17
Offshore Fixed Platform Projects Smart Solutions

Cngs group offshore fixed platform projects 2014

Embed Size (px)

DESCRIPTION

The history of the CNGS Group is marked by continues development. The company developed from a local construction company to an International EPC Contractor. The reason of existence is the fact that the CNGS Group always has provided Smart Solutions.

Citation preview

Page 1: Cngs group offshore fixed platform projects 2014

OffshoreFixed Platform Projects

Smart Solutions

Page 2: Cngs group offshore fixed platform projects 2014

Our clients require tailor-made solutions; our

challenge is to deliver solutions that fits their

unique needs. The projects are typically complex

and demanding solution-aimed thinking, technical

excellence, creativity and passion.

Since 1985, the CNGS Group has delivered the

smartest possible technical solutions safely, on time,

within budget and ready for immediate operation.

Our goals is to be ranked as the most efficient

EPC contractor in carefully selected segments

and regions of the worldwide Oil & Gas market.

We are pursuing our strategy through cooperation,

flexibility, local presence and creativity.

Smart Solutions

03Offshore Fixed Platform Projects

Content

06The Sea of azov

Gelendzhikskaya Platforms

The CaSpian Sea

08 Lam-A Platform

10121416

Additional Lam-APlatforms

Lam-63 Platform

Lam-B Platform

Lam-E Platform

18 FilanovskyIRP-1 & IRP-2Platforms

20 FilanovskyCPPPlatform

22 Block-1 Platform

2426

Block-2 Platform

Block-4 Platform

28 Lam-22 Platform

04world map

Page 3: Cngs group offshore fixed platform projects 2014

05Offshore Fixed Platform Projects

World map

Legend

Location The Caspian SeaProjects Lam A, Lam 63, Lam B, Lem E, IRP 1, IRP 2, CPP, Block-1, Block-2, Block-4, Lam 22

2

Location The Sea of AzovProjects Gelendzhikskaya Platforms

1

2

1

The Caspian Sea

The Sea of Azov

Page 4: Cngs group offshore fixed platform projects 2014

Gelendzhikskaya Platforms

Location The Sea of Azov Country Russia Operator Priazovneft Oil Company

Type Living Quarters Unit for 60 Persons with Helideck Scope of work Engineering Year 2006

Type Production and drilling platform Scope of work Engineering Year 2006

Specific NoteS ICE-RESISTAnT

Water Depth 10.4 meter

DeSigN life 25 years

Number of DeckS 3

maiN Deck Size 32.2 x 32.1 meter

Weight 2,845 ton

Specific NoteS ICE-RESISTAnT

Water Depth 10.4 meter

DeSigN life 25 years

Number of DeckS 3

maiN Deck Size 61.2 x 41.8 meter

Weight 10,079 ton

Number of WellS 1

07Offshore Fixed Platform Projects

Page 5: Cngs group offshore fixed platform projects 2014

Lam-APlatform

Location The Caspian Sea Country Turkmenistan Operator Dragon Oil Type Production and drilling platform Scope of work EPC Year 2005

Water Depth 27.5 meter

DeSigN life 25 years

Number of DeckS 2

maiN Deck Size 34 x 23 meter

Weight 2,400 ton

Number of WellS 1

Number of riSerS 6

09Offshore Fixed Platform Projects

Page 6: Cngs group offshore fixed platform projects 2014

AdditionalLam-A Platforms

Location The Caspian Sea Country Turkmenistan Operator Dragon Oil Type Production platform Scope of work EPC Year 2010

Water Depth 27.5 meter

DeSigN life 25 years

Number of DeckS 2

maiN Deck Size 20 x 18 meter

Weight 1,080 ton

Number of riSerS 10

11Offshore Fixed Platform Projects

Page 7: Cngs group offshore fixed platform projects 2014

Water Depth 27.5 meter

DeSigN life 25 years

Number of DeckS 1

maiN Deck Size 98 x 50 meter

Weight 7,800 ton

Number of WellS 6

Number of riSerS 4

Lam-63 Platform

Location The Caspian Sea Country Turkmenistan Operator Dragon Oil Type Production platform Scope of work EPC Year 2007

