City of South Daytona Community Development Dept. Post Office Box 214960 • South Daytona, FL 32121 · 386/322-3020 • FAX 386/322-3029
To:
From:
Date:
Ref:
MEMORANDUM
Joseph W. Yarbrough, City Manager
John A. Dillard, P.E., Community Development Directov('1
March 3, 2009 ~ Adoption of Ordinance 08-26, Final Adoption Public Hearing; Water Supply Facilities Work Plan and Associated Comprehensive Plan Element Amendments
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• 1
This is the final adoption public hearing on a Comprehensive Plan Amendment to adopt amendments to the Future Land Use, Capital Improvements, Intergovernmental Coordination, Conservation, Coastal Management, and Public Utilities Elements, and to adopt the Water Supply Facilities Work Plan for compliance with Florida Statutes.
Background:
In 2005, the Florida Legislature made significant changes to Chapters 163 and 373, F.S. to strengthen the link between land use and water supply planning. These changes were included in Senate Bill 360 and Senate Bill 444. The legislative changes pursuant to Chapter 163.3177(6)(c) Florida Statutes encourage cooperation in the development of alternative water supplies and reemphasize the need for conservation and reuse.
Local governments are required to update their Comprehensive Plans to identify alternative and traditional water supply projects, conservation and reuse necessary to meet the water needs in their jurisdictions, and to include a Water Supply Facilities Work Plan for building public, private, and regional water supply facilities necessary to meet the water needs. The Water Supply Facilities Work Plan acts as a support document for the Comprehensive Plan amendments, identifying existing conditions, future needs, and plan implementation.
Continuing Com mitment to Excellence
This Comprehensive Plan Amendment is exempt from the twice-a-year limitation on plan amendment adoptions, pursuant to 163.3177, (6)(c) Florida Statutes.
At the November 19, 2008 Land Development Regulation Board's public hearing, the Board unanimously approved the proposed Water Supply Facilities Work Plan and associated proposed amendments to the Comprehensive Plan and transmittal of the subject plan amendments to the City Council and Florida Department of Community Affairs.
On December 9, 2008, this Water Supply Facilities Work Plan and associated proposed amendments to the Comprehensive Plan was approved for transmittal to the Florida Department of Community Affairs (DCA) for review. On February 20, 2009, the City received an Objections, Recommendations and Comments (ORC) Report from the DCA. This ORC also stated the City had 60 days from receipt of this report to act on this Water Supply Facilities Work Plan by either choosing to adopt, adopt with changes, or not adopt the plan.
Recommendation:
Staff is requesting City Council's final approval and adoption to transmit said documents to the Florida Department of Community Mfairs and other reviewing agencies for compliance review.
This report qualifies as the lO-year Water Supply Facilities Work Plan and includes the necessary amendments to the Goals, Objectives, and Policies and addresses concerns in the ORC which are highlighted in yellow and underlined in the report and attached documents, that must also be adopted by the City Council for transmittal to the Florida Department of Community Affairs at a public hearing.
2
ORDINANCE NO. 08·26
AN ORDINANCE OF THE CITY OF SOUTH DAYTONA, VOLUSIA COUNTY, FLORIDA, RELATING TO COMPREHENSIVE PLANNING; PROVIDING FOR AMENDMENTS TO THE COMPREHENSIVE PLAN TO INCORPORATE THE CITY'S 10-YEAR WATER SUPPLY FACILITIES WORK PLAN; AMENDING THE FUTURE LAND USE ELEMENT, INTERGOVERNMENTAL COORDINATION ELEMENT, CONSERVATION ELEMENT, COASTAL MANAGEMENT ELEMENT, PUBLIC UTILITIES ELEMENT, AND CAPITAL IMPROVEMENTS ELEMENT IN ACCORDANCE WITH FLORIDA STATUTES; PROVIDING FOR REPEAL OF ALL ORDINANCES AND PARTS OF ORDINANCES IN CONFLICT HEREWITH; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City of South Daytona, Florida desires to ensure that the City's Comprehensive Plan be amended to include a Water Supply Facilities Work Plan that is consistent with and reflects changes mandated by State law; and
WHEREAS, the City of South Daytona, Florida has the authority to amend its Comprehensive Plan pursuant to Chapter 163, Part II, Florida Statutes; and
WHEREAS, amendments relating to Water Supply Facilities planning are exempt from the limitation on frequency of comprehensive plan amendments in accordance with 163.3177(6)(c), Florida Statutes; and
WHEREAS, the Land Development Regulation Board acting as the designated Local Planning Agency, has reviewed the proposed Water Supply Facilities Work Plan and associated proposed amendments to the Comprehensive Plan, held an advertised public hearing on November 19, 2008, providing for public participation in the process; and rendered its recommendation to the City Council of South Daytona; and
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF SOUTH DAYTONA, VOLUSIA COUNTY, FLORIDA:
Section I. The City Council hereby authorizes transmittal of proposed Comprehensive Plan amendments relating to water supply facilities planning, including the City'S proposed lO-year Water Facilities Supply Work Plan, in accordance with Chapter 163, Part II, Florida Statutes. The text of the proposed amendments is attached hereto and by reference incorporated herein.
(
Section 2. The City Manager or his designee is hereby directed to immediately transmit the proposed amendments to the Department of Community Affairs and to provide a copy of the proposed amendments to the Regional Planning Council, the St. Johns Water Management District, the County of Volusia, the Florida Departments of State, Transportation, and Environmental Protection, and to any requesting agency, in accordance with the requirements of Chapter 163.3184(3)(a), Florida Statutes. The transmittal package to the Department of Community Affairs shall comply with Rule 9J-11.006(1), Florida Administrative Code.
Section 3. All ordinances made in conflict with the Ordinance are hereby repealed to the extent of such conflict.
Section 4. If any section, subsection, sentence, clause, phrase, or portion of this Ordinance, or application hereof, is for any reason held invalid or unconstitutional by an Court, such portion or application shall be deemed a separate, distinct, and independent provision, and such holding shall not affect the validity of the remaining portions or application hereof.
Section 5. The effective date of the Comprehensive Plan Amendments adopted by this Ordinance shall be the date a final order is issued by the Florida Department of Community Affairs effective upon completion of the Intergovernmental approval process for Comprehensive Plan Amendments and the final order is issued by the Department of Community Mfairs.
PASSED at the first reading at a regular meeting of the City Council of the City of South Daytona held in the City of South Daytona, Florida on the 9th day of
Ik.enber , 2008.
PASSED AND ADOPTED upon second and final reading at a regular meeting of the City Council of South Daytona held in the City of South Daytona, Florida on the ___ _ day of , 2009.
ATTEST:
JOSEPHW. YARBROUGH City Manager
APPROVED AS TO FORM:
SCOTT E. SIMPSON City Attorney
SIGNED:
BLAINE O'NEAL, MAYOR
NOTICE OF PUBLIC HEARING TO ADOPT LARGE SCALE AMENDMENT TO
THE CITY OF SOUTH DAYTONA COMPREHENSIVE PLAN
The City Council of the City of South Daytona proposes to adopt the following ordinance:
ORDINANCE NO. 08-26
AN ORDINANCE OF THE CITY OF SOUTH DAYTONA, VOLUSIA COUNTY, FLORIDA, RELATING TO COMPREHENSNE PLANNING; PROVIDING FOR AMENDMENTS TO THE COMPREHENSNE PLAN TO INCORPORATE THE CITY'S lO-YEAR WATER SUPPLY FACILITIES WORK. PLAN; AMENDING THE FUTURE LAND USE ELEMENT, INTERGOVERNMENTAL COORDINATION ELEMENT, CONSERVATION ELEMENT, COASTAL MANAGEMENT ELEMENT, PUBLIC UTILITIES ELEMENT, AND CAPITAL IMPROVEMENTS ELEMENT IN ACCORDANCE WITH FLORIDA STATUTES; PROVIDING FOR REPEAL OF ALL ORDINANCES AND PARTS OF ORDINANCES IN CONFLICT HEREWITH; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE.
The public hearing on the second and final reading to adopt the proposed ordinance will be considered for approval and transmittal to the Florida Department of Community Affairs and other reviewing agencies by the South Daytona City Council on March 10, 2009 at 6:00 PM in the Council Room in City Hall located at 1672 S. Ridgewood Avenue, South Daytona, Florida. The proposed ordinance and documents may be inspected by the public at the Community Development Department or City Clerk's Office at City Hall, between the hours of 8:00 AM and 4:30 PM weekdays. Interested parties may appear at this public hearing and provide comments regarding the proposed ordinance. For additional information, contact the Community Development Department at (386) 322-3020.
The proposed ordinance will consider amending the City of South Daytona Comprehensive Plan to incorporate a 10-year Water Supply Facilities Work Plan. Included are text amendments to the Future Land Use Element, Intergovernmental Coordination Element, Conservation Element, Coastal Element, Public Utilities Element, and Capital Improvements Element of the City of South Daytona Comprehensive Plan, in accordance with State law.
If a person decides to appeal any decision made by the City of South Daytona City Council with respect to any matter considered at the above referenced public hearing, he/she will need a record of the proceedings. For such purposes, it may be necessary to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. The City Council assumes no responsibility for furnishing said record, however, the hearings will be audio recorded by the City Council for public use.
Note: Individuals covered by the Americans with Disabilities Act of 1990 in need of accommodations for the public meeting should contact the Office of the Deputy City Clerk at 1672 S. Ridgewood Avenue, South Daytona, FL 32119, telephone (386) 322-3011 at least five working days prior to the meeting.
CITY OF SOUTH DAYTONA
WATER SUPPLY FACILITIES WORK PLAN AND COMPREHENSIVE PLAN AMENDMENTS
DCA NO. 09-RWSPl
RESPONSE TO THE DEPARTMENT OF COMMUNITY AFFAIRS (DCA)
OBJECTIONS, RECOMMENDATIONS, AND COMMENT REPORT
March 10, 2009
The Department of Community Mfairs completed its review of the proposed Comprehensive Plan Amendment (DCA 09-RWSP1) and has supplied the City with three objections in their Objections, Recommendations, and Comments Report (ORC). Staff has prepared responses to the objections and recommendations as stated below.
Objection #1: Alternative Water Supply (AWS), Conservation and Reuse Planning:
DCA Objection: The City has not proposed to adopt any policies regarding the Implementation of the City's A WS project (s) into the Comprehensive Plan or work plan. The City communicated to the Water Management District (WMD) that it selected single entity project 49, "South Daytona Reclaimed Water System Expansion, and the WMD found this project sufficient in July 2007. Additionally, the work plan does not describe any reuse, water conservation practices or nonpotable water supply projects.
[Section 163.3164(32), 163.3167(13), 163.3177(2), (6)(a), (c) and (d) Rule 9J-5.011(2)(b). F.AC.]
DCA Recommendation: The City should adopt policies regarding the implementation of the City's A WS project(s) into the work plan and the Comprehensive Plan. In the work plan, the City should describe the project(s) including how much water the project(s) will generate. If the project(s) are being implemented within the five year planning period, they must be included in the schedule of capital improvements in the Capital Improvement Element (CIE) and demonstrate financial feasibility pursuant to Section 163.3164(32), F.S. The City should describe all agreements related to the development of A WS, as well as the need to establish, maintain or revise the agreements.
Additionally, the City should describe any existing or proposed reuse or nonpotable water supply project that will be implemented in the planning period in the work plan. Reuse projects must be implemented through policies in the Comprehensive Plan, and be listed in the schedule of capital improvements and be financially feasible pursuant to Section 163.3164(32), F.S.
The City should also include adequate conservation practices in the work plan. The practices described in Conservation Element policies 3-2, 3-3, and 3-4 should be included in the work plan.
City Response to DCA Objection # 1:
The Work Plan has been revised to include the adjusted reclaimed water use for the phased system in the Ridgewood Avenue corridor. The projected time and funding for each phase of the Ridgewood Avenue Reclaimed water project has been clarified in both the work plan and the CIS. Practices described in Conservation Element policies 3-2, 3-3, and 3-4 have been included in the work plan.
2
Objection #2: Concurrency:
DCA Objection: The City's Capital Improvements Element Policy 3-2 states that public facilities must in place or under construction at the time a development order is issued, or in place at the time of project impact or construction will begin within one year of issuance of the development order. This is not consistent with Section 163.3180(2)(a), F.S., which states that adequate water supplies and facilities must be available no later than the issuance of a certificate of occupancy, or its functional equivalent. Additionally, the City does not have policies to ensure coordination with the City's water suppliers during the permit review process.
[Section 163.3167(13), Sections 163.3177(3)(a) and (6)(a), (c) and (h); 163.3180(2)(a), F.S.; Rule 9J-5.005(6), 9J-5.0055(1)(d) and (3)(a), 9J-5.016(3)(c) 5 and 6, F.A.C.]
DCA Recommendation: Revise Policy 3-2 of the CIE to state that the City shall not issue development orders to permits without first consulting with the City's water suppliers to determine whether adequate water supplies exist to serve the development, no later than the anticipated date of issuance of a certificate or occupancy, or its functional equivalent.
City Response to DCA Objection #2:
Policy 3-2(C)(4) of the CIE has been revised to state that the facility/service shall be available no later than the issuance of a certificate of occupancy, or its functional equivalent.
Objection #3: Coordination:
DCA Objection: The City has not proposed to amend the Intergovernmental Coordination Element (ICE) to ensure coordination with the WMD regarding water supply planning. Section 163.3177(6)(h)1, F.S. requires a local government's ICE to provide guidelines to be used to accomplish coordination with the applicable regional water supply plan. In addition, Section 163.3177(6), F.S. requires a local government to update their water supply plan every five years within 18 months after the water management district enacts an updated regional water suppl y plan.
[163.3177(4)(a), (6)(a), (c), (d) and (h), F.S.; Rule 9j-5.011(2)(b)2 and 4, Rule 9J-5.015(1) and (3)(c), F.A.C.]
DCA Recommendation: The City should revise the ICE of the Comprehensive Plan to state that the City will maintain a water supply plan that is coordinated with the WMD, and that the City shall update its water supply plan within 18 months of an update to the WMD's regional water supply plan.
3
City Response to DCA Objection #3:
Policy 2-9 has been added to the ICE and states that: The City will maintain a Water Supply Plan that is coordinated with the Water Management District and the City will update its Water Supply Plan every five years within 18-months after the Water Management District enacts an updated Regional Water Supply Plan.
