Greenville County Planning Department 301 University Ridge, Suite 3800 Greenville, SC 09601 GCPlanning.org 864-467-7270 Greenville County Planning & Code Compliance will develop a community plan for the designated City View study area. The funcon of the resulng document is to supplement and update the County Comprehensive Plan by providing finer-grained, specialized aenon to the Future Land Use Plan, regarding this study area. Furthermore, the final document will offer a detailed acon strategy for achieving the desired goals, as specified by the community. Addional elements may be included, depending upon the needs and nature of the community plan as it develops over me. The City View Community Plan will commence in February of 2017 with an ancipated development schedule of six months. A detailed metable with the proposed schedule will be submied prior to the commencement of the plan. Following inial stakeholder interviews and public meengs, planning staff will develop a goals & objecves list along with a concept master plan for the study area. Each of the phases described in the following secons will be accompanied with their respecve deliverables which will be made available digitally or physically, by request. The City View study area (see Fig 1) is comprised of an area hand-selected by community residents (approximately 265 acres) that emerged out of the former municipal boundary of City View. Natural and infrastructural boundaries have been ulized as mush as possible in order to limit opportunies for drawing lines between neighbors. The resulng study area is bordered on the west by W. Blue Ridge Drive; to the south, by Long Branch Creek; to the east, by Norfolk Southern Railroad and Duke Energy right- of-way; and to the north, by W. Parker Road. CITY VIEW COMMUNITY PLAN: SCOPE OF WORK INTRODUCTION STUDY AREA Fig 1: City View Study Area (click to view link) Suzanne Terry, Planner, [email protected], 864-467-7332 Jonathan Hanna, Planner, [email protected], 864-467-7291 WESTSIDE PARK SWAMP RABBIT TRAIL PEACE ST W BRAMLETT RD W BLUE RIDGE DR AGNEW RD E BRAMLETT RD N VANCE ST CRANE AVE 4TH ST W 5TH ST FROST ST S SIXTH ST CLEMSON AVE PELZER ST SMYTHE ST LOUISE AVE MOODY ST SIRRINE ST ALLEY ALICE ST W MAIN ST BEATTIE ST REACH ST REDSTONE RD OWENS ST CORTEZ ST W WASHINGTON ST CREST ST SPRUCE ST W 4TH ST ALY E 5TH ST & 6TH ST ALLEY PIEDMONT - NORTHERN RAILROAD CSX RAILROAD PIEDMONT - NORTHERN RAILROAD LONG BRANCH REEDY RIVER REEDY RIVER City View Boundary Map New CITY VIEW Boundary INTERSTATE US HIGHWAY STATE ROAD COUNTY ROAD MUNICIPAL ROAD Railroad Stream TAX PARCEL Park / Recreation Center Municipal Boundary I 0 0.05 0.1 0.025 Miles 0 100 200 300 400 500 50 Feet

CITY VIEW COMMUNITY PLAN: SCOPE OF WORKThe City View Community Plan will commence in February of 2017 with an anticipated development schedule of six months. A detailed timetable with

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CITY VIEW COMMUNITY PLAN: SCOPE OF WORKThe City View Community Plan will commence in February of 2017 with an anticipated development schedule of six months. A detailed timetable with

Greenville County Planning Department301 University Ridge, Suite 3800Greenville, SC 09601GCPlanning.org864-467-7270

Greenville County Planning & Code Compliance will develop a community plan for the designated City View study area. The function of the resulting document is to supplement and update the County Comprehensive Plan by providing finer-grained, specialized attention to the Future Land Use Plan, regarding this study area. Furthermore, the final document will offer a detailed action strategy for achieving the desired goals, as specified by the community. Additional elements may be included, depending upon the needs and nature of the community plan as it develops over time.

The City View Community Plan will commence in February of 2017 with an anticipated development schedule of six months. A detailed timetable with the proposed schedule will be submitted prior to the commencement of the plan.

Following initial stakeholder interviews and public meetings, planning staff will develop a goals & objectives list along with a concept master plan for the study area. Each of the phases described in the following sections will be accompanied with their respective deliverables which will be made available digitally or physically, by request.

The City View study area (see Fig 1) is comprised of an area hand-selected by community residents (approximately 265 acres) that emerged out of the former municipal boundary of City View. Natural and infrastructural boundaries have been utilized as mush as possible in order to limit

opportunities for drawing lines between neighbors. The resulting study area is bordered on the west by W. Blue Ridge Drive; to the south, by Long Branch Creek; to the east, by Norfolk Southern Railroad and Duke Energy right-of-way; and to the north, by W. Parker Road.

