45
Star CNG Station EXECUTIVE SUMMARY THE PROJECT:- The proposed project contemplates to set up a new CNG station 1 kilomiter ahead from khan pur ada rahim yar khan. The project machinery is locally available. LOCATION: The proposed project contemplates to set up a new CNG station 1 kilomiter ahead from khan pur ada rahim yar khan.. The proposed project site enjoys the benefits of 1) easy availability of Natural gas which is main raw material for CNG Stations , 2) quick access to main road, 3) Lcated at main road and enjoys the excess of CNG fitted vehicles, 5) availability of Skilled and Un-Skilled labor, and 5) free from environmental hazards like water logging and salinity and floods. SPONSORS: Sponsors of this project are highly qualified and have good command over the project . MARKET AND PLANT CAPACITY: This project has good market and on its demand bases this project will going to get the sales 1

CNG pump feasibility repot

  • Upload
    majid

  • View
    156

  • Download
    3

Embed Size (px)

DESCRIPTION

it is a feasibility report figures in the annexsure r not assumed it based on real prce of particular thing for any help u can cunsult me 0333 7438756

Citation preview

Page 1: CNG pump feasibility repot

Star CNG Station

EXECUTIVE SUMMARYTHE PROJECT:-

The proposed project contemplates to set up a new CNG

station 1 kilomiter ahead from khan pur ada rahim yar khan.

The project machinery is locally available.

LOCATION:

The proposed project contemplates to set up a new CNG

station 1 kilomiter ahead from khan pur ada rahim yar khan..

The proposed project site enjoys the benefits of 1) easy

availability of Natural gas which is main raw material for CNG

Stations , 2) quick access to main road, 3) Lcated at main

road and enjoys the excess of CNG fitted vehicles, 5)

availability of Skilled and Un-Skilled labor, and 5) free from

environmental hazards like water logging and salinity and

floods.

SPONSORS:

Sponsors of this project are highly qualified and have good

command over the project .

MARKET AND PLANT CAPACITY:

This project has good market and on its demand bases

this project will going to get the sales of 36288000 Rs

in 1st year and sales of 52416000 Rs in 2nd year and

sales of 76230 in 3rd year.

PLANT CAPACITY:

1

Page 2: CNG pump feasibility repot

Star CNG Station

The capacity of this project is too good due to its latest

filling machines and compressor its has a capacity of

filling the 864000 vehicles per year .

MATERIAL REQUIREMENT:

Basic requirement of this project is natural gas.

PROJECT ENGINEERING:

Machinery of this project would be purchased from the

Karachi from a local provider .

MANPOWER:

The project would create employment opportunities for

the following staff:

Detail Total Nos.

Skilled Labor 2

Semi-Skilled Labor 4

CNG Administrative Staff 7

IMPLIMENTATION STAGE:

This project will start its operation form the april2009

Project started and completed at jan2009 march2008.

COST OF THE PROJECT: Rs. “(000”)

Fixed Cost 32161

Net Working Capital 1437

Total 33598

FINACIAL PLAN:

2

Page 3: CNG pump feasibility repot

Star CNG Station

EQUITY 33598

Total 33598

3

Page 4: CNG pump feasibility repot

Star CNG Station

OPERATING RESULTS: (“000”)

ITEMS 2009 2010 2011

Sales 36288 52416 76230

Gross Profit 14462 21260 34082

Operating Profit 13731 20366 33072

Net Profit 7324 10994 17982

FINANCIAL POSITION OF THE COMPANY: (Rs. “000”)

ITEMS 2009 2010 2011

Current Assets 7335 14782 28217

Fixed Assets 29958 28882 27806

FINANCIAL INDICATORS:

Project Cost IRR %

33598 33

4

Page 5: CNG pump feasibility repot

Star CNG Station

TERMS AND CONDITIONS:

1. Proposed name of the project need to be mentioned.

2. Sponsors contribution is fully indulge in this project.

3. Land will be purchased in transfer to the sponsors names.

4. Any further financial assistance will be provided by its

sponsors.

