Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
MASTER PLAN
PRESENTATION
PUBLIC MEETING
July 25, 2019 CLERMONT PARK
MEETING PURPOSE AND AGENDA
Meeting Purpose:
Present draft Master Plan and listen to public comments about the draft
plan
Agenda:
■ Welcome and Introductions
■ Background Information
■ Presentation of Clermont Park Draft Master Plan Revision
■ Public Input
PARK AUTHORITY MISSION
To enrich the quality of life for all members of the community through an enduring park system that provides a healthy environment, preserves natural and cultural heritage, offers inspiring recreational experiences and promotes healthy lifestyles.
PARK AUTHORITY FACTS
More than 23,000 acres of Parkland
More than 400 parks
National Gold Medal Winner
Nationally Accredited
MASTER PLAN PURPOSE
Site-specific long range vision
General guide for appropriate park uses
General location of facilities
Identifies resource protection areas
Captures site conditions or community concerns
-
CLERMONT MASTER PLAN REVISION PROCESS
PA staff develops Draft Plan
Presented to PAB for Review
Public Information Sessions on Draft
plan
PAB for review and approval to send for
public comment
Public Comment Meeting
• Public Comment Period 30 days
Return to PAB for review
Forward to BOS staff and member
for review
BOS Public Hearing soliciting comment
on any proposed changes to deed
restrictions
BOS Decision
Return to PAB for final approval if BOS approves revisions to
deed restrictions
PARK LOCATION AND NEIGHBORHOOD
40 acre site located in the Lee District in Franconia
Nearby parks include: Huntley Meadows
Lee District Park
Franconia Park
CLERMONT PARK 4100 Franconia Road, Alexandria - Maintenance Area 3 - Lee District
Level 2's - Fields 1, 2. 3, & 4
Field Information 1-60' Base, 200' Fence 2-60' Base,200' Fence 3- 60' Base, 200' Fence 4- 60' Base, 300' Fence
PARK HISTORY-DEED RESTRICTIONS
• 1968 - Fairfax County Public Schools acquired property via condemnation for
potential school
• 1975 – Park Authority developed a master plan for athletic fields and developed
fields through an interim use agreement with Public Schools
• 1985 – Schools transferred ownership of the property to the Board of Supervisors
and park use continued.
• July 26, 1999- PCA C-448-10 approved by BOS for Kingstowne LP
Proffers included the development of Clermont Park (Section 3) per the approved FDP
Resulting in the current athletic field development.
• March 2000 - Clermont Park Improvements – Task Force
Exclude lighting, permanent loudspeakers, and permanent concession structures from
the Master Plan. Write language into the BOS-Park Authority land transfer agreement
prohibiting these features.
PARK HISTORY-DEED RESTRICTIONS
• April 2003 – Athletic Field Redevelopment Completed
• March 2007 – Board of Supervisor Transferred 40.61 Acre Property To Park
Authority with deed restriction
Deed Restrictive Covenants Include:
• A Conservation Easement on 29.59 Acres of Undeveloped Property
• Prohibition of installation or Use of Any Lighting, Permanent Concession Areas and
Permanent Sound Systems on the Property
WHY A MASTER PLAN REVISION NOW
Evaluate park for field lights proposed by the community to provide for optimal use of the fields
30 acres of mature canopy in conservation easement
4 existing diamond fields
Existing gravel parking lot
EX
IST
ING
SIT
E C
ON
DIT
ION
S
EX
IST
ING
SIT
E FA
CIL
ITIE
S
EN
VIR
ON
ME
NT
AL
Deeded conservation easement for undeveloped portion of park
Mature tree canopy over more than 2/3’s of site
EN
VIR
ON
ME
NTA
L C
ON
DIT
ION
S
Retains existing park features. No new facilities proposed.
No changes proposed for the conservation area
Proposes lighting the 90’ diamond and one 60’ diamond field
Proposes lighting parking area
PR
OP
OS
ED
MA
ST
ER
PL
AN
ATHLETIC FIELD LIGHTING
International Dad::-Sky Association 3223 N orth First Avenue, Tucson. AZ 85719, USA
tel +1.520.293.3198
INTERNATIONAL DARK-SKY ASSOCIATION www.darksky.ore:- • To: Fairfax County Park Authority March 26, 2019
Congratulations! The lighting designs for Clennont Park Baseball/Soft.ball Field has been revie·wed and found to be in compliance with IDA 's Conununity Friendly Outdoor Sports Lighting program. This Letter of Certification confirms your successful application of Phase I, and allows you to apply for the Phase II Field Verification process.
