CITY OF MORRO BAY
WATER RECLAMATION FACILITY
TABLE OF CONTENTS
ISSUED FOR CONSTRUCTION
MAY 2020
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 1 of 18 Issued for Construction
The specifications prepared by the following registered engineer are listed in the Table of Contents as indicated by their initials.
Engineering Manager Erick Bevington, P.E. Black & Veatch Corporation
5/20/2020
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 2 of 18 Issued for Construction
The specifications prepared by the following registered engineer are listed in the Table of Contents as indicated by their initials.
Project Engineer Kaitie Zusy, P.E. Black & Veatch Corporation
5/19/2020
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 3 of 18 Issued for Construction
The specifications prepared by the following registered engineer are listed in the Table of Contents as indicated by their initials.
Structural Engineer Charles R. Ashley, Jr., S.E. Ashley and Vance Engineering, Inc.
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 4 of 18 Issued for Construction
The specifications prepared by the following licensed architect are listed in the Table of Contents as indicated by their initials.
Architect Bruce Fraser, AIA Frasier Seiple Architects
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 6 of 18 Issued for Construction
The specifications prepared by the following registered engineer are listed in the Table of Contents as indicated by their initials.
Instrumentation & Control Engineer Brian L. Butler, P.E. Black & Veatch Corporation
5/19/2020
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 7 of 18 Issued for Construction
The specifications prepared by the following registered engineer are listed in the Table of Contents as indicated by their initials.
Building Mechanical Engineer Randy W. Cantrell, P.E. Black & Veatch Corporation
RAND
REGISTERE
DPR
O FES IONA L
ENGINEER
ST
ATE
O F C A L IFO
RN
IA
No. M36207
S
YW. CAN
TRELL
N I CA L
ME CH A
5/19/2020
TABLE OF CONTENTS (Continued)
Number Title Author
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 8 of 18 Issued for Construction
DIVISION 1 – GENERAL REQUIREMENTS 01 33 00 Submittals Procedures EVB
01 45 33.3 Code Required Special Inspections and Procedures (IBC 2015) CRA 01 61 00 General Equipment Stipulations EVB
01 67 00.2 Meteorological and Seismic Design Criteria (IBC 2012 & 2015) CRA 01 68 00 Equipment and Valve Identification EVB 01 73 19 Equipment Installation EVB 01 75 11 Startup Requirements (Deferred Submittal) 01 79 00 Demonstration and Training EVB 01 91 00 Commissioning (Deferred Submittal)
DIVISION 2 – Not Used
DIVISION 3 – CONCRETE 03 01 26.66 Concrete Crack Repair CRA
03 08 13 Tightness Testing of Structures EVB 03 08 13.S01 Tightness Testing of Structures ‐ Schedule EVB
03 11 00 Concrete Forming CRA 03 15 19 Concrete Joints and Accessories CRA 03 20 00 Concrete Reinforcing CRA 03 30 00 Cast‐in‐Place Concrete CRA 03 30 13 Concrete Placing CRA 03 35 00 Concrete Finishing CRA 03 39 00 Concrete Curing CRA 03 60 00 Grouting CRA
DIVISION 4 – MASONRY
04 00 00 Masonry BDF, CRA
TABLE OF CONTENTS (Continued)
Number Title Author
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 9 of 18 Issued for Construction
DIVISION 5 – METALS
05 40 00 Cold‐Formed Metal Framing BDF, CRA
05 50 00 Metal Fabrications BDF, CRA
05 50 13 Structural Metals CRA 05 52 13 Metal Railings CRA 05 53 13 Metal Gratings CRA 05 81 00 Anchorage In Concrete and Masonry CRA
DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES
06 41 00 Casework BDF 06 74 15 Fiberglass Reinforced Railings EVB
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
07 05 00 Membrane Roofing BDF 07 11 00 Dampproofing EVB 07 20 00 Building Insulation BDF 07 60 00 Flashing and Sheet Metal BDF 07 92 00 Joint Sealants BDF
DIVISION 8 – OPENINGS 08 10 00 Metal Doors and Frames BDF 08 15 40 Fiberglass Doors and Frames BDF 08 33 00 Overhead Coiling Doors BDF 08 40 00 Storefront Systems BDF 08 51 13 Metal Windows BDF 08 62 50 Ducted Skylights BDF 08 70 00 Door Hardware BDF 08 80 00 Glass and Glazing BDF 08 90 00 Louvers and Vents RWC
TABLE OF CONTENTS (Continued)
Number Title Author
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 10 of 18 Issued for Construction
DIVISION 9 – FINISHES 09 25 00 Gypsum Drywall BDF 09 30 00 Ceramic Tile BDF 09 51 20 Suspended Acoustic Tile Ceiling BDF 09 90 00 Paints and Coatings BDF 09 96 11 Protective Coatings EVB 09 97 24 Corrosion Protection Systems EVB
DIVISION 10 – SPECIALTIES
10 12 16 Toilet Partitions BDF 10 28 00 Bathroom Accessories BDF 10 40 00 Signage BDF 10 44 00 Fire Extinguishers and Cabinets BDF
DIVISION 11 –– Not Used
DIVISION 12 –– Not Used DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 Metal Building Systems BDF 13 47 13 Cathodic Protection System – See IFC Yard Piping Specifications
DIVISION 14 – Not Used DIVISIONS 15 THROUGH 20 – Not Used DIVISION 21 – FIRE SUPPRESSION
21 13 00 Fire‐Suppression Sprinkler Systems RWC
DIVISION 22 – PLUMBING 22 00 00 Plumbing RWC 22 05 11 Mechanical Building Systems Materials and Methods RWC
TABLE OF CONTENTS (Continued)
Number Title Author
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 11 of 18 Issued for Construction
22 11 19 Backflow Preventers RWC 22 11 26 Water Meters RWC 22 13 17 Cast Iron Soil Pipe and Accessories RWC
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING 23 00 00 Heating, Ventilating, and Air Conditioning RWC 23 05 93 Testing, Adjusting, and Balancing for HVAC RWC 23 09 11 Building Systems Controls RWC 23 50 11 Heating System Equipment RWC 23 70 00 Refrigeration Systems RWC
DIVISION 24 – Not Used DIVISION 25 – INTEGRATED AUTOMATION – Not Used DIVISION 26 – ELECTRICAL
26 05 11 Electrical MK 26 05 83 Electrical Equipment Installation MK 26 24 13 Switchboards MK 26 24 23 600 Volt Class Motor Control Centers MK 26 29 24 Variable Frequency Drives MK 26 32 13 Engine‐Generator EVB 26 36 26 Bypass‐Isolation Automatic Transfer Switch MK 26 41 13 Lightning Protection for Structures MK 26 50 01 Performance Lighting MK
DIVISION 27 – Not Used DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 10 01 Facility Security System MK 28 31 16 Fire Detection and Alarm Systems MK
TABLE OF CONTENTS (Continued)
Number Title Author
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 12 of 18 Issued for Construction
DIVISIONS 29 THROUGH 30 – Not Used
DIVISION 31 – EARTHWORK
31 23 11 Excavation and Fill for Structures – See IFC Yard Piping Specifications
31 23 33 Trenching and Backfilling – See IFC Yard Piping Specifications
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES 33 05 14 Manhole and Vault Covers and Accessories EVB 33 13 13 Cleaning and Disinfection of Water Pipelines EVB
33 14 00 Pipeline Pressure and Leakage Testing – See IFC Yard Piping Specifications
33 16 13.13 Steel Water Storage Reservoir EVB
33 31 33 Sewer Pipe Installation and Testing – See IFC Yard Piping Specifications
DIVISION 34 – TRANSPORTATION – Not Used
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION – Not Used
DIVISIONS 36 THROUGH 39 – Not Used
DIVISION 40 – PROCESS INTEGRATION
40 05 05.11 Miscellaneous Piping and Accessories Installation – See IFC Yard Piping Specifications
40 05 17 Copper Tubing and Accessories – See IFC Yard Piping Specifications 40 05 19 Ductile Iron Pipe – See IFC Yard Piping Specifications
40 05 19‐S01 Ductile Iron Pipe Schedule – See IFC Yard Piping Specifications 40 05 23 Stainless Steel Pipe and Alloy Pipe, Tubing, and Accessories KEZ
40 05 23‐S01
Stainless Steel Pipe and Alloy Pipe, Tubing, and Accessories Schedule
EVB
TABLE OF CONTENTS (Continued)
Number Title Author
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 13 of 18 Issued for Construction
40 05 24 Steel Pipe – See IFC Yard Piping Specifications 40 05 24 – S01 Steel Pipe Schedule Buried – See IFC Yard Piping Specifications 40 05 24 – S02 Steel Pipe Schedule Above Grade EVB
40 05 24.43 Miscellaneous Steel Pipe, Tubing, and Accessories EVB
40 05 31.12 Polyvinyl Chloride (PVC) Pressure Pipe – See IFC Yard Piping Specifications
40 05 31.16 Polyvinyl Chloride (PVC) Sewer Pipe – See IFC Yard Piping Specifications
40 05 32 Miscellaneous Plastic Pipe, Tubing, and Accessories – See IFC Yard Piping Specifications
40 05 32 – S01 Miscellaneous Plastic Pipe, Tubing, and Accessories Schedule Buried – See IFC Yard Piping Specifications
