COAL DEMAND IN THE PHILIPPINES
ATTY. RINO E. ABAD
Director
Energy Resource Development Bureau, DOE
CURRENT DEMAND FOR COAL
Primary Energy Supply Mix (2013) Primary Energy Supply Mix in million tons of oil equivalent (MTOE)
Fuel Type/Source 2008 2013
Actual
Indigenous Energy
23.9 25.5
Coal 1.9 3.7
Natural Gas 3.2 2.9
Oil 0.7 0.7
Hydro 2.5 2.5
Geothermal 9.2 8.3
Solar 0.0 0.0
Wind 0.0 0.0
Biomass 6.3 7.3
Biofuels 0.1 0.2
Net Imported Energy
16.6 19.5
Coal 4.5 6.3
Natural Gas
Oil 12.1 13.0
Biofuels 0.0 0.2
Total Supply 40.5 45.0
Self-Sufficiency 59.0% 56.8%
Indigenous Energy
57%
Imported Energy
43%
Self-Sufficiency Mix
Coal
22%
Natural Gas
6%
Oil
31%
Biofuel
1%
Hydro
6%
Geothermal
18%
Solar
0%
Wind
0%
Biomass
16%
PRIMARY ENERGY SUPPLY MIX
Primary Energy Supply Mix
in million tons of oil equivalent (MTOE)
Fuel Type/Source 2008 2013
Actual
Indigenous Energy 23.9 25.5
Coal 1.9 3.7
Natural Gas 3.2 2.9
Oil 0.7 0.7
Hydro 2.5 2.5
Geothermal 9.2 8.3
Solar 0.0 0.0
Wind 0.0 0.0
Biomass 6.3 7.3
Biofuels 0.1 0.2
Net Imported Energy
16.6 19.5
Coal 4.5 6.3
Natural Gas
Oil 12.1 13.0
Biofuels 0.0 0.2
Total Supply 40.5 45.0
Self-Sufficiency 59.0% 56.8%
2013 COAL CONSUMPTION,
BY MAJOR TYPE OF USER in thousand metric tons (MT)
Power Generation 14,762.46
Cement
3,154.69
Industrial Uses/Others
1,005.06
Total 18,922.21 78%
17%
5%
Power Generation Cement
Industrial Uses/Others
2013 COAL CONSUMPTION,
BY MAJOR TYPE OF USER in thousand metric tons (MT)
POWER 86%
CEMENT 7%
INDUSTRY 7%
CONSUMPTION OF IMPORTED COAL(76%)
Power Generation 12,408.30
Cement 1,017.012
Industrial Uses/Others 989.28
Total
14,414.59
2013 COAL CONSUMPTION,
BY MAJOR TYPE OF USER in thousand metric tons (MT)
POWER 53%
CEMENT 46%
INDUSTRY 0%
CONSUMPTION OF LOCAL COAL(24%) Power Generation
2,353.80
Cement
2,042.92
Industrial Uses/Others
44.41
Total
4,441.14
2013 COAL CONSUMPTION,
BY MAJOR TYPE OF USER in thousand metric tons (MT)
TYPE OF COAL CONSUMPTION
BITUMINOUS
(IMPORTED) 14,191.66
ANTHRACITE
(IMPORTED) 189.22
SUB-BITUMINOUS
(LOCAL) 4,541.33
TOTAL 18,922.21
BITUMINOUS 75%
ANTHRACITE 1%
SUB-BITUMINOUS
24%
CONSUMPTION BY TYPE OF COAL
2013 Coal Consumption for Power Generation
in thousand metric tons (MT)
LUZON (8)
POWER PLANT
(IC = 4,530.60 MW)
TYPE OF POWER
PLANT LOCATION CONSUMPTION (MT)
Aboitiz/Thermal PC Pagbilao 1,764,882.00
San Miguel PC Sual 2, 654,871.00
Semirara/DMCI PC/CFB Calaca 1,509,230.00
AES-MPPCL PC Masinloc
1,842,945.00
Quezon Power PC Pagbilao 1,870,100.00
GN Power PC Bataan 1,539,132.00
Petron Corp PC Manila 250,407.00
2013 Coal Consumption for Power Generation
in thousand metric tons (MT)
VISAYAS (3)
POWER PLANT
(IC = 805.6 MW)
