City of Grand IslandTuesday, February 25, 2020
Council Session
Item G-14
#2020-52 - Approving Temporary Construction Easement for North Road- 13th Street to Highway 2 Roadway Improvements; Project No. 2019-P-5 (Manning- 3999 W Capital Avenue)
Staff Contact: John Collins, P.E. - Public Works Director
Grand Island Council Session - 2/25/2020 Page 1 / 6
Council Agenda Memo From: Keith Kurz PE, Assistant Public Works Director
Meeting: February 25, 2020
Subject: Approving Temporary Construction Easement for North Road- 13th Street to Highway 2 Roadway Improvements; Project No. 2019-P-5 (Manning- 3999 W Capital Avenue)
Presenter(s): John Collins PE, Public Works Director
Background The North Road- 13th Street to Highway 2 Roadway Improvements; Project No. 2019-P-5 is for the improvement of North Road from just north of 13th Street to Highway 2. The Engineering Division of the Public Works Department is proposing a concrete curb and gutter roadway section with associated sidewalk, traffic control, drainage and related improvements needed to complete the project.
A Temporary Construction easement is needed to accommodate the construction activities for North Road- 13th Street to Highway 2 Roadway Improvements; Project No. 2019-P-5, which must be approved by City Council. The temporary construction easement will allow for the roadway improvements to this area.
A sketch is attached to show the temporary construction easement area.
DiscussionA temporary construction easement is needed from one (1) property owner for North Road- 13th Street to Highway 2 Roadway Improvements; Project No. 2019-P-5 to be constructed.
Engineering staff of the Public Works Department negotiated with the property owner for use of such temporary construction easement.
Property Owner
Legal Description Amount
Sharon J. Manning
LOT ONE (1), NORTHWEST SUBDIVISION, IN THE CITY OF GRAND ISLAND, HALL COUNTY, NEBRASKA, BEING DESCRIBED AS FOLLOWS: REFERRING TO THE NORTHWEST CORNER OF LOT ONE (1), NORTHWEST SUBDIVISION; THENCE S89O47’38”E (ASSUMED BEARING) ON THE NORTH LINE OF SAID LOT ONE (1), A DISTANCE OF 69.66 FEET TO THE POINT OF BEGINNING; THENCE S64O08’41”W, A DISTANCE OF 26.52 FEET; THENCE
$3,009.84
Grand Island Council Session - 2/25/2020 Page 2 / 6
N89O47’38”W, PARALLEL WITH SAID NORTH LINE, A DISTANCE OF 17.96 FEET; THENCE SOUTHWESTERLY ON A 68.00 FOOT RADIUS CURVE TO THE LEFT, AN ARC DISTANCE OF 34.66 FEET, THE CHORD OF SAID CURVE BEARS S37O53’21”W, 34.28 FEET; THENCE S00O25’00”E, PARALLEL WITH AND 6.50 FEET DISTANT FROM THE WEST LINE OF SAID LOT ONE (1), A DISTANCE OF 178.21 FEET TO THE SOUTH LINE OF SAID LOT ONE (1); THENCE S89O52’00”E ON SAID SOUTH LINE, A DISTANCE OF 10.00 FEET; THENCE N00O25’00”W, PARALLEL WITH AND 16.50 FEET DISTANT FROM SAID WEST LINE, A DISTANCE OF 176.12 FEET; THENCE NORTHEASTERLY ON A 58.00 FOOT RADIUS CURVE TO THE RIGHT, AN ARC DISTANCE OF 40.32 FEET, THE CHORD OF SAID CURVE BEARS N45O11’54”E, 39.51 FEET; THENCE N89O59’38”E, A DISTANCE OF 85.28 FEET TO THE EAST LINE OF SAID LOT ONE (1); THENCE N00O24’59”W ON SAID EAST LINE, A DISTANCE OF 12.60 FEET TO THE NORTHEAST CORNER OF SAID LOT ONE (1); THENCE N89O47’38”W ON SAID NORTH LINE, A DISTANCE OF 60.36 FEET TO THE POINT OF BEGINNING, CONTAINING 0.07 ACRES, MORE OR LESS.