40 05 32 – S02 Miscellaneous Plastic Pipe, Tubing, and Accessories Schedule Above Grade
EVB
40 05 33.11 High Density Polyethylene (HDPE) Pressure Pipe – See IFC Yard Piping Specifications
40 05 33.11 – S01
High Density Polyethylene (HDPE) Pressure Pipe Schedule – See IFC Yard Piping Specifications
40 05 41 Miscellaneous Piping and Pipe Accessories – See IFC Yard Piping Specifications
40 05 51.13 Valve Installation EVB 40 05 51.16 Gate Installation EVB
40 05 56 Miscellaneous Valves – See IFC Yard Piping Specifications 40 05 57 Valve and Gate Actuators EVB
40 05 59.13 Open‐Channel Metal Slide Gates and Weir Gates EVB 40 05 59.13‐S01 Open‐Channel Metal Slide Gates and Weir Gates Schedule EVB
40 05 61.23 Resilient‐Seated Gate Valves RWC 40 05 61.43 Knife Gate Valves EVB
40 05 61.43‐S01 Knife Gate Valves Schedule EVB 40 05 62.16 Eccentric Plug Valves EVB
40 05 62.16‐S01, S02, S04 Eccentric Plug Valves Schedules
EVB
40 05 63.53 Miscellaneous Ball Valves EVB 40 05 64.22 Industrial Butterfly Valves EVB
40 05 64.22‐S01, S02, S03 Industrial Butterfly Valves Schedules
EVB
TABLE OF CONTENTS (Continued)
Number Title Author
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 14 of 18 Issued for Construction
40 05 67 Globe Valves EVB 40 05 68 Check Valves EVB
40 05 68‐S01 Check Valves Schedule EVB 40 05 73.13 Pressure Reducing Valves RWC 40 05 84.11 Pinch and Diaphragm Valves EVB
40 05 86 Air Valves EVB 40 05 86‐S01 Air Valves Schedule EVB 40 05 88.11 Solenoid Valves EVB
40 05 93 Common Motor Requirements for Process Equipment MK
40 06 20 Schedules for Liquids Process Piping – See IFC Yard Piping Specifications
40 42 11 Mechanical Insulation EVB 40 61 11 Instrumentation and Control System BLB
40 61 11A Instrument Devices BLB 40 62 00 Computer System Hardware BLB 40 64 00 Programmable Logic Controllers BLB
40 64 00A Input/Output List BLB 40 64 01 Vendor Standard Programmable Logic Controllers BLB 40 66 11 Network Systems BLB 40 66 33 Metallic and Fiber Optic Communication Cable and Connectors BLB 40 67 11 Panels, Consoles, and Appurtenances BLB 40 68 16 Computer System Software BLB 40 68 83 Software Control Block Descriptions BLB 40 69 13 Uninterruptible Power Supply BLB 40 71 00 Flow Instruments BLB 40 72 00 Pressure and Level Instruments EVB 40 73 12 Pressure Gauges EVB
40 73 12‐S01 Pressure Gauges Schedule EVB 40 74 00 Temperature Instruments BLB 40 75 00 Process Analytical Instruments BLB 40 78 00 Panel Mounted Instruments BLB 40 79 11 Miscellaneous Instruments BLB
TABLE OF CONTENTS (Continued)
Number Title Author
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 15 of 18 Issued for Construction
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 12 13.36 Screw Conveyors – See procurement package 41 12 13.36 Screw Conveyors ‐ Dewatering KEZ
DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING EQUIPMENT – Not Used
DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT
43 05 21 Seal Water Stations EVB 43 05 41 Chemical Storage Tank Installation EVB 43 11 15 Dry Screw Positive Displacement Blowers KEZ 43 11 17 Rotary Lobe Positive Displacement Blower KEZ
43 11 17 ‐ MBR Rotary Positive Displacement Blower – MBR – See procurement package
43 23 13.14 Horizontal End Suction Centrifugal Pumps ‐ IPR EVB 43 23 13.14 ‐ Outfall Pumps Horizontal End Suction Centrifugal Pumps ‐ Outfall Pumps
EVB
43 23 13.14 ‐ SAFE Filter Horizontal End Suction Centrifugal Pumps ‐ SAFE Filter
KEZ
43 23 13.14 ‐ MBR
Horizontal End Suction Centrifugal Pumps – MBR – See procurement package
43 23 58 Rotary Lobe Pumps KEZ 43 23 58 ‐ MBR Rotary Lobe Pumps – MBR – See procurement package
43 24 13 Vertical Multistage Centrifugal Pumps – See procurement package 43 25 14 Sanitary Lift Station EVB 43 25 15 Water Pressure Booster Systems KEZ 43 25 60 Submersible Horizontal Propeller Pumps KEZ 43 40 40 Liquid Chemical Feed Systems EVB 43 40 41 Polymer Feed Systems EVB
43 41 45.13 Fiberglass Reinforced Plastic Storage Tanks EVB 43 41 45.13‐DS01 – DS05 Fiberglass Reinforced Plastic Storage Tanks‐Data Sheet
EVB
TABLE OF CONTENTS (Continued)
Number Title Author
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 16 of 18 Issued for Construction
DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT 44 31 31 Odor Control Biofilter EVB
DIVISION 45 – INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT – Not Used
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
46 11 35 MBR Equipment – See procurement package 46 21 10 Packaged Headworks System – See procurement package 46 21 12 Mechanically Cleaned Bar Screens – See procurement package 46 22 00 Packaged Fine Screens EVB 46 23 23 Vortex Grit Removal Equipment – See procurement package
46 23 64 Grit Separation and Classification Equipment – See procurement package
46 41 23 Submersible Mixers KEZ 46 42 24 In‐Line Static Mixers EVB 46 51 21 Course Bubble Diffusers KEZ 46 51 31 Fine Pore Diffused Aeration Equipment KEZ 46 61 35 MBR – See procurement package 46 61 41 Disk Cloth Filters KEZ
46 63 26 Low Pressure Reverse Osmosis System – See procurement package
46 63 26 Low Pressure Reverse Osmosis System ‐ Data Sheet – See procurement package
46 66 56.17 Closed Channel UV – See procurement package 46 76 21 Belt Filter Presses KEZ 46 76 22 Calcite Contactor EVB
DIVISION 47 – Not Used
DIVISION 48 – ELECTRICAL POWER GENERATION – Not Used
Coarse
TABLE OF CONTENTS (Continued)
Number Title Author
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 17 of 18 Issued for Construction
Notes:
1. The italicized specifications have been issued with the IFC Yard Piping set.
2. The red specifications have been purchased and procured. See separate procurement packages and forthcoming shop drawings.
City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 18 of 18 Issued for Construction
THIS PAGE LEFT BLANK INTENTIONALLY
City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 1 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction
Section 01 33 00
SUBMITTAL PROCEDURES 1. SHOP DRAWINGS AND ENGINEERING DATA. 1.01. General. This section stipulates the requirements for engineering data that the Supplier shall submit for design information and review. The document submittal procedures shall be in accordance with the requirements of this Specification. Shop Drawings and engineering data (submittals) covering all equipment and all fabricated components and building materials which will become a permanent part of the Work under this Contract shall be submitted to Design-Builder for review. Submittals shall verify compliance with the Contract Documents, and shall include drawings and descriptive information in sufficient detail to show the kind, size, arrangement, and the operation of component materials and devices; the external connections, anchorages, and supports required; the performance characteristics; and dimensions needed for installation and correlation with other materials and equipment as required by the Design-Builder. All submittals, regardless of origin, shall be approved by Design-Builder and clearly identified with the name of this Contract, and references to the applicable specification paragraphs and Contract Drawings. When catalog pages are submitted, applicable items shall be clearly identified and inapplicable data crossed out. The current revision, issue number, and date shall be indicated on all drawings and other descriptive data. The Owner will only review submittals based upon the agreed upon list between the Owner and the Design-Builder. All deviations from the requirements of the Contract Documents shall be identified as deviations on each submittal and shall be noted by the Suppliers by red-lining a copy of the Specification and/or the Drawings. Such submittals shall, as pertinent to the deviation, indicate essential details of all changes proposed by the Supplier (including modifications to other facilities that may be a result of the deviation) and all required piping and wiring diagrams. Technical data submittals shall be submitted in electronic format. Electronic technical data submittals shall be made using the Procore project collaboration system, a Web-based file transfer handling service. If Supplier does not already have Procore transmittal capability, the Design-Builder will provide the required credentials for access upon Purchase Order award.
