11
Columbia School District 2013 Bond Program

Columbia School District

Embed Size (px)

DESCRIPTION

2013 Bond Program. Columbia School District. Introductions Project Scope Review Project Timeline Anticipated Work Categories Bidding Procedures Project Contacts. Project Scope Review. Columbia Central High School (BP 02) Renovate new 7 th /8 th grade wing - PowerPoint PPT Presentation

Citation preview

Page 2: Columbia School District

• INTRODUCTIONS• PROJECT SCOPE REVIEW• PROJECT TIMELINE• ANTICIPATED WORK CATEGORIES• BIDDING PROCEDURES• PROJECT CONTACTS

Page 3: Columbia School District

PROJECT SCOPE REVIEW

COLUMBIA CENTRAL HIGH SCHOOL (BP 02)- RENOVATE NEW 7TH/8TH GRADE WING- NEW ADDITION - LOCKER ROOMS- ADMINISTRATION RENOVATION / SECURE ENTRANCE- UPGRADE FINISHES AND REPLACE DOORS / WINDOWS

THROUGHOUT H.S.- NEW ARCHITECTURAL AND SCIENCE LAB CASEWORK- UPGRADE BUILDING HVAC AND CONTROLS- UPGRADE BUILDING LIGHTING, FIRE ALARM, ELECTRICAL- UPGRADE TECHNOLOGY- SITEWORK – ATHLETICS, PARKING, BUS AND PARENT

DROP OFF AREAS

Page 4: Columbia School District
Page 5: Columbia School District
Page 6: Columbia School District

PROJECT SCOPE REVIEW

ELEMENTARY, INTERMEDIATE, AND OPTIONS SCHOOL (BP 03)

- RENOVATIONS TO ACCOMMODATE GRADE LEVEL RECONFIGURATION

- ADMINISTRATION RENOVATION / SECURE ENTRANCE- UPGRADE FINISHES AND REPLACE DOORS / WINDOWS

THROUGHOUT- RENOVATE TOILET ROOMS- NEW CASEWORK- UPGRADE BUILDING HVAC AND CONTROLS- UPGRADE BUILDING LIGHTING, FIRE ALARM,

ELECTRICAL- UPGRADE TECHNOLOGY

Page 7: Columbia School District

TIMELINE • BID PACK 02 – (HIGH SCHOOL)

– BID DOCUMENTS AVAILABLE WEEK OF OCTOBER 20, 2014– BIDS DUE WEEK OF NOVEMBER 17, 2014– BID REVIEW / POST BID INTERVIEWS TO SUPPORT 12/1/14

AWARDS

• CONSTRUCTION– 7TH/8TH GRADE WING 12/1/14 – 4/6/15 (SPRING BREAK)– LOCKER ROOM ADDITION START 3/30/15– REMAINING BUILDING START AFTER SCHOOL– ALL WORK SUBSTANTIALLY COMPLETE FIRST WEEK

SEPTEMBER 2015 FOR SCHOOL

• BID PACK 03 (ELEMENTARY AND MIDDLE SCHOOL)– START IN SOME AREAS AT SPRING BREAK (APRIL 2015)– BALANCE OF WORK IN SUMMER 2015

Page 8: Columbia School District

TIMELINE

Page 9: Columbia School District

ANTICIPATED WORK CATEGORIES

• DEMOLITION• STRUCTURAL CONCRETE• MASONRY• STRUCTURAL /

MISCELLANEOUS STEEL• GENERAL TRADES• ROOFING• ALUMINUM / GLASS & GLAZING• DRYWALL / ACOUSTICAL /

PLASTER• RESILIENT FLOORING AND

CARPET• HARD TILE• PAINTING AND COATINGS

• LOCKERS• INTERIOR & EXTERIOR

SIGNAGE / BANNERS• PLUMBING• HVAC• ELECTRICAL / FIRE ALARM• EARTHWORK AND UTILITIES• ASPHALT PAVING / STRIPING• ATHLETIC SURFACES /

EQUIPMENT• SITE CONCRETE• FENCING• LANDSCAPE / TURF & GRASS /

PLANTINGS

Page 10: Columbia School District

QUESTIONS & ANSWERS• Question: Will there be a local preference for the bids? 

Answer: No, however the owner has the right to accept or reject any or all offers.

•  Question: Will plans and specifications be available at ABC Reproduction? Answer: Yes. Bid Docs can be reviewed on Granger FTP site. 

• Question: Will the mechanical package be one package (Plumbing/HVAC) or separate packages?

Answer: Separate packages

• Will this be a prevailing rate job?  Answer: Yes

• Will certified payroll be required?  Answer: Yes

• Will a bid bond be required in the amount of 5% be required?  Answer: Yes

• Will a performance bond be required?  Answer: Yes