CITY VIEW COMMUNITY PLAN: SCOPE OF WORK

INTRODUCTION

STUDY AREA

Fig 1: City View Study Area (click to view link)

Suzanne Terry, Planner, [email protected], 864-467-7332Jonathan Hanna, Planner, [email protected], 864-467-7291

WESTSIDE PARK

SWAMP RABBIT TRAIL

PEACE ST

W BRAMLETT RD

W BLUE RIDGE DR

AGNEW RD

E BRAMLETT RD

N V

ANC

E ST

CRANE AVE

4TH ST

W 5TH ST

FRO

ST

ST

S SIXTH ST

CLEMSON AVE

PELZ

ER

ST

SMY

THE

ST

LOUISE AVE

MO

OD

Y S

T

SIR

RIN

E S

T

ALLE

Y

ALICE ST

W MAIN ST

BEA

TTIE

ST

REACH ST

REDSTONE R

D

OWENS ST

CORTEZ ST

W W

ASHINGTON ST

CR

EST

ST

SPR

UC

E S

T

W 4T

H ST

ALY

E 5TH ST & 6TH ST ALLEY

PIED

MO

NT -

NORT

HERN

RAI

LROA

DCSX

RAIL

ROAD

PIED

MO

NT -

NORT

HERN

RAI

LROA

D

LONG

BRA

NCH

REE

DY

RIV

ER

REEDY R

IVER

City View Boundary MapNew CITY VIEW Boundary

INTERSTATE

US HIGHWAY

STATE ROAD

COUNTY ROAD

MUNICIPAL ROAD

Railroad

Stream

TAX PARCEL

Park / Recreation Center

Municipal Boundary

I 0 0.05 0.10.025Miles

0 100 200 300 400 50050Feet

Page 2: CITY VIEW COMMUNITY PLAN: SCOPE OF WORKThe City View Community Plan will commence in February of 2017 with an anticipated development schedule of six months. A detailed timetable with

The following phases breakdown for this Scope of Work pertains to the entire planning effort in order to provide an understanding of the context of the process.

SCOPE OF WORK PHASES

Gather and analyze area specific data (including, but not limited to):

Deliverables:

Deliverables:

Deliverables:

Gather community feedback through a public survey, community meetings, and other methodsIdentify area strengths, weaknesses, opportunities, and threatsConduct visioning exercises to solidify goals and objectives for the future

Develop an action strategy containing specific steps for realizing and maintaining the identified goals and objectivesSubmit the resulting deliverables for public review by the community and stakeholders

Define the broad vision, principles, and goals that will guide the plan’s development

Use the feedback from community members and stakeholders to update the existing County Comprehensive Plan and Future Land Use Plan on a parcel-specific level

Provide additional information, as available (economic, employment, business data, etc.)

Develop a detailed community engagement strategy

Identify stakeholders and conduct interviews

• Demographics data

• Future investments

• Inventory & Analysis Report

• Vision, Principles, & Goals List (distilling key themes)• Inventory of Items To Be Addressed

• Concept Master Land Use Plan• Concept Draft Goals with Action Strategies

• Road and utility infrastructure information

• Land use/zoning information

• Prevailing issues/constraints

• Community Engagement Strategy

• Community facilities (schools, recreation, etc.)

• Development activity

• Development constraints

• Public safety (law enforcement, fire protection, etc.)

Phase 1: Inventory & Analysis

Phase 2: Community Engagement

Phase 3: Concept Master Plan and Draft Goals Development

Page 3: CITY VIEW COMMUNITY PLAN: SCOPE OF WORKThe City View Community Plan will commence in February of 2017 with an anticipated development schedule of six months. A detailed timetable with

Deliverables:

Deliverables:

Apply the resulting feedback from the public review process to the plan documentFinalize the document and garner consensus from community members and stakeholders

Engage community members to provide support throughout the process

Commence the adoption process with Planning Commission, the Planning & Development Committee, and County Council

• Final Draft of the Community Plan Document

• Adopted Community Plan Document

Phase 4: Finalize Community Plan Document

Phase 5: Adoption Process

Phase 3: Concept Master Plan and Draft Goals DevelopmentPhase 4: Finalize Community Plan DocumentPhase 5: Adoption Process

Phase 2: Community EngagementPhase 1: Inventory & Analysis

2 months2 months1 month2 months

1 monthPROPOSED SCHEDULE (all dates and proposed deadlines subject to change)