City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 2 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction
1.02. Compliance Reports. Reports shall be submitted that record the tests and/or calculations required in the specification technical sections. Reports shall be submitted for each piece of equipment or each plant system. 1.03. Motor and Electric Actuator Information. If required by the Specifications, Motor and Electric Actuator Information shall be submitted in accordance with the Common Motor Requirements for Process Equipment section. 1.04. Drawings. Drawings shall be of sufficient detail to indicate the kind, size, arrangement, component weight, breakdown for shipment, and operation of component materials and devices; the external connections, anchorages, supports, and grouting requirement; the dimensions needed for installation and correlation with other materials and equipment; and the information specifically requested in both Section 2 of this Specification and the Schedule of Submittals section. Drawings for use in installation and erection shall include a Bill of Quantity (BOQ), identifying the unit of measure, quantity, description, part number (or piece mark identifier), location reference on the drawing and any other details required by Design-Builder. It may be acceptable to have the BOQ detail in other means or media, if approved in advance by Design-Builder. Supplier shall fully complete, check, and certify drawings, including drawings produced by a subcontractor, for compliance with the Purchase Order requirements prior to submittal. Drawings shall have title block entries that clearly indicate the drawing is certified. Each submitted drawing shall be project unique and shall be clearly marked with the name of the project, unit designation, Design Builder’s Purchase Order title, Design Builder’s Purchase Order file number, project equipment or structure nomenclature, component identification numbers, and Design Builder’s name. Equipment, instrumentation, and other components requiring Design-Builder-assigned identification tag numbers shall be clearly identified on the drawings. If standard drawings are submitted, the applicable equipment and devices furnished for the project shall be clearly marked. Transmittal letters shall be included with each submittal. It shall clearly identify the specification section reference and any contract drawing reference. It shall summarize the components of the submittal and list any attachments. Catalog pages are not acceptable, except as drawings for standard nonengineered products and when the catalog pages provide all dimensional data, all external termination data, and mounting data. The catalog page shall be submitted with a typed cover page clearly indicating the name of the project, unit designation, specification title, specification number, component identification
City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 3 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction
numbers, model number, Supplier’s drawing number, and Design Builder’s name. Drawings shall be submitted with all numerical values in English units. All multi sheet documents shall be submitted in their entirety for all revisions. 1.04.01. Drawing Submittal. Drawings shall be submitted electronically in Portable Document Format (PDF). AutoCAD or MicroStation format files are not acceptable. If Supplier does not have the capability to provide Portable Document Format (PDF), an alternative submittal format shall be used as mutually agreed between Design-Builder and Supplier. 1.04.02. Drawing Processing. Supplier’s engineering schedule shall allow a minimum of three (3) weeks for transmittal, processing, and review of drawings and data by Design-Builder. Unless this Purchase Order indicates that a drawing or engineering data submittal by Supplier is to be for Design-Builder’s information only, Design-Builder, upon receipt of submittals, shall review and return same to Supplier, marked "No Exceptions Noted," "Exceptions Noted," “Received for Distribution," "Returned for Corrections," “Release for Record,” “Void,” “Superseded” or “Hold” The timing of Supplier’s submittals and Purchaser's review shall be in accordance with the Completion Dates for same as set forth in the Purchase Order or the project schedule. The submittal of any drawing or other submittal document by Supplier to Design-Builder under this Purchase Order will be certified by Supplier that the information set forth therein is accurate in all material respects. 1.04.02.01. No Exceptions Noted (NE) or Received for Distribution (RD). Upon receipt of a submittal marked "No Exceptions Noted" or "Received for Distribution," Supplier may proceed with its Work to the extent of and in accordance with the submittal. Supplier shall not resubmit unless the drawing or document is revised, in which case it shall be resubmitted as a new document revision in accordance with the Resubmittals section. 1.04.02.02. Exceptions Noted (EN). Upon receipt of a submittal marked "Exceptions Noted" and if Supplier concurs with Design-Builder’s comments, Supplier shall incorporate same and may proceed with its Work to the extent of and in accordance with the annotated submittal. Supplier shall submit to Design-Builder within fourteen calendar days a revision to the original submittal in which Design-Builder’s comments, unless the individual comment indicates it does not require a resubmittal or revision, have been incorporated. If Supplier determines that it cannot incorporate Design-Builder’s comments without prejudice to Supplier’s warranty or other obligations under this Purchase Order, Supplier shall so advise Design-Builder in writing within seven calendar days of its receipt of
City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 4 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction
Design-Builder’s comments, stating the reasons therefore. Supplier may proceed with its Work to the extent of and in accordance with the annotated submittal only upon Design-Builder and Supplier resolving Design-Builder’s comments. 1.04.02.03. Returned for Corrections (RC). Upon receipt of a submittal marked "Returned for Corrections," Supplier shall immediately take all necessary action to revise its submittal in accordance with Design-Builder’s comments, the Specification, and the Drawings, and shall resubmit to Design-Builder for review the corrected original submittal, voiding previous information and adding new documents if required. In no event shall Supplier proceed with the affected Work until its revised submittals have been returned to Supplier marked "No Exceptions Noted" or "Exceptions Noted" by Purchaser. 1.04.02.04. Release for Record (RR). Receipt of a submittal marked “Release for Record” indicates that there are no specific objections to the document. Work may proceed. Certain project information required by the Design-Builder's document management system may have been added electronically to the drawing and provided to Supplier for the record. Supplier shall not resubmit the drawing or document unless revisions to the design are required. If revisions are required, Supplier shall incorporate Design-Builder’s information and resubmit as a new revision. Design-Builder’s project-specific information shall be added if future revisions and submittals are made. 1.04.02.05. Void (VO) or Superseded (SS). Receipt of a submittal marked “Void” or “Superseded” does not require any action by Supplier. “Void” indicates that the submittal is no longer applicable to the project and is not being replaced by other drawings or data. “Superseded” indicates that different drawings or data have replaced the previously submitted drawings and data; this status does not pertain to revisions of the same drawings and data. 1.04.02.06. Hold (HO). A submittal may be given a status of "Hold" by the Design-Builder, or the Supplier may have "Holds" on the submitted drawing. For a Hold status designated by the Design-Builder, the Supplier shall not proceed with the work that is designated on "Hold" except as specifically directed by the Design-Builder. Additional information required for the Supplier to release the "Hold" will be transmitted from the Design-Builder later. The Supplier shall provide information to the Design-Builder about the cause for any "Holds" designated on the drawing and immediately take all action necessary to resolve the "Holds". The Supplier shall resubmit the drawing for review once the "Holds" are removed from the drawing and should make all efforts to not submit drawings to the Design-Builder until drawing review comments have been received back from the Design-Builder.
City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 5 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction
1.04.02.07. Resubmittals. If during or subsequent to the completion of the submittal process, Supplier makes further changes to the equipment and materials shown on submittals that have been reviewed by Design-Builder, the changes shall be clearly marked on the submittal by Supplier and the submittal process shall be repeated. If changes are made by Supplier after delivery to the Jobsite, drawings conforming to construction records indicating the changes shall be prepared by Supplier and submitted to Design-Builder for review. Any resubmittal of information shall clearly identify the revisions by footnote or by a form of back-circle, with revision block update, as appropriate. The Supplier shall put the Black & Veatch drawing number on the transmittal letter and submit a complete document. 1.04.02.08. Design-Builder’s Review. Design-Builder’s review of drawings and other submittals will cover only general conformity of the data to the Specifications and Drawings, external connections, interfaces with equipment and materials furnished under separate specifications, and dimensions that affect plant arrangements. Design-Builder’s review does not include a thorough review of all dimensions, quantities, and details of the equipment, material, device, or item indicated or the accuracy of the information submitted. Review and comment by Design-Builder of Supplier's Drawings or other submittals shall not relieve Supplier of its sole responsibility to meet the Completion Dates requirement of this Purchase Order and to supply Goods that conform to the requirements of this Purchase Order. 1.04.02.09. File Returns to Supplier. The Procore web service will be used by Design-Builder to return PDF files to Supplier. Files returned to Supplier will be in PDF format. 2. OPERATION AND MAINTENANCE DATA AND MANUALS. Adequate operation and maintenance information shall be supplied for all equipment requiring maintenance or other attention. The equipment Supplier shall prepare a Project specific operation and maintenance manual for each type of equipment indicated in the individual equipment sections or the equipment schedule. Unless otherwise agreed by Design-Builder, the operation and maintenance manual for each type of equipment shall only be submitted for review following completion of review of all shop drawings and engineering data pertaining to that equipment. Operation and maintenance manuals shall include the following:
a. Equipment function, normal operating characteristics, and limiting conditions.
