United Nations Development Programme Page 1 Civil works for Construction of Zalingi prison Work shop Hall, Zalingi Locality, and Central Darfur State. ITB/KRT/DDR/16/01 Record of Question & Answer Session/Minutes of Meeting Date: Sunday 23 rd of Oct 2016. Time : 10:00am - 11:20 pm Khartoum Local Time. Venue: UNDP/DDR premises in Mashtal Street, House No. 98, and Block 10. 1) Q. Can the bid price be submitted in USD? Answer: The bid can be submitted in US$ but the bidder should have a bank account in USD. The bidder has to have an account in USD in the same bank of UNDP in order to receive the payment in USD as per Bank of Sudan local regulations. 2) Q. If we have our bank account in US$ but not in Khartoum Bank shall UNDP transfer the money in our account? Answer: UNDP can transfer the payment to bidder’s USD account, but the Bidder’s bank will not cash the payment in USD, it will be cashed in SDG according to the bank prevailing exchange rate. This is in line with the Bank of Sudan local regulations. UNDP shall not bear any extra cost apart from the value indicated in the Cheque. 3) Q. Is it possible to submit partial bid? Answer: No partial bid shall be allowed. 4) Q. Drawings are not clear when printed out. Answer: Separate drawings in PDF shall be posted in UNDP web site along with the answers.

Civil works for Construction of Zalingi prison Work …intra.sd.undp.org/bids/doc/1503.pdf · Civil works for Construction of Zalingi prison ... UNDP/DDR premises in Mashtal Street,

  • Upload
    vuthien

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

United Nations Development Programme

Page 1

Civil works for Construction of Zalingi prison Work shop Hall, Zalingi Locality, and Central Darfur State.

ITB/KRT/DDR/16/01

Record of Question & Answer Session/Minutes of Meeting

Date: Sunday 23rd of Oct 2016.

Time : 10:00am - 11:20 pm Khartoum Local Time.

Venue: UNDP/DDR premises in Mashtal Street, House No. 98, and Block 10.

1) Q. Can the bid price be submitted in USD?

Answer: The bid can be submitted in US$ but the bidder should have a bank

account in USD. The bidder has to have an account in USD in the same bank of

UNDP in order to receive the payment in USD as per Bank of Sudan local

regulations.

2) Q. If we have our bank account in US$ but not in Khartoum Bank shall UNDP transfer the

money in our account?

Answer: UNDP can transfer the payment to bidder’s USD account, but the Bidder’s

bank will not cash the payment in USD, it will be cashed in SDG according to the

bank prevailing exchange rate. This is in line with the Bank of Sudan local

regulations. UNDP shall not bear any extra cost apart from the value indicated in the

Cheque.

3) Q. Is it possible to submit partial bid?

Answer: No partial bid shall be allowed.

4) Q. Drawings are not clear when printed out.

Answer: Separate drawings in PDF shall be posted in UNDP web site along with the

answers.

United Nations Development Programme

Page 2

5) Q. We have submitted clarifications but we receive no answer?

Answer: all questions are gathered from all bidders and answers shall be posted in

UNDP website as soon as possible.

6) Q .Whether the type of contract is measurement or lump sum contract. It is lump sum:.

Answer: This is lump sum contract and shall be paid in milestone according to work

progress.

7) Q. Are electrical power and water on the site:

Answer. Bidders should not depend on the city power and water system as they are

not reliable and cuts are frequently experienced.

8) Q. Mismatch between drawings and BoQ. Drawings will be considered as reference.

Answer. The quantities in the BoQ are calculated by UNDP engineer based on the

drawings in case of any discrepancies in case of any mistake in the quantities in the

BoQ the bidder has to bring this to UNDP attention otherwise the quantities shall be

deemed as correct.

9) Q. the contract duration in the bid data sheet is 4 months but in other location its 3

month?

Answer. The contract duration is 4 months this include the resource mobilization

period. Anyway due to the project size the bidders are encouraged to reduce the

project duration as less as possible.

10) Q.Is the area accessible all the time?

Answer. Zalingi is linked by Nyala and Elgneneina by tarmac road (the road is in

rough condition). There is no direct commercial flight from Khartoum to Zalinigi.

11) Q. Is it possible to deviate from the specifications attached?

Answer. Even it could be possible that contractors deviate for specifications and

that’s state in noncompliance materials form but it’s not recommended and

bidder should bind to the stated specifications as much as possible.

