CMMI in small settings

Embed Size (px)

Citation preview

  • 8/7/2019 CMMI in small settings

    1/32

    CMMI Made Practical

    Concerns with SCAMPI-inducedoverhead in small settings

    A Biased Sample

    April 2010

    SMCMM Integration and SCAMPI are service marks of Carnegie Mellon University.

    CMMI, Capability Maturity Model, Capability Maturity Modeling, and CMM are registered in the U.S. Patent and Trademark Office by Ca rnegieMellon University. JuanJo Cukier

    SEI-Certified SCAMPI Lead Appraiser

    [email protected]

  • 8/7/2019 CMMI in small settings

    2/32

    JuanJo [email protected]

    2

    Index

    Objectives Notes CMMI Around the World The Sample Frequent hurdles with

    Specific Practices Generic Practices

    Conclusions

  • 8/7/2019 CMMI in small settings

    3/32

    JuanJo [email protected]

    3

    Objectives

    Quantify experience in 37 SCAMPI classes A, B and C appraisals, on small(and very small) settings

    Identify model components that concentrate the greatest number ofweaknesses

    Characterize trends in these weaknesses, and suggest their causes

    Put forward a concern on model/method interface issues for small settings

  • 8/7/2019 CMMI in small settings

    4/32

    JuanJo [email protected]

    4

    Index

    Objectives Notes CMMI Around the World The Sample Frequent hurdles with

    Specific Practices Generic Practices

    Conclusions

  • 8/7/2019 CMMI in small settings

    5/32

    JuanJo [email protected]

    5

    Notes

    37 SCAMPI appraisals 22 Organizations Argentina, Chile, Spain 2006 2009

    This does not intend to be a representativesample of appraisals around the world It only summarizes personal experience

    It includes a bias, introduced by the Appraisal Team Leader Training and professional experience cause focus in some areas more then others This is mitigated in SCAMPI A thanks to consensus building rules

  • 8/7/2019 CMMI in small settings

    6/32

  • 8/7/2019 CMMI in small settings

    7/32 JuanJo [email protected]

    7 Software Engineering Institute, Carnegie Mellon University

    CMMI Around the World

  • 8/7/2019 CMMI in small settings

    8/32 JuanJo [email protected]

    8

    CMMI Around the World

    Software Engineering Institute, Carnegie Mellon University

    155

  • 8/7/2019 CMMI in small settings

    9/32

  • 8/7/2019 CMMI in small settings

    10/32 JuanJo Cukier

    [email protected]

    10

    The Sample

    Country SCAMPI A Class B Class C Total

    Argentina 12 1 11 24Spain 6 0 0 6Chile 4 3 0 7Total 22 4 11 37

    OU Size Total1 to 20 9 (24%)

    20 to 50 17 (46%)50 to 100 11 (30%)

    Total 37

    All OrganizationalUnits < 100 people

  • 8/7/2019 CMMI in small settings

    11/32 JuanJo Cukier

    [email protected]

    About my Concern

    An useful classification of practices:

    Work-Product Oriented

    Action Oriented

    12

    -Specify measures-Establish records-Create or release baselines-Establish the project plan

    -Review plans that affect the project

    -Identify inconsistencies betweenproject work and requirements-Reconcile work and resource levels-Communicate results

    Direct Artifacts

    Direct Artifacts

    Direct Artifacts

    X

  • 8/7/2019 CMMI in small settings

    12/32 JuanJo Cukier

    [email protected]

    13

    Index

    Objectives Notes CMMI Around the World The Sample Frequent hurdles with

    Specific Practices Generic Practices

    Conclusions

  • 8/7/2019 CMMI in small settings

    13/32 JuanJo Cukier

    [email protected]

    14

    The Bottom 10

    # Process Area Practice Description

    1 CM SP 3.2 Perform Configuration Audits

    2 MA SP 1.4 Specify Analysis Procedures

    3 PMC SP 1.4 Monitor Data Management

    4 PP SP 3.3 Obtain Plan Commitment

    5 PPQA SP 1.1 Objectively Evaluate Processes

    6 MA SP 2.2 Analyze Measurement Data

    7 PP SP 3.1 Review Plans That Affect the Project

    8 PP SP 3.2 Reconcile Work and Resource Levels

    9 REQM SP 1.2 Obtain Commitment to Requirements

    10 MA SP 2.4 Communicate Results

    ++ + +/- - --Overhead Induced?