City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 6 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction
b. Assembly, installation, alignment, adjustment, and checking instructions.
c. Operating instructions for startup, routine and normal operation, regulation and control, shutdown, and emergency conditions.
d. Lubrication and maintenance instructions. e. Guide to troubleshooting. f. Parts lists and predicted life of parts subject to wear. g. Outline, cross section, and assembly drawings; engineering data; and
wiring diagrams. h. Test data and performance curves, where applicable. i. Electronic file of Computer Maintenance Management System (CMMS)
input data with all required preventative maintenance for seamless transition to incorporate into CMMS database.
The operation and maintenance manuals shall be in addition to any instructions or parts lists packed with or attached to the equipment when delivered, or which may be required by Design-Builder. Manuals shall be submitted in electronic format to Design-Builder prior to the date of shipment of the equipment and as indicated in the Schedule of Submittals. The manuals shall be submitted and Design-Builder’s review comments retrieved, through Procore accessible through the Internet. When review by Design-Builder is complete, the electronic O&M manual shall be delivered on Procore to Design-Builder. Delivery of the final O&M shall be made in accordance with the Schedule of Submittals section. All material shall be marked with Project identification, and inapplicable information shall be marked out or deleted. Shipment of equipment will not be considered complete until all required manuals and data have been received. 2.01. Electronic Operation and Maintenance Manuals. Electronic manuals shall be in Portable Document Format (PDF) and shall be prepared at a resolution between 300 and 600 dots per inch (dpi), depending on document type. Optical Character Recognition (OCR) capture shall be performed on these documents. OCR settings shall be performed. Documents prepared in PDF format shall be processed as follows, unless acceptable to the submittal reviewer:
1. Pages shall be searchable (processed for optical character recognition) and indexed when multiple files are required.
City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 7 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction
2. Pages shall be rotated for viewing in proper orientation. 3. A bookmark shall be provided in the navigation frame for each entry in
the Table of Contents. 4. Embedded thumbnails shall be generated for each completed PDF file. 5. The opening view for PDF files shall be as follows: Initial View: Bookmarks and Page Page Number: Title Page (usually Page 1) Magnification: Set to Fit in Window Page: Single Page 6. Where the bookmark structure is longer than one page the bookmarks
shall be collapsed to show the chapter headings only. 7. When multiple files are required the first file of the series (the parent file)
shall list every major topic in the Table of Contents. The parent file shall also include minor headings bookmarked based on the Table of Contents. Major headings, whose content is contained in subsequent files (children) shall be linked to be called from the parent to the specific location in the child file. The child file shall contain bookmark entries for both major and minor headings contained in the child file. The first bookmark of any child file shall link back to the parent file and shall read as follows "Return to the Equipment Name Table of Contents", e.g. Return to the Polymer Feed System Table of Contents.
8. Drawings shall be bookmarked individually. 9. Files shall be delivered without security settings to permit editing,
insertion and deletion of material to update the manual provided by the manufacturer.
2.02. Labeling. As a minimum, the following information shall be included on all final O&M manual materials:
Equipment name and/or O&M title spelled out in complete words. Project Name. Owner Project/Contract Number. Specification Section Number. Example: “Section 15500” Manufacturer’s name. File Name and Date.
For example:
MBR Operation and Maintenance Manual Morro Bay WRF Project/Contract No. 400530 Specification Section 46 61 35 Manufacturer OM11110-001.pdf, 5/05/07
End of Section
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 1 of 46 Issued for Construction
Section 01 45 33.3
CODE REQUIRED SPECIAL INSPECTIONS AND PROCEDURES
PART 1 - GENERAL
1-1. SCOPE. Owner, or Registered Design Professional in Responsible Chargeof construction acting as Owner’s Agent, will engage one or more ApprovedAgencies to conduct tests and special inspections specified in this section andrelated sections, and as may be specified in other sections of thesespecifications. The Approved Agency shall not be employed by Design-Builderor a supplier materially participating in the project.
1-2. GENERAL. This Section includes administrative and proceduralrequirements indicated in the governing building code.
Structural testing and special inspection services are required to verifycompliance with the construction documents and standards referenced herein.
1-3. DEFINITIONS.
Approved Agency: An established and recognized agency regularly engaged inconducting tests or furnishing inspection services, when such agency has beenapproved by the Authority Having Jurisdiction.
Approved Fabricator: An established and qualified person, firm or corporationregistered and approved by the Authority Having Jurisdiction to perform workwithout Special Inspection.
Authority Having Jurisdiction (AHJ): The officer or other designated authoritycharged with the administration and enforcement of the building code, or a dulyauthorized representative. Also commonly known as the Building Official.Construction Documents: Written, graphic and pictorial documents prepared orassembled for describing the design, location and physical characteristics of theelements of a project necessary for obtaining a building permit. Constructiondocuments include all supplemental instructions, sketches, addenda, andrevisions to the drawings and specifications issued by the Registered DesignProfessional beyond those issued for a building permit.
Pre-Engineered Structural Elements: Structural elements specified by theRegistered Design Professional but which may be designed by anotherRegistered Design Professional. (Examples are items such as open web steeljoists and joist girders, metal joists, pre-cast concrete elements, pre-fabricatedmetal buildings, pre-stressed wire wrapped tanks, tilt-up concrete panelreinforcement and lifting hardware.)
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 2 of 46 Issued for Construction
Registered Design Professional (RDP): An individual who is registered orlicensed to practice their respective design profession as defined by the statutoryrequirements of the professional registration laws of the state or jurisdiction inwhich the project is to be constructed.
Registered Design Professional in Responsible Charge (RDPRC): A RegisteredDesign Professional engaged by Owner to review and coordinate certain aspectsof the project, as determined by the AHJ and Construction Documents, forcompatibility with the design of the buildings or structure, including submittaldocuments prepared by others, deferred submittal documents and phasedsubmittal documents.
Shop Drawings / Submittal Data: Written, graphic and pictorial documentsprepared and / or assembled by Design-Builder or Supplier based on theConstruction Documents.
Special Inspection: Inspection and/or testing required by the governing buildingcode, as amended by the AHJ, of the materials, installation, fabrication, erectionor placement of components and connections requiring special expertise toensure compliance with approved Construction Documents and referencedstandards.
Special Inspection, Continuous: The full-time observation or testing of workrequiring special inspection by an approved Special Inspector who is present inthe area where the work is being performed.
Special Inspection, Periodic: The part-time or intermittent observation or testingof work requiring Special Inspection by an approved Special Inspector who ispresent in the area where the work has been or is being performed and at thecompletion of the work.
Special Inspector: A qualified person demonstrating competence, to thesatisfaction of the AHJ and RDPRC, for inspection of the particular type ofconstruction or operation requiring special inspection. The Special Inspector willbe qualified as specified herein.
Structural Observations: Visual observation of the structural system by aRegistered Design Professional for general conformance to the approvedConstruction Documents. Structural observations are not considered part of thetests and special inspections and do not replace inspections and testing by theApproved Agency. Owner will employ a RDP to perform Structural Observations.
Testing Agency: A qualified materials testing laboratory under the responsiblecharge of a Registered Design Professional, approved by the AHJ and theRDPRC, to measure, examine, test, calibrate, or otherwise determine the
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 3 of 46 Issued for Construction
characteristics or performance of construction materials and verify confirmationwith construction documents.
1-4. INSPECTION AND TESTING AGENCY QUALIFICATIONS. SpecialInspectors and testing agencies will be employed or retained by Owner, and willhave the minimum qualifications as described in this section. The qualificationsof all personnel performing special inspection and testing activities are subject tothe approval of the AHJ.
Minimum qualifications of inspection and testing agencies and their personnel willcomply with ASTM E329 “Standard Specification for Agencies Engaged inConstruction Inspection, Testing, or Special Inspection,” or IAS AC 291“Accreditation Criteria for Special Inspection Agencies.”
Inspectors and individuals performing tests will be certified for the work beingperformed as listed below and in Table 1 of IAS AC291, or by alternatecertifications when acceptable to the AHJ. The AHJ may have additionalrequirements.
Abbreviation used in this Section Description
AOR Architect licensed in the state of the project, specializingin the design of building structures
Licensed Engineers
PE/SE Structural Engineer (SE) or Professional Engineer (PE)licensed in the state of the project, specializing in thedesign of building structures
PE/GE Geotechnical Engineer (GE) or Professional Engineer(PE) licensed in the state of the project, specializing insoil mechanics and foundations
PE/EE Electrical Engineer (EE) or Professional Engineer (PE)licensed in the state of the project, specializing inelectrical systems
PE/ME Mechanical Engineer (ME) or Professional Engineer (PE)licensed in the state of the project, specializing inmechanical systems
EI/EIT Engineering Intern or Engineer-in-Training: a graduateengineer who has passed the Fundamentals ofEngineering examination working under the directsupervision of a Professional Engineer licensed in thestate of the project and with a minimum of one year ofexperience performing inspections.