DCA Comment #1: The work plan does not reference existing or proposed policies that provide for coordination with the City of Daytona Beach regarding the existing water supply agreement. Policies that enable coordination are required to ensure that the City has adequate water supply to accommodate its existing and projected population.
Additionally, the work plan does not reference proposed or existing policies enabling coordination with the East Volusia Regional Water Authority. The work plan should be revised to reference existing or proposed policies, specifically Policies 4-1 and 4-6 of the Intergovernmental Coordination Element, and Policy 3-1 of the Public Utilities Element. Additionally, the work plan should describe the City's participation as a member of the East Vol usia Regional Water Authority and reference enabling language in the Comprehensive Plan.
City Response to Comment #1:
The work plan has been revised to reference existing policies, specifically Policies 4-1 and 4-6 of the Intergovernmental Coordination Element, and Policy 3-1 of the Public Utilities Element.
DCA Comment #2: The City has not addressed all projects listed on the schedule of capital improvements in the work plan. The City should revise the work plan to describe all the water supply projects in the capital improvements schedule. The following projects were not included in the work plan, but are listed in the schedule: Palm Grove SewerIWater System, Chlorine Booster Station, and West Nova Road Water Main. Any other projects that will be implemented in the planning period (2025) to maintain level of service standards (LOSS) should also be described in the work plan, and be included in the schedule of capital improvements if occurring in the first five years.
City Response to Comment #2:
All of the water facilities projects as shown on the City'S Capital Improvements Schedule (CIS) have been further described in the water plan. The Palm Grove Water & Sewer project currently shown on the CIS is only the stormwater phase of a water and sewer project completed back in 2005. No other projects are currently proposed to maintain level of service standards within the City in the planning period (2025).
4
In addition to the above revisions and as recommendations made by the St. Johns River Water Management District, the following have been added to the Water Supply Facilities Plan:
1. Map (Figure 4.3) has been added to show the non-potable water service area in the City.
2. The Water Supply Facilities Plan now references Intergovernmental Coordination Element policy 4-6.
3. The projected reclaimed water use for project 49 has been adjusted and is now consistent with DWSP 200S that states the project will generate 0.14 million gallons per day (first phase).
4. All potable water projects in the CIS are now described in the Water Supply Plan, S. The Water Supply Plan now includes the practices based on the Comprehensive
Plan Policies, specifically Conservation Element Policy 3-2, 3-3 and 3-4.
S
CITY OF SOUTH DAYTONA
WATER SUPPLY COMPREHENSIVE PLAN AMENDMENTS
AND WATER SUPPLY FACILITIES WORK PLANS
City of South Daytona, Florida Community Development
November 2008
Revised March 2009
TABLE OF CONTENTS
Contents
I. Introduction
II. Statutory Requirements
III. Water Supply Planning Requirements
IV. Water Supply Work Plan
Service Area Area Description Area Land Use Service Area Boundaries
Existing and Alternative Water Sources Historical and Projected Use Potable Water Supply Quality Regional Water Supply Planning Coordination with Water Suppliers Alternative Water Supply
Potable and Reclaimed Water Systems Existing Potable Water System Proposed Water Facilities Capital Improvements Potable Water Local Interconnections Coordination with Potable Water Suppliers Water Supply Conservation Practices Approach to the Use of Reclaimed Water Reclaimed Water Availability Proposed Capital Improvements Reclaimed Water Distribution System
ATTACHMENTS
Attachment A: 5-year Capital Improvements Plan
Page
2
2
4
6
6 7 9
11 15 20 21 22
23 24 25 25 25 26 28 28 29
Attachment B: S1. Johns River District Water Supply Plan - Second Addendum
10f29
I. INTRODUCTION
Four of Florida's five Water Management Districts have determined that traditional
water supply sources currently used in their districts will not be sufficient to meet the
demands of the growing population and the needs of the environment, agriculture and
industry over the next twenty years. Only the Suwannee River Water Management District
has concluded that its traditional water supplies will be sufficient to serve the district's needs
over the next twenty years. As potential limitations on the continued use of traditional water
supplies became increasingly apparent in recent years, the Florida Legislature enacted bills
in 2002, 2004 and 2005 to more effectively address the state's water supply needs by
improving the coordination between local land use planning and water supply planning. The
focus of the 2002 legislation was to add requirements to Chapter 163, Florida Statutes
(F.S.), for local governments to prepare 10-year water supply facilities work plans and to
incorporate the work plans into their comprehensive plans. This legislative change
emphasized the need for local comprehensive plans to consider the applicable regional
water supply plans prepared by the water management districts. In 2004, the Legislature
further amended Chapter 163 to give local governments until December 1, 2006, to prepare
the 10-year water supply facilities work plans.
In 2005, the Florida Legislature Significantly changed Chapters 163 and 373, F.S., to
improve the coordination of water supply and land use planning. Senate Bills 360 and 444
strengthened the statutory linkage between the regional water supply plans prepared by the
water management districts and comprehensive plans prepared by the local governments.
Implementation of the new water supply planning requirements will ensure that adequate
water supplies and public facilities are available to serve the water supply demands of
Florida's growing population.
II. STATUTORY REQUIREMENTS
With regard to water supply, current statutory provisions direct the City of South
Daytona to:
1. Coordinate appropriate aspects of its comprehensive plan with the St.
Johns River Water Management District's regional water supply plan.
2. Ensure that the City of South Daytona's future land use plan is based upon
the availability of adequate water supplies and public facilities and services. With
appropriate data and analysis, demonstrate that adequate water supplies and
associated public facilities will be available to meet the projected growth demands
20f29
and this information must accompany all proposed Future Land Use Map
amendments submitted to the Department for review. The submitted package must
also include an amendment to the Capital Improvements Element, if necessary, to
demonstrate that adequate public facilities will be available to serve the proposed
Future Land Use Map modification.
3. Ensure that adequate water supplies and facilities are available to serve
new development no later than the date on which the local government anticipates
issuing a certificate of occupancy and consult with the City of Daytona Beach as the
water supplier, prior to approving a building permit, to determine whether adequate
water supplies will be available to serve the development by the anticipated issuance
date of the certificate of occupancy.
4. The City of South Daytona shall revise the General Sanitary Sewer, Solid
Waste, Drainage, Potable Water, and Natural Groundwater Aquifer Recharge
Element (the "Infrastructure Element"), within 18 months after the Water
Management District approves an updated regional water supply plan, to:
a. Identify and incorporate the alternative water supply
project(s) selected by the local government from projects identified in
the updated regional water supply plan, or the alternative project
proposed by the local government;
b. Identify the traditional and alternative water supply projects,
bulk sales agreements, and the conservation and reclaimed water
programs necessary to meet current and future water use demands
within the local government's jurisdiction; and
c. Include a water supply facilities work plan for at least a 10-
year planning period for constructing the public, private, and regional
water supply facilities identified in the element as necessary to serve
existing and new development. Amendments to incorporate the water
supply facilities work plan into the comprehensive plan are exempt
from the twice-a-year amendment limitation.
5. Revise the Five-Year Schedule of Capital Improvements to include any
water supply, reclaimed water, and conservation projects and programs to be
implemented during the five-year period.
30f29
6. To the extent necessary to maintain internal consistency after making
changes described in Paragraphs 1 through 5 above, revise the Conservation
Element to assess projected water needs and sources for at least a 10-year planning
period, considering the appropriate regional water supply plan(s) or, in the absence
of an approved regional water supply plan, the applicable District Water
Management Plan, as well as applicable consumptive use permit. If the established
planning period of a comprehensive plan is greater than ten years, the plan must
address the water supply sources necessary to meet and achieve the existing and
projected water use demand for the established planning period, considering the
appropriate regional water supply plan.
7. To the extent necessary to maintain internal consistency after making
changes described in Paragraphs 1 through 5 above, revise the Intergovernmental
Coordination Element to ensure coordination of the comprehensive plan with
applicable regional water supply plans and regional water supply authorities' plans.
8. Address in the Evaluation and Appraisal Report (EAR), the extent to which
the local government has implemented the 10-year water supply facilities work plan,
including the development of alternative water supplies, and determine whether the
identified alternative water supply projects, traditional water supply projects, bulk
sales agreements, and conservation and reclaimed water programs are meeting
local water use demands.
III. WATER SUPPLY PLANNING REQUIREMENTS
Effective July 1, 2005, all local governments must meet water supply concurrency
requirements and ensure that their future land use plans (the Future Land Use Element and
Future Land Use Map) are based upon the availability of adequate water supplies and
associated public facilities. All local governments are advised to update their
comprehensive plans and land development regulations as soon as possible to address the
water supply concurrency requirement. Data and analysis to demonstrate that adequate
water supplies and associated public facilities are, or will be available to meet projected
growth demands must accompany all proposed Future Land Use Map amendments
submitted to the Department for review.
Local governments subject to a regional water supply plan must revise their
comprehensive plans within 18 months after the water management district approves a
regional water supply plan or its update, to ensure that:
40f29
The Infrastructure Element identifies altemative and traditional water supply
projects, and conservation and reclaimed water programs necessary to meet the
projected water demands identified within the local government's jurisdiction;
incorporates the altemative water supply project(s) the local government has
selected from the regional water supply plan or proposed as an alternative under s.
373.0361 (7)(b), F.S.; and includes a minimum 10-year work plan for building public,
private, and regional water supply facilities necessary to serve existing and new
development.
The Capital Improvements Element addresses the need for and location of
public facilities, including those identified in the 10-year water facilities work plan.
The financially feasible Five-Year Schedule of Capital Improvements must describe
projects listed in the 10-year work plan that are to be implemented in the first five
years of the plan, including both publicly and privately funded water supply projects
that are necessary to ensure that adopted level-of-service standards are achieved
and maintained.
The Conservation Element includes an assessment of current and projected
water needs and sources for a minimum 10-year period, considering the appropriate
regional water supply plan and consumptive use permit. If the established planning
period of the comprehensive plan is greater than ten years, the assessment must
address the water supply needs and sources for the longer planning period.
The Intergovernmental Coordination Element addresses coordination of the
comprehensive plan with the applicable regional water supply plan(s) and regional
water supply authorities' plans. For local govemments that lie within more than
one water management district, the due date for adopting the amendments is 18
months from the approval date of the last regional water supply plan (or update)
applicable to the local government. See Attachment A for a map depicting areas
that are subject to regional water supply plans. Attachment B identifies the dates by
which amendments to local comprehensive plans must be adopted to incorporate
the 10-year water supply facilities work plans. See Attachment C for an overview of
regional water supply plans.
Local governments that are not subject to a regional water supply plan must address the
following in their next Evaluation and Appraisal Reports (EARs) and adopt the necessary
EAR-based amendments to ensure that:
50f29
The Conservation Element identifies the current and projected water needs
and sources for a minimum 10-year period, considering the appropriate district water
management plan, consumptive use permit and associated water supply
assessment reports. If the established planning period of a comprehensive plan is
greater than ten years, the assessment must address the water supply needs and
sources for the longer planning period.
The Intergovernmental Coordination Element addresses coordination with
regional water supply authorities, where the local government is served by a regional
water supply authority. See Section F for additional information about addressing
water supply issues in Evaluation and Appraisal Reports.
IV. WATER SUPPLY WORK PLAN
Service Area:
Area Description:
South Daytona is a small Halifax River City (13,547 residents) located between the
much larger cities of Daytona Beach and Port Orange. It once was mainly an agricultural
community engaged in orange growing and vegetable gardening because the land was
particularly suited for those types of agriculture. The City of Daytona Beach annexed the
community around 1926. However, the local residents became upset about the new taxes
and other levies and obtained legal assistance to "undo" the annexation. In 1938 they
succeeded in getting the annexation rescinded and formally established the Town of South
Daytona.
After the end of World War II, the Town established a building department, and soon
after, a Planning and Zoning Board. During this time, the town was able to obtain federal
assistance for the expansion of utility infrastructure. South Daytona was the first community
in the Halifax area, after Daytona Beach, to begin installing a sanitary sewer collection
system.
In 1951 the Town incorporated as the City of South Daytona. Since 1980, the City
has operated under a Council/Manager form of government. Starting in 1990 the Mayor and
four Council members, all elected at-large, had their staggered terms of office increased
from two years to four years.
The City has expanded its land area through annexation---there was one major
annexation in the 1970's and another one in 2002. However, since the City is virtually
60f29
"boxed-in" the only remaining annexation opportunities would be through voluntary
annexation of a few acres on the west side of Nova Rd.
The City has grown from a population of approximately 2,000 residents in 1960 to a
year 2007 estimate of 13,547---however, the potential for future geographic and population
growth is severely limited. Most of the available residential land already has housing, with
the main exception of approximately 50 acres in the US1 Redevelopment District which are
zoned for high-density condominium projects (though it is questionable whether most of
them will ever be constructed with the large number of units proposed). Therefore, the
maximum future population within the City limits probably will never increase to much over
16,000 persons, ifthat.
The existing water service area encompasses the entire incorporated limits of the
City of South Daytona. When the City began developing the utilities infrastructure, a
wholesale supply agreement was reached with Daytona Beach for South Daytona's potable
water and wastewater treatment needs. This agreement has been modified over the years,
but Daytona Beach still remains South Daytona's primary source for its water and
wastewater needs. A location map depicting the City of South Daytona in relation to the
adjacent cities in the greater Halifax area is shown in Figure 1-1.
Area Land Use:
The City of South Daytona covers a land area of approximately 3.75 square miles,
with a year -2000 Census population of 13,177 and an estimated population on April 1, 2007
of 13,547 (BEBR estimate). The City contains approximately 6,570 dwelling units, including
about 943 mobile homes.
South Daytona was incorporated in 1951, but most of its growth has occurred since
1970, when the population was only about 5,000 persons. Despite spurts of growth during
the 70's, 80's, and early 90's, during the past decade it has been one of the slowest growing
cities in Volusia County due to its small size and largely built-out character. Unless the City
gains significant population as a result of high-density condo construction along the river
and mixed-use redevelopment in the Sunshine Park Mall area or elsewhere in the
Redevelopment District, this slow growth is likely to become a longer-term trend given that
the City has very little vacant land left for development, along with the fact that very little
residential land adjacent to the City limits is available for annexation.