TYPE OF POWER
PLANT LOCATION
CONSUMPTION
(MT)
Global Power Group CFB
Toledo
64,932.00
Cebu
933,905.00
Panay
596,138.00
Cebu Thermal Power Plant PC Cebu
106,632.00
Kepco-SPC PC Naga
816,978.00
2013 Coal Consumption for Power Generation
in thousand metric tons (MT)
MINDANAO (1)
POWER PLANT
(IC = 232 MW)
TYPE OF
POWER
PLANT
LOCATION CONSUMPTION (MT)
STEAG PC Misamis
Oriental 812,311.00
TOTAL 14,762,464.00
*Note: Total of 12 Power Plants
List of Cement Plants (17):
Cement Plants Consumption (MT)
Eagle Cement 190,574.00
Holcim (4) 724,949.00
La Farge (6) 1,405,709.00
Cemex (2) 487,751.00
Taiheiyo Cement 101,399.00
Goodfound Cement 59,684.00
Northern Cement 135,325.00
Pacific Cement 49,300.00
Total 3,154,691.00
A Total of 17 Cement Plants:
• Holcim has 4 Plants
• La Farge Has 6
• Cemex has 2
List of Industrial Plants (25):
Industrial Plants Asian Alcohol
Asia Pacific
Energy
Taganito HPAL
Nickel Pasar Philphos
Consumption (MT) 29,610.19 201,334.45 114,000.00 8,013.86 5,040.00
Industrial Plants Ligo Phil. Sinter Pacifc Meat Celebes Mega Fishing
Consumption (MT) 1,200.00 215,505.48 5,040.00 2,703.84 2,010.48
Industrial Plants Del Monte Shemberg PERMEX Sprint
Industrial UPPC
Consumption (MT) 42,135.48 10,529.45 1,599.96 4,929.00 121,511
List of Industrial Plants:
Industrial Plants Coral Bay Lopez Sugar TATEH Quanta Paper Santeh Feeds
Consumption (MT) 183,490.68 5,535.00 2,068.80 6,330.00 6,241.98
Industrial Plants Columbus GenTuna Phidco Philbest OCEAN CANNING
Consumption (MT) 3,853.92 18,000.00 2,220.00 5,790.00 6,364.74
TOTAL 1,005,059.00
*Note: Total of 25 Industrial Plants
FUTURE COAL DEMAND
PHILIPPINE POLICY FRAMEWORK: ENERGY
REFORM AGENDA ON ENSURING ENERGY
SECURITY, ACHIEVING OPTIMAL ENERGY PRICE
AND DEVELOPING SUSTAINABLE ENERGY
SYSTEM:
Continuous offering of prospective areas under the PECR
Continuous implementation of small-scale coal mining
Strengthening coordination with other agencies of the Government on endorsement/permitting requirements of coal contracts
Positive outlook of the Philippines towards achieving lasting peace in conflict areas
PHILIPPINE POLICY FRAMEWORK: ENERGY
REFORM AGENDA ON ENSURING ENERGY
SECURITY, ACHIEVING OPTIMAL ENERGY PRICE
AND DEVELOPING SUSTAINABLE ENERGY
SYSTEM:
PHILIPPINE ENERGY FRAMEWORK
(2014-2018)
HISTORICAL CONSUMPTION (2008-2013) AND
FORECASTED CONSUMPTION(2014-2018)
• Consumption for the past five years has been increasing at an
average rate of 11% per year or around 1.6 MMT per year
• Out of the 1.6 Million MT: (1) 0.384M (24%) – Local
(2) 1.216M (76%) – Imported
-
5.00
10.00
15.00
20.00
25.00
30.00
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
