  • CITY OF MORRO BAY

    WATER RECLAMATION FACILITY

    TABLE OF CONTENTS

    ISSUED FOR CONSTRUCTION

    MAY 2020

  • City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 1 of 18 Issued for Construction

    The specifications prepared by the following registered engineer are listed in the Table of Contents as indicated by their initials.

    Engineering Manager Erick Bevington, P.E. Black & Veatch Corporation

    5/20/2020

  • City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 2 of 18 Issued for Construction

    The specifications prepared by the following registered engineer are listed in the Table of Contents as indicated by their initials.

    Project Engineer Kaitie Zusy, P.E. Black & Veatch Corporation

    5/19/2020

  • City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 3 of 18 Issued for Construction

    The specifications prepared by the following registered engineer are listed in the Table of Contents as indicated by their initials.

    Structural Engineer Charles R. Ashley, Jr., S.E. Ashley and Vance Engineering, Inc.

  • City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 4 of 18 Issued for Construction

    The specifications prepared by the following licensed architect are listed in the Table of Contents as indicated by their initials.

    Architect Bruce Fraser, AIA Frasier Seiple Architects

  • City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 6 of 18 Issued for Construction

    The specifications prepared by the following registered engineer are listed in the Table of Contents as indicated by their initials.

    Instrumentation & Control Engineer Brian L. Butler, P.E. Black & Veatch Corporation

    5/19/2020

  • City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 7 of 18 Issued for Construction

    The specifications prepared by the following registered engineer are listed in the Table of Contents as indicated by their initials.

    Building Mechanical Engineer Randy W. Cantrell, P.E. Black & Veatch Corporation

    RAND

    REGISTERE

    DPR

    O FES IONA L

    ENGINEER

    ST

    ATE

    O F C A L IFO

    RN

    IA

    No. M36207

    S

    YW. CAN

    TRELL

    N I CA L

    ME CH A

    5/19/2020

  • TABLE OF CONTENTS (Continued)

    Number Title Author

    City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 8 of 18 Issued for Construction

    DIVISION 1 – GENERAL REQUIREMENTS 01 33 00 Submittals Procedures EVB 

    01 45 33.3 Code Required Special Inspections and Procedures (IBC 2015) CRA 01 61 00 General Equipment Stipulations EVB 

    01 67 00.2 Meteorological and Seismic Design Criteria (IBC 2012 & 2015) CRA 01 68 00 Equipment and Valve Identification EVB 01 73 19 Equipment Installation EVB 01 75 11 Startup Requirements (Deferred Submittal)  01 79 00 Demonstration and Training EVB 01 91 00 Commissioning (Deferred Submittal)  

         

    DIVISION 2 – Not Used

    DIVISION 3 – CONCRETE 03 01 26.66 Concrete Crack Repair CRA

    03 08 13 Tightness Testing of Structures EVB 03 08 13.S01 Tightness Testing of Structures ‐ Schedule EVB 

    03 11 00 Concrete Forming CRA 03 15 19 Concrete Joints and Accessories CRA 03 20 00 Concrete Reinforcing CRA 03 30 00 Cast‐in‐Place Concrete CRA 03 30 13 Concrete Placing CRA 03 35 00 Concrete Finishing CRA 03 39 00 Concrete Curing CRA 03 60 00 Grouting CRA 

     DIVISION 4 – MASONRY  

    04 00 00 Masonry BDF, CRA 

         

  • TABLE OF CONTENTS (Continued)

    Number Title Author

    City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 9 of 18 Issued for Construction

    DIVISION 5 – METALS  

    05 40 00 Cold‐Formed Metal Framing BDF, CRA 

    05 50 00 Metal Fabrications BDF, CRA 

    05 50 13 Structural Metals CRA 05 52 13 Metal Railings CRA 05 53 13 Metal Gratings CRA 05 81 00 Anchorage In Concrete and Masonry CRA 

     DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES  

    06 41 00 Casework  BDF 06 74 15 Fiberglass Reinforced Railings EVB 

     DIVISION 7 – THERMAL AND MOISTURE PROTECTION  

    07 05 00 Membrane Roofing BDF 07 11 00 Dampproofing EVB 07 20 00 Building Insulation BDF 07 60 00 Flashing and Sheet Metal  BDF 07 92 00  Joint Sealants  BDF 

         

    DIVISION 8 – OPENINGS  08 10 00 Metal Doors and Frames  BDF 08 15 40  Fiberglass Doors and Frames  BDF 08 33 00 Overhead Coiling Doors BDF 08 40 00 Storefront Systems  BDF 08 51 13 Metal Windows  BDF 08 62 50  Ducted Skylights BDF 08 70 00 Door Hardware  BDF 08 80 00 Glass and Glazing BDF 08 90 00 Louvers and Vents            RWC 

         

  • TABLE OF CONTENTS (Continued)

    Number Title Author

    City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 10 of 18 Issued for Construction

    DIVISION 9 – FINISHES  09 25 00 Gypsum Drywall BDF 09 30 00 Ceramic Tile BDF 09 51 20 Suspended Acoustic Tile Ceiling BDF 09 90 00 Paints and Coatings  BDF 09 96 11 Protective Coatings  EVB 09 97 24 Corrosion Protection Systems EVB 

     DIVISION 10 – SPECIALTIES  

    10 12 16 Toilet Partitions BDF 10 28 00 Bathroom Accessories BDF 10 40 00 Signage BDF 10 44 00  Fire Extinguishers and Cabinets  BDF 

     DIVISION 11 –– Not Used  

     DIVISION 12 –– Not Used    DIVISION 13 – SPECIAL CONSTRUCTION  

    13 34 19 Metal Building Systems BDF 13 47 13  Cathodic Protection System – See IFC Yard Piping Specifications    

         

    DIVISION 14 – Not Used    DIVISIONS 15 THROUGH 20 – Not Used    DIVISION 21 – FIRE SUPPRESSION  

    21 13 00 Fire‐Suppression Sprinkler Systems RWC      

    DIVISION 22 – PLUMBING  22 00 00 Plumbing RWC 22 05 11 Mechanical Building Systems Materials and Methods RWC 

  • TABLE OF CONTENTS (Continued)

    Number Title Author

    City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 11 of 18 Issued for Construction

    22 11 19 Backflow Preventers RWC 22 11 26 Water Meters RWC 22 13 17 Cast Iron Soil Pipe and Accessories RWC 

        

     

    DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING  23 00 00 Heating, Ventilating, and Air Conditioning RWC 23 05 93 Testing, Adjusting, and Balancing for HVAC RWC 23 09 11 Building Systems Controls RWC 23 50 11 Heating System Equipment           RWC 23 70 00 Refrigeration Systems RWC 

         

    DIVISION 24 – Not Used DIVISION 25 – INTEGRATED AUTOMATION – Not Used DIVISION 26 – ELECTRICAL

    26 05 11 Electrical MK 26 05 83 Electrical Equipment Installation MK 26 24 13 Switchboards MK 26 24 23 600 Volt Class Motor Control Centers MK 26 29 24 Variable Frequency Drives MK 26 32 13 Engine‐Generator   EVB 26 36 26 Bypass‐Isolation Automatic Transfer Switch MK 26 41 13 Lightning Protection for Structures MK 26 50 01 Performance Lighting MK

        DIVISION 27 – Not Used DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

    28 10 01 Facility Security System MK 28 31 16 Fire Detection and Alarm Systems MK

  • TABLE OF CONTENTS (Continued)

    Number Title Author

    City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 12 of 18 Issued for Construction

    DIVISIONS 29 THROUGH 30 – Not Used

    DIVISION 31 – EARTHWORK

    31 23 11 Excavation and Fill for Structures – See IFC Yard Piping Specifications

    31 23 33 Trenching and Backfilling – See IFC Yard Piping Specifications    

    DIVISION 32 – EXTERIOR IMPROVEMENTS

    DIVISION 33 – UTILITIES 33 05 14 Manhole and Vault Covers and Accessories EVB 33 13 13 Cleaning and Disinfection of Water Pipelines EVB

    33 14 00 Pipeline Pressure and Leakage Testing – See IFC Yard Piping Specifications

    33 16 13.13 Steel Water Storage Reservoir EVB

    33 31 33 Sewer Pipe Installation and Testing – See IFC Yard Piping Specifications 

    DIVISION 34 – TRANSPORTATION – Not Used

    DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION – Not Used

    DIVISIONS 36 THROUGH 39 – Not Used

    DIVISION 40 – PROCESS INTEGRATION

    40 05 05.11 Miscellaneous Piping and Accessories Installation – See IFC Yard Piping Specifications

    40 05 17 Copper Tubing and Accessories – See IFC Yard Piping Specifications 40 05 19 Ductile Iron Pipe – See IFC Yard Piping Specifications

    40 05 19‐S01  Ductile Iron Pipe Schedule – See IFC Yard Piping Specifications  40 05 23 Stainless Steel Pipe and Alloy Pipe, Tubing, and Accessories KEZ

    40 05 23‐S01  

    Stainless Steel Pipe and Alloy Pipe, Tubing, and Accessories Schedule  

    EVB

  • TABLE OF CONTENTS (Continued)

    Number Title Author

    City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 13 of 18 Issued for Construction

    40 05 24 Steel Pipe – See IFC Yard Piping Specifications 40 05 24 – S01  Steel Pipe Schedule Buried – See IFC Yard Piping Specifications  40 05 24 – S02  Steel Pipe Schedule Above Grade   EVB

    40 05 24.43 Miscellaneous Steel Pipe, Tubing, and Accessories EVB

    40 05 31.12 Polyvinyl Chloride (PVC) Pressure Pipe – See IFC Yard Piping Specifications