    MoreLess

  • 8/7/2019 CMMI in small settings

    14/32 JuanJo Cukier

    [email protected]

    15

    Recurrent Problems - PPSpecific Practices

    SG 1 Establish Estimates SP 1.1 Estimate the Scope of the Project

    SP 1.2 Establish Estimates of Work Product and Task Attributes SP 1.3 Define Project Lifecycle SP 1.4 Determine Estimates of Effort and Cost

    SG 2 Develop a Project Plan SP 2.1 Establish the Budget and Schedule SP 2.2 Identify Project Risks SP 2.3 Plan for Data Management SP 2.4 Plan for Project Resources SP 2.5 Plan for Needed Knowledge and Skills SP 2.6 Plan Stakeholder Involvement

    SP 2.7 Establish the Project Plan SG 3 Obtain Commitment to the Plan

    SP 3.1 Review Plans That Affect the Project SP 3.2 Reconcile Work and Resource Levels SP 3.3 Obtain Plan Commitment

    The purpose ofProject Planningisto establish and maintain plans thatdefine project activities..

    SP 1.2

    5%

    SP 1.4

    6%

    SP 2.2

    6%SP 2.3

    2%SP 2.4

    6%SP 2.5

    8%

    SP 2.6

    6%

    SP 2.7

    5%

    SP 2.1

    8%

    SP 3.1

    12%

    SP 3.2

    12%

    SP 3.3

    13%SP 1.3

    11%#4#7

    #8

  • 8/7/2019 CMMI in small settings

    15/32

  • 8/7/2019 CMMI in small settings

    16/32

    JuanJo [email protected]

    17

    Recurrent Problems - PMCSpecific Practices

    SG 1 Monitor Project Against Plan SP 1.1 Monitor Project Planning Parameters

    SP 1.2 Monitor Commitments SP 1.3 Monitor Project Risks SP 1.4 Monitor Data Management SP 1.5 Monitor Stakeholder Involvement SP 1.6 Conduct Progress Reviews SP 1.7 Conduct Milestone Reviews

    SG 2 Manage Corrective Action to Closure SP 2.1 Analyze Issues SP 2.2 Take Corrective Action SP 2.3 Manage Corrective Action

    The purpose ofProject Monitoringand Controlis to provide anunderstanding of the projects

    progress so that appropriatecorrective actions can be takenwhen the projects performance

    deviates significantly from the plan.

    .SP 1.1

    9%

    SP 1.3

    7%

    SP 1.6

    12%

    SP 2.1

    5%

    SP 2.3

    10%

    SP 2.2

    9%

    SP 1.7

    12%

    SP 1.5

    10%

    SP 1.4

    16%

    SP 1.2

    10%

    #3

  • 8/7/2019 CMMI in small settings

    17/32

  • 8/7/2019 CMMI in small settings

    18/32

    JuanJo [email protected]

    19

    Recurrent Problems - MASpecific Practices

    SG 1 Align Measurement and Analysis Activities SP 1.1 Establish Measurement Objectives SP 1.2 Specify Measures SP 1.3 Specify Data Collection and Storage Procedures SP 1.4 Specify Analysis Procedures

    SG 2 Provide Measurement Results SP 2.1 Collect Measurement Data SP 2.2 Analyze Measurement Data SP 2.3 Store Data and Results SP 2.4 Communicate Results

    The purpose ofMeasurement andAnalysisis to develop and sustain ameasurement capability that is usedto support management informationneeds.

    SP 2.1

    8%

    SP 2.3

    6%

    SP 2 .2

    17%

    SP 2.4

    15%

    SP 1.3

    10%

    SP 1.2

    10%

    SP 1.1

    13%

    SP 1.4

    21%

    #2

    #6#10

  • 8/7/2019 CMMI in small settings

    19/32

    JuanJo [email protected]

    20

    Recurrent Problems - MASpecific Practices

    Practice Recurrent Problems Overhead Induced?

