1 Radhika Bharat, Senior Investment Officer, Private Sector Infrastructure Development Africa Carbon Forum, Nairobi, March 2010 Clean Development Mechanism Projects utilizing Carbon Credits

Clean Development Mechanism Projects utilizing Carbon Credits

Embed Size (px)

DESCRIPTION

Clean Development Mechanism Projects utilizing Carbon Credits. Africa Carbon Forum, Nairobi, March 2010. Radhika Bharat, Senior Investment Officer, Private Sector Infrastructure Development. Madagascar Project Cost EUR 14 mn ADB loan EUR 6 mn ADB roles Project Structuring - PowerPoint PPT Presentation

Citation preview

Page 1: Clean Development Mechanism Projects utilizing Carbon Credits

1

Radhika Bharat,Senior Investment Officer,Private Sector Infrastructure Development

Africa Carbon Forum, Nairobi, March 2010

Clean Development Mechanism

Projects utilizing Carbon Credits

Page 2: Clean Development Mechanism Projects utilizing Carbon Credits

2

The 15MW Sahanivotry Small Hydroelectric Power Project, a catalyst for Power Sector in Madagascar

Madagascar

• Project Cost EUR 14 mn

• ADB loan EUR 6 mn

ADB roles

– Project Structuring

– Long-term Lender

Benefits

– Independent power project (IPP)

– Expand the supply for electricity

– Reduce generation cost

– Long-term socio economic benefits

Page 3: Clean Development Mechanism Projects utilizing Carbon Credits

3

Country : Madagascar

Annual Electricity Production 80,000 MWhGrid Displacement Factor 0.496 tCO2e/KWh

Annual CO2 Reduction 39,680 tCO2

Price of Carbon 9 €/tCO2eNumber of year to benefit from carbon trade 5Start of Operation 2008

Total CO2 Reduction 198,400 tCO2

Estimation Total CER generated 1,785,600 EUR

Project: Sahanivotry Small Hydropower (15 MW)

Page 4: Clean Development Mechanism Projects utilizing Carbon Credits

4

The 9MW Buseruka Small Hydroelectric Power Project, a catalyst for Power Sector in Uganda

Project costs

• Project Cost USD 26 mn

• ADB loan USD 9 mn

ADB roles

– Project Structuring

– Long-term Lender

Benefits

– Independent power project (IPP)

– Connection of rural population

– Reduce generation cost

– Long-term socio economic benefits

Page 5: Clean Development Mechanism Projects utilizing Carbon Credits

5

Country : Uganda

Annual Electricity Production 47,304 MWhGrid Displacement Factor 0.496 tCO2e/KAnnual CO2 Reduction 23,463 tCO2

Price of Carbon 9 €/tCO2e

Number of year to benefit from carbon trade 3Start of Operation 2011

Total CO2 Reduction 70,388 tCO2

Estimation Total CER generated 633,495 EUR

Project: Buseruka Small Hydropower (9 MW)

Page 6: Clean Development Mechanism Projects utilizing Carbon Credits

6

CDM – Project Status

Project PIN

Project Design Document (PDD)

Validation CER

Sahanivotry Done Done under processing 2010

Buseruka Done Under review will be submitted June 2011

Page 7: Clean Development Mechanism Projects utilizing Carbon Credits

7

Project AfDB Other Donor

• Support to the sponsor on follow ups of Carbon

document processing

Technical Assistance

Sahanivotry

Austria – Komunal Credit provided grant to prepare the Carbon Credit documentation

Buseruka

Denmark – “UNIT Energy Styrelsen” provided grant to prepare the Carbon Credit documentation

• Guidance to the sponsor

• Preparation of request for technical assistance

Page 8: Clean Development Mechanism Projects utilizing Carbon Credits

Lake Turkana Wind Farm in Marsabit District, near Lake Turkana in north-western part of Kenya

• Project Cost EUR 300 mn

• ADB loan EUR 100 mn

ADB roles

– Mandated Lead Arranger for financing from DFIs and Commercial sources

– Project Structuring

– Long-term Lender

Notable features:

– Project is 300MW, with a capacity factor of 55%

– Project will supply up to 20% of Kenya’s total installed power

– Kenyan- Dutch project developer, JDA signed with UK based firm

– Carbon credits to be shared between the Government and project sponsor.