ME 486ME 486

4/25/034/25/03

Combustion Air Pre-heater

ME 486ME 486

4/25/034/25/03

Final Design Presentation

Photo courtesy of David Pedersen

Page 2: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

224/25/034/25/03 Carl VanceCarl Vance

Purina Boiler Efficiency TeamPurina Boiler Efficiency Team

Members and RolesMembers and Roles Ryan CookRyan Cook

Documenter and SecretaryDocumenter and Secretary

Kofi CobbinahKofi CobbinahTeam Leader and Website ManagerTeam Leader and Website Manager

Carl VanceCarl Vance

Communicator and HistorianCommunicator and Historian

Matt BishopMatt BishopFinancial Officer and MediatorFinancial Officer and Mediator

Page 3: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

334/25/034/25/03 Carl VanceCarl Vance

Our Client – NestléOur Client – Nestlé Purina Purina

Client Contact:Client Contact: John Cain John Cain

Manager of Engineering at the Flagstaff Manager of Engineering at the Flagstaff Plant. Plant.

NAU Graduate in Mechanical EngineeringNAU Graduate in Mechanical Engineering

Purina as a company:Purina as a company:Flagstaff Plant opened in 1975Flagstaff Plant opened in 1975

Employs 180 peopleEmploys 180 people

Purina is now a division of Nestlé FoodsPurina is now a division of Nestlé Foods

Page 4: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

444/25/034/25/03 Carl VanceCarl Vance

Project DescriptionProject Description

Problem DefinitionProblem Definition NestlNestlé Purina has requested a design for a é Purina has requested a design for a

combustion air pre-heater. The goal of the combustion air pre-heater. The goal of the project is to provide savings for the plant by project is to provide savings for the plant by reducing energy costs and improving reducing energy costs and improving efficiency in the steam system.efficiency in the steam system.

Page 5: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

554/25/034/25/03 Carl VanceCarl Vance

Our Design PhilosophyOur Design Philosophy

Finish Design On Time and Under Budget.Finish Design On Time and Under Budget.

Satisfy the Client’s Requirements.Satisfy the Client’s Requirements.

Design for Safety.Design for Safety.

Act with Integrity.Act with Integrity.

Page 6: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

664/25/034/25/03 Carl VanceCarl Vance

Client’s RequirementsClient’s Requirements

Client’s Needs Statement:Client’s Needs Statement:

Design of a combustion air preheater must Design of a combustion air preheater must be:be: Economically FeasibleEconomically Feasible Minimize Modifications to Existing SystemsMinimize Modifications to Existing Systems Show an improvement in evaporation rate.Show an improvement in evaporation rate.

Page 7: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

774/25/034/25/03 Carl VanceCarl Vance

Purina Steam SystemPurina Steam System

The boiler produces approximately 500,000 The boiler produces approximately 500,000 lbm of steam per day. lbm of steam per day.

40%: cooking products.40%: cooking products.

50%: drying products.50%: drying products.

10%: miscellaneous areas: air and water 10%: miscellaneous areas: air and water heating systems.heating systems.

Steam production is 2/3 of the plant's total Steam production is 2/3 of the plant's total energy use.energy use.

Page 8: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

884/25/034/25/03 Carl VanceCarl Vance

Basic Basic Boiler OperationBoiler Operation

Source: Source: Reducing Energy CostsReducing Energy Costs, KEH Energy Engineering, 1990., KEH Energy Engineering, 1990.

Page 9: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

994/25/034/25/03 Carl VanceCarl Vance

What is a Combustion Air What is a Combustion Air PreheaterPreheater

Device or system that heats the boiler Device or system that heats the boiler intake air before it enters the combustion intake air before it enters the combustion chamber.chamber.

Uses recaptured waste heat that would Uses recaptured waste heat that would normally leave the boiler to the normally leave the boiler to the atmosphere. atmosphere.

Page 10: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

10104/25/034/25/03 Carl VanceCarl Vance

Source: Source: Reducing Energy CostsReducing Energy Costs, KEH Energy Engineering, 1990., KEH Energy Engineering, 1990.