American Concrete Institute (ACI)Certification
ACI-CFTT Concrete Field Testing Technician – Grade 1
ACI-CCI Concrete Construction Inspector
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 4 of 46 Issued for Construction
Abbreviation used in this Section Description
ACI-LTT Laboratory Testing Technician – Grade 1 or 2
ACI-STT Strength Testing Technician
American Welding Society (AWS)Certification
AWS-CWI Certified Welding Inspector
AWS/AISC-SSI Certified Structural Steel Inspector
American Society of Non-DestructiveTesting (ASNT) Certification
ASNT Non-Destructive Testing TechnicianFor Ultrasonic Testing (UT) and Radiographic Testing(RT) Certified as Level III through examination by ASNTor certified as Level II by their employer for flawdetection.For Magnetic Particle Testing (MT) and Liquid PenetrantTesting (PT) certified as Level II by their employer orcertified as Level III through examination by ASNT andcertified by their employer
International Code Council (ICC)Certification
ICC-SMSI Structural Masonry Special Inspector
ICC-SWSI Structural Steel and Welding Special Inspector
ICC-SFSI Spray-Applied Fire-proofing Special Inspector
ICC-PCSI Prestressed Concrete Special Inspector
ICC-RCSI Reinforced Concrete Special Inspector
ICC-SBSI Structural Steel and Bolting Special Inspector
ICC-WSI Structural Welding Special Inspector
National Concrete Masonry Association
NCMA Concrete Masonry Testing Technician
National Institute for Certification inEngineering Technologies (NICET)
NICET-CT Concrete Technician – Levels II, III & IV
NICET-ST Soils Technician - Levels II, III & IV
NICET-GET Geotechnical Engineering Technician - Levels II, III & IV
Exterior Design Institute (EDI)Certification
EDI-EIFS EIFS Third Party Inspector
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 5 of 46 Issued for Construction
Inspection or Testing Item Qualification Standards
Fabricators Varies by product as listed below
Steel Construction – Welding Inspection ICC-SWSI, ICC-WSI, AWS-CWI orAWS/AISC-SSI
Steel Construction – Non-Destructive WeldTesting
ASNT
Steel Construction – Details PE/SE, ICC-SWSI, ICC-SBSI or AWS/AISC-SSI
Steel Construction – High Strength Bolts PE/SE or ICC-SBSI
Concrete Construction - Field Tests ACI-CFTT or NICET-CT
Concrete Construction - Field Inspection PE/SE, ICC-RCSI, ACI-CCI or NICET-CT
Concrete Construction - Laboratory Testing ACI-LTT, ACI-STT or NICET-CT
Prestressed Concrete Construction ICC-PCSI
Masonry Construction - Field Inspection PE/SE or ICC-SMSI
Masonry Construction - Laboratory Testing NCMA
Soils (special grading, excavation and filling) PE/GE, NICET-ST or NICET-GET under the directsupervision of Registered Civil (geotechnical)Engineer
Pile Foundations PE/GE, Appropriate structural material inspectionand NICET-ST or NICET-GET under the directsupervision of Registered Civil (geotechnical)Engineer
Pier Foundations PE/GE, Appropriate structural material inspectionand NICET-ST or NICET-GET under the directsupervision of Registered Civil (geotechnical)Engineer
Wall Panels and Veneers ICC-SMSI
Sprayed Fire-Resistant Materials ICC-SFSI
Exterior Insulation and Finish Systems (EIFS) ICC Building Inspector or EDI-EIFS
Post Installed Anchors in Concrete ICC Building Inspector, ICC-RCSI, or PE/SE
Post Installed Anchors in Masonry ICC Building Inspector, ICC-SMSI, or PE/SE
Smoke Control Systems IBC 1705.18.2
Other Architectural Systems ICC Building Inspector, AOR, or PE/SE
Mechanical Systems ICC Building Inspector or PE/ME
Electrical Systems See NFPA 70
1-4.01. Structural Steel Testing Agency Requirements. Submit the following tothe RDPRC and the AHJ prior to beginning testing:
Written practices for monitoring and control of the inspection and testingagency operations including:
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 6 of 46 Issued for Construction
Inspection and testing agency’s procedures for the selectionand administration of inspection personnel, describing thetraining, experience, and examination requirements forqualification and certification of inspection personnel.
Inspection and testing agency’s inspection procedures,including general inspection, material controls, and visualwelding inspection.
Qualifications of management and quality assurance personneldesignated for the project.
Qualification records for inspectors and NDT technicians designated forthe project.
NDT procedures and equipment calibration records for NDT to beperformed and equipment to be used for the project.
1-5. CONFLICTING REQUIREMENTS, REPORTS AND TEST RESULTS.
1-5.01. General. If compliance with two or more standards is specified and thestandards establish different or conflicting requirements for minimum quantitiesor quality levels, comply with the most stringent requirement. Refer uncertaintiesand requirements that are different, but apparently equal, to the RDPRC for adecision before proceeding.
1-5.02. Minimum Quantity or Quality Levels. The quantity or quality level shownor specified shall be the minimum provided or performed. The actual installationmay comply exactly with the minimum quantity or quality specified, or it mayexceed the minimum within reasonable limits. To comply with theserequirements, indicated numeric values are minimum or maximum, asappropriate, for the context of requirements. Refer uncertainties to the RDPRCfor a decision before proceeding.
1-6. TECHNICAL ATTACHMENTS. The following forms are required as part ofthe comprehensive administrative, testing and inspection requirements. Theforms are available from the AHJ, or are included herein, as indicated:
Form Title AHJProvided
IncludedHerein
Notes
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 7 of 46 Issued for Construction
Form Title AHJProvided
IncludedHerein
Notes
Statement of SpecialInspections (SSI)
x To be completed jointly by theRDPRC and the ApprovedAgency, and sealed by theRDPRC after completion.Design-Builder or Owner shallsubmit the form to the AHJ aspart of the building permitapplication process.
Request for Approval ofSpecial Inspector
x To be completed by ApprovedAgency. Approved Agency willsubmit the form to the AHJ andRDPRC for their approval ofindividual inspectors.
Request for Approval toProvide SpecialInspection of Non-LocalFabrication
x To be completed by ApprovedAgency and submitted toOwner, AHJ and RDPRC.
Design-Builder’sStatement ofResponsibility
x To completed by Design-Builder and his relevantsuppliers and submitted toOwner and AHJ.
Fabricator’s Certificateof Compliance
x To be completed by Design-Builder’s fabricators, asapplicable, and submitted toAHJ.
Final Report of SpecialInspections
x To be completed and sealed byApproved Agency. ApprovedAgency or Owner will submit toAHJ at the completion ofconstruction.
PART 2 – PRODUCTS (Not Used)
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 8 of 46 Issued for Construction
PART 3 – EXECUTION
3-1. DESIGN-BUILDER AND FABRICATOR RESPONSIBILITIES. EachFabricator or Design-Builder responsible for the construction of a seismic-force-resisting system, designated seismic system, seismic resisting component, mainwind force-resisting system, or a wind-resisting component listed in the SSI shallsubmit a Design-Builder’s Statement of Responsibility to the AHJ and to Ownerprior to the commencement of work.
To be considered an Approved Fabricator that may perform work without SpecialInspection, the Fabricator shall submit copies of certifications from theInternational Accreditation Service (IAS) or other recognized and acceptableaccreditation organization a minimum of 30 days prior to the start of fabrication.Acceptance as an Approved Fabricator is subject to approval by the AHJ. If theproject specifications required an Approved Fabricator, and the AHJ does notaccept the Fabricator as an Approved Fabricator, special inspection may becomenecessary in the fabricator’s shop. Such inspections will be performed byApproved Agency.
Design-Builder shall assist in coordination of the inspection and testing serviceswith the progress of the work. Design-Builder shall provide sufficient notice toallow proper scheduling of all inspection and testing personnel. Design-Buildershall provide safe access to inspection and testing personnel and shall ensurethat all work requiring special inspection is inspected and/or tested prior toconcealment.
Design-Builder shall submit schedules to Owner, RDPRC and testing andinspecting agencies. Schedules will note milestones and durations of time formaterials requiring tests and special inspections.
Design-Builder shall provide the Special Inspector access to approved plans atthe job site or fabrication shop as applicable.
