CMS rack system. Magnetic Stray Field in UXC. How to feed power to Racks. UXC. USC. Breaker + PLC. Power Supply. AC/DC converter. 400 Hz. 50 Hz. Rack Location - I. Rack Location - II. Rack Location - III. Rack Location - IV. Rack Standard Components. Power Cabinet. Power Cabinet. - PowerPoint PPT Presentation
Citation preview
June 2004 Andrea Gaddi, PH-CMI
CMS rack systemCMS rack system
QuickTime™ and aPhoto - JPEG decompressor
are needed to see this picture.
DSS
TS/EL Power distribution
RSS
TS/EL Bus
PLC
ST/MAAFDCIE
DCS
RSS loop
PDC breakers status
fire extinguisher (option)
from monitoring board
Premium PLC
thermal switch + crate monitoring
June 2004 Andrea Gaddi, PH-CMI
Magnetic Stray Field in UXCMagnetic Stray Field in UXC
June 2004 Andrea Gaddi, PH-CMI
How to feed power to RacksHow to feed power to Racks
QuickTime™ and aPhoto - JPEG decompressor
are needed to see this picture.
QuickTime™ and aPhoto - JPEG decompressor
are needed to see this picture.
USC UXC
50 Hz
400 Hz
PowerSupply
AC/DC converter
Breaker + PLC
June 2004 Andrea Gaddi, PH-CMI
Rack Location - IRack Location - I
June 2004 Andrea Gaddi, PH-CMI
Rack Location - IIRack Location - II
June 2004 Andrea Gaddi, PH-CMI
Rack Location - IIIRack Location - III
June 2004 Andrea Gaddi, PH-CMI
Rack Location - IVRack Location - IV
June 2004 Andrea Gaddi, PH-CMI
TurbinesPower Cabinet
Fan tray
Deflector Coolingmanifolds
Turbines
Power Cabinet
Electronics Crate
Heat Exchanger
Deflector
Cooling manifolds
Electronics Crate
Rack Standard ComponentsRack Standard Components
June 2004 Andrea Gaddi, PH-CMI
Power Distribution ControlPower Distribution Control
QuickTime™ and aPhoto - JPEG decompressor
are needed to see this picture.
DSS
TS/EL Power distribution
RSS
TS/EL Bus
PLC
ST/MAAFDCIE
DCS
RSS loop
PDC breakers status
fire extinguisher (option)
from monitoring board
Premium PLC
thermal switch + crate monitoring
June 2004 Andrea Gaddi, PH-CMI
Time ScheduleTime Schedule
Detector racks: from Sept 04
USC hand-over: 14 June 04USC infrastructures: Jul 04 to Feb 05USC control room racks: March to Jun 05USC control rooms crates: from July 05
UXC hand-over: 01 Nov 04UXC infrastructures: Jan to Dec 05UXC racks: Jan to March 06UXC crates: from Apr 06