Because the City's land area is over 90% developed, the major opportunity for
growth is now redevelopment of older properties, especially within the Ridgewood Corridor
70f29
t N HOLLY
HILL
ORMOND BEACH
DAYTONA BEACH
VOLUSIA COUNTY I"
CITY OF SOUTH DAYTONA LOCATION MAP
Halifax River
Atlantic Ocean
DAYTONA BEACH SHORES
PORT ORANGE
FIGURE 1-1
(U.S.-1) Community Redevelopment Area (CRA), which was created in 1987 and covers
about 25% of the land area of the City. A few years ago, Halifax River shoreline properties
in the CRA attracted developers proposing to construct high-density, high-rise condominium
projects, which could ultimately increase the City's population by several thousand
inhabitants, However, even though the City has entered into development agreements for
six such projects, only one (Halifax Landing with 186 dwelling units) is now constructed.
The other projects are currently problematic due to a market characterized by weak demand
for an over-supply of condominium units.
Table 4-'1 below provides a breakdown of current city-wide land uses.
LAND USE
Residential
Density Range 1
Density Range 2
Density Range 3
Density Range 4
Mobile Homes
Commercial
Industrial
Parkland
I * Public
** Other
Total
TABLE 4-1
EXISTING GROSS ACREAGE BY LAND USE
MAY, 2007
CITY OF SOUTH DAYTONA
ACRES PERCENT
1378 57.00% (excludes streets)
520 21.40% (single-family)
516 21.30% (single-family)
132 5.40% (Iow-density multi-family)
40 1.60% (high-density multi-family)
170 7.00%
292 12.02%
168 6.94%
10 24.20%
289 11.90%
196 7.94%
2,425 100.00%
Note: * "Public" includes street rights-of-way, except arterial roadways ..
** "Other" includes churches, private schools, railroad r/w, arterials, etc.
Source: City Community Development Dept.
Service Area Boundaries:
The service area boundaries for the City of South Daytona's potable water
di~tribution system are consistent with and bounded by the City Limits. The City is
comprised of 5.19 square miles and the potable water system covers the entire service
area. See Figure 4-1.
90f29
Halifax River
GIW'IIIC SC.wl
"kaMa""- T T
SKETCH OF DESCRIPTION CORPORATE LIMITS OF SOUTH DAYTONA, FLORIDA SEPTEMBER 30, 2008
FIGURE 4-1
Existing and Alternative Water Source:
Historical and Projected Use:
As mentioned earlier in the report, the population of the City of South Daytona was
approximately 2000 persons in 1960. The City of South Daytona has always purchased
wholesale potable water from Daytona Beach and in 1960 the estimated annual average
daily flow was approximately 254,000 gallons per day or about 93 gallons per day per
capita. As population increased so did the City's demand for potable water. The following
chart shows the annual average daily flow per equivalent residential connection (ERC) for
potable water purchased from the City of Daytona Beach. As you can see, the annual
average daily flow reached a peak of 231.0 gallons per service per day in 1999/2000 fiscal
year and was the lowest in the fiscal year 2006/2007 with 187.0 gallons per day per ERC.
With conservation methods and improved fixture units, the ERC usage has had a downward
trend over the past 10 years decreased to 208.0 gallons per service per day in 2007/2008.
City of SOUTH DAYTONA Daily Use per Equivalent Residential Connection
250 >-m 200 Q ... Q) 150 Q.
l:""!::FIOW! In 100 c
0
m 50 0
0
Figure 4·2
As shown in figure 4-2, between fiscal years 1999/2000 and 2001/2002, South
Daytona recorded a reduction in water usage of approximately 12%. This reduction was
based on the City of Daytona Beach reading the three wholesale meters at South Daytona's
City limits. At the time neither South Daytona nor Daytona Beach could explain this drop in
water usage nor this initiated several investigations by South Daytona to determine the
11 of29
cause of this reduction. According to Daytona Beach, the billing for wastewater treatment
during this period of time to South Daytona also dropped by approximately the same rate.
In talks with Daytona Beach, it was clear that there was no reasonable explanation for this
reduction. The three wholesale potable water meters were recalibrated; wastewater flows
were recorded by City staff as a correlation to water usage and canvassing local contractors
to determine if major repairs were made within the Daytona Beach water and sewer
systems that would explain this reduction in water usage.
III c 0
m (!) c :c 0
"-
1,200,000 1,150,000 1,100,000 1,050,000 1,000,000
950,000 900,000
CITY of SOUTH DAYTONA Average Annual Daily Water Usage
Figure 4·3
I-+-Flowl
As shown in this data, the usage per service connection has declined over the past
eleven years and also has the overall annual average daily usage. With a prOjected
population in 2025 for the City of South Daytona at 16,146 persons as shown in the 2008
Adopted Evaluation and Appraisal Report (EAR), the projected average annual daily water
usage for the year 2025 using 2.6 persons per ERC, the average equates to 6,210 service
connections with an average daily use of 214 gallons per service per day, would be
1,328,940 gallons per day. Using a peak factor of 120%, the maximum daily usage could
reach about 1,600,000 gallons per day. The City of Daytona Beach has more than
accounted for this usage with their projected growth for South Daytona well in excess of
23,000 persons in 2025 with a daily annual average of 2,300,000 gallons per day and a
peak daily average of 2,875,000 gallons per day.
120f29
Table 4-2 below provides a Past and Projected Potable Water Usage.
TABLE 4-2
CITY OF SOUTH DAYTONA
EXISTING AND PROJECTED POPULATIONS
WITH RECORDED AND PROJECTED POTABLE WATER USAGE
YEAR POPULATION PROJE~TED POPULATION WATER USAGE PROJECTED USAGE**
1980 11,252
1990 12,488
2000 13,177
2005 13,955
2008 13,148
2010 14,502
2015 15,050
2020 15,597
2025 16,146
•• Based on 2.6 persons per ERC and 214 gpd/ERC
1,001,428 gal.
1,089,163 gal.
1,149,255 gal.
1,059,189 gal.
1,051,856 gal.
1,193,626 gal.
1,238,731 gal.
1,283,753 gal.
1,328,940 gal.
The City of Daytona Beach water service area population was 80,628 (BEBR) in 2005,
including the City of South Daytona and a portion of Daytona Beach Shores. The City of
Daytona Beach has maintained a steady growth rate since the automobile races began in
1902. The historical populations are listed in Table 1-2. It should be noted that several
different sources for population figures were used during this time period and this is
responsible for the appearance of the erratic annual figures.
Population projections for Daytona Beach and South Daytona:
Population projections for Daytona Beach:
2000(census) 2005(BEBR) 2010 64,112 65,119 69,432 Source - U.S. Census, BEBR, TMH Consulting
1995 2015 2020 2025 63,258 67,620 68,730 69,681 Source - Affordable Housing Needs Assessment(AHNA)
13 of29
2015 75,736
2020 78,040
2025 82,344
Population projections for South Daytona:
2000(census) 2005(BEBR) 2010 13,177 13,955 14,502 Source - U.S. Census, BEBR, TMH Consulting
2015 15,050
1995 2015 2020 2025 12,889 13,900 14,154 14,375 Source - Affordable Housing Needs Assessment(AHNA)
2020 15,597
2025 16,146
Population projections for portions of Daytona Beach Shores served by Daytona Beach (approx. 1/3 served water by Daytona Beach, 2/3 by Port Orange):
2000(census) 2005(BEBR) 2010 1,433 1,554 1,606 Source - U.S. Census, BEBR, TMH Consulting
2015 1,659
1995 2015 2020 2025 893 1,376 1,499 1,617 Source - Affordable Housing Needs Assessment(AHNA)
2020 1,711
2025 1,764
The well field firm capacity for the City of Daytona Beach is 28.2 MGD, the water treatment
plant capacity is 24 MGD and the current CUP allocation is 16.16 MGD. Using the water
treatment plant capacity of 24 MGD, the following water capacity is still available.
2000 2005 2010 2015 2020 2025 MGD Total 24 24 24 24 24 24
MGD Used 11.80 12.09 12.84 13.86 14.39 15.03
MGD Available 12.20 11.91 11.16 10.14 9.61 8.97
Based on the above analysis, adequate potable water supply will be available to meet future
population growth within the City of Daytona Beach service area. It should be noted that
these projections of available water capacity do not reflect reductions in water needs that
can be expected from conservation efforts and continued and increased utilization of
reclaimed water. As water conservation and water reclaimed water programs are further
strengthened and implemented, adequacy of the water supply available will extend well
beyond this planning horizon.
14 of29
Potable Water Supply Quality:
The potable water supply for South Daytona is supplied by the City of Daytona
Beach. Daytona Beach currently has one water treatment facility; the Ralph Brennan WTP
and this facility is located off of LPGA Boulevard. This water treatment facility is a lime
softening plant that was initially constructed in 1975 with later retrofits in 1986 and has a
current permitted average daily capacity of 24.0 million gallons per day. The lime softening
treatment consists of: coagulation, flocculation, and sedimentation. Calcium carbonate is
produced as a waste product at a rate of two parts of sludge for every one part of lime
added. Sodium Fluosilicate is added to the water to increase fluoride levels and liquid
phosphate is added to reduce the corrosive tendency of the softened water in the
distribution system.
The raw water for this treatment system is currently withdrawn from the upper
Floridan Aquifer by means of 26 supply wells with an average depth of 250 feet. The
following test results reflect the latest full analysis for the potable supply.
City of Daytona Beach Water Test Results Performed in 2007
Analysis Report by Southern Analytical Laboratories, Inc. August 21, 2007
Inorganic Contaminants 62-550.310(1)
Contaminant Contaminant Analysis 10 Name MCl Units Result Qualifier*
1040 Nitrate (as N) 10 mg/L 0.002 U 1041 Nitrite (as N) 1 mg/L 0.005 U 1005 Arsenic 0.01 mg/L 0.001 U 1010 Barium 2 mg/L 0.023 I 1015 Cadmium 0.005 mg/L 0.001 U 1020 Chromium 0.1 mg/L 0.01 U 1024 Cyanide 0.2 mg/L 0.005 U 1025 Fluoride 4 mg/L 0.20 1030 Lead 0.015 mg/L 0.001 U 1035 Mercury 0.002 mg/L 0.0001 U 1036 Nickel 0.1 mg/L 0.02 U 1045 Selenium 0.05 mg/L 0.001 U 1052 Sodium 160 mg/L 35 1074 Antimony 0.006 mg/L 0.001 U 1075 Beryllium 0.004 mg/L 0.002 U 1085 Thallium 0.002 mg/L 0.001 U
*Qualifiers: U Analyte was undetected. Indicated concentration is method detection limit.
150f29
Secondary Contaminants 62-550.320 Contaminant Contaminant Analysis
10 Name MCl Units Result 1002 Aluminum 0.2 mg/L 0.1 1017 Chloride 250 mg/L 34 1022 Copper 1 mg/L 0.005 1025 Fluoride 2 mg/L 0.20 1028 Iron 0.3 mg/L 0.12 1032 Manganese 0.05 mg/L 0.010 1050 Silver 0.1 mg/L 0.01 1055 Sulfate 250 mg/L 1.5 1095 Zinc 5 mg/L 0.012 1905 Color 15 CU 20 1920 Odor 3 TON 1 1925 pH 8.5 7.2 1930 Total Dissolved Solids 500 mg/L 300 2905 Foaming Agents 0.5 mg/L 0.06
"Qualifiers: I The reported value is between the laboratory method
detection limit and the laboratory practical quantitation limit U Analyte was undetected. Indicated concentration is method
detection limit.
Disinfection Byproducts 62-550.310(3) Contaminant
10
2941 2942 2943 2944 2950
"Qualifier: U
Contaminant Analysis Name MCl Units Result
Chloroform N/A pg/L 0.2 Bromoform N/A pg/L 0.5 Bromodich loromethane N/A pg/L 0.3 Dibromochloromethane N/A pg/L 0.50 Total Trihalomethanes 80 pg/L 0.2
Analyte was undetected. Indicated concentration is method detection limit.
160f29
Qualifier*" U
U
I U
U
Qualifier*"
U U U U U
Radionuclides 62-550.310(6)
Analysis Contaminant 10
Contaminant Name MCl Units Result Qualifier*
4002 Gross Alpha (Incl. Uranium) ...... pCilL 2.5 4006 Combined Uranium 20 pCi/L 0.6 4020 Radium-226 5" pC ilL 0.9 4030 Radium-228 5" pCi/L 0.7
"Combined Limit mlf the results exceed 5 pCi/L, a measurement for radium-226 is required.
U1 U1
If the results exceed 15 pCi/L, measurements for radium-226 and uranium are required.
"Qualifier: U1 Analyte was not detected, indicated concentration is method detection
limit. Radiochemistry MDL is sample specific and matrix dependent.
Volatile Organics 62-550.310(4)(a) Contaminant Contaminant Analysis
10 Name MCl Units Result Qualifier*
2378 1.2,4 Trichlorobenzene 70 pg/L 0.5 U 2380 cis-1, 2-Dichloroethylene 70 pg/L 0.2 U 2955 Xylenes (total) 10,000 pg/L 0.5 U 2964 Dich loromethane 5 pg/L 0.5 U 2968 o-Dichlorobenzene 600 pg/L 0.5 U 2969 para-Dichlorobenzene 75 pg/L 0.5 U 2976 Vinyl Chloride 1 pg/L 0.5 U 2977 1 ,1-Dichloroethylene 7 pg/L 0.5 U 2979 trans-1,2-Dichloroethylene 100 pg/L 0.5 U 2980 1,2-Dichloroethane 3 pg/L 0.2 U 2981 1,1.1-Trichloroethane 200 pg/L 0.3 U 2982 Carbon tetrachloride 3 pg/L 0.3 U 2983 1,2-Dichloropropane 5 pg/L 0.3 U 2984 Trichloroethylene 3 pg/L 0.2 U 2985 1,1,2-Trichloroethane 5 pg/L 0.3 U 2987 T etrach loroethylene 3 pg/L 0.2 U 2989 Monochlorobenzene 100 pg/L 0.5 U 2990 Benzene 1 pg/L 0.5 U 2991 Toluene 1,000 pg/L 0.5 U 2992 Ethylbenzene 700 pg/L 0.5 U 2996 Styrene 100 pg/L 0.5 U
"Qualifier:
U Analyte was undetected. Indicated concentration is method detection limit.
