Clifford Devlin's Building Division was appointed to replace 240 square metres of glazed panelling forming the existing glass atrium to Block D at Johnson & Johnson's UK Headquarters in High Wycombe. To allow access to the roof level glazing, over 7 miles of scaffolding was installed both internally and externally. Internally a major exclusion zone was formed using white-faced plywood, lined with acoustic protection, to minimise the effect of the work, whilst maintaining aesthetics in the building, which remained fully occupied throughout. Further plywood and Correx sheeting was installed to protect glass balustrades, handrails and planters. Much of the work was undertaken out-of-hours which allowed maximum productivity and minimal disruption on the project. The external scaffold at roof level was encased with a shrink-wrap polythene system, providing a weath- erproof covering, which facilitated the removal of the glazing, whilst keeping the building weather tight, with a consistent ambient temperature, during the works. The new atrium glazing was installed by specialists Glassolutions, with operatives working simultane- ously from the internal scaffold deck and external roof area. To make full use of the access arrangements Clifford Devlin was retained to carry out a number of associated in-situ tasks including redecorating of the atriums structural steelwork and internal walls at atrium level to ground. In addition some 250 sq metres of roofing covering adjacent to the glazing was lifted and replaced with a new Kemperol Roofing system. A number of new uplighter luminaires were also installed . Clifford Devlin Limited Clifford House, Towcester Road, London E3 3ND Tel: +44 (0) 20 7538 8721 Fax: +44 (0) 20 7987 1857 Email: [email protected] Web: www.clifford-devlin.co.uk ATRIUM GLAZING HIGH WYCOMBE Discipline: Building Duration: 20 weeks Completed: Feb 2016 Value: £430K Engineering consultant: George Harwood Ltd Client: Johnson & Johnson

Clifford Devlin Case Study - Atrium Glazing · Glassolutions, with operatives working simultane-ously from the internal scaffold deck and external roof area. To make full use of the

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Clifford Devlin Case Study - Atrium Glazing · Glassolutions, with operatives working simultane-ously from the internal scaffold deck and external roof area. To make full use of the

Clifford Devlin's Building Division was appointed toreplace 240 square metres of glazed panellingforming the existing glass atrium to Block D atJohnson & Johnson's UK Headquarters in HighWycombe.

To allow access to the roof level glazing, over 7miles of scaffolding was installed both internally andexternally. Internally a major exclusion zone wasformed using white-faced plywood, lined withacoustic protection, to minimise the effect of thework, whilst maintaining aesthetics in the building,which remained fully occupied throughout.

Further plywood and Correx sheeting was installedto protect glass balustrades, handrails and planters.Much of the work was undertaken out-of-hourswhich allowed maximum productivity and minimaldisruption on the project.

The external scaffold at roof level was encased witha shrink-wrap polythene system, providing a weath-erproof covering, which facilitated the removal of theglazing, whilst keeping the building weather tight,with a consistent ambient temperature, during theworks.

The new atrium glazing was installed by specialistsGlassolutions, with operatives working simultane-ously from the internal scaffold deck and externalroof area.

To make full use of the access arrangementsClifford Devlin was retained to carry out a number ofassociated in-situ tasks including redecorating ofthe atriums structural steelwork and internal walls atatrium level to ground. In addition some 250 sqmetres of roofing covering adjacent to the glazingwas lifted and replaced with a new KemperolRoofing system. A number of new uplighterluminaires were also installed.

Clifford Devlin LimitedClifford House, Towcester Road, London E3 3NDTel: +44 (0) 20 7538 8721 Fax: +44 (0) 20 7987 1857 Email: [email protected] Web: www.clifford-devlin.co.uk

ATRIUM GLAZINGHIGH WYCOMBE

Discipline: BuildingDuration: 20 weeksCompleted: Feb 2016Value: £430KEngineering consultant: GeorgeHarwood LtdClient: Johnson & Johnson