The Recommended FY2015-2020 Capital Program
City of Philadelphia Philadelphia becomes one of the safest cities in America • The education and health of Philadelphians improve
Philadelphia is a place of choice • Philadelphia becomes the greenest and most sustainable city in America Philadelphia government works efficiently and effectively, with integrity and responsiveness
City of Philadelphia: The Recommended FY2015-2020 Capital Program
City of Philadelphia Michael A. Nutter, Mayor Alan Greenberger, Deputy Mayor for Economic Development Philadelphia City Planning Commission Alan Greenberger, FAIA, Chairman Joseph Syrnick, Vice Chairman Rob Dubow Patrick Eiding Bernard Lee, Esq. Elizabeth K. Miller Richard Negrin Nilda Iris Ruiz, MBA Nancy Rogo Trainer, AIA, AICP Gary J. Jastrzab, Executive Director Alan S. Urek, AICP, Deputy Executive Director Jeannette Brugger, AICP, PP John Haak, AICP Jametta Johnson Clint Randall Anthony M. Santaniello Deborah Schaaf Mark Wheeler, GISP One Parkway Building 1515 Arch Street, 13th Floor Philadelphia, PA 19102 215.683.4615 www.phila.gov/cityplanning www.phila2035.org
Thanks go to our colleagues… Office of Budget and Program Evaluation Rebecca Rhynhart, Budget Director Nicole McCormac, Deputy Budget Director, Capital Randy Milbourne Meredith Quick Thomas Tartack Tavare Brown Department of Public Property, Capital Projects Division
February 28, 2014
City of Philadelphia: The Recommended FY2015-2020 Capital Program
1 Sources of Funds 2 Uses of Funds 4 Table 1: Funding by Department, FY2015 5 How to Read the Funding Schedules 6 Table 2: Sources of Funds, FY2015-2020
7 Art Museum 9 Aviation 20 City Commissioners 21 Commerce 33 Finance 38 Fire 47 Fleet Management 51 Free Library 55 Health 61 MDO (Managing Director’s Office) 65 Office of Supportive Housing
68 OIT (Office of Innovation and Technology) 71 Parks and Recreation 94 Police 99 Prisons 102 Public Property 109 Records 111 Streets 127 Transit 133 Water 142 Zoological Gardens
Highlights of the Recommended FY2015-2020 Capital Program
Funding Schedule
Table of Contents
City of Philadelphia: The Recommended FY2015-2020 Capital Program 1
Highlights of the Recommended FY2015-2020 Capital Program
The Capital Program is the City of Philadelphia’s six-year plan for investing in its physical and technology infrastructure, neighborhood and community facilities, and public buildings. The Capital Program supports the overall goals of the City: Philadelphia becomes one of the safest cities in America; the education and health of Philadelphians improve; Philadelphia is a place of choice; Philadelphia becomes the greenest and most sustainable city in America; and Philadelphia government works efficiently and effectively, with integrity and responsiveness. The Recommended FY2015-2020 Capital Program allocates slightly more than $9.4 billion over this six-year period to advance these goals and address criti-cally needed public improvements. Sources of Funds The total budget for the 69 projects included for FY2015—the budget year of the Capital Program—is more than $3.2 billion. These 69 projects include sev-eral hundred subprojects that are either new for FY2015 or carried forward from previous years’ budgets. The Administration is committed to a continued in-vestment in the City’s infrastructure. To support this investment, the City has pledged in FY2015 to spend $131.5 million of City-supported capital funding
through new General Obligation (GO) bonds issued by the City and $14.5 million of prefinanced GO loans, for a total of $146.0 million. The GO bonds are tax-supported (i.e., repaid from the City’s general tax revenues). An additional $290.8 million will come from carried-forward City tax-supported loan funds. Other City sources, which include the prefinanced and PICA loans, operating revenue, and revolving funds, total $89.5 million. City self-sustaining operating funds and revenue bonds account for more than $1.8 billion of total budget-year funds. Funding from other levels of government, including federal, Commonwealth of Pennsylvania, and regional sources, totals $692.1 million in the budget year. Finally, $206.2 million of FY2015 funding will be provided by private sources.
City Carried-forward [CT]
$290.8 M 9.0% City New [CN]
$131.5 M 4.1%
City Other [A,CA,CR,Z]$89.5 M
2.8%
City Self-sustaining [XN,XR,XT]$1,815.7 M
56.3%
Other Government [TB,TO,TT]
$17.5 M 0.5%
State [SB,SO,ST]$299.8 M
9.3%
Private [PB,PT]$206.2 M
6.4%
Federal [FB,FO,FT]$374.8 M
11.6%
2 City of Philadelphia: The Recommended FY2015-2020 Capital Program
The availability of new general-obligation funding for capital projects is set by two inter-related factors: the City’s debt limit, which is established by the Pennsylvania Constitution, and the City’s financial, or borrowing capacity. Despite these constraints, the City Administration is committed to investing in the City’s infrastructure to the greatest extent possible, and to that end, is recommending a substantial amount of new City funding. Uses of Funds In keeping with the City Administration’s priorities, the Recommended FY2015-2020 Capital Program includes projects that help to achieve the following goals: Philadelphia becomes one of the safest cities in America; the education and health of Philadelphians improve; Philadelphia is a place of choice; Philadelphia becomes the greenest and most sustainable city in America; and Philadelphia government works efficiently and effectively, with integrity and responsiveness. A sampling of projects in the FY2015 budget year that support these goals is below. Projects that help Philadelphia become one of the safest cities in America increase safety from crime, emergencies, and accidents, at home, school, in the neighborhood, and at work and play: § More than $3.0 million of new and previously
authorized City funds are recommended for Police facility renovations across the city and for completion of the conversion of the former Woodhaven US Army facility for Police use.
§ The Philadelphia Prison System is recommended to use $5.8 million in previously authorized City
funds for security-system, infrastructure and other renovations at its facilities in Northeast Philadelphia.
§ $3.9 million in new City funding is recommended for structural renovations; mechanical, electrical and plumbing renovations; and site work at fire stations across the City.
Projects that ensure that the education and health of Philadelphians improve help to create “complete neighborhoods,” with ample cultural, health, and human-services opportunities: § Recommended Free Library improvements total
nearly $2.2 million in new City funds for HVAC, infrastructure, interior and exterior renovations at several library locations.
§ Nearly $1.6 million in new City funds are recommended for the Office of Supportive Housing to make improvements at its shelters, which serve some of the City’s most vulnerable population.
§ $850,000 in new City funding is recommended for improvements to facilities at the Philadelphia Zoo, which provides a great educational opportunity for the City’s children and adults alike.
Projects that make Philadelphia a place of choice promote economic development and job creation, and strengthen major infrastructure: § More than $690.1 million of federal, state, private,
and City self-sustaining operating funds and revenue bonds are recommended to enable Philadelphia International Airport to improve service for air traffic and travel to and from Philadelphia, through airfield and facilities im-provements, and safety and security projects.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 3 § The Commerce Department is recommended to
invest $5.0 million in City funds to improve neighborhood commercial centers, $2.5 million in City funds for infrastructure improvements in Center City to support the new Comcast Tower, and $900,000 to begin transformation of the Reading Viaduct into an elevated park.
§ $22.3 million in new City funding is recommended for the Streets Department to grade, pave, and make other improvements to city highways, historic streets, stairways, curb ramps, and new infrastructure; this leverages $45.8 million in federal, state and private funds.
§ Nearly $10.5 million in new City, federal and state funding are recommended for plans and improvements along the Central and North Delaware River and Schuylkill River waterfronts.
§ The Philadelphia Museum of Art is recommended to use $3.0 million in new City funding to implement interior and exterior improvement projects in support of its multi-year facilities master plan.
Projects that help Philadelphia become the greenest and most sustainable city in America focus on parks and recreation, and promote environmental and sus-tainable practices: § The Office of Sustainability is recommended to
use $500,000 in City funds for energy-efficiency improvements at City facilities as part of other capital investments.
§ More than $16.9 million in new and previously authorized funds are recommended for improve-ments to Parks and Recreation’s trails, parks, recreation centers, pools, cultural facilities and other assets and infrastructure across City neighborhoods, and for projects with broader
reach including the Benjamin Franklin Parkway and Bartram’s Mile.
§ More than $2.5 million in new City funds are rec-ommended for the Streets Department to continue reconstructing the City’s Northeast Incinerator, to be energy-efficient, safer, and more functional.
§ SEPTA bridge, track, station, infrastructure, and fare-collection improvements help make transit an attractive alternative to driving. More than $3.6 million in new City funds are recommended to leverage more than $189.3 million in state, federal and other monies for such projects.
Projects that enable Philadelphia’s government to work efficiently and effectively, with integrity and responsiveness foster a high-performing public sector that works better at less cost: § A continued major investment of $29.0 million of
new City funding is recommended for the Office of Innovation and Technology, for citywide technology improvements and a new message switch system to improve public safety information exchange between the City and Commonwealth.
§ Nearly $2.0 million of new City funds are recommended for the Department of Public Property to continue making functional improvements to major City government facilities including City Hall, Criminal Justice Center and Municipal Services Building.
§ The Office of Fleet Management is recommended to use $10.0 million to purchase specialty vehicles used as equipment for various departments including Fire and Streets.
4 City of Philadelphia: The Recommended FY2013-2018 Capital Program
*Please note these amounts only include new City GO bonds and do not include any prefinanced GO loans of $14.534 million
Art Museum 3,000 4,101 Aviation 0 1,208,531 Commerce 20,500 134,441 Finance 5,100 33,420 Fire 3,900 12,283 Fleet Management 11,856 14,381 Free Library 2,182 16,126 Health 785 29,275 MDO (Managing Director's Office) 655 24,425 Office of Supportive Housing 1,570 4,532 OIT (Office of Innovation and Technology) 29,000 65,000 Parks and Recreation 10,960 179,752 Police 716 32,358 Prisons 0 26,527 Public Property 8,150 26,131 Records 200 640 Streets 28,450 292,423 Transit 3,635 195,423 Water Department 0 917,721 Zoological Gardens 850 8,281 TOTAL 131,509 3,225,771
Table 1: Funding by Department, FY2015
New City Tax-Supported Funds* All Funding Sources ($ 000) ($ 000)
City of Philadelphia: The Recommended FY2015-2020 Capital Program 5
City sources identified with the prefix “C” represent tax-supported funding. The prefix “X” represents self-sustaining City amounts – projects that generate sufficient revenue from user charges to cover their debt service. CN, XN – New loans are financed either through tax-sup-ported general obligation bonds (CN) or through revenue bonds (XN). CT, XT – Carried-Forward Loans are funds for the same or equivalent project carried forward from FY2014 to FY2015. CR, XR – Operating Revenue appropriated to the Capital Budget from the Operating Budget. CA – Prefinanced Loans are funds that the electorate or City Council has already authorized. A – Previously Authorized PICA Funds are provided through loans obtained on behalf of the City by the Pennsylvania In-tergovernmental Cooperation Authority (PICA). Z – Revolving Funds are replenished through proceeds from the sale of property acquired in the past through the use of Capital funds.
Funding Source Codes—Non-City Sources For the non-City funding sources listed below, the suffix “B”—Budget—represents funds that are appropriated in the Capital Budget and for which the City will be responsible for accounting and spending. The suffix “O”—Off-Budget—is used for amounts that are not appropriated in the Capital Budget, but rather are the responsibility of other agencies, such as SEPTA, to budget and spend. These funds are shown in the Capital Program in order to provide complete information on the scope and cost of City-supported projects. The suffix “T” represents funds for the same or equivalent project carried forward from FY2014 to FY2015.
FB, FO, FT – Federal sources.
PB, PT – Private sources.
SB, SO, ST – State sources.
TO, TT – Other Governments and Agencies include SEPTA, adjacent counties and townships, and proceeds from the bonds of quasi-public authorities.
How to Read the Funding Schedule
Funding Source Codes—City Sources
6 City of Philadelphia: The Recommended FY2015-2020 Capital Program
FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 2015 - 2020 ($ 000) ($ 000) ($ 000) ($ 000) ($ 000) ($ 000) ($ 000) City Funds (Tax Supported) CT Carried-Forward Loans 290,824 0 0 0 0 0 290,824 CR Operating Revenue 44,450 4,464 3,964 3,264 3,264 3,264 62,670 CN New Loans 131,509 151,905 116,126 115,224 120,838 126,039 761,641 CA Prefinanced Loans 14,534 0 0 0 0 0 14,534 A PICA Prefinanced Loans 12,548 0 0 0 0 0 12,548 City Funds (Self Sustaining) XT Self-Sustaining Carried-Forward Loans 883,751 0 0 0 0 0 883,751 XR Self-Sustaining Operating Revenue 197,171 56,246 70,834 75,790 82,689 75,463 558,193 XN Self-Sustaining New Loans 734,742 629,856 713,393 714,612 690,580 707,469 4,190,652 Other City Funds Z Revolving Funds 18,000 0 0 0 0 0 18,000 Other Than City Funds TT Carried-Forward Other Government 16,273 0 0 0 0 0 16,273 TO Other Governments Off Budget 1,177 1,308 1,233 1,000 1,010 802 6,530 ST Carried-Forward State 84,097 0 0 0 0 0 84,097 SO State Off Budget 144,387 159,415 144,244 128,221 138,268 117,515 832,050 SB State 71,333 24,205 24,450 25,775 24,263 22,571 192,597 PT Carried-Forward Private 119,253 0 0 0 0 0 119,253 PB Private 86,920 55,182 49,663 58,475 44,968 50,854 346,062 FT Carried-Forward Federal 219,082 0 0 0 0 0 219,082 FO Federal Off Budget 43,720 55,306 17,134 16,527 13,728 0 146,415 FB Federal 112,000 118,062 100,748 107,435 100,167 110,479 648,891 TOTAL - ALL FUNDS 3,225,771 1,255,949 1,241,789 1,246,323 1,219,775 1,214,456 9,404,063
Table 2: Sources of Funds, FY2015-2020
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
ART MUSEUM
ART MUSEUM COMPLEX - CAPITAL
Philadelphia Museum of Art - Building Rehabilitation1
20,000 4,000 4,000 3,000 3,000 3,000 3,000 CN CN CN CN CN CN CNMake infrastructure improvements required for life safety and basic operations.
Interior and Exterior Improvements1
3,000 4,000 4,000 3,000 3,000 3,000 20,000
1A. Philadelphia Museum of Art - Building Rehabilitation-FY14 500 500 CT CT
500 500
See description under line item 1.
1B. Philadelphia Museum of Art - Building Rehabilitation-FY13 601 601 CT CT
601 601
See description under line item 1.
Totals - ART MUSEUM COMPLEX - CAPITAL
3,000 3,000 3,000 3,000 4,000 4,000 CN CN CN CN CN CN 20,000 CN
1,101 CT 1,101 CT
4,000 4,000 3,000 3,000 3,000 4,101 21,101
City of Philadelphia: The Recommended FY2015-2020 Capital Program 7
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - ART MUSEUM
3,000 3,000 3,000 3,000 4,000 4,000 CN CN CN CN CN CN 20,000 CN
1,101 CT 1,101 CT
4,000 4,000 3,000 3,000 3,000 4,101 21,101
City of Philadelphia: The Recommended FY2015-2020 Capital Program 8
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
AVIATION
NORTHEAST PHILADELPHIA AIRPORT
Airfield Improvements2
5,558 293 585 585 1,365 780 1,950 FB FB FB FB FB FB FB
427 22 45 45 105 60 150 SB SB SB SB SB SB SB
8,265 435 870 870 2,030 1,160 2,900 XN XN XN XN XN XN XN
Improve and reconstruct deteriorated pavement including crack sealing and patching, add taxiway segments, and upgrade airfield lighting systems.
Airfield Improvements1
5,000 750 1,500 1,500 3,500 2,000 14,250
2A. Airfield Improvements-FY14 250 250 XR XR
550 550 FT FT
800 800
See description under line item 2.
2B. Airfield Pavement & Rehabilitation Program-FY12 75 75 ST ST
75 75
See description under line item 2.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 9
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Improvements to Existing Facilities3
1,523 193 110 308 110 302 500 FB FB FB FB FB FB FB
3,046 385 220 616 220 605 1,000 SB SB SB SB SB SB SB
6,092 770 440 1,232 440 1,210 2,000 XR XR XR XR XR XR XR
3,139 402 230 644 230 633 1,000 XN XN XN XN XN XN XN
Rehabilitate and improve building exteriors, structures, roofing, electrical and mechanical systems.
Improvements to Existing Facilities1
4,500 1,750 1,000 2,800 1,000 2,750 13,800
3A. Improvements to Existing Facilities-FY14 250 250 FT FT
250 250
See description under line item 3.
