CL10 (MAY 2012)

Embed Size (px)

Citation preview

  • 7/27/2019 CL10 (MAY 2012)

    1/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SR

    Soil investigation

    The contractor shall implemented of exploratory drilling and Notemechanical test in all types of soil with on site testing and theissuance of the final report which contain the test results andrecommendations of the foundation work.

    01 Research and treatment for cavities

    Implementation through a perforating exploratory(cavity probing) In 1 M3

    all types of rock to determined the horizontal and vertical

    elongation of cavities, the contractor will be responsible for

    treatment all cavities By injection and treatment for all cavities and

    voids of rock with all necessary work accordance with the

    technical specifications and instructions of the Supervising

    engineer

    EXTERNAL WORKS

    The bidder is advised to visit the site before quoting the rates in

    order to get himself familiarized with the present site conditions

    SITE GRADING

    Bulk excavate over site on unclassified ground including all hard Note

    and rock layers to reduced levels generally in cutting profiles the

    work shall include clear away to approved disposals.

    All additional excavation required for temporary works and spaces, Note

    shoring, dewatering, removal of surplus excavated materials,

    support, temporary spoil heaps and general compaction

    EXCAVATION AND EARTHWORK

    Necessary moving or transportation about the site excavation

    material including handling to temporary stockpile or ultimate

    disposal off site is to be included in the unit rate of excavation

    SITE PREPARATION AND GRADING

    02 Excavation oversite on unclassified ground including all hard and 1760 M3

    rock layers (if any) to reduced levels generally in cutting profiles

    and forming depressions, falls and the like and clear away to

    approved disposal tip.

    03 Fill oversite with approved imported fill material according to site 7800 M3

    soil report recommendation including compaction in making up

    levels to required formations, embankments, contouring and the

    like as per drawings and spec.

    To Collection SR

    ITEM D E S C R I P T I O N QTY UNIT RATE

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    1 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    2/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    PAVING AND SURFACING

    01 Supply and install precast concrete shotblasted pavers with 250 M2photocatalytic titamium dioxide coating (beige color) size

    400x400x60mm thk. including 100mm thick cast-in-place concrete

    slab with A193-WWF mesh reinforcement, 20mm thick cement

    mortar setting bed, moisture barrier on compacted subgrade as per

    detail no. A1 on drawing CL10-XL301

    02 Supply and install precast concrete shotblasted pavers with 665 M2

    photocatalytic titamium dioxide coating (brown and light beige

    color) size 400x400x40mm thk. with precast concrete band (light

    grey color) size 200x200x40mm including 100mm thick

    cast-in-place concrete slab with A193-WWF mesh reinforcement,

    20mm thick cement mortar setting bed, moisture barrier,compacted subgrade as per detail no. B12 on drawing CL10-XL301

    03 Supply and install precast concrete shotblasted pavers with 1120 M2

    photocatolytic titamium dioxide coating ( light beige color) size

    400x400x40mm thk. with precast concrete band (light grey color)

    size 200x200x40mm including 100mm thick cast-in-place concrete

    slab with A193-WWF mesh reinforcement, 20mm thick cement

    mortar setting bed, moisture barrier, compacted subgrade as per

    detail no. B3 on drawing CL10-XL301

    04 Supply and install cast in place concrete with brick band 60mm 200 M2

    thick including A193WWF mesh reinforcement, setting mortar bedfor brick, moisture barrier, compacted subgrade as per detail no.

    D5 on drawing CL10-XL301

    05 Supply and install rubber pavement 50mm thick with various 54 M2

    colors, including adhesive mixture, cast in place concrete base with

    A193 W.W.F. reinforcement mesh , moisture barrier on compacted

    subgrade as per detail no. E6 on drawing CL10-XL-301

    06 Supply and install polished granite pavers light beige color size

    400x400x30mm including 20mm thick setting mortar bed, 100mm

    thick cast in place concrete base with A193WWF reinforcementmesh moisture barrier on compacted subgrad as per detail no. C11 95 M2

    on drawing CL10-XL301

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    2 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    3/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    PAVING AND SURFACING

    01 Supply and install polished granite paving (brown color) size 718 M2400x400x30mm with granite band (light beige color) size

