Citizens Coordinating Council Meeting
September 29, 2010
Status of Remediation Activities
• 20 Removal Action Areas (RAAs), Upper ½-Mile Reach and 1½-Mile Reach
• Remediation substantially complete at 16 RAAs; the Upper ½-Mile Reach and 1½Mile Reach
• Certificate of Completion issued to GE for 11 RAAs
Silver Lake
East Street Area 2- South
Unkamet Brook - Remainder
Unkamet Brook - West
Status of Remaining RAAs
• East Street Area 2-South: Remediation underway; approximately 40% complete
• Silver Lake: Revised Final Work Plan due November 8, 2010
• Unkamet Brook – West: Final Work Plan submitted July 16, 2010
• Unkamet Brook – Remainder: Final Work Plan due November 19, 2010
Status of Remaining RAAs (continued)
• Floodplain Residential Properties Downstream of the Confluence – Pre-Design Investigation Phase – To be further discussed at the next CCC
meeting
WMECO Property
PEDA Property
Proposed Walkway
Solar Panel Arrays
Silver Lake
Fourth Street
Silver Lake Walking Path
Shrub Clumps – Dry Soil
Nannyberry Serviceberry
Black Chokeberry Choke Cherry Silky Dogwood
Silver Lake
Oblong Shrub Patch
Red-Osier Dogwoods Winterberry Holly
Northern Arrowood
Benches with Viewing Area
Row of Red-Osier Dogwoods
along Edge of Water
Shrub Clumps – Moist Soil
Pussy Willow Speckled Alder