We are proud to have you join this community ofoutdoor sports lighting facilities working to reduce light pollution and improve the environment in localities across the nation. By adopting the IDA criteria for Conununity Friendly Outdoor Sports Lighting, your community will:
e Minimize neighborhood lighting nuisance by greatly reducing local spill and glare .
e Manage high angle light pollution, thus dramatically decreasing off-site light trespass and sky glow.
e Mitigate neighborhood light pollution and sky glow, which will benefit the enviromnent, the astronomy community, and others inipacted by poorly designed outdoor spo1ts facilities.
e Minimize. lumen densities, thereby reducing energy consumption.
Sincerely, Pete Strasser
International Dark-sky Association (IDA) Phase I Certification
In meeting IDA criteria, the Clermont Park Lighting Design:
◼ Minimizes local spill and glare
◼ Incorporates greatly decreased offsite light trespass and sky glow
◼ Minimizes lumen densities thereby reducing energy consumption
Obtrusive Light
• Useful Light
• 3 Interrelated Elements
• Spill Light
• Glare
• Sky Glow
Control of Obtrusive Light
• Shielded Fixtures
• Appropriate Pole Heights
• Downward Aiming Fixtures
• Optimum Aiming
• Fewer Fixtures
Two light source options
LED ATHLETIC FIELD LIGHTING
Field Lighting History
TYPICAL LIGHTING COLOR TEMPERATURE SCALE
MUSCO LED FIXTURES – 5,700 K
Light System Control
• Control Link
• Satellite
• Internet-based
• Phone
• Staffed Control Center
• Field Control Units
• System Monitoring
Field Lighting Standards
IESNA Recommended Lighting
(fc) = foot candles
Class Rectangle Diamond Infield Diamond Outfield
III – High School 30 fc 50 fc 30 fc
IV – Low Recreation 20 fc 30 fc 20 fc
Actual Spill and Glare LED Field Lighting
200 Foot Diamond 300 Foot Diamond
Max Spill 0.08 fc 0.68 fc
• Max Spill – 150 feet
• Property Line
C4 11~
C5
~
Field 4 300'/300'/300' - basepath 90'---
-$- 84 A4
B5 -$- ~
86 ~
B1
~
A1 ~
PB -$
P6
~
pg
P7 ~
PS -$-
P4 P3 47 ~
__ .,...... ____ ..,_ _ _. Parking
P1 235' x 215'
Clermont Park – Anticipated Pole Location
Clermont Park- Poles Height
Parking lot Field #1
Field #4
;n ~1 72
..29 ..32 _;33 ..31 _;30 ..24
.,34 ..39 _;35 ..30 ..32 ..32 ..29 .,2.y C1
.;37 ..31 ~1 .;31 .;32 .;32 .,33 .,34 . Tu1
ta 61 f.;---
?i~ .,35 .,30 .Pl .,37 .,34 .,35 .,35 .,33 ~9
..33 ..36 $ 1 ..37 .,32 .,32 ~ ..31 ..31 ..23
-----r--------------- -------j ft6 ~6 ~o ft2 ~s :
I ..31 ..33 ..31 ..31 ..29
I I I
A1 ~ ..,56 ..,58 _:55 .,48 .;39 l .;34 ..35 29 28 .;2.9 .;2.2
I
~1· I I I
P4 ..54 ~9 p2 .,46 I .;37 ..36 29 .;32 .;31 -i20 I I I I
;,2 fJ9 .p6 .{J6 ;,2 t .,34 ..JO .,30 .,38 .,31 .;2.0 I I
----t I I
ft5 ~2 ~6 P3 ft5 I ..31 ..32 ..34 ..35 ..28 I I
I I
L-----------------------------1 I ------------4
~l~ ~1~ ~ A2 ~ 82
Typical LED Field Lighting #1
P.03
.fl.00
Jl.01
-1102
.p.01
.p.02
.p.03
J).01
.p.oo
J).01
J).02
Jl.01 A4 , .00
00
J).04 Jl.01 p_05
86 -$-
81 ~
A1
~
fl.00 .Jl OO LLOO
-$A2
Jl.00 9 .00
-$B2
.JlOO
C1 181
Jl.00
J:LOO
Jl.00
J:LOO
J].00
fl.00
Jl.00
J]..00
P10
J:l..00
p.oo
_p.oo
p.oo
p _o1
Jl..00
Typical LED Field Lighting #1
cs~ -----,
I
420 ~5 is I
~1· I I I I
/ -i28 ;'.32 ;30 ;35 ;34 .;25
.;21 _;32 -i29 _,'.30 ;33 ;33 ;36 -i29 /
~o .;28 .;28 -i28 -i28 ;31 ;35 ;34 ..33
I ~ BG
;31 .;28 .;23 -i27 -i27 ;31 ;38 ff 1 ..37 ·r~
I l-7 l-9 -i28 J-7 _;31 _;34 ~9 fr5 ~5 +11
~---~---~---~-------------f------~ C4~ ;32 ;30 -i28 -i28 _;34 1 _;36 p 1 ~o ~5 ~9 ~r· '-
~o ;30 ;33 ~2 _;32 _ft1 p2 ps ~4 ~9 -i!)O
~6 ;35 ;33 _;36 _;38 _µ; ~2 p6 J31 ~6 -i!)6 ~A1
I ~6 ;35 ;36 ..34 ~2 .,A5 .,54 pO ~8 (.611 ..SB ~,~
--+--I
~5 ~9 ..33 _;36 ;'.39 I I
_;36 AB ~7 ~6 .;15 I
a1~ I
~------------------------_________ J ___________________________________
il. 86~
A4 i...---42"
Typical LED Field Lighting #4
~-n
P,.33
P,.32
.,p. 1~
f>JJ9
.DJ09
J l.1 :?