Totals - NORTHEAST PHILADELPHIA AIRPORT
893 1,475 1,082 2,450 695 486 FB FB FB FB FB FB 7,081 FB
800 FT 800 FT
661 325 665 1,150 265 407 SB SB SB SB SB SB 3,473 SB
75 ST 75 ST
1,514 2,260 1,793 3,900 1,100 837 XN XN XN XN XN XN 11,404 XN
1,232 440 1,210 2,250 440 770 XR XR XR XR XR XR 6,342 XR
2,500 2,500 4,300 4,500 4,750 10,625 29,175
City of Philadelphia: The Recommended FY2015-2020 Capital Program 10
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
PHILADELPHIA INTERNATIONAL AIRPORT
Airfield Improvements4
21,063 3,825 3,465 4,608 3,150 3,015 3,000 FB FB FB FB FB FB FB
64,689 11,475 10,395 13,824 9,450 9,045 10,500 PB PB PB PB PB PB PB
146,418 22,950 25,110 29,808 22,500 20,250 25,800 XN XN XN XN XN XN XN
15,415 2,125 2,765 2,980 2,450 2,095 3,000 SB SB SB SB SB SB SB
15,415 2,125 2,765 2,980 2,450 2,095 3,000 XR XR XR XR XR XR XR
Pave runways, taxiways, and aircraft parking aprons, replace cables and electrical equipment, provide new lighting and aircraft directional signage, and improve drainage.
Airfield Improvements1
45,300 42,500 44,500 54,200 40,000 36,500 263,000
4A. Airfield Improvements-FY14 20,000 20,000 FT FT
5,000 5,000 PT PT
22,135 22,135 XT XT
800 800 ST ST
5,000 5,000 XR XR
52,935 52,935
See description under line item 4.
4B. Airfield Improvements-FY13 800 800 ST ST
10,000 10,000 XT XT
2,000 2,000 XR XR
12,800 12,800
See description under line item 4.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 11
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
4C. Terminal D-E Apron Reconstruction-FY11 6,250 6,250 PT PT
6,250 6,250
See description under line item 4.
4D. Airport Roadway System Modifications-FY11 4,000 4,000 XT XT
4,000 4,000
See description under line item 4.
4E. Airfield Renovations & Additions-FY11 7,000 7,000 FT FT
7,000 7,000
See description under line item 4.
4F. Airfield Renovations & Additions-FY10 2,200 2,200 XR XR
2,200 2,200
See description under line item 4.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 12
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Improvements to Existing Facilities5
17,675 3,610 3,610 3,800 2,470 2,185 2,000 XR XR XR XR XR XR XR
53,025 10,830 10,830 11,400 7,410 6,555 6,000 XN XN XN XN XN XN XN
22,300 4,560 4,560 4,800 3,120 2,760 2,500 SB SB SB SB SB SB SB
Design and install new wiring, controls, and equipment.Electrical System Improvements1
7,340 1,260 1,460 1,200 1,180 1,240 1,000 SB SB SB SB SB SB SB
7,340 1,260 1,460 1,200 1,180 1,240 1,000 XR XR XR XR XR XR XR
14,680 2,520 2,920 2,400 2,360 2,480 2,000 FB FB FB FB FB FB FB
62,390 10,710 12,410 10,200 10,030 10,540 8,500 XN XN XN XN XN XN XN
Improve heating, ventilation, air conditioning, plumbing, and other mechanical systems.
Mechanical System Improvements2
City of Philadelphia: The Recommended FY2015-2020 Capital Program 13
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
14,294 775 1,425 1,615 2,344 3,135 5,000 FB FB FB FB FB FB FB
11,435 620 1,140 1,292 1,875 2,508 4,000 SB SB SB SB SB SB SB
77,330 4,030 7,410 8,398 12,190 16,302 29,000 PB PB PB PB PB PB PB
8,577 465 855 969 1,407 1,881 3,000 XR XR XR XR XR XR XR
184,424 9,610 17,670 20,026 29,069 38,874 69,175 XN XN XN XN XN XN XN
Improve roofing, structural, and paving elements.Structural, Building and Site Improvements3
133,175 50,250 65,750 67,300 74,635 89,700 480,810
5A. Improvements to Existing Facilities-FY14 2,500 2,500 FT FT
9,000 9,000 PT PT
5,000 5,000 XR XR
50,000 50,000 XT XT
1,400 1,400 ST ST
67,900 67,900
See description under line item 5.
5B. Improvements to Existing Facilities-FY13 7,000 7,000 FT FT
1,000 1,000 ST ST
8,000 8,000
See description under line item 5.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 14
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
5C. Improvements to Existing Facilities-FY12 1,000 1,000 ST ST
1,000 1,000
See description under line item 5.
5D. Improvements to Existing Facilities-FY10 9,050 9,050 XR XR
9,050 9,050
See description under line item 5.
5E. Noise Compatibility Program-FY12 1,000 1,000 FT FT
1,000 1,000 XR XR
2,000 2,000
See description under line item 5.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 15
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Airport Safety and Security Projects6
37,069 4,725 4,287 4,795 4,550 9,712 9,000 XN XN XN XN XN XN XN
29,956 3,780 3,430 3,836 3,640 7,770 7,500 FB FB FB FB FB FB FB
6,312 810 735 822 780 1,665 1,500 SB SB SB SB SB SB SB
28,655 3,645 3,308 3,699 3,510 7,493 7,000 PB PB PB PB PB PB PB
4,208 540 490 548 520 1,110 1,000 XR XR XR XR XR XR XR
Extend security systems to new locations, upgrade some of the existing systems and equipment, and add structural security elements.
Airport Safety and Security Projects1
26,000 13,500 12,250 13,700 13,000 27,750 106,200
6A. Airport Safety & Security Projects-FY14 10,000 10,000 XT XT
3,000 3,000 FT FT
500 500 ST ST
5,000 5,000 PT PT
4,000 4,000 XR XR
22,500 22,500
See description under line item 6.
6B. Airport Safety & Security Projects-FY13 3,000 3,000 XT XT
3,000 3,000
See description under line item 6.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 16
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Capacity Enhancement Program7
31,680 5,440 4,321 5,332 4,969 3,351 8,267 XR XR XR XR XR XR XR
860,012 145,078 115,223 142,200 132,501 89,360 235,650 XN XN XN XN XN XN XN
107,846 18,135 14,403 17,775 16,563 11,170 29,800 FB FB FB FB FB FB FB
11,537 1,813 1,440 1,778 1,656 1,117 3,733 SB SB SB SB SB SB SB
64,928 10,881 8,642 10,665 9,938 6,702 18,100 PB PB PB PB PB PB PB
Redesign, reconstruct and expand PHL runways and taxiways to accommodate projected increases in takeoffs and landings.
Airfield Projects1
1,386,629 272,706 249,958 233,071 247,134 227,960 155,800 XN XN XN XN XN XN XN
201,921 39,908 36,579 34,108 36,166 33,360 21,800 FB FB FB FB FB FB FB
17,510 3,326 3,048 2,842 3,014 2,780 2,500 SB SB SB SB SB SB SB
67,540 13,303 12,193 11,369 12,055 11,120 7,500 PB PB PB PB PB PB PB
17,510 3,326 3,048 2,842 3,014 2,780 2,500 XR XR XR XR XR XR XR
Construct new terminal and landside facilities to increase passenger capacity as needed to meet the projected demands and to coordinate with airside capacity increases.
Terminal /Landside Projects2
485,650 513,916 448,855 461,982 467,010 389,700 2,767,113
7A. Capacity Enhancement Program-FY14 200,000 200,000 XT XT
20,000 20,000 FT FT
5,000 5,000 ST ST
30,000 30,000 PT PT
7,000 7,000 XR XR
262,000 262,000
See description under line item 7.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 17
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
7B. Capacity Enhancement Program-FY13 10,000 10,000 PT PT
10,000 10,000
See description under line item 7.
7C. Airport Expansion Program-FY11 10,000 10,000 XR XR
10,000 10,000
See description under line item 7.
7D. Snow Removal Equipment Acquisition-FY08 6,171 6,171 XT XT
6,171 6,171
See description under line item 7.
7E. Terminal Expansion and Modernization Program-FY12 10,000 10,000 FT FT
10,000 10,000
See description under line item 7.
7F. Terminal Expansion and Modernization Program-FY10 10,975 10,975 XR XR
10,975 10,975
See description under line item 7.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 18
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Totals - PHILADELPHIA INTERNATIONAL AIRPORT
64,342 64,223 60,930 69,100 62,222 68,943 FB FB FB FB FB FB 389,760 FB
70,500 FT 70,500 FT
47,955 47,143 50,662 72,100 41,948 43,334 PB PB PB PB PB PB 303,142 PB
65,250 PT 65,250 PT
15,714 14,075 14,165 18,233 15,148 14,514 SB SB SB SB SB SB 91,849 SB
10,500 ST 10,500 ST
451,500 453,194 403,251 509,925 435,488 476,609 XN XN XN XN XN XN 2,729,967 XN
17,671 16,010 14,642 76,992 16,549 16,766 XR XR XR XR XR XR 158,630 XR
305,306 XT 305,306 XT
620,166 571,355 597,182 594,645 543,650 1,197,906 4,124,904
TOTALS - AVIATION
65,235 65,698 62,012 71,550 62,917 69,429 FB FB FB FB FB FB 396,841 FB
71,300 FT 71,300 FT
47,955 47,143 50,662 72,100 41,948 43,334 PB PB PB PB PB PB 303,142 PB
65,250 PT 65,250 PT
16,375 14,400 14,830 19,383 15,413 14,921 SB SB SB SB SB SB 95,322 SB
10,575 ST 10,575 ST
453,014 455,454 405,044 513,825 436,588 477,446 XN XN XN XN XN XN 2,741,371 XN
18,903 16,450 15,852 79,242 16,989 17,536 XR XR XR XR XR XR 164,972 XR
305,306 XT 305,306 XT
622,666 573,855 601,482 599,145 548,400 1,208,531 4,154,079
City of Philadelphia: The Recommended FY2015-2020 Capital Program 19
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
CITY COMMISSIONERS
VOTING MACHINES
New Voting Machines8
25,500 25,500CN CNPurchase new voting machines and technology including hardware and software for optical scanners that read paper ballots, tabulation system, ballot printing capabilities, and electronic poll books.
New Voting Machines1
25,500 25,500
Totals - VOTING MACHINES
25,500 CN 25,500 CN
25,500 25,500
TOTALS - CITY COMMISSIONERS
25,500 CN 25,500 CN
25,500 25,500
City of Philadelphia: The Recommended FY2015-2020 Capital Program 20
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
COMMERCE
COMMERCIAL DEVELOPMENT
Neighborhood Commercial Centers - Site Improvements9
12,500 1,500 1,500 1,500 1,500 1,500 5,000 CN CN CN CN CN CN CNUpgrade curbs, sidewalks, lighting, landscaping and parking in commercial corridors to complement public and private reinvestment.
Neighborhood Commercial Centers-Site Improvements1
10,000 5,000 2,500 2,500 CN CN CN CNImprove public infrastructure in Center City to support additional office development.
Center City Public Infrastructure2
750 750 CN CNFund improvements to Dilworth Plaza.Dilworth Plaza Improvements3
1,800 900 900 CN CN CN
4,250 4,250 SB SB
1,850 1,850 PB PB
Transform the western spur at Noble Street of the derelict elevated Reading Railroad Viaduct into an elevated park.
Reading Viaduct - Phase 14
200 200 CN CN
850 850 PB PB
Make streetscape improvements including landscaping, street furniture, and lighting to the 40th St. Trolley Portal.
40th Street Trolley Portal Improvements - Phase I5
16,300 1,500 1,500 1,500 6,500 4,900 32,200
City of Philadelphia: The Recommended FY2015-2020 Capital Program 21
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
9A. Neighborhood Commercial Centers - Site Improvements-FY14 5,000 5,000 CT CT
5,000 5,000
See description under line item 9.
9B. Neighborhood Commercial Centers - Site Improvements-FY13 4,926 4,926 CT CT
15,000 15,000 PT PT
500 500 ST ST
20,426 20,426
See description under line item 9.
9C. Neighborhood Commercial Centers - Site Improvements-FY12 2,993 2,993 CT CT
15,000 15,000 FT FT
15,000 15,000 ST ST
32,993 32,993
See description under line item 9.
9D. Avenue of the Arts-N. Broad Street-FY03 110 110 FT FT
110 110
See description under line item 9.
9E. Cultural Corridors Capital and Infrastructure Projects-FY08 4,048 4,048 TT TT
4,048 4,048
See description under line item 9.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 22
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Totals - COMMERCIAL DEVELOPMENT
1,500 6,500 4,900 9,350 1,500 1,500 CN CN CN CN CN CN 25,250 CN
12,919 CT 12,919 CT
15,110 FT 15,110 FT
2,700 PB 2,700 PB
15,000 PT 15,000 PT
4,250 SB 4,250 SB
15,500 ST 15,500 ST
4,048 TT 4,048 TT
1,500 1,500 1,500 6,500 4,900 78,877 94,777
INDUSTRIAL DEVELOPMENT
Industrial Districts10
5,600 800 1,400 1,300 1,100 1,000 SB SB SB SB SB SB
8,000 1,500 1,500 1,500 1,000 1,500 1,000 CN CN CN CN CN CN CN
Improve infrastructure and access to industrial land adjoining the Lower Schuylkill River.
Lower Schuylkill River Industrial District1
2,000 1,500 2,300 2,900 2,300 2,600 13,600
10A. Industrial Districts-FY14 500 500 CT CT
500 500
See description under line item 10.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 23
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
10B. Industrial Districts-FY12 283 283 CT CT
283 283
See description under line item 10.
Navy Yard Infrastructure Improvements11
6,000 1,000 1,000 1,000 2,000 1,000 CN CN CN CN CN CNReplace entire deck structure (Broad St. Causeway) supporting Broad St. from Langley Av. to Intrepid Av; improve streetscape to the Navy Yard's 26th Street entrance from Langley Av. to Broad St.
Navy Yard Access1
3,000 1,000 1,500 500 CN CN CN CNMake infrastructure improvements in support of public and private development.
Navy Yard Broad Street Improvements2
300 100 200 CN CN CNMake infrastructure improvements in support of public and private development.
Navy Yard Clean-Energy Campus Bldg Demolition3
1,000 1,000 2,600 1,700 1,000 2,000 9,300
11A. Navy Yard Infrastructure Improvements-FY14 1,221 1,221 CT CT
1,221 1,221
See description under line item 11.
11B. Navy Yard Infrastructure Improvements-FY11 2,900 2,900 FT FT
2,900 2,900
See description under line item 11.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 24
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Environmental Assessment/Remediation12
1,200 400 400 400 SB SB SB SB
1,200 400 400 400 CN CN CN CN
600 200 200 200 FB FB FB FB
Provide environmental assessment and remedial assistance to real city property with contamination issues.
Environmental Assessment/Remediation1
1,000 1,000 1,000 3,000
12A. Environmental Assessment/Remediation-FY13 400 400 CT CT
200 200 FT FT
400 400 ST ST
1,000 1,000
See description under line item 12.
12B. Environmental Assessment/Remediation-FY08 4 4 CT CT
4 4
See description under line item 12.
PIDC Landbank Improvements, Engineering and Administration13
6,000 6,000 Z ZConduct engineering, architectural, and environmental studies related to land acquisition and development.
Improvements, Engineering and Administration1
6,000 6,000
City of Philadelphia: The Recommended FY2015-2020 Capital Program 25
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
PIDC Landbank Acquisition & Improvements14
12,000 12,000 Z ZAcquire and improve industrial land, creating new jobs and tax ratables throughout the City.
Acquisition and Improvements1
12,000 12,000
Totals - INDUSTRIAL DEVELOPMENT
3,200 2,400 3,500 2,400 4,500 2,500 CN CN CN CN CN CN 18,500 CN
2,408 CT 2,408 CT
200 200 200 FB FB FB 600 FB
3,100 FT 3,100 FT
1,400 1,700 1,100 1,400 1,200 SB SB SB SB SB 6,800 SB
400 ST 400 ST
18,000 Z 18,000 Z
2,500 5,900 4,600 4,300 4,600 27,908 49,808
City of Philadelphia: The Recommended FY2015-2020 Capital Program 26
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
WATERFRONT IMPROVEMENTS
Central Delaware River Waterfront15
16,000 5,000 4,000 1,000 1,000 1,500 3,500 CN CN CN CN CN CN CNImplement the Central Delaware Waterfront Master Plan through construction, improvement, or acquisition of City assets.
Master Plan Implementation1
2,800 500 500 500 500 300 500 CN CN CN CN CN CN CNImplement infrastructure and site improvements in support of public and private development.
