PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SR
Soil investigation
The contractor shall implemented of exploratory drilling and Notemechanical test in all types of soil with on site testing and theissuance of the final report which contain the test results andrecommendations of the foundation work.
01 Research and treatment for cavities
Implementation through a perforating exploratory(cavity probing) In 1 M3
all types of rock to determined the horizontal and vertical
elongation of cavities, the contractor will be responsible for
treatment all cavities By injection and treatment for all cavities and
voids of rock with all necessary work accordance with the
technical specifications and instructions of the Supervising
engineer
EXTERNAL WORKS
The bidder is advised to visit the site before quoting the rates in
order to get himself familiarized with the present site conditions
SITE GRADING
Bulk excavate over site on unclassified ground including all hard Note
and rock layers to reduced levels generally in cutting profiles the
work shall include clear away to approved disposals.
All additional excavation required for temporary works and spaces, Note
shoring, dewatering, removal of surplus excavated materials,
support, temporary spoil heaps and general compaction
EXCAVATION AND EARTHWORK
Necessary moving or transportation about the site excavation
material including handling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
SITE PREPARATION AND GRADING
02 Excavation oversite on unclassified ground including all hard and 1760 M3
rock layers (if any) to reduced levels generally in cutting profiles
and forming depressions, falls and the like and clear away to
approved disposal tip.
03 Fill oversite with approved imported fill material according to site 7800 M3
soil report recommendation including compaction in making up
levels to required formations, embankments, contouring and the
like as per drawings and spec.
To Collection SR
ITEM D E S C R I P T I O N QTY UNIT RATE
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
1 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
2/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
PAVING AND SURFACING
01 Supply and install precast concrete shotblasted pavers with 250 M2photocatalytic titamium dioxide coating (beige color) size
400x400x60mm thk. including 100mm thick cast-in-place concrete
slab with A193-WWF mesh reinforcement, 20mm thick cement
mortar setting bed, moisture barrier on compacted subgrade as per
detail no. A1 on drawing CL10-XL301
02 Supply and install precast concrete shotblasted pavers with 665 M2
photocatalytic titamium dioxide coating (brown and light beige
color) size 400x400x40mm thk. with precast concrete band (light
grey color) size 200x200x40mm including 100mm thick
cast-in-place concrete slab with A193-WWF mesh reinforcement,
20mm thick cement mortar setting bed, moisture barrier,compacted subgrade as per detail no. B12 on drawing CL10-XL301
03 Supply and install precast concrete shotblasted pavers with 1120 M2
photocatolytic titamium dioxide coating ( light beige color) size
400x400x40mm thk. with precast concrete band (light grey color)
size 200x200x40mm including 100mm thick cast-in-place concrete
slab with A193-WWF mesh reinforcement, 20mm thick cement
mortar setting bed, moisture barrier, compacted subgrade as per
detail no. B3 on drawing CL10-XL301
04 Supply and install cast in place concrete with brick band 60mm 200 M2
thick including A193WWF mesh reinforcement, setting mortar bedfor brick, moisture barrier, compacted subgrade as per detail no.
