55
A JOURNEY BY TRAIN GERTRUDE LEE YUE SIEW 0306265 MS DELLIYA

CNC Final Project

Embed Size (px)

Citation preview

Page 1: CNC Final Project

A JOURNEY BY TRAIN

GERTRUDE LEE YUE SIEW0306265

MS DELLIYA

Page 2: CNC Final Project

CONTENT

• Introduction

• KTM Setia Jaya

• KL Sentral

• KL Monorail Station

• Bukit Bintang

Page 3: CNC Final Project

INTRODUCTIONFor my Final Project for Culture and

Civilization, I was required to choose

a theme and concept in order to make a

photo book out of it.

This book is about my journey by train

starting from KTM Setia Jaya ,

stopping by at KL Sentral, going to KL

Monorail Station to change train line

then ending my journey at Bukit

Bintang. My theme for this book is

about trains and people and my concept

is about my journey using train.

1

Page 4: CNC Final Project

KTM SETIA JAYA

My journey begin at 3.30pm in the

afternoon . I started from KTM Setia Jaya

as it is the nearest train station to my

place.

2

Page 5: CNC Final Project

The view from the train station.

3

My Touch N Go card

Page 6: CNC Final Project

Waiting area for the trains

to come

4

Page 7: CNC Final Project

The building next to the train

station.

People walking into the

train.

5

Page 8: CNC Final Project

The view inside the train

6

Page 9: CNC Final Project

The route for KTM trains.

7

Page 10: CNC Final Project

The outside view from inside

the train

8

Page 11: CNC Final Project

9

Passing by some buildings along the way

Page 12: CNC Final Project

10

Apartments along the side of the road.

Page 13: CNC Final Project

High rise buildings

Some houses outside another train station

11

Page 14: CNC Final Project

12

Terrace houses outside the train station

Page 15: CNC Final Project

We can see the contrast between

the high rise buildings and the

old houses.

13

Page 16: CNC Final Project

14

The roof is made out of metal

Page 17: CNC Final Project

15

Old shop lots near the housing area.

Page 18: CNC Final Project

16

As I realized the change in the design of the

building, I realized that we are reaching KL

Sentral.

Page 19: CNC Final Project

There is more apartments as I was about to reach KL Sentral.

Colourful flats

17

Page 20: CNC Final Project

18

Older flats

Page 21: CNC Final Project

KL SENTRAL

People walking out of the train.

19

Page 22: CNC Final Project

Walking up from the underground train area

Machine to slot in the ticket and also to scan the Touch n

Go

20

Page 23: CNC Final Project

21

Page 24: CNC Final Project

One of the interesting design on the ceiling.

22

Page 25: CNC Final Project

Walking down to the bus station.

23

Page 26: CNC Final Project

Walking out of KL Sentral

and towards the KL Monorail

Station as the passageway

from the KL Sentral to the

KL Monorail Station is

under repair.

24

Page 27: CNC Final Project

25

Page 28: CNC Final Project

KL Monorail Station

Taking the Monorail train

heading towards Bukit

Bintang.

The ticketing counter

26

Page 29: CNC Final Project

The ticketing machine

27

Page 30: CNC Final Project

Using the escalator up to

the waiting area for

train.

28

Page 31: CNC Final Project

The waiting area for the

train to come

29

Page 32: CNC Final Project

The train entering the KL

Monorail.

30

Page 33: CNC Final Project

Entering the KL Monorail

Train

31

Page 34: CNC Final Project

The inside of the Monorail train

32

Page 35: CNC Final Project

Looking out the window of the

Monorail train. There is

different kinds of religious

buildings and other buildings

along the way.

33

Page 36: CNC Final Project

34

Some office buildings along

the way.

Page 37: CNC Final Project

35

The Indian temple

Page 38: CNC Final Project

36

The Chinese Temple

Page 39: CNC Final Project

The Mosque

37

Page 40: CNC Final Project

38

The KL Monorail railway

which is above built above

ground, allow us to see

many different views

Page 41: CNC Final Project

39

Page 42: CNC Final Project

A football field

40

Page 43: CNC Final Project

41

Comparing to the sub-

urban area, KL has many

high rise buildings

Page 44: CNC Final Project

42

As we can see by the amount of

cars passing by, KL is a very

busy city

Page 45: CNC Final Project

There is still old shop

lots in Kuala Lumpur

43

Page 46: CNC Final Project

44

Page 47: CNC Final Project

The amount of people after a few

stops

45

Page 48: CNC Final Project

Almost reaching Bukit Bintang Monorail

Station

46

Page 49: CNC Final Project

BUKIT BINTANG MONORAIL STATION

Coming out of the

train

People waiting at the other

side for the train which is

heading towards KL Sentral

47

Page 50: CNC Final Project

People rushing to get out

from the train and in the

train.

48

Page 51: CNC Final Project

The train coming in to

fetch the passengers

49

Page 52: CNC Final Project

50

The escalator used to exit

the Bukit Bintang Monorail

Station

Staircase used to exit the

Bukit Bintang Monorail

Station.

Page 53: CNC Final Project

Exiting the Bukit Bintang

Monorail Station.

52

Page 54: CNC Final Project

THE END

Page 55: CNC Final Project