    40 05 31.16 Polyvinyl Chloride (PVC) Sewer Pipe – See IFC Yard Piping Specifications

    40 05 32 Miscellaneous Plastic Pipe, Tubing, and Accessories – See IFC Yard Piping Specifications

    40 05 32 – S01 Miscellaneous Plastic Pipe, Tubing, and Accessories Schedule Buried – See IFC Yard Piping Specifications 

    40 05 32 – S02 Miscellaneous Plastic Pipe, Tubing, and Accessories Schedule Above Grade  

    EVB

    40 05 33.11 High Density Polyethylene (HDPE) Pressure Pipe – See IFC Yard Piping Specifications

    40 05 33.11 – S01 

    High Density Polyethylene (HDPE) Pressure Pipe Schedule – See IFC Yard Piping Specifications 

    40 05 41 Miscellaneous Piping and Pipe Accessories – See IFC Yard Piping Specifications

    40 05 51.13 Valve Installation EVB 40 05 51.16 Gate Installation EVB

    40 05 56 Miscellaneous Valves – See IFC Yard Piping Specifications 40 05 57 Valve and Gate Actuators EVB

    40 05 59.13 Open‐Channel Metal Slide Gates and Weir Gates EVB 40 05 59.13‐S01  Open‐Channel Metal Slide Gates and Weir Gates Schedule  EVB

    40 05 61.23 Resilient‐Seated Gate Valves                          RWC 40 05 61.43 Knife Gate Valves EVB

    40 05 61.43‐S01  Knife Gate Valves Schedule  EVB 40 05 62.16 Eccentric Plug Valves EVB

    40 05 62.16‐S01, S02, S04  Eccentric Plug Valves Schedules 

    EVB

    40 05 63.53 Miscellaneous Ball Valves EVB 40 05 64.22 Industrial Butterfly Valves EVB

    40 05 64.22‐S01, S02, S03  Industrial Butterfly Valves Schedules 

    EVB

  • TABLE OF CONTENTS (Continued)

    Number Title Author

    City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 14 of 18 Issued for Construction

    40 05 67 Globe Valves EVB 40 05 68 Check Valves EVB

    40 05 68‐S01  Check Valves Schedule  EVB 40 05 73.13 Pressure Reducing Valves                        RWC 40 05 84.11 Pinch and Diaphragm Valves EVB

    40 05 86 Air Valves EVB 40 05 86‐S01  Air Valves Schedule   EVB 40 05 88.11 Solenoid Valves EVB

    40 05 93 Common Motor Requirements for Process Equipment MK

    40 06 20 Schedules for Liquids Process Piping – See IFC Yard Piping Specifications

    40 42 11 Mechanical Insulation EVB 40 61 11 Instrumentation and Control System BLB

    40 61 11A  Instrument Devices  BLB 40 62 00 Computer System Hardware BLB 40 64 00 Programmable Logic Controllers BLB

    40 64 00A  Input/Output List  BLB 40 64 01 Vendor Standard Programmable Logic Controllers   BLB 40 66 11 Network Systems BLB 40 66 33 Metallic and Fiber Optic Communication Cable and Connectors BLB 40 67 11 Panels, Consoles, and Appurtenances BLB 40 68 16 Computer System Software BLB 40 68 83 Software Control Block Descriptions BLB 40 69 13 Uninterruptible Power Supply BLB 40 71 00 Flow Instruments BLB 40 72 00 Pressure and Level Instruments EVB 40 73 12 Pressure Gauges EVB

    40 73 12‐S01 Pressure Gauges Schedule EVB 40 74 00 Temperature Instruments BLB 40 75 00 Process Analytical Instruments BLB 40 78 00  Panel Mounted Instruments  BLB 40 79 11  Miscellaneous Instruments  BLB

  • TABLE OF CONTENTS (Continued)

    Number Title Author

    City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 15 of 18 Issued for Construction

    DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT

    41 12 13.36 Screw Conveyors – See procurement package  41 12 13.36 Screw Conveyors ‐ Dewatering KEZ

    DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING EQUIPMENT – Not Used

    DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT

    43 05 21 Seal Water Stations EVB 43 05 41 Chemical Storage Tank Installation EVB 43 11 15 Dry Screw Positive Displacement Blowers  KEZ 43 11 17 Rotary Lobe Positive Displacement Blower KEZ

    43 11 17 ‐ MBR Rotary Positive Displacement Blower – MBR – See procurement package 

    43 23 13.14 Horizontal End Suction Centrifugal Pumps ‐ IPR  EVB 43 23 13.14 ‐ Outfall Pumps   Horizontal End Suction Centrifugal Pumps ‐ Outfall Pumps 

    EVB

    43 23 13.14 ‐ SAFE Filter  Horizontal End Suction Centrifugal Pumps ‐ SAFE Filter 

    KEZ

    43 23 13.14 ‐ MBR

    Horizontal End Suction Centrifugal Pumps – MBR – See procurement package

    43 23 58 Rotary Lobe Pumps  KEZ 43 23 58 ‐ MBR Rotary Lobe Pumps – MBR – See procurement package

    43 24 13 Vertical Multistage Centrifugal Pumps – See procurement package 43 25 14 Sanitary Lift Station EVB 43 25 15   Water Pressure Booster Systems   KEZ 43 25 60  Submersible Horizontal Propeller Pumps  KEZ 43 40 40  Liquid Chemical Feed Systems  EVB 43 40 41  Polymer Feed Systems  EVB

    43 41 45.13  Fiberglass Reinforced Plastic Storage Tanks  EVB 43 41 45.13‐DS01 – DS05 Fiberglass Reinforced Plastic Storage Tanks‐Data Sheet

    EVB

        

  • TABLE OF CONTENTS (Continued)

    Number Title Author

    City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 16 of 18 Issued for Construction

    DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT 44 31 31 Odor Control Biofilter  EVB

    DIVISION 45 – INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT – Not Used

    DIVISION 46 – WATER AND WASTEWATER EQUIPMENT

    46 11 35 MBR Equipment  – See procurement package 46 21 10 Packaged Headworks System – See procurement package 46 21 12 Mechanically Cleaned Bar Screens – See procurement package 46 22 00 Packaged Fine Screens EVB 46 23 23 Vortex Grit Removal Equipment – See procurement package

    46 23 64 Grit Separation and Classification Equipment – See procurement package

    46 41 23  Submersible Mixers  KEZ 46 42 24  In‐Line Static Mixers   EVB 46 51 21  Course Bubble Diffusers  KEZ 46 51 31  Fine Pore Diffused Aeration Equipment  KEZ 46 61 35  MBR – See procurement package  46 61 41  Disk Cloth Filters  KEZ

    46 63 26 Low Pressure Reverse Osmosis   System – See procurement package

    46 63 26 Low Pressure Reverse Osmosis   System ‐ Data Sheet – See procurement package

    46 66 56.17  Closed Channel UV – See procurement package  46 76 21 Belt Filter Presses KEZ 46 76 22 Calcite Contactor EVB

    DIVISION 47 – Not Used

    DIVISION 48 – ELECTRICAL POWER GENERATION – Not Used

    Coarse

  • TABLE OF CONTENTS (Continued)

    Number Title Author

    City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 17 of 18 Issued for Construction

    Notes:

    1. The italicized specifications have been issued with the IFC Yard Piping set.

    2. The red specifications have been purchased and procured. See separate procurement packages and forthcoming shop drawings.

  • City of Morro Bay Table of Contents Water Reclamation Facility 00 01 10.01 Issued: May 2020 B&V Project 400530 Page 18 of 18 Issued for Construction

    THIS PAGE LEFT BLANK INTENTIONALLY

  • City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 1 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction

    Section 01 33 00

    SUBMITTAL PROCEDURES 1. SHOP DRAWINGS AND ENGINEERING DATA. 1.01. General. This section stipulates the requirements for engineering data that the Supplier shall submit for design information and review. The document submittal procedures shall be in accordance with the requirements of this Specification. Shop Drawings and engineering data (submittals) covering all equipment and all fabricated components and building materials which will become a permanent part of the Work under this Contract shall be submitted to Design-Builder for review. Submittals shall verify compliance with the Contract Documents, and shall include drawings and descriptive information in sufficient detail to show the kind, size, arrangement, and the operation of component materials and devices; the external connections, anchorages, and supports required; the performance characteristics; and dimensions needed for installation and correlation with other materials and equipment as required by the Design-Builder. All submittals, regardless of origin, shall be approved by Design-Builder and clearly identified with the name of this Contract, and references to the applicable specification paragraphs and Contract Drawings. When catalog pages are submitted, applicable items shall be clearly identified and inapplicable data crossed out. The current revision, issue number, and date shall be indicated on all drawings and other descriptive data. The Owner will only review submittals based upon the agreed upon list between the Owner and the Design-Builder. All deviations from the requirements of the Contract Documents shall be identified as deviations on each submittal and shall be noted by the Suppliers by red-lining a copy of the Specification and/or the Drawings. Such submittals shall, as pertinent to the deviation, indicate essential details of all changes proposed by the Supplier (including modifications to other facilities that may be a result of the deviation) and all required piping and wiring diagrams. Technical data submittals shall be submitted in electronic format. Electronic technical data submittals shall be made using the Procore project collaboration system, a Web-based file transfer handling service. If Supplier does not already have Procore transmittal capability, the Design-Builder will provide the required credentials for access upon Purchase Order award.