5. Accessories and utilities will be arranged as per the

contract by the contract of civil work himself.

5

Page 6: CNG pump feasibility repot

Star CNG Station

INTRODUCTIONThe proposed project contemplates to set up a new CNG station 1

kilomiter ahead from khan pur ada rahim yar khan. The project machinery

is locally available. The capacity of this project is too good due to its latest

filling machines and compressor its has a capacity of filling the 864000

vehicles per year. CNG pump will work 360 days of years there will not be

any stop.

The total Capital Cost of the project is estimated to be Rs. 33598000.

This total Cost of the project comprises of Fixed Assets Rs. 32161000 and

Initial Net Working Capital of Rs.1437000

6

Page 7: CNG pump feasibility repot

Star CNG Station

Management

The overall management and control of the firm will be actively managed

by its partners who will actively participate in management decisions and

control the affairs of the firm.

Partners Name

1. Majid ali

2. Jam Imran Ahmad

3. Rehan Majeed

The partners will contribute equally in the equity of the project and will

equally participate in the profit and loss of the firm's business.

Sponsors

The sponsors of the project are professionally qualified and have valuable

and extensive experience. They have got good trading contacts and

market reputation in the industry. Moreover, they are professionally

qualified in the field of business Management from the Islamia University

of Bahawalpur under BBA Program. The sponsors experience would assist

the firm in its smooth and profitable operations.

The sponsors are financially sound and capable to contribute their part of

equity in the proposed project.

The Sponsors detail is as under:-

7

Page 8: CNG pump feasibility repot

Star CNG Station

1. Name : Majid ali

Age : 22 years

Address : Gulshan Usman Block u Street no 6

House no 10d

Rahim yar khan

Qualification : BBA(Finance)

Experience : In same industry of 2 years

2. Name : Jam Imran Ahmad

Age : 22 Years

Address : Rahim Yar Khan

Qualification : BBA (Finance)

Experience : 2 months internship at NRL.

3. Name : Rehan Majeed

Age : 23 Years

Address : Stellite Town 15-A, Rahim Yar Khan

Qualification : BBA (Finance)

Experience : 1 Years experience of Accountancy.

8

Page 9: CNG pump feasibility repot

Star CNG Station

Technical Analysis

Location of the Project

- The proposed project contemplates to set up a new CNG station

1 kilomiter ahead from khan pur ada rahim yar khan.

- Easy availability of raw material

- Access to the main road, Sources of Power, water, fuel etc.

- Availability of transport & communication like telephone, telex,

Internet etc.

- Availability of skilled and Un-Skilled manpower

Manufacturing Process

- Natural Gas is one of the most valuable natural resources

abundantly available in our country. Compressed Natural Gas

(CNG) is produced when the natural gas is compressed into

cylinders to be used as a fuel in the automobiles. The

compressed natural gas has been used as an automobile fuel

since 1940, and over the years, the technology has been

modified and refined. In the recent years, the usage of CNG as

an automobile fuel has significantly increased because of its low

cost and environment friendly nature that’s why it is also called

as Green Fuel, because it possesses less carbon and led

contents than petrol.

9

Page 10: CNG pump feasibility repot

Star CNG Station

GROWTH

There has been a tremendous growth in the CNG sector over the years. The total number of vehicles on CNG was 100,000 and CNG filling stations was 150 at the end of year 2000. The

number of CNG vehicles and CNG filling stations has increased to 210,000 vehicle and 220 stations respectively and by the year 2005 they have tremendously grown up to 670 CNG

Stations and 600,000 CNG fitted vehicles. At present, there are more than 2000 CNG stations &2 million CNG fitted vehicles. The

growth in terms of percentage is given in the following table:

Growth Percentage of Vehicles:

Year 2005 2008 %increaseNo. Of Vehicles on CNG 600,000 2,000,000 67%

CNG Filling Stations 670 2,000 67%

10

Page 11: CNG pump feasibility repot

Star CNG Station

MARKET ANALYSIS

Due to the increasing prices of petroleum products, the

trend of converting cars to CNG fueling system has been

on a rise. However, there exist a large number of people

who were reluctant to convert their vehicles from petrol to

gas due to safety concerns. Recently, many car

manufacturers have started manufacturing the cars with

built-in CNG fueling system. This change has led to

enhancing the confidence in the minds of the general

public regarding the safety concerns, and now, more

people are inclined towards purchasing these factory-fitted CNG fueling

system cars.

