United Nations Development Programme
Page 1
Civil works for Construction of Zalingi prison Work shop Hall, Zalingi Locality, and Central Darfur State.
ITB/KRT/DDR/16/01
Record of Question & Answer Session/Minutes of Meeting
Date: Sunday 23rd of Oct 2016.
Time : 10:00am - 11:20 pm Khartoum Local Time.
Venue: UNDP/DDR premises in Mashtal Street, House No. 98, and Block 10.
1) Q. Can the bid price be submitted in USD?
Answer: The bid can be submitted in US$ but the bidder should have a bank
account in USD. The bidder has to have an account in USD in the same bank of
UNDP in order to receive the payment in USD as per Bank of Sudan local
regulations.
2) Q. If we have our bank account in US$ but not in Khartoum Bank shall UNDP transfer the
money in our account?
Answer: UNDP can transfer the payment to bidder’s USD account, but the Bidder’s
bank will not cash the payment in USD, it will be cashed in SDG according to the
bank prevailing exchange rate. This is in line with the Bank of Sudan local
regulations. UNDP shall not bear any extra cost apart from the value indicated in the
Cheque.
3) Q. Is it possible to submit partial bid?
Answer: No partial bid shall be allowed.
4) Q. Drawings are not clear when printed out.
Answer: Separate drawings in PDF shall be posted in UNDP web site along with the
answers.
United Nations Development Programme
Page 2
5) Q. We have submitted clarifications but we receive no answer?
Answer: all questions are gathered from all bidders and answers shall be posted in
UNDP website as soon as possible.
6) Q .Whether the type of contract is measurement or lump sum contract. It is lump sum:.
Answer: This is lump sum contract and shall be paid in milestone according to work
progress.
7) Q. Are electrical power and water on the site:
Answer. Bidders should not depend on the city power and water system as they are
not reliable and cuts are frequently experienced.
8) Q. Mismatch between drawings and BoQ. Drawings will be considered as reference.
Answer. The quantities in the BoQ are calculated by UNDP engineer based on the
drawings in case of any discrepancies in case of any mistake in the quantities in the
BoQ the bidder has to bring this to UNDP attention otherwise the quantities shall be
deemed as correct.
9) Q. the contract duration in the bid data sheet is 4 months but in other location its 3
month?
Answer. The contract duration is 4 months this include the resource mobilization
period. Anyway due to the project size the bidders are encouraged to reduce the
project duration as less as possible.
10) Q.Is the area accessible all the time?
Answer. Zalingi is linked by Nyala and Elgneneina by tarmac road (the road is in
rough condition). There is no direct commercial flight from Khartoum to Zalinigi.
11) Q. Is it possible to deviate from the specifications attached?
Answer. Even it could be possible that contractors deviate for specifications and
that’s state in noncompliance materials form but it’s not recommended and
bidder should bind to the stated specifications as much as possible.
United Nations Development Programme
Page 3
12) Q. The bid validity is 120 days, which is too long with so rapid changing of prices is it
possible to reduce it?
Answer. There is no possibility that we reduce the validity time but we can
accelerate the procurement process of the service to reduce time.
13) Q. When the firm fill the table detailing previous contracts, do we mention any contract or only contracts relevant to this ITB submission?
Answer. The bidders are required to mention contracts of similar projects executed by their companies stressing on projects executed during the last five years and to indicate to clients, date, and cost of these projects.
14) Q. in case of any other question how can contact?
Answer. All contacts with UNDP is only through the contact address mentioned in the ITB.
*****
Attachment: Drawings in PDF are attached to this notes as requested by one of the bidders.