D5 on drawing CL10-XL301
05 Supply and install rubber pavement 50mm thick with various 54 M2
colors, including adhesive mixture, cast in place concrete base with
A193 W.W.F. reinforcement mesh , moisture barrier on compacted
subgrade as per detail no. E6 on drawing CL10-XL-301
06 Supply and install polished granite pavers light beige color size
400x400x30mm including 20mm thick setting mortar bed, 100mm
thick cast in place concrete base with A193WWF reinforcementmesh moisture barrier on compacted subgrad as per detail no. C11 95 M2
on drawing CL10-XL301
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
2 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
3/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
PAVING AND SURFACING
01 Supply and install polished granite paving (brown color) size 718 M2400x400x30mm with granite band (light beige color) size
400x400x30mm including 20mm thick setting mortar bed, cast in
place concrete base with A193WWF reinforcement mesh,
moisture barrier, on compacted subgrade as per detail no. F4 on
drawing CL10-XL-301
02 Supply and install polished granite paving (brown and light 715 M2
beige color) size 400x400x30mm with granite band (grey color)
size 200x200x30 mm, including 20mm thick setting
mortar bed, cast in place concrete base with A193WWF
reinforcement mesh, moisture barrier, on compacted subgrade as
per detail no. F7 on drawing CL10-XL-301
03 Supply and install polished granite paving light beige color size 685 M2
400x400x30mm with polished granite edge paving brown color size
400x400x30mm thick including 20mm thick setting mortar bed,
100mm thick cast in place concrete base with A193WWF
reinforcement mesh, moisture barrier on compacted subgrade as
per detail no. F8 on drawing CL10-XL-301
04 Supply and install polished granite paving light brown and light 745 M2
beige colors size 400x400x30mm with granite band grey color size
200x200x30mm including 20mm thick setting mortar bed, 100mm
thick cast in place concrete base with A193WWF reinforcementmesh, moisture barrier on compacted subgrade as per detail no.
F9 on drawing CL10-XL-301
05 Supply and install polished granite paving beige color size 470 M2
400x400x30mm with granite band grey color size 600x600x30mm
including 20mm thick setting mortar bed, 100mm thick cast in place
concrete base with A193WWF reinforcement mesh, moisture
barrier on compacted subgrade as per detail no. F10 on drawing
CL10-XL-301
06 Supply and install asphalt paving including 80mm bituminous 1955 M2
wearing course, bituminous prime coat, granular base course, oncompacted subgrade as per detail no. G on drawing CL10-XL-301
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
3 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
4/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
CURBS AND EDGING
01 Supply and install Precast concrete curb, size 300X500X150 mm 905 Mwith exposed aggregate finish including bedding, haunching, cast
in place concrete base and concrete grout behind curb, 20mm
thick cement mortar setting bed, on compacted subgrade, as per
detail no.1 on drawing CL10-XL302
02 Supply and install Precast concrete mowing edge, size
200X100X65 mm including concrete base, 20mm thick cement
mortar setting bed, cast in place concrete base on compacted
subgrade, as per detail no. 2 on drawing CL10-XL302 40 M
SUNDRIES
Precast concrete wheel stopper including dowels, grouting
and accessories for complete installation as per detail no. 9
on drawing CL10-XL302 and specification
03 Precast concrete wheel stopper including fixings 16 No.
Wooden Seating
04 Supply and install wooden seating comprising 50x75 mm interior
wood rails, steel sheets, steel straps, including concrete footings,
earthworks, insulation, finishing, fixing, and all required to
complete the work as per detail no.4 on drawing CL10- XL302 3 No.
WOODEN BENCH
05 Supply and install concrete raised planter with wooden bench,
50x75 mm interior wooden rails,comprising concrete walls,
reinforced concrete slab with A 193 W.W.F reinforcement mesh
smooth finished, (Softscape and planting soil mix are measured
elsewhere), drainage layer, filter membrane, water proofing
membrane, protection board, sealant and all required to complete
and finish the work as per detail no.6 on drawing CL010- XL302 to
suit required locations as shown on drawing CL10- XL101 16 M2
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
4 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
5/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SUNDRIES
Raised Planter
Supply and install concrete raised planter with granite
cladding, including soil mix, drainage layer, filter ,
membrane, sealant and all required to compleet and finish
the work as per detail no. 5 on drawing CL10-Xl302
01 Raised planter, overall area 190 m2 on plan to suit required
locations as shown on drawing CL10- XL101 1 Item
Tent Structure
02 Supply and install tent staructure comprising columns, tent fabric,foundation, earthwork, and all required to compleet and fix the work
as per manufacturer's recommendations and subject to engineer's
approoval to cover an area of 60 m2 as per detail no. 7 on drawing
XL-302 Contractor shall submitt shop drawings for approval before 1 No.