Total number of CNG stations in Pakistan is only 2000,

which is quite low for meeting the growing demand of

CNG. Apart from these 2000 CNG stations, many new CNG stations are

being setup across the country.

11

Page 12: CNG pump feasibility repot

Star CNG Station

Star CNG Station Annexure - I

Estimated Cost of Land

Sr. No.

DescriptionArea in Unit

CostRs ("000")

Marlas Total Cost

1 Land 50 2,80000 14000

2 Registration & Legal Requirements 50 400 20

3 Stamp Duty 50 300 15

4 District Council 50 100 5

5 Development Charges 50 1300 65

Total Cost of Land 14105

12

Page 13: CNG pump feasibility repot

Star CNG Station

Annexure - II

Star CNG Station

Estimated Cost of Civil Works

Sr. No.

DescriptionType of Unit of Covered Rate Per Rs ("000")

BuildingConstructio

n area Unit Total Cost

1 Control room Rcc Square foot 160 710 113

2Compressor and cylinder storage room

Rcc Square foot 310 710 220

3 shed Kanopi Square foot 1650 450 724

4 office Rcc Square foot 550 710 119

5 Tuc Shop Rcc Square foot 224 710 159

6 Mosque Rcc Square foot 250 710 177

7Car wash and Cng repair

Rcc Square foot 768 710 545

8 flooring Running feet 7388 150 1108

9 Lawn Running feet 2500 50 125

10 Contingency 250

Total Cost 3542

13

Page 14: CNG pump feasibility repot

Star CNG Station

Annexure - III

Star CNG Station

Estimated Cost of MachineryRupees ("000")

Rupees ("000")

Sr.No. Description QtyUnit Cost

Total Cost

1Gas compressor(8 to 15 PSIG) outlet pressure of 3625 PSIG 50 vehicle per hour 1 7500

7500

2 Electric Control Pannel 1 200 200

3 Storage Cascade 45 30 1350

4Cng Dispenser UK model=h430h-wl Capacity 400m3/hr

2 900 1800

5 Electric cables with tape fitting panel 265

6 Cooling tower 1 150 150

7 Contingencies 550

Total Cost of Machinery 1,1815

14

Page 15: CNG pump feasibility repot

Star CNG Station

Annexure – IV

Star CNG Station

Estimated cost of the Project

Sr.No. Description LCY FCYTotal cost

("000")

1 Land 14105 - 14105

2 Building 3542 - 3542

3 Machinery 10715 - 11815

4 Installation & Erection of Machinery 370 370

5 Insurance 5% of Cost of Machinery 590 590

6 Transportation 2% of Machinery 12 12

7 Furniture and Fixture 250 250

8 Office Equipment 350 350

09 Pre-operating expenses 1127 1127

Estimated fixed cost - 32161

Add: Net Initial Net Working Capital 1437

Total Estimated Cost of Project 33598

15

Page 16: CNG pump feasibility repot

Star CNG Station

Annexure - V

Star CNG Station

Initial Net Working Capital Requirement

Rs. "000"

A. Current Assets:

1Account receieveable 6% of sales

2177

2 Advances and Deposits, & Prepayments 210

Total Current Assets 2387

B. Possible Current Liabilities:

1 Accounts Payable for cost of gas 800

2 Accrued Power Expenses 150

Total current liabilities 950

Initial net working capital 1437

16

Page 17: CNG pump feasibility repot

Star CNG Station

Annexure - VI

Star CNG Station

Estimated Income StatementYears ending September 30 : 2009 2010 2011

Sales 36288 52416 76230

Less: COST OF SALES

Raw Material 16800 24640 33878

Labor 528 618 723

Manufacturing Overheads 3422 4822 6471

Depreciation 1076 1076 1076

Total Cost of Goods Manufactured 21826 31156 42148

Gross Profit 14462 21260 34082

OPERATING EXPENSES:

Administrative Expenses 65 74 87

General Expenses 485 558 642

Selling Expenses 181 262 381

Total Operating Expenses 731 894 1010

Operating Profit 13731 20366 33072

OTHER EXPENSES:

Financial Charges on:

Long Term Loan - - -

Bank Borrowings - - -

Amortization of Pre-Production Expenses 376 376 376

Total Other Expenses 376 376 376

Profit Before Tax and Worker's Fund 13355 19990 32696

Worker's Fund - - -

Profit/(Loss) Before Tax 13355 19990 32696

Tax Provisions @ 45% 6009 8995 14713

Net Profit 7324 10994 17982

ASSUMPTION UNDERLYING EARNING FORECAST

17

Page 18: CNG pump feasibility repot

Star CNG Station

PRODUCTION AND SALES

The purpose of compressor is to compress the gas enabling it to discharge

the gas for refueling. This compressor requires an input pressure of 8 or

15 PSIG (pounds per square inch gauge pressure) from the main gas

supply with the outlet pressure of 3,625 PSIG. With this discharge

pressure, the equipment can refuel 50 vehicles per hour.

Gas is filled into the vehicles with the help of dispenser. This dual hose

dispenser is capable of handling two vehicles at a time.

There are various foreign manufacturers providing the CNG filling station

equipment. In this feasibility report, a British origin compressor (Ham

worthy Compressor, Bellies & Marcum, UK, Model: H430H-WL Capacity:

400 m3/hr) has been selected. This equipment is selected because of its

low electricity consumption, higher outlet pressure, low maintenance,

durable working, longer periods between overhauls and good market

repute and presence.

Different gas pressures are available in different areas of Pakistan from

the main gas supply line. The pressure of 15 PSIG is not easily available at

every location. Where the gas pressure of 15 PSIG is not available, in that

situation, the model with inlet pressure of 8 PSIG is used, which has been

manufactured to operate at a lower gas pressure. However, the

consumption of electricity increases.

The total capacity of the selected equipment is 400M3/Hr with a total

power load of 93 KW.

Currently, the CNG cylinders with two different capacities are installed in

the CNG fitted cars. One type of cylinder has a capacity of 6kg and the

other has a capacity of 8k.

18

Page 19: CNG pump feasibility repot

Star CNG Station

Price are assumed to be according with the current market price that is

imposed by Govt.

19

Page 20: CNG pump feasibility repot

Star CNG Station

Based over these assumptions, following is the year-wise detail of

production, Sales and Sales Revenue of the proposed project:-

Annexure-VI-A

Production Capacity of 400m3/hr/filling unit No. of units Filling/unit Annual filling

Filling units 2 50 cars 864000

Total 864000

20

Page 21: CNG pump feasibility repot

Star CNG Station

Annexure-VI-A

300/day 400/day 550/day

Capacity Utilized2009 2010 2011

vehicle filled

vehicle filled

vehicle filled

a) Vehicles filled 108000 144000 198000

Total vehicle filled 108000 144000 198000

Sales Revenue:

Description Unit Price Rupees ‘000’

a) Cylinder capacity 7kg/car 48 (2009) 36288

52(2010) 52416

55(2011) 76230

21

Page 22: CNG pump feasibility repot

Star CNG Station

Annexure-VI-A

Raw Material:Rs ‘000’

2009 2010 2011

a) Natural gas 16800 24640 33878

Total 16800 24640 33878

22

Page 23: CNG pump feasibility repot

Star CNG Station

Annexure-VI-A

Labor Cost: Direct Labor:

No. of Salary/Month Annual

Sr. No.

