Document No. : CNG000EL011 PT. MARKINAH SPBG CNG untuk Angkutan Umum di Palembang Engineering Design & Preparation Works B.5. ELECTRICAL ENGINEERING B.5.2. CALCULATION B.5.203. Cable Size & Voltage Drop Calculation (Mother Station) 1 261011 Issued For Review MAM ADT 0 131011 Issued For Review MAM ADT Rev. Date Description By Checked Appr.

Cng-000-El-011 Voltage Drop Calculation (Ms) r1

Embed Size (px)

DESCRIPTION

Calculation

Citation preview

  

 

  

 

Document No.   : CNG‐000‐EL‐011  

 

 

PT. MARKINAH 

SPBG CNG untuk Angkutan Umum di Palembang 

Engineering Design & Preparation Works 

B.5. ELECTRICAL ENGINEERING 

B.5.2. CALCULATION 

B.5.203.  Cable  Size  &  Voltage  Drop  Calculation (Mother Station) 

           

           

           

1  26‐10‐11  Issued For Review  MAM ADT   

0  13‐10‐11  Issued For Review  MAM ADT   

Rev.  Date  Description  By  Checked  Appr. 

DOCUMENT CODE: 

CALCULATION REV: 

1   

PT. MARKINAH  TITLE: 

CABLE SIZE & VOLTAGE DROP CALCULATION (MOTHER STATION) 

PAGE: 

2 OF 6 

 

 GROUP: 

ENGINEERING DISCIPLINE: 

ELECTRICAL DATE: 

26 October 2011 DOC. NUMBER: 

CNG‐OOO‐EL‐011 

PROJECT:: 

DEDC PROYEK PEMBANGUNAN SPBG CNG ANGKUTAN UMUM DI PALEMBANG 

 

 

1. OBJECTIVE 

This document is intended to define the cable sizing  and  to  calculate  the  voltage  drop  of electrical  equipment  for  Online  Mother Station  SPBG  (Stasiun  Pengisian  Bahan  bakar Gas)  Compressed  Natural  Gas  (CNG)  untuk Angkutan Umum di Palembang. 

 

  1. TUJUAN 

Dokumen  ini dimaksudkan untuk menentukan ukurang kabel dan menghitung susut tegangan setiap perlengkapan  listrik pada Stasiun  induk online  SPBG  (Stasiun  Pengisian  Bahan  bakar Gas)  Compressed  Natural  Gas  (CNG)  untuk Angkutan Umum di Palembang. 

2. REFERENCE DOCUMENTS 

The  following  Codes  and  Standard  will  be applied  for  cable  sizing  and  voltage  drop calculation: 

1. IEC  (International  Electrotechnic Commission) standard No. 60364‐5‐2001 

2. Persyaratan  Umum  Instalasi  Listrik  (PUIL) 2000 

  2. KLASIFIKASI AREA 

Kode  dan  standar  di  bawah  ini  akan diberlakukan  dan  perhitungan  ukuran  kabel dan susut tegangan: 

1. IEC  (International  Electrotechnic Commission) standard No. 60364‐5‐2001 

2. Persyaratan Umum  Instalasi Listrik (PUIL) 2000 

3. VOLTAGE SYSTEM 

Electrical voltage system shall be based on the document  no.  CNG‐000‐EL‐001  ELECTRICAL DESIGN PHYLOSOPHY that the three (3) phase system  shall  be  380V  ±5%,  and  the  single phase system shall be 220V ±5%. 

  3. SISTEM TEGANGAN 

System  tegangan  listrik  harus  diadasarkan pada  dokumen  no.  CNG‐000‐EL‐001 ELECTRICAL  DESIGN  PHYLOSOPHY  bahwa tegangan  tiga  (3)  fasa  adalah  380V  ±5%, dan satu fasa adalah 220V ±5%. 

4. CABLE VOLTAGE DROP CRITERIA 

The total voltage drop in AC or DC feeder shall be  not  exceed  5%  of  their  nominal  voltage bus. 

The  voltage  drop  calculation  for  equipment shall be based on the rated nominal voltage of the  distribution  bus  feeding  the  equipment, 

  4. KRITERIA TEGANGAN JATUH KABEL 

Total  tegangan  jatuh pada beban AC atau DC harus  tidak  melebihi  5%  dari  tegangan pengenalnya.  

