Denver-Metro 10 Year Transmission PlanPrepared for Rule 3627, 2018
2019 Thornton Distribution Substation (New, PSCo)
2019 Pawnee-Daniels Park 345 kV Transmission (PSCo)20
1
21
2018 Moon Gulch Distribution Substation (New, PSCo)
2016 Cherokee-Ridge 230 kV Conversion (New, PSCo)
20
21
1
10
10
2019 NREL Substation (New, PSCo)
2018 Two Basins Relocation Project (PSCo)
19
12
12
19
2022 Barker Distribution Substation (PSCo)40
2022 High Point Distribution Substation (New, PSCo)
2022 Stock Show Distribution Substation (New, PSCo)
2022 Titan Distribution Substation (New, PSCo)
2022 Dove Valley Distribution Substation (New, PSCo)
TBD Sandy Creek Distribution Substation (New, PSCo)
TBD Solterra Distribution Substation (New, PSCo)
TBD Superior Distribution Substation (New, PSCo)
41
42
43
44
54
55
56
54
44
41
55
42
56
40 43