

FY 2018 24,020,735 21,229,533 11,875,094 9,354,439

FY 2019 24,030,973 17,648,000 11,839,966 5,808,034

FY 2020 14,313,842 10,360,000 14,874,892 (4,514,892)

FY 2021 9,898,484 7,049,000 14,977,281 (7,928,281)

FY 2022 19,344,555 14,133,000 14,867,962 (734,962)

FY 2023 13,582,237 9,812,000 14,988,176 (5,176,176)

FY 2024 - - 15,416,455 (15,416,455)

Grand Total 164,164,397 125,253,533 $ 134,711,015 (9,457,482)

Page 8: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us8

FY 2015 Non‐Capacity Project SummaryFY 2015 Project Description/Site Project Budget

SchoolBusesandVehicles $1.28MEmergencyRepairs/Asbestos/Renovations/CodeCompliance

$0.41M

FF&E $0.30MLongRangePlanning $0.32MProjectPlanning $0.40MAccessControl&KeyReplacement $0.45MElevator FrancisC.Hammond $1.13MParkingExpansion JohnAdams;

TransportationFacility$2.20M

BuildingEnvelope CB,GW,JA,LC,MM,MV,Rowing,T.C.W.:MH

$2.91M

HVACReplacement CB,DM,GM,GW,MV,ST,JKP $1.98MRoofReplacement GeorgeWashingtonAnnex $0.34MMaintenanceUntilBuildingReplacement

PatrickHenry,CoraKelly $.013M

BleacherReplacement CoraKelly $0.04MStormwater Management JohnAdams $0.01MPressBoxReplacement T.C.Williams:KingStreet $0.07M

GrandTotal $11.99M

Page 9: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us9

Major Building Envelope Projects• CharlesBarrettFY2015$0.71million

– Repairexistingbuildingfenestrationtopreventwaterinfiltrationtothebuildinginterior.

– Repairexteriormasonrycladding.

Page 10: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us10

Major Building Envelope Projects• GeorgeMasonFY2015$0.2millionandFY2019$0.78million– Repairexistingbuildingfenestrationtopreventwaterinfiltrationtothebuildinginteriorandwaterproofsubsurfacewallsatbasementlevelelectricalroom.

– Replaceexteriorwindowswithnewenergyefficientassemblies.

Page 11: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us11

Major Building Envelope Projects• JohnAdamsFY2015$0.17million– Repoint/repairexteriorbrickmasonryandinstall/replaceexteriorsealants

• MountVernonFY2015$0.23million– Repoint/repairexteriorbrickmasonryandinstall/replaceexteriorsealants

– Remediatewaterinfiltrationandreplaceexteriordoors.

JohnAdams

Page 12: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us12

Major Building Envelope Repair

• RowingFacilityFY2015$0.42million– Replacefailingexteriorsiding.

Page 13: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us13

Major Building Envelope Projects• T.C.WilliamsMinnieHowardFY2015$0.14million– Repairexistingbuildingfenestrationtopreventwaterinfiltrationtothebuildinginterior.

Page 14: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us14

Major HVAC Projects • GeorgeMasonFY2015$0.13millionandFY2016$0.25million– Replacechillerand“Univent”wallunit– CurrentDeficiencies:

• Increasingvolumeof“DownTime”• Partsforrepairslessavailable• 85%ofschooldoesnothaveautomatedcontrols

• On‐goingcontrollerfailuresforthechillerpump

Page 15: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us15

Major HVAC Projects• MountVernonFY2015$0.17million:

– ReplaceRTU#6and#9whichhaveexceededtheirlifeexpectancy.

