OPI Success Story : Implementasi Modifikasi

Floating Hose Suction untuk Coal Runoff Pond

Rakor DITOP JBSemarang, 17 - 18 Januari 2013

Oleh : Muhammad Arif Susetyo – 8510765ZAssistant Engineer Pengendalian Operasi Unit 3-4Angkatan : 17/18OJT : Mei 2010

PLN Tanjung Jati B

Page 2: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 2

Agenda

▪ Initiative Charter

▪ Root Cause Problem Solving

▪ Kesimpulan

Page 3: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 3

Initiative Charter : Floating Hose Suction untuk Coal Runoff Pond

3 SUMBER: OPI

Judul Ide: Memasang Floating Hose di Coal Runoff Pond Bidang yang paling terpengaruh: Coal handling & WWTP

Pemasangan Floating Hose berguna untuk mengurangi lumpur batu bara yang terkirim ke Waste Water Treatment Plant (WWTP), yang berasal dari Coal Runoff Pond (Kolam Pengendapan air Limpasan Batu Bara).

Deskripsi

• Coal Yard TJB Unit 3-4 berkapasitas 660.000 ton menghasilkan

banyak air limpasan di musim hujan

• Desain Coal Runoff Pond Existing tidak efektif dalam menyaring

lumpur batu bara sebelum dikirim ke WWTP

• Hal ini mengakibatkan WWTP Overload, dan terjadi kerusakan di

peralatan, mengakibatkan Shutdown sistem WWTP

• Untuk menormalkan WWTP, air limbah PLTU terpaksa dibuang

langsung ke laut (mengancam lingkungan).

• Biaya besar untuk rekondisi motor, pompa, dan agitator.

Latar belakang Aktifitas

Limbah di Outfall (Permit KLH) Sedang Tinggi Rp 250.000.000

KPI yang terpengaruh Kemudahan Implementasi Manfaat atau dampak Biaya Penerapan

TS Regional Coach OPITitah Unggul Wirandono

Manager Produksi 2Agung Wahyudi

Muhammad Arif Susetyo

Workstream Mentor Co-Mentor OPI Local Coach

Informasi Inisiatif Manajemen

• Melakukan Root Cause Failure Analysis

• Mengukur Kandungan Total Suspended Solid fluida di sistem.

• Mendesain sistem penyaring Lumpur di Coal Runoff Pond

• Melakukan Kalkulasi Head Loss Akibat floating pipe

• Analisa Dampak instalasi terhadap sistem

• Melakukan Tender

• Optimalisasi pengoperasian.

• Membuat Laporan

Page 4: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

|

Apakah Coal Runoff Pond?

Coal Yard Unit 3-4 Kapasitas 660.000 ton

Air Limpasan di Musim Hujan

Lumpur Batu Bara diendapkan di

Coal Runoff Pond

Waste Water

Treatment Plant

(WWTP)

Air Hasil Pengendapan dipompa ke WWTP

Air Bersih (sesuai Permit KLH)

Outfall LAUT

LEPAS

Solid WasteKontraktor

Waste Handling

Retention Basin

Page 5: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 5

Foto-foto Coal Yard & Coal Runoff Pond

Coal Yard Unit 3-4 Kapasitas 660.000 Ton

Coal Runoff Pond

Pump Pit (to WWTP)

Page 6: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

|

Limbah Yang Dimasukkan ke Coal Runoff Pond

6

Page 7: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 7

Problem Di Coal Runoff Pond (Akhir 2011)

From Coal Yard

To WWTP

Desain Pump Pit

Endapan Lumpur

Batu Bara

Design Induced Problem : Lumpur Batu Bara yang sudah diendapkan terpompa ke WWTP

Bottom Total Suspended Solid :233.577 mg/liter

Page 8: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 8

Akibat Dari Terpompanya Lumpur Batu Bara ke WWTP

Sample Location TSS (mg/liter)

Coal Runoff Basin (CS1) Upper 24,2

Coal Runoff Basin (CS1) Bottom 233.577,87

WWTP Retention Basin 6000

▪ WWTP Overload (maximum 1000mg/L, actual 6000 mg/L)

