Page 1 of 2 Friday, October 1, 2021 PROJECT 2021-19PW| Response to Vendor Inquires City of Prosser City Hall and Police Department Abatement (Project No. 2021-19PW) The city is providing the responses below to inquiries received. 1. Can you identify what contents need to be collected? a. The successful bidder will work with the insurance company to allow for the inventory of contents in the police department. Additionally, some records will need to be retrieved from the police department and the successful bidder with coordinate those efforts with Belfor. Otherwise, the remaining contents will be disposed of by the successful bidder. 2. What is the plan for all the contents in city hall? Are we to plan on removing these and disposing of them or will they be handled before the project starts? a. The successful bidder will be responsible for the disposal of property. 3. Do you have a quantity for the mold abatement? a. There is no know mold at this time, only the potential for it as the roof is open to the elements and may become an issue during the wetter months of the year until the roof overframing is completed. 4. Can the contract time be extended? We do not feel 30 days is enough for the multiple scopes of work. a. Please see Addendum No. 1 5. How will you be handling bad weather days? a. If bad weather arises, the City will evaluate the day and if the City determines that these days are considered unworkable then the day will be added to the end of the completion date as noted in Addendum No. 1 6. Is the boiler being removed or just the pipe insulation around the boiler? a. The boiler will remain. Only the pipe insulation around the boiler should be removed. 7. Where does the temp roof repair sketch occur? Where it seems to be indicated, the second floor above the garage will be demoed completely will it not? If so the “existing roof” in the sketch will no longer be there. a. The temporary overframe detail occurs over the “Conference Room” and “Archive Storage” on the floor plan. The second floor above the garage is located on the opposite side of the conference room and is not labeled on the floor plan. 8. Has a survey been done on where and what types of asbestos there is? a. Please see attached Exhibit E

City of Prosser

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Project 2021-19PWFriday, October 1, 2021 PROJECT 2021-19PW| Response to Vendor Inquires
City of Prosser
City Hall and Police Department Abatement (Project No. 2021-19PW) The city is providing the responses below to inquiries received.
1. Can you identify what contents need to be collected? a. The successful bidder will work with the insurance company to allow for the inventory
of contents in the police department. Additionally, some records will need to be retrieved from the police department and the successful bidder with coordinate those efforts with Belfor. Otherwise, the remaining contents will be disposed of by the successful bidder.
2. What is the plan for all the contents in city hall? Are we to plan on removing these and disposing of them or will they be handled before the project starts?
a. The successful bidder will be responsible for the disposal of property. 3. Do you have a quantity for the mold abatement?
a. There is no know mold at this time, only the potential for it as the roof is open to the elements and may become an issue during the wetter months of the year until the roof overframing is completed.
4. Can the contract time be extended? We do not feel 30 days is enough for the multiple scopes of work.
a. Please see Addendum No. 1 5. How will you be handling bad weather days?
a. If bad weather arises, the City will evaluate the day and if the City determines that these days are considered unworkable then the day will be added to the end of the completion date as noted in Addendum No. 1
6. Is the boiler being removed or just the pipe insulation around the boiler? a. The boiler will remain. Only the pipe insulation around the boiler should be removed.
7. Where does the temp roof repair sketch occur? Where it seems to be indicated, the second floor above the garage will be demoed completely will it not? If so the “existing roof” in the sketch will no longer be there.
a. The temporary overframe detail occurs over the “Conference Room” and “Archive Storage” on the floor plan. The second floor above the garage is located on the opposite side of the conference room and is not labeled on the floor plan.
8. Has a survey been done on where and what types of asbestos there is? a. Please see attached Exhibit E
Page 2 of 2
Friday, October 1, 2021 PROJECT 2021-19PW| Response to Vendor Inquires
9. Has a walk through been scheduled? Is it possible to schedule a walk-through? a. Due to the conditions in the building, we are unable to accommodate a walk-through.
Staff have prepared a floor plan with associated pictures to help inform interested bidders of the conditions.
It may be important to note that final inquires are due by October 6th and response to those items will be available on October 8th.
Sealed Bids are Due Tuesday, October 19th at 3:00 p.m.
1002 Dudley Ave, Prosser, WA
Questions: Steve Zetz, Community Development Director
a) Photo 1
b) Photo 2
c) Photo 3
d) Photo 4
e) Photo 5
f) Photo 6
g) Photo 7
h) Photo 8
i) Photo 9
j) Photo 10
City Hall and Police Department Abatement (Project No. 2021-19PW)
It may be important to note that final inquires are due by October 6th and response to those items will be available on October 8th.
Sealed Bids are Due Tuesday, October 19th at 3:00 p.m.
1002 Dudley Ave, Prosser, WA
Questions: Steve Zetz, Community Development Director
[email protected]
509-786-8212