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
August 2016
WORKSHOP - STANDARD MODEL
UNAMIDUNDP
ZALENGEI PRISONCENTRAL DARFUR II
SUDAN
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:13:53 PM, DWG To PDF.pc3
ENTRANCE
A0
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
FLOOR PLAN
STANDARD MODEL
WALL MOUNTED LAMP
ELECTRICAL KEY
DOUBLE ONE WAY SWICH
SOCKET OUTLET
WC
SF
FLOOR FINISHES
EPOXY FINISH
CERAMIC TILES
SAND FINISH ON PCFAIR FACE CEMENT/
4 ROUPH PLASTER
WALL FINISHES
CERAMIC TILESMARBLE TILES
3 COATS OF POMASTIC
12
3
CEILING FINISHES
US ZINC SHEET (0.45MM)
OIL PAINT
FABRIC TEXTILE SHEETS
1
2
3
3 MARBLE TILES
GRANITE TILES4
SKIRTING
CERAMIC TILES2
1
FLOOR FINISHES SKIRTING
CEILING FINISHES WALL FINISHES
3
2
1
FINISHING SCHEDULE
ON C/S PLASTER
SLOPE DIRECTION
ZALENGEI PRISONCENTRAL DARFUR ISUDAN
4.0
0
A
1
5.00
10.0
0
D
2.0
04.0
0
5.00 5.00 5.00
2 3 4
B
C
520.00
SLIDING DIRECTION SLIDING DIRECTION
GROUND FLOOR PLAN LAYOUT
WALL MOUNTED KDK FAN
31
11
EPOXY FINISH H. 25CM
W2W2W2
W2W2W2
W2
W2
W2
W2
EN
TR
AN
CE
EN
TR
AN
CE
MA
IN B
OA
RD
HEAVY DUTY FOR WORKSHOP
SU
B B
OA
RD
SU
B B
OA
RD
SU
B B
OA
RD
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:13:56 PM, DWG To PDF.pc3
5.0010.41 STEEL BOTTOM TRACK
2.80 DOOR LEAF2.80 DOOR LEAF
4.80 STRUCTURAL OPENING
3.0
3 D
OO
R L
EA
F
2.80 DOOR STOPPER2.80 DOOR LEAF
3.0
3 D
OO
R L
EA
F
2.70 DOOR STOPPER
5.00 5.005.00
6.2
55
.65
5.0
5
20.00
10.00
0.65
11.30 FASCIA TO FASCIA
0.65
0.6
0
0.6
0
0.6
4
0.2
4
2.23
2.00
2.00
2.60
4.002.004.00
2.60
A1
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
ELEVATIONS
STANDARD MODEL
WALL MOUNTED LAMP
ELECTRICAL KEY
DOUBLE ONE WAY SWICH
SOCKET OUTLET
WC
SFFLOOR FINISHES SKIRTING
CEILING FINISHES WALL FINISHES
SLOPE DIRECTION
ZALENGEI PRISONCENTRAL DARFUR ISUDAN
WALL MOUNTED KDK FAN
1.2
5
1.50
1.5
0
1.2
5
1.50
1.5
0
1.2
5
1.50
1.5
0
1.2
5
1.50
1.5
0
1.2
5
1.50
1.5
0
FLOOR FINISHES
EPOXY FINISH
CERAMIC TILES
SAND FINISH ON PCFAIR FACE CEMENT/
4 ROUPH PLASTER
WALL FINISHES
CERAMIC TILESMARBLE TILES
3 COATS OF POMASTIC
12
3
CEILING FINISHES
US ZINC SHEET (0.5MM)
OIL PAINT
FABRIC TEXTILE SHEETS
1
2
3
3 MARBLE TILES
GRANITE TILES4
SKIRTING
CERAMIC TILES2
1
3
2
1
FINISHING SCHEDULE
ON C/S PLASTER
EPOXY FINISH H. 25CM
Southern Elevation
Eastern & Western Elevations
GALVANIZED STEEL CAP
POWDER COATED PRE PAINT "RAL
1001" FIXED TO STEEL SHEETS BY
