12
CleanSky SFWA demonstrators for future Business Jets Innovation takes off Thomas PROFFIT

CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

CleanSky SFWA demonstrators for future Business Jets

Innovation takes off

Thomas PROFFIT

Page 2: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

Cleansky SFWA program has increased the maturity of technologies candidates for future Business Jets Merged within 2 concept aircraft

Supported by major demonstrators Targeting high Technology Readiness Level

Introduction

Low Sweep Business Jet (LSBJ) High Sweep Business Jet (HSBJ)

SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels 2

Page 3: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

6 majors demonstrators tailored to bizjets

2 other have direct applicability to bizjets

Made possible by strong partnership

+ other BLADE partners

SFWA Major demonstrators supporting bizjets

Flutter WTT1 @ Onera

Noise Shielding Ground Test @ Dassault Aviation

High and Low Speed WTT1 on HSBJ @ Onera

High Speed WTT1 on LSBJ @ ETW

Laminarity Flight Test Preparation @ Airbus

Vibration Control Ground Test @ Dassault Aviation

Laminarity Flight Test @ Dassault Aviation

1WTT = Wind Tunnel Test

Powered Low Speed WTT1 on LSBJ @ DNW

SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels 3

Page 4: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

This is an essential phase to detail strategy based on shared objectives and designs

A consolidated demonstration path per technology stream is necessary to support this phase From design to individual testing to large demonstrators

Initial Phase: Detailing objectives and

converging strategy

Aerodynamic

Noise Shielding

Flutter

Handling qualities

Acoustic Fatigue

Innovative Aft Bodies

Techno Stream 8 Key enablers Demonstration path

SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels 4

Page 5: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

Project Start: Building partnership

2008 2009 2010 2011 2012 2013 2014 2015 2016

ROM cost

Aft Body Demos Kick Off Meeting New

partners

Aft Body Shape Freeze

1OEM = Original Equipment Manufacturer (A/C manufacturers) 2PDR = Preliminary Design Review

Ground Demo PDR2 Detailled

Spec Global Spec.

Launch Review

Building a good team of partners takes time

Setting up the worksharing, securing budget

Getting the appropriate number of partners

From challenging global specification to reality

Compromise between desirable objective and technical and budget constrains

Necessary iteration on OEM1 specification to steer the design in enough details

SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels 5

Page 6: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

Making on-purpose Building innovate testing components

and technique

Progressing quickly towards testing Supported by partners skills

Facilitated by close link between design and manufacturing partners

Ramp up phase: Getting concrete

2008 2009 2010 2011 2012 2013 2014 2015 2016

Launch Review

Aft Body Demos Kick Off Meeting

PDR1 CDR2

Test

ing

TRR3

1PDR = Preliminary Design Review 2CDR = Critical Design Review

3TRR = Test Readiness Review

SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels 6

Page 7: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

Testing phase : Movie of SHIELD demonstrator

SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels 7

Page 8: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

Noise shielding efficiency of U tail confirmed On ground with real engine

source

In WTT1 with TPS2

Outcome: TRL 5 demonstrated

Powered Low Speed WTT1 on LSBJ @ DNW

Noise Shielding Ground Test @ Dassault Aviation

Impact of engine jet on the U tail aerodynamic efficiency CFD coded now calibrated

Flutter WTT1 @ Onera

Flutter behavior of intersecting lifting surfaces configuration Parametric effect measured

1WTT = Wind Tunnel Test 2TPS: Turbine Powered Simulator SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels

8

Page 9: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

Outcome: TRL 5 demonstrated

High and Low Speed WTT1 on HSBJ @ Onera

Vibration Control Ground Test @ Dassault Aviation

1WTT = Wind Tunnel Test

Aerodynamic identification of HSBJ configuration Handling quality

Air intake distortion

Capacity to reduce a/c vibration level by closed loop system

SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels 9

Page 10: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

Outcome: TRL 5 demonstrated

1WTT = Wind Tunnel Test

High Speed WTT1 on LSBJ @ ETW

Validation of the performances of the laminar wing

Evaluation of handling qualities of the U Tail

Laminarity Flight Test @ Dassault Aviation

Measurement technique validated Preparation for BLADE

Refined defect criteria for laminarity Validation of numerical

tools

SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels 10

Page 11: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

Demonstrations performed successfully in the framework of CleanSky 1, with some delays, despite a number of technical and programmatic difficulties, thanks to the strong involvement of all parties

Comprehensive testing with TRL 5 in CleanSky 1, makes first deployments possible

Further optimization and extension of applicability of part of these technologies is one of the objectives of CleanSky 2

Future

SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels 11

Page 12: CleanSky SFWA demonstrators for future Business Jetscleansky.eu/sites/default/files/inline-files/3... · Powered Low 1Speed WTT on LSBJ @ DNW Noise Shielding Ground Test @ Dassault

SFWA-ITD Consortium Confidential

©2014 by the Clean Sky Leading Partners: Airbus, Agusta Westland, Alenia Aermacchi, Dassault Aviation, EADS-CASA, Fraunhofer Institute, Liebbherr-Aerospace, Rolls-Royce, Saab AB, Safran, Thales & the European Commission. Permission to copy, store electronically, or disseminate this presentation is hereby granted freely provided the source is recognized. No rights to modify the presentation are granted.

SFWA-ITD:CS closing event 21 & 22 March 2017, Brussels 12