26

Cody J. Sanborn | Architecture Portfolio | 2015

Embed Size (px)

DESCRIPTION

This booklet is an architecture portfolio including work from my years at Roger Williams University in Bristol, Rhode Island

Citation preview

Page 1: Cody J. Sanborn | Architecture Portfolio | 2015

Bristol, Rhode Island

2015

Cody J. SanbornArchitecture Portfolio

School of Art, Architecture, & Historic Preservation

Windsor, CT

Page 2: Cody J. Sanborn | Architecture Portfolio | 2015

“Architecture is not so much a knowledge of form, but a form of knowledge”

-Bernard Tschumi

Trinity Church, Boston, MA 1

Page 3: Cody J. Sanborn | Architecture Portfolio | 2015

Master Chief, 20092

Page 4: Cody J. Sanborn | Architecture Portfolio | 2015

“The Providence Underground”

The design concept for this proposal was to adapt Providence's abandoned railway tunnel into a home for a vast underground area of commerce. This included a retail area for crafts & art exhibits along with an exhibits along with an organic farmer's market. The architectural design within the tunnel maintains a relationship with the urban context above. The goal for my proposal was to turn this abandoned tunnel turn this abandoned tunnel into an attraction for the city with hopes of boosting the local economy and establishing a reputation as a unique shopping experience.

3

Presented to Governor Chafee

Page 5: Cody J. Sanborn | Architecture Portfolio | 2015

Farmer’s Market

Craft-Goods

Existing Tunnel

Process Diagrams

Underground Tunnel Plan

Page 6: Cody J. Sanborn | Architecture Portfolio | 2015
Page 7: Cody J. Sanborn | Architecture Portfolio | 2015
Page 8: Cody J. Sanborn | Architecture Portfolio | 2015

Model 1/4” = 1’

Tunnel Art Gallery

Page 9: Cody J. Sanborn | Architecture Portfolio | 2015
Page 10: Cody J. Sanborn | Architecture Portfolio | 2015

“The RWU Creative Arts Center”Third-Year

The concept for the RWU Creative Arts Center involveda bold, strong concrete bearingwall dividing the flat site intotwo.The building’s circulationfollows down along-side the wall, passing through in certain wall, passing through in certain instances. The program spaces, including an auditorium, electrical shop, studio spaces, art galleries, wood shops, andseveral lounges all plug into thewall. The structure is completely comprised of concrete, both pre-comprised of concrete, both pre-cast and cast-in-place. A simple grid was installed, using intermediate spans and organizing the building providing more intimate spaces along the journey through the spaces.

9

Page 11: Cody J. Sanborn | Architecture Portfolio | 2015

Third-YearUndergraduate

fall 2013

Creative Arts CenterRwu Campus, Bristol 10

Page 12: Cody J. Sanborn | Architecture Portfolio | 2015

Typ. Roof Detail

Typ. Parapet Detail

Typ. Curtain Wall Detail

Typ. Floor Detail

Typ. Foundation Detail

11

Page 13: Cody J. Sanborn | Architecture Portfolio | 2015

Third-Year

12Longitudinal Section

Page 14: Cody J. Sanborn | Architecture Portfolio | 2015

Parti (Plan)

Model 1/8”=1’

Third-YearUndergraduate

fall 2013

13

Page 15: Cody J. Sanborn | Architecture Portfolio | 2015

“Infinity”Third Year, Abstract Art Piece

14

Page 16: Cody J. Sanborn | Architecture Portfolio | 2015

“The Rwu Spiritual Center”

The RWU Spiritual Centerwas a collaborative project between the ConstructionManagement & Architecture students at RWU. The goal was to use BIM and LEANmethodology in joint-methodology in joint-efforts to simulate the fullcompletion of a spiritualcenter from start to finish, including the details in between. The center wouldservice the school and itscommunitcommunity. Together, we completed a full program, schedule, budget and construction approachalong with drawings and renderings. We presented tothe school Chaplain and some of her colleagues.some of her colleagues.15

Page 17: Cody J. Sanborn | Architecture Portfolio | 2015

Site Logistics PlanGoals & Metrics

-Relocate existing Career center Building

-Design & Construct building on schedule

-Design & Construct within the budget

-Complete project safely w/ no incidents

-Design The building with sustainable methods

-Obtain at least LEED Silver Certification

16

Page 18: Cody J. Sanborn | Architecture Portfolio | 2015

17

Fourth-yearUndergraduate

fall 2013

Structure

Mechanical

Ground Floor plan

Page 19: Cody J. Sanborn | Architecture Portfolio | 2015

Final Gross 9,000 SF

Schedule Overview 18

Conceptual - 16 days

Design & Planning 51 days

Interior Construction - 29 daysExterior Construction - 73 days

Demo/Excavation - 49 days

Page 20: Cody J. Sanborn | Architecture Portfolio | 2015

Middle School Project - 2nd Year19

Page 21: Cody J. Sanborn | Architecture Portfolio | 2015

“School for the Deaf & Hard of Hearing”

The 70,000sf Pre-K-12 School for the Deaf & Hard of Hearing was a semester-long project in my third year. The sloping site was on the waterfront of our RWU campus. Because of this, I wanted to maximize views and provide ample natural light to all spaces in the school. Color and light were the two main themes during the design the two main themes during the design process. Each grade/age-group was seperat-ed into a different section as defined by the building’s color (the older students class-rooms on the second floor). In the main circulation corridors, which are deliniated by double-height clerestory strips, there are many gathering spaces where students could ‘pull-over’ and be able to communi-cate & sign to each other. These “nooks” appeared natural and are crucial for social interaction.

20

Third-YearUndergraduate

fall 2013

Page 22: Cody J. Sanborn | Architecture Portfolio | 2015

Third-YearUndergraduate

fall 2013

Light study diagram (Hypostyle Hall)

Playground Area

21

Floor/Site plan (Colored Pencil)

Page 23: Cody J. Sanborn | Architecture Portfolio | 2015

22

Interior - Kindergarden BlockThird-yearUndergraduate

fall 2013

Southern Elevation

3-d Abstract art

Page 24: Cody J. Sanborn | Architecture Portfolio | 2015

Assisted Living Complex

-Third Year

23

Page 25: Cody J. Sanborn | Architecture Portfolio | 2015

Los Nogales Chapel

-Third Year Model 1/8” = 1 24

Page 26: Cody J. Sanborn | Architecture Portfolio | 2015