in m
illion M
T
years
OVERALL COAL PERFORMANCE
2008-2013
2014-2018
Power Generation, Total Philippines
in gigawatt-hours (GWh)
Source/Plant Type Actual
2008 2013
Oil-Based
4,868
4,491
Coal
15,749
32,081
Natural Gas
19,576
18,791
Hydro
9,843
10,019
Geothermal
10,723
9,605
Other Renewable*
63
279
Total Generation
60,821
75,266
Self-Sufficiency (%)
67.1
56.2
*Wind,Solar,Biomass
Oil-Based
6%
Coal 43%
Natural Gas 25%
Hydro 13%
Geothermal
13%
Other Renewable*
0%
POWER GENERATION MIX
POWER GENERATION FORECAST (MW)
POWER GENERATION FORECAST (MW) 2013 2014 2015 2016 2017 2018
LUZON
Highest Peak Demand (MW) 8,305.00 8,653.81 9,017.27 9,450.10 9,903.70 10,379.08
Demand Growth Rate 4.20% 4.20% 4.20% 4.80% 4.80% 4.80%
GDP Growth Rate 7.00% 7.00% 7.00% 7.00% 7.00% 7.00%
Additional Capacity Required (MW) 416.00 348.81 363.46 432.83 453.60 475.38
Additional Regulating Reserve (MW) 16.64 13.95 14.54 17.31 18.14 19.02
VISAYAS
Highest Peak Demand (MW) 1,659.62 1,729.33 1,801.96 1,888.45 1,979.10 2,074.09
Demand Growth Rate 4.20% 4.20% 4.20% 4.80% 4.80% 4.80%
GDP Growth Rate 7.00% 7.00% 7.00% 7.00% 7.00% 7.00%
Additional Capacity Required (MW) 108.57 69.70 72.63 86.49 90.65 95.00
Additional Regulating Reserve (MW) 4.34 2.79 2.91 3.46 3.63 3.80
MINDANAO
Highest Peak Demand (MW) 1,394.98 1,453.56 1,514.61 1,587.32 1,663.51 1,743.36
Demand Growth Rate 4.20% 4.20% 4.20% 4.80% 4.80% 4.80%
GDP Growth Rate 7.00% 7.00% 7.00% 7.00% 7.00% 7.00%
Additional Capacity Required (MW) 73.98 58.59 61.05 72.70 76.19 79.85
Additional Regulating Reserve (MW) 2.96 2.34 2.44 2.91 3.05 3.19
Total Highest Peak Demand (MW)
11,359.60
11,836.70
12,333.84
12,925.87
13,546.31
14,196.53
Total Additional Capacity Required (MW) 622.49 496.19 517.03 615.71 645.26 676.23
FORECASTED DEMAND EQUIVALENT IN COAL (MT)
Year
Total Required
Additional
Capacity (MW)
Coal Power
Plant(43%)
(MW)
Equivalent Metric
Ton per Year per
MW
Equivalent Coal
Requirement for
Power (MT)
Total Coal Usage
Requirement (78%
for Power)
2013
622.49
267.67
4,320.00
1,156,340.04
1,482,487.23
2014
496.19
213.36
4,320.00
921,717.45
1,181,689.04
2015
517.03
222.32
4,320.00
960,429.59
1,231,319.98
2016
615.71
264.75
4,320.00
1,143,734.43
1,466,326.20
2017
645.26
277.46
4,320.00
1,198,633.69
1,536,709.85
2018
676.23
290.78
4,320.00
1,256,168.10
1,610,471.93
Note: (1) 1 MW= 12 MT/ Day; (2) 1 year = 360 days
• Expected consumption, based from the above figures,
for the 2014 to 2018 will be around 1.4 MMT per year
• Out of the 1.4 Million MT: (1) 0.34M – Local (24%)
(2) 1.06M – Imported(76%)
Summary of Committed Power Plants as of
September 2014
COMMITTED LUZON VISAYAS MINDANAO
TOTAL NO.