AlternativesIt appears that the Council has the following alternatives concerning the issue at hand. The Council may:
1. Move to approve2. Refer the issue to a Committee3. Postpone the issue to future date4. Take no action on the issue
RecommendationCity Administration recommends that the Council approve the Temporary Construction Easement between the City of Grand Island and the affected property owner for North Road- 13th Street to Highway 2 Roadway Improvements; Project No. 2019-P-5, in the amount of $3,009.84.
Sample MotionMotion to approve the temporary construction easement.
Grand Island Council Session - 2/25/2020 Page 3 / 6
Δ=51°08'55"
R=68.00'
T=32.54'
L=60.70'
CHD BRG=S48°51'49"W
CHD=58.71'
S00°25'00"E
178.21'
N89°52'00"W 6.50'
N00°25'00"W
217.00'
N89°47'38"W 60.36'
N00°24'59"W 12.60'
N89°59'38"E 85.28'
Δ=39°49'44"
R=58.00'
T=21.01'
L=40.32'
CHD BRG=N45°11'54"E
CHD=39.51'
N00°25'00"W
176.12'
S89°52'00"E 10.00'
Δ=29°11'59"
R=68.00'
T=17.71'
L=34.66'
CHD BRG=S37°53'21"W
CHD=34.28'
Δ=21°56'56"
R=68.00'
T=13.19'
L=26.05'
CHD BRG=N63°27'49"E
CHD=25.89'
S89°47'38"E 51.00'
N89°47'38"W 17.96'
S89°47'38"E 18.66'
S
6
4
°
0
8
'4
1
"
W
2
6
.
5
2
'
L
O
T
1
N
O
R
T
H
W
E
S
T
S
U
B
D
I
V
I
S
I
O
N
POINT OF BEGINNING
(TEMPORARY CONSTRUCTION EASEMENT)
DATE
SCALE
DRAWN
JOB NO.
FIELD BOOK
FIELD WORK
SHEETTRACT NO.
OF
4
21
10/24/2019
R190020
GRAND ISLAND #7
AG/BS
1" = 40'
AJG
PERMANENT EASEMENTTEMPORARY CONSTRUCTION EASEMENT,
MONUMENT FOUNDMONUMENT SETCALCULATED POINTDEEDED DISTANCEGOVERNMENT DISTANCEMEASURED DISTANCEPLATTED DISTANCERECORDED DISTANCE
PR
DGM
LEGEND NOTE: ALL BEARINGS ARE ASSUMED.
VICINITY SKETCH
NW 1/4 NE 1/4
SE 1/4SW 1/4
NEBRASKA
12
T11N
HALL COUNTY
R10W
P:\Engineering\190020.00 - Grand Island North Road Improvements - North\6 Survey\Drawings\SV-190020-Easement.dwg, on 1/14/2020 2:21 PM.
800.723.8567
www.jeo.comGrand Island, NE 308.381.7428
GRAPHIC SCALE0 402010
POINT OF BEGINNING
NW COR. LOT 1
(PERMANENT RIGHT OF WAY)
1
CURVE DATA:
SW COR. NW1/4SEC. 12-T11N-R10W
TEMPORARY CONSTRUCTIONEASEMENT (0.07 ACRES)
PERMANENT RIGHT OF WAY(0.05 ACRES)
CAPITAL AVENUE
NO
RT
H R
OA
D
AND NEW RIGHT OF WAY EXHIBIT
SECTION LINE
PERMANENT EASEMENT AREA
RIGHT OF WAY AREA
TEMPORARY CONSTRUCTION EASEMENT AREA
33.00'
NW COR. NW1/4SEC. 12-T11N-R10W
SEE DETAIL "A"
DETAIL "A"
SCALE: 1"=20'
2
3
4
1
2
3
4
4
3
POINT OF BEGINNING
(PERMANENT EASEMENT)
S89°47'38"E
(ASSUMED BEARING)
69.66'
PERMANENTEASEMENT(235 SQ.FT.)
GROVE AVENUE
SW COR. LOT 1
NE COR. LOT 1
Grand Island Council Session - 2/25/2020 Page 4 / 6
DATE
SCALE
DRAWN
JOB NO.
FIELD BOOK
FIELD WORK
SHEETTRACT NO.
OF
4
22
10/24/2019
R190020
GRAND ISLAND #7
AG/BS
AJG
PERMANENT EASEMENTTEMPORARY CONSTRUCTION EASEMENT,
P:\Engineering\190020.00 - Grand Island North Road Improvements - North\6 Survey\Drawings\SV-190020-Easement.dwg, on 1/14/2020 2:21 PM.