Page 11: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

11114/25/034/25/03 Carl VanceCarl Vance

Design OptionsDesign Options

What are the industry standards?What are the industry standards?

Which design best meets our client’s Which design best meets our client’s requirements.requirements.

Page 12: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

12124/25/034/25/03 Carl VanceCarl Vance

Runaround SystemRunaround System

Source: Source: Canadian Agriculture Library, http://www.agr.gc.ca/cal/calweb_e.htmlCanadian Agriculture Library, http://www.agr.gc.ca/cal/calweb_e.html

Page 13: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

13134/25/034/25/03 Carl VanceCarl Vance

Gas - to - Gas Plate Heat Gas - to - Gas Plate Heat ExchangerExchanger

Source: Source: Canadian Agriculture Library, Canadian Agriculture Library, http://www.agr.gc.ca/cal/calweb_e.htmlhttp://www.agr.gc.ca/cal/calweb_e.html

Page 14: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

14144/25/034/25/03 Ryan CookRyan Cook

Concentric Duct DesignConcentric Duct Design

Source: Canadian Agriculture Library, http://www.agr.gc.ca/cal/calweb_e.html

Page 15: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

15154/25/034/25/03 Ryan CookRyan Cook

Design ChoiceDesign Choice

Final Design Choice: Final Design Choice: Concentric Duct DesignConcentric Duct Design

Air enters into a duct that surrounds the Air enters into a duct that surrounds the stack.stack.

The stack transfers heat to the air by The stack transfers heat to the air by convection and radiation.convection and radiation.

The air enters into the boiler at a higher The air enters into the boiler at a higher temperature.temperature.

Page 16: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

16164/25/034/25/03 Ryan CookRyan Cook

Why a Concentric Duct?Why a Concentric Duct?

InexpensiveInexpensiveNo modifications to current systemNo modifications to current systemSimple Design that WorksSimple Design that WorksPassive SystemPassive System

Page 17: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

17174/25/034/25/03 Ryan CookRyan Cook

Design BenefitsDesign Benefits

Concentric Duct Design Will Provide:Concentric Duct Design Will Provide: Relatively Low Installation CostRelatively Low Installation Cost Low Material CostsLow Material Costs Low Impact on Existing SystemsLow Impact on Existing Systems High Payback on InvestmentHigh Payback on Investment Low Maintenance CostsLow Maintenance Costs

Page 18: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

18184/25/034/25/03 Ryan CookRyan Cook

Preheater Design BasicsPreheater Design Basics

Page 19: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

19194/25/034/25/03 Ryan CookRyan Cook

Given ConditionsGiven Conditions

Exhaust Stack Surface TemperatureExhaust Stack Surface Temperature 399 K = 258 degrees Fahrenheit399 K = 258 degrees Fahrenheit

Inlet Air TemperatureInlet Air Temperature 305 K = 89 degrees Fahrenheit305 K = 89 degrees Fahrenheit

Exhaust Stack HeightExhaust Stack Height 4.3 meters4.3 meters

Exhaust Stack DiameterExhaust Stack Diameter 3 feet = 0.9144 meters3 feet = 0.9144 meters

Page 20: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

20204/25/034/25/03 Ryan CookRyan Cook

Specifications to dateSpecifications to date

The exhaust stack height is 4.3 meters, The exhaust stack height is 4.3 meters, which fixes our duct height and will provide which fixes our duct height and will provide the surface area for heat transfer.the surface area for heat transfer.

Duct diameter will be 1.05 meters to Duct diameter will be 1.05 meters to optimize forced convection.optimize forced convection.

Mass flow rate of air through duct will be Mass flow rate of air through duct will be 4.52 kg/s. This gives an air velocity of 4.52 kg/s. This gives an air velocity of 13.56 m/s.13.56 m/s.

Page 21: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

21214/25/034/25/03 Ryan CookRyan Cook

Temperature DistributionTemperature Distribution

Page 22: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

22224/25/034/25/03 Ryan CookRyan Cook

Our DesignOur Design

Page 23: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

23234/25/034/25/03 Ryan CookRyan Cook

Our DesignOur Design

Page 24: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

24244/25/034/25/03 Ryan CookRyan Cook

InstallationInstallation

Two half tubes that will be welded together Two half tubes that will be welded together around the stack.around the stack.

