Collab 4/15/04 #1
EDM UIUC meeting 12/3/2004
Walter Sondheim, P-25, Los Alamosfor presentation to
The EDM CollaborationUIUC meeting, Urbana, IL
UCN storage/lifetime tests run at LANSCE
Collab 4/15/04 #2
EDM UCN lifetime measurement
Current status of EDM beamline:
EDM gate valve, released to shop for fabrication.
EDM/UCN switcher, release to shop for fabrication (2)
EDM test chamber, moved into Area-B, lid removed for inspection.
A Helitran pump has been identified for cooling acrylic trap.
A Cryotorr pump and gate valve are available to connect to the test chamber, along with a scroll pump.
All other beamline components are in the “design” stage.
Collab 4/15/04 #3
EDM View of UCN experiment
UCN beam height 108 in. from floor
B4 shield block, 60in. H. x 32in. x 72in.
Collab 4/15/04 #4
EDM Plan view of UCN experiment
Pre-polarizermagnet
AFP magnet
SCS spectrometer magnet
All three magnets shown Are superconducting
Collab 4/15/04 #5
EDM EDM test chamber on UCN beamline
Chamber is 40 in. dia. X 36 in. height, 4-32 in. flanges with 23.5india. ports.
8 in. dia. AcrylicTube, with diamondcoating, UCN trap
UCN trap-door
Direction ofbeam
Collab 4/15/04 #6
EDM LANSCE, exp. Area-B, UCN source
Experimental area-B is 78ft L x 60ft W x 23ft H
Liquid Helium cryogenic facilityUCN source
UCN lifetimeTest chamber
Collab 4/15/04 #7
EDM EDM beamline components
EDM switchEDM valve
EDM switch-2, nowa shutter
40 in
Collab 4/15/04 #8
EDM ARS model 3B Heli-tran, open cycle cryo. system
Collab 4/15/04 #9
EDM Cryo-Torr-8
Water vapor – 4,000 l/sec, Air – 1,500 l/sec, H2 – 2,500 l/sec
Collab 4/15/04 #10
EDM Area – B at LANSCE
Collab 4/15/04 #11
EDM Area – B at LANSCE
Collab 4/15/04 #12
EDM UCN guide switch, exploded view
Collab 4/15/04 #13
EDM UCN Gate Valve
Collab 4/15/04 #14
EDM Area – B at LANSCE
Collab 4/15/04 #15
EDM Tasks Needed . . . .
• There are a number of tasks needed in order to accept UCNs into the test chamber:
• . Locate operational Helitran• . Finalize length of beam flight path, between test cell/trap and
gate valve• . Develop design for new simple switch – obtain a 6” Conflat
cross• . Quartz UCN beam guides with diamond coating• . Scroll pump to evacuate test chamber and beamline• . Electrical isolation from UCN beamline• . Possible additional tasks yet to be defined . . . . .