  • City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 2 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction

    1.02. Compliance Reports. Reports shall be submitted that record the tests and/or calculations required in the specification technical sections. Reports shall be submitted for each piece of equipment or each plant system. 1.03. Motor and Electric Actuator Information. If required by the Specifications, Motor and Electric Actuator Information shall be submitted in accordance with the Common Motor Requirements for Process Equipment section. 1.04. Drawings. Drawings shall be of sufficient detail to indicate the kind, size, arrangement, component weight, breakdown for shipment, and operation of component materials and devices; the external connections, anchorages, supports, and grouting requirement; the dimensions needed for installation and correlation with other materials and equipment; and the information specifically requested in both Section 2 of this Specification and the Schedule of Submittals section. Drawings for use in installation and erection shall include a Bill of Quantity (BOQ), identifying the unit of measure, quantity, description, part number (or piece mark identifier), location reference on the drawing and any other details required by Design-Builder. It may be acceptable to have the BOQ detail in other means or media, if approved in advance by Design-Builder. Supplier shall fully complete, check, and certify drawings, including drawings produced by a subcontractor, for compliance with the Purchase Order requirements prior to submittal. Drawings shall have title block entries that clearly indicate the drawing is certified. Each submitted drawing shall be project unique and shall be clearly marked with the name of the project, unit designation, Design Builder’s Purchase Order title, Design Builder’s Purchase Order file number, project equipment or structure nomenclature, component identification numbers, and Design Builder’s name. Equipment, instrumentation, and other components requiring Design-Builder-assigned identification tag numbers shall be clearly identified on the drawings. If standard drawings are submitted, the applicable equipment and devices furnished for the project shall be clearly marked. Transmittal letters shall be included with each submittal. It shall clearly identify the specification section reference and any contract drawing reference. It shall summarize the components of the submittal and list any attachments. Catalog pages are not acceptable, except as drawings for standard nonengineered products and when the catalog pages provide all dimensional data, all external termination data, and mounting data. The catalog page shall be submitted with a typed cover page clearly indicating the name of the project, unit designation, specification title, specification number, component identification

  • City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 3 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction

    numbers, model number, Supplier’s drawing number, and Design Builder’s name. Drawings shall be submitted with all numerical values in English units. All multi sheet documents shall be submitted in their entirety for all revisions. 1.04.01. Drawing Submittal. Drawings shall be submitted electronically in Portable Document Format (PDF). AutoCAD or MicroStation format files are not acceptable. If Supplier does not have the capability to provide Portable Document Format (PDF), an alternative submittal format shall be used as mutually agreed between Design-Builder and Supplier. 1.04.02. Drawing Processing. Supplier’s engineering schedule shall allow a minimum of three (3) weeks for transmittal, processing, and review of drawings and data by Design-Builder. Unless this Purchase Order indicates that a drawing or engineering data submittal by Supplier is to be for Design-Builder’s information only, Design-Builder, upon receipt of submittals, shall review and return same to Supplier, marked "No Exceptions Noted," "Exceptions Noted," “Received for Distribution," "Returned for Corrections," “Release for Record,” “Void,” “Superseded” or “Hold” The timing of Supplier’s submittals and Purchaser's review shall be in accordance with the Completion Dates for same as set forth in the Purchase Order or the project schedule. The submittal of any drawing or other submittal document by Supplier to Design-Builder under this Purchase Order will be certified by Supplier that the information set forth therein is accurate in all material respects. 1.04.02.01. No Exceptions Noted (NE) or Received for Distribution (RD). Upon receipt of a submittal marked "No Exceptions Noted" or "Received for Distribution," Supplier may proceed with its Work to the extent of and in accordance with the submittal. Supplier shall not resubmit unless the drawing or document is revised, in which case it shall be resubmitted as a new document revision in accordance with the Resubmittals section. 1.04.02.02. Exceptions Noted (EN). Upon receipt of a submittal marked "Exceptions Noted" and if Supplier concurs with Design-Builder’s comments, Supplier shall incorporate same and may proceed with its Work to the extent of and in accordance with the annotated submittal. Supplier shall submit to Design-Builder within fourteen calendar days a revision to the original submittal in which Design-Builder’s comments, unless the individual comment indicates it does not require a resubmittal or revision, have been incorporated. If Supplier determines that it cannot incorporate Design-Builder’s comments without prejudice to Supplier’s warranty or other obligations under this Purchase Order, Supplier shall so advise Design-Builder in writing within seven calendar days of its receipt of

  • City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 4 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction

    Design-Builder’s comments, stating the reasons therefore. Supplier may proceed with its Work to the extent of and in accordance with the annotated submittal only upon Design-Builder and Supplier resolving Design-Builder’s comments. 1.04.02.03. Returned for Corrections (RC). Upon receipt of a submittal marked "Returned for Corrections," Supplier shall immediately take all necessary action to revise its submittal in accordance with Design-Builder’s comments, the Specification, and the Drawings, and shall resubmit to Design-Builder for review the corrected original submittal, voiding previous information and adding new documents if required. In no event shall Supplier proceed with the affected Work until its revised submittals have been returned to Supplier marked "No Exceptions Noted" or "Exceptions Noted" by Purchaser. 1.04.02.04. Release for Record (RR). Receipt of a submittal marked “Release for Record” indicates that there are no specific objections to the document. Work may proceed. Certain project information required by the Design-Builder's document management system may have been added electronically to the drawing and provided to Supplier for the record. Supplier shall not resubmit the drawing or document unless revisions to the design are required. If revisions are required, Supplier shall incorporate Design-Builder’s information and resubmit as a new revision. Design-Builder’s project-specific information shall be added if future revisions and submittals are made. 1.04.02.05. Void (VO) or Superseded (SS). Receipt of a submittal marked “Void” or “Superseded” does not require any action by Supplier. “Void” indicates that the submittal is no longer applicable to the project and is not being replaced by other drawings or data. “Superseded” indicates that different drawings or data have replaced the previously submitted drawings and data; this status does not pertain to revisions of the same drawings and data. 1.04.02.06. Hold (HO). A submittal may be given a status of "Hold" by the Design-Builder, or the Supplier may have "Holds" on the submitted drawing. For a Hold status designated by the Design-Builder, the Supplier shall not proceed with the work that is designated on "Hold" except as specifically directed by the Design-Builder. Additional information required for the Supplier to release the "Hold" will be transmitted from the Design-Builder later. The Supplier shall provide information to the Design-Builder about the cause for any "Holds" designated on the drawing and immediately take all action necessary to resolve the "Holds". The Supplier shall resubmit the drawing for review once the "Holds" are removed from the drawing and should make all efforts to not submit drawings to the Design-Builder until drawing review comments have been received back from the Design-Builder.

  • City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 5 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction

    1.04.02.07. Resubmittals. If during or subsequent to the completion of the submittal process, Supplier makes further changes to the equipment and materials shown on submittals that have been reviewed by Design-Builder, the changes shall be clearly marked on the submittal by Supplier and the submittal process shall be repeated. If changes are made by Supplier after delivery to the Jobsite, drawings conforming to construction records indicating the changes shall be prepared by Supplier and submitted to Design-Builder for review. Any resubmittal of information shall clearly identify the revisions by footnote or by a form of back-circle, with revision block update, as appropriate. The Supplier shall put the Black & Veatch drawing number on the transmittal letter and submit a complete document. 1.04.02.08. Design-Builder’s Review. Design-Builder’s review of drawings and other submittals will cover only general conformity of the data to the Specifications and Drawings, external connections, interfaces with equipment and materials furnished under separate specifications, and dimensions that affect plant arrangements. Design-Builder’s review does not include a thorough review of all dimensions, quantities, and details of the equipment, material, device, or item indicated or the accuracy of the information submitted. Review and comment by Design-Builder of Supplier's Drawings or other submittals shall not relieve Supplier of its sole responsibility to meet the Completion Dates requirement of this Purchase Order and to supply Goods that conform to the requirements of this Purchase Order. 1.04.02.09. File Returns to Supplier. The Procore web service will be used by Design-Builder to return PDF files to Supplier. Files returned to Supplier will be in PDF format. 2. OPERATION AND MAINTENANCE DATA AND MANUALS. Adequate operation and maintenance information shall be supplied for all equipment requiring maintenance or other attention. The equipment Supplier shall prepare a Project specific operation and maintenance manual for each type of equipment indicated in the individual equipment sections or the equipment schedule. Unless otherwise agreed by Design-Builder, the operation and maintenance manual for each type of equipment shall only be submitted for review following completion of review of all shop drawings and engineering data pertaining to that equipment. Operation and maintenance manuals shall include the following:

    a. Equipment function, normal operating characteristics, and limiting conditions.

  • City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 6 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction

    b. Assembly, installation, alignment, adjustment, and checking instructions.

    c. Operating instructions for startup, routine and normal operation, regulation and control, shutdown, and emergency conditions.

    d. Lubrication and maintenance instructions. e. Guide to troubleshooting. f. Parts lists and predicted life of parts subject to wear. g. Outline, cross section, and assembly drawings; engineering data; and

    wiring diagrams. h. Test data and performance curves, where applicable. i. Electronic file of Computer Maintenance Management System (CMMS)

    input data with all required preventative maintenance for seamless transition to incorporate into CMMS database.