    400x400x30mm including 20mm thick setting mortar bed, cast in

    place concrete base with A193WWF reinforcement mesh,

    moisture barrier, on compacted subgrade as per detail no. F4 on

    drawing CL10-XL-301

    02 Supply and install polished granite paving (brown and light 715 M2

    beige color) size 400x400x30mm with granite band (grey color)

    size 200x200x30 mm, including 20mm thick setting

    mortar bed, cast in place concrete base with A193WWF

    reinforcement mesh, moisture barrier, on compacted subgrade as

    per detail no. F7 on drawing CL10-XL-301

    03 Supply and install polished granite paving light beige color size 685 M2

    400x400x30mm with polished granite edge paving brown color size

    400x400x30mm thick including 20mm thick setting mortar bed,

    100mm thick cast in place concrete base with A193WWF

    reinforcement mesh, moisture barrier on compacted subgrade as

    per detail no. F8 on drawing CL10-XL-301

    04 Supply and install polished granite paving light brown and light 745 M2

    beige colors size 400x400x30mm with granite band grey color size

    200x200x30mm including 20mm thick setting mortar bed, 100mm

    thick cast in place concrete base with A193WWF reinforcementmesh, moisture barrier on compacted subgrade as per detail no.

    F9 on drawing CL10-XL-301

    05 Supply and install polished granite paving beige color size 470 M2

    400x400x30mm with granite band grey color size 600x600x30mm

    including 20mm thick setting mortar bed, 100mm thick cast in place

    concrete base with A193WWF reinforcement mesh, moisture

    barrier on compacted subgrade as per detail no. F10 on drawing

    CL10-XL-301

    06 Supply and install asphalt paving including 80mm bituminous 1955 M2

    wearing course, bituminous prime coat, granular base course, oncompacted subgrade as per detail no. G on drawing CL10-XL-301

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    3 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    4/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    CURBS AND EDGING

    01 Supply and install Precast concrete curb, size 300X500X150 mm 905 Mwith exposed aggregate finish including bedding, haunching, cast

    in place concrete base and concrete grout behind curb, 20mm

    thick cement mortar setting bed, on compacted subgrade, as per

    detail no.1 on drawing CL10-XL302

    02 Supply and install Precast concrete mowing edge, size

    200X100X65 mm including concrete base, 20mm thick cement

    mortar setting bed, cast in place concrete base on compacted

    subgrade, as per detail no. 2 on drawing CL10-XL302 40 M

    SUNDRIES

    Precast concrete wheel stopper including dowels, grouting

    and accessories for complete installation as per detail no. 9

    on drawing CL10-XL302 and specification

    03 Precast concrete wheel stopper including fixings 16 No.

    Wooden Seating

    04 Supply and install wooden seating comprising 50x75 mm interior

    wood rails, steel sheets, steel straps, including concrete footings,

    earthworks, insulation, finishing, fixing, and all required to

    complete the work as per detail no.4 on drawing CL10- XL302 3 No.

    WOODEN BENCH

    05 Supply and install concrete raised planter with wooden bench,

    50x75 mm interior wooden rails,comprising concrete walls,

    reinforced concrete slab with A 193 W.W.F reinforcement mesh

    smooth finished, (Softscape and planting soil mix are measured

    elsewhere), drainage layer, filter membrane, water proofing

    membrane, protection board, sealant and all required to complete

    and finish the work as per detail no.6 on drawing CL010- XL302 to

    suit required locations as shown on drawing CL10- XL101 16 M2

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    4 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    5/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SUNDRIES

    Raised Planter

    Supply and install concrete raised planter with granite

    cladding, including soil mix, drainage layer, filter ,

    membrane, sealant and all required to compleet and finish

    the work as per detail no. 5 on drawing CL10-Xl302

    01 Raised planter, overall area 190 m2 on plan to suit required

    locations as shown on drawing CL10- XL101 1 Item

    Tent Structure

    02 Supply and install tent staructure comprising columns, tent fabric,foundation, earthwork, and all required to compleet and fix the work

    as per manufacturer's recommendations and subject to engineer's

    approoval to cover an area of 60 m2 as per detail no. 7 on drawing

    XL-302 Contractor shall submitt shop drawings for approval before 1 No.

    supply

    Earth Mount

    03 Supply and formation of 6500-1500 mm height earth mount

    including compacted sub base layer, 100 mmm thick layer of sand

    and gravel mix, and all required to complete and finish te work as

    shown on drawing CL10- XL101 and as per detail no. 11 ondrawing CL10- Xl302 1 Item