General Site Improvements2
2,550 500 500 500 250 300 500 CN CN CN CN CN CN CNConstruct a paved trail, physically separated from motorized vehicles, for exclusive use by pedestrians, cyclists and other non-motorized trail users.
Delaware River Trail Development3
3,500 3,500 CN CN
25,000 25,000FB FB
Improvements to Penn's Landing.Penn's Landing Improvements4
8,000 6,000 5,000 2,000 1,750 27,100 49,850
City of Philadelphia: The Recommended FY2015-2020 Capital Program 27
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
15A. Central Delaware River Waterfront-FY14 4,450 4,450 CT CT
710 710 PT PT
1,250 1,250 ST ST
1,030 1,030 FT FT
60 60 TT TT
7,500 7,500
See description under line item 15.
Schuylkill River Waterfront16
5,100 600 1,000 1,000 1,000 1,000 500 CN CN CN CN CN CN CN
1,050 350 350 350 SB SB SB SB
1,500 500 500 500 FB FB FB FB
Complement public and private reinvestment through capital improvements to the Schuylkill River Trail; extend the greenway to the south.
Schuylkill Riverfront Improvements1
1,350 600 1,000 1,000 1,850 1,850 7,650
16A. Schuylkill River Waterfront-FY14 1,000 1,000 CT CT
350 350 ST ST
500 500 FT FT
1,850 1,850
See description under line item 16.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 28
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
16B. Schuylkill River Waterfront-FY13 1,000 1,000 CT CT
500 500 FT FT
350 350 ST ST
1,850 1,850
See description under line item 16.
16C. Schuylkill River Waterfront-FY12 950 950 CT CT
950 950
See description under line item 16.
16D. Schuylkill River Waterfront-FY11 378 378 FT FT
378 378
See description under line item 16.
16E. Schuylkill Riverfront Improvements-FY10 648 648 ST ST
648 648
See description under line item 16.
North Delaware River Waterfront17
2,550 500 500 500 300 500 250 CN CN CN CN CN CN CN
1,400 350 350 350 350 SB SB SB SB SB
1,850 350 500 500 500 FB FB FB FB FB
Complement public and private reinvestment and help implement the Greenway Master Plan through public improvements along the North Delaware Greenway.
North Delaware River Waterfront1
1,100 500 500 1,200 1,150 1,350 5,800
City of Philadelphia: The Recommended FY2015-2020 Capital Program 29
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
17A. North Delaware River Waterfront-FY14 365 365 PT PT
300 300 CT CT
95 95 ST ST
760 760
See description under line item 17.
17B. North Delaware River Waterfront-FY13 500 500 CT CT
500 500 FT FT
350 350 ST ST
1,350 1,350
See description under line item 17.
17C. North Delaware River Waterfront-FY11 350 350 CT CT
350 350
See description under line item 17.
17D. North Delaware Riverfront Improvements-FY10 540 540 CT CT
540 540
See description under line item 17.
17E. North Delaware Riverfront Improvements-FY09 944 944 CT CT
944 944
See description under line item 17.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 30
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
17F. North Delaware Riverfront Improvements-FY08 86 86 CT CT
86 86
See description under line item 17.
Totals - WATERFRONT IMPROVEMENTS
3,500 3,050 3,600 8,750 6,500 7,100 CN CN CN CN CN CN 32,500 CN
10,120 CT 10,120 CT
350 1,000 26,000 1,000 FB FB FB FB 28,350 FB
2,908 FT 2,908 FT
1,075 PT 1,075 PT
350 700 700 700 SB SB SB SB 2,450 SB
3,043 ST 3,043 ST
60 TT 60 TT
7,100 6,500 4,200 4,750 30,300 27,656 80,506
City of Philadelphia: The Recommended FY2015-2020 Capital Program 31
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - COMMERCE
8,200 11,950 12,000 20,500 12,500 11,100 CN CN CN CN CN CN 76,250 CN
25,447 CT 25,447 CT
350 1,200 26,000 1,200 200 FB FB FB FB FB 28,950 FB
21,118 FT 21,118 FT
2,700 PB 2,700 PB
16,075 PT 16,075 PT
1,750 2,400 1,800 6,350 1,200 SB SB SB SB SB 13,500 SB
18,943 ST 18,943 ST
4,108 TT 4,108 TT
18,000 Z 18,000 Z
11,100 13,900 10,300 15,550 39,800 134,441 225,091
City of Philadelphia: The Recommended FY2015-2020 Capital Program 32
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
FINANCE
CAPITAL PROJECTS
Improvements to Facilities18
6,000 1,000 1,000 1,000 1,000 1,000 1,000 CN CN CN CN CN CN CNFund critical renovations and other improvements to City-owned facilities.
Administration - ITEF1
24,600 4,100 4,100 4,100 4,100 4,100 4,100 CN CN CN CN CN CN CNFund critical renovations and other improvements to City-owned sites as needed.
City Council - ITEF2
5,100 5,100 5,100 5,100 5,100 5,100 30,600
18A. Improvements to Facilities-FY14 5,100 5,100 CT CT
5,100 5,100
See description under line item 18.
18B. Improvements to Facilities-FY13 4,944 4,944 CT CT
4,944 4,944
See description under line item 18.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 33
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
18C. Improvements to Facilities-FY12 2,899 2,899 CT CT
1,000 1,000 PT PT
3,899 3,899
See description under line item 18.
18D. Improvements to Facilities-FY11 3,911 3,911 CT CT
1,000 1,000 PT PT
4,911 4,911
See description under line item 18.
18E. Improvements to Facilities-FY10 5,165 5,165 CT CT
5,165 5,165
See description under line item 18.
18F. Citywide Facilities-FY09 1,495 1,495 CT CT
1,495 1,495
See description under line item 18.
18G. Citywide Facilities-FY08 639 639 CT CT
639 639
See description under line item 18.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 34
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
18H. Citywide Facilities-FY07 734 734 CT CT
734 734
See description under line item 18.
18I. Citywide Facilities-FY06 257 257 CT CT
257 257
See description under line item 18.
18J. Citywide Facilities-FY05 55 55 CT CT
55 55
See description under line item 18.
18K. Citywide Facilities-FY04 646 646 CT CT
646 646
See description under line item 18.
18L. Citywide Facilities-FY03 91 91 CT CT
91 91
See description under line item 18.
18M. Citywide Facilities-FY02 44 44 CT CT
44 44
See description under line item 18.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 35
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
18N. Citywide Facilities-FY01 119 119 CT CT
119 119
See description under line item 18.
18O. Citywide Facilities-FY00 159 159 CT CT
159 159
See description under line item 18.
18P. Citywide Facilities-FY99 4 4 CT CT
4 4
See description under line item 18.
18Q. Facilities Improvements-Citywide-FY97 58 58 CT CT
58 58
See description under line item 18.
Totals - CAPITAL PROJECTS
5,100 5,100 5,100 5,100 5,100 5,100 CN CN CN CN CN CN 30,600 CN
26,320 CT 26,320 CT
2,000 PT 2,000 PT
5,100 5,100 5,100 5,100 5,100 33,420 58,920
City of Philadelphia: The Recommended FY2015-2020 Capital Program 36
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - FINANCE
5,100 5,100 5,100 5,100 5,100 5,100 CN CN CN CN CN CN 30,600 CN
26,320 CT 26,320 CT
2,000 PT 2,000 PT
5,100 5,100 5,100 5,100 5,100 33,420 58,920
City of Philadelphia: The Recommended FY2015-2020 Capital Program 37
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
FIRE
FIRE FACILITIES
City of Philadelphia: The Recommended FY2015-2020 Capital Program 38
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Fire Department Interior and Exterior Renovations19
City of Philadelphia: The Recommended FY2015-2020 Capital Program 39
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
1,350 250 100 1,000 CN CN CN CNDesign and construct building improvements that are essential to maintain operations and safety at Fire Department facilities.
Structural Renovations at Various Fire Stations1
650 650 CN CNRehabilitate passenger elevator; modernize and retrofit.Fire Administration Building Renovations - Elevators2
City of Philadelphia: The Recommended FY2015-2020 Capital Program 40
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
1,900 300 300 300 300 100 600 CN CN CN CN CN CN CNDesign and construct concrete site work.Fire Station Renovations - Ramps, Sidewalks, Paving3
City of Philadelphia: The Recommended FY2015-2020 Capital Program 41
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
5,750 1,000 1,000 1,000 1,000 600 1,150 CN CN CN CN CN CN CNDesign and construct out-year restoration of mechanical, electrical and plumbing systems at Fire Department facilities.
Fire Facilities - Mechanical/Electrical/Plumbing4
1,700 300 300 300 300 500 CN CN CN CN CN CNDesign and construct roof replacements.Roof Replacements5
City of Philadelphia: The Recommended FY2015-2020 Capital Program 42
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
2,500 500 750 500 500 250CN CN CN CN CN CNRenovate kitchen and bathroom facilities.Fire Facilities Kitchens/Bathroom Restoration6
3,800 1,000 2,500 300 CN CN CN CNDesign and construct expanded training facilities.Fire Academy Training Complex - Classroom Expansion7
770 700 70 CN CN CNDesign and construct boat dock improvements.Fire Academy Training Complex - Piles, Boat Dock, Ramp8
City of Philadelphia: The Recommended FY2015-2020 Capital Program 43
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
3,900 1,000 950 1,000 700 250CN CN CN CN CN CNDesign and construct Fire Facility exterior improvements.Fire Facility Exterior Window and Door Improvements9
3,900 3,100 5,000 5,670 3,350 1,300 22,320
19A. Fire Department Interior and Exterior Renovations-FY14 1,112 1,112 A A
1,368 1,368 CT CT
2,480 2,480
See description under line item 19.
19B. Fire Department Interior and Exterior Renovations-FY13 1,819 1,819 CT CT
1,819 1,819
See description under line item 19.
19C. Fire Department Interior and Exterior Renovations-FY12 2,619 2,619 CT CT
2,619 2,619
See description under line item 19.
19D. Fire Department Interior and Exterior Renovations-FY11 11 11 CT CT
11 11
See description under line item 19.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 44
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
19E. Fire Department Interior and Exterior Renovations-FY09 104 104 CT CT
104 104
See description under line item 19.
19F. Fire Department Interior and Exterior Renovations-FY08 835 835 A A
835 835
See description under line item 19.
19G. Fire Department New Facility-FY12 499 499 CT CT
499 499
See description under line item 19.
19H. Fire Department New Facility-FY10 16 16 CT CT
16 16
See description under line item 19.
Totals - FIRE FACILITIES
1,947 A 1,947 A
5,670 3,350 1,300 3,900 5,000 3,100 CN CN CN CN CN CN 22,320 CN
6,436 CT 6,436 CT
3,100 5,000 5,670 3,350 1,300 12,283 30,703
City of Philadelphia: The Recommended FY2015-2020 Capital Program 45
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - FIRE
1,947 A 1,947 A
5,670 3,350 1,300 3,900 5,000 3,100 CN CN CN CN CN CN 22,320 CN
6,436 CT 6,436 CT
3,100 5,000 5,670 3,350 1,300 12,283 30,703
City of Philadelphia: The Recommended FY2015-2020 Capital Program 46
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
FLEET MANAGEMENT
CAPITAL PROJECTS
Fleet Management Facilities20
950 950 CN CNRehabilitate and expand Shop 134 at Front Street and Hunting Park Avenue.
Rehabilitation and Expansion of Shop 1341
60,000 10,000 10,000 10,000 10,000 10,000 10,000 CN CN CN CN CN CN CNPurchase specialty vehicles used as equipment for various departments.
Vehicle Purchases2
City of Philadelphia: The Recommended FY2015-2020 Capital Program 47
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
1,450 300 300 300 300 250CN CN CN CN CN CNPerform various interior and exterior improvements, including new roofs at Automotive Shop 1 and Garage 282 and HVAC and equipment improvements at all Fleet Management Garages.
Interior and Exterior Improvements3
10,950 10,300 10,300 10,300 10,300 10,250 62,400
20A. Fleet Management Facilities-FY14 500 500 CT CT
500 500
See description under line item 20.
20B. Fleet Management Facilities-FY12 129 129 CT CT
129 129
See description under line item 20.
20C. Fleet Management Facilities-FY11 5 5 CT CT
5 5
See description under line item 20.
20D. Fleet Management Facilities-FY09 8 8 CT CT
8 8
See description under line item 20.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 48
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Fuel Tank Replacement21
2,500 400 400 400 400 400 500 CN CN CN CN CN CN CN
2,400 400 400 400 400 400 400 PB PB PB PB PB PB PB
Replace automotive fuel tanks and piping.Fuel Tank Replacement1
1,906 300 300 300 300 300 406 CN CN CN CN CN CN CNRemediate contaminated sites including testing and clean up of groundwater and disposal of contaminated soil.
Fuel Site Environmental Remediation2
1,306 1,100 1,100 1,100 1,100 1,100 6,806
21A. Fuel Tank Replacement-FY14 385 385 CT CT
400 400 ST ST
785 785
See description under line item 21.
21B. Fuel Tank Replacement-FY13 685 685 CT CT
685 685
See description under line item 21.
21C. Fuel Tank Replacement-FY12 13 13 CT CT
13 13
See description under line item 21.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 49
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Totals - CAPITAL PROJECTS
11,000 11,000 10,950 11,856 11,000 11,000 CN CN CN CN CN CN 66,806 CN
1,725 CT 1,725 CT
400 400 400 400 400 400 PB PB PB PB PB PB 2,400 PB
400 ST 400 ST
11,400 11,400 11,400 11,400 11,350 14,381 71,331
TOTALS - FLEET MANAGEMENT
11,000 11,000 10,950 11,856 11,000 11,000 CN CN CN CN CN CN 66,806 CN
1,725 CT 1,725 CT
400 400 400 400 400 400 PB PB PB PB PB PB 2,400 PB
400 ST 400 ST
11,400 11,400 11,400 11,400 11,350 14,381 71,331
City of Philadelphia: The Recommended FY2015-2020 Capital Program 50
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
FREE LIBRARY
LIBRARY FACILITIES - CAPITAL
Free Library Improvements22
1,500 1,500CN CN
2,000 2,000PB PB
Improve various Branch Library facilities.Branch Library Improvements1
City of Philadelphia: The Recommended FY2015-2020 Capital Program 51
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
4,752 1,000 1,000 1,000 500 100 1,152 CN CN CN CN CN CN CNReplace HVAC systems and key infrastructure at several library locations including HVAC, building lighting, fire protection, electrical work, elevator work, power distribution, and emergency generator
HVAC and Infrastructure Upgrades2
1,530 250 250 1,030 CN CN CN CNPerform interior and exterior improvements to Free Library facilities, including water infiltration remediation.
Interior and Exterior Renovations3
2,182 1,000 1,000 1,000 750 3,850 9,782
22A. Free Library Improvements-FY14 1,500 1,500 CT CT
2,000 2,000 PT PT
1,310 1,310 A A
4,810 4,810
See description under line item 22.
22B. Free Library Improvements-FY13 2,905 2,905 CT CT
2,000 2,000 PT PT
4,905 4,905
See description under line item 22.
22C. Free Library Improvements-FY12 1,535 1,535 CT CT
1,535 1,535
See description under line item 22.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 52
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
22D. Free Library Improvements-FY11 1,018 1,018 CT CT
1,018 1,018
See description under line item 22.
22E. Free Library Improvements-FY10 768 768 CT CT
768 768
See description under line item 22.
22F. Free Library Improvements-FY09 906 906 CT CT
906 906
See description under line item 22.
22G. Free Library Improvements-FY08 2 2 CT CT
2 2
See description under line item 22.
Totals - LIBRARY FACILITIES - CAPITAL
1,310 A 1,310 A
1,000 750 1,850 2,182 1,000 1,000 CN CN CN CN CN CN 7,782 CN
8,634 CT 8,634 CT
2,000 PB 2,000 PB
4,000 PT 4,000 PT
1,000 1,000 1,000 750 3,850 16,126 23,726
City of Philadelphia: The Recommended FY2015-2020 Capital Program 53
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - FREE LIBRARY
1,310 A 1,310 A
1,000 750 1,850 2,182 1,000 1,000 CN CN CN CN CN CN 7,782 CN
8,634 CT 8,634 CT
2,000 PB 2,000 PB
4,000 PT 4,000 PT
1,000 1,000 1,000 750 3,850 16,126 23,726
City of Philadelphia: The Recommended FY2015-2020 Capital Program 54
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
HEALTH
HEALTH FACILITIES
23A. Health Center #2-FY14 1,000 1,000 CT CT
1,000 1,000
Construct new Health Center #2.
23B. Health Centers 2 & 10 Major Interior/ Exterior Renovations-FY13 1,850 1,850 CT CT
1,850 1,850
Major Interior/ Exterior Renovations Health Centers 2 & 10
Health Department Equipment and Improvements24
6,600 1,000 1,000 1,000 1,200 1,200 1,200 CR CR CR CR CR CR CRReplace and update equipment and perform renovations at various sites.