United Nations Development Programme

Page 3

12) Q. The bid validity is 120 days, which is too long with so rapid changing of prices is it

possible to reduce it?

Answer. There is no possibility that we reduce the validity time but we can

accelerate the procurement process of the service to reduce time.

13) Q. When the firm fill the table detailing previous contracts, do we mention any contract or only contracts relevant to this ITB submission?

Answer. The bidders are required to mention contracts of similar projects executed by their companies stressing on projects executed during the last five years and to indicate to clients, date, and cost of these projects.

14) Q. in case of any other question how can contact?

Answer. All contacts with UNDP is only through the contact address mentioned in the ITB.

*****

Attachment: Drawings in PDF are attached to this notes as requested by one of the bidders.

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

August 2016

WORKSHOP - STANDARD MODEL

UNAMIDUNDP

ZALENGEI PRISONCENTRAL DARFUR II

SUDAN

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:13:53 PM, DWG To PDF.pc3

ENTRANCE

A0

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

FLOOR PLAN

STANDARD MODEL

WALL MOUNTED LAMP

ELECTRICAL KEY

DOUBLE ONE WAY SWICH

SOCKET OUTLET

WC

SF

FLOOR FINISHES

EPOXY FINISH

CERAMIC TILES

SAND FINISH ON PCFAIR FACE CEMENT/

4 ROUPH PLASTER

WALL FINISHES

CERAMIC TILESMARBLE TILES

3 COATS OF POMASTIC

12

3

CEILING FINISHES

US ZINC SHEET (0.45MM)

OIL PAINT

FABRIC TEXTILE SHEETS

1

2

3

3 MARBLE TILES

GRANITE TILES4

SKIRTING

CERAMIC TILES2

1

FLOOR FINISHES SKIRTING

CEILING FINISHES WALL FINISHES

3

2

1

FINISHING SCHEDULE

ON C/S PLASTER

SLOPE DIRECTION

ZALENGEI PRISONCENTRAL DARFUR ISUDAN

4.0

0

A

1

5.00

10.0

0

D

2.0

04.0

0

5.00 5.00 5.00

2 3 4

B

C

520.00

SLIDING DIRECTION SLIDING DIRECTION

GROUND FLOOR PLAN LAYOUT

WALL MOUNTED KDK FAN

31

11

EPOXY FINISH H. 25CM

W2W2W2

W2W2W2

W2

W2

W2

W2

EN

TR

AN

CE

EN

TR

AN

CE

MA

IN B

OA

RD

HEAVY DUTY FOR WORKSHOP

SU

B B

OA

RD

SU

B B

OA

RD

SU

B B

OA

RD

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:13:56 PM, DWG To PDF.pc3

5.0010.41 STEEL BOTTOM TRACK

2.80 DOOR LEAF2.80 DOOR LEAF

4.80 STRUCTURAL OPENING

3.0

3 D

OO

R L

EA

F

2.80 DOOR STOPPER2.80 DOOR LEAF

3.0

3 D

OO

R L

EA

F

2.70 DOOR STOPPER

5.00 5.005.00

6.2

55

.65

5.0

5

20.00

10.00

0.65

11.30 FASCIA TO FASCIA

0.65

0.6

0

0.6

0

0.6

4

0.2

4

2.23

2.00

2.00

2.60

4.002.004.00

2.60

A1

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

ELEVATIONS

STANDARD MODEL

WALL MOUNTED LAMP

ELECTRICAL KEY

DOUBLE ONE WAY SWICH

SOCKET OUTLET

WC

SFFLOOR FINISHES SKIRTING

CEILING FINISHES WALL FINISHES

SLOPE DIRECTION

ZALENGEI PRISONCENTRAL DARFUR ISUDAN

WALL MOUNTED KDK FAN

1.2

5

1.50

1.5

0

1.2

5

1.50

1.5

0

1.2

5

1.50

1.5

0

1.2

5

1.50

1.5

0

1.2

5

1.50

1.5

0

FLOOR FINISHES

EPOXY FINISH

CERAMIC TILES

SAND FINISH ON PCFAIR FACE CEMENT/

4 ROUPH PLASTER

WALL FINISHES

CERAMIC TILESMARBLE TILES

3 COATS OF POMASTIC

12

3

CEILING FINISHES

US ZINC SHEET (0.5MM)

