GENERAL CONVERSION TABLELENGTH :- VOLUME :-1 Centimeter = 0.3937 Inch 1 Cu.Cm. = 0.061 Cu.Inch.1 Feet = 0.3038 Metre 1 Cu.Metre = 35.315 Cu.Feet.1 Metre = 1.0938 Yard 1 Cu.Metre = 1.30795 Cu.Yard1 Metre = 3.28 Feet 1 Cu.Inch = 16.387 Cu.Cm.1 Kilometre = 1000 Metre 1 Cu.Feet = 28.3 Litres.1 Kilometre = 0.6214 Mile 1 Cu.Feet = 6.24 Gallons1 Yard = 3.00 Feet 1 Litre = 1000 Cu.Cm.1 Yard = 0.9144 Metre 1 Gallon = 4.456 Litre.1 Rod = 5.500 Yards WEIGHT :-1 Furlong = 40 Rods 1 Gram = 15.432 Grains1 Furlong = 20.1643 Metres 1 Cunec = 28.350 Grams.1 Stat-Mile = 8.00 Furlong 1 Tola = 11.6638 Grams.1 Mile = 5280 Feet 1 Pound = 0.454 Sq.gm.AREA :- 1 Pound = 453.59 Grams.1 Sq. Inch = 6.4516 Sq.Cm. 1 Quintal = 100 Kg.1 Sq.Metre = 10.7639 Sq.feet 1 Ton. = 1016 Kg.1 Sq.Metre = 1.196 Sq.Yard 1 Ton. = 2240 Lb.1 Sq.Yard = 0.8361 Sq.Metre 1 Ton = 1.01605 Tonne (Metre)1 Sq.Yard = 9.00 Sq.Feet POWER :-1 Sq.Mile = 640 Acres. 1 Horse-Power = 746 Walts.1 Sq.Mile = 259 Hectors. 1 Horse-Power = 76.00 Kg. m/sec1 Sq.Kilometre = 100 Hectors. 1 Walt = 76.00 Kg.m.1 Sq.Kilometre = 0.3861 Sq.Mile 1 Walt = 0.1 Kg. m/sec.1 Acre = 4046.86 Sq.Metre. 1 Joules = 0.737 Feet-Lb.
1 Acre = 43560 Sq.Feet 1 Joules/sec = 1.0 Walt1 Acre = 0.404671 Hectors. 1 German candles = 0.90 English candles1 Acre = 4840 Sq.Yards. 1 Heat-unit = 0.252 Calories1 Acre = 40.00 Guntha. 1 C.H.U. = 1.8 B.TH.U1 Guntha = 1089 Sq.Feet. 1 Heat-unit/Hp. = 2.713 Calories/Sq.m.1 Guntha = 16 Are 1 Acre /cusec = 14.3 Hect./ cumecs1 Are = 100 Sq.Metre. 1 Cumec = 35.316 Cusecs.1 Hector = 10000 Sq.Metre. 1 Cumec = 219.97 Gallons.1 Hector = 2.4711 Acres. 1 Cumec-day = 8.64 Het-Metre1 Hector = 100 Ares. 1 Inch of rain-fall = 100 Tens (Aprox)
1 Hector = 0.003861 Sq.Mile.
7/29/2019 Code of Conduct Engg.
2/9
-: Materials required per m 2 for various thickness of concrete screed :-
Nominal mix. Material Thickness in mm.50 60 70 80 90 100 125 150 200 225 250 300
1 : 1-1/2 : 3 CFACA
202141
242550
282958
323366
363775
404183
4952
104
5962
124
7983
166
8993
187
99104207
118124249
1 : 2 : 3 CFACA
192740
233249
273857
314365
354973
395481
4867
101
5881
121
77108162
87122182
96135202
115162242
1 : 1-2/3 : 3-1/3 CFACA
182142
222550
262959
293467
333875
364284
4552
105
5563
126
7384
168
8295
189
91105210
109126251
1 : 2 : 4 C
FACA
16
2243
19
2652
22
3061
25
3570
28
3978
31
4387
39
54109
47
65130
62
87174
70
98196
78
109217
93
130260
1 : 2-1/2 : 5 CFACA
132245
152754
183163
203671
234080
264589
3256
112
3867
134
5189
178
57100200
64112223
77134268
1 : 3 : 5 CFACA
122542
143050
173559
194067
224576
245084
3063
105
3676
126
48101168
54114189
60126210
72151252
1 : 3 : 6 CFACA
112345
132754
153263
173672
194181
224590
2757
113
3268
136
4390
181
48101203
54113226
64136271
1 : 4 : 8 CFACA
82346
102855
113265
133774
154283
174692
2158
116
2569
139
3392
185
37104208
41116231
49139277
C = Cement, kg., FA = Fine aggregate, saturated surface dry, liters, CA = Coarse aggregate, liters. No allowance made for bulking and wastage.