Equipment and Renovations - Various Sites1
6,000 500 500 500 1,000 1,500 2,000 CR CR CR CR CR CR CRProcure and implement an Electronic Health Records (EHR) system.
Electronic Health Records2
3,200 1,500 1,500 1,500 2,200 2,700 12,600
City of Philadelphia: The Recommended FY2015-2020 Capital Program 55
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
24A. Health Department Equipment and Improvements-FY14 2,700 2,700 CR CR
2,700 2,700
See description under line item 24.
24B. Health Department Equipment and Improvements-FY13 4,200 4,200 CR CR
4,200 4,200
See description under line item 24.
24C. Health Department Equipment and Improvements-FY12 2,816 2,816 CR CR
2,816 2,816
See description under line item 24.
24D. Health Department Equipment and Improvements-FY11 175 175 CR CR
175 175
See description under line item 24.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 56
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Health Facility Renovations25
3,000 500 500 1,000 300 500 200 CN CN CN CN CN CN CNReplace HVAC systems and infrastructure at various health centers.
HVAC and Infrastructure Improvements1
1,935 300 300 300 300 150 585 CN CN CN CN CN CN CNReplace and update equipment and perform renovations at various sites.
Interior and Exterior Renovations2
785 800 800 1,300 600 650 4,935
25A. Health Facility Renovations-FY14 300 300 CT CT
300 300
See description under line item 25.
25B. Health Facility Renovations-FY13 300 300 CT CT
300 300
See description under line item 25.
25C. Health Facility Renovations-FY12 601 601 CT CT
601 601
See description under line item 25.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 57
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
25D. Health Facility Renovations-FY11 727 727 CT CT
727 727
See description under line item 25.
25E. Health Facility Renovations-FY10 630 630 CT CT
630 630
See description under line item 25.
25F. Health Facility Renovations-FY09 746 746 CT CT
746 746
See description under line item 25.
25G. Health Facility Renovations-FY08 439 439 CT CT
439 439
See description under line item 25.
25H. Health Facility Renovations-FY07 29 29 CT CT
29 29
See description under line item 25.
Totals - HEALTH FACILITIES
1,300 600 650 785 800 800 CN CN CN CN CN CN 4,935 CN
1,500 2,200 2,700 13,091 1,500 1,500 CR CR CR CR CR CR 22,491 CR
6,622 CT 6,622 CT
2,300 2,300 2,800 2,800 3,350 20,498 34,048
City of Philadelphia: The Recommended FY2015-2020 Capital Program 58
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
PHILADELPHIA NURSING HOME
Equipment and Renovations - Philadelphia Nursing Home26
10,000 1,000 1,000 1,000 1,000 1,000 5,000 CR CR CR CR CR CR CRPerform ongoing repairs and procure equipment at the Philadelphia Nursing Home.
Equipment and Renovations - Philadelphia Nursing Home1
5,000 1,000 1,000 1,000 1,000 1,000 10,000
26A. Equipment and Renovations - Philadelphia Nursing Home-FY14 1,000 1,000 CR CR
1,000 1,000
See description under line item 26.
26B. Equipment and Renovations - Philadelphia Nursing Home-FY13 1,000 1,000 CR CR
1,000 1,000
See description under line item 26.
26C. Equipment and Renovations - Philadelphia Nursing Home-FY12 1,100 1,100 CR CR
1,100 1,100
See description under line item 26.
26D. Equipment and Renovations - Philadelphia Nursing Home-FY11 677 677 CR CR
677 677
See description under line item 26.
Totals - PHILADELPHIA NURSING HOME
1,000 1,000 1,000 8,777 1,000 1,000 CR CR CR CR CR CR 13,777 CR
1,000 1,000 1,000 1,000 1,000 8,777 13,777
City of Philadelphia: The Recommended FY2015-2020 Capital Program 59
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - HEALTH
1,300 600 650 785 800 800 CN CN CN CN CN CN 4,935 CN
2,500 3,200 3,700 21,868 2,500 2,500 CR CR CR CR CR CR 36,268 CR
6,622 CT 6,622 CT
3,300 3,300 3,800 3,800 4,350 29,275 47,825
City of Philadelphia: The Recommended FY2015-2020 Capital Program 60
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
MDO
CAPITAL PROJECTS - VARIOUS
Citywide Facilities27
430 275 155 CN CN CNReplace existing trailers with new modified office/storage containers for the Community Life Improvement Program (CLIP).
Trailer Replacement--CLIP1
3,500 3,500 SB SB
4,000 4,000 PB PB
Create a bikesharing system to provide low-cost, low environmental impact transportation options.
Bikeshare Infrastructure2
7,655 275 7,930
27A. Citywide Facilities-FY14 4,500 4,500 FT FT
2,500 2,500 PT PT
3,000 3,000 CT CT
10,000 10,000
See description under line item 27.
27B. Citywide Facilities-FY13 1,000 1,000 CT CT
1,000 1,000
See description under line item 27.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 61
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
27C. Citywide Facilities-FY12 1,320 1,320 CT CT
1,320 1,320
See description under line item 27.
27D. Citywide Facilities-FY11 1,367 1,367 CT CT
1,367 1,367
See description under line item 27.
Office of Sustainability28
2,900 500 500 500 500 400 500 CN CN CN CN CN CN CNImprove energy efficiency and sustainability at various locations on a case-by-case basis to help accelerate high performance projects that reduce the environmental impact of city government.
Energy Efficiency and Sustainability Improvements1
100 100CN CNSustainability upgrades to City facilities using an integrated design approach to maximize cost efficiency, project performance and learning opportunities for City employees.
Innovations in Sustainability2
500 500 500 500 500 500 3,000
28A. Office of Sustainability-FY14 590 590 CT CT
590 590
See description under line item 28.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 62
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
28B. Office of Sustainability-FY13 950 950 CT CT
950 950
See description under line item 28.
28C. Office of Sustainability-FY12 700 700 CT CT
700 700
See description under line item 28.
28D. Office of Sustainability-FY11 253 253 CT CT
253 253
See description under line item 28.
28E. Office of Sustainability-FY10 64 64 CT CT
64 64
See description under line item 28.
28F. Energy Efficiency Improvements-FY09 26 26 CT CT
26 26
See description under line item 28.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 63
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Totals - CAPITAL PROJECTS - VARIOUS
500 500 775 655 500 500 CN CN CN CN CN CN 3,430 CN
9,270 CT 9,270 CT
4,500 FT 4,500 FT
4,000 PB 4,000 PB
2,500 PT 2,500 PT
3,500 SB 3,500 SB
500 500 500 500 775 24,425 27,200
TOTALS - MDO
500 500 775 655 500 500 CN CN CN CN CN CN 3,430 CN
9,270 CT 9,270 CT
4,500 FT 4,500 FT
4,000 PB 4,000 PB
2,500 PT 2,500 PT
3,500 SB 3,500 SB
500 500 500 500 775 24,425 27,200
City of Philadelphia: The Recommended FY2015-2020 Capital Program 64
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
OFFICE OF SUPPORTIVE HOUSING
FAMILY CARE FACILITIES - CAPITAL
OSH Facility Renovations29
2,387 700 525 512 500 150 CN CN CN CN CN CNModernize elevators and upgrade fire alarm system at Woodstock; install emergency generators at shelters.
Infrastructure Improvements1
1,170 695 175 300 CN CN CN CNReplace two outdoor 60 ton chillers, associated piping and upgrade of ATC (controls) at Stenton; install new thru-wall packaged terminal air-conditioning units at Gateway.
HVAC Improvements2
1,120 1,120 CN CNPerform facade renovations at Woodstock; replace asphalt service driveway at Stenton Family Shelter.
Interior and Exterior Improvements3
1,570 695 700 700 512 500 4,677
29A. OSH Facility Renovations-FY14 600 600 ST ST
600 600
See description under line item 29.
29B. OSH Facility Renovations-FY13 604 604 CT CT
604 604
See description under line item 29.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 65
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
29C. OSH Facility Renovations-FY12 235 235 CT CT
235 235
See description under line item 29.
29D. OSH Facility Renovations-FY11 560 560 CT CT
560 560
See description under line item 29.
29E. OSH Facility Renovations-FY10 500 500 CT CT
500 500
See description under line item 29.
29F. OSH Facility Renovations-FY09 452 452 CT CT
452 452
See description under line item 29.
29G. OSH Facility Renovations-FY08 11 11 CT CT
11 11
See description under line item 29.
Totals - FAMILY CARE FACILITIES - CAPITAL
700 512 500 1,570 700 695 CN CN CN CN CN CN 4,677 CN
2,362 CT 2,362 CT
600 ST 600 ST
695 700 700 512 500 4,532 7,639
City of Philadelphia: The Recommended FY2015-2020 Capital Program 66
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - OFFICE OF SUPPORTIVE HOUSING
700 512 500 1,570 700 695 CN CN CN CN CN CN 4,677 CN
2,362 CT 2,362 CT
600 ST 600 ST
695 700 700 512 500 4,532 7,639
City of Philadelphia: The Recommended FY2015-2020 Capital Program 67
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
OIT
CAPITAL PROJECTS
Citywide Technology Improvements & Enhancements30
32,088 2,348 4,348 6,348 6,348 6,348 6,348 CN CN CN CN CN CN CN
3,000 500 500 500 500 500 500 CR CR CR CR CR CR CR
Stabilize, secure and enhance the network infrastructure that provides the computing foundation for the City’s business operations.
Network Infrastructure Stabilization & Enhancement1
31,420 2,737 14,109 14,574 CN CN CN CNReplace and modernize legacy applications and create new applications that improve business processes to increase operational efficiency and reduce costs/risks of older applications.
Citywide and Departmental Applications2
10,000 5,000 5,000 CN CN CNImplement a new system to enable the Philadelphia Police Department's public safety information systems to continue communicating with the Pennsylvania State Police's information systems.
Message Switch System3
9,492 652 652 652 1,915 2,543 3,078 CN CN CN CN CN CN CNProvide staffing to support the Capital Program.Payroll - Admin4
29,500 3,500 5,500 7,500 11,500 28,500 86,000
30A. Citywide Technology Improvements & Enhancements-FY14 13,542 13,542 CT CT
13,542 13,542
See description under line item 30.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 68
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
30B. Citywide Technology Improvements & Enhancements-FY13 5,249 5,249 CT CT
5,249 5,249
See description under line item 30.
30C. Citywide Technology Improvements & Enhancements-FY12 2,845 2,845 CT CT
2,845 2,845
See description under line item 30.
30D. Citywide Technology Improvements & Enhancements-FY11 8,546 8,546 CT CT
8,546 8,546
See description under line item 30.
31A. Communications System Improvements-FY13 5,318 5,318 CR CR
5,318 5,318
Improve and upgrade 911, 800 MHz, and other Communications systems.
Totals - CAPITAL PROJECTS
7,000 11,000 28,000 29,000 5,000 3,000 CN CN CN CN CN CN 83,000 CN
500 500 500 5,818 500 500 CR CR CR CR CR CR 8,318 CR
30,182 CT 30,182 CT
3,500 5,500 7,500 11,500 28,500 65,000 121,500
City of Philadelphia: The Recommended FY2015-2020 Capital Program 69
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - OIT
7,000 11,000 28,000 29,000 5,000 3,000 CN CN CN CN CN CN 83,000 CN
500 500 500 5,818 500 500 CR CR CR CR CR CR 8,318 CR
30,182 CT 30,182 CT
3,500 5,500 7,500 11,500 28,500 65,000 121,500
City of Philadelphia: The Recommended FY2015-2020 Capital Program 70
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
PARKS AND RECREATION
PARKS AND RECREATION
Buildings, Courts, Play Areas, Athletic Fields32
770 770 CA CA
3,850 770 770 770 770 770CN CN CN CN CN CN
Fund water service upgrades, building security, roofs, lighting installations and improvements to Department facilities.
Improvements to Existing Facilities - Building Infrastructure1
30 30 CA CA
1,320 300 300 220 220 170 110 CN CN CN CN CN CN CN
Replace HVAC and upgrade roadway lighting at the Horticultural Center.
Horticultural Center – Building and Site Improvements2
1,600 300 300 300 300 300 100 CN CN CN CN CN CN CNReconstruct one pool on a critical-need basis.Improvements to Existing Recreation Facilities - Swimming Pools3
1,200 200 200 200 200 200 200 CN CN CN CN CN CN CNPerform life-safety improvements at the following facilities: Athletic, Capitolo, Simpson, Tarken, Parkside-Evans, Panati, Mullin, and Cobbs.
Life Safety Improvements - Buildings4
800 150 150 150 150 150 50 CN CN CN CN CN CN CNRehabilitate various play areas throughout the park system.Play Area Improvements5
City of Philadelphia: The Recommended FY2015-2020 Capital Program 71
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
1,400 250 250 250 250 150 250 CN CN CN CN CN CN CNFund improvements to the Robin Hood Dell East, the African American Museum and the Mummers Museum.
Cultural Facilities Renovations6
1,510 1,970 1,970 1,890 1,890 1,740 10,970
Neighborhood Parks33
2,280 380 380 380 380 380 380 CN CN CN CN CN CN CNFund fencing, playground renovations, roofs, lighting installations and improvements to Department facilities.
Improvements to Existing Facilities - Site Infrastructure1
350 350 CN CN
1,500 1,500 PB PB
Rehabilitate various parks throughout the city.Green 2015 Neighborhood Park Improvements - Citywide2
200 100 100 CN CN CNImplement Phase I master plan recommendations including grading, stormwater management and related site improvements.
Penn Treaty Park Site Improvements3
500 100 100 100 100 100CN CN CN CN CN CNRehabilitate park facilities with an emphasis on site safety and security.
Life Safety Improvements - Site4
2,330 480 480 480 480 580 4,830
City of Philadelphia: The Recommended FY2015-2020 Capital Program 72
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Natural Lands / Large Manicured Parks34
1,840 340 340 290 290 290 290 CN CN CN CN CN CN CNDesign and restore historic structures.Roof and Exterior Restoration1
2,720 500 500 430 430 430 430 CN CN CN CN CN CN CN
600 100 100 100 100 100 100 PB PB PB PB PB PB PB
Replace deteriorating structural, HVAC equipment, plumbing and electrical systems.
Interior/Exterior, Structural & HVAC Improvements2
5,000 1,000 1,000 1,000 1,000 1,000CN CN CN CN CN CN
1,000 1,000 CA CA
Design and construct improvements to the retaining wall at various locations.
Schuylkill River Retaining Wall Reconstruction3
4,000 500 1,500 500 1,000 500CN CN CN CN CN CN
500 500 CA CA
Plant trees throughout the city and remove dead and diseased trees.
Park and Street Trees Removal and Planting4
1,850 1,000 500 350 CN CN CN CNImprove lighting, parking, landscaping, amenities, and other site features.
Water Works Drive Site Improvements5
City of Philadelphia: The Recommended FY2015-2020 Capital Program 73
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
1,460 300 300 280 280 200 100 CN CN CN CN CN CN CNStabilize creek banks at Tacony Creek and various other sites.Creek Banks, Natural Terrain and Pathways6
850 200 200 200 200 50 CN CN CN CN CN CNStabilize embankments, outfalls, and tributaries to control water runoff and erosion along river edge.
Drainage Improvements - Outfall Restoration7
1,130 280 140 140 280 140 150 CN CN CN CN CN CN CNRestore damaged bridges across the park system.Bridge Improvements Citywide8
1,600 300 300 300 300 250 150 CN CN CN CN CN CN CN
1,600 300 300 300 300 250 150 SB SB SB SB SB SB SB
Improve existing trails and access new areas along the Delaware River, Tacony Creek, Poquessing Creek and various other connections throughout the city and park system.
Recreational Trails at Various Locations9
900 200 200 200 200 100CN CN CN CN CN CNImprove existing curbing, footways and roadways at heavily used locations.
Curbing, Footways and Roadways Citywide10
475 100 100 100 100 75CN CN CN CN CN CN
475 100 100 100 100 75SB SB SB SB SB SB
Improve stormwater management and green infrastructure.Drainage Improvements - Green Infrastructure11
City of Philadelphia: The Recommended FY2015-2020 Capital Program 74
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
340 80 80 80 50 50CN CN CN CN CN CNInstall guide rail, fencing and gates at locations where public safety is compromised.
Guide Rail, Fencing and Gates - Citywide12
100 100CN CNDesign and reconstruct the Ericsson, Swann, Rond Point and Phillips Fountains.
Fountain Rehabilitation13
3,270 4,300 5,160 4,020 5,430 4,260 26,440
Parks and Recreation Projects35
500 500 SB SB
1,000 1,000 PB PB
1,000 1,000 CA CA
Design and build green open space connecting Gray's Ferry Crescent to 58th Street.