OIL PAINT

FABRIC TEXTILE SHEETS

1

2

3

3 MARBLE TILES

GRANITE TILES4

SKIRTING

CERAMIC TILES2

1

3

2

1

FINISHING SCHEDULE

ON C/S PLASTER

EPOXY FINISH H. 25CM

Southern Elevation

Eastern & Western Elevations

GALVANIZED STEEL CAP

POWDER COATED PRE PAINT "RAL

1001" FIXED TO STEEL SHEETS BY

SELF DRILLING STAINLESS STEEL

SCREWS WITH RUBBER WASHER

0.4 MM US CORRUGATED SHEET

POWDER COATED PRE PAINT "RAL

1001" FIXED TO PURLING BY SELF

DRILLING STAINLESS STEEL SCREWS

WITH RUBBER WASHER

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:01 PM, DWG To PDF.pc3

10.00

1.001.001.00 1.001.00

0.60

2.8

8

1.00

1.00

1.001.00

0.70

1 HOLLOW CEMENT BLOCK

40X20X20 CM WITH 1.5 CM

PLASTER C/S 1:4 MIX BOTH

SIDES COATED WITH 3

LAYERS OF ACRYLIC

EMULSION INTERNALLY

AND TEXTURED PAINT

EXTERNALLY

STEEL STRUCTURAL TRUSS

3 COATS OF ANTI-CORROGION PAINT

SEE STRUCTURAL DRAWINGS

3X6 CM SQUARE SECTION PURLING

3 COATS OF ANTI-CORROGION PAINT

ROCK WOOL THERMAL INSULATION

LAID UNDER US ZINC SHEETS & ABOVE

PURLING

GALVANIZED STEEL CAP

POWDER COATED PRE PAINT "RAL

1001" FIXED TO STEEL SHEETS BY

SELF DRILLING STAINLESS STEEL

SCREWS WITH RUBBER WASHER

0.4 MM US CORRUGATED SHEET

POWDER COATED PRE PAINT "RAL

1001" FIXED TO PURLING BY SELF

DRILLING STAINLESS STEEL SCREWS

WITH RUBBER WASHER

10 CM PLAIN CONCRETE 1:3:6 FAIR FACE "MECHANICALLY"

COMPACTED SELECTED MATERIALS FOR FILLS

NATURAL SOIL EARTH

2 COATS OF POLYAMINE EPOXY PAINT 3MM THICK GRAY RED COLOR

DET.024.0

7 H

EA

D R

OO

M

3.0

5

HLW2 SIZE : 2.00 X 0.80 M.

4.00 COLUMNS ON EDGE WALLS2.00

1.00

0.2

50.2

0

11.30 FASCIA TO FASCIA

4.00 COLUMNS ON EDGE WALLS

1.38

DET.01

A2

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

DETAILS

STANDARD MODEL

WALL MOUNTED LAMP

ELECTRICAL KEY

DOUBLE ONE WAY SWICH

SOCKET OUTLET

WC

SFFLOOR FINISHES SKIRTING

CEILING FINISHES WALL FINISHES

SLOPE DIRECTION

ZALENGEI PRISONCENTRAL DARFUR ISUDAN

WALL MOUNTED KDK FAN

FLOOR FINISHES

EPOXY FINISH

CERAMIC TILES

SAND FINISH ON PC

FAIR FACE CEMENT/

4 ROUPH PLASTER

WALL FINISHES

CERAMIC TILESMARBLE TILES

3 COATS OF POMASTIC

12

3

CEILING FINISHES

US ZINC SHEET (0.5MM)

OIL PAINT

FABRIC TEXTILE SHEETS

1

2

3

3 MARBLE TILES

GRANITE TILES4

SKIRTING

CERAMIC TILES2

1

3

2

1

FINISHING SCHEDULE

ON C/S PLASTER

EPOXY FINISH H. 25CM

Section YY

TRUSS SECTIONAL DETAILSSEE

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:06 PM, DWG To PDF.pc3

0.3

5

2.2

2 M

AX

@ C

EN

TE

R

DET.01 PARTIAL LONGITUDE STEEL ROOF SECTIONNTS (X4)

3X6 CM SQUARE SECTION PURLING

3 COATS OF ANTI-CORROGION PAINT

0.4 MM US CORRUGATED SHEET POWDER

COATED PRE PAINT "RAL 1001" FIXED TO

PURLING BY SELF DRILLING STAINLESS

STEEL SCREWS WITH RUBBER WASHER,

INSERTED IN WALL BY 10 CM.

