CM(IS) Delivering Information Superiority ASTOR SAR Imagery Flight: 27 Oct 05 - First DMR Collection ASTOR SAR EO GROUND TRUTH

Embed Size (px)

DESCRIPTION

CM(IS) Delivering Information Superiority Project HELIX Single Statement of User Need: Project HELIX will sustain the Nimrod R Mk1 capability to circa 2025 and provide a rapidly deployable, SIGINT capability configured to deliver effect from the strategic to the tactical level with reach to support operations across a theatre of operations. It will be capable of operating within a networked systems of systems to collect, analysis, fuse and disseminate a coherent and rapidly interpretable SIGINT picture in support of National, Joint and Coalition operations and provide actionable information to support TST and Combat ID.

Citation preview

CM(IS) Delivering Information Superiority ASTOR SAR Imagery Flight: 27 Oct 05 - First DMR Collection ASTOR SAR EO GROUND TRUTH ASTOR Connectivity MOB JFLCC/Div HQ TGS JTFHQ OLGS Bde HQ SOB/JFACC PMP, MDRF, OLGS OPERATING AREA FALCON/CORMORANT BOWMAN CM(IS) Delivering Information Superiority Project HELIX Single Statement of User Need: Project HELIX will sustain the Nimrod R Mk1 capability to circa 2025 and provide a rapidly deployable, SIGINT capability configured to deliver effect from the strategic to the tactical level with reach to support operations across a theatre of operations. It will be capable of operating within a networked systems of systems to collect, analysis, fuse and disseminate a coherent and rapidly interpretable SIGINT picture in support of National, Joint and Coalition operations and provide actionable information to support TST and Combat ID. CM(IS) Delivering Information Superiority Timeline IG MG PASE OSD Aim: Sustainment of the capability. Issues: 1.Preferred bidder (L3/LM) downselect Oct/Nov Impact of Innovative Bids/Proposals? 3.FEWSI Reach-back and Joint Exploitation Capability. Project HELIX CM(IS) Delivering Information Superiority Other Sensors Watchkeeper Eagle Soothsayer Shaman PERFORMANCE COST TIME AvailabilitySustainabilityDeployabilitySurvivabilityFlexibility Interoperability Upgradability Manpower Training INT Capability (3) Op Support & Follow-on Exploitation Gather Receive ControlNetworking Contribute & Manage Direct HELIX key user requirements CM(IS) Delivering Information Superiority Year Concept AssessmentDevelopment ManufactureInst & Accept Concept Programme Initial Gate Jul 03 Increment 1 Main Gate Dec 07 Dec 11 Nov 14 Increment 2 Main Gate Feb 12 Oct 15Mar 18 Max Capability for 200m through Competition Remaining Capability for Min Cost through Competition HELIX Programme Schedule CM(IS) Delivering Information Superiority Enabling the Network CM(IS) Delivering Information Superiority ISTAR issue of balance Collect Process Direct Disseminate CM(IS) Delivering Information Superiority ISTAR issue of balance Disseminate Collect Process Direct Need to address imbalance