Jl.1e Jl.13
;..n5
.P-113
P .19
JJt.2--5
) .24
.C.19
p . 13
C4 ~-
l
~·
J)...Cl 4).34
-$-BS
Jl.D3 .,p.14 n 1e- ... u
.,p.36 .....
cs ~
~ B4
-$-A4
-$-
;.-19 .,p. n p.os
B6 -$-
6 1 • A1 •
Jl.C2
Jl.41
,P.56
p .62
~-Jl.6~
SJ.SJ
'1.53
SJ.JS
}j].:?8
p.:in
SJ. 4
'1.DB
p .!llS
~ .A:2
~..OJ
.0.01 PM SJ!lll .:J;J Q
P,1J -$.~1 .;J.33 Jl 4] ) .H ~c Jl.W ) .Se ;...:s ) .3S ~9 Jl2 1 ~.1 l Jl..05 l.rJJ .
• 8 3
• 82
C1
Typical LED Field Lighting #4
. R
/).9 -1-1-Q J .3 .J).1 _5 p.4 j t3 $ .7 ; .6 -1-1-4 /).Q .Jl-8 +U
) .1 .,2.6 .;5.Q .j}.O ~-7 ;l.5 .p_9 Jj.2 $ .2 .. Ls .,i .o .,0_9 .. 1.3 7.1 ~-0 ,6.1 ./H .J.5 p .8 .Ji-1 $ .1 .. 1.7 .fH
) .3 .,2.7 .;5.3 .j.9 $ -7 ~. 1 7 _Q .J.O $ .0 .;2-1 ) _3 .. 1-2 .. 1.tl 7 .Q .PA j .Q .fH ;{1.1 j .8 .j}_Qi ,3.Q .. 1.9 _;LO
J .7 .,2..8 $ .B ;T.O Pa7 ,91!0 .,9-1 ~-3 J .6 .;2_5 J .7 -1-1-5 .,:2.0 J .O jC_Qi J .1 p"-,7 ~-1 .J)-2 ,3.5 .,2..3 .. L2 r:----- f .
) .8 .,2.8 .;5.0 .j}.9 r~0_2.j3_8 jl.4 ,3.6 ~-7 ) -B .. u ;l..2 ,3.0 .p_ 1 , _o r .. 10.2JH .Ji-3 ,3.5 .,2.5 .. 1-3 E ~
J .8 ~ 1 $ .ti JU ... 8 p .2 .Jl6 ~.7 J .9 .;2-7 J .8 -1-1-6 .,:2.2 J .3 fl -7 ~. 1 .- 8 JL2 ~.6 ft-6 ,3.7 .,2..4 -1-1-3
J .6 ..3-5 ~.Q JU -1-10.9~2 .,Q_3 J .B p .2 .;2-7 J .tl -1-1-5 .,:2.0 J .7 .l-0 ~.2 .. Hl.9+12.3,9.2 .J"-7 p .O .,2..4 .. L2
.,i .1 ~- 1 .;5.7 .,S.4 $L6 .,io_5.13_5 .J.2 $ .7 ~-6 .,t .7 .. L5 ;i..u ,3.4 .p_g 13_5 .!1-6 .. rn.5/3.5 7 _1 $ .5 .,2.3 .. 1-2
J .8 _,2..Q /t.7 .J).9 ~'j ,91!0 .,9-0 ~.2 J .6 .;2_7 J .8 .. u .,:2.2 J .1 fl -8 J .O PS~ ~ it ~-Q .J)_1 ,3.4 .,2..4 .. L3 ~ ,..,....,_,...---
) .7 .,2.5 $ .B .j}.6 ~.7 .f.-3 Jj.2 ,3.4 ~-6 ) .8 .. u ;1..1 7 .8 ~-Qi ,6.7 ~ .7 f3.3 .Ji-1 ,3.2 .;l.3 .. 1_3 p ~
J .6 .,2..5 J .9 .J.3 ... 1 ~.o .;n ~.o J .1 .;2-3 J .7 .. L6 .J.o ; .1 ic-o J .3 ... 8 .,a.o J .7 _p_g ,J.o .;rn .. L2
J A .,2..8 /t.B .J).2 ~-2 p .3 .l-1 ti.Q J .9 .;2-3 J .5 -1-1.4 +1.B J .1 fl -9 " ·3 Jt3 ~. 3 J JJ .P-8 ,3.8 .,2..0 .. u
) .5 ~- 1 tU ./j.2 .;7-0 /3.0 .j}J) .;5.0 $ .5 ~-4 ) .5 .. 1-3 .. 1.B ,3.3 .P-2 p .3 7 _0 ..£.0 j lO .jl_Qi $.4 .,2.2 .tL1