STEEL STRUCTURAL TRUSS

3 COATS OF ANTI-CORROGION PAINT

SEE STRUCTURAL DRAWINGS

ROCK WOOL THERMAL INSULATION

LAID UNDER US ZINC SHEETS & ABOVE

PURLING

STEEL CAP

POWDER COATED PRE PAINT "RAL

1001" FIXED TO STEEL SHEETS BY

SELF DRILLING STAINLESS STEEL

SCREWS WITH RUBBER WASHER

INSIDE

20 X 20 CM RC BEAM

SEE STRUCTURAL DRAWINGS

0.5

1 M

AX

@ C

EN

TE

R

0.10 INSERTED

PARAPET:

1 HOLLOW CEMENT BLOCK 40X20X20

CM WITH 1.5 CM PLASTER C/S 1:4 MIX

BOTH SIDES COATED WITH 3 LAYERS

OF ACRYLIC EMULSION TEXTURED

PAINT EXTERNALLY

0.6250.5250.510

A3

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

DETAILS

STANDARD MODEL

WALL MOUNTED LAMP

ELECTRICAL KEY

DOUBLE ONE WAY SWICH

SOCKET OUTLET

WC

SFFLOOR FINISHES SKIRTING

CEILING FINISHES WALL FINISHES

SLOPE DIRECTION

ZALENGEI PRISONCENTRAL DARFUR ISUDAN

WALL MOUNTED KDK FAN

FLOOR FINISHES

EPOXY FINISH

CERAMIC TILES

SAND FINISH ON PC

FAIR FACE CEMENT/

4 ROUPH PLASTER

WALL FINISHES

CERAMIC TILESMARBLE TILES

3 COATS OF POMASTIC

12

3

CEILING FINISHES

US ZINC SHEET (0.5MM)

OIL PAINT

FABRIC TEXTILE SHEETS

1

2

3

3 MARBLE TILES

GRANITE TILES4

SKIRTING

CERAMIC TILES2

1

3

2

1

FINISHING SCHEDULE

ON C/S PLASTER

EPOXY FINISH H. 25CM

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:11 PM, DWG To PDF.pc3

A4

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

DETAILS

STANDARD MODEL

WALL MOUNTED LAMP

ELECTRICAL KEY

DOUBLE ONE WAY SWICH

SOCKET OUTLET

WC

SFFLOOR FINISHES SKIRTING

CEILING FINISHES WALL FINISHES

SLOPE DIRECTION

ZALENGEI PRISONCENTRAL DARFUR ISUDAN

WALL MOUNTED KDK FAN

FLOOR FINISHES

EPOXY FINISH

CERAMIC TILES

SAND FINISH ON PCFAIR FACE CEMENT/

4 ROUPH PLASTER

WALL FINISHES

CERAMIC TILESMARBLE TILES

3 COATS OF POMASTIC

12

3

CEILING FINISHES

US ZINC SHEET (0.5MM)

