    Kaduna City Drive Test Report

    ETISALAT DRIVE TEST REPORT

    Kaduna City

    SIGN:

    DATE:.

    Huawei Technologies Co., Ltd.

    OCTOBER 2010

    All rights reserved

    2010-10-20 Kaduna City DT Report Page 1, Total 10 Pages

  • 7/28/2019 Cluster Drive Test for Kaduna (Ftp)

    2/10

    Kaduna City Drive Test Report

    Contents

    1. Summary of drive test.................................................................................3

    2. Drive Test......................................................................................................3

    2.1 Summary of Drive Test................................................................................................3

    3. Conclusion.................................................................................................10

    2010-10-20 Kaduna City DT Report Page 2, Total 10 Pages

  • 7/28/2019 Cluster Drive Test for Kaduna (Ftp)

    3/10

    Kaduna City Drive Test Report

    1. Summary of drive test

    Tools of Drive Test:

    Test Hardware Sony Ericsson Z750i, USB GPS76, Laptop

    Test Software TEMS Investigation 9.1

    Dial Configuration (Long Call) Duration(s): Long Call

    Interval(s): 10

    Test Engineer: Uko Akaninyene

    Test Date: 18/10/2010 & 19/10/2010

    Drive test Analyst: Uko Akaninyene

    Log data name: Kaduna_20101018_01.log ~ Kaduna_20101019_19.log

    2. Drive Test

    2.1 Summary of Drive Test

    The figures below show the Data Mode, Coding Scheme and Throughput of Kaduna City.

    2010-10-20 Kaduna City DT Report Page 3, Total 10 Pages

  • 7/28/2019 Cluster Drive Test for Kaduna (Ftp)

    4/10

    Kaduna City Drive Test Report

    Figure 2.1.1 Site Distribution in Kaduna City

    2010-10-20 Kaduna City DT Report Page 4, Total 10 Pages

  • 7/28/2019 Cluster Drive Test for Kaduna (Ftp)

    5/10

    Kaduna City Drive Test Report

    Figure 2.1.2 Data Mode Map

    2010-10-20 Kaduna City DT Report Page 5, Total 10 Pages

  • 7/28/2019 Cluster Drive Test for Kaduna (Ftp)

    6/10

    Kaduna City Drive Test Report

    Figure 2.1.3 Rx Lev Coverage Map

    2010-10-20 Kaduna City DT Report Page 6, Total 10 Pages

  • 7/28/2019 Cluster Drive Test for Kaduna (Ftp)

    7/10

    Kaduna City Drive Test Report

    Figure 2.1.4 RLC Throughput DL

    Figure 2.1.5 Throughput Chart

    2010-10-20 Kaduna City DT Report Page 7, Total 10 Pages

  • 7/28/2019 Cluster Drive Test for Kaduna (Ftp)

    8/10

    Kaduna City Drive Test Report

    Figure 2.1.6 Coding Scheme DL

    Figure 2.1.7 Coding Scheme Statistic Chart

    2010-10-20 Kaduna City DT Report Page 8, Total 10 Pages

  • 7/28/2019 Cluster Drive Test for Kaduna (Ftp)

    9/10

    Kaduna City Drive Test Report

    Figure 2.1.8 Number of Used Timeslots DL

    Figure 2.1.9 Number of Used Timeslots DL

    2010-10-20 Kaduna City DT Report Page 9, Total 10 Pages

  • 7/28/2019 Cluster Drive Test for Kaduna (Ftp)

    10/10

    Kaduna City Drive Test Report

    3. Conclusion

    According to the above analysis, the percentage of the number of used timeslots

    that is allocated 4 ts is about 78%. The coding scheme is also averagely high. The radio

    environment is also good (good C/I) from the test logfile. It can be concluded that the

    FTP service in Kaduna city is very good.