J .5 .,2..4 $ .4 ;1.2 Jto ~.5 .l-2 ~. 1 J.4 .;2-2 J .5 -1-1-4 +1.B ; .6 fl -6 J .3 .jlO _.a.5 J .1 .J)_O ,3.3 -1-1.9 -1-U
.,t .6 .,2.5 $.4 .Ji.5 p-4
1.J 1i>- .f.-5 .;5.Q ,3.2 ~-4 .,i .t1 .. L5 .. LQ 7.1 ~-5 ,e.t1P3
1J # rir 13.5 .p_8 ,3.1 .,z.1 ~,_2
.,t .6 .,2.5 ~-B .fl.6 ~.7 .f.-3 jj .. 1 ,3.4 ~-4 .,i .t1 .. L5 .. 1.g ;..1 .. 4_9 ~.ti ~-7 ~-3 .p_o ~2 ;..2 .. u
J .5 .,2..5 /t.1 J .5 1to ~.3 .,a_o ~. 1 J .3 .;2-2 J .4 .. 1-3 .1.s ; .1 fl -2 J.5 ~1 .,a.3 ~.o ft-1 .3-1 .,2..0 .. Lo
.,i .2 .,2.7 .;5.2 .fl.4 $ -3 ~. 1 72 jl.3 $ .O ~-o .,i _ 1 .. 1-0 .. 1.4 7 .9 .p_3 ,6-4 -13_3 ;{!. 1 ; .2 .fl-2 ,3.Q .. i.0 .p_s
J .O .,2..3 /t.7 ft.9 ~- 1 p.7 fl-5 /t.Q J .7 -1-1_6 /).Q .Jl_8 +1.2 ;.4 fl -7 tt.Q .P-1 ffJ.7 tt.5 fl -9 ,3.tl .. 1.5 .fH
p .8 .. L5 ;i..s .p.6 $ -B $ .ti .p_1 ~.3 7 .1 .. u p .8 .p_1 p .9 .,t .6 ~-9 p .tl 41_9 $ .6 p .1 412 7 _0 .. u .p_6
p .6 .. L2 ;i..t1 ~.9 ;., 6 p .3 .fl-3 ,3.Q .,i .0 .p_Q p .t1 .p_6 fJ.7 .,t .3 ~-6 ,3.Q., 6 .;5.3 $ .3 .,3..8 .,i _1 .,0.0 .P-~I
• • P2 ~ P1 ~
LED Parking Lot Lighting
PROCESS
Public Information Meetings- April 25, 2018 and Sep 11, 2018
Park Authority Board authorized staff May 2019 to take the Draft Master Plan for public comment
Public Comment Meeting (tonight)
30-day comment period
Discuss comments with Park Authority Board (PAB) and review with BOS member –Fall 2019
If decision is made to move forward with field lights, then schedule a public hearing with BOS to recommend changing the deed restrictions
BOS to hold Public Hearing to solicit public comment on any recommended changes to the deed restrictions
BOS Decision
MPR returns to PAB for final approval if BOS approves revisions to deed restrictions
COMMUNITY INPUT
Questions or Suggestions
Phone
Public Input Meeting
COMMENTS AND FEEDBACK
Email: [email protected]
Written comments:
Pat Rosend, Project Manager
FCPA Planning & Development Division, Suite 406
12055 Government Center Parkway, Fairfax, VA 22035
Or leave comment slip with us tonight!