    Softscape and planting soil mix are measured lsewhere Note

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    5 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    6/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SUNDRIES

    WATER FEATURES

    Water fountain comprising reinforced concrete wall and

    base, ceramic tiles finish, cement mortar setting bed, 30 mm

    thick coping, water proofing & mositure barrier, subgrade

    compaction, fountain kit, supply and drainage pipework,

    fountain pump, electrical power and lighting, installation,

    ventilation and exhaust system and all associated works

    including builder's work and service installation as per deatil

    no.3 on drawing CL10- XL302

    01 Water fountain, overall area 46 m2

    area on plan, shape as shown

    on drawing CL10-XL101. 1 Item

    02 Water fountain, overall area 38 m2

    area on plan, shape as shown 1 Item

    on drawing CL10-XL101.

    03 Water fountain, overall area 100 m2

    area on plan, shape as shown 1 Item

    on drawing CL10-XL101.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    6 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    7/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SUNDRIES

    Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per

    details on drawing CL10-XL602 and as per specifications

    01 Ref. type 1 (DIRECTIONAL SIGN) 2 No.

    02 Ref. type 2 (COMMERCIAL CENTER ) 2 No.

    03 Ref. type 3 (ADVERTISING PANEL) 6 No.

    Manufacturer's standard outdoor sings, letters and plaques

    including fixings, finishes, accessories complete as per

    details on drawing CL10-XC-05 and as per specifications

    04 Ref. type I1 (PARKING) 1 No.

    05 Ref. type I2 (ENTRY ) 2 No.

    06 Ref. type R2-1 (GIVE WAY ) 1 No.

    07 Ref. type R5-1 ( ENTRY PROHIBTED ) 2 No.

    08 Ref. type W11-1 ( PEDESTRAIN CROSSING ) 2 No.

    Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per

    details on drawing CL10-XC-04 and as per specifications

    09 White stop line 7 M

    10 Pedestrain crossing 13 M

    11 White edge line 860 M

    12 Through traffic arrow 18 M

    13 Lane marking205 M

    14 Speed control hump including cut & removal of existing wearing 7 M

    (0.05m) course & add a new course, tack coat and 0.10m of

    bituminous wearing course, ref. 10 detail G

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    7 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    8/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    LANDSCAPING

    Trees/palms including pit excavation, stakes and ties, soilplanting mix, mulching, filter membrane and drainage

    layer all as details and planting schedule as per detail P1,

    on drawing CL10-XL-401

    01 P/Wf 12 No.

    Trees/palms including pit excavation, stakes and ties, soil

    planting mix, mulching, filter membrane and drainage

    layer all as details and planting schedule as per detail

    P2 on drawing CL10-XL-401

    02 T/Af 14 No.

    03 T/Bv 9 No.

    04 T/Fm 7 No.

    05 T/Po 2 No.

    Shrubs and ground cover including planting, site excavation

    as required, soil planting mix, mulching, filter membrane

    and drainage layer all as per details and planting schedule

    as per detail P3, on drawing CL10-XL-401

    06 S/Iha 56 No.

    07 S/Io 13 No.

    08 S/Ob 34 No.

    09 S/Pav 26 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    8 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    9/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    LANDSCAPING

    Shrubs and ground cover including planting, site excavationas required, soil planting mix, mulching, filter membrane

    and drainage layer all as per details and planting schedule

    as per detail P3, on drawing CL10-XL-401

    01 G/Ggp 1088 No.

    02 G/Cm ( O ) 747 No.

    03 G/Cm (W) 1469 No.

    Lawn planting, including soil planting mix, filter membrane

    and drainage layer all as per details and planting scheduleas per detail P4, on drawing CL10-XL-401

    04 L/Cd 1497 M2

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    9 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    10/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 14 - CONVEYING SYSTEMS

    PIPE WORK

    Supply and installation of Automated waste collection

    system piping. Item shall include the earth works, insulation,

    ,concentric reducer, puddle flanges ,inspection covers and

    all required materials and equipments to complete the

    transport pipe line from DV rooms , outdoor load stations and

    full vacuum load stations to waste plant.

    01 508mm under/above ground transport pipe 75 M

    RC MANHOLE

    Supply and install cast insitu or precast reinforced concrete

    manhole ,the item shall include excavation, backfill

    insulation ,inspection cover and all required to complete the

    work.