supply
Earth Mount
03 Supply and formation of 6500-1500 mm height earth mount
including compacted sub base layer, 100 mmm thick layer of sand
and gravel mix, and all required to complete and finish te work as
shown on drawing CL10- XL101 and as per detail no. 11 ondrawing CL10- Xl302 1 Item
Softscape and planting soil mix are measured lsewhere Note
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
5 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
6/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SUNDRIES
WATER FEATURES
Water fountain comprising reinforced concrete wall and
base, ceramic tiles finish, cement mortar setting bed, 30 mm
thick coping, water proofing & mositure barrier, subgrade
compaction, fountain kit, supply and drainage pipework,
fountain pump, electrical power and lighting, installation,
ventilation and exhaust system and all associated works
including builder's work and service installation as per deatil
no.3 on drawing CL10- XL302
01 Water fountain, overall area 46 m2
area on plan, shape as shown
on drawing CL10-XL101. 1 Item
02 Water fountain, overall area 38 m2
area on plan, shape as shown 1 Item
on drawing CL10-XL101.
03 Water fountain, overall area 100 m2
area on plan, shape as shown 1 Item
on drawing CL10-XL101.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
6 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
7/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SUNDRIES
Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per
details on drawing CL10-XL602 and as per specifications
01 Ref. type 1 (DIRECTIONAL SIGN) 2 No.
02 Ref. type 2 (COMMERCIAL CENTER ) 2 No.
03 Ref. type 3 (ADVERTISING PANEL) 6 No.
Manufacturer's standard outdoor sings, letters and plaques
including fixings, finishes, accessories complete as per
details on drawing CL10-XC-05 and as per specifications
04 Ref. type I1 (PARKING) 1 No.
05 Ref. type I2 (ENTRY ) 2 No.
06 Ref. type R2-1 (GIVE WAY ) 1 No.
07 Ref. type R5-1 ( ENTRY PROHIBTED ) 2 No.
08 Ref. type W11-1 ( PEDESTRAIN CROSSING ) 2 No.
Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per
details on drawing CL10-XC-04 and as per specifications
09 White stop line 7 M
10 Pedestrain crossing 13 M
11 White edge line 860 M
12 Through traffic arrow 18 M
13 Lane marking205 M
14 Speed control hump including cut & removal of existing wearing 7 M
(0.05m) course & add a new course, tack coat and 0.10m of
bituminous wearing course, ref. 10 detail G
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
7 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
8/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
LANDSCAPING
Trees/palms including pit excavation, stakes and ties, soilplanting mix, mulching, filter membrane and drainage
layer all as details and planting schedule as per detail P1,
on drawing CL10-XL-401
01 P/Wf 12 No.
Trees/palms including pit excavation, stakes and ties, soil
planting mix, mulching, filter membrane and drainage
layer all as details and planting schedule as per detail
P2 on drawing CL10-XL-401
02 T/Af 14 No.
03 T/Bv 9 No.
04 T/Fm 7 No.
05 T/Po 2 No.
Shrubs and ground cover including planting, site excavation
as required, soil planting mix, mulching, filter membrane
and drainage layer all as per details and planting schedule
as per detail P3, on drawing CL10-XL-401
06 S/Iha 56 No.
07 S/Io 13 No.
08 S/Ob 34 No.
09 S/Pav 26 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
8 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
9/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
LANDSCAPING
Shrubs and ground cover including planting, site excavationas required, soil planting mix, mulching, filter membrane
and drainage layer all as per details and planting schedule
as per detail P3, on drawing CL10-XL-401
01 G/Ggp 1088 No.
02 G/Cm ( O ) 747 No.
03 G/Cm (W) 1469 No.
Lawn planting, including soil planting mix, filter membrane
and drainage layer all as per details and planting scheduleas per detail P4, on drawing CL10-XL-401
04 L/Cd 1497 M2
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
9 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
10/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 14 - CONVEYING SYSTEMS
PIPE WORK
Supply and installation of Automated waste collection
system piping. Item shall include the earth works, insulation,
,concentric reducer, puddle flanges ,inspection covers and
all required materials and equipments to complete the
transport pipe line from DV rooms , outdoor load stations and
full vacuum load stations to waste plant.