    SP 1.4 Analysis parameters are not specified. --SP 2.2

    Metrics do indicate problems, but there is no explanationof the source cause. -

    SP 2.4 Communication may not be recorded.Passive, non-proactive communication. +/-

  • 8/7/2019 CMMI in small settings

    20/32

    JuanJo [email protected]

    21

    Recurrent Problems - REQMSpecific Practices

    SG 1 Manage Requirements SP 1.1 Obtain an Understanding of Requirements SP 1.2 Obtain Commitment to Requirements SP 1.3 Manage Requirements Changes SP 1.4 Maintain Bidirectional Traceability of Requirements SP 1.5 Identify Inconsistencies Between Project Work and Requirements

    The purpose ofRequirementsManagementis to manage therequirements of the projects

    products and product componentsand to identify inconsistenciesbetween those requirements and theprojects plans and work products.

    SP 1.1

    8%SP 1.5

    23%

    SP 1.4

    19%

    SP 1.3

    19%

    SP 1.2

    31%

    #9

  • 8/7/2019 CMMI in small settings

    21/32

    JuanJo [email protected]

    22

    Recurrent Problems - REQMSpecific Practices

    Practice Recurrent Problems Overhead Induced?

    SP 1.2 Lack of evidence from the Project Teams commitment. +/-

  • 8/7/2019 CMMI in small settings

    22/32

    JuanJo [email protected]

    23

    Recurrent Problems - CMSpecific Practices

    SG 1 Establish Baselines SP 1.1 Identify Configuration Items SP 1.2 Establish a Configuration Management System SP 1.3 Create or Release Baselines

    SG 2 Track and Control Changes SP 2.1 Track Change Requests SP 2.2 Control Configuration Items

    SG 3 Establish Integrity SP 3.1 Establish Configuration Management Records SP 3.2 Perform Configuration Audits

    The purpose ofConfigurationManagementis to establish andmaintain the integrity of workproducts using configurationidentification, configuration control,configuration status accounting, andconfiguration audits.

    SP 1.1

    4%SP 1.2

    4%

    SP 2.1

    4%

    SP 2.2

    13%SP 3.1

    0%

    SP 3 .2

    53%

    SP 1.3

    22%

    #1

  • 8/7/2019 CMMI in small settings

    23/32

    JuanJo [email protected]

    24

    Recurrent Problems - CMSpecific Practices

    Practice Recurrent Problems Overhead Induced?

    SP 3.2Not all baselines are audited, nor sampling criteriaexists. --

  • 8/7/2019 CMMI in small settings

    24/32

    JuanJo [email protected]

    25

    Recurrent Problems - PPQASpecific Practices

    SG 1 Objectively Evaluate Processes and Work Products SP 1.1 Objectively Evaluate Processes SP 1.2 Objectively Evaluate Work Products and Services

    SG 2 Provide Objective Insight SP 2.1 Communicate and Ensure Resolution of Noncompliance Issues SP 2.2 Establish Records

    The purpose ofProcess andProduct Quality Assuranceis toprovide staff and management withobjective insight into processes andassociated work products.

    SP 2.2

    12%

    SP 2.1

    28%

    SP 1.2

    24%

    SP 1.1

    36%

    #5

  • 8/7/2019 CMMI in small settings

    25/32

    JuanJo [email protected]

    26

    Recurrent Problems - PPQASpecific Practices

    Practice Recurrent Problems Overhead Induced?

    SP 1.1Not all processes are evaluated (GP2.9 is not fullysupported). --

  • 8/7/2019 CMMI in small settings

    26/32

    JuanJo [email protected]

    27

    Index

    Objectives Notes CMMI Around the World The Sample Findings Problematic Process Areas Frequent hurdles with

    Specific Practices Generic Practices

    Conclusions

  • 8/7/2019 CMMI in small settings

    27/32

    JuanJo [email protected]

    28

    Recurrent ProblemsGeneric Practices

    GG 2 Institutionalize a Managed Process

    GP 2.1 Establish an organizational policy GP 2.2 Plan the process GP 2.3 Provide resources GP 2.4 Assign responsibility GP 2.5 Train People GP 2.6 Manage configurations

    GP 2.7 Identify and involve relevant stakeholders GP 2.8 Monitor and control de process GP 2.9 Objectively evaluate adherence GP 2.10 Review status with higher level management

    Institutionalization: The ingrainedway of doing business that anorganizationfollows routinely as part of itscorporate culture.