DiscriptionEmployee

s/Worker

Salary ("000")

1 Skilled 2 10000 240

2 Semi skilled 4 6000 288

Total 528

Assumptions:

1 Direct labor will increase every year @ 17%.

Year Wise Wages of Labor:

Sr. No. DescriptionYears

2009 2010 2011Rs ("000")

1 Labor cost 528 618 723

Total Cost of Labor 528 618 723

23

Page 24: CNG pump feasibility repot

Star CNG Station

Annexure-VI-A

Manufacturing Overhead Cost:

DescriptionRs

("000")a) Fixed Cost:

Insurance: @ 1% of Fixed Assets Cost 321

Maintenance:

Maintenance of filler 15000/unit 30

Maintenance of Building @ 2% of Cost of Building 71

Total Fixed Cost 422

b) Variable Manufacturing Expenses:

Electricity charges 3000

Total Variable Cost 3000

Year ending Manufacturing Overheads as per Different Capacities:

Description

Years

2009 2010 2011

Rupees ("000")

Fixed Cost 422 422 422

Variable Cost 3000 4400 6049

Total Cost of Manufacturing Overheads

3422 4822 6471

24

Page 25: CNG pump feasibility repot

Star CNG Station

Annexure-VI-A

Administrative And General Expenses:Rupees ("000")

Sr. No.

DesignationNo. of Salary/ Annual

Employees Month Salary1 Manager 1 25000 252 Deputy manager 1 10000 103 Clerk 1 8000 84 Watchman 2 6000 125 Peon/Sweeper 2 5000 10

Total 65

General Expenses:

Sr. No. DescriptionYear Exp. ("000")

1 Traveling Expenses 752 Printing & Stationary 303 Telephone, Telex, Postage 804 Entertainment 2006 Legal & Audit 207 Miscellaneous 80

Total 485

Assumptions:1 Administrative Salaries will increase @ 15% every year.

Year Wise Administrative Salaries:

25

Page 26: CNG pump feasibility repot

Star CNG Station

No. of Rupees ("000")Sr. No.

DesignationEmployee

s 2009 2010 2011

1 Manager 1 25 29 332 Deputy manager 1 10 12 143 Clerk 1 8 9 104 Watchman 2 12 14 165 Peon/Sweeper 2 10 12 14

Total 65 74 87

General Expenses:Sr. No. Description Rupees ("000")

1 Traveling Expenses 75

86 99

2 Printing & Stationary 30

35 40

3 Telephone, Telex, Postage 80

92 106

4 Entertainment 200

230 265

6 Legal & Audit 20

23 26

7 Miscellaneous 80

92 106

Total 485 558 642

Selling Expenses:

Selling Expenses are assumed to be .5% of Sales

Sr. No.

Description Rupees ‘000’

1 Selling Expenses .5% of Sales Revenue 181 262 381

26

Page 27: CNG pump feasibility repot

Star CNG Station

Annexure-VI-A

Depreciation Schedule of Fixed Assets:

Sr. No. Description Total Cost (Rs.) Rs. ("000")1 Machinery 11687 15 7792 Building 3542 20 1773 Furniture & Fixture 250 5 504 Office Equipment 350 5 70

Total 1076

Note:- Depreciation will be constant over the life of assets.

Year Wise Depreciation:

DescriptionYears

2009 2010 2011

Rupees ("000")

Depreciation 1076 1076 1076

Pre- Production Expenses :

Sr. No. DescriptionRs.

("000")

1 Registration Charges 350

2 NOCs 300

3 Sales Tax Registration Charges 12

4 Consultancy & Report Preparation Charges 250

5 Printing & Stationary 45

6 Conveyance Charges 35

7 Telephone & Postage 45

8 Salaries and Wages during Construction 90

Total Pre- Preproduction Expenses 1127

27

Page 28: CNG pump feasibility repot

Star CNG Station

Annexure-VII

Star CNG Station.Cash Flow Statement

End ofOperating YearsConstructio

n

2009 2010 2011

SOURCES OF FUNDS:

Operating Profits - 13731 20366 33072

Add: Depreciation - 1076 1076 1076

Total Funds from Operation - 14807 21442 34148

Other Sources:

Long Term Loan - - -

Bank Borrowings - - -

Paid-Up Capital 33598 - -

Total Sources of Funds 33598 14807 21442 34148

APPLICATION OF FUNDS:

Investment in Fixed Assets 29934 - - -Financial Charges during Construction

- - - -

Pre-Production Expenses 1127 - - -

Repayment of:

Long Term Loan - - - -

Bank Borrowings - - -

Financial Charges On:

Long Term Loan - - - -

Bank Borrowings - -

PAYMENT OF:

Taxes - 6009 8995 14713

Dividends - - - -

Worker's Fund - - -

Short Term Investment - 4000 5000 6000Increase in Current Assets (Other than Cash)

210 2177 967 1429

Total Application of Funds 31271 12186 14962 22142

Cash Surplus/(Deficit) 2327 2621 6480 12006Cash at the Beginning of the Year

- 2327 4948 11,428

Cash at the end of the year 2327 4948 11,428 23434

28

Page 29: CNG pump feasibility repot

Star CNG Station

Annexure-VIII

Star CNG StationBalance Sheet

End ofOperating Years

Construction2009 2010 2011

ASSETS: Rupees ("000")CURRENT ASSETS:Cash and Bank Balance 2327 4948 11428 23434Short Term Investment - - - -Accounts Receivable - 2177 3144 4573Advances, Deposits and Prepayments 210 210 210 210Total Current Assets 2537 7335 14782 28217FIXED ASSETS:Fixed Assets at Cost 31034 31034 31034 31034Accumulated Depreciation on Fixed Assets - 1076 2152 3228Fixed Assets Net 31034 29958 28882 27806Intangibles 1127 751 376 -Total Assets 33598 46931 53587 66293LIABILITIES AND EQUITY:CURRENT LIABILITIES:Bank Borrowings - -Taxes Payable - 6009 8995 14713Dividend Payable - -Worker's Fund Payable - - - - -Current Maturity of Log Term Debt - - - -Total Current Liabilities - 6009 8995 14713LONG TERM DEBTS:Long Term Debt - - - -Total long Term Debt - - - -EQUITY:Paid-Up-capital 33598 33598 33598 33598Retained Earnings - 7324 10994 17982Total Equity 33598 40922 44592 51580Total Liabilities and Equity 33598 46931 53587 66293

29

Page 30: CNG pump feasibility repot

Star CNG Station

Annexure-IX

BREAK-EVEN ANALYSIS

Commercial Break-even in the first operating year:

( Rs. In '000' )

ItemsVariable Cost

Fixed Cost Total Cost

Raw Material 16800

-

16800

Labor 528 528 Manufacturing Overheads

3000

422

3422

Depreciation Expenses -

1076

1076

Administrative & General Expenses

-

550

550

Selling Expenses 181 181

Interest / Mark-Up Expenses - - -

Amortization of Pre-Production Expenses 376

376

Total: 19981

2952

22933

Sales value of Production: 36288

Break-Even Point 2952 

X 100 36288 -

19981

18%

30

Page 31: CNG pump feasibility repot

Star CNG Station

BREAK-EVEN ANALYSIS

Cash Break-even in the third Operating Year:

( Rs. In '000' )

Items Variable CostFixed Cost

Total Cost

Raw Material 16800 - 16800

Labor 528 528

Manufacturing Overheads 3000 422 3422

Administrative & General Expenses 550 550

Selling Expenses 181 - 181

Interest / Mark-Up Expenses - - -

Worker's Participation Fund - - -

Debt Payment - - -

Tax - 6009 6009

Total: 19981 7509 27490

-

Sales from Operations: 36288

Break-Even Point:7509

X 10036288 - 19981

46%

31

Page 32: CNG pump feasibility repot

Star CNG Station

Annexure-X

Weighted Average Cost of Capital

("000")

Nature of Fund AmountInterest Rate

%After Tax Rate %

Total Interest

IN this project there is no long term debt so there would not be this annexure participation.

32

Page 33: CNG pump feasibility repot

Star CNG Station

Annexure - XIII

FAT Oil Mills (Pvt) Limited.