Bartram's Mile1
16,500 16,500 CR CRRedesign and rebuild the public spaces at JFK Plaza/Love Park and fund separation of utilities.
JFK Plaza/Love Park Renovations2
1,000 200 200 200 200 200CN CN CN CN CN CN
1,200 1,200 CA CA
Make improvements to pedestrain areas and walkways along the Parkway and all environs.
Benjamin Franklin Parkway from JFK Plaza to Eakins Oval and all environs3
City of Philadelphia: The Recommended FY2015-2020 Capital Program 75
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
1,000 1,000 CA CA
2,000 1,000 1,000CN CN CN
Perform site improvements.Mann Center Improvements4
500 500 CA CA
2,500 500 500 500 500 500CN CN CN CN CN CN
3,000 500 500 500 500 500 500 SB SB SB SB SB SB SB
Provide appropriation authority for State grants and appropriate matching City funds.
Grant Funded Recreation Improvements5
22,200 1,200 1,200 1,200 2,200 2,200 30,200
Improvements to Existing Recreation Facilities36
47,400 7,900 7,900 7,900 7,900 7,900 7,900 CN CN CN CN CN CN CNRenovate existing recreation facilities in accordance with the facility assessment report.
Improvements to Existing Recreation Facilities1
7,900 7,900 7,900 7,900 7,900 7,900 47,400
36A. Improvements to Existing Recreation Facilities-FY14 7,900 7,900 CT CT
7,900 7,900
See description under line item 36.
36B. Improvements to Existing Recreation Facilities-FY13 7,517 7,517 CT CT
7,517 7,517
See description under line item 36.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 76
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
36C. Improvements to Existing Recreation Facilities-FY12 6,793 6,793 CT CT
6,793 6,793
See description under line item 36.
36D. Improvements to Existing Recreation Facilities-FY11 5,812 5,812 CT CT
5,812 5,812
See description under line item 36.
36E. Improvements to Existing Recreation Facilities-FY10 3,986 3,986 CT CT
3,986 3,986
See description under line item 36.
36F. Improvements to Existing Recreation Facilities-FY09 3,741 3,741 CT CT
3,741 3,741
See description under line item 36.
36G. Improvements to Existing Recreation Facilities-FY08 2,365 2,365 CT CT
2,365 2,365
See description under line item 36.
36H. Improvements to Existing Recreation Facilities-FY07 1,708 1,708 CT CT
1,708 1,708
See description under line item 36.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 77
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
36I. Improvements to Existing Recreation Facilities-FY06 1,391 1,391 CT CT
1,391 1,391
See description under line item 36.
36J. Improvements to Existing Recreation Facilities-FY05 846 846 CT CT
846 846
See description under line item 36.
36K. Improvements to Existing Rec Facilities-FY04 728 728 CT CT
728 728
See description under line item 36.
36L. Improvements to Existing Rec Facilities-FY03 544 544 CT CT
544 544
See description under line item 36.
36M. Improvements to Existing Rec Facilities-FY02 122 122 CT CT
122 122
See description under line item 36.
36N. Imps to Existing Rec Facilities-FY01 832 832 CT CT
832 832
See description under line item 36.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 78
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
36O. Improvements to Existing Facilities-FY99 585 585 CT CT
585 585
See description under line item 36.
36P. Improvements to Existing Facilities-FY96 9 9 CT CT
9 9
See description under line item 36.
36Q. ITEF-Site Improvements-FY00 675 675 CT CT
675 675
See description under line item 36.
37A. Cultural Facilities Improvements-FY14 1,600 1,600 CT CT
3,200 3,200 PT PT
4,800 4,800
Fund improvements to the City's cultural facilities.
37B. Cultural Facilities Improvements-FY13 1,300 1,300 CT CT
9,400 9,400 PT PT
10,700 10,700
Fund improvements to the City's cultural facilities.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 79
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
37C. Cultural Facilities Improvements-FY12 118 118 CT CT
118 118
Fund improvements to the City's cultural facilities.
38A. Building Improvements-FY14 1,070 1,070 CT CT
100 100 PT PT
1,170 1,170
Fund improvements to various buildings of the City's Parks and Recreation Department.
38B. Building Improvements-FY13 940 940 CT CT
1,700 1,700 PT PT
200 200 ST ST
2,840 2,840
Fund improvements to various buildings of the City's Parks and Recreation Department.
38C. Building Improvements-FY12 720 720 CT CT
720 720
Fund improvements to various buildings of the City's Parks and Recreation Department.
38D. Building Improvements-FY11 78 78 CT CT
1,000 1,000 ST ST
1,078 1,078
Fund improvements to various buildings of the City's Parks and Recreation Department.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 80
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
38E. Building Improvements-FY10 716 716 CT CT
716 716
Fund improvements to various buildings of the City's Parks and Recreation Department.
38F. Building Improvements-FY09 23 23 CT CT
415 415 ST ST
438 438
Fund improvements to various buildings of the City's Parks and Recreation Department.
38G. Facility Improvements-FY08 446 446 CT CT
446 446
Fund improvements to various buildings of the City's Parks and Recreation Department.
38H. Facility Improvements-FY07 105 105 CT CT
105 105
Fund improvements to various buildings of the City's Parks and Recreation Department.
39A. Infrastructure-FY14 1,150 1,150 CT CT
1,150 1,150
Fund improvements to the infrastructure of the City's Parks and Recreation Department.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 81
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
39B. Infrastructure-FY12 113 113 CT CT
113 113
Fund improvements to the infrastructure of the City's Parks and Recreation Department.
39C. Infrastructure-FY11 25 25 CT CT
25 25
Fund improvements to the infrastructure of the City's Parks and Recreation Department.
39D. Infrastructure-FY09 1,000 1,000 ST ST
1,000 1,000
Fund improvements to the infrastructure of the City's Parks and Recreation Department.
40A. Parkland - Site Improvements-FY14 3,520 3,520 CT CT
600 600 ST ST
2,500 2,500 PT PT
6,620 6,620
Fund improvements to the parkland of the City's Parks and Recreation Department.
40B. Parkland - Site Improvements-FY13 165 165 ST ST
2,324 2,324 CT CT
165 165 PT PT
2,654 2,654
Fund improvements to the parkland of the City's Parks and Recreation Department.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 82
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
40C. Parkland - Site Improvements-FY12 750 750 CT CT
750 750
Fund improvements to the parkland of the City's Parks and Recreation Department.
40D. Parkland - Site Improvements-FY11 1,042 1,042 CT CT
500 500 ST ST
1,542 1,542
Fund improvements to the parkland of the City's Parks and Recreation Department.
40E. Parkland - Site Improvements-FY10 974 974 CT CT
5,000 5,000 FT FT
3,800 3,800 PT PT
1,450 1,450 ST ST
90 90 XT XT
11,314 11,314
Fund improvements to the parkland of the City's Parks and Recreation Department.
40F. Parkland - Site Improvements-FY09 1,083 1,083 CT CT
2,600 2,600 FT FT
2,289 2,289 PT PT
3,000 3,000 ST ST
1,240 1,240 TT TT
10,212 10,212
Fund improvements to the parkland of the City's Parks and Recreation Department.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 83
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
40G. Parkland - Site Improvements-FY08 737 737 ST ST
737 737
Fund improvements to the parkland of the City's Parks and Recreation Department.
40H. Parkland - Site Improvements-FY05 1,280 1,280 FT FT
1,280 1,280
Fund improvements to the parkland of the City's Parks and Recreation Department.
40I. Parkland - Site Improvements-FY02 1,177 1,177 ST ST
1,177 1,177
Fund improvements to the parkland of the City's Parks and Recreation Department.
40J. Manayunk Canal Improvements-FY01 318 318 ST ST
318 318
Improvements to Manayunk Canal.
40K. Manayunk Canal Restoration-FY00 2,240 2,240 ST ST
2,240 2,240
Improvements to Manayunk Canal.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 84
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
41A. Roadways, Footways, and Parking-FY14 1,100 1,100 ST ST
920 920 CT CT
2,020 2,020
Fund improvements to the roadways, footways and parking of the City's Parks and Recreation Department.
41B. Roadways, Footways, and Parking-FY13 1,670 1,670 CT CT
1,300 1,300 ST ST
2,970 2,970
Fund improvements to the roadways, footways and parking of the City's Parks and Recreation Department.
41C. Roadways, Footways, and Parking-FY12 135 135 CT CT
135 135
Fund improvements to the roadways, footways and parking of the City's Parks and Recreation Department.
41D. Roadways, Footways, and Parking-FY11 128 128 CT CT
1,000 1,000 FT FT
700 700 ST ST
1,828 1,828
Fund improvements to the roadways, footways and parking of the City's Parks and Recreation Department.
41E. Roadways, Footways, and Parking-FY10 45 45 CT CT
45 45
Fund improvements to the roadways, footways and parking of the City's Parks and Recreation Department.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 85
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
41F. Roadways, Footways, and Parking-FY06 1,135 1,135 FT FT
250 250 ST ST
1,385 1,385
Fund improvements to the roadways, footways and parking of the City's Parks and Recreation Department.
42A. Improvements to Existing Recreation Facilities - Infrastructure-FY14 900 900 CT CT
900 900
Fund water service upgrades, building security, fencing, playground renovations, roofs, lighting installations and improvements to Department facilities.
42B. Improvements to Existing Recreation Facilities - Infrastructure-FY13 650 650 CT CT
650 650
Fund water service upgrades, building security, fencing, playground renovations, roofs, lighting installations and improvements to Department facilities.
42C. Improvements to Existing Recreation Facilities - Infrastructure-FY12 1,223 1,223 CT CT
1,223 1,223
Fund water service upgrades, building security, fencing, playground renovations, roofs, lighting installations and improvements to Department facilities.
42D. Improvements to Existing Recreation Facilities - Infrastructure-FY11 3,184 3,184 CT CT
3,184 3,184
Fund water service upgrades, building security, fencing, playground renovations, roofs, lighting installations and improvements to Department facilities.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 86
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
42E. Improvements to Existing Recreation Facilities - Infrastructure-FY10 41 41 CT CT
41 41
Fund water service upgrades, building security, fencing, playground renovations, roofs, lighting installations and improvements to Department facilities.
42F. Improvements to Existing Recreation Facilities - Infrastructure-FY09 100 100 CT CT
100 100
Fund water service upgrades, building security, fencing, playground renovations, roofs, lighting installations and improvements to Department facilities.
42G. Improvements to Existing Recreation Facilities - Infrastructure-FY08 95 95 CT CT
95 95
Fund water service upgrades, building security, fencing, playground renovations, roofs, lighting installations and improvements to Department facilities.
42H. Improvements to Existing Recreation Facilities - Infrastructure-FY05 16 16 CT CT
16 16
Fund water service upgrades, building security, fencing, playground renovations, roofs, lighting installations and improvements to Department facilities.
43A. Improvements to Existing Recreation Facilities - Swimming Pools-FY14 500 500 CT CT
500 500
Reconstruct pools on a critical-need basis.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 87
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
43B. Improvements to Existing Recreation Facilities - Swimming Pools-FY13 500 500 CT CT
500 500
Reconstruct pools on a critical-need basis.
43C. Improvements to Existing Recreation Facilities - Swimming Pools-FY12 1,000 1,000 CT CT
1,000 1,000
Reconstruct pools on a critical-need basis.
43D. Improvements to Existing Recreation Facilities - Swimming Pools-FY09 500 500 CT CT
500 500
Reconstruct pools on a critical-need basis.
43E. Improvements to Existing Recreation Facilities - Swimming Pools-FY08 113 113 CT CT
113 113
Reconstruct pools on a critical-need basis.
44A. Improvements to Existing Recreation Facilities - Life Safety Systems-FY14 300 300 CT CT
300 300
Replace alarm systems, modify egresses and other safety improvements at various Recreation Centers.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 88
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
44B. Improvements to Existing Recreation Facilities - Life Safety Systems-FY13 300 300 CT CT
300 300
Replace alarm systems, modify egresses and other safety improvements at various Recreation Centers.
44C. Improvements to Existing Recreation Facilities - Life Safety Systems-FY12 300 300 CT CT
300 300
Replace alarm systems, modify egresses and other safety improvements at various Recreation Centers.
44D. Improvements to Existing Recreation Facilities - Life Safety Systems-FY11 198 198 CT CT
198 198
Replace alarm systems, modify egresses and other safety improvements at various Recreation Centers.
44E. Improvements to Existing Recreation Facilities - Life Safety Systems-FY10 300 300 CT CT
300 300
Replace alarm systems, modify egresses and other safety improvements at various Recreation Centers.
44F. Improvements to Existing Recreation Facilities - Life Safety Systems-FY09 171 171 CT CT
171 171
Replace alarm systems, modify egresses and other safety improvements at various Recreation Centers.
44G. Improvements to Existing Recreation Facilities - Life Safety Systems-FY08 63 63 CT CT
63 63
Replace alarm systems, modify egresses and other safety improvements at various Recreation Centers.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 89
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
44H. Improvements to Existing Recreation Facilities - Life Safety Systems-FY07 8 8 CT CT
8 8
Replace alarm systems, modify egresses and other safety improvements at various Recreation Centers.
44I. Improvements to Existing Recreation Facilities - Life Safety Systems-FY06 15 15 CT CT
15 15
Replace alarm systems, modify egresses and other safety improvements at various Recreation Centers.
44J. Improvements to Existing Recreation Facilities - Life Safety Systems-FY05 6 6 CT CT
6 6
Replace alarm systems, modify egresses and other safety improvements at various Recreation Centers.
45A. Grant Funded Recreation Improvements-FY14 500 500 CT CT
500 500 ST ST
1,000 1,000
Make building, pool, playground equipment, and other facility improvements on a case-by-case basis.
45B. Grant Funded Recreation Improvements-FY13 1,000 1,000 CT CT
1,000 1,000 ST ST
2,000 2,000
Make building, pool, playground equipment, and other facility improvements on a case-by-case basis.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 90
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
45C. Grant Funded Recreation Improvements-FY12 377 377 CT CT
529 529 ST ST
906 906
Make building, pool, playground equipment, and other facility improvements on a case-by-case basis.
45D. Grant Funded Recreation Improvements-FY11 808 808 CT CT
1,100 1,100 PT PT
1,521 1,521 ST ST
3,429 3,429
Make building, pool, playground equipment, and other facility improvements on a case-by-case basis.
45E. Grant Funded Recreation Improvements-FY10 60 60 CT CT
1,701 1,701 ST ST
1,761 1,761
Make building, pool, playground equipment, and other facility improvements on a case-by-case basis.
45F. Grant Funded Recreation Improvements-FY09 1,174 1,174 ST ST
1,174 1,174
Make building, pool, playground equipment, and other facility improvements on a case-by-case basis.
45G. Grant Funded Recreation Improvements-FY08 297 297 CT CT
1,538 1,538 ST ST
1,835 1,835
Make building, pool, playground equipment, and other facility improvements on a case-by-case basis.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 91
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
45H. Grant Funded Recreation Improvements-FY07 1,018 1,018 ST ST
113 113 CT CT
1,131 1,131
Make building, pool, playground equipment, and other facility improvements on a case-by-case basis.
45I. Grant Funded Recreation Improvements-FY06 623 623 ST ST
623 623
Make building, pool, playground equipment, and other facility improvements on a case-by-case basis.
Totals - PARKS AND RECREATION
6,000 CA 6,000 CA
14,490 16,900 15,755 10,960 15,710 14,850 CN CN CN CN CN CN 88,665 CN
16,500 CR 16,500 CR
80,187 CT 80,187 CT
11,015 FT 11,015 FT
100 100 100 2,600 100 100 PB PB PB PB PB PB 3,100 PB
24,254 PT 24,254 PT
900 900 825 1,150 900 900 SB SB SB SB SB SB 5,575 SB
25,756 ST 25,756 ST
1,240 TT 1,240 TT
90 XT 90 XT
15,850 16,710 15,490 17,900 16,680 179,752 262,382
City of Philadelphia: The Recommended FY2015-2020 Capital Program 92
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - PARKS AND RECREATION
6,000 CA 6,000 CA
14,490 16,900 15,755 10,960 15,710 14,850 CN CN CN CN CN CN 88,665 CN
16,500 CR 16,500 CR
80,187 CT 80,187 CT
11,015 FT 11,015 FT
100 100 100 2,600 100 100 PB PB PB PB PB PB 3,100 PB
24,254 PT 24,254 PT
900 900 825 1,150 900 900 SB SB SB SB SB SB 5,575 SB
25,756 ST 25,756 ST
1,240 TT 1,240 TT
90 XT 90 XT
15,850 16,710 15,490 17,900 16,680 179,752 262,382
City of Philadelphia: The Recommended FY2015-2020 Capital Program 93
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
POLICE
POLICE FACILITIES
Police Facilities - Renovations46
2,000 2,000 CA CARedesign and renovate the Woodhaven BRAC facility.BRAC Facilities - Design and Renovations1
334 334 CA CA
16 16 CN CN
Make exterior and interior renovations of the multi-purpose building.