Perhitungan  tegangan  jatuh  untuk  peralatan harus didasarkan pada niai  tegangan nominal dari bus yang menyuplai peralatan, arus beban 

DOCUMENT CODE: 

CALCULATION REV: 

1   

PT. MARKINAH  TITLE: 

CABLE SIZE & VOLTAGE DROP CALCULATION (MOTHER STATION) 

PAGE: 

3 OF 6 

 

 GROUP: 

ENGINEERING DISCIPLINE: 

ELECTRICAL DATE: 

26 October 2011 DOC. NUMBER: 

CNG‐OOO‐EL‐011 

PROJECT:: 

DEDC PROYEK PEMBANGUNAN SPBG CNG ANGKUTAN UMUM DI PALEMBANG 

 

full load current of the equipment being fed at its  rated  voltage  and maximum  feeder  cable impedance. 

penuh  peralatan,  dan    impedansi  maksimal kabel suplai. 

5. CABLE AMPACITY 

Cable ampacity  is  referred  to PUIL 2000,  that conductor  for  equipment  motor  shall  have ampacity  not  less  than  125%  of  full  load current.  If  the  cable will  supplied  2  or more motor  circuit  in  a  group,  cable  shall  have ampacity not  less  than  total  full  load  current of  motor  plus  25%  of  the  biggest  full  load current in the group. 

  5. KEMAMPUAN HANTAR ARUS KABEL 

Kemampuan  hantar  arus  untuk  kabel didasarkan  pada  PUIL  2000,  bahwa penghantar  untuk  peralatan  motor  harus memiliki  kemmpuan hantar  tidak  kurang dari 125% arus beban penuh. Jika kabel menyuplai 2  motor  atau  lebih  dalam  satu  grup,  kabel harus  mempunyai  kemampuan  hantar  arus tidak  kurang  dari  arus  beban  penuh  total motor  ditambah  25%  dari  arus  beban  penuh dari motor terbesar dalam grop tersebut. 

6. METHOD OF CALCULATION 

Calculation  of  voltage  drop will  be  based  on the below formula: 

a. Three phase system: 

( )xLXRxIVd ϕϕ sincos3 +=  

b. Single phase system 

( )xLXRxIVd ϕϕ sincos2 +=  

Where: 

V  : voltage drop in cable 

I  : full  load  ampere  (FLA)  of  the equipment 

R  : resistant for one conductor in ohms 

X  : reactance for one conductor in ohms 

φ  : angle of load power factor 

  6. METODE PERHITUNGAN 

Perhitungan  susut  tegangan  akan  mengacu pada rumus berikut: 

a. Sistem tiga fasa 

( )xLXRxIVd ϕϕ sincos3 +=  

b. System fasa tunggal 

( )xLXRxIVd ϕϕ sincos2 +=  

Dimana: 

V  : susut tegangan dalam kabel 

I  : arus beban penuh peralatan 

R  : tahanan kabel dalam ohm 

X  : rekatansi kabel dalam ohm 

φ  : sudut factor daya beban 

DOCUMENT CODE: 

CALCULATION REV: 

1   

PT. MARKINAH  TITLE: 

CABLE SIZE & VOLTAGE DROP CALCULATION (MOTHER STATION) 

PAGE: 

4 OF 6 

 

 GROUP: 

ENGINEERING DISCIPLINE: 

ELECTRICAL DATE: 

26 October 2011 DOC. NUMBER: 

CNG‐OOO‐EL‐011 

PROJECT:: 

DEDC PROYEK PEMBANGUNAN SPBG CNG ANGKUTAN UMUM DI PALEMBANG 

 

L  : Length of cable (meter) 

The  phasor  of  voltage  drop  calculation  is  as follow: 

 

 

 

 

 

L  : panjang kabel (meter) 

Fasor  perhitungan  susut  tegangan  seperti gambar di bawah ini:  

7. CALCULATION SUMMARY 

Calculation  summary  can  be  seen  on  the below table (see next page) 

  7. HASIL PERHITUNGAN 

Hasil  perhitungan  dapat  dilihat  dalam  table berikut (lihat halaman berikutnya) 

 

Load/Motor voltage 

Voltage drop 

Bus/panel voltage

φ I RI X

I Z

DOCUMENT: REV:

TITLE: PAGE:

C‐P‐Q‐01 400.00 3 380 607.7371 911.61000 AT / 1000 AF

759.7 10 NYFGbY 2x4x 300 0.0601 0.04808 0.76 0.20

C‐P‐Q‐02 400.00 3 380 607.7371 911.6800 AT / 800 AF

759.7 10 NYFGbY 2x4x 240 0.0754 0.06032 0.95 0.25

C‐P‐Q‐03 200.00 3 380 304 455.80630 AT / 630 AF

379.8 15 NYFGbY 4x 240 0.0754 0.06032 0.71 0.19

C‐P‐Q‐04 93.75 3 380 142 213.66200 AT / 250 AF

178.0 15 NYFGbY 4x 95 0.193 0.1544 0.86 0.23

C‐P‐Q‐05 13.75 3 380 21 31.3440 AT / 100 AF

26.1 15 NYFGbY 4x 6 3.03 2.424 1.97 0.52

C‐P‐Q‐06 28.59 3 380 43 65.1563 AT / 100 AF

54.3 20 NYFGbY 4x 16 1.15 0.92 2.08 0.55

C‐P‐Q‐07 4.69 3 380 7 10.6825 AT / 100 AF

8.9 20 NYFGbY 4x 4 4.56 3.648 1.35 0.36

GROUP: DISCIPLINE: PROJECT:ENGINEERING

DATE DOC. NUMBER

26 OCTOBER 2011

CONDUCTOR RATING

ELECTRICAL

CNG‐000‐EL‐011DEDC PROYEK PEMBANGUNAN SPBG CNG ANGKUTAN UMUM DI PALEMBANG

AIR COOLER

GAS DRYER

AIR COMPRESSOR

MAIN CABLE FROM GENSET‐1 (400 kVA)

MAIN CABLE FROM GENSET‐2 (400 kVA)

MAIN MOTOR COMPRESSOR

PRE COMPRESSOR MOTOR

LVMDP ( LOW VOLTAGE MAIN DISTRIBUTION PANEL )

PT MARKINAHCALCULATION

CABLE SIZE AND VOLTAGE DROP CALCULATION OF MOTHER STATION

1

5 OF 6

CABLE No.

SELECTED AMPERE

STARTING CURRENT

VOLTAGEPHASETOTAL kVAEQUIPMENTNOMINAL CURRENT

VD VD%LENGTH DIMENSION RESISTANCE IMPEDANCE

DOCUMENT: REV:

TITLE: PAGE:

C‐P‐Q‐11 11.68 3 380 18 26.6132 AT / 100 AF

22.2 5 NYY 4x 6 3.03 2.424 0.56 0.15

C‐P‐Q‐12 0.68 1 220 3 4.60 10 A 3.8 15 NYM 3x 2.5 7.28 5.824 0.80 0.37

C‐P‐Q‐13 1.25 1 220 6 8.52 10 A 7.1 20 NYM 3x 2.5 7.28 5.824 1.99 0.90

C‐P‐Q‐14 0.63 1 220 3 4.26 10 A 3.6 35 NYFGbY 3x 4 4.56 3.648 1.09 0.49

C‐P‐Q‐15 0.94 1 220 4 6.39 10 A 5.3 54 NYFGbY 3x 4 4.56 3.648 2.52 1.14C‐P‐Q‐16 1.00 1 220 5 6.82 10 A 5.7 20 NYM 3x 2.5 7.28 5.824 1.59 0.72C‐P‐Q‐17 1.00 1 220 5 6.82 10 A 5.7 20 NYM 3x 2.5 7.28 5.824 1.59 0.72C‐P‐Q‐18 1.19 1 220 5 8.10 10 A 6.7 10 NYM 3x 2.5 7.28 5.824 0.94 0.43C‐P‐Q‐19 3.00 1 220 14 20.45 20 A 17.0 10 NYM 3x 2.5 7.28 5.824 2.38 1.08C‐P‐Q‐20 2.00 1 220 9 13.64 16 A 11.4 5 NYM 3x 2.5 7.28 5.824 0.79 0.36

NOTE:VD: VOLTAGE DROP IN VOLTVD%: VOLTAGE DROP IN %

GROUP: DISCIPLINE: PROJECT:ENGINEERING

DATE DOC. NUMBER

26 OCTOBER 2011

ELECTRICALDEDC PROYEK PEMBANGUNAN SPBG CNG ANGKUTAN UMUM DI PALEMBANG

CNG‐000‐EL‐011

TOTAL kVA PHASE VOLTAGENOMINAL CURRENT

STARTING CURRENT

SELECTED AMPERE

VD

LIGHTING PANEL

CABLE No.

EQUIPMENT

PT MARKINAHCALCULATION

MAIN BREAKER

LIGHTING SHELTER

CABLE SIZE AND VOLTAGE DROP CALCULATION OF MOTHER STATION

DIMENSION RESISTANCE

UPS 2 KVA

LIGHTING OFFICE AND FILLING STATION

OUTDOOR LIGHTING (HAZARDOUS AREA)OUTDOOR / STREET LIGHTINGRECEPTACLERECEPTACLEAC SPLIT (PANEL ROOM)AC SPLIT (OFFICE ROOM)

IMPEDANCECONDUCTOR 

RATINGLENGTH

1

6 OF 6

VD%