    02 RC manhole to suit required location in sitesas shown on drawings 3 No.

    STM - ITCCP2 - TD 001 to 016

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    10 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    11/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATION

    WASTE AND DRAINAGE INSTALLATION

    Supply, install and testing pipework, UPVC schedule 40, the

    work shall include but not limited to fittings, supports, cast

    iron pipes on roof for vent with caps, installation, all

    associate works and all materials and equipments required

    to complete and finish the work according to drawings,

    specification and code of practices

    01 50 mm dia. 30 M

    02 75 mm dia. 29 M

    03 100 mm dia. 115 M

    04 150 mm dia. 290 M

    05 200 mm dia. 42 M

    Accesssories

    06 Ground cleanout 50 mm dia, ref. GCO 1 No

    07 Ground cleanout 100 mm dia, ref. GCO 10 No

    08 Ground cleanout 150 mm dia, ref. GCO 1 No

    09 Ground cleanout 200 mm dia, ref. GCO 1 No

    10 Grease interceptor 1 No

    Construction work for briks inspection chamber, the work

    shall include bit not limited to earth work, plain concrete

    for foundation BED, concrete channel at chamber DED with

    standard cast iron manhole frame and double cover and all

    materials and equipments required to complete and finish

    the work according to specifications, drawings and code of

    practice

    11 Inspection chamber, ref. (IC&STIC) 600x600mm 11 No

    12 Slow down chamber, ref. (IC&STIC) 600x600mm 2 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    11 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    12/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15 - MECHANICAL

    MANHOLE AND COVERS

    Supply , install, testing and commissioning precast

    concrete sewer manholes with standard traffic (heavy duty)

    type cast iron manhole covers and frames, access ladders,

    concrete channel at manhole bed, foundation bed, drop

    pipe to manhole where required, all associated earthworks,

    damp proofing, and all materals, equipments required to

    complete and finish. the work according to specifications

    section 02605, 02730, drawings and code of practices

    01 Sewer manhole, ref. (SMH) 5 No.

    POTABLE WATER INSTALLATION

    Supply, install and testing pipework, UPVC Schedule 80 for

    potable water the work shall include but not limited to

    fittings, supports, all associate works and all materials and

    equipments required to complete and finish the work

    according to drawings, specification and code of practices

    02 25 mm dia. 90 M

    03 32 mm dia. 25 M

    04 40 mm dia. 20 M

    05 50 mm dia. 88 M

    06 75 mm dia. 2 M

    07 100 mm dia. 90 M

    NOT POTABLE WATER INSTALLATION

    Supply, install and testing pipework, UPVC Schedule 80 for

    not-potable water the work shall include but not limited to

    fittings, supports, all associate works and all materials and

    equipments required to complete and finish the work

    according to drawings, specification and code of practices

    08 40 mm dia. 58 M

    09 50 mm dia. 84 M

    10 63 mm dia. 2 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    12 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    13/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15 - MECHANICAL

    Accessories

    01 Water meter assembly 100 mm dia., ref. WMA 1 No

    02 Gate valve, 40 mm dia., ref. GV 1 No

    03 Gate valve, 100 mm dia., ref. GV 1 No

    04 Back flow preventer assembly, 100mm dia., ref. BFPA 1 No

    Drainage installation to the external drainage network

    Construction work for briks inspection chamber, the work

    shall include bit not limited to earth work, plain concrete for

    foundation BED, concrete channel at chamber DED withstandard cast iron manhole frame and double cover, UPVC

    pipework schedule 40 to nearest main sewer manhole and

    all materials and equipments required to complete and

    finish the work according to specifications, drawings and

    code of practice

    05 Slow down chamber 1 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    13 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    14/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15 - MECHANICAL

    IRRIGATION WATER INSTALLATION

    Supply, install and testing pipework, UPVC Schedule 80 for

    Irrigataion water the work shall include but not limited to

    fittings, supports, all associate works and all materials and

    equipments required to complete and finish the work

    according to drawings, specification and code of practices

    01 25 mm dia. 80 M

    02 32 mm dia. 87 M

    03 40 mm dia. 195 M

    04 50 mm dia. 220 M

    Accessories

    05 Supply and installation irrigation controller as detailed on drwings 1 No.

    and as per specifications

    06 Supply and installation bubbler for shrubs, ground cover and 569 No.

    succulents

    07 Supply and installation bubbler for trees and palm tree 188 No.

    08 Supply and installation spray lawn sprinkler 46 No.

    09 Gate valve W/valve box 32 mm dia., 2 No.

    10 Gate valve W/valve box 40 mm dia., 1 No.

    11 Gate valve W/valve box 50 mm dia., 5 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    14 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    15/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15 - MECHANICAL