170f29
Other Contaminants
Contaminant 10
*Qualifier:
Contaminant Name
Enterococcit100 ml Calcium Magnesium Potassium Bicarbonate Alkalinity as CaC03 Fecal Coliform Total Coliform Corrosivity @ 20C Corrosivity@ 57.2C Total Alkalinity as CaC03 Calcium Hardness as CaC03 Corrosivity @ 32.2C
Analysis MCl Units Result
mgtl mgll mgll
mgll
mg/l mgll
1 100 8.5 1.0
280 Absent Absent
0.1 0.64 280 250
0.25
Qualifier*
U.S23
U
U.S23 Analyte was undetected. Indicated concentration is method detection limit. Analysis subcontracted to Volusia County Environmental Health Lab Analysis, FLOOH Cert. No. E23111.
U Analyte was undetected. Indicated concentration is method detection limit.
Inorganic Contaminants Contaminant .1)_0' !,.e!. ...... Level Range ."CI..". MCl pkely $o.,rce of an<tUnitCif $~p'it1g \(i,'~n .. QeteCted···· of Contamioation """urtrtl.m . ·..(bto.l~r.l .YLH·· I > .• iteaitit$ Fluoride (ppm) 07111/07 N 0.63 N/A 4 4 Erosion of natural
deposits; water additive which promotes strong teeth
Sodium (ppm) 07111/07 N 31 N/A N/A 160 Salt water intrusion leaching from soil
Nitrate (ppm) 07111/07 N 0.02 N/A 10 10 Runoff from fertilizer use; leaching from septic tanks, sewage; erosion of natural depoSits
18of29
q~mjrnmtand Dates of Mel· ... .Lever Range MClG MCLor Likely Source of Unit of
Sampling ViOlation ...
Oetected of or MROl Contamination MRDlG . ' M_utament
(mo.lyr.) YIN .... ResUlts ' .'
., ...•.. . . .. . Bromate (ppb) 1/07 - N 0.05 ND-5.0 N/A Mel= By-product of
12/07 10 drinking water disinfection
Chloramines and 1/07 - N 3.4 0.0-5.0 N/A MRDl Water additive Chlorine (ppm)
12/07 =4 used to control
microbes
I **Haloacetic Acids 1/1107, N 38.4 24.3- N/A Mel= By-product of • (five) (HAA5) (ppb)
12/31/07 52.5 60 drinking water
disinfection
*TTHM {Total 111107, N 35 32.0- N/A Mel= By-product of trihalomethanes}
12131/07 38.0 80 drinking water
(ppb) disinfection
*Total Trihalomethanes (TTHM) Some people who drink water containing trihalomethanes in excess of the MCl over many years may experience problems with their liver, kidneys, or central nervous system, and may have an increased risk of getting cancer.
**Haloacetlc Acids (HAAS) Some people who drink water containing haloacetic acids in excess of the MCl over many years may have an increased risk of getting cancer.
CITY OF SOUTH DAYTONA WATER TEST RESULTS 2007
. ..
i
I
Lik&lySoure& Of Contamination
01107-12107 For systems that Naturally present in collect <40 the environment samples per month: 1 positive monthl sam Ie
Important Information: The one positive sample occurred during the month of June. The Total Coliform Rule requires water systems to meet a strict limit for coliform bacteria. Coliform bacteria are usually harmless, but their presence in water can be an indication of disease.causing bacteria. When coliform bacteria are found, special followup tests are done to determine if harmful bacteria are present in the water supply. If this limit is exceeded, the water
! su lier must notif the ublic via news a er, teleVision, andlor radio.
Inorganic. Pat~9f) •. AL· •.••. .9Ottl #otsite& Mq.G Action Likely SOurce of Contaminants sampling. violation f'~ntile abOVeAL. level Contamination (Tapsatnples) I YiN Re$lJlts .
, ... . ... .... ..
Lead (ppb) 06/05- N 3 1 above AL 0 15 Corrosion of 07/05 out of 60 site household
samples plumbing system Copper (ppm) 06/05- N 0.08 o above AL 1.3 1.3 Corrosion of
07105 out of 60 site household samples plumbing system
190f29
I
Regional Water Supply Planning:
The 2005 Water Supply Plan as developed by the St. Johns River Water
Management District has projected that some locations within the District will likely approach
or even reach, sustainable limits within the 20-year planning horizon. Therefore, the District
has identified water supply development project options and water resource development
projects that will meet future water supply needs. Water supply projects for the City of
Daytona Beach identified in the 2005 water supply plan, which supplies South Daytona's
potable water, included the Daytona Beach reclaimed water reservoir, Daytona Beach
reclaimed water pipeline, and Daytona Beach reclaimed water system. Additionally,
Daytona Beach has begun an investigation into an aquifer storage and recovery facility as a
possible alternate water source. Primary discussions have taken place with both the District
and the Florida Department of Environmental Protection (FDEP) staff. The construction
permit has been issued by FDEP for this project.
The City was a member of the 14 member planning agency known as the Water
Authority of Volusia (WAV), as well as the East Volusia Regional Water Authority, both the
City of South Daytona and it's potable water supplier, the City of Daytona Beach, have been
long term members and supporters of the regional planning organizations. The City's
commitment to this coordination is stated in the Intergovernmental Coordination Element
Policy 4-6. In the capacity as a member of WAV, the City had actively participated in
developing alternative water supply options through facilities planning by the City of Daytona
Beach for WAV. One important element of the water supply planning identified by WAV,
was the promotion of water conservation. The City worked closely with the conservation
coordinator of W AV and identified and implemented conservation projects for the Daytona
Beach/South Daytona area. Examples of these projects included xeriscape landscaping,
low flow toilet rebates, low flow showerhead replacements, educational programs and rain
sensors for irrigation systems.
In 2007, the City of South Daytona, along with Daytona Beach discontinued its
association with WAV and concentrated exclusively with the East Vol usia Regional Water
Authority. The City of South Daytona is a full member of the East Vol usia Regional Water
authority and partiCipates with all of its functions.
Through the St. Johns River Water Management District planning, South Daytona is
identified in the plan as having project DWSP 49, which is a reclaimed water system
expansion to 0.14 million gallons per day reclaimed water distribution. Potable water
distribution system inter-connects have also been earmarked .
200f29
Coordination with Surrounding Area Water Suppliers:
In addition to coordinating with the St. Johns River Water Management District, the
local governments are encouraged to work closely with local water utilities that supply water
to the community. As stated earlier, the City of South Daytona is bordered by Daytona
Beach to the north and Port Orange to the south and in some areas, the City abuts property
under County jurisdiction.
The City of Port Orange's potable water supply system to the south of the City of
South Daytona consists of one (1) water treatment plant with 34 wells. Their water
treatment plant is permitted for capacity of 15.0 million gallons per day which is sufficient to
supply City of Port Orange service area including the incorporated City Limits of Ponce Inlet,
Wilbur by the Sea, a portion of Daytona Beach Shores, Harbor Oaks, Allendale and several
mobile home parks in the unincorporated areas of Volusia County. Due to these facilities;
the City of Port Orange appears to be self-sufficient in water supply. In past years, the City
of South Daytona has approached Port Orange as a supply source for wholesale water to
the City. The physical connection to the Port Orange water distribution system would be a
fairly easy process. However, at this time Daytona Beach is a more economically feasible
source of potable water for the City of South Daytona and over the years the two Cities have
developed a good working relationship.
The City of Daytona Beach's potable water system lies to the North of South
Daytona. The City of South Daytona has historically purchased its potable water under a
wholesale contract with Daytona Beach since before the 1960's. Daytona Beach's existing
potable water supply, treatment and distribution system consists of raw water supply wells,
a single water treatment plant along with associated high service pumping facilities and
ground storage. Daytona Beach's existing Consumptive Use Permit (CUP) authorizes the
average daily withdrawal of 16.16 million gallons per day (MGD) from the Floridan aquifer to
serve the projected demand of year 2011 with a maximum day withdrawal not to exceed
24.0 MGD. This amount is equivalent to the full hydraulic capacity of the existing water
treatment plant.
Daytona Beach's Ralph Brennan Water Treatment Plant water treatment facility is
currently permitted for an average daily capacity of 24.0 MGD. The system currently
withdraws its groundwater supply from the upper Floridan aquifer by the means of 26 supply
wells averaging 293 feet in depth. The total well capacity actually exceeds the treatment
capacity and is currently set at 28.2 million gallons per day.
21 of29
The City of South Daytona's potable water distribution system currently consists of
approximately 40 miles above water mains ranging from 4 to 14-inch in diameter. At one
time the City had an elevated storage tank located in the southeastern portion of town.
However, due to consistently high pressure within the distribution system, the water within
the storage tank rarely cycled and maintaining unacceptable disinfection level was
practically impossible. This elevated storage tank was eventually removed and
improvements to the distribution system were made to ensure a safe and adequate water
supply for both potable use and fire protection.
A part of the local coordination between adjacent cities is the local interconnections
between potable supply systems. These local interconnects provide redundancy as
required by the Florida Department of Environment Protection (FDEP) and Volusia County
Health Department regulations. These interconnects can provide adequate fire flow for
emergency conditions, and provide capacity in facilities when necessary, to ensure the
proper potable supply until the next incremental increase in capacity or facilities can be
constructed.
The City of Daytona Beach, which supplies South Daytona with potable water
currently, has emergency interconnect agreements with several local municipalities. The
City of Daytona Beach has three existing emergency interconnects with the City of Port
Orange and two (2) emergency interconnects with both the City of Ormond Beach and Holly
Hill.
Alternative Water Supply:
In 2005, the St. Johns River Water Management District's Water Supply Plan,
projected that some locations within the district would experience withdrawal rates that will
likely approach or reach their sustainable limits within the next 20 years. Therefore, the
District identified Water Supply Development Project options and Water Resource
Development projects that will help to meet future water supply needs. South Daytona's
water supplier, Daytona Beach, had several projects identified in the 2005 plan. This project
included the Daytona Beach reclaimed water reservoir, the reclaimed water pipeline and
modifications to the reclaimed water system. Additionally, Daytona Beach investigated an
Aquifer Storage and Recovery facility (ASR) as a possible alternate water source. The City
of South Daytona is also included in this plan and the only project outlined at this time is a
reclaimed water distribution system.
220f29
According to a report called the "City of Daytona Beach Water Treatment and Supply
Report" prepared by Tetratech, Inc. in 2006, Daytona Beach had an existing firm raw water
well field capacity of 28.2 MGD. Firm service pumping capacity is estimated to be 58.2
MGD, and the total water treatment plant's capacity is approximately 24.0 MGD. The same
report states that the 2025 projected potable water demand will not exceed the firm capacity
of the current well field. Therefore, no new Floridan aquifer wells are anticipated within that
timeframe.
Potable and Reclaimed Water System:
Existing Potable Water System:
The City of South Daytona owns the potable water distribution system within the
City. This distribution system contains approximately 40 miles of water mains sizing from 6-
inch to 14-inch. The system has three (3) metered connection points to the City of Daytona
Beach's water distribution system. Two of these connections are metered 12-inch mains
and the third is a metered 14-inch main.
The City of South Daytona has been very proactive in the operation and
maintenance of the potable water distribution system. Leak detection services are engaged
at regular intervals to determine the structural condition of the water system. This service
entails the use of companies and underground leak detection testing devices to determine
the location and quantity of possible leaks to be repaired. Due to this proactive program,
even with the 40 plus miles of water mains, the City experiences minimal losses of water
throughout the system.
The potable water supply system is also under a proactive repair and replacement
program. As the City performs roadway improvements, distribution lines are evaluated and
many times replaced depending on the condition and the materials used in the construction
of the pipe. Within the potable distribution system, there are approximately 70% PVC pipe,
30% asbestos cement pipe and 10% ductile iron pipe. Due to the high maintenance costs
and the propensity of asbestos cement pipe to break, the City has an active program to
replace this type of pipe when ever doing work in the right-of-way where this type of pipe is
located.
The main source of revenue for the operation and maintenance of the City of South
Daytona's potable water distribution system is funds generated by the retail sale of water.
Some funding is also available in the redevelopment area through County and State funds.
230f29
However, the funding is limited and may only be used in specific areas within the City of
South Daytona.
As stated earlier in this report, the supply of potable water for the City of South
Daytona is purchased through a wholesale agreement with the City of Daytona Beach. This
agreement has evolved over the years and has been written to include costs for operation
and maintenance of the water treatment plant in Daytona Beach and also a portion of repair
and replacement of the distribution system within the City of Daytona Beach which transmits
water to one of the three entry points into South Daytona. The agreement also includes a
wholesale bulk rate for the treated water, which in turn is sold on a retail level to residences
and businesses in South Daytona. This agreement is reviewed on an annual basis to
ensure that the agreement is fair and equitable for both South Daytona and Daytona Beach.
Proposed Water Facilities Capital Improvements:
At this time the only proposed potable water distribution system improvements are
the replacement of the six-inch potable water line on Foxcroft Lane, the extension of the
City's Nova Road water main to the recently annexed City-streets. and the construction of a
chlorine booster station all in fiscal year 2008/2009 .
The 6-inch potable water line on Foxcroft lane is being replaced as part of a roadway
improvement which will raise Foxcroft Lane approximately 18 inches to avoid flooding
problems that have consistently occurred on this road since its construction. The Nova
Road water main project involves the extension of the City's water main to the recently
annexed City-streets west of Nova Road; Sheri Boulevard, Palm View Drive, and Cutters
Way. This extension will provide potable water to residential and commercial properties
along those streets.
The City has experienced a few instances when the potable water supply received
from Daytona Beach has had a low chlorine level. When this occurred, the City had to issue
a City-wide boiled water notice until levels were corrected . To avoid this situation in the
future , South Daytona is proposing the installation of a chlorine booster station and a
reci rculation pump to raise chlorine levels throughout the City before they drop to an
unacceptable level. The City of Daytona Beach has committed to installing a chlorine
booster station with the understanding that South Daytona would operate and maintain.
South Daytona would also install a recirculation pump to move potable water to ensure the
chlorine from the booster station would reach all parts of our City. This project is shown in
the CIS for fiscal year 2008/2009.
24 of29
As stated earlier, South Daytona's potable supply distribution system is in very good
condition and with the addition of two large water mains that intersect the City and follow the
southern perimeter of the City limits. The system's water pressures and firefighting
capabilities have given it the highest rating in the Public Protection Classification (PPC)
program sponsored by the Insurance Services Office, Inc. (ISO).