SELF DRILLING STAINLESS STEEL
SCREWS WITH RUBBER WASHER
0.4 MM US CORRUGATED SHEET
POWDER COATED PRE PAINT "RAL
1001" FIXED TO PURLING BY SELF
DRILLING STAINLESS STEEL SCREWS
WITH RUBBER WASHER
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:01 PM, DWG To PDF.pc3
10.00
1.001.001.00 1.001.00
0.60
2.8
8
1.00
1.00
1.001.00
0.70
1 HOLLOW CEMENT BLOCK
40X20X20 CM WITH 1.5 CM
PLASTER C/S 1:4 MIX BOTH
SIDES COATED WITH 3
LAYERS OF ACRYLIC
EMULSION INTERNALLY
AND TEXTURED PAINT
EXTERNALLY
STEEL STRUCTURAL TRUSS
3 COATS OF ANTI-CORROGION PAINT
SEE STRUCTURAL DRAWINGS
3X6 CM SQUARE SECTION PURLING
3 COATS OF ANTI-CORROGION PAINT
ROCK WOOL THERMAL INSULATION
LAID UNDER US ZINC SHEETS & ABOVE
PURLING
GALVANIZED STEEL CAP
POWDER COATED PRE PAINT "RAL
1001" FIXED TO STEEL SHEETS BY
SELF DRILLING STAINLESS STEEL
SCREWS WITH RUBBER WASHER
0.4 MM US CORRUGATED SHEET
POWDER COATED PRE PAINT "RAL
1001" FIXED TO PURLING BY SELF
DRILLING STAINLESS STEEL SCREWS
WITH RUBBER WASHER
10 CM PLAIN CONCRETE 1:3:6 FAIR FACE "MECHANICALLY"
COMPACTED SELECTED MATERIALS FOR FILLS
NATURAL SOIL EARTH
2 COATS OF POLYAMINE EPOXY PAINT 3MM THICK GRAY RED COLOR
DET.024.0
7 H
EA
D R
OO
M
3.0
5
HLW2 SIZE : 2.00 X 0.80 M.
4.00 COLUMNS ON EDGE WALLS2.00
1.00
0.2
50.2
0
11.30 FASCIA TO FASCIA
4.00 COLUMNS ON EDGE WALLS
1.38
DET.01
A2
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
DETAILS
STANDARD MODEL
WALL MOUNTED LAMP
ELECTRICAL KEY
DOUBLE ONE WAY SWICH
SOCKET OUTLET
WC
SFFLOOR FINISHES SKIRTING
CEILING FINISHES WALL FINISHES
SLOPE DIRECTION
ZALENGEI PRISONCENTRAL DARFUR ISUDAN
WALL MOUNTED KDK FAN
FLOOR FINISHES
EPOXY FINISH
CERAMIC TILES
SAND FINISH ON PC
FAIR FACE CEMENT/
4 ROUPH PLASTER
WALL FINISHES
CERAMIC TILESMARBLE TILES
3 COATS OF POMASTIC
12
3
CEILING FINISHES
US ZINC SHEET (0.5MM)
OIL PAINT
FABRIC TEXTILE SHEETS
1
2
3
3 MARBLE TILES
GRANITE TILES4
SKIRTING
CERAMIC TILES2
1
3
2
1
FINISHING SCHEDULE
ON C/S PLASTER
EPOXY FINISH H. 25CM
Section YY
TRUSS SECTIONAL DETAILSSEE
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:06 PM, DWG To PDF.pc3
0.3
5
2.2
2 M
AX
@ C
EN
TE
R
DET.01 PARTIAL LONGITUDE STEEL ROOF SECTIONNTS (X4)
3X6 CM SQUARE SECTION PURLING
3 COATS OF ANTI-CORROGION PAINT
0.4 MM US CORRUGATED SHEET POWDER
COATED PRE PAINT "RAL 1001" FIXED TO
PURLING BY SELF DRILLING STAINLESS
STEEL SCREWS WITH RUBBER WASHER,
INSERTED IN WALL BY 10 CM.