OF
PLANTS CAPACITY (MW)
2014 1 1 2 217.00
2015 3 2 5 1,017.00
2016 1 1 2 4 1,275.00
2017 1 1 2 960.00
2018 1 1 460.00
TOTAL 7 2 5 14 3,929.00
Summary of Indicative Power Plants as of
September 2014
INDICATIVE LUZON VISAYAS MINDANAO TOTAL CAPACITY (MW)
2015 1 1 20.00
2016 1 2 3 6 1,270.00
2017 4 1 1 6 2,200.00
2018 2 2 4 2,400.00
2019 1 1 1,200.00
2020 2 2 640.00
TOTAL 10 3 7 20 7,730.00
Committed Coal Power Plants (Luzon) as of September 2014
Name of the Project Project Proponent Location Rated Capacity
(MW)
Target Testing &
Commissioning Target Commercial Operation
COAL
1,372.00
135 MW Puting Bato Coal
Fired Power Plant Phase I
South Luzon Thermal
Energy Corp. (SLTEC)
Brgy. Puting Bato
West, Calaca,
Batangas
135 May 2014 October 2014
2 X 150 MW SLPGC Coal-
Fired Power Plant Phase I
Southwest Luzon Power
Generation Corporation
(Project Company)
Brgy. San Rafael,
Calaca, Batangas 300
Unit I & II -December
2014
Unit 1 - March 2015
Unit 2 -
June 2015;
135 MW Puting Bato Coal
Fired Power Plant Phase II
South Luzon Thermal
Energy Corp. (SLTEC)
Brgy. Puting Bato
West, Calaca,
Batangas
135 June 2015 November 2015
Anda Power Corporation's
82 MW Ciculating Fluidized
Bed Coal Fired Power Plant
Anda Power Corporation
Brgy. Bundagul,
Mabalacat,
Pampanga
82 June 2015 October 2015
300 MW Limay Power Plant
Project Phase I
(2x150MW)
SMC Consolidated
Power Corporation
Brgy. Lamao, Limay,
Bataan 300
Unit 1 - 150 MW -
March 2016
Unit 2 - 150 MW -July
2016
Unit 1 - 150 MW -May 2016
Unit 2 - 150 MW -September 2016
1 x 420 MW Pagbilao Coal-
Fired Thermal Power Plant
Pagbilao Energy
Corporation
Pagbilao Power
Station, Nrgy.
Ibabang Polo,
Pagbilao, Quezon
420 Between May to
November 2017 November 2017
San Buenaventura Power
Ltd. Co. (SBPL) Project
San Buenaventura
Power Ltd. Co. (SBPL)
Mauban, Quezon 460 December 2017 June 2018
Indicative Coal Power Plants (Luzon)
Name of the Project Project Proponent Location Rated Capacity
(MW)
Target Testing &
Commissioning Target Commercial Operation
COAL
5,740.00
4 X 150 MW Coal Fired
Thermal Power Plant
JG Summit Holdings,
Inc.
Brgy. Pinamukan Ibaba,
Batangas City 600
Unit 1 - June 2018
Unit 2 - Dec 2018
Unit 3 - June 2019
Unit 4 - Dec 2019
Unit 1 - June 2018
Unit 2 - Dec 2018
Unit 3 - June 2019
Unit 4 - Dec 2019
(Target Testing & Commissioning Date)
2 X 20 MW FDC Camarines
CFB Coal Power Plant FDC Utilities, Inc. Camarines Sur 40 March 2016 TBA
2 X 300 MW Coal-Fired Power
Plant
Redondo Peninsula
Energy, Inc.
Sitio Naglatore, Cawag,
Subic Bay Freeport Zone 600
Unit I - October 2016
Unit II - December
2016
(Target
Commencement of
Construction will be
Dependent on Supreme
Court decision on Writ
of Kalikasan Case.)