(As per Concrete Hand Book. P. 48)
7/29/2019 Code of Conduct Engg.
3/9
- : Standards of Canal Cross Section :-Sr.
No.Item. Main & Branch Canal. Major distributories. Minor distributories.
150 to 300cumecs
30 to 10cumecs
10 to 5cumecs
5 to 1cumecs
1 to 0.3cumecs
0.3 to belowcumecs
1. Maximum crest width of bank. 3 m. 2.5 m. 2.25 m. 2 m. 1.5 m. 1.0 m.2. Free board. 0.9 m. 0.75 m. 0.6 m. 0.5 m. 0.4 m. 0.3 m.3. Width of beam. Minimum bed width = 0.6 m. + th. Of width of combined side slopes of cutting
& embankment. Maximum bed width = 0.6 m. + th. The width of combinedslopes.
4. Width of road way. 6 m. 5 m. 5 m. 3.5 m. 3.5 m. Nil.5. Depth of earth cover over
saturation gradient.1 m. 0.8 m. 0.5 m. 0.5 m. 0.5 m. 0.5 m.
6. Width of land to be acquired :Clear of banks when canalcutting depth is less than
balancing depth.
Full height of bank + 5 m.
Full height of bank + 5 m.
Full height of bank above groundlevel + 1.5 m.
7. Width of land to be acquired :Clear of banks when canalcutting is deeper than bankingdepth.
5 m. Half the height of the bank above ground subject to a minimum of 1.5 m.
7/29/2019 Code of Conduct Engg.
4/9
WEIGHT OF MATERIALS
Material Lb/cft Kg/cu.m. Material Lb/cft Kg/cu.m.Aluvial ground-undistributed. 100 1600 Iron : Pig.
Gray cast.White cast.Wrought
450445473-481480
720071307580-77207700
Asbestos, felt. 9 150 Kerosene. 51 820Asphalt flooring. 137 2200 Lime freshly burnt. 60 960Balast stone. 100-
2001600-1970
Lime stone crushed. 80-90 1280-1440
Bamboo. 23 370 Lime shaked. 40 640Bitumen. 65 1040 Mortar : Cement.
Lime.
130
110
2080
2760Brass. 534 8550 Oils : Castor
Diesel.Linsed.Turpentine.
60605854
960960930865
Bricks : Common Burnt Clay.Sand CementSand lime.
100-120115130
1600-192018402080
Paper : Close packed.Loose records.
5540-45
880640-720
Brick ballast.Brick dust (surki)
7563
12001010
Petrol. 43 690
Brick Masonary. 120 1920 Plastics. 69-100 1100-1600Cement : Ordinary & Aluminous.
Rapid Hardening.9080
14401280
Plaster of paris. 50 800
Cement Concrete Plain, Aerated.Brick AggregateStone Ballast.
1611540
26018402240
Rubber. 60 960
Cement concrete reinforced : Sand : Dry-Clean. 100 1600
7/29/2019 Code of Conduct Engg.
5/9
Material Lb/cft Kg/cu.m. Material Lb/cft Kg/cu.m.With 1% steel.With 2% steel.With 3% steel.
148150160
237024202580
River.Wet.
115110-125
18401760-2000
Chalk. 100-120
1600-1920
Silt Wet. 110-120
1760-1920
Clay : Dry compact.Damp, compact.Wet, compact.
90100130
144017602080
Steel : Cast.Wrohgh muld.
490489
78507830
Coal. 55-70 880-1120 Stones :Concrete with brick aggregate & lime mortar. 120 1920 Basalt.
GneissGraniteKankar.
Laterite.Limestone.Marble.Quarts.Sandstone.Slate.
178-185150-168
165-17585-92130-150150-165164165140-450175
2850-29602400-26902400-28001360-1470
2080-24002400-2640262026402240-24002800
Cuddapah slabs. 170 2720Earth : Dry, loose.
Dry, compact.
Moist, loose.Moist, compact.
8097
900-100100-115
12801550
1440-16001760-1840
Glass : Crown.Common.Flint.Plass glass.
157158191172
2510253030602750
Gravel 100-125
1600-2000
Gunmetal. 548 8780
Stone Masonary :
7/29/2019 Code of Conduct Engg.
6/9
Material Lb/cft Kg/cu.m. Material Lb/cft Kg/cu.m.Dry Rubble.Granite-Ashlar.Granite Rubble.Limestone Ashlat.
130165150160
2080264024002560
7/29/2019 Code of Conduct Engg.