Potable Water Local Interconnects:
At the time of this report, South Daytona's potable supply system only has
interconnects with the City of Daytona Beach. In 1996, South Daytona constructed the
"South Loop Waterline", which is a 12-inch PVC line which runs the full length of the
southern city limits of South Daytona and ties a 14-inch water main on Nova Road to a 10-
inch line within the South Daytona Industrial Park. During the construction of this line, they
10-inch stub out was constructed in the area of Alexander Avenue, in Port Orange, to
accommodate the future local interconnect with South Daytona's potable distribution system
and Port Orange's system. To date the physical connection has not been made.
Also another potable supply interconnect was proposed by the local water Authority
between South Daytona and Port Orange along Nova Road in the southern portion of the
City. This interconnect is not being pursued at this time due to objections from Daytona
Beach.
Coordination with Potable Water Suppliers:
Daytona Beach is currently the only potable water and reclaimed water supplier for
the City of South Daytona. As per a water and wastewater contract recently updated in
February 2005. the City of South Daytona and Daytona Beach have worked closely to
insure an adequate and un-interrupted potable water supply and wastewater treatment and
will continue to do so in concert with the Intergovernmental Coordination Element policies 4-
1 and 4-2. The two Cities have had a good working relationship for many years and are
both members of the East Volusia Regional Water Authority. Regular meetings are held for
this board and provide an excellent means of communication, planning and discussing
operational issues with the potable supply and distribution system.
Water Supply Conservation Practices:
The City of South Daytona has historically and will continue to enforce the City's
standard procedures for limiting water use in times of water shortage as declared by the St.
250f29
Johns River Water Management District or by the City Counci l. The Ci ty will also continue
to enforce the City's water conservation regulati ons in accordance with Volusia County
minimum performance standards:
a. that limit hours for yard irrigation.
b. that reguire on-si te recharge of HVAC system water.
c. that require automatic shut-off nozzles for hoses.
d. that require care in use of water for other domestic activities.
South Daytona also provides information on water conservation methods through
publications such as the City newsletter and other water conservation practices. In January
2009, the City enacted a "Low Flow Toilet Rebate Program" that reimburses up to $100.00
towards replacement of toilets installed prior to 1991 for both Commercial and Residential
water customers. The City will continue to implement water savinq incentive programs and
furnish its customers with water saving tips through the quarterly City News Letter.
Approach to the Use of Reclaimed Water:
As part of the water supply agreement most recently updated in February 2005 with
Daytona Beach, the City of South Daytona has agreed to language that requires Daytona
Beach to provide South Daytona an unlimited amount of reclaimed water based on
availability, and at no charge to South Daytona. The agreement states that "Daytona Beach
will provide without charge reclaimed water to South Daytona at mutually agreeable
locations in such guantities as are available with South Daytona bearing all costs (including
transmission. storage and pumping costs) from the pOint(s) of connection". Back in 1992,
the City of South Daytona contracted with Briley Wild & Associates to provide a Master
Reclaimed Water Plan for the City. This plan was a genuine attempt to start the City of
South Daytona down the path of providing reclaimed water to the City. However, due to
logistical problems within the City of Daytona Beach's reclaimed water system the plan has
only come to fruition in the past year.
South Daytona is fully committed to the use of reclaimed water as an "alternative
water supply" (AWS) for irrigation along the commercial corridor of Ridgewood Avenue and
City buildings and parks. The initial use of the AWS for irrigation is in the Ridgewood
Avenue Commercial corridor. The implementation of this three phase project will entail the
installation of a total of approximately 14,000 feet of 8" reclaimed water mains capable of
utilizing up to 0.48 million gallons per day of reclaimed water for irrigation (see Figure 4.3).
260f29
NORlH
Phase I 3900' @ 0.14 mgd rv 36 gp fit Phase II 6200' @ 0.22 mgd Phase III 3400' @ 0.12 mgd
13,500' 0.48 mgd
RIDGEWOOD AVENUE CORRIDOR ALTERNATIVE WATER SUPPLY
PHASE I 0.14 mgd RECLAIM WATER COMPLETED 2009
PHASE II 0.22 mgd RECLAIM WATER
PHASE III 0.12 mgd RECLAIM WATER
FIGURE 4-3
The first phase of the reclaimed water system for South Daytona is the construction
of an 8-inch reclaimed water line starting at the northern City limits and traveling south along
the Ridgewood Avenue right-of-way to Big Tree Road . This first phase of the reclaimed
water program is outlined in the Capital Improvements Schedule (CIS) for fi scal year
2008/2009. This first section when fully operational will use approximately 0.14 million
gallons per day of reclaimed water for the landscape medians and right-of-way along with
businesses that front Ridgewood Avenue and the City Hall Complex.
The City has also recently contracted the services of Quentin Hampton &
Associates, a local engineering firm, to update the 1992 Master Reclaimed Water Plan.
This new update's main emphasis is in the area of parks and commercial properties and the
usage for single-family residential properties will be addressed in the final phases. The
ultimate goal for South Daytona is to have in place a distribution system for reclaimed water
that will be able to utilize all of the available reclaimed water produced.
Reclaimed Water Availability:
Currently Daytona Beach has a relatively large reclaimed water infrastructure and
distribution system. However, the supply of reclaimed water generated by the Daytona
Beach Regional Wastewater Treatment Facility exceeds the average reclaimed water
needs. Currently Daytona Beach uses on an average about 50% of their available
reclaimed water. Any additional treated reclaimed water not utilized for irrigation is
currently discharged into the Halifax River. This excess amount of available reclaimed
water will be the supply for the reclaimed water system within the City of South Daytona. In
2008, the City of Daytona Beach will discharge approximately 6.0 million gallons per day on
an annual average in the Halifax River. Daytona Beach will continue to expand their
reclaimed water system; it is currently projected that approximately 2 million gallons per day
of reclaimed water will be available for the City of South Daytona. With that availability and
the projected needs for South Daytona, this will be adequate to help achieve the goals set
by the City for an effective, comprehensive reclaimed water distribution system.
Proposed Reclaimed Water Capital Improvements:
The current study being prepared by Quentin Hampton & Associates will help to
establish reclaimed water rates and set up a utility fund for the operation, maintenance and
expansion of the reclaimed water distribution system. The tentative plan for the expansion
of the reclaimed water system is to provide reclaimed water for the landscaped islands and
280f29
adjacent commercial properties for the Ridgewood Avenue corridor and also to provide
reclaimed water for City parks.
The first phase currently under construction was funded by a Florida Department of
Environmental Regulation grant of $200,000 in matching funds from the City of South
Daytona of approximately $67,000. Phase II is budgeted in the CIP for fiscal year
2009/2010 . Future phases of the reclaimed water system will be funded by either grant
monies or money from the City Utility Services Fund.
Reclaimed Water Distribution System:
As mentioned earlier in the report, the first phase of the reclaimed water distribution
system is projected to be up and running by early 2009. From this first phase, expansion of
the system will proceed south along the Ridgewood Avenue corridor to include all green
space within the right-of-way and adjacent businesses. The second area of expansion for
the reclaimed water system will be to provide reclaimed water to the City parks. It has not
been ultimately determined by the City if it will pursue the service of single-family residential
lots within the City for reclaimed water at this time. The ultimate decision will be made in the
future and will be determined by reclaimed water availability, operational construction costs
and determined maintenance for the system.
290f29
City of South Daytona - December 2008 FIVE-YEAR CAPITAL IMPROVEMENTS SCHEDULE, 2008-2013
CAPITAL IMPROVEMENTS ELEMENT UPDATE, COMPREHENSIVE PLAN
ACTIVITY PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED 5-YR. CAPITAL IMPROVEMENT CODE FY 08/09-1 FY 09/10-2 FY10/11-3 FY 11/12i4 FY 12113--5 TOTAL
PUBLIC WORKS DEPT. , .. : , 'i '
Infiltration/Inflow Sewer Retrofit SI 50000 50000 50000 50000 50000 250000 funding: Utility Fund, Operating Revenues, COBG .~ .{""
. ' ,:, .
Reuse Water, Phase-I (CRA)·* SI 267000 " ). 267000 funding: DEP (CIBR) & Utility Fund ;;, ,·r: .. .
.; ",' ,'.
Reuse Water, Phase II (eRA)*· SI ':;. ... '". 375000 .. ;' . ... ' 375000
funding" Grants & Redev Trust Fund .... .< ,;;;,
f ,. , ; .
Lift Station Improvements (CRA)·· SI I
Pump Station, #9 Area '. ::. 429000 429000 funding: impact fees . .. ......... I
, . ' ;
Lift Station Improvements (eRA)·'" SI . ', '. ' .
Pump Station, #8 Area .i: 571000 571000 funding: impact fees ·F. .' '.': :~; .'
". '. .
Lift Station Improvements (eRA)·· SI ; :';.: ,
Pump Station. #1 Area :r .:; ,,;'; 1500000 1500000 funding: impact fees ?' . i,
,;f',.
Sidewalks/Bikeways, City-Wide SI 15000 15000 15000 16000 15000 75000 funding: impact fees & proportionate fair-share contributions
West Nova Rd. Sewer Main SI . ; 110000 .... 110000 funding: Utility Fund. Reserves '.; . .. ;
•
;
Totals, this sheet (1): 332000 175000 440000 65000 2565000 3577000 Activity Code: SI Service Improvement, M = Maintenance, NG = New Growth, 0 = DefiCiency
City of South Daytona - December 2008 FIVE-YEAR CAPITAL IMPROVEMENTS SCHEDULE, 2008-2013
CAPITAL IMPROVEMENTS ELEMENT UPDATE, COMPREHENSIVE PLAN PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED 5-YR.
CAPITAL IMPROVEMENT Activity Code FY 08/09-1 FY 09/10-2 "'Fv10/11~3 FY 11/12-4 FY 12113~5 TOTAL PUBLIC WORKS DEPT. ~ ,:c
Palm Grove Sewer/Water System SI 601049 601049 funding: State Revolv Loan/Charges
New Public Works Headquarters NG ,l,- ee , .. '.·5200000 520'0000 funding: tax-exempt loan ..
-:;:'
Sauls St./Reed Canal Rd. Traffic Signal .... 250000 250000 funding: County roadway impact fees & proportionate fair-share contributions
-;·'c'
Foxcroft Drainage Retrofit SI 329168 329168 funding: Stormwater Utility ::;-,."
, '. Blue Villa Pond Site Const SI 1764000 " 1764000 funding: DEP (TMDL) Grant, DEP (CIBR), + Stjohn's .
Gary Blvd. Lift Station Purchase SI 150000 150000 funding: Impact fees & Utility Reserves
Segrave Stormwater Improvements SI 55000 55000 funding: CDBG
.. .-,-"
Chlorine Booster Station SI 80000 60000, funding: City of DB Grant
West Nova Rd. Water Main SI 750000 750000 funding: Utility Fund, Reserves
Totals, this sheet (2): 1065217 2664000 ·0 5450000 0 9179217 Totals, sheets (1) + (2): 1397217 2839000 440000 5515000 2565000 12756217 Activity Code: SI = Service Improvement, M = Maintenance, NG = New Growth, D = DefiCiency
City of South Daytona - December 2008 FIVE-YEAR CAPITAL IMPROVEMENTS SCHEDULE, 2008-2013
CAPITAL IMPROVEMENTS ELEMENT UPDATE, COMPREHENSIVE PLAN ACTIVITY PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED ,5-YR.
CAPITAL IMPROVEMENT CODE FY 08/09-1 FY09110-2 FY 10/11-3 FY 11/12-4 FY 12113-5 ' TOTAL
"
Redevelopment Dept.
U.S.-1 Corridor, Phase II 2000000 -f "
::( '. - " 2000000 Section A (CRA)(TCEA) SI ,~ ," , ,},-,-- :
funding: Redevelcpment Trust Fund & proportionate fair-share contributions ", '", .{ ,:,
" " " '
,~: ,
Halifax River Dredglng** SI I 1133000 ~ '- !, 1133000 funding: Redev.Trust Fund, FIND,+developer contributions .!' " '. " ' ':>,'
" ::1-:-'-' •. ..
Parkland Acquisitlon** SI , '2900000 2900000 funding: FRDAP+ECHO+Redev Trust
,
, ' "
,
,
} ,~
"
. ' . .
.
:
iTotals, this sheet (3): 1133000 " 2000000 0 2900000 0 6033000 Totals, sheets (1)+ (2) + (3): 2530217 4839000 440000 8415000 2565000 18789217 Activity Code: SI = Service Improvement, M = Maintenance, NG = New Growth, D = DefiCiency
FIVE·YEAR CAPITAL IMPROVEMENTS SCHEDULE. 2008·2013 CAPITAL IMPROVEMENTS ELEMENT UPDATE. COMPREHENSIVE PLAN
Activity PROJECTED PROJECTED ~ROJECTED :PROJECTED PROJECTED 5-YR. CAPITAL IMPROVEMENT Code FY 08/09-1 FY09/10-2 FY 10/11 .. 3 fFY 11/12-4 FY 12113·5 TOTAL
PARKSI REC. DEPT. , ,;
Reed Canal Park Dev., Phase·1II SI 60000 60000 funding: FRDAP & ECHO ,1,
. '. ' . I
So. Da}'tona Senso_ry Park SI 400000 .; ;-; Ii .... 400000 funding: FRDAP & ECHO .' .'. i)
. '
." :. t .... .
Central Park Development SI 45000 .' 355000 ,·.400000 funding: FRDAP & ECHO ,;:
, Stevens Canal Park Dev. SI .... 400000 400000 funding: FRDAP & ECHO " ..
;
Wagner Park Upgrade SI It. 400000 400000 funding: FRDAP & ECHO . I;
. ' ii' . .,
Melodle Park Improvements SI .. . 400000 ~ j . ··.· .. 400000 funding: FRDAP & ECHO " .' 3<:
.' , , :. '; . I'v . '.
-..\
Riverfront Park Improvements·· SI .: 400000 It, .. 4000001 funding: FRDAP & ECHO + CRA '.' -' !,:,,--
.. , ' .