Police Academy Valor Hall Renovations2
City of Philadelphia: The Recommended FY2015-2020 Capital Program 94
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
10,000 2,400 3,300 1,600 1,000 1,000 700 CN CN CN CN CN CN CNMake building system improvements.High Crime Police Districts Renovations3
10,500 6,000 3,000 1,500 CN CN CN CNDesign and construct new police station.New Police District 39 Facility4
1,900 1,500 400CN CN CNDesign and construct new training facility.Police Academy New Firearms Training Facility5
16,500 12,000 3,000 1,500 CN CN CN CNDesign and construct new consolidated facility housing Districts 6 and 9, Central Detective Division, and Delaware Avenue Detail.
Districts 6 and 9 Consolidation6
1,350 300 300 500 250CN CN CN CN CNDesign and construct multi-phase critical window and exterior door replacements at police facilities.
Police Facilities Critical Window/Door Replacements7
570 500 70CN CN CNDesign and construct multi-phase sitework improvements at various police facilities.
Critical Site Work8
City of Philadelphia: The Recommended FY2015-2020 Capital Program 95
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
750 150 150 150 150 150CN CN CN CN CN CNDesign and construct roof replacements.Roof Replacements9
1,810 400 450 360 400 200CN CN CN CN CN CNDesign and construct mechanical/electrical/plumbing renovations at various police facilities.
Mechanical/Electrical/Plumbing Renovations10
3,050 21,250 9,900 5,410 4,050 2,070 45,730
46A. Police Facilities - Renovations-FY14 8,000 8,000 CT CT
1,810 1,810 A A
9,810 9,810
See description under line item 46.
46B. Police Facilities - Renovations-FY13 8,590 8,590 CT CT
80 80 TT TT
8,670 8,670
See description under line item 46.
46C. Police Facilities - Renovations-FY12 6,461 6,461 CT CT
6,461 6,461
See description under line item 46.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 96
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
46D. Police Facilities - Renovations-FY11 2,141 2,141 CT CT
2,141 2,141
See description under line item 46.
46E. Police Facilities - Renovations-FY10 206 206 CT CT
206 206
See description under line item 46.
46F. Police Facilities - Renovations-FY08 1,613 1,613 A A
74 74 CT CT
1,687 1,687
See description under line item 46.
47A. Port Security Program-FY14 333 333 CT CT
333 333
Purchase emergency responder equipment, detection equipment and physical security enhancements for The Aviation Division of the PPD.
Totals - POLICE FACILITIES
3,423 A 3,423 A
2,334 CA 2,334 CA
5,410 4,050 2,070 716 9,900 21,250 CN CN CN CN CN CN 43,396 CN
25,805 CT 25,805 CT
80 TT 80 TT
21,250 9,900 5,410 4,050 2,070 32,358 75,038
City of Philadelphia: The Recommended FY2015-2020 Capital Program 97
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - POLICE
3,423 A 3,423 A
2,334 CA 2,334 CA
5,410 4,050 2,070 716 9,900 21,250 CN CN CN CN CN CN 43,396 CN
25,805 CT 25,805 CT
80 TT 80 TT
21,250 9,900 5,410 4,050 2,070 32,358 75,038
City of Philadelphia: The Recommended FY2015-2020 Capital Program 98
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
PRISONS
CORRECTIONAL INSTITUTIONS - CAPITAL
Prison System - Renovations48
2,000 2,000 CA CAInstall telecommunications, video surveillance and control system.
PICC Security System Improvements - Phase 41
1,000 1,000 CA CADesign and construct replacement of existing security control system at Detention Center Prisons Health Services Wing (PHSW).
Health Services Wing Security System Improvements2
4,500 1,000 1,000 1,000 1,000 500CN CN CN CN CN CN
2,000 2,000 CA CA
Design and construct building system improvements at Detention Center, PICC, Curran-Fromhold Correctional Facility and Riverside Correctional Facility Renovation.
Prisons Facilities Infrastructure Improvements3
500 500 CA CAProvide an emergency power auto transfer for HOC.HOC/CFCF Emergency Power Auto Transfer4
300 300CN CNDesign and install an automatic cell lock and release security system for the House of Corrections Detention Facility.
House of Corrections Automatic Cell Lock Security System5
City of Philadelphia: The Recommended FY2015-2020 Capital Program 99
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
1,500 750 750CN CN CN
300 300 CA CA
Renovate existing training academy.Holmesburg Prisons Training Academy Building Renovations6
5,000 1,000 1,000 1,000 1,500 500CN CN CN CN CN CNDesign and construct facility improvements to address habitability and life/safety concerns.
Holmesburg Prisons Cannery Renovations7
5,800 2,000 2,000 2,000 3,250 2,050 17,100
48A. Prison System - Renovations-FY14 7,150 7,150 CT CT
7,150 7,150
See description under line item 48.
48B. Prison System - Renovations-FY13 2,653 2,653 CT CT
2,653 2,653
See description under line item 48.
48C. Prison System - Renovations-FY12 750 750 CT CT
750 750
See description under line item 48.
48D. Prison System - Renovations-FY11 8,345 8,345 TT TT
8,345 8,345
See description under line item 48.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 100
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
48E. Prison System - Renovations-FY10 524 524 CT CT
524 524
See description under line item 48.
48F. Prison System - Renovations-FY09 828 828 CT CT
828 828
See description under line item 48.
48G. Prison System - Renovations-FY08 477 477 CT CT
477 477
See description under line item 48.
Totals - CORRECTIONAL INSTITUTIONS - CAPITAL
5,800 CA 5,800 CA
2,000 3,250 2,050 2,000 2,000 CN CN CN CN CN 11,300 CN
12,382 CT 12,382 CT
8,345 TT 8,345 TT
2,000 2,000 2,000 3,250 2,050 26,527 37,827
TOTALS - PRISONS
5,800 CA 5,800 CA
2,000 3,250 2,050 2,000 2,000 CN CN CN CN CN 11,300 CN
12,382 CT 12,382 CT
8,345 TT 8,345 TT
2,000 2,000 2,000 3,250 2,050 26,527 37,827
City of Philadelphia: The Recommended FY2015-2020 Capital Program 101
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
PUBLIC PROPERTY
BUILDINGS AND FACILITIES - OTHER
Improvements to Municipal Facilities49
1,584 264 264 264 264 264 264 CR CR CR CR CR CR CRFund critical renovations and other improvements to City owned facilities.
City Improvements1
1,700 1,700 CN CNRenovate the Market Street sidewalk grates from 16th to 18th Streets.
Market Street Sidewalk Grates2
3,900 500 500 450 500 1,500 450 CN CN CN CN CN CN CNPerform various improvement projects associated with the Criminal Justice Center, Municipal Services Building, and One Parkway Buildings.
Triplex Facilities Improvements Projects3
7,500 1,500 1,500 1,500 1,000 1,000 1,000 CN CN CN CN CN CN CNRestore City Hall portals, lightwells and tower, and replace the portal gates.
City Hall Exterior Renovations4
1,800 900 900CN CN CNDesign and construction improvements to 12 elevators.Municipal Services Building Elevator Improvements5
City of Philadelphia: The Recommended FY2015-2020 Capital Program 102
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
2,500 1,000 1,500CN CN CNAssess, design and construct window replacements to include thermal and infiltration efficiency.
Municipal Services Building Window Improvements6
2,500 700 1,500 300CN CN CN CNFund necessary upgrades to 16 Criminal Justice Center elevators.
CJC Elevator Improvements7
300 300 CN CNRenovate vacant building for reuse.Improvements to Former NE Adult Center8
2,400 500 500 500 300 100 500 CN CN CN CN CN CN CNPerform various infrastructure improvements to City Hall.City Hall Improvements9
1,000 200 200 200 100 100 200 CN CN CN CN CN CN CNAssess and restore public artwork.Conservation of Art10
4,414 2,964 2,964 3,614 5,564 5,664 25,184
49A. Improvements to Municipal Facilities-FY14 3,220 3,220 CT CT
3,220 3,220
See description under line item 49.
49B. Improvements to Municipal Facilities-FY13 3,174 3,174 CT CT
3,174 3,174
See description under line item 49.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 103
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
49C. Improvements to Municipal Facilities-FY12 1,635 1,635 CT CT
1,635 1,635
See description under line item 49.
49D. Improvements to Municipal Facilities-FY11 118 118 CT CT
118 118
See description under line item 49.
49E. Improvements to Municipal Facilities-FY08 300 300 PT PT
300 300
See description under line item 49.
49F. Quadplex Facilities Improvements-FY10 69 69 CT CT
69 69
See description under line item 49.
49G. City Hall-FY08 140 140 CT CT
140 140
See description under line item 49.
49H. Triplex Facility Improvements-FY09 125 125 CT CT
125 125
See description under line item 49.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 104
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
49I. Eastern State Penitentiary Renov-FY99 3,099 3,099 PT PT
3,099 3,099
See description under line item 49.
49J. Transit Facilities Improvements-FY02 722 722 FT FT
151 151 ST ST
873 873
See description under line item 49.
Citywide Asbestos Abatement & Environmental Remediation50
2,000 400 400 400 300 400 100 CN CN CN CN CN CN CNProvide asbestos abatement and air monitoring at facilities citywide.
Asbestos Abatement & Environmental Remediation1
100 400 400 400 300 400 2,000
50A. Citywide Asbestos Abatement & Environmental Remediation-FY14 500 500 CT CT
500 500
See description under line item 50.
50B. Citywide Asbestos Abatement & Environmental Remediation-FY13 456 456 CT CT
456 456
See description under line item 50.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 105
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
50C. Citywide Environmental Remediation-FY10 41 41 CT CT
41 41
See description under line item 50.
50D. Citywide Environmental Remediation-FY08 5 5 CT CT
5 5
See description under line item 50.
Totals - BUILDINGS AND FACILITIES - OTHER
3,750 5,600 5,800 4,250 3,100 3,100 CN CN CN CN CN CN 25,600 CN
264 264 264 264 264 264 CR CR CR CR CR CR 1,584 CR
9,483 CT 9,483 CT
722 FT 722 FT
3,399 PT 3,399 PT
151 ST 151 ST
3,364 3,364 4,014 5,864 6,064 18,269 40,939
City of Philadelphia: The Recommended FY2015-2020 Capital Program 106
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
PUBLIC PROPERTY - CAPITAL PROG ADMIN
Capital Program Administration Design and Engineering51
25,400 4,300 4,300 4,300 4,300 4,300 3,900 CN CN CN CN CN CN CN
400 400 CA CA
Pay salaries of the design and engineering staff in the Capital Projects Division.
Payroll - A & E and Administration1
4,300 4,300 4,300 4,300 4,300 4,300 25,800
51A. Capital Program Administration Design and Engineering-FY14 2,086 2,086 CT CT
2,086 2,086
See description under line item 51.
51B. Capital Program Administration Design and Engineering-FY13 189 189 CT CT
189 189
See description under line item 51.
51C. Capital Program Administration Design and Engineering-FY12 518 518 CT CT
518 518
See description under line item 51.
51D. Capital Program Administration Design and Engineering-FY11 430 430 CT CT
430 430
See description under line item 51.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 107
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
51E. Capital Program Administration Design and Engineering-FY10 339 339 CT CT
339 339
See description under line item 51.
Totals - PUBLIC PROPERTY - CAPITAL PROG ADMIN
400 CA 400 CA
4,300 4,300 4,300 3,900 4,300 4,300 CN CN CN CN CN CN 25,400 CN
3,562 CT 3,562 CT
4,300 4,300 4,300 4,300 4,300 7,862 29,362
TOTALS - PUBLIC PROPERTY
400 CA 400 CA
8,050 9,900 10,100 8,150 7,400 7,400 CN CN CN CN CN CN 51,000 CN
264 264 264 264 264 264 CR CR CR CR CR CR 1,584 CR
13,045 CT 13,045 CT
722 FT 722 FT
3,399 PT 3,399 PT
151 ST 151 ST
7,664 7,664 8,314 10,164 10,364 26,131 70,301
City of Philadelphia: The Recommended FY2015-2020 Capital Program 108
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
RECORDS
CAPITAL PROJECTS
Records Improvements52
200 200 CN CNUpgrade and renovate security system in City Hall, Room 111.City Hall Security Improvements1
200 200
52A. Records Improvements-FY14 300 300 CT CT
300 300
See description under line item 52.
52B. Records Improvements-FY13 11 11 CT CT
11 11
See description under line item 52.
52C. Records Improvements-FY12 49 49 CT CT
49 49
See description under line item 52.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 109
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
52D. Records Improvements-FY11 80 80 CT CT
80 80
See description under line item 52.
Totals - CAPITAL PROJECTS
200 CN 200 CN
440 CT 440 CT
640 640
TOTALS - RECORDS
200 CN 200 CN
440 CT 440 CT
640 640
City of Philadelphia: The Recommended FY2015-2020 Capital Program 110
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
STREETS
BRIDGES
Bridge Reconstruction & Improvements53
6,000 1,000 1,000 1,000 1,000 1,000 1,000 CN CN CN CN CN CN CNReconstruct, rehabilitate, and restore existing bridges.Local Bridge Rehabilitation1
5,600 500 500 2,600 1,000 500 500 CN CN CN CN CN CN CN
72,000 12,000 12,000 12,000 12,000 12,000 12,000 FB FB FB FB FB FB FB
22,000 2,000 2,000 2,000 2,000 2,000 12,000 SB SB SB SB SB SB SB
6,000 1,000 1,000 1,000 1,000 1,000 1,000 PB PB PB PB PB PB PB
Design and construct federally-funded bridge construction and reconstruction efforts in which federal and/or state funding has been authorized after approval of the Capital Program.
Bridge Reconstruction, Rehabilitation, and Restoration2
15,000 2,500 2,500 2,500 2,500 2,500 2,500 SB SB SB SB SB SB SBStabilize structurally deficient bridges.Act 13 - Stabilize Structurally Deficient Bridges3
29,000 19,000 19,000 21,100 19,500 19,000 126,600
53A. Bridge Reconstruction & Improvements-FY14 2,877 2,877 CT CT
8,475 8,475 FT FT
4,378 4,378 ST ST
15,730 15,730
See description under line item 53.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 111
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
53B. Bridge Reconstruction & Improvements-FY13 10,366 10,366 FT FT
5,788 5,788 ST ST
16,154 16,154
See description under line item 53.
53C. Bridge Reconstruction & Improvements-FY12 99 99 CT CT
1,640 1,640 FT FT
307 307 ST ST
2,046 2,046
See description under line item 53.
53D. Bridge Reconstruction & Improvements-FY11 368 368 ST ST
2,177 2,177 FT FT
2,545 2,545
See description under line item 53.
53E. Bridge Reconstruction & Improvements-FY10 157 157 ST ST
838 838 FT FT
995 995
See description under line item 53.
53F. Bridge Reconstruction & Improvements-FY09 2,938 2,938 FT FT
335 335 ST ST
3,273 3,273
See description under line item 53.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 112
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
53G. Bridge Reconstruction & Improvements-FY08 2,472 2,472 FT FT
458 458 ST ST
2,930 2,930
See description under line item 53.
53H. Bridge Reconstruction & Improvements-FY07 4,861 4,861 FT FT
4,847 4,847 ST ST
9,708 9,708
See description under line item 53.
Totals - BRIDGES
3,600 2,000 1,500 1,500 1,500 1,500 CN CN CN CN CN CN 11,600 CN
2,976 CT 2,976 CT
12,000 12,000 12,000 12,000 12,000 12,000 FB FB FB FB FB FB 72,000 FB
33,767 FT 33,767 FT
1,000 1,000 1,000 1,000 1,000 1,000 PB PB PB PB PB PB 6,000 PB
4,500 4,500 4,500 14,500 4,500 4,500 SB SB SB SB SB SB 37,000 SB
16,638 ST 16,638 ST
19,000 19,000 21,100 19,500 19,000 82,381 179,981
City of Philadelphia: The Recommended FY2015-2020 Capital Program 113
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
GRADING & PAVING
Reconstruction/Resurfacing of Streets54
120,000 24,000 24,000 22,000 18,000 16,000 16,000 CN CN CN CN CN CN CNResurface and reconstruct neighborhood streets and Fairmount Park roads; design, reconstruct and verify ADA ramps.
Reconstruction/Resurfacing and ADA Ramp Reconstruction1
200 200CN CNReplace existing metal roof at 4040 Whitaker Avenue.Roof Replacement at 4040 Whitaker2
250 250CN CNReplace canvas roof that is torn and/or damaged and construct new salt storage structure.