Financial Plan

Rupees ("000")

Description LCY FCY Total cost

Total Fixed cost of the project 32161 - 32161

Initial Permanent working capital 1437 - 1437

Total cost of the project 33598 33598

Long Term Debt - - -

Equity Participation 33598 - 33598

Total Capital Required 33598 33598

Debt/Equity Ratio

KEY SUCCESS FACTORS

33

Page 34: CNG pump feasibility repot

Star CNG Station

Few factors ensure the profitability of the project which is as follows:Location of the project will play a pivotal role in the successful running of the CNG station. The daily turnover of the cars largely depends on this important factor.Selection of proper equipment is another key for carrying out the successful operations of the proposed project.

OPPORTUNITIES

The project would have a number of opportunities:The project will provide cheaper fuel to its customers compared to the petroleum products which are already on the higher side.Government has exempted the imposition of sales tax and custom duties on the import of CNG kits and CNG plant and equipment.HDIP, a non-profitable organization working under the umbrella of Ministry of Petroleum and Natural Resources, provides consultancy services to the interested parties for setting up the CNG filling stations.This project will reduce the import bill of petroleum products and promote the use of gas fuel, as it is abundantly available in our country in this way it can save our foreign reserves.Environment friendly / green fuel will protect the environment from deadly pollution.

THREATS/CONSTRAINS

The project will be facing the following threat:Market saturation over a longer period of time due to a large number of entrants .

Threat of increase in the prices of the natural gas by the government. The gap between the prices of Petrol and Gas is becoming narrower, since the last month .

Shortage of gas supply in winter season.The under-table money for acquiring the NOCs is another threat for the project.

ALTERNATIVE INVESTMENT OPPORTUNITY

The cost of land is the major portion of investment in this project. If any investor does not have enough resources for the acquisition of land, he/she also has another alternative course of action to setup the CNG station without acquiring the land.The investor can make investments only in the purchase of CNG plant and equipment and install this equipment with any existing petrol pump. In this case, the investment for installing the CNG equipment will be made by the investor and the space will be provided by the dealer/owner of the existing petrol pump. The investor will pay 15% commission on the total revenue to the dealer/owner of the petrol pump. Moreover, the investor can also avail lease facility from any leasing company on the purchase of CNG plant and equipment.

34

Page 35: CNG pump feasibility repot

Star CNG Station

35

Page 36: CNG pump feasibility repot

Star CNG Station

APPENDICES

36

Page 37: CNG pump feasibility repot

Star CNG Station

37

Page 38: CNG pump feasibility repot

Star CNG Station

A list of some of the available equipment and machinery provided by HDIP is as

follows:

Table: Suppliers

Supplier’s Name Available Models

Rix Services, New Zealand 2JJS3G-178, FX-150, 3KX3G-40,6W5G-150

Compare UK Ltd, UK Gazpack 36, Gazpack37

Norwalk Company Inc. USA C-75-3, C150-4, NQSV3

Sulzer Burckhardt Engg. Works Switzerland

C40111S, C50214S

Hamworthy, Bellis & Morcom UK H430H-WL, H280H-WL, V130H-WL

Safe s.r.l Italy SW75SE-F1-EM, SW110SE-F1-EM,SW110-F1-EM, SW132-F1-EM,

SW90F0, 35-EMHurricane, Grimmer Industries,

USA

CNG90, CNG 125, CNG250

Chengdu Jinxing Chemical Machinery and Equiment

Factory, China

ZW-3.45/250JX, ZW-5.0/1-23, ZW-

5.52/0.5-250JXChonqing Air Gas Compressor

Factory, ChinaL-3.8/1-250, L-3/1-250, L-5/0.56-

250,L-2.9/0.56-250, L-4.65/0.56-250,

W3.8/0.56-250, W-3.8/1-250Intermech Ltd. NewZealand RHINO PAR-75VE 4-8

RHINO PAR-1-DE 4-82RHINO-PAR 150DE4-10

Unigas NewZealand Apollo VR-550

Compare Mahle GmbH, Germany 5409.2NG.EU

Sicom SRL , Italy 650.250.20-IFDE-23SE

38

Page 39: CNG pump feasibility repot

Star CNG Station

39