– CurrentDeficiencies:• Compressorfailures• Substantialrusting• Controlsnotintegrated

Page 16: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us16

Major HVAC Projects• DouglasMacArthurFY2015$1.03million:– ReplaceoutdatedengineeredairunitsRTUs#1through#5

– ReplaceRTUs#8,#9,#14,#15whichhaveexceededtheirlifeexpectancy

– CurrentDeficiencies• Constantleakrepairs• Compressorsfailing• Condensationrusting• Controlsoutdated• Partsforrepairsnolongeravailable

Page 17: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us17

Major HVAC Projects

• FrancisC.HammondFY2016$0.29million– ReplaceYorkAHU‐1,AHU‐3andAHU‐6– Replacechilledwaterpumps

• JamesK.PolkFY2018$0.32million– ReplacelibraryRTUs– UpgradeiVu controlsystemandintegratewithexistingcontrolsystem

FrancisC.Hammond

Page 18: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us18

Major Elevator Projects

• FrancisC.HammondFY2015$1.13million– AddsasecondADAelevatortoprovidedirectaccessfromthemainlobbytoalltheclassroomsandthemediacenter(deferredfromFY12)

• CharlesBarrettFY2017$0.27million– Replaceexistingelevator– Currentdeficiencies:

• Controllerisoutdated• HigherVolumeof“DownTime”• Approximately20ServiceCallsduring2012

Page 19: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us19

Major Roof Projects• GeorgeMasonFY2016$0.26millionandFY2019$0.95million– GymRoofReplacement– MainBuildingRoofReplacement

• GeorgeWashingtonFY2016$1.24million– Replaceoutofwarrantyexistingroofsystemtoincreaseinsulationandlowerenergyuse

GeorgeWashington

Page 20: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us20

Major Roof Projects• JohnAdamsFY2016$2.1million

– Replaceoutofwarrantyexistingroofsystemtoincreaseinsulationandlowerenergyuse

Page 21: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us21

Transportation Facility Project• UpgradeTransportationFacility

– FY2015$1.98millionforparkinglotexpansion

– FY2017$6.50millionforbuildingupgradeandphase2ofparkinglotexpansion

Page 22: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us22

Division‐Wide Projects

• ProjectPlanning$0.40millionannually– Improveprojectplanningforprojectsatleast1 to2yearspriortotheexecutionofthework.Allowstimeforproperscoping,costestimating,coordinationandpermitting

• EmergencyRepairsFY2015‐2024$0.96million– System‐widerepairstobuildingsystemsthataffectsafetysuchasbrokenpipes,hotwatersystems,roofleaks,andbrokenwindows

Page 23: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us23

Division‐Wide Projects• CodeComplianceRequirementsFY2015‐2024$1.06million– System‐wideupgradestoexistingfirealarmsystemsorotherregulatoryupgradesasrequiredtocomplywithnewfirecodesordirectivesfromtheCityFireMarshal/CodeEnforcement

• Furniture,Fixtures&EquipmentFY2015‐2024$4.05million– Additionandreplacementoffurniture,fixturesandequipmentaspartoftheroutinereplacementcycleorasnecessaryforemergencies

• SchoolBusesandVehiclesFY2015‐2024$6.62million

Page 24: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.uswww.acps.k12.va.us24

Key Decisions

• Provideconcurrencewithprojectpriorities.• ProvideconcurrencewiththelevelfundingstrategytoaddressthegapbetweentheSchoolBoardandCityCouncil.

Page 25: CIP Work Session #2 FY 2024 Non Capacity Project Planeboard.acps.k12.va.us/attachments/149f8fcc-c561-4c66-aef5-ed015… · Laurel Hammig, Planner & GIS Specialist Alex Alexander,

www.acps.k12.va.usInterimSuperintendent SchoolBoard

KarenA.Graf,ChairmanKellyC.BoozRonnieCampbellWilliamE.CampbellPatriciaAnnHennig

StephanieA.KapsisChristopherJ.LewisMarcWilliamsJustinKeating,ViceChairman

Dr.AlvinL.Crawley

Staff Contact Information

EducationalFacilitiesWilliamFinn,Director

TraceyArmah,FinancialAnalyst

Planning,Design&ConstructionAndreaFeniak,Director

LaurelHammig,Planner&GISSpecialistAlexAlexander,FacilitiesEngineer

703‐461‐4168