OIL PAINT

FABRIC TEXTILE SHEETS

1

2

3

3 MARBLE TILES

GRANITE TILES4

SKIRTING

CERAMIC TILES2

1

3

2

1

FINISHING SCHEDULE

ON C/S PLASTER

EPOXY FINISH H. 25CM

0.65

11.30 FASCIA TO FASCIA

0.65

10.00

4.00 COLUMNS ON EDGE WALLS2.004.00 COLUMNS ON EDGE WALLS

OUTSIDE ELEVATION

0.6

0

0.6

0

0.6

4

0.2

4

0.1

4

0.2

4

2.23

2.00

2.00

0.4

9

1.001.001.00 1.001.000.60

1.00

1.00

1.001.00

0.70

STEEL STRUCTURAL TRUSS

3 COATS OF ANTI-CORROGION PAINT

SEE STRUCTURAL DRAWINGS

3X6 CM SQUARE SECTION PURLING

3 COATS OF ANTI-CORROGION PAINT

ROCK WOOL THERMAL INSULATION

LAID UNDER US ZINC SHEETS & ABOVE

PURLING

GALVANIZED STEEL CAP

POWDER COATED PRE PAINT "RAL

1001" FIXED TO STEEL SHEETS BY

SELF DRILLING STAINLESS STEEL

SCREWS WITH RUBBER WASHER

0.4 MM US CORRUGATED SHEET

POWDER COATED PRE PAINT "RAL

1001" FIXED TO PURLING BY SELF

DRILLING STAINLESS STEEL SCREWS

WITH RUBBER WASHER1.00

11.30 FASCIA TO FASCIA

PARTIAL SECTION Y-Y1:50

PARTIAL ELEVATION1:50

TRUSS SECTIONAL DETAILSSEE

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:16 PM, DWG To PDF.pc3

3.0

5

ST

RU

CT

UR

AL

OP

EN

ING

0.2

5

INS

IDE

4.80

STRUCTURAL OPENING

SLIDING DIRECTION

10.41 STEEL BOTTOM TRACK

2.80 DOOR LEAF2.51 DOOR GUIDE 2.51 DOOR GUIDE

SLIDING DIRECTION SLIDING DIRECTION

2.80 DOOR LEAF

4.80 STRUCTURAL OPENING

0.15

1.5

03

.03

DO

OR

LE

AF

3.0

3 D

OO

R L

EA

F

2.80 DOOR STOPPER

2.17 DOOR GUIDE2.51 DOOR GUIDE2.80 DOOR LEAF

0.150.500.500.50 0.500.50

0.15

3.0

3 D

OO

R L

EA

F

2.70 DOOR STOPPER

0.3

0

0.20

10.41 CHANNEL

SLIDING STEEL DOOR : PLAN1:50

SLIDING STEEL DOOR : ELEVATION1:50

SECTION1:50

2.17 DOOR GUIDE

DOOR ROLLER GUIDE

DET.01

DET.03

2.80 DOOR LEAF2.48 DOOR GUIDE

2.70 DOOR STOPPER

0.150.50 0.50 0.500.50 0.50

IPE A120 - 8.7 KG/M

WELDED TO PLATE

SLIDING DIRECTION

OUTSIDE2.80 DOOR LEAF2.48 DOOR GUIDE

2.70 DOOR STOPPER

INSIDE

IPE A120 - 8.7 KG/M

COLUMN

DOOR WHEEL

DOOR ROLLER GUIDE

DET.02

10X10 CM C-SECTION

CHANNEL TRACK

WELDED TO IPE A120

IPE A120 - 8.7 KG/M

WELDED TO PLATE

DOOR STOPPER

SPRING

10X10 CM C-SECTION

CHANNEL TRACK

WELDED TO IPE A120

DOOR STOPPER

SPRING

DOOR STOPPER

SPRING

FILLED STEEL ROD AS WHEEL TRACK

A5

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

DETAILS

STANDARD MODEL

WALL MOUNTED LAMP

ELECTRICAL KEY

DOUBLE ONE WAY SWICH

SOCKET OUTLET

WC

SFFLOOR FINISHES SKIRTING

CEILING FINISHES WALL FINISHES

SLOPE DIRECTION

ZALENGEI PRISONCENTRAL DARFUR ISUDAN

WALL MOUNTED KDK FAN

FLOOR FINISHES

EPOXY FINISH

CERAMIC TILES

SAND FINISH ON PCFAIR FACE CEMENT/

4 ROUPH PLASTER

WALL FINISHES

CERAMIC TILESMARBLE TILES

3 COATS OF POMASTIC

12

3

CEILING FINISHES

US ZINC SHEET (0.5MM)

OIL PAINT

FABRIC TEXTILE SHEETS

1

2

3

3 MARBLE TILES

GRANITE TILES4

SKIRTING

CERAMIC TILES2

1

3

2

1

FINISHING SCHEDULE

ON C/S PLASTER

EPOXY FINISH H. 25CM

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:21 PM, DWG To PDF.pc3

0.20

0.3

0

DET. 01: VERTICAL UPPER SECTIONNTS (X6)

DET. 02: VERTICAL LOWER SECTIONNTS (X6)

DET. 02: SECTIONAL PART PLANNTS (X6)