Target Commercial Operation will be
Dependent on Supreme Court decision on
Writ of Kalikasan Case;
2 X 150 MW SLPGC Coal-
Fired Power Plant Phase II
Southwest Luzon
Power Generation
Corporation (Project
Company)
Brgy. San Rafael, Calaca,
Batangas 300
Unit I - 2016
Unit II - 2016 2017
2 X 300 MW Masinloc
Expansion
AES Masinloc Power
Partners Co., Inc. Zambales 600
Unit 3 (300 MW) -
October 2017
Unit 4 (300 MW) -
October 2017
3rd Quarter of 2017
(Target Testing and Commissioning)
Indicative Coal Power Plants (Luzon)
Name of the Project Project Proponent Location Rated Capacity
(MW)
Target Testing &
Commissioning Target Commercial Operation
COAL
5,740.00
1x300 MW Coal Power
Plant Lucidum Energy, Inc.
Silanguin Bay,
Zambales 300 June 2017
June 2017
(Target Testing & Commissioning)
2 X 600 MW Mariveles
Expansion Project
GNPower Mariveles Coal
Plant Ltd. Co. Mariveles, Bataan 1200 2018 2018
2 x 600 MW (net) Coal-
Fired Power Plant
Meralco PowerGen
Corporation (Project
Company: Atimonan
One Energy
Atimonan, Quezon 1,200 2019 2019
300 MW Limay Power
Plant Project Phase II
(2x150MW)
SMC Consolidated
Power Corporation
Brgy. Lamao, Limay,
Bataan 300
Unit 1 - December
2016
Unit II - May 2017
Unit 1 - December 2016
Unit II - May 2017
(Target Testing & Commissioning)
600 MW Limay Power
Plant Project Phase III
(2x300MW)
SMC Consolidated
Power Corporation
Brgy. Lamao, Limay,
Bataan 600
Unit 1 - October 2017
Unit II - December
2017
Unit 1 - October 2017
Unit II - December 2017
(Target Testing & Commissioning)
1x300 MW Coal Power
Plant Lucidum Energy, Inc.
Silanguin Bay,
Zambales 300 June 2017
June 2017
(Target Testing & Commissioning)
2 X 600 MW Mariveles
Expansion Project
GNPower Mariveles Coal
Plant Ltd. Co. Mariveles, Bataan 1200 2018 2018
Committed Coal Power Plants (Visayas)
Name of the
Project
Project
Proponent Location
Rated
Capacity
(MW)
Target Testing &
Commissioning Target Commercial Operation
COAL
352.00
TPC Coal-Fired
Power Plant
Expansion Project
(1 x 82 MW Coal-
Fired Power Plant
Toledo Power
Company
Toledo City,
Cebu 82 October 2014 December 2014
2 X 135 MW
Concepcion Coal-
fired Power Plant
Phase 1-135MW
(1st Unit)
Phase 2-135MW
(2nd Unit)
Palm Thermal
Consolidated
Holdings Corp.
Brgy. Nipa,
Concepcion,
Iloilo
270
1st Unit - 3rd
Quarter of 2015
2nd Unit - May
2016 to
September 2016
(specific dates for
the 2nd unit will
still be firmed up
after 1st unit's
commencement
of construction)
1st Unit - 2nd Quarter of 2016
2nd Unit - November 2016
(specific dates for the 2nd unit
will still be firmed up after 1st
unit's commencement of
construction) ;
Indicative Coal Power Plants (Visayas)
Name of the Project Project Proponent Location Rated Capacity
(MW)
Target Testing &
Commissioning Target Commercial Operation
COAL
5,740.00
PEDC Expansion
Project
Former report
(1x150 MW
Circulating Fluidized
Bed (CFB) Coal-
Fired Power Plant)
Panay Energy
Development
Corporation
(Global Business
Power
Corporation)
Brgy. Ingore,
La Paz, Iloilo 150 May 2016 July 2016
1 X 20 MW FDC
Danao CFB Coal
Power Plant
FDC Utilities, Inc. Danao City,
Cebu 20 2016
2016
(Target Testing and
Commissioning)
300 MW Therma
Visayas Energy
Project
Therma Visayas
Inc.