    The operation and maintenance manuals shall be in addition to any instructions or parts lists packed with or attached to the equipment when delivered, or which may be required by Design-Builder. Manuals shall be submitted in electronic format to Design-Builder prior to the date of shipment of the equipment and as indicated in the Schedule of Submittals. The manuals shall be submitted and Design-Builder’s review comments retrieved, through Procore accessible through the Internet. When review by Design-Builder is complete, the electronic O&M manual shall be delivered on Procore to Design-Builder. Delivery of the final O&M shall be made in accordance with the Schedule of Submittals section. All material shall be marked with Project identification, and inapplicable information shall be marked out or deleted. Shipment of equipment will not be considered complete until all required manuals and data have been received. 2.01. Electronic Operation and Maintenance Manuals. Electronic manuals shall be in Portable Document Format (PDF) and shall be prepared at a resolution between 300 and 600 dots per inch (dpi), depending on document type. Optical Character Recognition (OCR) capture shall be performed on these documents. OCR settings shall be performed. Documents prepared in PDF format shall be processed as follows, unless acceptable to the submittal reviewer:

    1. Pages shall be searchable (processed for optical character recognition) and indexed when multiple files are required.

  • City of Morro Bay 01 33 00 Submittal Procedures Water Reclamation Facility Page 7 of 7 Issued: May 2020 B&V Project 400530 Issued for Construction

    2. Pages shall be rotated for viewing in proper orientation. 3. A bookmark shall be provided in the navigation frame for each entry in

    the Table of Contents. 4. Embedded thumbnails shall be generated for each completed PDF file. 5. The opening view for PDF files shall be as follows: Initial View: Bookmarks and Page Page Number: Title Page (usually Page 1) Magnification: Set to Fit in Window Page: Single Page 6. Where the bookmark structure is longer than one page the bookmarks

    shall be collapsed to show the chapter headings only. 7. When multiple files are required the first file of the series (the parent file)

    shall list every major topic in the Table of Contents. The parent file shall also include minor headings bookmarked based on the Table of Contents. Major headings, whose content is contained in subsequent files (children) shall be linked to be called from the parent to the specific location in the child file. The child file shall contain bookmark entries for both major and minor headings contained in the child file. The first bookmark of any child file shall link back to the parent file and shall read as follows "Return to the Equipment Name Table of Contents", e.g. Return to the Polymer Feed System Table of Contents.

    8. Drawings shall be bookmarked individually. 9. Files shall be delivered without security settings to permit editing,

    insertion and deletion of material to update the manual provided by the manufacturer.

    2.02. Labeling. As a minimum, the following information shall be included on all final O&M manual materials:

    Equipment name and/or O&M title spelled out in complete words. Project Name. Owner Project/Contract Number. Specification Section Number. Example: “Section 15500” Manufacturer’s name. File Name and Date.

    For example:

    MBR Operation and Maintenance Manual Morro Bay WRF Project/Contract No. 400530 Specification Section 46 61 35 Manufacturer OM11110-001.pdf, 5/05/07

    End of Section

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 1 of 46 Issued for Construction

    Section 01 45 33.3

    CODE REQUIRED SPECIAL INSPECTIONS AND PROCEDURES

    PART 1 - GENERAL

    1-1. SCOPE. Owner, or Registered Design Professional in Responsible Chargeof construction acting as Owner’s Agent, will engage one or more ApprovedAgencies to conduct tests and special inspections specified in this section andrelated sections, and as may be specified in other sections of thesespecifications. The Approved Agency shall not be employed by Design-Builderor a supplier materially participating in the project.

    1-2. GENERAL. This Section includes administrative and proceduralrequirements indicated in the governing building code.

    Structural testing and special inspection services are required to verifycompliance with the construction documents and standards referenced herein.

    1-3. DEFINITIONS.

    Approved Agency: An established and recognized agency regularly engaged inconducting tests or furnishing inspection services, when such agency has beenapproved by the Authority Having Jurisdiction.

    Approved Fabricator: An established and qualified person, firm or corporationregistered and approved by the Authority Having Jurisdiction to perform workwithout Special Inspection.

    Authority Having Jurisdiction (AHJ): The officer or other designated authoritycharged with the administration and enforcement of the building code, or a dulyauthorized representative. Also commonly known as the Building Official.Construction Documents: Written, graphic and pictorial documents prepared orassembled for describing the design, location and physical characteristics of theelements of a project necessary for obtaining a building permit. Constructiondocuments include all supplemental instructions, sketches, addenda, andrevisions to the drawings and specifications issued by the Registered DesignProfessional beyond those issued for a building permit.

    Pre-Engineered Structural Elements: Structural elements specified by theRegistered Design Professional but which may be designed by anotherRegistered Design Professional. (Examples are items such as open web steeljoists and joist girders, metal joists, pre-cast concrete elements, pre-fabricatedmetal buildings, pre-stressed wire wrapped tanks, tilt-up concrete panelreinforcement and lifting hardware.)

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 2 of 46 Issued for Construction

    Registered Design Professional (RDP): An individual who is registered orlicensed to practice their respective design profession as defined by the statutoryrequirements of the professional registration laws of the state or jurisdiction inwhich the project is to be constructed.

    Registered Design Professional in Responsible Charge (RDPRC): A RegisteredDesign Professional engaged by Owner to review and coordinate certain aspectsof the project, as determined by the AHJ and Construction Documents, forcompatibility with the design of the buildings or structure, including submittaldocuments prepared by others, deferred submittal documents and phasedsubmittal documents.

    Shop Drawings / Submittal Data: Written, graphic and pictorial documentsprepared and / or assembled by Design-Builder or Supplier based on theConstruction Documents.

    Special Inspection: Inspection and/or testing required by the governing buildingcode, as amended by the AHJ, of the materials, installation, fabrication, erectionor placement of components and connections requiring special expertise toensure compliance with approved Construction Documents and referencedstandards.

    Special Inspection, Continuous: The full-time observation or testing of workrequiring special inspection by an approved Special Inspector who is present inthe area where the work is being performed.

    Special Inspection, Periodic: The part-time or intermittent observation or testingof work requiring Special Inspection by an approved Special Inspector who ispresent in the area where the work has been or is being performed and at thecompletion of the work.

    Special Inspector: A qualified person demonstrating competence, to thesatisfaction of the AHJ and RDPRC, for inspection of the particular type ofconstruction or operation requiring special inspection. The Special Inspector willbe qualified as specified herein.

    Structural Observations: Visual observation of the structural system by aRegistered Design Professional for general conformance to the approvedConstruction Documents. Structural observations are not considered part of thetests and special inspections and do not replace inspections and testing by theApproved Agency. Owner will employ a RDP to perform Structural Observations.

    Testing Agency: A qualified materials testing laboratory under the responsiblecharge of a Registered Design Professional, approved by the AHJ and theRDPRC, to measure, examine, test, calibrate, or otherwise determine the

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 3 of 46 Issued for Construction

    characteristics or performance of construction materials and verify confirmationwith construction documents.

    1-4. INSPECTION AND TESTING AGENCY QUALIFICATIONS. SpecialInspectors and testing agencies will be employed or retained by Owner, and willhave the minimum qualifications as described in this section. The qualificationsof all personnel performing special inspection and testing activities are subject tothe approval of the AHJ.

    Minimum qualifications of inspection and testing agencies and their personnel willcomply with ASTM E329 “Standard Specification for Agencies Engaged inConstruction Inspection, Testing, or Special Inspection,” or IAS AC 291“Accreditation Criteria for Special Inspection Agencies.”

    Inspectors and individuals performing tests will be certified for the work beingperformed as listed below and in Table 1 of IAS AC291, or by alternatecertifications when acceptable to the AHJ. The AHJ may have additionalrequirements.

    Abbreviation used in this Section Description

    AOR Architect licensed in the state of the project, specializingin the design of building structures

    Licensed Engineers

    PE/SE Structural Engineer (SE) or Professional Engineer (PE)licensed in the state of the project, specializing in thedesign of building structures

    PE/GE Geotechnical Engineer (GE) or Professional Engineer(PE) licensed in the state of the project, specializing insoil mechanics and foundations

    PE/EE Electrical Engineer (EE) or Professional Engineer (PE)licensed in the state of the project, specializing inelectrical systems

    PE/ME Mechanical Engineer (ME) or Professional Engineer (PE)licensed in the state of the project, specializing inmechanical systems

    EI/EIT Engineering Intern or Engineer-in-Training: a graduateengineer who has passed the Fundamentals ofEngineering examination working under the directsupervision of a Professional Engineer licensed in thestate of the project and with a minimum of one year ofexperience performing inspections.

    American Concrete Institute (ACI)Certification

    ACI-CFTT Concrete Field Testing Technician – Grade 1

    ACI-CCI Concrete Construction Inspector

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 4 of 46 Issued for Construction

    Abbreviation used in this Section Description

    ACI-LTT Laboratory Testing Technician – Grade 1 or 2

    ACI-STT Strength Testing Technician

    American Welding Society (AWS)Certification

    AWS-CWI Certified Welding Inspector

    AWS/AISC-SSI Certified Structural Steel Inspector

    American Society of Non-DestructiveTesting (ASNT) Certification

    ASNT Non-Destructive Testing TechnicianFor Ultrasonic Testing (UT) and Radiographic Testing(RT) Certified as Level III through examination by ASNTor certified as Level II by their employer for flawdetection.For Magnetic Particle Testing (MT) and Liquid PenetrantTesting (PT) certified as Level II by their employer orcertified as Level III through examination by ASNT andcertified by their employer

    International Code Council (ICC)Certification

    ICC-SMSI Structural Masonry Special Inspector

    ICC-SWSI Structural Steel and Welding Special Inspector

    ICC-SFSI Spray-Applied Fire-proofing Special Inspector

    ICC-PCSI Prestressed Concrete Special Inspector

    ICC-RCSI Reinforced Concrete Special Inspector

    ICC-SBSI Structural Steel and Bolting Special Inspector

    ICC-WSI Structural Welding Special Inspector

    National Concrete Masonry Association

    NCMA Concrete Masonry Testing Technician

    National Institute for Certification inEngineering Technologies (NICET)

    NICET-CT Concrete Technician – Levels II, III & IV

    NICET-ST Soils Technician - Levels II, III & IV

    NICET-GET Geotechnical Engineering Technician - Levels II, III & IV

    Exterior Design Institute (EDI)Certification

    EDI-EIFS EIFS Third Party Inspector

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 5 of 46 Issued for Construction