    IRRIGATION WATER INSTALLATION

    Supply and installation remote control valve assembly

    including piping complete with valve box, Y-strainer,

    accessories and all associated works as detail on drawing

    and as per specifications section 02810

    01 Ref. RCV 25mm dia. 1 No.

    02 Ref. RCV 32mm dia. 2 No.

    03 Ref. RCV 40mm dia. 6 No.

    04 Ref. RCV 50mm dia. 6 No.

    DIESEL FUEL STORAGE TANK INSTALLATION

    Allow for underground fiberglass diesel fuel storage tank

    with required capacity including concrete anti-flotation

    pad, heavy duty traffic type manhole ring and cover,

    pipework, valves duplex diesel fuel transfer pumps, steel

    ladder, pea gravel bed, earthworks, fixings and accessories

    all as detailed on drawings

    05 Proprietary tank units 1 Item

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    15 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    16/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    MEDIUM VOLTAGE CABLES

    Supply , install and test medium voltage Cables

    XLPE/STA/PVC 15KVcopper Between RMU unit and

    transformers as required to suit the following extensions as

    shown on drawings and drawings and as described in

    specifications drawings and by making arrangiement with

    supervising engineer to achieve the work to the best

    possible specifications

    01 Medium voltage cable comprising 3 core 70 mm CU / XLPE /STA/ 10 M

    PVC, cables route from RMU up to transformers

    supply and install Electrical concrete ATTIC including

    trenching and backfilling for duct banks, conduits for M.V

    cables in duct banks, tapes, all as required to suit locations

    as shown on drawings XE-201and as per specifications

    section 16180 and by making arrangement with supervising

    engineer to achieve the work to the best possible

    specifications

    02 Electrical concrete ATTIC 32 M

    MAIN AND SUB-MAIN POWER

    supply and install reinforced concrete Man / Holes connected

    via duct banks, complete with man / hand hole bolted type

    metal cover, drain pipe outlet, including trenching and

    backfilling for duct banks, conduits for M.V cables in duct

    banks, tapes, all as required to suit locations as shown on

    drawings drawings E201--E220and as all accessories and

    coordination & integration with other systems shall be

    conducted during work execution as per technical

    specificationssection 16180 and by making arrangement with

    supervising engineer to achieve the work to the best

    possible specifications

    Site work

    03 Power Hand Holes (900900900) Ref. HH including UPVC conduit 2 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    16 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    17/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    POWER CABLES FOR PUMP ROOMS

    supply , install, testing and commissioning multicore copper

    cable ( XLPE/PVC -1000/600V) in direct buiried including

    junction boxes, connection for feeders and various power

    loads as shown on drawings E-701 and as per specification

    section 16126 and by making arrangement with supervisingengineer to achieve the work to the best possiblespecifications

    01 (4 C-16 mm ) + 16 mm G /direct buiried 340 M

    PANEL BOARDS FOR PUMP ROOMS

    Supply , install , testing and commissioning of panel boards

    including grounding, circuit breakers, grounding, fixings,

    markers and , other functional units and all associated works

    as required and shown on drawings E 701, XE-201

    and coordination & integration with other systems shall be

    conducted during work execution as per technical

    specificationssection 16442,16410,16415 and by makingarrangement with supervising engineer to achieve the workto the best possible specifications

