CNC Newsletter Volume 12 1 CNC Freight Services Sdn. Bhd. Competent & Committed TWELVETH EDITION NEWSLETTER JANUARY 2017 DECEMBER 2017 Welcome, dear reader, to our 12th edition newsletter. Certainly, 2017 has quickly gone by and in spite of the downturn impacting the overall transport industry, we are nonetheless, delighted to share some of the interesting shipments we have handled last year as well as highlight our participation in annual network meetings namely, WCA at Singapore, WWPC at Cebu, Philippines, and GPLN at Dubai. We would also like to take this opportunity to thank our regular customers and agents for all their cooperation and strong support. Happy New Year 2018 and we hope you enjoy reading our newsletter! – Patrick Lee. Air Freight Part-Charter: Door Italy to Door Malaysia – March, 2017. Ball Valve Trunnion being packed at shipper’s premise, Varese, Italy. Additional cargo of blind flanges being cased-up at Varese, Italy. Ball Valve Trunnion case loaded onto airline pallet at AMS airport. Case moved by road from SIN airport to Port Klang blasting shop. In Q1 2017, CNC Freight Services Sdn Bhd had undertaken an urgent 23.50 metric ton consignment of a Ball Valve Trunnion and accessories from door Italy to door Malaysia. The valve case measured L5.12m x W1.93 x H1.41 and weighed 18.00 metric tons while the accessories of blind flanges measured L2.81m x W1.51m x H1.41 and weighed 5.50 metric tons. Due to the time sensitive nature of the cargo, the cases were moved over the weekend by truck with two dedicated drivers from Varese, Italy to AMS airport. From there, the cargo was freighted on part charter basis on SQ's service up to SIN airport. From SIN airport, the cargo was trucked to Port Klang for blasting and painting, and subsequently trucked to final door destination at Nilai.

CNC Freight Services Sdn. Bhd.€¦ · Bi -Drum Watertube Boiler from Port Klang to Asahan riverine jetty – November , 2017 . Cargo loading at Port Klang jetty. Smaller riverboats

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

CNC Newsletter

Volume 12

1

CNC Freight Services Sdn. Bhd. Competent & Committed

TWELVETH EDITION NEWSLETTER JANUARY 2017 – DECEMBER 2017

Welcome, dear reader, to our 12th edition newsletter. Certainly, 2017 has quickly gone by and in spite of the downturn impacting the overall

transport industry, we are nonetheless, delighted to share some of the interesting shipments we have handled last year as well as highlight our

participation in annual network meetings namely, WCA at Singapore, WWPC at Cebu, Philippines, and GPLN at Dubai.

We would also like to take this opportunity to thank our regular customers and agents for all their cooperation and strong support. Happy New

Year 2018 and we hope you enjoy reading our newsletter! – Patrick Lee.

Air Freight Part-Charter: Door Italy to Door Malaysia – March, 2017.

Ball Valve Trunnion being packed at shipper’s premise, Varese, Italy. Additional cargo of blind flanges being cased-up at Varese, Italy.

Ball Valve Trunnion case loaded onto airline pallet at AMS airport. Case moved by road from SIN airport to Port Klang blasting shop.

In Q1 2017, CNC Freight Services Sdn Bhd had undertaken an urgent 23.50 metric ton consignment of a Ball Valve Trunnion and

accessories from door Italy to door Malaysia. The valve case measured L5.12m x W1.93 x H1.41 and weighed 18.00 metric tons

while the accessories of blind flanges measured L2.81m x W1.51m x H1.41 and weighed 5.50 metric tons. Due to the time

sensitive nature of the cargo, the cases were moved over the weekend by truck with two dedicated drivers from Varese, Italy to

AMS airport. From there, the cargo was freighted on part charter basis on SQ's service up to SIN airport. From SIN airport, the

cargo was trucked to Port Klang for blasting and painting, and subsequently trucked to final door destination at Nilai.

CNC Newsletter

Volume 12

2

Container Delivery: Machinery from Port Klang to Nilai – April to October, 2017.

Oversized case was unstuffed at Port Klang prior delivery to Nilai. Delivery of laden flat rack container to consignee’s premise.

Transfer of oversized cases into Nilai factory. Cargo from general containers unstuffed via factory’s loading bay.

CNC Freight Services Sdn Bhd was once again appointed by our German agent to coordinate and deliver a second import batch

of machinery & equipment to a local Malaysian manufacturer in the personal healthcare industry.

A total of 120x40' (including special containers) which arrived Port Klang in 10 split shipments, was delivered from Port Klang to

Nilai over a 7 month period.