STEEL STRUCTURAL TRUSS
3 COATS OF ANTI-CORROGION PAINT
SEE STRUCTURAL DRAWINGS
ROCK WOOL THERMAL INSULATION
LAID UNDER US ZINC SHEETS & ABOVE
PURLING
STEEL CAP
POWDER COATED PRE PAINT "RAL
1001" FIXED TO STEEL SHEETS BY
SELF DRILLING STAINLESS STEEL
SCREWS WITH RUBBER WASHER
INSIDE
20 X 20 CM RC BEAM
SEE STRUCTURAL DRAWINGS
0.5
1 M
AX
@ C
EN
TE
R
0.10 INSERTED
PARAPET:
1 HOLLOW CEMENT BLOCK 40X20X20
CM WITH 1.5 CM PLASTER C/S 1:4 MIX
BOTH SIDES COATED WITH 3 LAYERS
OF ACRYLIC EMULSION TEXTURED
PAINT EXTERNALLY
0.6250.5250.510
A3
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
DETAILS
STANDARD MODEL
WALL MOUNTED LAMP
ELECTRICAL KEY
DOUBLE ONE WAY SWICH
SOCKET OUTLET
WC
SFFLOOR FINISHES SKIRTING
CEILING FINISHES WALL FINISHES
SLOPE DIRECTION
ZALENGEI PRISONCENTRAL DARFUR ISUDAN
WALL MOUNTED KDK FAN
FLOOR FINISHES
EPOXY FINISH
CERAMIC TILES
SAND FINISH ON PC
FAIR FACE CEMENT/
4 ROUPH PLASTER
WALL FINISHES
CERAMIC TILESMARBLE TILES
3 COATS OF POMASTIC
12
3
CEILING FINISHES
US ZINC SHEET (0.5MM)
OIL PAINT
FABRIC TEXTILE SHEETS
1
2
3
3 MARBLE TILES
GRANITE TILES4
SKIRTING
CERAMIC TILES2
1
3
2
1
FINISHING SCHEDULE
ON C/S PLASTER
EPOXY FINISH H. 25CM
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:11 PM, DWG To PDF.pc3
A4
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
DETAILS
STANDARD MODEL
WALL MOUNTED LAMP
ELECTRICAL KEY
DOUBLE ONE WAY SWICH
SOCKET OUTLET
WC
SFFLOOR FINISHES SKIRTING
CEILING FINISHES WALL FINISHES
SLOPE DIRECTION
ZALENGEI PRISONCENTRAL DARFUR ISUDAN
WALL MOUNTED KDK FAN
FLOOR FINISHES
EPOXY FINISH
CERAMIC TILES
SAND FINISH ON PCFAIR FACE CEMENT/
4 ROUPH PLASTER
WALL FINISHES
CERAMIC TILESMARBLE TILES
3 COATS OF POMASTIC
12
3
CEILING FINISHES
US ZINC SHEET (0.5MM)
OIL PAINT
FABRIC TEXTILE SHEETS
1
2
3
3 MARBLE TILES
GRANITE TILES4
SKIRTING
CERAMIC TILES2
1
3
2
1
FINISHING SCHEDULE
ON C/S PLASTER
EPOXY FINISH H. 25CM
0.65
11.30 FASCIA TO FASCIA
0.65
10.00
4.00 COLUMNS ON EDGE WALLS2.004.00 COLUMNS ON EDGE WALLS
OUTSIDE ELEVATION
0.6
0
0.6
0
0.6
4
0.2
4
0.1
4
0.2
4
2.23
2.00
2.00
0.4
9
1.001.001.00 1.001.000.60
1.00
1.00
1.001.00
0.70
STEEL STRUCTURAL TRUSS
3 COATS OF ANTI-CORROGION PAINT
SEE STRUCTURAL DRAWINGS
3X6 CM SQUARE SECTION PURLING
3 COATS OF ANTI-CORROGION PAINT
ROCK WOOL THERMAL INSULATION
LAID UNDER US ZINC SHEETS & ABOVE
PURLING
GALVANIZED STEEL CAP
POWDER COATED PRE PAINT "RAL
1001" FIXED TO STEEL SHEETS BY
SELF DRILLING STAINLESS STEEL
SCREWS WITH RUBBER WASHER
0.4 MM US CORRUGATED SHEET
POWDER COATED PRE PAINT "RAL
1001" FIXED TO PURLING BY SELF
DRILLING STAINLESS STEEL SCREWS
WITH RUBBER WASHER1.00