10 CM THICK REINFORCED CONCRETE

RAMP 1:2:4 MIX, 10 MM @ 150 MM

BOTHWAY

20 X 30 CM 10.45 M LENGTH REINFORCED

CONCRETE BEAM AS DOOR BED 1:2:4 MIX,

4Ø16MM LINKS 8MM @ 150 MM C/C

2 QTY 50 X 50 MM STEEL ANGLE INSERTED IN RC

BEAM BY STEEL FISHER,OR ANCHORS WELDED TO

BEAM STEEL

3 COATS OF ANTI- CORROSION PAINT

3X6 CM SQUARE SECTION @ 50 CM C/C BOTHWAY

COATED BY ANTI-CORROGION PAINT

STYROFOAM INSULATION

7 MM THICK PLASTIC SHEET CURTAIN

STRIPS AS WEATHER PROTECTION

FIXED TO RC BEAM BY STEEL FISHER

@ 50CM C/C

IPE A120 - 8.7 KG/M

WELDED TO PLATE

10X10 CM C-SECTION

CHANNEL TRACK

WELDED TO IPE A120

IPE A120 - 8.7 KG/M

WELDED TO PLATE

IPE A120 - 8.7 KG/M

WELDED TO PLATE

2 QTY 50 X 50 MM STEEL

ANGLE INSERTED IN RC

BEAM BY STEEL

FISHER,OR ANCHORS

WELDED TO BEAM STEEL

3 COATS OF ANTI-

CORROSION PAINT

FILLED STEEL ROD AS

WHEEL TRACK

DOOR ROLLER GUIDE

DOOR ROLLER GUIDE

DOOR LEAF FRAME

3X6 CM HOLLOW SECTION

FILLED STEEL ROD AS WHEEL TRACK

ROLLER WHEEL DETAILNTS

2 QTY 50 X 50 MM STEEL ANGLE

INSERTED IN RC BEAM BY STEEL

FISHER,OR ANCHORS WELDED TO

BEAM STEEL

3 COATS OF ANTI- CORROSION

PAINT

A6

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

DETAILS

STANDARD MODEL

WALL MOUNTED LAMP

ELECTRICAL KEY

DOUBLE ONE WAY SWICH

SOCKET OUTLET

WC

SFFLOOR FINISHES SKIRTING

CEILING FINISHES WALL FINISHES

SLOPE DIRECTION

ZALENGEI PRISONCENTRAL DARFUR ISUDAN

WALL MOUNTED KDK FAN

FLOOR FINISHES

EPOXY FINISH

CERAMIC TILES

SAND FINISH ON PCFAIR FACE CEMENT/

4 ROUPH PLASTER

WALL FINISHES

CERAMIC TILESMARBLE TILES

3 COATS OF POMASTIC

12

3

CEILING FINISHES

US ZINC SHEET (0.5MM)

OIL PAINT

FABRIC TEXTILE SHEETS

1

2

3

3 MARBLE TILES

GRANITE TILES4

SKIRTING

CERAMIC TILES2

1

3

2

1

FINISHING SCHEDULE

ON C/S PLASTER

EPOXY FINISH H. 25CM

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:26 PM, DWG To PDF.pc3

A7

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

DETAILS

STANDARD MODEL

WALL MOUNTED LAMP

ELECTRICAL KEY

DOUBLE ONE WAY SWICH

SOCKET OUTLET

WC

SFFLOOR FINISHES SKIRTING

CEILING FINISHES WALL FINISHES

SLOPE DIRECTION

ZALENGEI PRISONCENTRAL DARFUR ISUDAN

WALL MOUNTED KDK FAN

FLOOR FINISHES

EPOXY FINISH

CERAMIC TILES

SAND FINISH ON PC

FAIR FACE CEMENT/

4 ROUPH PLASTER

WALL FINISHES

CERAMIC TILESMARBLE TILES

3 COATS OF POMASTIC

12

3

CEILING FINISHES

US ZINC SHEET (0.5MM)

OIL PAINT

FABRIC TEXTILE SHEETS

1

2

3

3 MARBLE TILES

GRANITE TILES4

SKIRTING

CERAMIC TILES2

1

3

2

1

FINISHING SCHEDULE

ON C/S PLASTER

EPOXY FINISH H. 25CM

0.60

0.70

HLW2SIZE : 2.00 X 0.80 M.