    Inspection or Testing Item Qualification Standards

    Fabricators Varies by product as listed below

    Steel Construction – Welding Inspection ICC-SWSI, ICC-WSI, AWS-CWI orAWS/AISC-SSI

    Steel Construction – Non-Destructive WeldTesting

    ASNT

    Steel Construction – Details PE/SE, ICC-SWSI, ICC-SBSI or AWS/AISC-SSI

    Steel Construction – High Strength Bolts PE/SE or ICC-SBSI

    Concrete Construction - Field Tests ACI-CFTT or NICET-CT

    Concrete Construction - Field Inspection PE/SE, ICC-RCSI, ACI-CCI or NICET-CT

    Concrete Construction - Laboratory Testing ACI-LTT, ACI-STT or NICET-CT

    Prestressed Concrete Construction ICC-PCSI

    Masonry Construction - Field Inspection PE/SE or ICC-SMSI

    Masonry Construction - Laboratory Testing NCMA

    Soils (special grading, excavation and filling) PE/GE, NICET-ST or NICET-GET under the directsupervision of Registered Civil (geotechnical)Engineer

    Pile Foundations PE/GE, Appropriate structural material inspectionand NICET-ST or NICET-GET under the directsupervision of Registered Civil (geotechnical)Engineer

    Pier Foundations PE/GE, Appropriate structural material inspectionand NICET-ST or NICET-GET under the directsupervision of Registered Civil (geotechnical)Engineer

    Wall Panels and Veneers ICC-SMSI

    Sprayed Fire-Resistant Materials ICC-SFSI

    Exterior Insulation and Finish Systems (EIFS) ICC Building Inspector or EDI-EIFS

    Post Installed Anchors in Concrete ICC Building Inspector, ICC-RCSI, or PE/SE

    Post Installed Anchors in Masonry ICC Building Inspector, ICC-SMSI, or PE/SE

    Smoke Control Systems IBC 1705.18.2

    Other Architectural Systems ICC Building Inspector, AOR, or PE/SE

    Mechanical Systems ICC Building Inspector or PE/ME

    Electrical Systems See NFPA 70

    1-4.01. Structural Steel Testing Agency Requirements. Submit the following tothe RDPRC and the AHJ prior to beginning testing:

    Written practices for monitoring and control of the inspection and testingagency operations including:

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 6 of 46 Issued for Construction

    Inspection and testing agency’s procedures for the selectionand administration of inspection personnel, describing thetraining, experience, and examination requirements forqualification and certification of inspection personnel.

    Inspection and testing agency’s inspection procedures,including general inspection, material controls, and visualwelding inspection.

    Qualifications of management and quality assurance personneldesignated for the project.

    Qualification records for inspectors and NDT technicians designated forthe project.

    NDT procedures and equipment calibration records for NDT to beperformed and equipment to be used for the project.

    1-5. CONFLICTING REQUIREMENTS, REPORTS AND TEST RESULTS.

    1-5.01. General. If compliance with two or more standards is specified and thestandards establish different or conflicting requirements for minimum quantitiesor quality levels, comply with the most stringent requirement. Refer uncertaintiesand requirements that are different, but apparently equal, to the RDPRC for adecision before proceeding.

    1-5.02. Minimum Quantity or Quality Levels. The quantity or quality level shownor specified shall be the minimum provided or performed. The actual installationmay comply exactly with the minimum quantity or quality specified, or it mayexceed the minimum within reasonable limits. To comply with theserequirements, indicated numeric values are minimum or maximum, asappropriate, for the context of requirements. Refer uncertainties to the RDPRCfor a decision before proceeding.

    1-6. TECHNICAL ATTACHMENTS. The following forms are required as part ofthe comprehensive administrative, testing and inspection requirements. Theforms are available from the AHJ, or are included herein, as indicated:

    Form Title AHJProvided

    IncludedHerein

    Notes

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 7 of 46 Issued for Construction

    Form Title AHJProvided

    IncludedHerein

    Notes

    Statement of SpecialInspections (SSI)

    x To be completed jointly by theRDPRC and the ApprovedAgency, and sealed by theRDPRC after completion.Design-Builder or Owner shallsubmit the form to the AHJ aspart of the building permitapplication process.

    Request for Approval ofSpecial Inspector

    x To be completed by ApprovedAgency. Approved Agency willsubmit the form to the AHJ andRDPRC for their approval ofindividual inspectors.

    Request for Approval toProvide SpecialInspection of Non-LocalFabrication

    x To be completed by ApprovedAgency and submitted toOwner, AHJ and RDPRC.

    Design-Builder’sStatement ofResponsibility

    x To completed by Design-Builder and his relevantsuppliers and submitted toOwner and AHJ.

    Fabricator’s Certificateof Compliance

    x To be completed by Design-Builder’s fabricators, asapplicable, and submitted toAHJ.

    Final Report of SpecialInspections

    x To be completed and sealed byApproved Agency. ApprovedAgency or Owner will submit toAHJ at the completion ofconstruction.

    PART 2 – PRODUCTS (Not Used)

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 8 of 46 Issued for Construction

    PART 3 – EXECUTION

    3-1. DESIGN-BUILDER AND FABRICATOR RESPONSIBILITIES. EachFabricator or Design-Builder responsible for the construction of a seismic-force-resisting system, designated seismic system, seismic resisting component, mainwind force-resisting system, or a wind-resisting component listed in the SSI shallsubmit a Design-Builder’s Statement of Responsibility to the AHJ and to Ownerprior to the commencement of work.

    To be considered an Approved Fabricator that may perform work without SpecialInspection, the Fabricator shall submit copies of certifications from theInternational Accreditation Service (IAS) or other recognized and acceptableaccreditation organization a minimum of 30 days prior to the start of fabrication.Acceptance as an Approved Fabricator is subject to approval by the AHJ. If theproject specifications required an Approved Fabricator, and the AHJ does notaccept the Fabricator as an Approved Fabricator, special inspection may becomenecessary in the fabricator’s shop. Such inspections will be performed byApproved Agency.

    Design-Builder shall assist in coordination of the inspection and testing serviceswith the progress of the work. Design-Builder shall provide sufficient notice toallow proper scheduling of all inspection and testing personnel. Design-Buildershall provide safe access to inspection and testing personnel and shall ensurethat all work requiring special inspection is inspected and/or tested prior toconcealment.

    Design-Builder shall submit schedules to Owner, RDPRC and testing andinspecting agencies. Schedules will note milestones and durations of time formaterials requiring tests and special inspections.

    Design-Builder shall provide the Special Inspector access to approved plans atthe job site or fabrication shop as applicable.

    Design-Builder shall retain at the job site or fabrication shop, as applicable, allspecial inspection records submitted by an Approved Agency or SpecialInspector and shall provide these records for review by the AHJ’s inspector uponrequest.

    3-2. APPROVED AGENCY AND SPECIAL INSPECTOR RESPONSIBILITIES.

    3-2.01. Preliminary Approvals. Not used.

    3-2.02. Perform Inspections and Tests. Be present for and perform continuousor periodic inspections and tests as listed in the SSI for conformance of the workto the AHJ approved Construction Documents. Notify Design-Builder personnelof their presence and responsibilities. Reference the applicable “Code or

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 9 of 46 Issued for Construction

    Standard Reference” column in the SSI for the minimum level of inspections andtesting. When the SSI column titled “Code or Standard Reference” indicates“Manufacturer’s research reports”, inspector will obtain the most current ICBO-ES Report, ICC-ES Legacy Report, ICC-ES Report, or IAPMO UES EvaluationReport (as applicable) prior to the applicable inspection, for the type and brand ofproducts or materials being inspected.

    Provide additional inspections and testing as necessary to determine compliancewith the Construction Documents. Perform special inspections in a timelymanner to avoid delay of work.

    The Approved Agency shall be responsible to insure that any non-localinspection/testing agency fully complies with this Section and the SSI.

    3-2.03. Defective Work. Immediately notify Design-Builder of the need forcorrective action when work does not conform to Construction Documents.

    3-2.04. Uncorrected Defective Work. Notify the AHJ and RDPRC whendeficiencies have not been corrected. Notice will be made prior to the completionof that phase of the work.

    3-2.05. Interim Inspection Reports. Furnish interim inspection reports to theAHJ, the RDPRC, Design-Builder, and Owner during the progress of the work.Frequency of reports will be as established in the SSI. Reports will indicate thatwork inspected was done in conformance to the approved ConstructionDocuments, or that the work was defective, as applicable.

    Special inspection reports and test results will include, but not be limited to, thefollowing:

    Project name and address.

    Permit number.

    Special Inspection Agency name, address, and phone number.

    Unique identification of the report and of each page.

    Date and time of inspection.

    Description of inspections or tests performed, including itemdescription and location (reference grid lines, floors, elevations,etc.). Identify approved agencies employed to carry out tests.

    Identification of test/inspection equipment used.

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 10 of 46 Issued for Construction

    Statement noting that the work, material, and/or product conformsor does not conform to the construction document requirements.Describe defective items.

    Name and signature of Design-Builder’s representative who wasnotified of work, material, and/or products that do not meet theconstruction document requirements.

    Name and signature of Special Inspector and/or testing agencyrepresentative performing the work.

    3-2.06. Report of Defective Work. Each agent will maintain a log that identifieswork that does not meet the requirements of the construction documents.Include:

    Description and exact location.

    Reference to applicable drawings and specifications.

    Reference to original inspection/test report and subsequent datesof re-inspection/retesting.

    Name and title of each individual notified and method of notification.

    How defective items were resolved or unresolved, as applicable.

