P: +61 2 9231 3644 E: [email protected] W: www.ccl.com.au A.B.N. 72 000 111 302
Level 1 Selborne Chambers 174 Phillip Street Sydney NSW 2000 Australia DX: 973 Sydney
Circular to Shareholders & Clerks:
Construction and noise in Phillip Street 17
th August 2017
Further to my circular of Tuesday 8 August, notices relating specifically to the proposed demolition and development of 148 King Street have been received from the developer, these are attached. Contrary to the advice in one of the notices, the work scheduled for three weeks beginning 21 August is expected to be noisy and disruptive as it involves demolition. If you wish to make a complaint about the work, please contact the Environmental Health Officer from the City of Sydney, the contact details follow:
Glenn Braid Snr Environmental Health Officer Health & Building
____
Telephone: +61 2 9265 9211 cityofsydney.nsw.gov.au
Kind regards,
Debbie George
General Manager
Level 1 Selborne Chambers 174 Phillip Street Sydney NSW 2000 Australia DX 973 Sydney
P: +61 2 9231 3644
W: www.ccl.com.au
This email (including any attachments) is confidential, may be privileged, may contain commercially valuable information and intended solely for the use of the individual or entity to whom it is addressed. It may be read, copied and used only by the intended recipient. If you have received it in error, please contact CCL on +61 2 9231 3644 or by email at [email protected], or the Sender immediately by return email, and immediately delete this email. CCL
reserves the right to monitor all email communications through its networks. If the content of this email is personal or unconnected with CCL’s business, we accept no liability or responsibility for it. You should take full responsibility for virus checking of this email and any attachments. If this email contains personal information (as defined in the Privacy Act Cth as amended) you must at all times comply with the Privacy Act and Australian Privacy Principles in connection with the personal information.
148 King Street Project Construction Update
Work details
From 21 August, the existing hoarding at 148 King Street will be removed and replaced. The work Includes internal preparation for crane installation and a work zone established on King Street. The work is expected to be completed in 3 weeks (weather permitting) and is not expected to be noisy.
Subject to further approvals scaffolding will be erected around the entire building on King, Phillip and Elizabeth Streets.
Work hours Hoarding removal and replacement:
• Monday to Saturday from 9 pm to 5am • Sundays from 9pm to 5am (subject to approval)
Scaffolding installation:
This will take place during standard construction hours:
• Monday to Friday 7am to 7pm • Saturday 7am to 5pm
This work will be notified separately.
Traffic and pedestrian changes Local access will be maintained at all times with some lane closures. Any lane closures and minor diversions
will be under traffic management. When required, traffic control will be in place to direct motorists and
pedestrians safely around the work site. Access for emergency services will be maintained at all times.
Contact information • 24-hour Construction Response Line for urgent enquiries or complaints Site Manager 0497 603 906 • Project email to [email protected] for enquiries or to receive email updates We appreciate your patience during this stage of the project.
Celebrating 40 Years…
Hoarding removal and installation will occur from 21 August at 148 King Street
Metropolitan Demolitions has been engaged by Galileo Phillip Street Joint Venture to deconstruct the existing building located at 148 King Street, Sydney as part of the proposed redevelopment.
Celebrating 40 Years…
Work to commence at 148 King Street Metropolitan Demolitions has been engaged by Galileo Phillip Street Joint Venture to deconstruct the existing building located at 148 King Street, Sydney as part of the proposed redevelopment. Work is scheduled to commence on 21 August 2017. Details of work activities As part of the enabling works the following works are to commence: The current hoarding will be replaced; following this activity scaffold will be erected around the entire building. The replacement of the hoarding will be between the hours of 9pm to 5am. The erection of the scaffolding will be during standard hours of work as below. Preparation for the establishment of a Tower Crane for the dismantling of the building is to be carried out under a Complying Development Certificate. Following this and satisfaction of City of Sydney Approval Conditions, the work will be continuous within the Phillip, King and Elizabeth Streets zone during notified periods including: scaffolding and crane installation, demolition work and removal of building material. It is intended a dedicated works zone will is to be established on King Street between Elizabeth and Phillip Streets and a temporary crossover will be installed on Phillip Street for vehicle access.
Standard Hours of work Monday to Friday: 7am to 7pm Saturday: 7am to 5pm. Work outside standard hours will be notified separately. Traffic and pedestrian changes Local access will be maintained at all times with some lane closures. Any lane closures and minor diversions will be under traffic management. When required, traffic control will be in place to direct motorists and pedestrians safely around the work site. Access for emergency services will be maintained at all times.
Contact information • 24-hour Construction Response Line for urgent enquiries or complaints: Site Manager 0497 603 906 • Project email: [email protected] We appreciate your patience during this stage of the project.
Celebrating 40 Years…