Roof Replacement at 4th Highway Salt Domes3
16,000 24,000 24,000 22,000 18,000 16,450 120,450
54A. Reconstruction/Resurfacing of Streets-FY14 5,868 5,868 A A
6,382 6,382 CT CT
12,250 12,250
See description under line item 54.
54B. Reconstruction/Resurfacing of Streets-FY13 3,651 3,651 CT CT
3,651 3,651
See description under line item 54.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 114
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
54C. Reconstruction/Resurfacing of Streets-FY12 317 317 CT CT
317 317
See description under line item 54.
Historic Streets55
1,400 250 250 250 200 250 200 CN CN CN CN CN CN CNRestore streets and sidewalks on historic venues designated by the Historic Commission.
Historic Streets1
200 250 250 250 200 250 1,400
55A. Historic Streets-FY14 260 260 CT CT
260 260
See description under line item 55.
Rehabilitation of Stairways in Manayunk and Citywide56
3,000 500 500 500 500 500 500 CN CN CN CN CN CN CNAnalyze, design and rehabilitate existing public stairways and retaining walls throughout the City.
Rehabilitation of Stairways Citywide1
500 500 500 500 500 500 3,000
56A. Rehabilitation of Stairways in Manayunk and Citywide-FY14 250 250 CT CT
250 250
See description under line item 56.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 115
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Totals - GRADING & PAVING
5,868 A 5,868 A
22,750 18,700 17,200 16,700 24,750 24,750 CN CN CN CN CN CN 124,850 CN
10,860 CT 10,860 CT
24,750 24,750 22,750 18,700 17,200 33,428 141,578
IMPROVEMENTS TO CITY HIGHWAYS
Federal Aid Highway Program57
15,200 15,200 SB SB
17,800 3,000 3,000 3,000 2,500 2,500 3,800 CN CN CN CN CN CN CN
71,200 12,000 12,000 12,000 10,000 10,000 15,200 FB FB FB FB FB FB FB
Resurface, reconstruct and restore city highways that are eligible for federal funds; modernize and preserve facilities and infrastructure.
Citywide 3R1
6,560 6,560 SB SB
6,000 1,000 1,000 1,000 1,000 1,000 1,000 PB PB PB PB PB PB PB
8,100 1,500 1,500 1,500 1,500 460 1,640 CN CN CN CN CN CN CN
32,400 6,000 6,000 6,000 6,000 1,840 6,560 FB FB FB FB FB FB FB
Improve federally-funded highway and transportation networks citywide.
Transportation Engineering and Restoration Fund (TERF)2
City of Philadelphia: The Recommended FY2015-2020 Capital Program 116
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
240 240 SB SB
3,200 2,800 160 240 FB FB FB FB
800 700 40 60 CN CN CN CN
Improve the pedestrian environment adjacent to the Philadelphia Museum of Art.
Pennsylvania Avenue Improvements3
400 400 SB SB
3,800 2,000 1,000 200 500 100 CN CN CN CN CN CN
15,200 8,000 4,000 800 2,000 400 FB FB FB FB FB FB
Design, acquire right of way and construct a multi-phase project to extend North Delaware Avenue.
North Delaware Avenue Extension4
2,000 2,000 CN CN
8,000 8,000 FB FB
Resurface, reconstruct and restore Swanson Street between Columbus Boulevard and Oregon Avenue.
Swanson Street Reconstruction5
51,400 33,500 28,500 34,500 24,500 18,500 190,900
57A. Federal Aid Highway Program-FY14 7,234 7,234 CT CT
28,131 28,131 FT FT
35,365 35,365
See description under line item 57.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 117
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
57B. Federal Aid Highway Program-FY13 3,943 3,943 CT CT
30,110 30,110 FT FT
10,300 10,300 ST ST
2,500 2,500 TT TT
46,853 46,853
See description under line item 57.
57C. Federal Aid Highway Program-FY12 63 63 CT CT
9,583 9,583 FT FT
9,646 9,646
See description under line item 57.
57D. Federal Aid Highway Program-FY11 279 279 FT FT
279 279
See description under line item 57.
57E. Federal Aid Highway Program-FY10 62 62 FT FT
62 62
See description under line item 57.
57F. Federal Aid Highway Program-FY09 561 561 CT CT
1,311 1,311 FT FT
134 134 ST ST
2,006 2,006
See description under line item 57.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 118
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
57G. Federal Aid Highway Program-FY08 433 433 FT FT
500 500 PT PT
600 600 ST ST
1,533 1,533
See description under line item 57.
57H. Federal Aid Highway Program-FY07 1,920 1,920 FT FT
1,920 1,920
See description under line item 57.
Totals - IMPROVEMENTS TO CITY HIGHWAYS
6,700 4,700 3,500 5,600 5,500 6,500 CN CN CN CN CN CN 32,500 CN
11,801 CT 11,801 CT
26,800 18,800 14,000 22,400 22,000 26,000 FB FB FB FB FB FB 130,000 FB
71,829 FT 71,829 FT
1,000 1,000 1,000 1,000 1,000 1,000 PB PB PB PB PB PB 6,000 PB
500 PT 500 PT
22,400 SB 22,400 SB
11,034 ST 11,034 ST
2,500 TT 2,500 TT
33,500 28,500 34,500 24,500 18,500 149,064 288,564
City of Philadelphia: The Recommended FY2015-2020 Capital Program 119
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
SANITATION
Modernization of Sanitation Facilities58
4,550 2,000 2,550 CN CN CNReconstruct four floors with interior improvements including office space, locker rooms, conference room and warehouse space.
Northeast Incinerator Rehabilitation1
200 100 100 CN CN CNRemove the existing Fleet Management Office and parts floor, excavate poor soil and backfill area with crushed aggregate to form base for a new reinforced concrete floor.
Sanitation Area 6 Floor Construction2
900 150 150 150 150 150 150 CN CN CN CN CN CN CNImprove various Sanitation Division facilities including dispatch yards, service buildings, and the Division's Municipal Waste Transfer Station.
Modernization of Sanitation Division Facilities3
200 200CN CNReconstruct upper level roof of the building.26th and Glenwood Roof Replacement4
300 300 CN CNModernize the Division's Northwest Transfer Station crane and packer waste processing system.
Northwest Transfer Station Improvements5
2,800 150 150 150 450 2,450 6,150
58A. Modernization of Sanitation Facilities-FY14 2,550 2,550 CT CT
2,550 2,550
See description under line item 58.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 120
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
58B. Modernization of Sanitation Facilities-FY13 2,044 2,044 CT CT
2,044 2,044
See description under line item 58.
Totals - SANITATION
150 450 2,450 2,800 150 150 CN CN CN CN CN CN 6,150 CN
4,594 CT 4,594 CT
150 150 150 450 2,450 7,394 10,744
STREET LIGHTING
Street Lighting Improvements59
4,750 1,000 1,000 1,000 1,000 500 250 CN CN CN CN CN CN CNPurchase new fiberglass poles and energy-efficient LED luminaires to replace obsolete luminaires and aluminum poles.
Street Lighting Improvements1
2,200 400 800 400 400 200 CN CN CN CN CN CNReplace direct burial street light poles with new foundations and poles.
Martin Luther King Drive - Street Lighting Improvements2
450 1,000 1,400 1,800 1,400 900 6,950
59A. Street Lighting Improvements-FY14 450 450 CT CT
450 450
See description under line item 59.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 121
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
59B. Alley Lighting Improvements-FY12 1,826 1,826 CT CT
1,826 1,826
See description under line item 59.
Totals - STREET LIGHTING
1,800 1,400 900 450 1,400 1,000 CN CN CN CN CN CN 6,950 CN
2,276 CT 2,276 CT
1,000 1,400 1,800 1,400 900 2,726 9,226
STREETS DEPARTMENT FACILITIES
Streets Department Support Facilities60
1,500 500 500 250 250 CN CN CN CN CNExpand brine production facilities.New Brine Prod. Facilities in 1st, 2nd, 3rd, 5th Hwy Districts1
250 500 500 250 1,500
60A. Streets Department Support Facilities-FY14 300 300 CT CT
300 300
See description under line item 60.
60B. Streets Department Support Facilities-FY11 1 1 CT CT
1 1
See description under line item 60.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 122
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
60C. Streets Department Support Facilities-FY06 32 32 CT CT
32 32
See description under line item 60.
Totals - STREETS DEPARTMENT FACILITIES
500 500 250 250 CN CN CN CN 1,500 CN
333 CT 333 CT
500 500 250 583 1,833
TRAFFIC ENGINEERING IMPS
Traffic Control61
1,150 200 200 200 200 200 150 CN CN CN CN CN CN CN
4,600 800 800 800 800 800 600 FB FB FB FB FB FB FB
800 800 SB SB
Develop a Traffic Operations Center (TOC) system.Traffic Operations Center1
2,000 1,000 1,000 FB FB FBRetime signals on high-volume traffic corridors.Signal Retiming2
1,750 250 250 250 250 250 500 CN CN CN CN CN CN CN
13,000 2,000 2,000 2,000 2,000 2,000 3,000 FB FB FB FB FB FB FB
13,000 2,000 2,000 2,000 2,000 2,000 3,000 SB SB SB SB SB SB SB
Make ongoing, federally funded citywide traffic safety improvements.
Traffic Safety Improvement3
City of Philadelphia: The Recommended FY2015-2020 Capital Program 123
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
2,650 350 700 350 700 350 200 CN CN CN CN CN CN CNRemove/replace aging electromechanical controllers with solid-state equipment, and replace all traffic control signage citywide with new State and Federally mandated high reflectivity materials.
Traffic Control Equipment Replacement4
1,850 500 250 500 250 250 100 CN CN CN CN CN CN CNInstall and modernize signals at existing and new intersections and replace signal support.
Signal Synchronization/Modernization5
2,370 480 480 480 480 250 200 CN CN CN CN CN CN CNImprove traffic control equipment on streets recently resurfaced in the City; upgrade existing traffic signals and signs to PennDOT and FHWA standards.
Material Requisition6
9,550 6,580 6,680 6,580 6,680 7,100 43,170
61A. Traffic Control-FY14 1,690 1,690 CT CT
3,600 3,600 FT FT
5,290 5,290
See description under line item 61.
61B. Traffic Control-FY12 189 189 CT CT
189 189
See description under line item 61.
61C. Traffic Control-FY11 182 182 CT CT
1,231 1,231 FT FT
1,413 1,413
See description under line item 61.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 124
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
61D. Traffic Control-FY09 250 250 CT CT
250 250
See description under line item 61.
61E. Traffic Control-FY08 98 98 CT CT
98 98
See description under line item 61.
61F. Traffic Engineering Improvements-FY09 57 57 CT CT
57 57
See description under line item 61.
Totals - TRAFFIC ENGINEERING IMPS
1,780 1,880 1,300 1,150 1,880 1,780 CN CN CN CN CN CN 9,770 CN
2,466 CT 2,466 CT
2,800 2,800 3,800 4,600 2,800 2,800 FB FB FB FB FB FB 19,600 FB
4,831 FT 4,831 FT
2,000 2,000 2,000 3,800 2,000 2,000 SB SB SB SB SB SB 13,800 SB
6,580 6,680 6,580 6,680 7,100 16,847 50,467
City of Philadelphia: The Recommended FY2015-2020 Capital Program 125
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TOTALS - STREETS
5,868 A 5,868 A
37,280 29,630 27,100 28,450 35,180 35,680 CN CN CN CN CN CN 193,320 CN
35,306 CT 35,306 CT
41,600 33,600 29,800 39,000 36,800 40,800 FB FB FB FB FB FB 221,600 FB
110,427 FT 110,427 FT
2,000 2,000 2,000 2,000 2,000 2,000 PB PB PB PB PB PB 12,000 PB
500 PT 500 PT
6,500 6,500 6,500 40,700 6,500 6,500 SB SB SB SB SB SB 73,200 SB
27,672 ST 27,672 ST
2,500 TT 2,500 TT
84,980 80,480 87,380 71,730 65,400 292,423 682,393
City of Philadelphia: The Recommended FY2015-2020 Capital Program 126
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
TRANSIT
TRANSIT IMPROVEMENTS - SEPTA
SEPTA Bridge, Track, Signal, and Infrastructure Improvements62
5,777 844 844 844 844 844 1,557 CN CN CN CN CN CN CN
235,147 34,355 34,355 34,355 34,355 34,355 63,372 SO SO SO SO SO SO SO
2,060 301 301 301 301 301 555 TO TO TO TO TO TO TO
Provide for restoration of SEPTA's transit and railroad infrastructure to a state of good repair.
Infrastructure Safety Renewal Program (ISRP) (ALL)1
57,139 36,341 20,798 FO FO FO
322 205 117 CN CN CN
13,824 8,792 5,032 SO SO SO
138 88 50 TO TO TO
Modernize the train signal system for several regional rail lines.Regional Rail Signal System Modernization (RRD)2
326 78 248 CN CN CN
11,863 2,842 9,021 FO FO FO
13,972 3,347 10,625 SO SO SO
139 33 106 TO TO TO
Separate SEPTA regional rail service from CSX freight rail service on the West Trenton Line via the construction of a third track and other rail infrastructure improvements.
West Trenton Line SEPTA-CSX Separation3
City of Philadelphia: The Recommended FY2015-2020 Capital Program 127
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
1,363 35 23 235 439 364 267 TO TO TO TO TO TO TO
3,195 81 54 548 1,023 849 640 CN CN CN CN CN CN CN
136,772 3,484 2,323 23,509 43,868 36,382 27,206 SO SO SO SO SO SO SO
344 344 FO FO
Rehabilitate/replace several regional rail bridges.Regional Rail Division Bridge Improvement Program (RRD)4
3,410 282 528 554 852 800 394 CN CN CN CN CN CN CN
176 176 FO FO
146,198 12,097 22,625 23,769 36,514 34,305 16,888 SO SO SO SO SO SO SO
1,462 121 226 238 365 343 169 TO TO TO TO TO TO TO
Replace traction power substations for SEPTA's regional rail service.
Regional Rail Substation Improvements (RRD)5
692 216 237 71 30 55 83 CN CN CN CN CN CN CN
9,381 9,381 FO FO
27,876 8,855 9,726 2,903 1,219 2,261 2,912 SO SO SO SO SO SO SO
237 79 87 26 11 20 14 TO TO TO TO TO TO TO
Bring SEPTA maintenance and transportation facilities and systems to a state of good repair, including roofs.
Maintenance & Transportation Facilities and Roofs6
3,757 527 1,134 2,096FO FO FO FO
2,638 676 927 449 239 316 31 CN CN CN CN CN CN CN
1,026 266 364 177 94 125TO TO TO TO TO TO
109,858 28,239 38,749 18,766 10,015 13,243 846 SO SO SO SO SO SO SO
Make improvements to maintenance, support, and electrical facilities; signal and communications systems; track and grade crossings; stations; bridges; as well as perform environmental clean-up.
State of Good Repair Program (ALL)7
170,832 89,931 111,369 107,272 131,303 178,385 789,092
City of Philadelphia: The Recommended FY2015-2020 Capital Program 128
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
62A. SEPTA Bridge, Track, Signal, and Infrastructure Improvements-FY14 1,369 1,369 CT CT
1,369 1,369
See description under line item 62.
62B. SEPTA Bridge, Track, Signal, and Infrastructure Improvements 175 175 CT CT
175 175
See description under line item 62.
62C. SEPTA Bridge, Track, Signal, and Infrastructure Improvements 70 70 CT CT
70 70
See description under line item 62.
SEPTA Station and Parking Improvements63
1,888 806 484 323 113 81 81 CN CN CN CN CN CN CN
56,612 24,194 14,516 9,677 3,387 2,419 2,419 SO SO SO SO SO SO SO
Rehabilitate City Hall Station on the Broad Street Subway Line and make ADA-accessibility renovations to 15th Street Station on the Market-Frankford Line.
City Hall Station and 15th Street Renovations (CTD)1
City of Philadelphia: The Recommended FY2015-2020 Capital Program 129
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
1,527 56 105 161 307 526 372 CN CN CN CN CN CN CN
45,824 1,694 3,145 4,839 9,200 15,794 11,152 SO SO SO SO SO SO SO
Make accessibility improvements to Margaret-Orthodox, 40th Street, Erie and Snyder Stations.
Station Accessibility Program (CTD)2
766 153 226 153 24 129 81 CN CN CN CN CN CN CN
23,710 4,597 6,774 4,597 726 4,277 2,739 SO SO SO SO SO SO SO
24 14 10 TO TO TO
Renovate various railroad and transit stations, including improvements to parking facilities
Railroad and Transit Stations and Parking Improvements3
229 91 65 36 32 5 CN CN CN CN CN CN
427 427FO FO
6,936 2,734 1,935 1,089 950 228 SO SO SO SO SO SO
Make improvements to the 23rd & Venango, 35th & Allegheny, Ridge & Summit, 61st & Pine, Bethlehem Pike, and Rising Sun & Olney bus loops.