Brgy. Bato,
Toledo City,
Cebu
300 March 2017 June 2017
Committed Coal Power Plants (Mindanao)
Name of the Project Project Proponent Location Rated Capacity
(MW)
Target Testing &
Commissioning Target Commercial Operation
COAL
1,745.00
2 X 150 MW Coal-
Fired Therma South
Energy Project
Therma South Inc.
Brgy. Binugao, Toril,
Davao City and
Brgy. Inawayan,
Sta. Cruz, Davao
Del Sur
300
Unit 1 - November 2014
Unit 2 -November 2014
Unit 1 -
31 March 2015
Unit 2 -
30 June 2015
2 X 100 MW Southern
Mindanao Coal Fired
Power Station
Sarangani Energy
Corporation
Brgy, Kamanga,
Maasim, Sarangani 200 Phase 1 - February 2015 Phase 1 - September 2015
3 X 135 MW FDC-
Misamis Circulating
Fluidized Bed (CFB)
Coal-Fired Power Plant
Project
FDC Utilities, Inc.
Phividec Industrial
Estate, Villanueva,
Misamis Oriental
405
1st Unit - December
2015
2nd Unit -
March 2016
3rd Unit-
June 2016
1st Unit -
June 2016
2nd Unit - September 2016
3rd Unit-
December 2016
300 MW SMC Davao
Power Plant Project
Phase I
2x150MW
San Miguel
Consolidated Power
Corporation
Brgy. Culaman,
Malita, Davao del
Sur
300
Unit 1 -
December 2015
Unit 2 -May 2016
Unit 1 -
February 2016
Unit 2 -July 2016
(Target Testing & Commissioning)
GNPower Kauswagan
Ltd. 540MW Clean
Coal-Fired Power Plant
GN Power
Kauswagan Ltd. Co.
Kauswagan, Lanao
del Norte 540 February 2017 December 2017
Indicative Coal Power Plants (Mindanao)
Name of the Project Project Proponent Location Rated Capacity (MW) Target Testing &
Commissioning Target Commercial Operation
COAL
5,740.00
PEDC Expansion
Project
Former report
(1x150 MW
Circulating Fluidized
Bed (CFB) Coal-
Fired Power Plant)
Panay Energy
Development
Corporation
(Global Business
Power Corporation)
Brgy. Ingore, La Paz,
Iloilo 150 May 2016 July 2016
1 X 20 MW FDC
Danao CFB Coal
Power Plant
FDC Utilities, Inc. Danao City, Cebu 20 2016 2016
(Target Testing and Commissioning)
300 MW Therma
Visayas Energy
Project
Therma Visayas Inc. Brgy. Bato, Toledo
City, Cebu 300 March 2017 June 2017
Name of the Project Project Proponent Location Rated Capacity
(MW)
Target Testing &
Commissioning Target Commercial Operation
COAL
1,230.00
Davao del Norte 20
MW Circulating
Fluidized Bed
Biomass-Coal Fired
Thermal Power
Plant
FDC Utilities, Inc. Maco, Davao del
Norte 20 March 2015
March 2015
(Target Testing and Commissioning)
ZAM 100 MW
Circulating Fluidized
Bed (CFB) Coal-
Fired Power Station
San Ramon Power
Inc.