01 508mm under/above ground transport pipe 75 M
RC MANHOLE
Supply and install cast insitu or precast reinforced concrete
manhole ,the item shall include excavation, backfill
insulation ,inspection cover and all required to complete the
work.
02 RC manhole to suit required location in sitesas shown on drawings 3 No.
STM - ITCCP2 - TD 001 to 016
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
10 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
11/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATION
WASTE AND DRAINAGE INSTALLATION
Supply, install and testing pipework, UPVC schedule 40, the
work shall include but not limited to fittings, supports, cast
iron pipes on roof for vent with caps, installation, all
associate works and all materials and equipments required
to complete and finish the work according to drawings,
specification and code of practices
01 50 mm dia. 30 M
02 75 mm dia. 29 M
03 100 mm dia. 115 M
04 150 mm dia. 290 M
05 200 mm dia. 42 M
Accesssories
06 Ground cleanout 50 mm dia, ref. GCO 1 No
07 Ground cleanout 100 mm dia, ref. GCO 10 No
08 Ground cleanout 150 mm dia, ref. GCO 1 No
09 Ground cleanout 200 mm dia, ref. GCO 1 No
10 Grease interceptor 1 No
Construction work for briks inspection chamber, the work
shall include bit not limited to earth work, plain concrete
for foundation BED, concrete channel at chamber DED with
standard cast iron manhole frame and double cover and all
materials and equipments required to complete and finish
the work according to specifications, drawings and code of
practice
11 Inspection chamber, ref. (IC&STIC) 600x600mm 11 No
12 Slow down chamber, ref. (IC&STIC) 600x600mm 2 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
11 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
12/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15 - MECHANICAL
MANHOLE AND COVERS
Supply , install, testing and commissioning precast
concrete sewer manholes with standard traffic (heavy duty)
type cast iron manhole covers and frames, access ladders,
concrete channel at manhole bed, foundation bed, drop
pipe to manhole where required, all associated earthworks,
damp proofing, and all materals, equipments required to
complete and finish. the work according to specifications
section 02605, 02730, drawings and code of practices
01 Sewer manhole, ref. (SMH) 5 No.
POTABLE WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 for
potable water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
02 25 mm dia. 90 M
03 32 mm dia. 25 M
04 40 mm dia. 20 M
05 50 mm dia. 88 M
06 75 mm dia. 2 M
07 100 mm dia. 90 M
NOT POTABLE WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 for
not-potable water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
08 40 mm dia. 58 M
09 50 mm dia. 84 M
10 63 mm dia. 2 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
12 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
13/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15 - MECHANICAL
Accessories
01 Water meter assembly 100 mm dia., ref. WMA 1 No
02 Gate valve, 40 mm dia., ref. GV 1 No
03 Gate valve, 100 mm dia., ref. GV 1 No
04 Back flow preventer assembly, 100mm dia., ref. BFPA 1 No
Drainage installation to the external drainage network
Construction work for briks inspection chamber, the work
shall include bit not limited to earth work, plain concrete for
foundation BED, concrete channel at chamber DED withstandard cast iron manhole frame and double cover, UPVC