11.30 FASCIA TO FASCIA
PARTIAL SECTION Y-Y1:50
PARTIAL ELEVATION1:50
TRUSS SECTIONAL DETAILSSEE
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:16 PM, DWG To PDF.pc3
3.0
5
ST
RU
CT
UR
AL
OP
EN
ING
0.2
5
INS
IDE
4.80
STRUCTURAL OPENING
SLIDING DIRECTION
10.41 STEEL BOTTOM TRACK
2.80 DOOR LEAF2.51 DOOR GUIDE 2.51 DOOR GUIDE
SLIDING DIRECTION SLIDING DIRECTION
2.80 DOOR LEAF
4.80 STRUCTURAL OPENING
0.15
1.5
03
.03
DO
OR
LE
AF
3.0
3 D
OO
R L
EA
F
2.80 DOOR STOPPER
2.17 DOOR GUIDE2.51 DOOR GUIDE2.80 DOOR LEAF
0.150.500.500.50 0.500.50
0.15
3.0
3 D
OO
R L
EA
F
2.70 DOOR STOPPER
0.3
0
0.20
10.41 CHANNEL
SLIDING STEEL DOOR : PLAN1:50
SLIDING STEEL DOOR : ELEVATION1:50
SECTION1:50
2.17 DOOR GUIDE
DOOR ROLLER GUIDE
DET.01
DET.03
2.80 DOOR LEAF2.48 DOOR GUIDE
2.70 DOOR STOPPER
0.150.50 0.50 0.500.50 0.50
IPE A120 - 8.7 KG/M
WELDED TO PLATE
SLIDING DIRECTION
OUTSIDE2.80 DOOR LEAF2.48 DOOR GUIDE
2.70 DOOR STOPPER
INSIDE
IPE A120 - 8.7 KG/M
COLUMN
DOOR WHEEL
DOOR ROLLER GUIDE
DET.02
10X10 CM C-SECTION
CHANNEL TRACK
WELDED TO IPE A120
IPE A120 - 8.7 KG/M
WELDED TO PLATE
DOOR STOPPER
SPRING
10X10 CM C-SECTION
CHANNEL TRACK
WELDED TO IPE A120
DOOR STOPPER
SPRING
DOOR STOPPER
SPRING
FILLED STEEL ROD AS WHEEL TRACK
A5
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
DETAILS
STANDARD MODEL
WALL MOUNTED LAMP
ELECTRICAL KEY
DOUBLE ONE WAY SWICH
SOCKET OUTLET
WC
SFFLOOR FINISHES SKIRTING
CEILING FINISHES WALL FINISHES
SLOPE DIRECTION
ZALENGEI PRISONCENTRAL DARFUR ISUDAN
WALL MOUNTED KDK FAN
FLOOR FINISHES
EPOXY FINISH
CERAMIC TILES
SAND FINISH ON PCFAIR FACE CEMENT/
4 ROUPH PLASTER
WALL FINISHES
CERAMIC TILESMARBLE TILES
3 COATS OF POMASTIC
12
3
CEILING FINISHES
US ZINC SHEET (0.5MM)
OIL PAINT
FABRIC TEXTILE SHEETS
1
2
3
3 MARBLE TILES
GRANITE TILES4
SKIRTING
CERAMIC TILES2
1
3
2
1
FINISHING SCHEDULE
ON C/S PLASTER
EPOXY FINISH H. 25CM
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:21 PM, DWG To PDF.pc3
0.20
0.3
0
DET. 01: VERTICAL UPPER SECTIONNTS (X6)
DET. 02: VERTICAL LOWER SECTIONNTS (X6)
DET. 02: SECTIONAL PART PLANNTS (X6)
10 CM THICK REINFORCED CONCRETE
RAMP 1:2:4 MIX, 10 MM @ 150 MM
BOTHWAY
20 X 30 CM 10.45 M LENGTH REINFORCED
CONCRETE BEAM AS DOOR BED 1:2:4 MIX,
4Ø16MM LINKS 8MM @ 150 MM C/C
2 QTY 50 X 50 MM STEEL ANGLE INSERTED IN RC
BEAM BY STEEL FISHER,OR ANCHORS WELDED TO
BEAM STEEL
3 COATS OF ANTI- CORROSION PAINT
3X6 CM SQUARE SECTION @ 50 CM C/C BOTHWAY
COATED BY ANTI-CORROGION PAINT
STYROFOAM INSULATION
7 MM THICK PLASTIC SHEET CURTAIN
STRIPS AS WEATHER PROTECTION
FIXED TO RC BEAM BY STEEL FISHER
@ 50CM C/C