▪ WWTP Retention Basin overload (shutdown & Buang ke laut)

▪ WWTP Clarifier Overload (Shutdown & Buang ke laut)

▪ WWTP Retention Basin Pump x4 Rusak

▪ WWTP pH Adjustment Tank agitator motor terbakar

▪ Coal Runoff Basin Pump x2 Shaft Patah

Page 9: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 9

Foto-foto Kerusakan WWTP (Akhir 2011)

Pembersihan WWTP Retention Basin Penggunaan Pompa Emergency

Pembuangan Sludge WWTP Ke outfall Resiko Lingkungan

Shaft Pompa Coal Runoff Pond Patah

Page 10: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 10

Agenda

▪ Initiative Charter

▪ Root Cause Problem Solving

▪ Kesimpulan

Page 11: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 11

Root Cause Problem Solving (RCPS)

Sample Location TSS (mg/liter)

Coal Runoff Basin (CS1) Upper 24,2

Coal Runoff Basin (CS1) Bottom 233.577,87

WWTP Retention Basin 6000

Root cause

▪ Desain Lubang Intake di sisi bawah coal runoff pond tidak menguntungkan karena membawa lumpur yang telah diendapkan

▪ Lumpur denganTSS terkirim menyebabkan kegagalan WWTP

Problem Solving

▪ Data menunjukkan TSS permukaan coal runoff basin rendah (24mg/Liter)

▪ Disimpulkan menguntungkan mengambil air dari permukaan dengan TSS rendah

▪ Diusulkan sistem Floating hose suction untuk mengakomodir level air yang berubah-ubah

Page 12: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

|

Problem solving - Concept

12

Floating Hose Suction

Chain Block

Page 13: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 13

Problem Solving - Design

Floating Hose Suction x 2

Problem :Dimensi Floating Hose untuk mencukupi kebutuhan flow

Pompa yang besar ?(2 x 3.21 m3/min)

Page 14: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

|

Floating Hose Head Loss Calculation

14

BC

Lc

A

Lb

Coal Runoff Basin

Dh

Pump Pit Pump Capacity : 0.0535 m3/s

Page 15: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

|

Floating Hose Head Loss Calculation

Head Loss Major

Head Loss Entry

Head Loss Exit

Total Head Loss = 0.1457 meter (acceptable)

Reynolds Number

Fluid Velocity

Configuration FHose

Diameter8 in

Hose Length 20 m

Hose Quantity 2

Page 16: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 16

Pemilihan Konfigurasi Floating Hose

Page 17: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 17

Foto-foto Aplikasi & Operasi Coal Runoff Pond (Pertengahan 2012)

Instalasi Floating Hose (8 in x 20m x 2)

Coal Runoff Pond di Musim Hujan (Floating Hose tenggelam)

Air yang masuk ke Pump Pit

Page 18: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 18

Kondisi WWTP di Musim Hujan

Kondisi WWTP Retention Basin (TSS 300 mg/L)

Kejernihan Overflow Retention Basin

Sample Location TSS (mg/liter)

Coal Runoff Pond Pump Pit 150-200

WWTP Retention Basin 300-500

Page 19: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 19

Agenda

▪ Initiative Charter

▪ Root Cause Problem Solving

▪ Kesimpulan

Page 20: Coal runoff basin modification presentation

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 20

Kesimpulan Floating Hose Suction

▪ Floating Hose Suction efektif dalam mengisolasi Coal Runoff Pond Pump pit dari Endapan Lumpur Batu Bara.

▪ Air yang dikirim ke WWTP memenuhi baku mutu spesifikasi (150 mg/Liter).

▪ Air yang diproses di WWTP mempunyai TSS didalam batas operasional WWTP (300mg/Liter).

▪ Perhitungan Head Loss dengan flow dari 1 pompa akurat

▪ Perlu dilakukan Optimasi operasi untuk meminimalkan start-stop pada operasi 2 pompa

▪ Perlu dilakukan penyempurnaan pada filter masukan Floating Hose Suction, karena sering terjadi penyumbatan.

Sample Location TSS (mg/liter)

Coal Runoff Pond Pump Pit 150-200

WWTP Retention Basin 300-500