pipework schedule 40 to nearest main sewer manhole and
all materials and equipments required to complete and
finish the work according to specifications, drawings and
code of practice
05 Slow down chamber 1 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
13 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
14/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15 - MECHANICAL
IRRIGATION WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 for
Irrigataion water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
01 25 mm dia. 80 M
02 32 mm dia. 87 M
03 40 mm dia. 195 M
04 50 mm dia. 220 M
Accessories
05 Supply and installation irrigation controller as detailed on drwings 1 No.
and as per specifications
06 Supply and installation bubbler for shrubs, ground cover and 569 No.
succulents
07 Supply and installation bubbler for trees and palm tree 188 No.
08 Supply and installation spray lawn sprinkler 46 No.
09 Gate valve W/valve box 32 mm dia., 2 No.
10 Gate valve W/valve box 40 mm dia., 1 No.
11 Gate valve W/valve box 50 mm dia., 5 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
14 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
15/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15 - MECHANICAL
IRRIGATION WATER INSTALLATION
Supply and installation remote control valve assembly
including piping complete with valve box, Y-strainer,
accessories and all associated works as detail on drawing
and as per specifications section 02810
01 Ref. RCV 25mm dia. 1 No.
02 Ref. RCV 32mm dia. 2 No.
03 Ref. RCV 40mm dia. 6 No.
04 Ref. RCV 50mm dia. 6 No.
DIESEL FUEL STORAGE TANK INSTALLATION
Allow for underground fiberglass diesel fuel storage tank
with required capacity including concrete anti-flotation
pad, heavy duty traffic type manhole ring and cover,
pipework, valves duplex diesel fuel transfer pumps, steel
ladder, pea gravel bed, earthworks, fixings and accessories
all as detailed on drawings
05 Proprietary tank units 1 Item
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
15 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
16/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
MEDIUM VOLTAGE CABLES
Supply , install and test medium voltage Cables
XLPE/STA/PVC 15KVcopper Between RMU unit and
transformers as required to suit the following extensions as
shown on drawings and drawings and as described in
specifications drawings and by making arrangiement with
supervising engineer to achieve the work to the best
possible specifications
01 Medium voltage cable comprising 3 core 70 mm CU / XLPE /STA/ 10 M
PVC, cables route from RMU up to transformers
supply and install Electrical concrete ATTIC including
trenching and backfilling for duct banks, conduits for M.V
cables in duct banks, tapes, all as required to suit locations
as shown on drawings XE-201and as per specifications
section 16180 and by making arrangement with supervising
engineer to achieve the work to the best possible
specifications
02 Electrical concrete ATTIC 32 M
MAIN AND SUB-MAIN POWER
supply and install reinforced concrete Man / Holes connected
via duct banks, complete with man / hand hole bolted type
metal cover, drain pipe outlet, including trenching and
backfilling for duct banks, conduits for M.V cables in duct
banks, tapes, all as required to suit locations as shown on
drawings drawings E201--E220and as all accessories and
coordination & integration with other systems shall be
conducted during work execution as per technical
specificationssection 16180 and by making arrangement with
supervising engineer to achieve the work to the best
possible specifications
Site work
03 Power Hand Holes (900900900) Ref. HH including UPVC conduit 2 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
16 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
17/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
POWER CABLES FOR PUMP ROOMS
supply , install, testing and commissioning multicore copper
cable ( XLPE/PVC -1000/600V) in direct buiried including
junction boxes, connection for feeders and various power
loads as shown on drawings E-701 and as per specification
section 16126 and by making arrangement with supervisingengineer to achieve the work to the best possiblespecifications
01 (4 C-16 mm ) + 16 mm G /direct buiried 340 M
PANEL BOARDS FOR PUMP ROOMS
Supply , install , testing and commissioning of panel boards
including grounding, circuit breakers, grounding, fixings,
markers and , other functional units and all associated works
as required and shown on drawings E 701, XE-201
and coordination & integration with other systems shall be
conducted during work execution as per technical
specificationssection 16442,16410,16415 and by makingarrangement with supervising engineer to achieve the workto the best possible specifications
02 Ref. EPP (IP54) 1 No.
03 Ref. PP1(IP 54) 1 No.
04 Ref. PP2(IP 54) 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
17 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
18/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
Supply , install, testing and commissioning of power andsockets accessories including all necessary boxes,