800.723.8567
www.jeo.comGrand Island, NE 308.381.7428
AND NEW RIGHT OF WAY EXHIBIT
PERMANENT RIGHT OF WAY DESCRIPTION:
A PARCEL OF LAND LOCATED IN LOT 1, NORTHWEST SUBDIVISION, IN THE CITY OF GRAND ISLAND, HALL COUNTY,
NEBRASKA, BEING DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF LOT 1, NORTHWEST
SUBDIVISION; THENCE S89°47'38"E (ASSUMED BEARING) ON THE NORTH LINE OF SAID LOT 1, A DISTANCE OF 51.00 FEET;
THENCE SOUTHWESTERLY ON A 68.00 FOOT RADIUS CURVE TO THE LEFT, AN ARC DISTANCE OF 60.70 FEET, THE CHORD
OF SAID CURVE BEARS S48°51'49"W, 58.71 FEET; THENCE S00°25'00"E, PARALLEL WITH AND 6.50 FEET DISTANT FROM THE
WEST LINE OF SAID LOT 1, A DISTANCE OF 178.21 FEET TO THE SOUTH LINE OF SAID LOT 1; THENCE N89°52'00"W ON SAID
SOUTH LINE, A DISTANCE OF 6.50 FEET TO THE SOUTHWEST CORNER OF SAID LOT 1; THENCE N00°25'00"W ON SAID WEST
LINE, A DISTANCE OF 217.00 FEET TO THE POINT OF BEGINNING, CONTAINING 0.05 ACRES, MORE OR LESS.
PERMANENT EASEMENT DESCRIPTION:
A PARCEL OF LAND LOCATED IN LOT 1, NORTHWEST SUBDIVISION, IN THE CITY OF GRAND ISLAND, HALL COUNTY,
NEBRASKA, BEING DESCRIBED AS FOLLOWS: REFERRING TO THE NORTHWEST CORNER OF LOT 1, NORTHWEST
SUBDIVISION; THENCE S89°47'38"E (ASSUMED BEARING) ON THE NORTH LINE OF SAID LOT 1, A DISTANCE OF 51.00 FEET TO
THE POINT OF BEGINNING; THENCE CONTINUING S89°47'38"E ON SAID NORTH LINE, A DISTANCE OF 18.66 FEET; THENCE
S64°08'41"W, A DISTANCE OF 26.52 FEET; THENCE N89°47'38"W, PARALLEL WITH SAID NORTH LINE, A DISTANCE OF 17.96
FEET; THENCE NORTHEASTERLY ON A 68.00 FOOT RADIUS CURVE TO THE RIGHT, AN ARC DISTANCE OF 26.05 FEET TO THE
POINT OF BEGINNING, THE CHORD OF SAID CURVE BEARS N63°27'49"E, 25.89 FEET, CONTAINING 235 SQUARE FEET, MORE
OR LESS.
TEMPORARY CONSTRUCTION EASEMENT DESCRIPTION:
A PARCEL OF LAND LOCATED IN LOT 1, NORTHWEST SUBDIVISION, IN THE CITY OF GRAND ISLAND, HALL COUNTY,
NEBRASKA, BEING DESCRIBED AS FOLLOWS: REFERRING TO THE NORTHWEST CORNER OF LOT 1, NORTHWEST
SUBDIVISION; THENCE S89°47'38"E (ASSUMED BEARING) ON THE NORTH LINE OF SAID LOT 1, A DISTANCE OF 69.66 FEET TO
THE POINT OF BEGINNING; THENCE S64°08'41"W, A DISTANCE OF 26.52 FEET; THENCE N89°47'38"W, PARALLEL WITH SAID
NORTH LINE, A DISTANCE OF 17.96 FEET; THENCE SOUTHWESTERLY ON A 68.00 FOOT RADIUS CURVE TO THE LEFT, AN ARC
DISTANCE OF 34.66 FEET, THE CHORD OF SAID CURVE BEARS S37°53'21"W, 34.28 FEET; THENCE S00°25'00"E, PARALLEL
WITH AND 6.50 FEET DISTANT FROM THE WEST LINE OF SAID LOT 1, A DISTANCE OF 178.21 FEET TO THE SOUTH LINE OF
SAID LOT 1; THENCE S89°52'00"E ON SAID SOUTH LINE, A DISTANCE OF 10.00 FEET; THENCE N00°25'00"W, PARALLEL WITH
AND 16.50 FEET DISTANT FROM SAID WEST LINE, A DISTANCE OF 176.12 FEET; THENCE NORTHEASTERLY ON A 58.00 FOOT
RADIUS CURVE TO THE RIGHT, AN ARC DISTANCE OF 40.32 FEET, THE CHORD OF SAID CURVE BEARS N45°11'54"E, 39.51
FEET; THENCE N89°59'38"E, A DISTANCE OF 85.28 FEET TO THE EAST LINE OF SAID LOT 1; THENCE N00°24'59"W ON SAID
EAST LINE, A DISTANCE OF 12.60 FEET TO THE NORTHEAST CORNER OF SAID LOT 1; THENCE N89°47'38"W ON SAID NORTH
LINE, A DISTANCE OF 60.36 FEET TO THE POINT OF BEGINNING, CONTAINING 0.07 ACRES, MORE OR LESS.