FIXED & GLAZED

COMPACTED SELECTED MATERIALS FOR FILLS

2 COATS OF POLYAMINE EPOXY PAINT

3MM THICK GRAY RED COLOR

10 CM PLAIN CONCRETE 1:3:6 FAIR FACE

"MECHANICALLY"

INSIDE

OUTSIDE INSIDE

OUTSIDE

20 X 20 CM RC BEAM

SEE STRUCTURAL DRAWINGS

STEEL STRUCTURAL TRUSS

3 COATS OF ANTI-CORROGION PAINT

SEE STRUCTURAL DRAWINGS

ROCK WOOL THERMAL INSULATION

LAID UNDER US ZINC SHEETS & ABOVE

PURLING

3X6 CM SQUARE SECTION PURLING

3 COATS OF ANTI-CORROGION PAINT

0.65

0.2

4

0.4 MM US CORRUGATED SHEET POWDER

COATED PRE PAINT "RAL 1001" FIXED TO

PURLING BY SELF DRILLING STAINLESS

STEEL SCREWS WITH RUBBER WASHER,

INSERTED IN WALL BY 10 CM.

20 CM WIDE 1CM THICK SOFT WOODEN

FASCIA, 3 COATS OF WEATHER PROOF OIL

PAINT

OVERLAP

JOINT GROOVE

"V SHAPE"

20 CM WIDE 1CM THICK SOFT WOODEN

CLADDING, 3 COATS OF WEATHER PROOF

OIL PAINT

25X25CM SQUARE SECTION, SCREWED

ON 5X10 CM VERTICAL ANGLE WELDED

TO TRUSS

EPOXY PAINT ON PC FLOORNTS (X4)

WOODEN FASCIA & CLADDINGNTS (X4)

DETAIL 01

DETAIL 02

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:31 PM, DWG To PDF.pc3

1.00

EAVE DETAILS AT STEEL ROOF

0.2

020 X 20 CM RC BEAM

SEE STRUCTURAL DRAWINGS

STEEL STRUCTURAL TRUSS

3 COATS OF ANTI-CORROGION PAINT

SEE STRUCTURAL DRAWINGS

ROCK WOOL THERMAL INSULATION

LAID UNDER US ZINC SHEETS & ABOVE

PURLING

3X6 CM SQUARE SECTION PURLING

3 COATS OF ANTI-CORROGION PAINT

0.4 MM US CORRUGATED SHEET POWDER

COATED PRE PAINT "RAL 1001" FIXED TO

PURLING BY SELF DRILLING STAINLESS

STEEL SCREWS WITH RUBBER WASHER,

INSERTED IN WALL BY 10 CM.

20 CM WIDE 1CM THICK SOFT WOODEN

FASCIA, 3 COATS OF WEATHER PROOF OIL

PAINT

20 CM WIDE 1CM THICK SOFT WOODEN

CLADDING, 3 COATS OF WEATHER PROOF

OIL PAINT

25X25CM SQUARE SECTION, SCREWED

ON 5X10 CM VERTICAL ANGLE WELDED

TO TRUSS

1.00

20 X 20 X 1 CM

STEEL PLATE

ANCHORED TO RC BEAM

NTS (X4)

DETAIL 03

A8

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

DETAILS

STANDARD MODEL

WALL MOUNTED LAMP

ELECTRICAL KEY

DOUBLE ONE WAY SWICH

SOCKET OUTLET

WC

SFFLOOR FINISHES SKIRTING

CEILING FINISHES WALL FINISHES

SLOPE DIRECTION

ZALENGEI PRISONCENTRAL DARFUR ISUDAN

WALL MOUNTED KDK FAN

FLOOR FINISHES

EPOXY FINISH

CERAMIC TILES

SAND FINISH ON PC

FAIR FACE CEMENT/

4 ROUPH PLASTER

WALL FINISHES

CERAMIC TILESMARBLE TILES

3 COATS OF POMASTIC

12

3

CEILING FINISHES

US ZINC SHEET (0.5MM)

OIL PAINT

FABRIC TEXTILE SHEETS

1

2

3

3 MARBLE TILES

GRANITE TILES4

SKIRTING

CERAMIC TILES2

1

3

2

1

FINISHING SCHEDULE

ON C/S PLASTER

EPOXY FINISH H. 25CM

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:36 PM, DWG To PDF.pc3

SELF DRILLING

STAINLESS STEEL

SCREW

PANEL B

US ZINC SHEET

RUBBER WASHER

SILICONE SEALANT

SILICONE SEALANT

PANEL A

US ZINC SHEET

ENLARGED DETAIL

Width1500xH.1250mmW2 Painted Steel

Hinged WindowFlyscreen Mesh6mm GlazeFrame (4X8 Tube)Window Leaf (3X6 Tube)Grill (2X2 Tube)