Some of the cases stowed on out-of-gauge flat-racks arriving Port Klang had to be unstuffed prior delivery to Nilai to overcome

fixed obstacles enroute to consignee's new factory.

With CNC's close attention and coordination to prompt delivery times, quick truck turn-around times, and ultimately

eliminating the need for container detention and demurrage charges, our client was extremely satisfied with our commitment.

Cargo : Machinery and Manufacturing Equipment

Place of Loading : Hamburg, Germany

Port of Discharge : Port Klang, Malaysia

Place of Delivery : Nilai, Malaysia

Total Shipments : 10 split shipments

Total Volume : 120 FEUs (including special containers)

CNC Newsletter

Volume 12

3

Port to Door Delivery of Gas Line Pipes (21,904cbm) – October, 2017.

Gas Line Pipes being staged at Westport terminal, Port Klang after being discharged from breakbulk vessel.

Reloading of pipes onto trailers at Port Klang staging area. Unloading from trailers upon arrival consignee’s pipe storage yard.

In October 2017, CNC Freight Services Services Sdn. Bhd. handled a port to door shipment of Gas Line Pipes from Port Klang to Broga and

Semenyih pipe storage yard, in Selangor state.

CNC provided supervision on,

1. Discharging from vessel 5. Reloading operation at Port Klang open yard

2. Transfer from vessel to Port Klang open yard 6. Stowage & cargo securing on trailer

3. Unloading operation at Port Klang open yard 7. Trucking from Port Klang to Broga & Semenyih yard

4. Pipe storage/staging at Port Klang 8. Unloading of pipes at Broga & Semenyih yard

Our operation team worked around the clock (24 hours for 7 days) to complete the discharging process of pipes from vessel. Additionally, it

took our operation team working in excess of 11 hours daily to meet delivery schedule to consignee's pipe storage yard at Broga & Semenyih. A

total of 800 truck trips were deployed from Port Klang to Broga & Semenyih, which took 24 days to complete. Our customer was immensely

satisfied with CNC’s dedication and commitment.

Cargo : Gas Line Pipes

Port of Loading : Jinzhou, China

Port of Discharge : Port Klang, Malaysia

Total Packages : 15,820 lengths

Total Cubic Meters : 21,904.00 cbm

Total Gross Weight : 10,658.25 M/Tons

CNC Newsletter

Volume 12

4

Barge Transshipment: Ex Singapore to Pengerang, Johor – October, 2017.

Oversized case being lifted from vessel’s hold by ship’s derrick. Overside discharging at Singapore from vessel onto barge.

Shot of barge arriving Teluk Ramunia, Pegerang in the state of Johor. Oversized case carefully being placed onto lowbed truck.

CNC Freight Services Sdn Bhd worked together with fellow THLG member to deliver four oversized cases from Singapore to

Teluk Ramunia jetty in Pengerang, Johor.

Due to the road restriction at causeway customs border point, the cargo needed to be barged to construction site’s private

jetty, Teluk Ramunia’s Marine Offshore Loading Facility.

The four cases were discharged at Jurong port by ocean carrier’s own derricks onto double-banked barge. The overside

discharging and subsequent delivery to Teluk Ramunia occurred smoothly and without any incidents whatsoever. Our

personnel were on site at both occasions to make sure that the barge arrives at Jurong port and Teluk Ramunia without

problems.

Ultimately, our overseas agent’s client was hugely pleased on the perfect performance and coordination at both Singapore port

and Teluk Ramunia MOLF jetty.

Cargo : Goggle Valves

Place of Loading : Antwerp, Belgium

Port of Discharge : Singapore

Place of Delivery : Pengerang, Johor

Total Packages : 4 cases

Dims & Weight : L11.84m x W5.61m x H2.53m @ 44 M/Tons each

CNC Newsletter

Volume 12

5

RORO shipment of Rock Crushing Machinery – October, 2017.

Jaw Tracked Crusher after being loaded onto lowbed at factory. Shipper’s operator at Port Klang performing the roll-off from truck.

Jaw Tracked Crusher being rolled onto RORO vessel’s ramp. CNC staff, Din, pleased with the operation after roll-on was complete.

In September 2017, CNC Freight Services Sdn. Bhd. handled on behalf of fellow WWPC member a door to port delivery of a

Tracked Jaw Crusher which was to be shipped to Melbourne, Australia.

Having performed the exact same shipment twice before with the same shipper; one ex Port Klang and the other ex Singapore,

we were familiar and confident that we would perform the delivery without any hiccups.