Grand Island Council Session - 2/25/2020 Page 5 / 6
Approved as to Form ¤ ___________February 21, 2020 ¤ City Attorney
R E S O L U T I O N 2020-52
WHEREAS, a temporary construction easement is required by the City of Grand Island, from an affected property owner in North Road- 13th Street to Highway 2 Roadway Improvements; Project No. 2019-P-5 project area:
Sharon J. Manning– $3,009.84
LOT ONE (1), NORTHWEST SUBDIVISION, IN THE CITY OF GRAND ISLAND, HALL COUNTY, NEBRASKA, BEING DESCRIBED AS FOLLOWS: REFERRING TO THE NORTHWEST CORNER OF LOT ONE (1), NORTHWEST SUBDIVISION; THENCE S89o47’38”E (ASSUMED BEARING) ON THE NORTH LINE OF SAID LOT ONE (1), A DISTANCE OF 69.66 FEET TO THE POINT OF BEGINNING; THENCE S64o08’41”W, A DISTANCE OF 26.52 FEET; THENCE N89o47’38”W, PARALLEL WITH SAID NORTH LINE, A DISTANCE OF 17.96 FEET; THENCE SOUTHWESTERLY ON A 68.00 FOOT RADIUS CURVE TO THE LEFT, AN ARC DISTANCE OF 34.66 FEET, THE CHORD OF SAID CURVE BEARS S37o53’21”W, 34.28 FEET; THENCE S00o25’00”E, PARALLEL WITH AND 6.50 FEET DISTANT FROM THE WEST LINE OF SAID LOT ONE (1), A DISTANCE OF 178.21 FEET TO THE SOUTH LINE OF SAID LOT ONE (1); THENCE S89o52’00”E ON SAID SOUTH LINE, A DISTANCE OF 10.00 FEET; THENCE N00o25’00”W, PARALLEL WITH AND 16.50 FEET DISTANT FROM SAID WEST LINE, A DISTANCE OF 176.12 FEET; THENCE NORTHEASTERLY ON A 58.00 FOOT RADIUS CURVE TO THE RIGHT, AN ARC DISTANCE OF 40.32 FEET, THE CHORD OF SAID CURVE BEARS N45o11’54”E, 39.51 FEET; THENCE N89o59’38”E, A DISTANCE OF 85.28 FEET TO THE EAST LINE OF SAID LOT ONE (1); THENCE N00o24’59”W ON SAID EAST LINE, A DISTANCE OF 12.60 FEET TO THE NORTHEAST CORNER OF SAID LOT ONE (1); THENCE N89o47’38”W ON SAID NORTH LINE, A DISTANCE OF 60.36 FEET TO THE POINT OF BEGINNING, CONTAINING 0.07 ACRES, MORE OR LESS.
WHEREAS, such Temporary Construction easement has been reviewed and approved by the City Legal Department.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the City of Grand Island be, and hereby is, authorized to compensate the affected property owner for the Temporary Construction easement on the above described tract of land, in the total amount of $3,009.84.
- - -
Adopted by the City Council of the City of Grand Island, Nebraska, February 25, 2020.
_______________________________________Roger G. Steele, Mayor
Attest:
_______________________________________RaNae Edwards, City Clerk
Grand Island Council Session - 2/25/2020 Page 6 / 6