Design-Builder shall retain at the job site or fabrication shop, as applicable, allspecial inspection records submitted by an Approved Agency or SpecialInspector and shall provide these records for review by the AHJ’s inspector uponrequest.
3-2. APPROVED AGENCY AND SPECIAL INSPECTOR RESPONSIBILITIES.
3-2.01. Preliminary Approvals. Not used.
3-2.02. Perform Inspections and Tests. Be present for and perform continuousor periodic inspections and tests as listed in the SSI for conformance of the workto the AHJ approved Construction Documents. Notify Design-Builder personnelof their presence and responsibilities. Reference the applicable “Code or
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 9 of 46 Issued for Construction
Standard Reference” column in the SSI for the minimum level of inspections andtesting. When the SSI column titled “Code or Standard Reference” indicates“Manufacturer’s research reports”, inspector will obtain the most current ICBO-ES Report, ICC-ES Legacy Report, ICC-ES Report, or IAPMO UES EvaluationReport (as applicable) prior to the applicable inspection, for the type and brand ofproducts or materials being inspected.
Provide additional inspections and testing as necessary to determine compliancewith the Construction Documents. Perform special inspections in a timelymanner to avoid delay of work.
The Approved Agency shall be responsible to insure that any non-localinspection/testing agency fully complies with this Section and the SSI.
3-2.03. Defective Work. Immediately notify Design-Builder of the need forcorrective action when work does not conform to Construction Documents.
3-2.04. Uncorrected Defective Work. Notify the AHJ and RDPRC whendeficiencies have not been corrected. Notice will be made prior to the completionof that phase of the work.
3-2.05. Interim Inspection Reports. Furnish interim inspection reports to theAHJ, the RDPRC, Design-Builder, and Owner during the progress of the work.Frequency of reports will be as established in the SSI. Reports will indicate thatwork inspected was done in conformance to the approved ConstructionDocuments, or that the work was defective, as applicable.
Special inspection reports and test results will include, but not be limited to, thefollowing:
Project name and address.
Permit number.
Special Inspection Agency name, address, and phone number.
Unique identification of the report and of each page.
Date and time of inspection.
Description of inspections or tests performed, including itemdescription and location (reference grid lines, floors, elevations,etc.). Identify approved agencies employed to carry out tests.
Identification of test/inspection equipment used.
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 10 of 46 Issued for Construction
Statement noting that the work, material, and/or product conformsor does not conform to the construction document requirements.Describe defective items.
Name and signature of Design-Builder’s representative who wasnotified of work, material, and/or products that do not meet theconstruction document requirements.
Name and signature of Special Inspector and/or testing agencyrepresentative performing the work.
3-2.06. Report of Defective Work. Each agent will maintain a log that identifieswork that does not meet the requirements of the construction documents.Include:
Description and exact location.
Reference to applicable drawings and specifications.
Reference to original inspection/test report and subsequent datesof re-inspection/retesting.
Name and title of each individual notified and method of notification.
How defective items were resolved or unresolved, as applicable.
Itemized changes authorized by the RDPRC and AHJ if notincluded in a defective item.
3-2.07. Submittal Schedule. Documentation of reports, test results, and non-compliant work will be submitted at the frequency indicated in the SSI.
3-2.08. Final Report of Special Inspections. Each agent listed in the SSI shallsubmit a final report to the Approved Agency documenting the performed specialinspections and the correction of any discrepancies noted. The ApprovedAgency shall cumulate the reports and submit a comprehensive final report at apoint in time as agreed upon by the permit applicant and the AHJ prior to thestart of work.
3-3. STRUCTURAL OBSERVATION. Owner, or RDPRC on Owner’s behalf,shall employ a RDP to perform Structural Observation. Prior to thecommencement of observations, the structural observer shall submit to the AHJa written statement identifying the frequency and extent of structuralobservations. Structural observations may be made periodically as determinedby the Registered Design Professional.
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 11 of 46 Issued for Construction
At the conclusion of the work requiring observation, the structural observer shallsubmit to the AHJ a written statement that the site visits have been made andidentify any reported deficiencies which, to the best of the structural observer’sknowledge, have not been resolved.
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 12 of 46 Issued for Construction
Statement of Special Inspections
Project:Project Address:Permit Applicant:Applicant Address:Owner:Owner Address:
Registered Design Professional in Responsible Charge (RDPRC) :Discipline Name License Number Expiration Date
Structural Engineer
Geotechnical Engineer
Mechanical Engineer
Electrical Engineer
Architect
This Statement of Special Inspections includes a Schedule of Special Inspections applicable tothe above referenced project as well as the identity of the individuals, agencies, or firms intendedto be retained for conducting these inspections.
The Special Inspector(s) shall keep records of all inspections and shall furnish interim inspectionreports to the Authority Having Jurisdiction (AHJ) and to the Registered Design Professional inResponsible Charge (RDPRC). Discrepancies shall be brought to the immediate attention of theDesign-Builder for correction. If the discrepancies are not corrected, the discrepancies shall bebrought to the attention of the AHJ and the RDPRC prior to completion of that phase of work. AFinal Report of Special Inspections documenting required special inspections and correction ofany discrepancies noted in the inspections shall be submitted by each agent.
The Special Inspection program does not relieve the Design-Builder of the responsibility tocomply with the Contract Documents. Jobsite safety and means and methods of construction aresolely the responsibility of the Design-Builder.
Inspection work shall be performed in accordance with the following codes and standards.Unless otherwise indicated within the Statement of Special Inspections, the applicable edition forall codes and standards shall be as follows.
Work In Accordance With
Building Code 2016 California Building Code (CBC)
Seismic Criteria for NonstructuralComponents
ASCE 7-10
Standard Tests and Practices Listed American Society for Testing andMaterials (ASTM) specifications
Concrete ACI 318-14 and ACI 350-06
Masonry ACI 530-13 and ACI 530.1-13
Structural Steel AISC 360-10 and AISC 341-10
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 13 of 46 Issued for Construction
Work In Accordance With
Structural steel welding AWS D1.1 Structural Welding Code - Steel
Aluminum welding AWS D1.2 Structural Welding Code –Aluminum
Sheet steel welding AWS D1.3 Structural Welding Code –Sheet Steel
Structural steel bolting Research Council on StructuralConnections Specification for StructuralJoints Using High Strength Bolts,December 31, 2009
Intumescent Fire-Resistive Coating Association of the Wall and CeilingIndustry (AWCI) Technical Manual 12-B,Second Edition; Standard Practice for theTesting and Inspection of Field AppliedThin Film Intumescent Fire-ResistiveMaterials; an Annotated Guide
RDPRC - Structural RDPRC - Civil/Geotechnical RDPRC - Mechanical
RDPRC – Electrical RDPRC - Architect
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 14 of 46 Issued for Construction
Owner’s Acknowledgement:
Signature Date
Acceptance by Authority Having Jurisdiction:
Signature Date
Permit No.
Frequency of interim report submittals to AHJ:
□ 1 week □ 2 weeks □ Monthly □ Bi-Monthly □ At Completion □ Per attached Schedule
City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 15 of 46 Issued for Construction
Statement of Special Inspections(Schedule of Inspections)
The attached tables as listed below define the applicable Special Inspections and Procedures.
Table 1 of 9 Geotechnical Special Inspections
Table 2 of 9 Structural Special Inspections
Table 3 of 9 Architectural Special Inspections
Table 4 of 9 Inspections for Special Cases
Table 5 of 9 Testing for Special Inspections
Table 6 of 9 Special Inspections for Seismic Resistance
Table 7 of 9 Testing for Seismic Resistance
Table 8 of 9 Special Inspections for Wind Resistance – NOT USED
Table 9 of 9 Inspection Agents
The Seismic Design Category for the project is D.
City
of M
orro
Bay
Cod
e R
equi
red
Spe
cial
Insp
ectio
ns a
nd P
roce
dure
sW
ater
Rec
lam
atio
n Fa
cilit
y
01
45
33.3
Issu
ed: M
ay 2
020
B&
V P
roje
ct 4
0053
0P
age
16 o
f46
Issu
ed fo
r Con
stru
ctio
n
Sche
dule
of S
peci
al In
spec
tions
- Ta
ble
1 of
9 (G
eote
chni
cal S
peci
al In
spec
tions
)
Syst
em o
r Mat
eria
l
Insp
ectio
n
Rem
arks
Insp
ectio
nA
gent
No.
(see
Tab
le 9
)
Bui
ldin
gC
ode
Ref
eren
ce
Cod
e or
Stan
dard
Ref
eren
ce
Freq
uenc
y
Con
tinuo
usPe
riodi
c
Soils
Ver
ify m
ater
ial b
elow
foun
datio
n is
adeq
uate
to a
chie
ve d
esig
nbe
arin
g ca
paci
ty, f
ree
of lo
ose,
dele
terio
us o
r for
eign
mat
eria
l.