With CNC’s quick response to quotation, coordinating with local shipper, customs clearance, documentation, and supervision at

factory as well as load port, the operation was carried out smoothly.

Our Australian agent and partner was pleased on the job well executed.

Cargo : Tracked Jaw Crusher

Place of Loading : Port Klang, Malaysia

Port of Discharge : Melbourne, Australia

Dimensions : L15.05m x W2.80m x H3.60m

Weight : 43.00 M/Tons

CNC Newsletter

Volume 12

6

28.00m Length Girdles from Jenjarom to Port Klang – April, 2017.

28.00meter long girdle exiting shipper’s factory at Jenjarom. Girdles at Port Klang awaiting direct delivery to vessel.

Loading onto vessel was performed following morning. Girdles being lashed on vessel.

CNC Freight Services Sdn Bhd was tasked with delivering four long length girdles from EXW supplier’s factory in Jenjarom to

Port Klang. The girdles were due for the Masinloc Power Plant Expansion Project in the Philippines.

Although we have been servicing our client for many years, the length of the girdles this time was extreme. Our project team

conducted a route survey to ascertain turning points and road accessibility towards Port Klang. From our survey, the use of

extendable pole trailer was found suitable for road journey.

CNC supervised the load out from factory, and escorted the long length girdles to Port Klang. Two back-to-back trips were made

from shipper’s factory to Port Klang, which completed late in the evening.

The following morning, the girdles were successfully loaded onto vessel at Port Klang and to our client’s satisfaction.

Cargo : Girder for Overhead Travelling Crane

Place of Loading : Port Klang, Malaysia

Port of Discharge : Manilla, Philippines

Total : 4 Lengths & 18 cases of accessories

Girdle Dimensions : L28.00m x W1.20m x H2.40m

Girdle Weight : 19.00 M/Tons each

CNC Newsletter

Volume 12

7

Bi-Drum Watertube Boiler from Port Klang to Asahan riverine jetty – November, 2017.

Cargo loading at Port Klang jetty. Smaller riverboats used as make shift tugs at Asahan.

View of the barge being towed by riverboats. Barge arriving Tanjung Balai Asahan jetty.

Last November 2017, CNC Freight Services Sdn. Bhd. was awarded a contract to arrange transportation of a complete palm oil

mill boiler from Port Klang to a riverine port in Asahan, Indonesia. The total shipping volume is approximately 650 cbm and a

full barge charter was used.

Prior delivery to riverine port, our project team ascertained the draft of the river on the navigation path from the river mouth

to the location of discharge jetty. From our survey, calculating the cargo load, as well as pre-determining the footprint, we

recommended for the use of a 220 feet pontoon barge. This is to ensure that the barge is able to navigate the shallow river

which at the lowest point, has a depth of only 1.50 meters.

Our personnel were involved during the river journey at Asahan to make sure that the barge arrives at the site jetty without any

navigational problem.

Cargo : Bi-Drum Watertube Boiler

Place of Loading : Port Klang, Malaysia

Place of Delivery : Tanjung Balai riverine jetty, Asahan, Indonesia

Total Packages : 145 packages

Total Volume : 647.49cbm

Total Weight : 276.36 M/Tons

CNC Newsletter

Volume 12

8

Part Charter from Mobile to Port Klang – December, 2017.

Breakbulk pieces were barged alongside vessel for overside loading. I2SS/I3SS Section being loaded into vessel’s hold at Mobile, USA.

Primary cyclones on shipper’s own flat-racks, stowed at vessel’s hold. Discharging of Regenerator Dome Head at Port Klang.

Last December 2017, CNC Freight Services Sdn. Bhd. secured a contract to transport 21 packages of regenerator components

and equipment from USA to Malaysia. The part vessel charter was arranged with BBC Chartering on a last-in, first-out basis.

The 2 oversized pieces were delivered through in-land waterway by river barge by shipper's own contractor up to alongside

vessel at Mobile, for overside loading.

There were also 14x40' shipper's own container which accompanied the shipment.

The sea voyage took 39 days to complete.

Cargo : Regenerator Equipment and Components

Place of Loading : Mobile, USA

Port of Discharge : Port Klang, Malaysia

Total Packages : 21 packages

Total Volume : 3692.40 cbm

Total Weight : 499.53 M/Tons

Oversized Pieces : L14.80m x W8.33m x H8.80m @ 152.60 M/Tons

L14.22m x W13.97m x H6.31m @ 87.96 M/Tons