    Itemized changes authorized by the RDPRC and AHJ if notincluded in a defective item.

    3-2.07. Submittal Schedule. Documentation of reports, test results, and non-compliant work will be submitted at the frequency indicated in the SSI.

    3-2.08. Final Report of Special Inspections. Each agent listed in the SSI shallsubmit a final report to the Approved Agency documenting the performed specialinspections and the correction of any discrepancies noted. The ApprovedAgency shall cumulate the reports and submit a comprehensive final report at apoint in time as agreed upon by the permit applicant and the AHJ prior to thestart of work.

    3-3. STRUCTURAL OBSERVATION. Owner, or RDPRC on Owner’s behalf,shall employ a RDP to perform Structural Observation. Prior to thecommencement of observations, the structural observer shall submit to the AHJa written statement identifying the frequency and extent of structuralobservations. Structural observations may be made periodically as determinedby the Registered Design Professional.

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 11 of 46 Issued for Construction

    At the conclusion of the work requiring observation, the structural observer shallsubmit to the AHJ a written statement that the site visits have been made andidentify any reported deficiencies which, to the best of the structural observer’sknowledge, have not been resolved.

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 12 of 46 Issued for Construction

    Statement of Special Inspections

    Project:Project Address:Permit Applicant:Applicant Address:Owner:Owner Address:

    Registered Design Professional in Responsible Charge (RDPRC) :Discipline Name License Number Expiration Date

    Structural Engineer

    Geotechnical Engineer

    Mechanical Engineer

    Electrical Engineer

    Architect

    This Statement of Special Inspections includes a Schedule of Special Inspections applicable tothe above referenced project as well as the identity of the individuals, agencies, or firms intendedto be retained for conducting these inspections.

    The Special Inspector(s) shall keep records of all inspections and shall furnish interim inspectionreports to the Authority Having Jurisdiction (AHJ) and to the Registered Design Professional inResponsible Charge (RDPRC). Discrepancies shall be brought to the immediate attention of theDesign-Builder for correction. If the discrepancies are not corrected, the discrepancies shall bebrought to the attention of the AHJ and the RDPRC prior to completion of that phase of work. AFinal Report of Special Inspections documenting required special inspections and correction ofany discrepancies noted in the inspections shall be submitted by each agent.

    The Special Inspection program does not relieve the Design-Builder of the responsibility tocomply with the Contract Documents. Jobsite safety and means and methods of construction aresolely the responsibility of the Design-Builder.

    Inspection work shall be performed in accordance with the following codes and standards.Unless otherwise indicated within the Statement of Special Inspections, the applicable edition forall codes and standards shall be as follows.

    Work In Accordance With

    Building Code 2016 California Building Code (CBC)

    Seismic Criteria for NonstructuralComponents

    ASCE 7-10

    Standard Tests and Practices Listed American Society for Testing andMaterials (ASTM) specifications

    Concrete ACI 318-14 and ACI 350-06

    Masonry ACI 530-13 and ACI 530.1-13

    Structural Steel AISC 360-10 and AISC 341-10

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 13 of 46 Issued for Construction

    Work In Accordance With

    Structural steel welding AWS D1.1 Structural Welding Code - Steel

    Aluminum welding AWS D1.2 Structural Welding Code –Aluminum

    Sheet steel welding AWS D1.3 Structural Welding Code –Sheet Steel

    Structural steel bolting Research Council on StructuralConnections Specification for StructuralJoints Using High Strength Bolts,December 31, 2009

    Intumescent Fire-Resistive Coating Association of the Wall and CeilingIndustry (AWCI) Technical Manual 12-B,Second Edition; Standard Practice for theTesting and Inspection of Field AppliedThin Film Intumescent Fire-ResistiveMaterials; an Annotated Guide

    RDPRC - Structural RDPRC - Civil/Geotechnical RDPRC - Mechanical

    RDPRC – Electrical RDPRC - Architect

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 14 of 46 Issued for Construction

    Owner’s Acknowledgement:

    Signature Date

    Acceptance by Authority Having Jurisdiction:

    Signature Date

    Permit No.

    Frequency of interim report submittals to AHJ:

    □ 1 week □ 2 weeks □ Monthly □ Bi-Monthly □ At Completion □ Per attached Schedule

  • City of Morro Bay Code Required Special Inspections and ProceduresWater Reclamation Facility 01 45 33.3 Issued: May 2020B&V Project 400530 Page 15 of 46 Issued for Construction

    Statement of Special Inspections(Schedule of Inspections)

    The attached tables as listed below define the applicable Special Inspections and Procedures.

    Table 1 of 9 Geotechnical Special Inspections

    Table 2 of 9 Structural Special Inspections

    Table 3 of 9 Architectural Special Inspections

    Table 4 of 9 Inspections for Special Cases

    Table 5 of 9 Testing for Special Inspections

    Table 6 of 9 Special Inspections for Seismic Resistance

    Table 7 of 9 Testing for Seismic Resistance

    Table 8 of 9 Special Inspections for Wind Resistance – NOT USED

    Table 9 of 9 Inspection Agents

    The Seismic Design Category for the project is D.

  • City

    of M

    orro

    Bay

    Cod

    e R

    equi

    red

    Spe

    cial

    Insp

    ectio

    ns a

    nd P

    roce

    dure

    sW

    ater

    Rec

    lam

    atio

    n Fa

    cilit

    y

    01

    45

    33.3

    Issu

    ed: M

    ay 2

    020

    B&

    V P

    roje

    ct 4

    0053

    0P

    age

    16 o

    f46

    Issu

    ed fo

    r Con

    stru

    ctio

    n

    Sche

    dule

    of S

    peci

    al In

    spec

    tions

    - Ta

    ble

    1 of

    9 (G

    eote

    chni

    cal S

    peci

    al In

    spec

    tions

    )

    Syst

    em o

    r Mat

    eria

    l

    Insp

    ectio

    n

    Rem

    arks

    Insp

    ectio

    nA

    gent

    No.

    (see

    Tab

    le 9

    )

    Bui

    ldin

    gC

    ode

    Ref

    eren

    ce

    Cod

    e or

    Stan

    dard

    Ref

    eren

    ce

    Freq

    uenc

    y

    Con

    tinuo

    usPe

    riodi

    c

    Soils

    Ver

    ify m

    ater

    ial b

    elow

    foun

    datio

    n is

    adeq

    uate

    to a

    chie

    ve d

    esig

    nbe

    arin

    g ca

    paci

    ty, f

    ree

    of lo

    ose,

    dele

    terio

    us o

    r for

    eign

    mat

    eria

    l.

    1705

    .6G

    eote

    chni

    cal

    Rep

    ort

    X (foun

    datio

    nex

    cava

    tion

    com

    plet

    e)

    Ver

    ify e

    xcav

    atio

    ns a

    re e

    xten

    ded

    topr

    oper

    dep

    th, p

    rope

    r siz

    e an

    dm

    ater

    ial.

    1705

    .6G

    eote

    chni

    cal

    Rep

    ort

    X (foun

    datio

    nex

    cava

    tion

    com

    plet

    e)

    Prio

    r to

    plac

    emen

    t of c

    ontro

    lled

    fill,

    insp

    ect s

    ubgr

    ade

    and

    verif

    y si

    te is

    prop

    erly

    pre

    pare

    d.17

    05.6

    Geo

    tech

    nica

    lR

    epor

    t

    X(p

    rior t

    opl

    acem

    ent

    of fi

    ll)

    Per

    form

    cla

    ssifi

    catio

    n an

    d te

    stin

    gof

    com

    pact

    ed fi

    ll m

    ater

    ial.

    1705

    .6G

    eote

    chni

    cal

    Rep

    ort

    X(d

    urin

    gpl

    acem

    ent

    of fi

    ll)

    Ver

    ify m

    ater

    ials

    , den

    sitie

    s, a

    nd li

    ftth

    ickn

    esse

    s du

    ring

    plac

    emen

    t and

    com

    pact

    ion

    of c

    ontro

    lled

    fill f

    orfo

    unda

    tions

    .

    1705

    .6G

    eote

    chni

    cal

    Rep

    ort

    XN

    ote

    the

    exce

    ptio

    n of

    Arti

    cle

    1705

    .6.

    Driv

    en D

    eep

    Foun

    datio

    n El

    emen

    ts N

    OT

    USE

    D

    Cas

    t-in-

    Plac

    e D

    eep

    Foun

    datio

    n El

    emen

    ts (A

    uger

    Cas

    t Pile

    s an

    d D

    rille

    d Pi

    ers)

    NO

    T U

    SED

    Hel

    ical

    Pile

    Fou

    ndat

    ions

    NO

    T U

    SED

    Scre

    w A

    ncho

    rs N

    OT

    USE

    D

    Mec

    hani

    cally

    Sta

    biliz

    ed E

    arth

    (MSE

    ) Ret

    aini

    ng W

    alls

    NO

    T U

    SED

    Tens

    ion

    Anc

    hors

    NO

    T U

    SED

    Ston

    e C

    olum

    ns N

    OT

    USE

    D

  • City

    of M

    orro

    Bay

    Cod

    e R

    equi

    red

    Spe

    cial

    Insp

    ectio

    ns a

    nd P

    roce

    dure

    sW

    ater

    Rec

    lam

    atio

    n Fa

    cilit

    y

    01

    45

    33.3

    Issu

    ed: M

    ay 2

    020

    B&

    V P

    roje

    ct 4

    0053

    0P

    age

    17 o

    f46

    Issu

    ed fo

    r Con

    stru

    ctio

    n

    Sche

    dule

    of S

    peci

    al In

    spec

    tions

    - Ta

    ble

    2 of

    9 (S

    truc

    tura

    l Spe

    cial

    Insp

    ectio

    ns)

    Syst

    em o

    r Mat

    eria

    l

    Insp

    ectio

    n

    Rem

    arks

    Insp

    ectio

    nA

    gent

    No.