IPE A120 - 8.7 KG/M
WELDED TO PLATE
10X10 CM C-SECTION
CHANNEL TRACK
WELDED TO IPE A120
IPE A120 - 8.7 KG/M
WELDED TO PLATE
IPE A120 - 8.7 KG/M
WELDED TO PLATE
2 QTY 50 X 50 MM STEEL
ANGLE INSERTED IN RC
BEAM BY STEEL
FISHER,OR ANCHORS
WELDED TO BEAM STEEL
3 COATS OF ANTI-
CORROSION PAINT
FILLED STEEL ROD AS
WHEEL TRACK
DOOR ROLLER GUIDE
DOOR ROLLER GUIDE
DOOR LEAF FRAME
3X6 CM HOLLOW SECTION
FILLED STEEL ROD AS WHEEL TRACK
ROLLER WHEEL DETAILNTS
2 QTY 50 X 50 MM STEEL ANGLE
INSERTED IN RC BEAM BY STEEL
FISHER,OR ANCHORS WELDED TO
BEAM STEEL
3 COATS OF ANTI- CORROSION
PAINT
A6
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
DETAILS
STANDARD MODEL
WALL MOUNTED LAMP
ELECTRICAL KEY
DOUBLE ONE WAY SWICH
SOCKET OUTLET
WC
SFFLOOR FINISHES SKIRTING
CEILING FINISHES WALL FINISHES
SLOPE DIRECTION
ZALENGEI PRISONCENTRAL DARFUR ISUDAN
WALL MOUNTED KDK FAN
FLOOR FINISHES
EPOXY FINISH
CERAMIC TILES
SAND FINISH ON PCFAIR FACE CEMENT/
4 ROUPH PLASTER
WALL FINISHES
CERAMIC TILESMARBLE TILES
3 COATS OF POMASTIC
12
3
CEILING FINISHES
US ZINC SHEET (0.5MM)
OIL PAINT
FABRIC TEXTILE SHEETS
1
2
3
3 MARBLE TILES
GRANITE TILES4
SKIRTING
CERAMIC TILES2
1
3
2
1
FINISHING SCHEDULE
ON C/S PLASTER
EPOXY FINISH H. 25CM
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:26 PM, DWG To PDF.pc3
A7
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
DETAILS
STANDARD MODEL
WALL MOUNTED LAMP
ELECTRICAL KEY
DOUBLE ONE WAY SWICH
SOCKET OUTLET
WC
SFFLOOR FINISHES SKIRTING
CEILING FINISHES WALL FINISHES
SLOPE DIRECTION
ZALENGEI PRISONCENTRAL DARFUR ISUDAN
WALL MOUNTED KDK FAN
FLOOR FINISHES
EPOXY FINISH
CERAMIC TILES
SAND FINISH ON PC
FAIR FACE CEMENT/
4 ROUPH PLASTER
WALL FINISHES
CERAMIC TILESMARBLE TILES
3 COATS OF POMASTIC
12
3
CEILING FINISHES
US ZINC SHEET (0.5MM)
OIL PAINT
FABRIC TEXTILE SHEETS
1
2
3
3 MARBLE TILES
GRANITE TILES4
SKIRTING
CERAMIC TILES2
1
3
2
1
FINISHING SCHEDULE
ON C/S PLASTER
EPOXY FINISH H. 25CM
0.60
0.70
HLW2SIZE : 2.00 X 0.80 M.
FIXED & GLAZED
COMPACTED SELECTED MATERIALS FOR FILLS
2 COATS OF POLYAMINE EPOXY PAINT
3MM THICK GRAY RED COLOR
10 CM PLAIN CONCRETE 1:3:6 FAIR FACE
"MECHANICALLY"
INSIDE
OUTSIDE INSIDE
OUTSIDE
20 X 20 CM RC BEAM
SEE STRUCTURAL DRAWINGS
STEEL STRUCTURAL TRUSS
3 COATS OF ANTI-CORROGION PAINT
SEE STRUCTURAL DRAWINGS
ROCK WOOL THERMAL INSULATION
LAID UNDER US ZINC SHEETS & ABOVE
PURLING
3X6 CM SQUARE SECTION PURLING
3 COATS OF ANTI-CORROGION PAINT
0.65
0.2
4
0.4 MM US CORRUGATED SHEET POWDER
COATED PRE PAINT "RAL 1001" FIXED TO
PURLING BY SELF DRILLING STAINLESS
STEEL SCREWS WITH RUBBER WASHER,
INSERTED IN WALL BY 10 CM.
