Clinic at the Gesundbrunnen, 1st construction phase Heilbronn, Germany Contract Value (net): 2.2 million Euro Construction Period: 05/2012 - 09/2012 Client: SLK-Kliniken Heilbronn GmbH, Heilbronn Services: Soldier pile wall Grouted anchors Jet grouting works Execution: Implenia Spezialtiefbau GmbH Infrastructure - Central Branch Mannheim Office Diffenéstraße 14 68169 Mannheim T +49 621 70014 250 F +49 621 70014 260 [email protected] www.spezialtiefbau.implenia.com In a joint venture Implenia Spezialtiefbau GmbH performed the technical direction for the building pit for the new development of the SLK clinic at the Gesundbrunnen in Heilbronn. Determining factors for the execution were the continuation of patient care in the adjacent hospital building and the minimization of emissions through selecting suitable production methods using ultra-modern machinery. Excavation and lining works of the 120 m x 220 m building pit were commenced on the plot of the former patients garden in May 2012. A soldier pile lining made up of double U profiles and timber infill panels, as well as up to 23 metre long grouted anchors in order to secure the up to 15 metre high lining wall were executed. In the areas where the building pit is directly adjacent to the existing buildings of the women's clinic and the neonatal department, underpinning using the jet grouting method was planned and executed. The design collaboration with the representatives of the client led to a smooth construction process even with the continued planning of the future hospital building. It was possible to hand over the building pit for the subsequent works on time and at the agreed quality standard. Quantities: 250,000 m³ soil excavation 3,500 m drill holes for soldier piles 4,000 m² retaining wall surface area 11,100 m anchor drilling 750 m³ jet grouted bodies

Clinic at the Gesundbrunnen, 1st construction phase · department, underpinning using the jet grouting method was planned and executed. The design collaboration with the representatives

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Clinic at the Gesundbrunnen, 1st construction phase · department, underpinning using the jet grouting method was planned and executed. The design collaboration with the representatives

Clinic at theGesundbrunnen,1st construction phase

Heilbronn, Germany

Contract Value (net):

2.2 million Euro

Construction Period:

05/2012 - 09/2012

Client:

SLK-Kliniken Heilbronn GmbH,Heilbronn

Services:

Soldier pile wall

Grouted anchors

Jet grouting works

Execution:

Implenia Spezialtiefbau GmbHInfrastructure - Central BranchMannheim OfficeDiffenéstraße 1468169 Mannheim

T +49 621 70014 250F +49 621 70014 260

[email protected]

www.spezialtiefbau.implenia.com

In a joint venture Implenia Spezialtiefbau GmbH performed thetechnical direction for the building pit for the new developmentof the SLK clinic at the Gesundbrunnen in Heilbronn.

Determining factors for the execution were the continuation ofpatient care in the adjacent hospital building and theminimization of emissions through selecting suitableproduction methods using ultra-modern machinery.

Excavation and lining works of the 120 m x 220 m building pitwere commenced on the plot of the former patients garden inMay 2012. A soldier pile lining made up of double U profilesand timber infill panels, as well as up to 23 metre long groutedanchors in order to secure the up to 15 metre high lining wallwere executed.

In the areas where the building pit is directly adjacent to theexisting buildings of the women's clinic and the neonataldepartment, underpinning using the jet grouting method wasplanned and executed.

The design collaboration with the representatives of the clientled to a smooth construction process even with the continuedplanning of the future hospital building.

It was possible to hand over the building pit for the subsequentworks on time and at the agreed quality standard.

Quantities:

250,000 m³ soil excavation

3,500 m drill holes for soldier piles

4,000 m² retaining wall surface area

11,100 m anchor drilling

750 m³ jet grouted bodies