    (see

    Tab

    le 9

    )

    Bui

    ldin

    gC

    ode

    Ref

    eren

    ce

    Cod

    e or

    Stan

    dard

    Ref

    eren

    ce

    Freq

    uenc

    y

    Con

    tinuo

    usPe

    riodi

    c

    Stru

    ctur

    al L

    oad-

    Bear

    ing

    Mem

    bers

    Fab

    ricat

    ed in

    a S

    hop

    If re

    gist

    ered

    and

    app

    rove

    d by

    the

    AH

    J to

    per

    form

    wor

    k w

    ithou

    t spe

    cial

    insp

    ectio

    n, s

    ubm

    it "F

    abric

    ator

    ’sC

    ertif

    icat

    e of

    Com

    plia

    nce"

    at t

    heco

    mpl

    etio

    n of

    wor

    k th

    at fa

    bric

    ated

    item

    s w

    ere

    cons

    truct

    ed in

    acco

    rdan

    ce w

    ith th

    e ap

    prov

    edco

    nstru

    ctio

    n do

    cum

    ents

    .

    1704

    .2.5

    .117

    04.5

    1705

    .10

    X(a

    t end

    of

    fabr

    icat

    ion)

    N/A

    Con

    cret

    e

    Rei

    nfor

    cing

    ste

    el a

    nd p

    rest

    ress

    ing

    tend

    on c

    ondi

    tion

    (free

    of o

    il, d

    irt a

    ndlo

    ose

    rust

    and

    that

    pro

    perly

    coa

    ted

    and/

    or s

    heat

    hed)

    and

    pla

    cem

    ent.

    Ver

    ify s

    ize,

    spa

    cing

    , bar

    cle

    aran

    ces,

    cove

    r, an

    d ad

    equa

    te s

    uppo

    rt to

    prev

    ent d

    ispl

    acem

    ent d

    urin

    gco

    ncre

    te p

    lace

    men

    t. V

    erify

    lap

    splic

    es, m

    echa

    nica

    l spl

    ices

    , and

    embe

    dmen

    t len

    gths

    . Ve

    rify

    dow

    els

    for w

    ork

    abov

    e ar

    e pr

    oper

    ly a

    ligne

    dan

    d sp

    aced

    to m

    atch

    oth

    er w

    ork.

    1705

    .3

    AC

    I 318

    (Ch.

    20)

    AC

    I 318

    (25.

    2-25

    .3)

    AC

    I 318

    (26.

    6.1-

    26.6

    .3

    X (p

    rior t

    ocl

    osin

    g of

    form

    s or

    deliv

    ery

    ofco

    ncre

    te, f

    orea

    chpl

    acem

    ent)

    Anc

    hors

    cas

    t in

    conc

    rete

    1705

    .3A

    CI 3

    18 (1

    7.8.

    2)X

    All

    bolts

    vis

    ually

    insp

    ecte

    d to

    ver

    ifyan

    chor

    dia

    met

    er, l

    ocat

    ion,

    and

    embe

    dmen

    t len

    gth.

    Ver

    ify u

    se o

    f app

    rove

    d m

    ixde

    sign

    (s).

    1705

    .319

    04.1

    AC

    I 318

    (Ch.

    19)

    AC

    I 318

    (26.

    4.3-

    26.4

    .4)

    X

    RD

    PR

    C to

    app

    rove

    Des

    ign-

    Build

    er’s

    prop

    osed

    mix

    des

    ign

    prio

    r to

    cons

    truct

    ion.

    Insp

    ecto

    r to

    verif

    y fro

    m c

    oncr

    ete

    deliv

    ery

    ticke

    t tha

    t the

    app

    ropr

    iate

    mix

    has

    been

    pro

    vide

    d pr

    ior t

    o pl

    acem

    ent.

  • City

    of M

    orro

    Bay

    Cod

    e R

    equi

    red

    Spe

    cial

    Insp

    ectio

    ns a

    nd P

    roce

    dure

    sW

    ater

    Rec

    lam

    atio

    n Fa

    cilit

    y

    01

    45

    33.3

    Issu

    ed: M

    ay 2

    020

    B&

    V P

    roje

    ct 4

    0053

    0P

    age

    18 o

    f46

    Issu

    ed fo

    r Con

    stru

    ctio

    n

    Sche

    dule

    of S

    peci

    al In

    spec

    tions

    - Ta

    ble

    2 of

    9 (S

    truc

    tura

    l Spe

    cial

    Insp

    ectio

    ns)

    Syst

    em o

    r Mat

    eria

    l

    Insp

    ectio

    n

    Rem

    arks

    Insp

    ectio

    nA

    gent

    No.

    (see

    Tab

    le 9

    )

    Bui

    ldin

    gC

    ode

    Ref

    eren

    ce

    Cod

    e or

    Stan

    dard

    Ref

    eren

    ce

    Freq

    uenc

    y

    Con

    tinuo

    usPe

    riodi

    c

    Form

    wor

    k sh

    ape,

    loca

    tion,

    and

    dim

    ensi

    ons

    of th

    e co

    ncre

    te m

    embe

    rbe

    ing

    form

    ed, c

    onst

    ruct

    ion

    join

    tspr

    oper

    ly p

    repa

    red.

    1705

    .3A

    CI 3

    18(2

    6.11

    .1.2

    (b)

    X(p

    rior t

    ode

    liver

    y of

    conc

    rete

    for

    each

    plac

    emen

    t)

    Prio

    r to

    conc

    rete

    pla

    cem

    ent,

    fabr

    icat

    e sp

    ecim

    ens

    for s

    treng

    thte

    sts,

    per

    form

    slu

    mp

    and

    air c

    onte

    ntte

    st, a

    nd d

    eter

    min

    e th

    e te

    mpe

    ratu

    reof

    the

    conc

    rete

    .

    1705

    .3A

    STM

    C31

    AST

    M C

    172

    AC

    I 318

    (26.

    12)

    XS

    ampl

    ing

    and

    test

    ing

    frequ

    ency

    sha

    llbe

    as

    indi

    cate

    d in

    the

    cast

    -in-p

    lace

    conc

    rete

    spe

    cific

    atio

    n.

    Con

    cret

    e pl

    acem

    ent.

    1705

    .3A

    CI 3

    18 (2

    6.5.

    2)X

    Ver

    ify th

    at w

    ater

    add

    ed a

    t the

    site

    does

    not

    exc

    eed

    that

    allo

    wed

    by

    the

    mix

    des

    ign.

    Ver

    ify c

    onve

    ying

    ,de

    posi

    ting,

    and

    con

    solid

    atio

    n of

    conc

    rete

    . O

    bser

    ve p

    lace

    men

    tpr

    oced

    ures

    for e

    vide

    nce

    ofse

    greg

    atio

    n, p

    ossi

    ble

    cold

    join

    ts,

    disp

    lace

    men

    t of r

    einf

    orci

    ng o

    r for

    ms,

    and

    prop

    er s

    uppo

    rt of

    em

    bedd

    edite

    ms,

    anc

    hor b

    olts

    , etc

    .

    Con

    cret

    e cu

    ring

    – m

    aint

    ain

    tem

    pera

    ture

    and

    tech

    niqu

    es.

    1705

    .3A

    CI 3

    18 (2

    6.5.

    3-26

    .5.5

    )

    X(d

    urin

    gho

    t, co

    ld,

    and

    win

    dyco

    nditi

    ons)

    For w

    et-c

    urin

    g, c

    heck

    at t

    hebe

    ginn

    ing

    of e

    ach

    day

    durin

    g 7

    day

    curin

    g pe

    riod

    Ver

    ifica

    tion

    of in

    -situ

    con

    cret

    est

    reng

    th p

    rior t

    o re

    mov

    al o

    f for

    ms

    and

    shor

    es fr

    om e

    leva

    ted

    beam

    san

    d sl

    abs.

    1705

    .3A

    CI 3

    18 (2

    6.11

    .2)

    X(p

    rior t

    ofo

    rm o

    rsh

    ore

    rem

    oval

    )

    Ver

    ifica

    tion

    of in

    -situ

    con

    cret

    est

    reng

    th p

    rior t

    o ba

    ckfil

    ling

    agai

    nst

    wal

    ls.

    X(p

    rior t

    oba

    ckfil

    ling

    oper

    atio

    ns)

  • City

    of M

    orro

    Bay

    Cod

    e R

    equi

    red

    Spe

    cial

    Insp

    ectio

    ns a

    nd P

    roce

    dure

    sW

    ater

    Rec

    lam

    atio

    n Fa

    cilit

    y

    01

    45

    33.3

    Issu

    ed: M

    ay 2

    020

    B&

    V P

    roje

    ct 4

    0053

    0P

    age

    19 o

    f46

    Issu

    ed fo

    r Con

    stru

    ctio

    n

    Sche

    dule

    of S

    peci

    al In

    spec

    tions

    - Ta

    ble

    2 of

    9 (S

    truc

    tura

    l Spe

    cial

    Insp

    ectio

    ns)

    Syst

    em o

    r Mat

    eria

    l

    Insp

    ectio

    n

    Rem

    arks

    Insp

    ectio

    nA

    gent

    No.