•• Denotes location in Redevelopment District (CRA) .-
-"
Totals, this sheet (4): 505000 ·355000 ·800000 j . 400000 400000 2460000 Tot. sheet(1)(2)(3)(4}: 3035217 5194000 1240000 8815000 2965000 21249217
Activity Code: SI = Service Improvement. M = Maintenance. NG = New Growth, D = Deficiency
TECHNICAL PUBLICATION SJ2006-2B
ST. JOHNS RIVER WATER MANAGEMENT DISTRICT
DISTRICT WATER SUPPLY PLAN
2005
SECOND ADDENDUM
DECEMBER II, 2007
Technical Publication SJ2006-2B
St. Johns River Water Management District District Water Supply Plan
2005
Second Addendum December 11, 2007
St. Johns River Water Management District Palatka, Florida
2008
•
South Florida Water Management
District
The St. John.<; River Water Management District (SJRWMD) was created by the Florida Legislature in 1972 to be one of five water management districts in FJorida. It includes all or part of 18 countit."S in northeast Florida. The mission of SJRWMD is to ensure the sustainable use and protection of water resources for the benefit of the people of the District and the state of Florida. 5JRWMD accomplishes its mission through regulation; applied reseilrch; assistance to federal, state, and local governments; operation and maintenance of water control works; and land acquisition and management.
This document is published to disseminate inionnation collected by 5JRWMD in pursuit of its mission. Copies of this document can be obt."\ined from:
Library 51. Jolms Rh'er Water Management District
4049 Reid Street • P.O, Box 1429 Palatka, FL32178-1429
Phone: (386) 3294132
District Water Supply Plan 2005--Second Addendum
DISTRICT WATER SUPPLY PLAN
2005
SECOND ADDENDUM
DECEMBER 11, 2007
The St. Johns River Water Management District (5JRWMD) approved its District Water Supply Plan 2005 (DWSP 2005) on February 7, 2006. DWSP 2005 has been published by 5JRWMD as Technical Publication 5J2006-2. The 5JRWMD Governing Board approved an addendum (first addendum) to DWSP 2005 on October 10, 2006. A second addendum to DWSP 2005 was approved on December 11,2007. This second addendum to DWSP 2005 is important because the revised information contained within tables is (1) directly linked to the water supply entity notification process, which is required pursuant to Section 373.0361, Florida Statutes; (2) required for 5JRWMD's Water Protection and 5ustainability Program; and (3) essential in 5JRWMD's efforts to develop technical assistance documents for local governments to use in updating their comprehensive plans to address water supply issues, including the identification of alternative and traditional water supply projects necessary for meeting the water supply needs within their jurisdictions. Following are enumerated changes to DWSP 2005 associated with this second addendum.
Table 13. Quantities and estimated costs of alternative water supply development projects. As presented in this second addendum to DWSP 2005, the proposed quantity and estimated costs for project number 4, Ormond Beach Water Treatment Plant Expansion Project, are modified to increase the. quantity from 2 million gallons per day (mgd) to 4 mgd, to increase the construction cost from $10.90 million to $14.62 million, and to increase the total project cost from $12.02 million to $15.82 million. Table 13, as it is included in this addendum, supersedes Table 13 in DWSP 2005 and in the first addendum to DWSP 2005.
Table 15. Status of water supply development projects. As presented in this addendum, Table 15 includes a change in the proposed quantity of water associated with the Ormond Beach Water Treatment Plant Expansion Project from 2 mgd to 4 mgd. Table 15, as it is included in this addendum, supersedes Table 15 in DWSP 2005 and in the first addendum to DWSP 2005.
St. Johns River Water Management District 5
O'I~
~ I Table 13. Quantities and estimated costs of alternative water supply development projects S tn
;:..;, ~.
~ ,.-... ~ ;::t
~ ::. ;::t
~ 9. v,
3'. !:l.
DWSP Project Number
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15
16 17
Capacity
Project Name Average
Construction Daily Flow (in millions) (mgd)
Brackish Groundwater Source for Potable Use Dunes Community Development District Brackish Ground'vvater Project 1,00 $9,50 East Putnam RegiOnal water System Project 0,63 $10.91 Melbourne Reverse Osmosis (RO) Plant Expansion 2,5C $4.80 Ormond Beach Water Treatment Plant Expansion Project 4.00 $14.62 ~. Augustine Water Supply Project 5,00 $12,80 St. Johns Cou~ Water SU[J!JIy P..!Qject 6,66 $20.00
Brackish Groundwater Subtotals 19.79 $72.63 Surface Water Source for Potable Use
Lower Ocklawahp River in Putnam County Project 20,00 $201.00 St. Johns River Near SR 50 Project 10,DC $76,00 St. Johns River Near Lake Monroe Project 50. DC $387.56 St. Johns River Near DeLand Project 20.00 $182.58 st. Johns River Near Lake George Project 33.0C $313.0C St. Johns RiverfTaylor Creek Reservoir Water Supply Project 40,OC $174.00
Surface Water Subtotals 173.00 $1334.14 Seawater Source for Potable Use
Indian River Lagoon at FP8L Cape Canaveral Power Plant Project 15.0C $111.00 Indian River Lagoon at Reliant Energy Power Plant Project 15.0C $113,00 Intracoastal Waterway at New Smyma Beach Project 15.0C $134.00
Seawater Subtotals 45,OC $358.00 Reclaimed water Source
Alafaya' (Utilities Inc. of Florida) Reclaimed Water Storage and High Service Pumps Project 0.41 $20')
Altamonte Springs and Apopka Project RENEW APRICOT 6,63 $1119
Estimated Costs Operation
Total and capital Maintenance
(In millions) (in millions per year)
$10,4C $0,183 $11.22 $0.400
$5,8C $2.827 $15.82 $0.427 $14,70 $1,980 $22.00 $2.000 $79.94 $7.82
$266.00 $5.790 $95.00 $4.350
$505,68 $21.003 $239.52 $8,578 $402.0( $13.670 $215.OC $11.830
$1723.2C $65.22
$140.00 $7.510 $141.00 $8.100 $168.00 $8.840 $449.00 $24.45
$2.4.<1 $0.033 $13,52 $0,195
Unit Production (cost per
1,000 gallons)
$2,65 $5,39 $3.~
$0.69 $1,69 $1,51
$3.16 $3,01 $3,04 $3,40 $3.39 $1,871
$3.4:'l $3.51 $4.05
$1.2f $O.4E
a iii' q [ :E Q)
$' ..., (IJ c: "C "C -< ""0 Qj' ::::I J\)
8
! 8 ::::I 0.
» 0. 0. Q) ::::I 0. c: 3
V> :'" --~ ;i V>
'" ~.
~ ~ ~
i g -CJ ;;;.
'J g:"
Table 13-Continued
DWSP Project Project Name Number
18 Apopka and Winter Garden Reuse Partnership Project
Belleview and Spruce Creek Golf Course Reclaimed water System 19 Expansion Project
Beverly Beach Integrated Reclaimed Water and Stormwater Reuse 20 Project, Phase II
21 Clermont Reclaimed and Stormwater System Expansion Project 22 ~ocoa/Rockledge Reclaimed Water Line Connection Project 23 Daytona Beach Reclaimed Water System Project 24 DeLand Reclaimed Water and Surface Water Augmentation Proiect
25 Eastem Orange and Seminole Counties Regional Reuse Project Edgewater Reclaimed Water System Interconnect to Southeast
26 Volusia County Project 27 Eustis Reclaimed Water System Expansion and AUQmentation Project 28 FlaQler County Bulow Reclaimed Water System Proiect 29 Holly Hill Reuse System to Ormond Beach
30 Lady Lake Phase II Reclaimed Water System Lake Utility Services (Utilities Inc. of Florida) Lake Groves WVVTF
31 Reclaimed Water System Expansion Project 32 Leesburg Reclaimed water Reuse Project 33 Melbourne Reclaimed Water System Expansion Project 34 Minneola Reclaimed Water Reuse Project
35 Mount Dora Country Club Golf Course Reclaimed Water Project North Seminole Regional Reclaimed water and Surface Water
36 Optimization System Expansion and Optimization Project 37 Ocoee Reuse System Expansion Project 38 Orange County Northwest Reclaimed Water Project 39 Orange County Southeastern Reclaimed Water System Expansion
Capacity Average
Construction Daily Flow (in millions) (mgd)
3.00 $4.31
1.00 $1.6-4
0.5C $2.25
5.10 $18.77 0.25 $1.07
26.00 $20.33 1,70 $4.83
20.00 $28.94
1.0C $5.2'': 1.1C $1.8/ 1.7C $1.7 { O,Be $O.4C 0.50 $2.00
1.0C $3.60 7.05 $23.02 1.50 $4,03 1.00 $7.78 0.26 $0.33
7.76 $8.7€ O.3E $2.3-; 3.0C $10.0C
12.5C $13.21
Estimated Costs Operation
Total and Capital Maintenance
(in millions) (in millions peryeart
$5.21 $0.071
$2.37 $0.032
$2.6-4 $0.049
$22.68 $0.923 $1.29 $0.021
$25.41 $1.826 $5.5: $0.328
$28.9-4 $0.364
$6.3C $0.146 $2.2€ $0.09€ $2.1-4 $0.185 $0.49 $0.041:1 $2.20 $0.22g
$4.35 $0.219 $27.8') $0.33-4
$4.8 $0.373 $11.4E $0.140
$0.4C $0.021
$10.3C $0.505 $2.66 $0.001
$10.2!3 $0.300 $13.21 $0,351
Unit Productior (cost per
1,000 gallons)
$0.3€
$0.5:
$1.21:1
$1.21:1 $1.1-4 $0.36 $1.15
$0.32
$1.49 $0.60 $0.53 $0.36 $2.05
$1.4~
$O.SE $1.3C $1.01 $0.4£
$0.43 $1.33 $0.81 $0.27
o
~ Sl ~ Il)
(j) ... CJ) C "0 "0 -< -U iii" :J
N o o
! (I)
§ c..
6: a. (I) :J a. c 3
00(,1) ;---
;:Il ~. ....
~ ;:; ....
~ ;s
~ 3 ~ o 0;'
~.
Table 13-Continued
DWSP Capacity
Project Project Name Average
Number DaifyFlow
(rngd)
40 Orlando Utilities Commission Project RENEW 9.2 41 Ormond Beach North Peninsula Reclaimed Water storage Project 0.4~ 42 Ormond Beach South Peninsula Reuse Improvement Project 2.13 43 Palm Coast Reclaimed Water System Expansion Project 8.2::1 44 Port Orange Airport Road Reclaimed Water Transmission Main Project 1.00 45 Port Orange Pioneer Trail storage and Pumping Facility Project 2.0C 46 Port Orange Reclaimed Water Reservoir and Recharge Basin Project 27C 47 Rockledge Reclaimed Water Storage Project 0.1E 48 Rockledge Reclaimed Water System Expansion - ASR Project 0.55 49 South Daytona Reclaimed water System Expansion Project 0.1..:1 50 rravares Reclaimed water Treatment System Expansion Project 0.6e 51 Volusia County Southwest Reclaimed Water System Project 0.2C 52 West Melbourne Above Ground Reclaimed Water Storage Tank 2.413 53 Winter Garden Reclaimed Water Pumping and Transmission Project 4.00
Reuse Subtotals 137.79
Reuse Augmentation Source
54 Lake Apopka Reuse AUQmentation Project 1~OC Seminole County Yankee Lake Reclaimed Water System
55 Augmentation Project 10.0C University of Central Florida (UCF) Reclaimed Water arid Stormwater
56 Integration Project 0.41 57 Winter Park Windsong stormwater Reuse Demonstration Project 0.10
~nter Springs - Lake Jessup Reclaimed Water Augmentation 58 Project 2.25
Reuse Augmentation Subtotals 13.76
Estimated Costs Operation
Construction Total and
(in millions) Capital Maintenance
(in millions) (in millions per year)
$51.9 $62.7!: $1.612 $2.4€ $2.9, $0.142 $8.2C $9.91 $0.19"1
$13.91 $16.61 $1.23~
$1.6C $1.9 $O.08C $2.3~ $2.8 $0.182 $8.78 $10.01: $0.107 $1.613 $2.0~ $0.01:3 $2.01 $2.42 $0.045 $0.7 $0.67 $0.011 $4.71 $5.69 $0.048 $1.1E $1.4" $0.016 $2.51 $2.76 $0.1OC
$14.4C $17.40 $0.49€ $296.12 $348.46 $11.07
$7.27 $8.79 $0.11~
$25.013 $31.36 $3.156
$0.88 $1.06 $0.052 $0.43 $0.5~ $0.030
$6.7C $6.70 $0.100 $40.31: $48·4~ ~.50
' Unit Productior (cost per
1,000 gallons)
$1.61: $1.9~
$1.OE $0.77 $0.56 $0.50 $0.82 $2.36 $1.25 $1.32 $1.66 $1.46 $0.31 $1.09
$1.9E
$1.43
$0.8C $1.7"
$0.75
o ~ ..., ~ :E t\)
(i) ..., (J) c: "C "C -< ""0 Q) ::J I'J o o
! (I)
8 ::J a..
~ (I)
a c: 3
!!! 0" :::-;:: .." ,., ;::;. r;; ... ~ 1f ~ ;:I
~ ~ ~ t:J ;;;.
~ [.
Table 13-Continued
Estimated Costs
DWSP Capacity Operation Unit
Project Project Name Average Construction Total and Production
Number Daily Flow (in millions)
Capital Maintenance (cost per (mgd) (in millions) (in millions 1,000
pervear) gallons)
Other I\-'herry Lake Tree Farm Lake Withdrawal for Agricultural Irrigation
59 Project 0.71 $O.BE $0.82 $0.06~ $0.4~
Holloway Farms Agricultural Irrigation Rainwater Collection System 60 Project o.oa $1.2fl $1.5e $0.002 $3.66
other Subtotals 0.85 $1.97 $2.37 $0.06
Alternative Water SUPRly~nt Projects Total 390.19 .~3.~ ~6!51-~ $112.12
mgd = million gallons per day Notes: Alternative water supply projects are defined. to the extent possible, on the basis of complete water production, treatment. storage. and transmission
systems. Complete projects may include several hydraulically connected major projects elements under single ownership.
Cost estimates are presented for various levels of project development, ranging from order of magnitude conceptual planning level to final design. Actual project costs will vary from these estimates, which are presented herein only to provide an overview of potential alternative water supply project costs.
Construction cost estimates may include construction contingencies as appropriate.
Total capital costs include estimated construction cost plus allowance for nonconstruction capital items, which may include land. land acquisition, planning, permitting, design, and services during construction. as applicable to a given project.
Cost totals for project categories have been rounded. Dollars are in millions for construction. total capital, and operation and maintenance.
o fir s: Sl. ~ Q)
Cii .., (fJ c: '0 '0 -< "0 i» ::J
N o o
! <Tl o g 0.