7/9
WEIGHT OF MATERIALS
Material lb/cft kg/cu.m. Material lb/cft kg/cu.m.Aluvial ground-undistributed 100 1600 Iron : Pig 450 7200Asbestos, felt 9 150 Grey-cast 445 7130Asphalt flooring 137 2200 White cast 473-481 7580-7720Ballast stone 100-120 1600-1970 Wrough 480 7700Bamboo 23 370 Kerosene 51 820Bitumen 65 1040 Lime freshly burnt 60 960Brass 534 8550 Lime stone crushed 80-90 1280-1440Bricks : Common burnt clay. 100-120 1600-1920 Lime shaked 40 640
Sand Cement 115 1840 Mortar : Cement 130 2080Sand lime 130 2080 Lime 110 1760
Brick ballast 75 1200 Oils : Castor 60 960Brick dust (surki) 63 1010 Diesel 60 960Brick masonary 120 1920 Linseed 58 930Cement : Ordinary & Aluminous 90 1440 Turpentine 54 865
Rapid hardening 80 1280 Paper : Close packed 55 880Cement concrete : Plain, Aerated 16 260 Loose records 40-45 640-720
Brick aggregate 115 1840 Petrol 43 690Stone ballast 140 2240 Plastics 69-100 1100-1600
Cement concrete reinforced : Plaster of Paris 50 800With 1% steel 148 2370 Rubber 60 960With 2% steel 150 2420 Sand : Dry clean 100 1600With 3% steel 160 2580 River 115 1840
Chalk 100-120 1600-1920 Wet 110-125 1740-2000Clay : Dry compact 90 1440 Silt wet 110-120 1760-1920
Demp compact 100 1760 Steel : Cast 490 7850Wet compact 130 2080 Wrough mild 489 7830
Coal 55-70 880-1120 Stones : Basalt 178-185 2850-2960
7/29/2019 Code of Conduct Engg.
8/9
Material lb/cft kg/cu.m. Material lb/cft kg/cu.m.Concrete with brick aggregate and limemortar.
120 1920 Gneiss 150-168 2400-2690
170 2720 Granite 165-175 2460-2800Cuddapah slabs 80 1280 Kankar 85-92 1360-1470Earth : Dry, loose 97 1550 Laterite 130-150 2080-2400
Dry, compact 90-100 1440-1600 Limestone 150-165 2400-2640Moist, loose 100-115 1760-1840 Marble 164 2620
Glass : Crown 157 2510 Quartz 165 2640Common 158 2530 Sandstone 140-150 2240-2400Flint 191 3060 Slate 175 2800Plass glass 172 2750 Stone masonary :
Gravel 100-125 1600-2000 Dry rubble 130 2080Gunmetal 548 87580 Granite Ashlar 165 2640
Stone Masonary : Granite Rubble 150 2400Marble Dressed 169 2700 Limestone Ashlat 160 2560Sandstone Dressed 140 2240 22 gauge 1.75 8.6
Tar 63 1010 24 gauge 1.50 7.3Terra coata (solid) 130 2080 Country tiles with battensTimber : Chir wood 32 510 Single 14 68.04
Deal wood 40 640 Double 24 117Hard wood 40-60 640-960 Eternit sheets or tiles 2.50 12.2
Light wood 25-30 400-480 Felt Asphalted 3 14.7Medium wood 30-40 480-640 First class mud roof 100 488.8Sal wood 62 990 Flat and pan tiles 30 146.5Teak wood 42-52 670-830 Glazed roofing (with 1
glass with lead coveredsteel brass)
6 29.3
Tin 456 7300 Jack Arch roof 150 732.4Varnish 60 960 Lath and Plaster ceiling 8 39Water (pure at 39.9 o F) 62.425 1000 Lead sheet per mm
thickness2.25 11
7/29/2019 Code of Conduct Engg.
9/9
Material lb/cft kg/cu.m. Material lb/cft kg/cu.m.Roofing Materials lb/sf.t. kg/sq.m. Linoleum per mm
thickness0.27 1.3
Aluminium sheet per mm. thickness 0.57 2.8 Manglore tiles 11 53.7Asbestos sheet 1 thick : Corrugated. 3.30 16 Manglore tiles bedded in
mortar over flat tiles22 107.4
Flat 2.30 11 Manglore tiles with battens
14 68.3
Battens 0.50 2.5 Manglore tiles with flattiles
16 73
Bituminous roofing flet 1.50 7.3 Plywood per mmthickness
0.14 0.7
Boarding : 1 thick 3 14.7 Rafters 1 4.9 thick 2 9.8 Thatch with frame 9 10 48.9
Copper sheet per mm. thickness 1.78 8.7 Thatch with frame 6 6.5 31.7C.G.I. sheets : 18 gauge 2.78 13.4 Timber trusses :
With light roofs 2 9.8With heavy roofs 3 14.7
Zinc sheet per mmthickness
1.45 7.1
Dead load of Trusses :
1. For heavy covering W = 7/8 x DL x (1 + L/12) 2. For medium covering W = x DL x (1 + L/12)2. For light covering W = 11/16 x DL x (1 + L/12)
Where : W = Weight of one truss in pounds.D = Distance apart of trusses.L = Square feet.