    (see

    Tab

    le 9

    )

    Bui

    ldin

    gC

    ode

    Ref

    eren

    ce

    Cod

    e or

    Stan

    dard

    Ref

    eren

    ce

    Freq

    uenc

    y

    Con

    tinuo

    usPe

    riodi

    c

    Shot

    cret

    e N

    OT

    USE

    D

    Mas

    onry

    for O

    ccup

    ancy

    Cat

    egor

    y I,

    II, o

    r III

    Stru

    ctur

    es

    Ver

    ifica

    tion

    of p

    ropo

    rtion

    s fo

    r site

    -pr

    epar

    ed m

    orta

    r and

    gro

    ut.

    1705

    .4A

    CI 5

    30.1

    (2.1

    )A

    CI 5

    30.1

    (2.6

    A)A

    CI 5

    30.1

    (2.6

    B)

    X(a

    tbe

    ginn

    ing

    ofm

    ason

    ryco

    nstru

    ctio

    nan

    d pr

    ior t

    ogr

    outin

    g)

    Ver

    ifica

    tion

    of p

    ropo

    rtion

    s of

    mat

    eria

    ls in

    pre

    mix

    ed o

    r pre

    blen

    ded

    mor

    tar a

    nd g

    rout

    as

    deliv

    ered

    to th

    esi

    te.

    X(a

    tbe

    ginn

    ing

    ofm

    ason

    ryco

    nstru

    ctio

    nan

    d pr

    ior t

    ogr

    outin

    g)

    RD

    PR

    C to

    app

    rove

    Des

    ign-

    Build

    er’s

    prop

    osed

    mix

    des

    igns

    prio

    r to

    cons

    truct

    ion.

    Insp

    ecto

    r to

    verif

    y fro

    m g

    rout

    del

    iver

    ytic

    ket t

    hat t

    he a

    ppro

    pria

    te m

    ix h

    asbe

    en p

    rovi

    ded

    prio

    r to

    plac

    emen

    t.

    Ver

    ifica

    tion

    of s

    lum

    p flo

    w a

    nd V

    SI

    as d

    eliv

    ered

    to th

    e si

    te fo

    r sel

    f-co

    nsol

    idat

    ing

    grou

    t.17

    05.4

    AC

    I 530

    .1(1

    .5B.

    1.b.

    3)X

    Ver

    ifica

    tion

    of f’

    m a

    nd f’

    AA

    C p

    rior t

    oco

    nstru

    ctio

    n an

    d fo

    r eve

    ry 5

    000

    squa

    re fe

    et d

    urin

    g co

    nstru

    ctio

    n.17

    05.4

    AC

    I 530

    .1 (1

    .4B)

    XV

    erifi

    catio

    n by

    uni

    t stre

    ngth

    or p

    rism

    test

    ing,

    see

    mas

    onry

    spe

    cific

    atio

    n.

    Pla

    cem

    ent o

    f mas

    onry

    uni

    ts a

    ndm

    orta

    r joi

    nt c

    onst

    ruct

    ion.

    1705

    .4A

    CI 5

    30.1

    (3.3

    B)

    X(a

    tbe

    ginn

    ing

    ofm

    ason

    ryco

    nstru

    ctio

    n,on

    ce d

    aily

    for e

    ach

    crew

    , and

    prio

    r to

    grou

    ting)

    Insp

    ect s

    ize,

    layo

    ut, b

    ondi

    ng a

    ndpl

    acem

    ent o

    f mas

    onry

    uni

    ts.

    Insp

    ect

    cons

    truct

    ion

    of m

    orta

    r joi

    nts

    incl

    udin

    gto

    olin

    g an

    d fil

    ling

    of h

    ead

    join

    ts.

  • City

    of M

    orro

    Bay

    Cod

    e R

    equi

    red

    Spe

    cial

    Insp

    ectio

    ns a

    nd P

    roce

    dure

    sW

    ater

    Rec

    lam

    atio

    n Fa

    cilit

    y

    01

    45

    33.3

    Issu

    ed: M

    ay 2

    020

    B&

    V P

    roje

    ct 4

    0053

    0P

    age

    20 o

    f46

    Issu

    ed fo

    r Con

    stru

    ctio

    n

    Sche

    dule

    of S

    peci

    al In

    spec

    tions

    - Ta

    ble

    2 of

    9 (S

    truc

    tura

    l Spe

    cial

    Insp

    ectio

    ns)

    Syst

    em o

    r Mat

    eria

    l

    Insp

    ectio

    n

    Rem

    arks

    Insp

    ectio

    nA

    gent

    No.

    (see

    Tab

    le 9

    )

    Bui

    ldin

    gC

    ode

    Ref

    eren

    ce

    Cod

    e or

    Stan

    dard

    Ref

    eren

    ce

    Freq

    uenc

    y

    Con

    tinuo

    usPe

    riodi

    c

    Ver

    ifica

    tion

    of s

    ize

    and

    loca

    tion

    ofst

    ruct

    ural

    ele

    men

    ts.

    1705

    .4A

    CI 5

    30.1

    (3.3

    F)

    X(a

    tbe

    ginn

    ing

    ofm

    ason

    ryco

    nstru

    ctio

    nan

    d pr

    ior t

    ogr

    outin

    g)

    Anc

    hors

    gro

    uted

    in m

    ason

    ry a

    ndan

    chor

    age

    of m

    ason

    ry to

    fram

    es,

    stru

    ctur

    al m

    embe

    rs, a

    nddi

    aphr

    agm

    s in

    clud

    ing

    type

    , siz

    e,an

    d lo

    catio

    n of

    anc

    hors

    .

    1705

    .4A

    CI 5

    30 (6

    .2)

    X(a

    tbe

    ginn

    ing

    ofm

    ason

    ryco

    nstru

    ctio

    nan

    d pr

    ior t

    ogr

    outin

    g)

    Type

    , gra

    de, a

    nd s

    ize

    of re

    info

    rcin

    gst

    eel.

    1705

    .4A

    CI 5

    30 (6

    .1)

    AC

    I 530

    .1 (2

    .4)

    AC

    I 530

    .1 (3

    .4)

    X(w

    hen

    stag

    ed a

    ndpr

    ior t

    oin

    stal

    latio

    n)

    Ver

    ify g

    rout

    spa

    ce is

    cle

    an p

    rior t

    ogr

    outin

    g.17

    05.4

    AC

    I 530

    .1 (3

    .2D

    )A

    CI 5

    30.1

    (3.2

    F)

    X(p

    rior t

    oea

    chgr

    outin

    gop

    erat

    ion)

    Ver

    ify th

    at c

    ells

    and

    sta

    rting

    bed

    s ar

    ecl

    ean.

    Rei

    nfor

    cing

    ste

    el a

    nd c

    onne

    ctor

    plac

    emen

    t: ve

    rify

    size

    , spa

    cing

    ,su

    rface

    con

    ditio

    n, c

    orre

    ct lo

    catio

    n,ty

    pe o

    f em

    bedm

    ents

    .

    1705

    .4A

    CI 5

    30 (6

    .1)

    AC

    I 530

    .1 (3

    .2E)

    AC

    I 530

    .1 (3

    .4)

    X(a

    tbe

    ginn

    ing

    ofm

    ason

    ryco

    nstru

    ctio

    nan

    d pr

    ior t

    ogr

    outin

    g)

    Ver

    ify d

    owel

    s an

    d in

    serts

    are

    sec

    ured

    in p

    lace

    , par

    ticul

    arly

    at r

    oof l

    ines

    , flo

    orlin

    es, a

    nd in

    ters

    ectin

    g w

    all l

    ines

    .

  • City

    of M

    orro

    Bay

    Cod

    e R

    equi

    red

    Spe

    cial

    Insp

    ectio

    ns a

    nd P

    roce

    dure

    sW

    ater

    Rec

    lam

    atio

    n Fa

    cilit

    y

    01

    45

    33.3

    Issu

    ed: M

    ay 2

    020

    B&

    V P

    roje

    ct 4

    0053

    0P

    age

    21 o

    f46

    Issu

    ed fo

    r Con

    stru

    ctio

    n

    Sche

    dule

    of S

    peci

    al In

    spec

    tions

    - Ta

    ble

    2 of

    9 (S

    truc

    tura

    l Spe

    cial

    Insp

    ectio

    ns)

    Syst

    em o

    r Mat

    eria

    l

    Insp

    ectio

    n

    Rem

    arks

    Insp

    ectio

    nA

    gent

    No.

    (see

    Tab

    le 9

    )

    Bui

    ldin

    gC

    ode

    Ref

    eren

    ce

    Cod

    e or

    Stan

    dard

    Ref

    eren

    ce

    Freq

    uenc

    y

    Con

    tinuo

    usPe

    riodi

    c

    Gro

    ut p

    lace

    men

    t.17

    05.4

    AC

    I 530

    .1 (3

    .5)

    X

    Ver

    ify th

    at th

    e gr

    out l

    ift h

    eigh

    t is

    inco

    nfor

    man

    ce w

    ith th

    e co

    de a

    ndsp

    ecifi

    catio

    ns.

    Ver

    ify in

    stal

    latio

    n of

    clea

    nout

    clo

    sure

    s. V

    erify

    that

    grou

    ting

    oper

    atio

    ns a

    re h

    eld

    belo

    wth

    e to

    p if

    keyi

    ng is

    requ

    ired

    for

    subs

    eque

    nt li

    fts, a

    s re

    quire

    d by

    cod

    ean

    d sp

    ecifi

    catio

    ns.

    Ver

    ify m

    echa

    nica

    lvi

    brat

    ion

    durin

    g pl

    acem

    ent,

    and

    late

    rdu

    ring

    reco

    nsol

    idat

    ion.

    Ver

    ify th

    atcu

    ring

    requ

    irem

    ents

    are

    bei

    ngfo

    llow

    ed.

    Col

    d/ho

    t wea

    ther

    mas

    onry

    prot

    ectio

    n.

    1705

    .421

    04.3

    2104

    .4

    AC