» 0. 0. ro ::J 0. c: 3
District Water Supply Plan 2005-Second Addendum
Table 15, Slalus o/waler supply development projects
projects
Dunes Communlly Development District I!ract<istl Groundwaler Project
East Putnam Regional Water System Project
Melbourne RO Pleni Elq)anslon
Onnond Sesch Trea~1 Plant Expansion Project
51. Augustine Water $uppjy Pfoject
51. Johns Counly
Lower Ocklawaha River in Putnam County Project
St Johns River Neat SR 50 Project
St. Johns River Near lake Monroe Project
SI. Johns River Near DeLand Project
SI. Johns River Near lake G8OfOt! Project
S .. Johns RiverfT aytOl' Creek Reservoir Water Supply Project
Indian Rille, lagoon at FP&l Cape Conaveral Power Planl Project
Indian Rive. lagoon al Reliant Ene'llY Power Plant Project
St. 1'''#'I1~ /(1tJ(r W.Ilt'T MI1/Mgnm'ttt l)'~/"(1
10
MulIf.. Selededfor /urisdiclional Enllly I~-
no yes
no yes
00 yes .. - ryes -----
no
no yes
no yes
"to be no det<!fmined
"lObe no delermined
no yes
'to be no determined
'to be no determined
yes yes
'lobe no detennined
"lobe no determined
--------
PYoject E~ project Sponsor{a) PRJPOI'Id Quantity Funding So........ Permitting ComINctlon PlwmW>g De. llradcith GIou_ ... So........ for Potable Ute
Dunes Conmwnily Development \,OOmgd Dunes Community Development [)jatrict, WPSP Complete In progress Complete 2005-2007 [)jstricl funds requeSled
Putnam County 0,93 mgd U,S, Oop""",,,nl of Agriculture Rural p""p"'te Inp«,gm. In progreso 2005-2007 Development Fund, Florida Cop_t 01 En"lt_tal Protecllon grant, WPSP funds requOlted
i City 01 Melbourne 2,5Qmgd City 01 Melbourne, WPSP funds requested 2006 2008 2008-2009 2009-20tO
ClIy 01 0_ aeach 4.00mgd City of Onnond a...ch, WPSP fund. requested 2005 2005-2008 2008 2006-2007 I
City of SI. Augustine 6.00mgd City of SI. Augustine, WPSP funds requeSled Complete In progress In pr<lllfOSl 2008-2007
51. Johns Couniy 8.00 mgd SI. Johns County, WPSP fund. requesled Complete In prognIas In progreal 2005-2006
S_ W_ Souroe for Potable Use
to be identifled 20.00 mgd to be identifled Nots_uled Nol scheduled
__ uled
Nots_uled
to be identifted up 1010.00 mgd to be: identified Not scheduted NO! scheduled Not scIlIIduled Not scheduled
City 01 Sonford 2 mgd (up 10 50.00 mgd City 01 Sanford, WPSP 'unds requested tnprogress 2006 2006 2001-2008 lotal avsUable)
to be idenlifled up 10 20.00 mgd to be identified Not._uled Not._uled _ sclllld uled Not scIlIIduilld
to be identified up to 33,00 "'lId 10 be idenlif",d Not._uIIId Nol scheduled NO! scllllduled Not scheduled
CHyof Cocoa, City of nusvilie, up 10 40.00 mgd Project sponsors, Stale and Tribal Assislance 2005-2006 2006-2009 2006-2009 2010-2012 Eest Central Florida 5ervlces Granl (STAG), WPSP funds reque.led tnc .. Orange County, Orlando UUlltte. Commieston, South Florida Wat ... Managemenl [)jslriel, SI. Johns River Water Management Dlslrict, T oho Water Authorily
5e_ Sourc. for Potable UN
to be identified up to 30.00 "'lId 10 be identified Not scIlIIduled _ scheduled
Nol scheduled Not scheduled
10 be identified up 10 30.00 "'lId to be identified _ scheduled Not scIleduled Not scIleduled Not_uled
L"" .. -------- .,,-,,-----
Table 15-Continu&d
Multi- s.lededfor Projeds iun.dlcdonal Project Sponsor(s)
Enllly ImpIernenIallon
Intracoastal Wal<>rwav at New Smyrna "lObe no 10 be idenlifie<l Beach Project dete,mined
Alafaya Utllrues R __ Wat'" no yeo Utilities!oc, of Florida (S_) Siorage and High SeMce Pumps
Altamonte Springs and Apopka Project yes yes Altamonte Spri"ll". Apopka RENEW APRICOT
Apopka and Winter Garden (or yes yes Apopka. Winter Garden North ...... Orange Counly) Regional Reuse PlII1nership Pmject
Belleview and Spruce ~ Golf no ye. 8eUeyiew Course Rodoimod Waler System Expansion
Beverly Beach Inlegrated Rodaimed no yes Flagler Counly Wate, and SIOrm ... I., Reuse Proje<:I. _II Clermont R_ and Stormwater no yes CItV of Clermont Syslem E--"'"
Co.:oaiRod<Iedgo Reclaimed Waler yes yes Gily of Cocoa, Cily of Rockledge LInB Conneclion
Daytona Beach Reclaimed Water no V·· Clly 01 Davlona Beach System
DeLand Re<;Iaime<I W_ and Suoiace no yes City of DeLand Water AugmenlaUon Pmject
Eastern Orange and Seminole Counlles yes yes City 01 Orlando, Orange Counly, Regional Reuse Projeci Ortando Ulililie. CommIssion,
Seminole County. Cilyof OvIedo. Unlvlll'sity of Central Florida
Edgewater Recla_ Water system no yes City of Edgewater tnt_1O SE Volusia County
EusUs Reclaimed Water System no yes City of Eustis expansion and AugmenlaIion
Flagler County Bulow Reuse Water no yes Flagle' Counly System
Holly Hil Reuse System to Ormond no yes Cijy of Holly HUt Beach
pmject Proposeda... ... uty Funding Source
Planning
15,oomgd 10 be identified Not scheduled
Redllimed Water Source
OAt mgd UtilKleslnc. 01 Florida (Seminole). WPSP funds omp!ete ,_sled
6.63mgd Project sponaors. WPSP funds 'equested Complele
3.00 mgd Project spons."... WPSP funds reque.ted 0lmpIeIe
LOOmgd Projecl SpotISOnI. WPSP funds requested GOmpOeI.
O.50mgd Flagler County. Rural Development. WPSP Complete funds reque.ted, others 10 be idenlifie<l
5.10mgd City 01 ao""""l. WPSP funds requ •• ted 004-2006
0,25 City of COC .... City of Rockledge. WPSP funds 2006 requested
26.00 CitV 01 Daytona Beach, WPSP funds requested f""'I""Ie
L70mgd City of DeLand, Florida FOlev., Trull Fund, ComiIfele WPSP II.Ind. requested
20.00 mgd Project partner •• State and T rlJal Aaslslan<:e Complete Grant (STAG), WPSP II.Inds requesled
1.00 mgd Cily of Edgewaler. WPSP lUnds requested !;OmpIele
1.10mgd C~y of EusU •• WPSP fund. requested Complete
1.10mgd Flagle, County. WPSP funds requesled Complele
0.60 mgd Cily 01 Holly Hill, WPSP funds requested ~e
- ---- ---
District Waler Supply Plan 2005-Second Addendum
E'ngIMemg De.
__ uled
Complete
2006
Not_uled
2005-2OIl6
2006
2005-2001
2006
2005-2006
Complel"
Complete
2006
2006-2008
2006-2007
2006-2007
Permitting CoMINdIon
Not scheduled Not scheduled
2006 2006
2006 2001
_scheduled Not scheduled
2006 2006-2001
2006 2006-2007
2006-2001 2007-2006
2006 2007
2006-2007 2007 2006
2004-2006 2004-2009
•
2007 2004-2007
2006-2007 2007
2007-2009 2009-2012
2007 2007 2006
2007 2008
51. 101,"5 Ri!Jt"r Wilt,.,. MQnagr1Mflt Vistncl 11
District Water Supply Plan 2005---Second Addendum
Table 15-Conlinued
Multi- SeIecIed lor PrcjecI EngiMering Projeels junldldional PrcjecI Spons~.) Propoled au_y Funding Source PermllIing ConsINctIon Entity Implementation PI_g Design
Lady Lake Phase II Reclaimed Water no yes Town of lady lake 0.50 mgd Town of Lady Lake, WPSP funds requested Complete 2006 2007 2008 2008 2009 System
lake UIHily Services Inc. (Utilities Inc, of no yes UIHilies Inc. of Florida 1.00mgd Utilities Inc. of Florida, WPSP funds requesled Complete 2ooS-2006 2006 2006-2007 Florida) Lake Groves WWTF Reclaimed Waler Expansion
!
Leesburg Reclaimed Water Reuse no yes City of Leesburg 7.10 mgd City of leesburg. WPSP funds requested Complete Complete 2006 2006-2007 Project i
Melbourne Reclaimed Waler Syslem no yes Cily of Melbourne 1.50 mgd City of Melbourne, WPSP funds requesled CompIele 200S-2006 2006 2006-2007 Expansion
Minneola Reclaimed Water Reu.e no yes City of Minneola 1.50 - 2.50 mgd City of Minneola, WPSP fundI requested Complete Complete Complete 200S-2006 Project
Mount Dora Country Club Golf Course no ye. Mount Dora Countoy Club 0.26 mgd Mount Dora Country Oub, WPSP funds omplele Not scheduled Not scheduled Not scheduled Redaimed Water Projecl requested
North Seminole Regional Reclaimed yes yes City of Sanford, City of lake 7.80 mgd Project partners, Florida Forever Trust Fund, Complele In progress In progress 200S-2009 Waler and Surface Water Augmentation Maoy, Seminole Counly WPSP funds requesled System Expansion and Optimization Project
Ocoee Reuse System E)I(panslon no yes City of Ocoee 0.35 mgd City of Ocoee, WPSP funds requested Complete 200S-2oo6 2006 2006
Orange County Northwest Redaimed no yes Orange County 3.00 mgd Orange Counly, WPSP funds requesled Complete 2006 2006-2007 2006-2010 Water Augmentation
Orange Counly Soulheastem yes yes Orange Counly, O~ando Ulillie. 12.50 mgd Orange County, WPSP funds requested Complete 200S-2006 2006-2008 2006-2010 Redaimed Water Syslem Expansion Commission, City of O~ando
Ol1aooo Utilities Convnission Project no yes 0118000 Utilities Commission 9.20mgd Orlando Ulitities Commission. WPSP funds 2ooS-2007 2008-2009 2009-2010 2009-2011 RENEW requested
Ormond Beach North Peninsula no yes City of Ormond Beach 0.49 mgd Cily of Ormond Beach, Florida Forever T rusl Complele In progress In progrosl 200S-2006 Redalmed Water Storage Project Fund, WPSP funds requested
Ormond Beach South Peninsula Reuse no yes City of Ormond Beach 2.13 City of Ormond Beach, WPSP funds requesled Complete 2006-2007 2006-2009 2007-2010 Improvements
Palm Coast New Redallned Water no ye. City of Palm Coast 8.23 City of Palm Coasl, WPSP fund. requested Complete 200S-2007 2006-2009 2006-2009 Syslem E.panslon
Port Orange Airport Road Redaimed no yes City of Port Orange 1.00mgd Cilyof Port Orange, WPSP funds reque.ted Complete Complele 2006 2006 Water Transmission Main
Port Orange Pioneer T raH Siorage and no yes City of Port Orange 2.00 mgd City of Port Orange, WPSP funds requesled Complete 2006 2008 2006 Pumping Facility
Port Orange Redaimed Water no yes City of Port Orange 2.70 mgd City of Port Orange. Florida Forever Trust Fund. Complete Complete Complele 2004-2006 Reservoir and Recharge Basin WPSP funds requesled
St. '..,'rns RW('r ~Vfl'('r MII"llgt'rtU"n' V'S,"" 12
District Water Supply Plan 2005-Second Addendum
Table 15-Conlinued
MulU-5eIedod ror Prqect Engineering Projects judsdidlonlll project S~'I propot<lCl QuanUly Funding Soun:e P.-tng ConaINc;tion
Entity Implementation P!WV1Ing Oeoign
Rockledge Redaimed Water Storage no yes City of Rockledge O.16mgd City 01 Rockledge, WPSP Ivnd. requested Complete Not scheduled Not sd>eduled Not scheduled
Rockledge Reclaimed Water System no yes City of Rockledge 0.55mgd Expansion - ASR
City of Rockledge. WPSP funds requested Complete CompIele 2005-2006 2006 I
South Daytona Reclaimed Water no yes City of South Daytona 0.1' mgd City 01 Soult! Daytona, WPSP Ivnds ,_sted CompIele 2005-2006 2006-2007 2006-2007 System Expansion
T ayares Reclaimed Water T ,ealment no yes City of Tavares 0.6 mgd City of Tav",es, WPSP funds requested 2006 2007 2007 2008 Syslem Expansion
VoIu'" County SW Reclaimed Water no yes VoIIJsla County 0.20 mgd VoI"sia County, WPSP Ivnd. requelled ompIele 2006 2006 2007 System
We.t Melbourne -. Gtound no yes City of We.t Melbourne 2.48 mgd City olWesl MaIO"""",, STAG funds, WPSP p>mr»ete 2006 2006 2006-2007 Reclaimed Water Storage T ani< funds ",quested
Winter Garden Reclaimed Water no yes City 01 W ... ter Garden 4.00mgd City of Winter Garden. WPSP fund. requested <.;ompIete 2005-2006 2006 2006-2006 Pumping and Transmis_
Reu" Augmenlallotl Source
Lake Apopka Reus. Augmentation no yes City of Apopka l.00mgd Cily of Apopka. WPSP funds ",quelted In progress Inprogresa 2006 2001-2006 Project
Seminole County Yankee lake no yes Seminole County 10.00 "'lId Seminole County, WPSP funds requested Complete 2006 2006 2006--2001 Reclaimed water System Augmentallotl
University of Central Florida (UCF) no yes Universlly of Central Florid. 0.41 mgd Unl.erslly 01 Central Florida. SJRWMD Complete 2006 2006 2006 Reclaimed Waler and Stormwat., Stonnw8ter Cosl·share Ivnd •• WPSP funds Integration requesled
Winter Park Windsong Stormwaler no yes City 01 WInter Park O.IOmgd City 01 WlIlt., Park, SJRWMO Stormwaler Cost· Complele 2006 2006 2006 Reuse Oemo share funds
WInter Springs Lake Jesup no yes City 01 Winter Springs 2.25mgd City of Willie< Springs. WPSP fund. requested 2006 2006 2006--2007 2006-2010 Reclaimed Water Augmentation
ou.er Cherry Lake Tree Farm Lake no yes Cherry Lake Tree Farm 0.77 mgd Cheny Lake Tree Farm, SJRWMD funds f""'P"'1e 2006 2006 2001 Wilhdrawal ",.. Agricultural Use requested
Hoiloway Farms Agricultural Rainwater no ye. Holloway F ann. 0.08 mgd Holloway Fann •• WPSP Ivnds requested NO! scheduled Not scheduled Not scheduled Not scheduled (;ojlection System
mgd = million gatlons per day
"Allhough the multijunsdictional status of these projects has been not been determined, SJRWMO anticipates that their development by mullijurisdictional water supply entilies will likely offer the greatest opportunity for their full development. Relatively small versions oItllese proje<:ts, which are to be developed by single entities, are Identified as part of lhese projects.