1705
.6G
eote
chni
cal
Rep
ort
X (foun
datio
nex
cava
tion
com
plet
e)
Ver
ify e
xcav
atio
ns a
re e
xten
ded
topr
oper
dep
th, p
rope
r siz
e an
dm
ater
ial.
1705
.6G
eote
chni
cal
Rep
ort
X (foun
datio
nex
cava
tion
com
plet
e)
Prio
r to
plac
emen
t of c
ontro
lled
fill,
insp
ect s
ubgr
ade
and
verif
y si
te is
prop
erly
pre
pare
d.17
05.6
Geo
tech
nica
lR
epor
t
X(p
rior t
opl
acem
ent
of fi
ll)
Per
form
cla
ssifi
catio
n an
d te
stin
gof
com
pact
ed fi
ll m
ater
ial.
1705
.6G
eote
chni
cal
Rep
ort
X(d
urin
gpl
acem
ent
of fi
ll)
Ver
ify m
ater
ials
, den
sitie
s, a
nd li
ftth
ickn
esse
s du
ring
plac
emen
t and
com
pact
ion
of c
ontro
lled
fill f
orfo
unda
tions
.
1705
.6G
eote
chni
cal
Rep
ort
XN
ote
the
exce
ptio
n of
Arti
cle
1705
.6.
Driv
en D
eep
Foun
datio
n El
emen
ts N
OT
USE
D
Cas
t-in-
Plac
e D
eep
Foun
datio
n El
emen
ts (A
uger
Cas
t Pile
s an
d D
rille
d Pi
ers)
NO
T U
SED
Hel
ical
Pile
Fou
ndat
ions
NO
T U
SED
Scre
w A
ncho
rs N
OT
USE
D
Mec
hani
cally
Sta
biliz
ed E
arth
(MSE
) Ret
aini
ng W
alls
NO
T U
SED
Tens
ion
Anc
hors
NO
T U
SED
Ston
e C
olum
ns N
OT
USE
D
City
of M
orro
Bay
Cod
e R
equi
red
Spe
cial
Insp
ectio
ns a
nd P
roce
dure
sW
ater
Rec
lam
atio
n Fa
cilit
y
01
45
33.3
Issu
ed: M
ay 2
020
B&
V P
roje
ct 4
0053
0P
age
17 o
f46
Issu
ed fo
r Con
stru
ctio
n
Sche
dule
of S
peci
al In
spec
tions
- Ta
ble
2 of
9 (S
truc
tura
l Spe
cial
Insp
ectio
ns)
Syst
em o
r Mat
eria
l
Insp
ectio
n
Rem
arks
Insp
ectio
nA
gent
No.
(see
Tab
le 9
)
Bui
ldin
gC
ode
Ref
eren
ce
Cod
e or
Stan
dard
Ref
eren
ce
Freq
uenc
y
Con
tinuo
usPe
riodi
c
Stru
ctur
al L
oad-
Bear
ing
Mem
bers
Fab
ricat
ed in
a S
hop
If re
gist
ered
and
app
rove
d by
the
AH
J to
per
form
wor
k w
ithou
t spe
cial
insp
ectio
n, s
ubm
it "F
abric
ator
’sC
ertif
icat
e of
Com
plia
nce"
at t
heco
mpl
etio
n of
wor
k th
at fa
bric
ated
item
s w
ere
cons
truct
ed in
acco
rdan
ce w
ith th
e ap
prov
edco
nstru
ctio
n do
cum
ents
.
1704
.2.5
.117
04.5
1705
.10
X(a
t end
of
fabr
icat
ion)
N/A
Con
cret
e
Rei
nfor
cing
ste
el a
nd p
rest
ress
ing
tend
on c
ondi
tion
(free
of o
il, d
irt a
ndlo
ose
rust
and
that
pro
perly
coa
ted
and/
or s
heat
hed)
and
pla
cem
ent.
Ver
ify s
ize,
spa
cing
, bar
cle
aran
ces,
cove
r, an
d ad
equa
te s
uppo
rt to
prev
ent d
ispl
acem
ent d
urin
gco
ncre
te p
lace
men
t. V
erify
lap
splic
es, m
echa
nica
l spl
ices
, and
embe
dmen
t len
gths
. Ve
rify
dow
els
for w
ork
abov
e ar
e pr
oper
ly a
ligne
dan
d sp
aced
to m
atch
oth
er w
ork.
1705
.3
AC
I 318
(Ch.
20)
AC
I 318
(25.
2-25
.3)
AC
I 318
(26.
6.1-
26.6
.3
X (p
rior t
ocl
osin
g of
form
s or
deliv
ery
ofco
ncre
te, f
orea
chpl
acem
ent)
Anc
hors
cas
t in
conc
rete
1705
.3A
CI 3
18 (1
7.8.
2)X
All
bolts
vis
ually
insp
ecte
d to
ver
ifyan
chor
dia
met
er, l
ocat
ion,
and
embe
dmen
t len
gth.
Ver
ify u
se o
f app
rove
d m
ixde
sign
(s).
1705
.319
04.1
AC
I 318
(Ch.
19)
AC
I 318
(26.
4.3-
26.4
.4)
X
RD
PR
C to
app
rove
Des
ign-
Build
er’s
prop
osed
mix
des
ign
prio
r to
cons
truct
ion.
Insp
ecto
r to
verif
y fro
m c
oncr
ete
deliv
ery
ticke
t tha
t the
app
ropr
iate
mix
has
been
pro
vide
d pr
ior t
o pl
acem
ent.
City
of M
orro
Bay
Cod
e R
equi
red
Spe
cial
Insp
ectio
ns a
nd P
roce
dure
sW
ater
Rec
lam
atio
n Fa
cilit
y
01
45
33.3
Issu
ed: M
ay 2
020
B&
V P
roje
ct 4
0053
0P
age
18 o
f46
Issu
ed fo
r Con
stru
ctio
n
Sche
dule
of S
peci
al In
spec
tions
- Ta
ble
2 of
9 (S
truc
tura
l Spe
cial
Insp
ectio
ns)
Syst
em o
r Mat
eria
l
Insp
ectio
n
Rem
arks
Insp
ectio
nA
gent
No.
(see
Tab
le 9
)
Bui
ldin
gC
ode
Ref
eren
ce
Cod
e or
Stan
dard
Ref
eren
ce
Freq
uenc
y
Con
tinuo
usPe
riodi
c
Form
wor
k sh
ape,
loca
tion,
and
dim
ensi
ons
of th
e co
ncre
te m
embe
rbe
ing
form
ed, c
onst
ruct
ion
join
tspr
oper
ly p
repa
red.
1705
.3A
CI 3
18(2
6.11
.1.2
(b)
X(p
rior t
ode
liver
y of
conc
rete
for
each
plac
emen
t)
Prio
r to
conc
rete
pla
cem
ent,
fabr
icat
e sp
ecim
ens
for s
treng
thte
sts,
per
form
slu
mp
and
air c
onte
ntte
st, a
nd d
eter
min
e th
e te
mpe
ratu
reof
the
conc
rete
.
1705
.3A
STM
C31
AST
M C
172
AC
I 318
(26.
12)
XS
ampl
ing
and
test
ing
frequ
ency
sha
llbe
as
indi
cate
d in
the
cast
-in-p
lace
conc
rete
spe
cific
atio
n.
Con
cret
e pl
acem
ent.
1705
.3A
CI 3
18 (2
6.5.
2)X
Ver
ify th
at w
ater
add
ed a
t the
site
does
not
exc
eed
that
allo
wed
by
the
mix
des
ign.
Ver
ify c
onve
ying
,de
posi
ting,
and
con
solid
atio
n of
conc
rete
. O
bser
ve p
lace
men
tpr
oced
ures
for e
vide
nce
ofse
greg
atio
n, p
ossi
ble
cold
join
ts,
disp
lace
men
t of r
einf
orci
ng o
r for
ms,
and
prop
er s
uppo
rt of
em
bedd
edite
ms,
anc
hor b
olts
, etc
.
Con
cret
e cu
ring
– m
aint
ain
tem
pera
ture
and
tech
niqu
es.
1705
.3A
CI 3
18 (2
6.5.
3-26
.5.5
)
X(d
urin
gho
t, co
ld,
and
win
dyco
nditi
ons)
For w
et-c
urin
g, c
heck
at t
hebe
ginn
ing
of e
ach
day
durin
g 7
day
curin
g pe
riod
Ver
ifica
tion
of in
-situ
con
cret
est
reng
th p
rior t
o re
mov
al o
f for
ms
and
shor
es fr
om e
leva
ted
beam
san
d sl
abs.