    GP 2.3

    1%

    GP 2.5

    5%

    GP 2.10

    17%

    GP 2.9

    12%

    GP 2.8

    18%

    GP 2.711%

    GP 2.6

    6%

    GP 2.4

    9%

    GP 2.213%

    GP 2.1

    8%

  • 8/7/2019 CMMI in small settings

    28/32

    JuanJo [email protected]

    29

    Recurrent ProblemsGeneric Practices

    Practice Recurrent Problems Overhead Induced?

    GP 2.1Not all Project Team members have a policyknowledge adequate to their role. -

    GP 2.2There is not always planning of the process in anyform. -

    GP 2.4Responsibility for the process is not always explicit.

    -GP 2.6

    Not all relevant process artifacts are underconfiguration management. --

    GP 2.7Not all stakeholders are identified.

    There is not always evidence of involvement. +GP 2.8 In general, processes are not monitored according

    to their planning (GP2.2). +GP 2.9

    Relevant sub-processes and deliverables are notalways evaluated. --

    GP 2.10There is no evidence of the review beyond thecrafting of a report on process status.

    ++

  • 8/7/2019 CMMI in small settings

    29/32

    JuanJo [email protected]

    30

    Temario

    Objectives Notes CMMI Around the World The Sample Findings Problematic Process Areas Frequent hurdles with

    Specific Practices Generic Practices

    Conclusions

  • 8/7/2019 CMMI in small settings

    30/32

    JuanJo [email protected]

    Conclusions

    31

    Organization

    Model

    Method

    PP/SP2.7Lets plan ourprojects

    PP/SP3.1Lets reviewother plansthat may affect

    our project

    Lets recordour review,

    even if therewerent anyissues

    Effortpu

    tonthein

    ternalsell

    Degreeof

    trueinstitutionalization

    Inefficiencies?

    Need to simplify the appraisal method (ie:all practice should have a direct artifact)

    Input standardization

    Variability reduction

    Preserve SCAMPI A as a benchmark method

  • 8/7/2019 CMMI in small settings

    31/32

    JuanJo [email protected]

    Conclusions

    Some potential pointers

    Add an essential characteristic to SCAMPI A?Accuracy

    Repeatability

    Cost/Resource Effectiveness

    MeaningfulnessARC Compliance

    Non-intrusion: The appraisal methods minimum objective evidence requirementsdoes not influence the organizations process design

    Tailor the method further for small/micro settings?

    Review conflicting conditional practices? Align interpretation of meaningful direct artifacts for conditional practices?

    More than 50% of the current CMMI market might be interested.

    32

  • 8/7/2019 CMMI in small settings

    32/32

    Visite our WEBSITE:

    www.pragmaconsultores.com-

    Argentina: San Martn 575 2 | (C1004AAK) Buenos Aires | Tel (+54-11) 4327-1999 | [email protected] 524 1er Piso | (Q8300BLL) Neuqun | TE: (0299) 4424044

    Spain: Santa Hortensia 15, Of. A3 | (28002) Madrid | Tel (+ 34) 91-515-0558 | [email protected]

    Chile: Luis T. Ojeda 0191 Piso 7 | Providencia, Santiago | Tel (+56-2) 334-3361 | [email protected]

    Contact us:

    Mexico: Prol. Corregidora No. 338 Oficina 3 y 4 | Fracc. Alamos 3ra. Seccin | Quertaro, Qro. C.P. 76160 |Tel. 442 245 2151/52

    HQ Homero, Homero 203 Piso 10 | Col. Chapultepec Morales | Mxico DF, C.P. 11570 |

    Tel. 55 3300 5361