13Offshore Fixed Platform Projects

Page 8: Cngs group offshore fixed platform projects 2014

Water Depth 32 meter

DeSigN life 25 years

Number of DeckS 3

maiN Deck Size 41 x 21 meter

Weight 3,000 ton

Number of WellS 16

Number of riSerS 3

Lam-B Platform

Location The Caspian SeaCountry Turkmenistan Operator Dragon Oil Type Production and drilling platform Scope of work EPC Year 2007

15Offshore Fixed Platform Projects

Page 9: Cngs group offshore fixed platform projects 2014

Lam-EPlatform

Location The Caspian Sea Country Turkmenistan Operator Dragon Oil Type Production platform Scope of work EPC Year 2014

Specific NoteS Float-over method used for Topside installation

Water Depth 30 meter

DeSigN life 25 years

Number of DeckS 3 mAIn + 3 InTERmEDIATE

Weight 4,800 ton

Number of WellS 20

Number of riSerS 3

17Offshore Fixed Platform Projects

Page 10: Cngs group offshore fixed platform projects 2014

irp-1

Specific NoteS ICE-RESISTAnT

Water Depth 6.8 meter

DeSigN life 35 years

Number of DeckS 3

maiN Deck Size 75 x 45 meter

Weight 15,221 ton

Number of WellS 16

Number of riSerS 1

irp-2

Specific NoteS ICE-RESISTAnT

Water Depth 9.4 meter

DeSigN life 35 years

Number of DeckS 3

maiN Deck Size 75 x 45 meter

Weight 14,887 ton

Number of WellS 20

Number of riSerS 1

FilanovskyIRP-1 and IRP-2Platforms

Location The Caspian Sea Country Russia Client Globalstroy-Engineering Operator Lukoil Type Production and drilling platform Scope of work Engineering Year 2009

19Offshore Fixed Platform Projects

Page 11: Cngs group offshore fixed platform projects 2014

Location The Caspian Sea Country Russia Client Globalstroy-Engineering Type Production platform Operator Lukoil Scope of work Engineering Year 2009

FilanovskyCPP Platform

Specific NoteS ICE-RESISTAnT

Water Depth 7.2 meter

DeSigN life 35 years

Number of DeckS 5

maiN Deck Size 72 x 40 meter

Weight 22,962 ton

21Offshore Fixed Platform Projects

Page 12: Cngs group offshore fixed platform projects 2014

Block-1Platform

Location The Caspian Sea Country Turkmenistan Operator Dragon Oil Type Production platform Scope of work EPC Year 2010

Water Depth 28.7 meter

DeSigN life 25 years

Number of DeckS 2

maiN Deck Size 29 x 28 meter

Weight 1,964 ton

Number of riSerS 12

23Offshore Fixed Platform Projects

Page 13: Cngs group offshore fixed platform projects 2014

Block-2Platform

Location The Caspian Sea Country Turkmenistan Operator Dragon Oil Type Production platform Scope of work EPC Year 2006

Water Depth 23.5 meter

DeSigN life 25 years

Number of DeckS 2

maiN Deck Size 39 x 22 meter

Weight 1,890 ton

Number of riSerS 13

25Offshore Fixed Platform Projects

Page 14: Cngs group offshore fixed platform projects 2014

Block-4Platform

Location The Caspian Sea Country Turkmenistan Operator Dragon Oil Type Production platform Scope of work EPC Year 2011

Water Depth 18.1 meter

DeSigN life 25 years

Number of DeckS 2

maiN Deck Size 33.5 x 26.4 meter

Weight 2,157 ton

Number of riSerS 19

27Offshore Fixed Platform Projects

Page 15: Cngs group offshore fixed platform projects 2014

Lam-22Platform

Location The Caspian Sea Country Turkmenistan Operator Dragon Oil Type Living quarter platform Scope of work EPC Year 2000

Water Depth 20 meter

DeSigN life 25 years

Number of DeckS 1

maiN Deck Size 46 x 21,5 meter

Weight 2,070 ton

29Offshore Fixed Platform Projects

Page 16: Cngs group offshore fixed platform projects 2014

Smart Solutions

www.cngsgroup.com

‘We are pursuing our strategy through cooperation, flexibility, local presence and creativity.’

31Offshore Fixed Platform Projects

Page 17: Cngs group offshore fixed platform projects 2014

Smart Solutions

www.cngsgroup.com

version 1.2014Copyright 2014 CnGS Group. Alle rights are reserved and no part of this document may be reproduced or transmitted in any form, by any means, without obtaining prior written permission of CnGS Group.