Sitio San Ramon,
Bgry. Talisayan,
Zamboanga City
100 December 2015 June 2016
600 MW SMC
Davao Power Plant
Project Phase III
San Miguel
Consolidated Power
Corporation
Brgy. Culaman,
Malita, Davao del
Sur
600
Phase I
Unit 1 (150MW) - January
2016
Unit 2 (150MW0 - June
2016
Phase II
300 MW - Dec 2018
Phase I
Unit 1 (150MW) - January 2016
Unit 2 (150MW0 - June 2016
(Testing and Commissioning)
Phase II
300 MW - Dec 2019
Indicative Coal Power Plants (Mindanao)
Name of the Project Project Proponent Location Rated Capacity (MW) Target Testing &
Commissioning Target Commercial Operation
COAL
1,230.00
Sibuguey Power
Plant Project
Philippine National Oil
Company (PNOC-EC)
Sibugay,
Zamboanga 100 September 2016
September 2016
(Target Testing and Commissioning)
2x55 MW Balingasag
Thermal Power Plant
(Circulating Fluidized
Bed Combustion
(CFBC) Coal-Fired
Power Plant Plant)
Minergy Coal
Corporation
Brgy. Mandangoa,
Balingasag,
Misamis Oriental
110 January 2017 January 2017
(Target Testing and Commissioning)
300 MW Coal Fired
Power Plant
Phase 1 - 2 x
100MW
Phase 2 - 1 x
100MW
Ozamiz Power
Generation, Inc.
Brgy. Pulot,Ozamiz
City,Misamis
Occidental
300
Phase 1 - 2 x 100MW -
March 2018
Phase 2 - 1 x 100MW -
2018
Phase 1 - 2 x 100MW -September
2018
Phase 2 - 1 x 100MW - 2018
300 MW SMC Davao
Power Plant Project
Phase II
San Miguel
Consolidated Power
Corporation
Brgy. Culaman,
Malita, Davao del
Sur
300 December 2018 December 2018
(Target Testing and Commissioning)
Low Carbon Scenario vs. Business As Usual
Coal
22%
Natural
Gas
7%
Oil
31%
Hydro
6%
Geothermal
18%
Solar &
Wind
0%
Biomass
16%
Biofuels
0%
2013 Energy Mix
Coal
27%
Natural
Gas
9%
Oil
30% Hydro
5%
Geothermal
21%
Solar &
Wind
0%
Biomass
8%
Biofuels
0%
2018 Business As Usual
Coal
27%
Natural
Gas
9%
Oil
30%
Hydro
5%
Geothermal
21%
Solar &
Wind
0%
Biomass
8%
Biofuels
0%
2018 Low Carbon Scenario
Total Energy: in million tons of oil equivalent (MTOE)
YEAR BAU LCS
2013 44.90 44.90
2018 50.60 50.60
2030 73.85 77.52
Coal
27%
Natural
Gas
9% Oil
30%
Hydro
5%
Geotherma
l
21%
Solar &
Wind
0%
Biomass
8%
Biofuels
0%
2018 Business As Usual
Coal
39%
Natural Gas
11%
Oil
25%
Hydro
15%
Geothermal
3%
Solar & Wind
0%
Biomass
4% Biofuels
3%
2030 Business As Usual
Total Energy: in million tons of oil equivalent (MTOE)
YEAR BAU LCS
2013 44.90 44.90
2018 50.60 50.60
2030 73.85 77.52
Low Carbon Scenario vs. Business As Usual
Low Carbon Scenario: Energy Supply Mix
Forecast
Coal: in million tons of oil equivalent (MTOE)
YEAR BAU LCS
2014 10.201 10.201
2015 10.916 10.916
2016 11.9208 11.9208
2017 12.8752 12.8752
2018 13.9002 13.9002
2019 14.69 14.69
2020 15.76 14.98
2021 16.96 15.26
2022 18.2 15.56
2023 18.98 15.89
2024 20.33 16.23
2025 21.59 16.61
2026 23.13 17.01
2027 24.09 17.44
2028 25.57 17.9
2029 27.12 18.4
2030 28.73 18.93
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
20
08
20
13
20
14
20
15
20
16
20
17
20
18
20
19
20
20
20
21
20
22
20
23
20
24
20
25
20
26
20
27
20
28
20
29
20
30
in M
TO
E
Year
BAU
LCS
• BAU – Business As Usual
• LCS – Low Carbon Scenario
Thank you for your attention!