City Transit Division Loop Improvements (CTD)4
17,087 31,500 28,075 21,750 14,882 24,649 137,943
63A. SEPTA Station and Parking Improvements-FY14 80 80 CT CT
80 80
See description under line item 63.
63B. SEPTA Station and Parking Improvements-FY13 48 48 CT CT
48 48
See description under line item 63.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 130
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
63C. SEPTA Station and Parking Improvements-FY12 49 49 CT CT
49 49
See description under line item 63.
63D. SEPTA Vehicle/Equipment Acquisition and Improvement Program-FY10 58 58 CT CT
58 58
See description under line item 63.
SEPTA Passenger Information, Communications, and System Controls64
430 102 106 106 90 26 CN CN CN CN CN CN
63,328 13,728 16,000 16,000 13,600 4,000 FO FO FO FO FO FO
15,321 3,321 3,871 3,871 3,290 968 SO SO SO SO SO SO
81 9 23 23 20 6 TO TO TO TO TO TO
Design and implement a new fare collection system that will replace and/or enhance the entire array of current revenue collection equipment.
New Payment Technologies (ALL)1
5,000 17,160 20,000 20,000 17,000 79,160
64A. SEPTA Passenger Information, Communications, and System Controls-FY14 63 63 CT CT
63 63
See description under line item 64.
64B. SEPTA Passenger Information, Communications, and System Controls-FY13 106 106 CT CT
106 106
See description under line item 64.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 131
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
64C. SEPTA Passenger Information, Communications, and System Controls-FY10 486 486 CT CT
486 486
See description under line item 64.
Totals - TRANSIT IMPROVEMENTS - SEPTA
3,274 3,574 4,005 3,635 3,598 3,114 CN CN CN CN CN CN 21,200 CN
2,504 CT 2,504 CT
16,527 17,134 55,306 43,720 13,728 FO FO FO FO FO 146,415 FO
128,221 144,244 159,415 144,387 138,268 117,515 SO SO SO SO SO SO 832,050 SO
1,000 1,233 1,308 1,177 1,010 802 TO TO TO TO TO TO 6,530 TO
121,431 156,604 149,022 166,185 220,034 195,423 1,008,699
TOTALS - TRANSIT
3,274 3,574 4,005 3,635 3,598 3,114 CN CN CN CN CN CN 21,200 CN
2,504 CT 2,504 CT
16,527 17,134 55,306 43,720 13,728 FO FO FO FO FO 146,415 FO
128,221 144,244 159,415 144,387 138,268 117,515 SO SO SO SO SO SO 832,050 SO
1,000 1,233 1,308 1,177 1,010 802 TO TO TO TO TO TO 6,530 TO
121,431 156,604 149,022 166,185 220,034 195,423 1,008,699
City of Philadelphia: The Recommended FY2015-2020 Capital Program 132
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
WATER
COLLECTOR SYSTEMS - CAPITAL
Improvements to Collector System65
177,000 29,500 29,500 29,500 29,500 29,500 29,500 XN XN XN XN XN XN XN
3,000 500 500 500 500 500 500 XR XR XR XR XR XR XR
300 50 50 50 50 50 50 SB SB SB SB SB SB SB
300 50 50 50 50 50 50 FB FB FB FB FB FB FB
Reconstruct and rehabilitate the public collection system citywide.
Reconstruction of Collector System1
6,000 1,000 1,000 1,000 1,000 1,000 1,000 XR XR XR XR XR XR XR
513,500 100,300 100,300 100,300 95,300 78,300 39,000 XN XN XN XN XN XN XN
Construct storm flood relief sewers in sections of the City that experience flooding during major storms.
Storm Flood Relief / Combined Overflow2
3,300 550 550 550 550 550 550 XN XN XN XN XN XN XN
60 10 10 10 10 10 10 PB PB PB PB PB PB PB
Extend the public collection system citywide.Expansion of Collector System3
70,660 131,960 131,960 131,960 126,960 109,960 703,460
65A. Improvements to Collector System-FY14 969 969 XR XR
91,717 91,717 XT XT
92,686 92,686
See description under line item 65.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 133
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
65B. Improvements to Collector System-FY13 101,450 101,450 XT XT
1,423 1,423 XR XR
102,873 102,873
See description under line item 65.
65C. Improvements to Collector System-FY12 1,500 1,500 XR XR
57,295 57,295 XT XT
58,795 58,795
See description under line item 65.
65D. Improvements to Collector System-FY11 990 990 XR XR
31,198 31,198 XT XT
32,188 32,188
See description under line item 65.
65E. Improvements to Collector System-FY10 9,715 9,715 XT XT
9,715 9,715
See description under line item 65.
65F. Storm Flood Relief/Combined Sewer Overflow-FY10 1,000 1,000 XR XR
55,450 55,450 XT XT
56,450 56,450
See description under line item 65.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 134
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
65G. Storm Flood Relief/Combined Sewer Overflow-FY09 1,000 1,000 XR XR
11,102 11,102 XT XT
12,102 12,102
See description under line item 65.
Totals - COLLECTOR SYSTEMS - CAPITAL
50 50 50 50 50 50 FB FB FB FB FB FB 300 FB
10 10 10 10 10 10 PB PB PB PB PB PB 60 PB
50 50 50 50 50 50 SB SB SB SB SB SB 300 SB
130,350 125,350 108,350 69,050 130,350 130,350 XN XN XN XN XN XN 693,800 XN
1,500 1,500 1,500 8,382 1,500 1,500 XR XR XR XR XR XR 15,882 XR
357,927 XT 357,927 XT
131,960 131,960 131,960 126,960 109,960 435,469 1,068,269
CONVEYANCE SYSTEMS - CAPITAL
Improvements to Conveyance System66
600 100 100 100 100 100 100 FB FB FB FB FB FB FB
600 100 100 100 100 100 100 SB SB SB SB SB SB SB
199,800 33,300 33,300 33,300 33,300 33,300 33,300 XN XN XN XN XN XN XN
3,000 500 500 500 500 500 500 XR XR XR XR XR XR XR
Reconstruct water mains throughout the city.Reconstruction of Conveyance Systems1
City of Philadelphia: The Recommended FY2015-2020 Capital Program 135
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
111,000 2,000 35,000 35,000 35,000 2,000 2,000 XN XN XN XN XN XN XNPurchase water meters to replace obsolete meters.Meter Replacement2
60 10 10 10 10 10 10 PB PB PB PB PB PB PB
300 50 50 50 50 50 50 XN XN XN XN XN XN XN
Expand water mains citywide to service the areas of the city not currently supplied by public water mains.
Expansion of Conveyance Systems3
36,060 36,060 69,060 69,060 69,060 36,060 315,360
66A. Improvements to Conveyance System-FY14 32,367 32,367 XT XT
229 229 XR XR
32,596 32,596
See description under line item 66.
66B. Improvements to Conveyance System-FY13 12,111 12,111 XT XT
500 500 XR XR
12,611 12,611
See description under line item 66.
66C. Improvements to Conveyance System-FY11 500 500 XR XR
500 500
See description under line item 66.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 136
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
66D. Improvements to Conveyance System-FY10 37,923 37,923 XT XT
37,923 37,923
See description under line item 66.
Totals - CONVEYANCE SYSTEMS - CAPITAL
100 100 100 100 100 100 FB FB FB FB FB FB 600 FB
10 10 10 10 10 10 PB PB PB PB PB PB 60 PB
100 100 100 100 100 100 SB SB SB SB SB SB 600 SB
68,350 68,350 35,350 35,350 68,350 35,350 XN XN XN XN XN XN 311,100 XN
500 500 500 1,729 500 500 XR XR XR XR XR XR 4,229 XR
82,401 XT 82,401 XT
36,060 69,060 69,060 69,060 36,060 119,690 398,990
GENERAL - CAPITAL
Engineering and Material Support67
61,660 11,318 10,879 10,458 10,053 9,663 9,289 XN XN XN XN XN XN XNProvide staffing for engineering work to support the Capital Program.
Payroll - Design Units1
115,129 21,132 20,313 19,527 18,770 18,043 17,344 XR XR XR XR XR XR XRProvide staffing for Capital Accounting and Material Testing, Construction, Survey, and Projects Control units.
Payroll - Engineering for various units2
36,000 6,000 6,000 6,000 6,000 10,000 2,000 XR XR XR XR XR XR XRReplace Water Department vehicles that have exceeded their useful life.
Vehicles3
28,633 38,450 37,192 35,985 34,823 37,706 212,789
City of Philadelphia: The Recommended FY2015-2020 Capital Program 137
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
67A. Engineering and Material Support-FY14 14,016 14,016 XR XR
14,016 14,016
See description under line item 67.
67B. Engineering and Material Support-FY13 6,000 6,000 XR XR
6,000 6,000
See description under line item 67.
67C. Engineering and Material Support-FY12 6,000 6,000 XR XR
6,000 6,000
See description under line item 67.
67D. Vehicles-FY11 500 500 XR XR
500 500
See description under line item 67.
67E. Vehicles-FY10 826 826 XR XR
826 826
See description under line item 67.
67F. Vehicles-FY09 1,306 1,306 XR XR
1,306 1,306
See description under line item 67.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 138
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
67G. Vehicles-FY08 1,017 1,017 XR XR
1,017 1,017
See description under line item 67.
Totals - GENERAL - CAPITAL
10,458 10,053 9,663 9,289 10,879 11,318 XN XN XN XN XN XN 61,660 XN
25,527 24,770 28,043 49,009 26,313 27,132 XR XR XR XR XR XR 180,794 XR
38,450 37,192 35,985 34,823 37,706 58,298 242,454
TREATMENT FACILITIES - CAPITAL
Improvements to Treatment Facilities68
600 100 100 100 100 100 100 FB FB FB FB FB FB FB
600 100 100 100 100 100 100 SB SB SB SB SB SB SB
382,721 53,005 44,413 52,440 54,186 71,449 107,228 XN XN XN XN XN XN XN
151,079 28,795 37,387 29,360 27,614 10,351 17,572 XR XR XR XR XR XR XR
Improve the water and wastewater treatment plants, pump stations, and related Water Department facilities.
Improvements to Treatment Facilities1
125,000 82,000 82,000 82,000 82,000 82,000 535,000
68A. Improvements to Treatment Facilities-FY14 28,092 28,092 XT XT
13,046 13,046 XR XR
41,138 41,138
See description under line item 68.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 139
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
68B. Improvements to Treatment Facilities-FY13 12,900 12,900 XT XT
12,900 12,900
See description under line item 68.
68C. Improvements to Treatment Facilities-FY12 7,942 7,942 XR XR
43,399 43,399 XT XT
51,341 51,341
See description under line item 68.
68D. Improvements to Treatment Facilities-FY11 11,650 11,650 XR XR
11,650 11,650
See description under line item 68.
68E. Improvements to Treatment Facilities-FY10 42,788 42,788 XT XT
42,788 42,788
See description under line item 68.
68F. Improvements to Treatment Facilities-FY09 4,498 4,498 XR XR
4,498 4,498
See description under line item 68.
68G. Improvements to Treatment Facilities-FY08 4,101 4,101 XR XR
9,770 9,770 XT XT
13,871 13,871
See description under line item 68.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 140
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
68H. Improvements to Treatment Facilities-FY07 1,078 1,078 XT XT
1,078 1,078
See description under line item 68.
Totals - TREATMENT FACILITIES - CAPITAL
100 100 100 100 100 100 FB FB FB FB FB FB 600 FB
100 100 100 100 100 100 SB SB SB SB SB SB 600 SB
52,440 54,186 71,449 107,228 44,413 53,005 XN XN XN XN XN XN 382,721 XN
29,360 27,614 10,351 58,809 37,387 28,795 XR XR XR XR XR XR 192,316 XR
138,027 XT 138,027 XT
82,000 82,000 82,000 82,000 82,000 304,264 714,264
TOTALS - WATER
250 250 250 250 250 250 FB FB FB FB FB FB 1,500 FB
20 20 20 20 20 20 PB PB PB PB PB PB 120 PB
250 250 250 250 250 250 SB SB SB SB SB SB 1,500 SB
261,598 257,939 224,812 220,917 253,992 230,023 XN XN XN XN XN XN 1,449,281 XN
56,887 54,384 40,394 117,929 65,700 57,927 XR XR XR XR XR XR 393,221 XR
578,355 XT 578,355 XT
288,470 320,212 319,005 312,843 265,726 917,721 2,423,977
City of Philadelphia: The Recommended FY2015-2020 Capital Program 141
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
ZOOLOGICAL GARDENS
PHILADELPHIA ZOO - CAPITAL
Philadelphia Zoo Facility and Infrastructure Improvements69
1,710 100 100 200 340 500 470 CN CN CN CN CN CN CNReplace elements of City –owned building envelopes.City-owned Building Envelope Restoration1
1,700 250 250 300 500 300 100 CN CN CN CN CN CN CNRenovations to multiple infrastructure systems in City –owned buildings.
City-owned Building Renovation2
130 130 CN CN
3,100 3,100 PB PB
Make improvements to east-side infrastructure in support of the Zoo Master Plan.
East-side Infrastructure3
520 200 220 100 CN CN CN CNUpgrade security systems, fire alarms and communications systems throughout the Zoo site.
Alarms/Security and Communications Systems4
450 300 100 50 CN CN CN CNMake site-wide improvements to the electrical distribution and lighting systems.
Philadelphia Zoo Facility & Infrastructure Improvements5
City of Philadelphia: The Recommended FY2015-2020 Capital Program 142
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
500 100 200 100 100CN CN CN CN CNRestore perimeter fences and gates.Philadelphia Zoo Facility & Infrastructure Improvements6
450 200 150 100CN CN CN CNMake site-wide sewer and water improvements.Philadelphia Zoo Facility & Infrastructure Improvements7
500 100 200 100 100CN CN CN CN CNMake improvements to south-end infrastructure in support of the Zoo Master Plan.
Philadelphia Zoo Facility & Infrastructure Improvements8
400 300 100 CN CN CNMake accessibility improvements.Philadelphia Zoo Facility & Infrastructure Improvements9
100 100 CN CNImprove paving site-wide.Philadelphia Zoo Facility & Infrastructure Improvements10
300 300 CN CN
8,000 8,000 PB PB
Make improvements to the Treehouse/New Guest Amenity Center.
Philadelphia Zoo Facility & Infrastructure Improvements11
500 500 CN CN
5,500 5,000 500 PB PB PB
Make infrastructure improvements to support redevelopment of the main path and bird valley.
Philadelphia Zoo Facility & Infrastructure Improvements12
3,950 6,450 1,950 9,250 1,060 1,200 23,860
City of Philadelphia: The Recommended FY2015-2020 Capital Program 143
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
69A. Philadelphia Zoo Facility and Infrastructure Improvements-FY14 750 750 CT CT
1,275 1,275 PT PT
2,025 2,025
See description under line item 69.
69B. Philadelphia Zoo Facility and Infrastructure Improvements-FY13 1,180 1,180 CT CT
1,180 1,180
See description under line item 69.
69C. Philadelphia Zoo Facility and Infrastructure Improvements-FY12 338 338 CT CT
338 338
See description under line item 69.
69D. Philadelphia Zoo Facility and Infrastructure Improvements-FY11 475 475 CT CT
475 475
See description under line item 69.
69E. Philadelphia Zoo Facility and Infrastructure Improvements-FY10 313 313 CT CT
313 313
See description under line item 69.
City of Philadelphia: The Recommended FY2015-2020 Capital Program 144
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
Totals - PHILADELPHIA ZOO - CAPITAL
1,250 1,060 1,200 850 1,450 1,450 CN CN CN CN CN CN 7,260 CN
3,056 CT 3,056 CT
8,000 3,100 500 5,000 PB PB PB PB 16,600 PB
1,275 PT 1,275 PT
6,450 1,950 9,250 1,060 1,200 8,281 28,191
TOTALS - ZOOLOGICAL GARDENS
1,250 1,060 1,200 850 1,450 1,450 CN CN CN CN CN CN 7,260 CN
3,056 CT 3,056 CT
8,000 3,100 500 5,000 PB PB PB PB 16,600 PB
1,275 PT 1,275 PT
6,450 1,950 9,250 1,060 1,200 8,281 28,191
City of Philadelphia: The Recommended FY2015-2020 Capital Program 145
$x000 $x000 $x000 $x000 $x000 $x000 $x000 2015 2016 2017 2018 2019 2020 2015 - 2020
City of Philadelphia: The Recommended FY2015-2020 Capital Program 146