    02 Ref. EPP (IP54) 1 No.

    03 Ref. PP1(IP 54) 1 No.

    04 Ref. PP2(IP 54) 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    17 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    18/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    Supply , install, testing and commissioning of power andsockets accessories including all necessary boxes,

    faces(according to the engineer approvement ) comprising

    cables, conduits, fittings, connections, from the outlets to

    Panelboards feeder associated works as required to suit the

    locations shown on drawings XE-201and Coordination with

    other disciplines shall be conducted during work execution

    as per technical specifications, section 16050and by making

    arrangiement with supervising engineer to achieve the work

    to the best possible specifications

    01 Junction box , Floor mounted 10 No.

    02 Disconnect switch,non fused and with pilot light16A, 1P, 230V 2 No.,weatherproof for waste collection

    03 Disconnect switch,non fused and with pilot light 20A, 1P, 230V 2 No.,weatherproof for feul pumsp

    PUMP ROOMS

    04 Disconnect switch,non fused and with pilot light 20A, 3P, 400V 1 No.

    ,weatherproof for fountain pump(FP3)& potable water pump

    05 Disconnect switch,non fused and with pilot light 20A, 1P, 230V 5 No.

    ,weatherproof for submersible pump fountain pump(FP2)&(SP2)

    06 Disconnect switch, non fused, 400A, 3P, 400V 1 No.,weatherproof for fire jocky pumps

    07 Duplex socket outlet, 13A, 230V, grounding type, weatherproof 3 No

    08 Single pole one-way ,one gang switch (13A), weatherproof 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    18 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    19/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    LIGHTING INSTALLATION

    Supply, install , testing and commissioning of lighting

    fixture outlets and including conduits, wires and all boxes

    belong to Lighting Panelboards and associated works as

    required to suit the locations shown on drawings XE-201

    .Coordination with other disciplines shall be conducted

    during work execution as per technical specifications,

    section 16050 and by making arrangiement with supervising

    engineer to achieve the work to the best possible

    specifications

    PUMP ROOMS

    01 Lighting fixer outlet 8 No.

    LIGHTING INSTALLATION

    Supply ,install, testing and commissioning of lighting

    fixture (furnishe with lamp and electronic blast, accessories

    and internal wires) mounting accessories.(according to the

    engineer approval ) associated works as required to suit the

    locations shown on drawings XE-201 ,GE-E01,GE-E01 and

    Coordination with other disciplines shall be conducted

    during work execution as per technical specifications,section 16500 and by making arrangiement with supervising

    engineer to achieve the work to the best possible

    specifications

    PUMP ROOMS

    02 Type F1 4 No.

    03 Type F1E 4 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    19 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    20/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    GROUNDING SYSTEM FOR PUMP ROOMS

    Supply, installation , test and commissioning of a grounding

    system comprising bare copper conductor to bond the

    building's distribution boards and HVACand plumping

    equipments to the main ear thing grid of the building.

    Including necessary earthwork, buried galvanized steel

    foundations strips surrounding the building phosphor bronze

    test joints & triangular counter poise and all associated

    works to suit grounding resistivity required as shown on

    drawings XE201 and as described in

    specifications16452,16453 by making arrangiement with

    supervising engineer to achieve the work to the bestpossible specifications

    01 Complete building grounding system network to suit ground 1 Item

    resistivity as shown on drawings and specification

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    20 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    21/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    TELECOMMUNICATION SYSTEM

    Supply, installation, testing and commissioning of

    telecommunication system commporising of

    telecommunication outlets including cable / wires and

    conduits as shown on drawings E- 501-and as described in

    specification section 16715,16720 and by making

    arrangiement with supervising engineer to achieve the work

    to the best possible specifications

    To suit system network equipped with:

    01Wall mounted telecommunication outlet 1 port (1data ) , ref. (T0)

    11No.

    weatherproof

    FIRE ALARM SYSTEM FOR PUMP ROOMS

    Supply, installation, testing and commissioning of Optical

    smoke detectors including associated cable wires and

    conduiting, interfacing as shown on drawings XE201and as

    described in specifications 16721 and by making

    arrangiement with supervising engineer to achieve the work

    to the best possible specifications

    To suit system network equipped with:

    02 Optical smoke detector Ceiling mounted 3 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    21 / 22

    REVISED PAGE

    Date: MAY 2012

  • 7/27/2019 CL10 (MAY 2012)

    22/22

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL10)

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    Collection

    Sheet - 1

    Sheet - 2

    Sheet - 3

    Sheet - 4

    Sheet - 5

    Sheet - 6

    Sheet - 7

    Sheet - 8

    Sheet - 9

    Sheet - 10

    Sheet - 11

    Sheet - 12

    Sheet - 13

    Sheet - 14

    Sheet - 15

    Sheet - 16

    Sheet - 17

    Sheet - 18

    Sheet - 19

    Sheet - 20

    Sheet - 21

    To Bill Summary SR