faces(according to the engineer approvement ) comprising
cables, conduits, fittings, connections, from the outlets to
Panelboards feeder associated works as required to suit the
locations shown on drawings XE-201and Coordination with
other disciplines shall be conducted during work execution
as per technical specifications, section 16050and by making
arrangiement with supervising engineer to achieve the work
to the best possible specifications
01 Junction box , Floor mounted 10 No.
02 Disconnect switch,non fused and with pilot light16A, 1P, 230V 2 No.,weatherproof for waste collection
03 Disconnect switch,non fused and with pilot light 20A, 1P, 230V 2 No.,weatherproof for feul pumsp
PUMP ROOMS
04 Disconnect switch,non fused and with pilot light 20A, 3P, 400V 1 No.
,weatherproof for fountain pump(FP3)& potable water pump
05 Disconnect switch,non fused and with pilot light 20A, 1P, 230V 5 No.
,weatherproof for submersible pump fountain pump(FP2)&(SP2)
06 Disconnect switch, non fused, 400A, 3P, 400V 1 No.,weatherproof for fire jocky pumps
07 Duplex socket outlet, 13A, 230V, grounding type, weatherproof 3 No
08 Single pole one-way ,one gang switch (13A), weatherproof 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
18 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
19/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
LIGHTING INSTALLATION
Supply, install , testing and commissioning of lighting
fixture outlets and including conduits, wires and all boxes
belong to Lighting Panelboards and associated works as
required to suit the locations shown on drawings XE-201
.Coordination with other disciplines shall be conducted
during work execution as per technical specifications,
section 16050 and by making arrangiement with supervising
engineer to achieve the work to the best possible
specifications
PUMP ROOMS
01 Lighting fixer outlet 8 No.
LIGHTING INSTALLATION
Supply ,install, testing and commissioning of lighting
fixture (furnishe with lamp and electronic blast, accessories
and internal wires) mounting accessories.(according to the
engineer approval ) associated works as required to suit the
locations shown on drawings XE-201 ,GE-E01,GE-E01 and
Coordination with other disciplines shall be conducted
during work execution as per technical specifications,section 16500 and by making arrangiement with supervising
engineer to achieve the work to the best possible
specifications
PUMP ROOMS
02 Type F1 4 No.
03 Type F1E 4 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
19 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
20/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
GROUNDING SYSTEM FOR PUMP ROOMS
Supply, installation , test and commissioning of a grounding
system comprising bare copper conductor to bond the
building's distribution boards and HVACand plumping
equipments to the main ear thing grid of the building.
Including necessary earthwork, buried galvanized steel
foundations strips surrounding the building phosphor bronze
test joints & triangular counter poise and all associated
works to suit grounding resistivity required as shown on
drawings XE201 and as described in
specifications16452,16453 by making arrangiement with
supervising engineer to achieve the work to the bestpossible specifications
01 Complete building grounding system network to suit ground 1 Item
resistivity as shown on drawings and specification
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
20 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
21/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
TELECOMMUNICATION SYSTEM
Supply, installation, testing and commissioning of
telecommunication system commporising of
telecommunication outlets including cable / wires and
conduits as shown on drawings E- 501-and as described in
specification section 16715,16720 and by making
arrangiement with supervising engineer to achieve the work
to the best possible specifications
To suit system network equipped with:
01Wall mounted telecommunication outlet 1 port (1data ) , ref. (T0)
11No.
weatherproof
FIRE ALARM SYSTEM FOR PUMP ROOMS
Supply, installation, testing and commissioning of Optical
smoke detectors including associated cable wires and
conduiting, interfacing as shown on drawings XE201and as
described in specifications 16721 and by making
arrangiement with supervising engineer to achieve the work
to the best possible specifications
To suit system network equipped with:
02 Optical smoke detector Ceiling mounted 3 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
21 / 22
REVISED PAGE
Date: MAY 2012
7/27/2019 CL10 (MAY 2012)
22/22
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL10)
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
Collection
Sheet - 1
Sheet - 2
Sheet - 3
Sheet - 4
Sheet - 5
Sheet - 6
Sheet - 7
Sheet - 8
Sheet - 9
Sheet - 10
Sheet - 11
Sheet - 12
Sheet - 13
Sheet - 14
Sheet - 15
Sheet - 16
Sheet - 17
Sheet - 18
Sheet - 19
Sheet - 20
Sheet - 21
To Bill Summary SR