20 CM WIDE 1CM THICK SOFT WOODEN
FASCIA, 3 COATS OF WEATHER PROOF OIL
PAINT
OVERLAP
JOINT GROOVE
"V SHAPE"
20 CM WIDE 1CM THICK SOFT WOODEN
CLADDING, 3 COATS OF WEATHER PROOF
OIL PAINT
25X25CM SQUARE SECTION, SCREWED
ON 5X10 CM VERTICAL ANGLE WELDED
TO TRUSS
EPOXY PAINT ON PC FLOORNTS (X4)
WOODEN FASCIA & CLADDINGNTS (X4)
DETAIL 01
DETAIL 02
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:31 PM, DWG To PDF.pc3
1.00
EAVE DETAILS AT STEEL ROOF
0.2
020 X 20 CM RC BEAM
SEE STRUCTURAL DRAWINGS
STEEL STRUCTURAL TRUSS
3 COATS OF ANTI-CORROGION PAINT
SEE STRUCTURAL DRAWINGS
ROCK WOOL THERMAL INSULATION
LAID UNDER US ZINC SHEETS & ABOVE
PURLING
3X6 CM SQUARE SECTION PURLING
3 COATS OF ANTI-CORROGION PAINT
0.4 MM US CORRUGATED SHEET POWDER
COATED PRE PAINT "RAL 1001" FIXED TO
PURLING BY SELF DRILLING STAINLESS
STEEL SCREWS WITH RUBBER WASHER,
INSERTED IN WALL BY 10 CM.
20 CM WIDE 1CM THICK SOFT WOODEN
FASCIA, 3 COATS OF WEATHER PROOF OIL
PAINT
20 CM WIDE 1CM THICK SOFT WOODEN
CLADDING, 3 COATS OF WEATHER PROOF
OIL PAINT
25X25CM SQUARE SECTION, SCREWED
ON 5X10 CM VERTICAL ANGLE WELDED
TO TRUSS
1.00
20 X 20 X 1 CM
STEEL PLATE
ANCHORED TO RC BEAM
NTS (X4)
DETAIL 03
A8
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
DETAILS
STANDARD MODEL
WALL MOUNTED LAMP
ELECTRICAL KEY
DOUBLE ONE WAY SWICH
SOCKET OUTLET
WC
SFFLOOR FINISHES SKIRTING
CEILING FINISHES WALL FINISHES
SLOPE DIRECTION
ZALENGEI PRISONCENTRAL DARFUR ISUDAN
WALL MOUNTED KDK FAN
FLOOR FINISHES
EPOXY FINISH
CERAMIC TILES
SAND FINISH ON PC
FAIR FACE CEMENT/
4 ROUPH PLASTER
WALL FINISHES
CERAMIC TILESMARBLE TILES
3 COATS OF POMASTIC
12
3
CEILING FINISHES
US ZINC SHEET (0.5MM)
OIL PAINT
FABRIC TEXTILE SHEETS
1
2
3
3 MARBLE TILES
GRANITE TILES4
SKIRTING
CERAMIC TILES2
1
3
2
1
FINISHING SCHEDULE
ON C/S PLASTER
EPOXY FINISH H. 25CM
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:36 PM, DWG To PDF.pc3
SELF DRILLING
STAINLESS STEEL
SCREW
PANEL B
US ZINC SHEET
RUBBER WASHER
SILICONE SEALANT
SILICONE SEALANT
PANEL A
US ZINC SHEET
ENLARGED DETAIL
Width1500xH.1250mmW2 Painted Steel
Hinged WindowFlyscreen Mesh6mm GlazeFrame (4X8 Tube)Window Leaf (3X6 Tube)Grill (2X2 Tube)
3Handle & 6Latch
1.2
5
1.50
1.2
5
1.50
2X2 CM Rectangular
3 COATS OF PAINT
2X2 CM Rectangular
3 COATS OF PAINT
A9
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
DETAILS
STANDARD MODEL
WALL MOUNTED LAMP
ELECTRICAL KEY
DOUBLE ONE WAY SWICH