1705
.3A
CI 3
18 (2
6.11
.2)
X(p
rior t
ofo
rm o
rsh
ore
rem
oval
)
Ver
ifica
tion
of in
-situ
con
cret
est
reng
th p
rior t
o ba
ckfil
ling
agai
nst
wal
ls.
X(p
rior t
oba
ckfil
ling
oper
atio
ns)
City
of M
orro
Bay
Cod
e R
equi
red
Spe
cial
Insp
ectio
ns a
nd P
roce
dure
sW
ater
Rec
lam
atio
n Fa
cilit
y
01
45
33.3
Issu
ed: M
ay 2
020
B&
V P
roje
ct 4
0053
0P
age
19 o
f46
Issu
ed fo
r Con
stru
ctio
n
Sche
dule
of S
peci
al In
spec
tions
- Ta
ble
2 of
9 (S
truc
tura
l Spe
cial
Insp
ectio
ns)
Syst
em o
r Mat
eria
l
Insp
ectio
n
Rem
arks
Insp
ectio
nA
gent
No.
(see
Tab
le 9
)
Bui
ldin
gC
ode
Ref
eren
ce
Cod
e or
Stan
dard
Ref
eren
ce
Freq
uenc
y
Con
tinuo
usPe
riodi
c
Shot
cret
e N
OT
USE
D
Mas
onry
for O
ccup
ancy
Cat
egor
y I,
II, o
r III
Stru
ctur
es
Ver
ifica
tion
of p
ropo
rtion
s fo
r site
-pr
epar
ed m
orta
r and
gro
ut.
1705
.4A
CI 5
30.1
(2.1
)A
CI 5
30.1
(2.6
A)A
CI 5
30.1
(2.6
B)
X(a
tbe
ginn
ing
ofm
ason
ryco
nstru
ctio
nan
d pr
ior t
ogr
outin
g)
Ver
ifica
tion
of p
ropo
rtion
s of
mat
eria
ls in
pre
mix
ed o
r pre
blen
ded
mor
tar a
nd g
rout
as
deliv
ered
to th
esi
te.
X(a
tbe
ginn
ing
ofm
ason
ryco
nstru
ctio
nan
d pr
ior t
ogr
outin
g)
RD
PR
C to
app
rove
Des
ign-
Build
er’s
prop
osed
mix
des
igns
prio
r to
cons
truct
ion.
Insp
ecto
r to
verif
y fro
m g
rout
del
iver
ytic
ket t
hat t
he a
ppro
pria
te m
ix h
asbe
en p
rovi
ded
prio
r to
plac
emen
t.
Ver
ifica
tion
of s
lum
p flo
w a
nd V
SI
as d
eliv
ered
to th
e si
te fo
r sel
f-co
nsol
idat
ing
grou
t.17
05.4
AC
I 530
.1(1
.5B.
1.b.
3)X
Ver
ifica
tion
of f’
m a
nd f’
AA
C p
rior t
oco
nstru
ctio
n an
d fo
r eve
ry 5
000
squa
re fe
et d
urin
g co
nstru
ctio
n.17
05.4
AC
I 530
.1 (1
.4B)
XV
erifi
catio
n by
uni
t stre
ngth
or p
rism
test
ing,
see
mas
onry
spe
cific
atio
n.
Pla
cem
ent o
f mas
onry
uni
ts a
ndm
orta
r joi
nt c
onst
ruct
ion.
1705
.4A
CI 5
30.1
(3.3
B)
X(a
tbe
ginn
ing
ofm
ason
ryco
nstru
ctio
n,on
ce d
aily
for e
ach
crew
, and
prio
r to
grou
ting)
Insp
ect s
ize,
layo
ut, b
ondi
ng a
ndpl
acem
ent o
f mas
onry
uni
ts.
Insp
ect
cons
truct
ion
of m
orta
r joi
nts
incl
udin
gto
olin
g an
d fil
ling
of h
ead
join
ts.
City
of M
orro
Bay
Cod
e R
equi
red
Spe
cial
Insp
ectio
ns a
nd P
roce
dure
sW
ater
Rec
lam
atio
n Fa
cilit
y
01
45
33.3
Issu
ed: M
ay 2
020
B&
V P
roje
ct 4
0053
0P
age
20 o
f46
Issu
ed fo
r Con
stru
ctio
n
Sche
dule
of S
peci
al In
spec
tions
- Ta
ble
2 of
9 (S
truc
tura
l Spe
cial
Insp
ectio
ns)
Syst
em o
r Mat
eria
l
Insp
ectio
n
Rem
arks
Insp
ectio
nA
gent
No.
(see
Tab
le 9
)
Bui
ldin
gC
ode
Ref
eren
ce
Cod
e or
Stan
dard
Ref
eren
ce
Freq
uenc
y
Con
tinuo
usPe
riodi
c
Ver
ifica
tion
of s
ize
and
loca
tion
ofst
ruct
ural
ele
men
ts.
1705
.4A
CI 5
30.1
(3.3
F)
X(a
tbe
ginn
ing
ofm
ason
ryco
nstru
ctio
nan
d pr
ior t
ogr
outin
g)
Anc
hors
gro
uted
in m
ason
ry a
ndan
chor
age
of m
ason
ry to
fram
es,
stru
ctur
al m
embe
rs, a
nddi
aphr
agm
s in
clud
ing
type
, siz
e,an
d lo
catio
n of
anc
hors
.
1705
.4A
CI 5
30 (6
.2)
X(a
tbe
ginn
ing
ofm
ason
ryco
nstru
ctio
nan
d pr
ior t
ogr
outin
g)
Type
, gra
de, a
nd s
ize
of re
info
rcin
gst
eel.
1705
.4A
CI 5
30 (6
.1)
AC
I 530
.1 (2
.4)
AC
I 530
.1 (3
.4)
X(w
hen
stag
ed a
ndpr
ior t
oin
stal
latio
n)
Ver
ify g
rout
spa
ce is
cle
an p
rior t
ogr
outin
g.17
05.4
AC
I 530
.1 (3
.2D
)A
CI 5
30.1
(3.2
F)
X(p
rior t
oea
chgr
outin
gop
erat
ion)
Ver
ify th
at c
ells
and
sta
rting
bed
s ar
ecl
ean.
Rei
nfor
cing
ste
el a
nd c
onne
ctor
plac
emen
t: ve
rify
size
, spa
cing
,su
rface
con
ditio
n, c
orre
ct lo
catio
n,ty
pe o
f em
bedm
ents
.
1705
.4A
CI 5
30 (6
.1)
AC
I 530
.1 (3
.2E)
AC
I 530
.1 (3
.4)
X(a
tbe
ginn
ing
ofm
ason
ryco
nstru
ctio
nan
d pr
ior t
ogr
outin
g)
Ver
ify d
owel
s an
d in
serts
are
sec
ured
in p
lace
, par
ticul
arly
at r
oof l
ines
, flo
orlin
es, a
nd in
ters
ectin
g w
all l
ines
.
City
of M
orro
Bay
Cod
e R
equi
red
Spe
cial
Insp
ectio
ns a
nd P
roce
dure
sW
ater
Rec
lam
atio
n Fa
cilit
y
01
45
33.3
Issu
ed: M
ay 2
020
B&
V P
roje
ct 4
0053
0P
age
21 o
f46
Issu
ed fo
r Con
stru
ctio
n
Sche
dule
of S
peci
al In
spec
tions
- Ta
ble
2 of
9 (S
truc
tura
l Spe
cial
Insp
ectio
ns)
Syst
em o
r Mat
eria
l
Insp
ectio
n
Rem
arks
Insp
ectio
nA
gent
No.
(see
Tab
le 9
)
Bui
ldin
gC
ode
Ref
eren
ce
Cod
e or
Stan
dard
Ref
eren
ce
Freq
uenc
y
Con
tinuo
usPe
riodi
c
Gro
ut p
lace
men
t.17
05.4
AC
I 530
.1 (3
.5)
X
Ver
ify th
at th
e gr
out l
ift h
eigh
t is
inco
nfor
man
ce w
ith th
e co
de a
ndsp
ecifi
catio
ns.
Ver
ify in
stal
latio
n of
clea
nout
clo
sure
s. V
erify
that
grou
ting
oper
atio
ns a
re h
eld
belo
wth
e to
p if
keyi
ng is
requ
ired
for
subs
eque
nt li
fts, a
s re
quire
d by
cod
ean
d sp
ecifi
catio
ns.
Ver
ify m
echa
nica
lvi
brat
ion
durin
g pl
acem
ent,
and
late
rdu
ring
reco
nsol
idat
ion.
Ver
ify th
atcu
ring
requ
irem
ents
are
bei
ngfo
llow
ed.
Col
d/ho
t wea
ther
mas
onry
prot
ectio
n.
1705
.421
04.3
2104
.4
AC