51.101"'$ XitifT Watrr Mauugt'ml'1u Drs-In'", 13
where it adjoins residential land use designations in adjacent
jurisdictions, the City shall provide the adjacent jurisdiction
with prior written notice of any proposed land use or site plan
changes for the designated industrial areas, and adequate
time, based upon mutual consultation, to review and
comment on any proposed land use or site plan change for
those areas; and the City shall consider any review
comments from the adjacent jurisdiction through its land use
and site plan review process prior to approval of any such
change.
POLICY 2-9: The City will maintain a Water Supply Plan that is
coordinated with the Water Management District and the City
will update its Water Supply Plan within 18 months after the
Water Management District enacts an updated Regional
Water Supply Plan.
OBJECTIVE 3: South Daytona shall continue to enforce the
requirements for non-local agency approvals contained
in its Consolidated Land Development Regulations.
POLICY 3-1: Development orders including development plan approval
and issuance ot the Certificate-ot-Occupancy may not be
issued until any required non-local approvals have been
obtained.
Intergovernmental Coordination Element (ICE)
OBJECTIVE 3: The Capital Improvements Element shall be used as a
means of meeting capital needs and providing a Capital
Improvements Schedule (CIS) which is coordinated with
land-use decisions.
POLICY 3-1: Adopt the schedule of capital improvements as part of the
City's annual operating and capital budget.
POLICY 3-2: The City shall continue to implement a concurrency
management plan which provides standards and guidelines
for approving development proposals as follows:
a. The level-of-service standards cited in
Objective 2 of the Capital Improvements
Element shall be the level-of-service standards
applied in the Concurrency Management Plan.
b. The issuance of development orders shall be
based on a finding that public facilities which
meet the adopted level-of-service standards
are available to serve the development at the
time the development impacts occur.
c. A public facility or service shall be determined
as available for potable water, sanitary sewer
solid waste and storm drainage if it meets any
of conditions one through three below. Park
and recreation service shall be determined as
available if any of conditions one through five
are met.
1. The facility/service is in place to serve a
proposed project at the time that a
development order is approved;
2. The facility/service will be in place at the
time of project impact;
3. The facility is under construction at the
time that a development order is
approved;
4. The facility/service is the subject of a
binding executed construction contract
that provides for the commencement of
the actual construction of the required
facilities within one year of the issuance
of the development order; however, the
faci lity/service shall be available no later
than the issuance of a certificate of
occupancy, or its functional equivalent.
5. The facility/service is guaranteed
through an enforceable development
agreement that provides for the
commencement of the actual
construction of the required facilities
within one year of the issuance of the
development order;
d. The traffic circulation network concurrency
requirements may be satisfied by complying
GOALS, OBJECTIVES AND POLICIES
The Goals, Objectives and Policies which have been developed for the
Coastal Zone Element are intended to support the overarching community goal
which emerged for South Daytona's Strategic Planning process. The Goals,
Objectives and Policies of the Coastal Zone Element are subsumed within the
overarching community goal, and in combination with the Goals, Objectives and
Policies of the other Plan elements, contribute to the achievement of the
community goal. The Future Land Use Element. the Open Space and
Recreation Element, the Stormwater Drainage Sub-element, the Transportation
Element, and the Conservation Element are particularly linked to the Coastal
Zone Element.
GOAL: CONSERVE, PROTECT AND MANAGE THE COASTAL
RESOURCES OF VOLUSIA COUNTY AND SOUTH DAYTONA
INCLUDING THE WETLAND AND UPLAND ECOSYSTEM SO
AS TO MAINTAIN AND ENHANCE NATIVE HABITATS,
FLORAL AND FAUNAL SPECIES DIVERSITY, WATER
QUALITY AND NATURAL SURFACE WATER
CHARACTERISTICS.
OBJECTIVE 1. Continue to implement management programs to
ensure long-term protection and enhancement of
selected natural upland and wetland habitats and water
quality. The primary means of accomplishing this
objective will be through the retention of
Interconnected hydro-ecological systems where the
wetlands and uplands function as a productive unit
resembling the original landscape.
SUPPORTING POLICIES INCLUDE:
a.
b.
c.
GOAL:
Land Use Element policy 3-1
Public Utility Element policies 2-1, 2-6. 3-3. 4-4.5-5,5-6 and 5-7.
Conservation Element policies 1-6. 1-7, 2-2, 2-3, 2-5, and 3-5 and
Objectives 4 and 5 including all supporting policies.
TO CONSERVE, PROTECT AND RESTORE COASTAL
RESOURCES BY MANAGING GROWTH AND LAND USE SO
AS NOT TO DAMAGE OR DESTROY THOSE RESOURCES.
OBJECTIVE 2. Continue to implement land use regulations that
provide for the location, extent and distribution of land
uses consistent with the protection of coastal
resources.
POLICY 2-1: Require special in-depth review of any development project
proposed for a wetland. This shall include clearance from
the 5t. Johns River Water Management District. It must be
demonstrated that any such project will not have a
significant negative impact on the flora and fauna of the
immediate area or on the Halifax River. The Consolidated
Land Development Regulations shall require that any such
GOAL:
POLICY 4-8: To assure the full and timely availability of services, the City
shall issue its development orders in accordance with the
adopted concurrency management plan.
CREATE A REGULATORY SYSTEM WHICH SUPPORTS THE DESIRED
LAND USE PATTERN AND OTHER COMPONENTS OF THE
OVERARCHHG GOAL.
OBJECTIVE 5: Implement and annually review and update the
Consolidated Land Development Regulations ("unified
code") to regulate, at a minimum, the following types of
activity:
a. The use of land and water.
b. The subdivision of land.
c. Stormwater management.
d. Landscaping.
e. Tree preservation.
f. Signage.
POLICY 5-1: Continue the Development Review Committee (DRC) as a
mechanism for the review of development proposals. site
plans and construction plans.
POLICY 5-2: Provide and utilize a method of evaluating the fiscal impact
of proposed development as part of the development
approval process.
POLICY 5·3: The City shall encourage the elimination or reduction of land
uses inconsistent with the Future Land Use Map.
Accordingly. periodic revisions shall be conducted of all
inconsistent FLUM and zoning categories as well as any
inconsistent provisions of the Consolidated Land
Development Regulations.
POLICY 5-4: Prohibit the issuance of development orders which will
reduce the designated level-of-service for the affected public
facilities below the level adopted in the Comprehensive Plan
··with the exception of the any roadway level.of-service for
which there is an exemption within the Transportation
Concurrency Exception Area (TCEA) of the CRA.
POLICY 5-5: Review the impacts on infrastructure and services to
determine conformance to the Future Land Use Map
including. but not limited to: potable water. sewer, drainage
and solid waste.
GOAL: PROVIDE FOR THE MAINTENANCE OF EXISTING
PROPERTIES AND NEIGHBORHOODS AND FOR THE
REDEVELOPMENT OF THOSE AREAS OF THE CITY IN NEED
OF SIGNIFICANT PUBLIC AND PRIVATE REINVESTMENT.
OBJECTIVE 6: Upgrade and improve building codes and inspection
procedures.
valorem taxes. This means that the City has to regularly evaluate its fees and
rates to determine if increases are necessary to fund needed utility
improvements.
GOALS, OBJECTIVES AND POLICIES
The Goals, Objectives and Policies which have been developed for
the Public Utilities Element are intended to support the overarching community
goal which emerged from South Daytona's Strategic Planning process. The
Public Utilities Element Goals, Objectives and Policies are subordinate to the
overarching goal; yet, in combination with the Goals, Objectives and Policies of
the other Plan Elements, contribute to the achievement of the community goal.
GOAL: SOUTH DAYTONA WILL PROVIDE PUBLIC SERVICES (INCLUDING
SANITARY SEWER, POTABLE WATER, STORMWATER DRAINAGE, SOLID
WASTE DISPOSAL AND RECLAIMED WATER.) TO MEET CURRENT AND
ANTICIPATED NEEDS AND WILL PROTECT THE NATURAL
GROUNDWATER AQUIFER RECHARGE AREAS.
OBJECTIVE 1: South Daytona shall ensure that adequate public services
and facilities are available to meet the needs of residents
and businesses.
POLICY 1-6: The City shall operate its trash collection service either on a
competitive contract basis or as a City·operated service.
POLICY 1-7: The City shall continue its inspection programs and support
Volusia County efforts at identifying, inspecting and
managing hazardous waste generators.
POLICY 1-8: The City shall actively coordinate its master stormwater
planning efforts with those of Volusia County.
POLICY 1·9: The Citv shall continye to expand and make available
reclaimed water along the Ridgewood Avenue corridor and
Citv Parks as funding is made available.
OBJECTIVE 2: South Daytona shall schedule Improvements designed
to correct system deficiencies within five (5) years from
the identification of such deficiencies.
POLICY 2-1: The City shall continue to periodically survey - at intervals
no longer than every five years - the infiltration/inflow
conditions of the sanitary sewer system and construct
corrective improvements based upon the survey results.
POLICY 2-2: Shortly before completion of the Country Club Gardens
Sanitary Sewer Collection System Project in 1998·99, The
City shall establish a future schedule, budget, and funding
sources for extending sanitary sewer collection lines into the
remaining unsewered areas of the City.
POLICY 2-3: By 1998, the City shall complete the South Loop Water Main
project.
POLICY 2-4: As financially feasible, the City shall schedule in its Capital
Budget the remaining projects recommended in the City's
Master Stormwater Drainage Plan.
OBJECTIVE 3: South Daytona shall provide for a coordinated program
of service extensions for public systems within the City.
POLICY 3·1: The City shall coordinate any expansions of the water, sewer
service areas and reclaimed water service areas with the
City of Daytona Beach, as per the latest Interlocal Service
,Agreement.
POLICY 3-2: In all development requiring extension of the water and
sewer distribution and collection systems, the developer
shall be required to provide for the construction of all lines
and associated system improvements.
POLICY 3-3: The City shall continue to implement its recycling program
which provides for the collection and recycling of
newspapers, aluminum cans, glass and plastic.
POLICY 3-4: The City shall continue to enforce its requirements for the
disposal of oil, tires, batteries, white goods and hazardous
waste consistent with Volusia County landfill regulations.
POLICY3-5: The City shall install a reuse water distribution system that
obtains reuse water from either Daytona Beach or Port
GOALS, OBJECTIVES AND POLICIES
The Goals, Objectives and Policies contained in the Conservation Element
are intended to support the overarching community goal which emerged form
South Daytona's strategic planning and visioning process. The Goals,
Objectives and Policies of this Element are subordinate to the community goal,
yet, in combination with the Goals, Objectives and Policies of the other Plan
Elements, contribute to the achievement of the community goal. The Open
Space and Recreation Element, Stormwater Drainage Sub-Element, the Coastal
Zone Element, and the Traffic Circulation Element have special links to· the
Conservation Element.
GOAL: CONSERVE AND PROTECT SOUTH DAYTONA'S NATURAL
RESOURCES IN A MANNER CONSISTENT WITH THE CITY'S
PLANNED DEVELOPMENT PATTERN AND IN A MANNER
WHICH CONTRIBUTES TO THE CREATION OF A QUALITY,
WELL-ROUNDED COMMUNITY.
OBJECTIVE 1. Create a regulatory framework which integrates South
Daytona's natural resources into an urban environment.
POLICY 1-1: Implement the City's Streetscape Program schedule for
landscape planting on key streets.
POLICY 1-2: Periodically review the City's Tree Ordinance to ensure that
it meets or exceeds the Volusia County minimum
environmental performance standards mandated for all
governments in the county.
POLICY 1-3: Continue to implement development regulations which
require additional open space and landscaping for
commercial and industrial development.
POLICY 1-4:Continue to implement development regulations which
provide planned unit development and planned commercial
development options for residential and commercial
development as a means of providing additional flexibility in
dealing with site limitations and conservation needs.
POLICY 1·5: Continue to support the conservation of vital resource areas
in Volusia County through support of Volusia County's
Environmentally Sensitive Lands Acquisition program,
adoption of resolutions of support for conservation activities,
and other actions which the City Council deems appropriate.
POLICY 1-6: Preserve the City's scenic assets through the purchase of
riverfront land as recommended in the Recreation and Open
Space Element and through the continued development of
the City's lakes as public recreation and scenic assets.
OBJECTIVE 2: Maintain and improve the quality of the Halifax River.
POLICY 2-1: Join with other communities along the Halifax River in the
development and implementation of a comprehensive water
quality management program.
POLICY 2-2: Continue to implement the City's storm water management
master plan which includes recommendations to improve the
quality of stormwater discharge.
POLICY 2-3: Continue the City's present policy of requiring onsite
retention and detention as a means of limiting the flow of
non·point source pollutants into area water bodies and
facilitating groundwater and aquifer recharge.
POLICY 2-4: The City shall meet the permit requirements of the NPDES
Program for its MS4 classification.
POLICY 2·5: The City shall develop a Reclaimed Water System Master
Plan for the expansion of the first phase of the City's reuse
water utility system to utilize the City of Daytona Beach's
reclaimed. water in an effort to reduce groundwater
withdrawals for irrigation and to reduce effluent discharges to
improve water quality in the Halifax River.
OBJECTIVE 3: Establish methods to conserve the city's water and air
resources.
POLICY 3-1: Continue to keep current and enforce development
regulations with minimum performance standards for
construction in flood prone areas.
POLICY 3-2: Continue to enforce the City's standard procedures for
limiting water use in times of water shortage as declared by