    110 November 2015

    Protecting

    Coler

    Campus

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    2/19

    210 November 2015

    Table of Contents

    About Coler

    Protecting Coler from Climate Change

    Conclusion/QuestionsDraft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    3/19

    10 November 20153

    The Value of CRITICAL INFRASTRUCTURE lies inthe SERVICEit provides to THE PUBLIC

    ColerDraft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    4/19

    10 November 20154

    Coler Rehabilitation and Nursing Care Center (Coler)

    C Building

    B Building

    A Building

    S Building

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    5/19

    10 November 20155

    Coler

    ServesNYCs MostVulnerable

    Populations

    Coler is an essential health

    care provider More than 800 long term

    skilled nursing facility

    residents

    All with significant disabilitiesand chronic health

    conditions

    Significant number ofresidents have no health

    insurance

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    6/19

    610 November 2015

    Table of Contents

    About Coler

    Protecting Coler from Climate Change

    Conclusion/QuestionsDraft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    7/19

    10 November 20157

    Source: FEMA; CUNY Institute for Sustainable Cities

    Climate Change / 21stCentury ThreatsNew York City faces expanded vulnerability as sea levels continue to rise.

    Projected floodplain for the 2020s and 2050s

    FEMA 2015 Preliminary FIRMs 100-year Floodplain

    Projected 2020s 100-year Floodplain

    Projected 2050s 100-year Floodplain

    Source: FEMA; CUNY Institute for Sustainable Cities

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    8/19

    10 November 20158

    Climate Change / 21stCentury ThreatsNew York City faces expanded vulnerability as sea levels continue to rise.

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    9/19

    10 November 20159

    Sandy Inundation Model

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    10/19

    10 November 201510

    FEMA Public Assistance (428)

    Approved scope for repair and mitigation of

    damaged elements

    Must be cost-beneficial Community Development Block Grant (CDBG)

    10% local match to FEMA funding

    Being used to cover the cost of design

    How is this Project Funded?

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    11/19

    10 November 201511

    An Option for Protecting Coler

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    12/19

    10 November 201512

    By elevating the shoreline aroundthe northern end of the Island, we

    can both reduce the risk of water

    damage to the campus and create

    new public space for the RI

    community Together we can:

    Improve entry to Lighthouse Park

    Increase access to the waterfront by

    creating new recreation opportunities

    Protecting Coler Through Design

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    13/19

    1310 November 2015

    Additional Renderings

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    14/19

    1410 November 2015

    !"#$ &' ()##*+

    !"#$ &' &,# -'.&,

    !"#$ &' /0*,0&&0*

    122'.&)*"&"#+ 3'. $04#

    .#5)6&"'*

    Additional Renderings

    Solutions should be adaptableto changing context, and scalableto changing risk

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    15/19

    1510 November 2015

    !"#$ &' ()##*+

    !"#$ &' &,# -'.&,

    !"#$ &' /0*,0&&0*

    122'.&)*"&"#+ 3'. $04#

    .#5)6&"'*

    Additional Renderings

    Solutions should be adaptableto changing context, and scalableto changing risk

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    16/19

    10 November 201516

    The entire project is expected to takeapproximately 4.5 years to complete

    This will include:

    Environmental Review: 1 year

    Design: 1.5 years

    Construction: 2 years

    0 4.5

    Env. Review Design Construction

    Project Schedule

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    17/19

    1710 November 2015

    Table of Contents

    About Coler

    Protecting Coler from Climate Change

    Conclusion/QuestionsDraft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    18/19

    10 November 201518

    Provides flood risk mitigation up to

    the 500-year level of protection forColer with low residual risk

    Maintains patient quality of life

    Integrates with surrounding land use

    Improved waterfront access

    Increases green spaces

    Conclusions

    Draft/Discussion only

  • 7/24/2019 Coler Roosevelt Island Flood Management

    19/19

    1910 November 2015

    Thank you for this opportunityWe are happy to answer your questions

    Draft/Discussion only