SOCKET OUTLET
WC
SFFLOOR FINISHES SKIRTING
CEILING FINISHES WALL FINISHES
SLOPE DIRECTION
ZALENGEI PRISONCENTRAL DARFUR ISUDAN
WALL MOUNTED KDK FAN
FLOOR FINISHES
EPOXY FINISH
CERAMIC TILES
SAND FINISH ON PCFAIR FACE CEMENT/
4 ROUPH PLASTER
WALL FINISHES
CERAMIC TILESMARBLE TILES
3 COATS OF POMASTIC
12
3
CEILING FINISHES
US ZINC SHEET (0.5MM)
OIL PAINT
FABRIC TEXTILE SHEETS
1
2
3
3 MARBLE TILES
GRANITE TILES4
SKIRTING
CERAMIC TILES2
1
3
2
1
FINISHING SCHEDULE
ON C/S PLASTER
EPOXY FINISH H. 25CM
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:41 PM, DWG To PDF.pc3
COLUMNS & GRADE BEAMS LAYOUT1:100
TYPE SIZE STEEL
COLUMN'S SCHEDULE
L (A) X W (B)QTYLEVEL
C1 20 X 20 CM 14ABOVE GB4 YØ12 - LINKS 8MM @ 150MM
300
40
0 6 Y Ø 12
LINKS R 8 @150
SECTION XGRADE BEAM
200
20
0
4 Y Ø 12
LINKS 1 R 8 @150
C1COLUMN
WORKSHOP
S1
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
STRUCTURES
STANDARD MODELZALENGEI PRISONCENTRAL DARFUR I
SUDAN
4.0
0
A
1
5.00
10
.00
C1
DC1
C1
C1
2.0
04
.00
C1
C1
5.00
C1
C1
5.00
C1
C1
5.00
C1
C1
C1
C1
2 3 4
B
C
520.00
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:46 PM, DWG To PDF.pc3
4.0
0
A
1
10
.00
C1
DC1
C1
C1
2.0
04
.00
C1
C1
C1
C1
B
C
ROOF BEAMS & TRUSS LAYOUT1:100
20.00
2.502.502.50 2.502.50
C.L
. O
F T
RU
SS
C.L
. O
F T
RU
SS
C.L
. O
F T
RU
SS
C.L
. O
F T
RU
SS
C.L
. O
F T
RU
SS
C.L
. O
F T
RU
SS
30X60 MM SQUARE SECTION
PURLING
3 COATS OF ANTI-CORROGION
PAINT
C1
C1
C1
C1
2 3 4 5
2.50 2.50 2.50
C.L
. O
F T
RU
SS
C.L
. O
F T
RU
SS
C.L
. O
F T
RU
SS
C1
C1
5.00 5.00 5.00 5.00
S2
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
ROOF PLAN
STANDARD MODELZALENGEI PRISONCENTRAL DARFUR I
SUDAN
WORKSHOP
0.2
0
Y 2 Ø12
ROOF BEAM
200
Y 2 Ø12
LINKS 1 R 8 @150
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:51 PM, DWG To PDF.pc3
TRUSS SECTIONAL DETAILSNTS (X2)
1.00
1.00
1.00
1.001.001.00 1.001.00
1.00
1.00
1.00
1.00
0.70
1.5
0
1.00
0.60 0.60
11.2010.00
3.8
5 C
EM
EN
T/ S
AN
D 2
0C
M T
HK
BR
ICK
WA
LL
0.2
00.4
0
0.20
ROOF BEAM @ +3.85M FROM GB NTS
ROOF BEAM
AT +3.85M FROM GB 30X60 MM SQUARE SECTION
PURLING
3 COATS OF ANTI-CORROGION
PAINT
0.3
0
S3
Lead Agency:
PRISON WORKSHOP
+249 (0) 9 112 13 334 / +249 (0) 1 141 97 005
Design By:
DETAILS
STANDARD MODELZALENGEI PRISONCENTRAL DARFUR I
SUDAN
40X80 MM SQUARE SECTION
TRUSS
3 COATS OF ANTI-CORROGION
PAINT
E:\UNDP\Zalingei Prison Workshop\Zalengei Prison Workshop.dwg, 8/9/2016 4:14:56 PM, DWG To PDF.pc3