3Handle & 6Latch

1.2

5

1.50

1.2

5

1.50

2X2 CM Rectangular

3 COATS OF PAINT

2X2 CM Rectangular

3 COATS OF PAINT

A9

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

DETAILS

STANDARD MODEL

WALL MOUNTED LAMP

ELECTRICAL KEY

DOUBLE ONE WAY SWICH

SOCKET OUTLET

WC

SFFLOOR FINISHES SKIRTING

CEILING FINISHES WALL FINISHES

SLOPE DIRECTION

ZALENGEI PRISONCENTRAL DARFUR ISUDAN

WALL MOUNTED KDK FAN

FLOOR FINISHES

EPOXY FINISH

CERAMIC TILES

SAND FINISH ON PCFAIR FACE CEMENT/

4 ROUPH PLASTER

WALL FINISHES

CERAMIC TILESMARBLE TILES

3 COATS OF POMASTIC

12

3

CEILING FINISHES

US ZINC SHEET (0.5MM)

OIL PAINT

FABRIC TEXTILE SHEETS

1

2

3

3 MARBLE TILES

GRANITE TILES4

SKIRTING

CERAMIC TILES2

1

3

2

1

FINISHING SCHEDULE

ON C/S PLASTER

EPOXY FINISH H. 25CM

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:41 PM, DWG To PDF.pc3

COLUMNS & GRADE BEAMS LAYOUT1:100

TYPE SIZE STEEL

COLUMN'S SCHEDULE

L (A) X W (B)QTYLEVEL

C1 20 X 20 CM 14ABOVE GB4 YØ12 - LINKS 8MM @ 150MM

300

40

0 6 Y Ø 12

LINKS R 8 @150

SECTION XGRADE BEAM

200

20

0

4 Y Ø 12

LINKS 1 R 8 @150

C1COLUMN

WORKSHOP

S1

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

STRUCTURES

STANDARD MODELZALENGEI PRISONCENTRAL DARFUR I

SUDAN

4.0

0

A

1

5.00

10

.00

C1

DC1

C1

C1

2.0

04

.00

C1

C1

5.00

C1

C1

5.00

C1

C1

5.00

C1

C1

C1

C1

2 3 4

B

C

520.00

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:46 PM, DWG To PDF.pc3

4.0

0

A

1

10

.00

C1

DC1

C1

C1

2.0

04

.00

C1

C1

C1

C1

B

C

ROOF BEAMS & TRUSS LAYOUT1:100

20.00

2.502.502.50 2.502.50

C.L

. O

F T

RU

SS

C.L

. O

F T

RU

SS

C.L

. O

F T

RU

SS

C.L

. O

F T

RU

SS

C.L

. O

F T

RU

SS

C.L

. O

F T

RU

SS

30X60 MM SQUARE SECTION

PURLING

3 COATS OF ANTI-CORROGION

PAINT

C1

C1

C1

C1

2 3 4 5

2.50 2.50 2.50

C.L

. O

F T

RU

SS

C.L

. O

F T

RU

SS

C.L

. O

F T

RU

SS

C1

C1

5.00 5.00 5.00 5.00

S2

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

ROOF PLAN

STANDARD MODELZALENGEI PRISONCENTRAL DARFUR I

SUDAN

WORKSHOP

0.2

0

Y 2 Ø12

ROOF BEAM

200

Y 2 Ø12

LINKS 1 R 8 @150

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:51 PM, DWG To PDF.pc3

TRUSS SECTIONAL DETAILSNTS (X2)

1.00

1.00

1.00

1.001.001.00 1.001.00

1.00

1.00

1.00

1.00

0.70

1.5

0

1.00

0.60 0.60

11.2010.00

3.8

5 C

EM

EN

T/ S

AN

D 2

0C

M T

HK

BR

ICK

WA

LL

0.2

00.4

0

0.20

ROOF BEAM @ +3.85M FROM GB NTS

ROOF BEAM

AT +3.85M FROM GB 30X60 MM SQUARE SECTION

PURLING

3 COATS OF ANTI-CORROGION

PAINT

0.3

0

S3

Lead Agency:

PRISON WORKSHOP

+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005

[email protected]

Design By:

DETAILS

STANDARD MODELZALENGEI PRISONCENTRAL DARFUR I

SUDAN

40X80 MM SQUARE SECTION

TRUSS

3 COATS OF ANTI-CORROGION

PAINT

E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:56 PM, DWG To PDF.pc3