Water TreatmentPackage Plant Design
Sedimentation TankDesign
1 of 4
Sedimentation Tank design
Typical design criteria for horizontal-flow rectangular tanks with tube settlers
MWH pp.823
"Tube settlers typically have detention time less than 20min, but they still have a settling efficientycomparable to that of a rectangular settling tank with a minimum 2h detention time."
Water TreatmentPackage Plant Design
Sedimentation TankDesign
2 of 4
General Data
Raw water, Q = m3/s
Number of basin = No.
Unit Load = m3/s
Adopted Parameters
Settling Zone Dimension by trial and error
Width W = m AssumedDepth D = m AssumedLength L = m Assumed
Settling Area, A= m2Vf Ɵ = m/sVf Ɵ = m/h < 2.5 to 6.25 m/h
Total TankWidth W = m
0.0289
2
1.21
0.01447
2.4
2.880.0164859.3303
1.22.4
Width W = mDepth D = mTotal Length L = m
Tank volume, V = m3 including additional % for settling.Thus, Total length = m
Detention time, T = s= 10 min OK
Tube settlers
Length Lp = mWidth d = m
Settling Velocity, Vs = m/s AssumedƟ = 60 degrees
3
0.7
8.64
597
0.00061
0.05
25