Spacers will be inserted along the bottom Spacers will be inserted along the bottom to to keep the duct steady.to to keep the duct steady.

Will be hung by threaded rod supports Will be hung by threaded rod supports from the ceiling.from the ceiling.

Page 25: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Mathematical ModelsMathematical Models

Convection ModelConvection Model

Heat Exchanger ModelHeat Exchanger Model

Drag ModelDrag Model

Radiation ModelRadiation Model

Insulation ModelInsulation Model

Page 26: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Known Values for ConvectionKnown Values for Convection

Volumetric Flow Rate = 2.84 mVolumetric Flow Rate = 2.84 m33/s/s

Thermal Conductivity = .0263 W/(m*K)Thermal Conductivity = .0263 W/(m*K)

Kinematic Viscosity = 1.59E –05 mKinematic Viscosity = 1.59E –05 m22/s/s

Prandlt Number = 0.707Prandlt Number = 0.707

TTs s – T– Taa = 100 K = 100 K

Stack Surface Area = 12.26 mStack Surface Area = 12.26 m22

Stack Diameter = 0.9144 mStack Diameter = 0.9144 m

Page 27: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Convection ModelConvection Model

variable

O.D. (D2) I.D. (D1) hydraulic diameter X section area (m^2) airspeed (m/s) Re1 0.9144 0.086 0.13 22.04 59300

1.05 0.136 0.21 13.56 578001.1 0.186 0.29 9.66 56400

1.15 0.236 0.38 7.43 550001.2 0.286 0.47 5.98 53700

Page 28: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Convection ModelConvection Model

Pr Nu h (W/(m^2 K)) Ts - Ta (K) q" stack S.A (m^2) Energy transfer (W)0.707 131.8 40.49 100 4050 12.26 49700

129.1 25.04 2500 30700126.6 17.94 1790 21900124.1 13.85 1390 17000121.8 11.22 1120 13700

Page 29: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Convection Model SavingsConvection Model Savings

Estimate

Btu/h Yearly Btu Savings Gallons per year saved Yearly monetary savings 5- year savings 169600 1.038E+09 6920 $3,180 $15,900104800 6.410E+08 4270 $1,960 $9,80074700 4.570E+08 3050 $1,400 $7,00058000 3.550E+08 2370 $1,090 $5,45046700 2.860E+08 1910 $880 $4,400

Page 30: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Known Values for Known Values for Heat Exchanger Heat Exchanger

Cp,c = 1007 (J/kg*K) Cp,c = 1007 (J/kg*K)

Cp,h = 1030 (J/kg*K)Cp,h = 1030 (J/kg*K)

hhi i = 17.31 (W/m = 17.31 (W/m22*K)*K)

hhoo = 25.05 (W/m= 25.05 (W/m22*K)*K)

TTc,Ic,I = 305.4 (K) = 305.4 (K)

TTh,Ih,I = 509.1 (K) = 509.1 (K)

Mass Flow Rate = 4.52 kg/sMass Flow Rate = 4.52 kg/s

Page 31: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Heat Exchanger ModelHeat Exchanger Model

variableTh,o (K) Th,I (K) mdot h (kg/s) mdot c (kg/s) q (Watts)503.72 509.10 4.52 4.52 25050503.73 25000503.74 24950503.75 24910503.76 24860503.77 24810503.78 24770

Page 32: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Heat Exchanger ModelHeat Exchanger Model

result checkTc,I (K) Tc,o (K) Delta Tlm (K) U (W/m^2*K) Area (heat transfer)305.40 310.90 198.26 10.24 12.34

310.89 198.27 12.32310.88 198.28 12.29310.87 198.29 12.27310.86 198.30 12.25310.85 198.31 12.22310.84 198.32 12.20

Page 33: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Heat Exchanger SavingsHeat Exchanger Savings

Btu/h Yearly Btu Savings Gallons per year saved Yearly monetary savings 5- year savings85500 5.23E+08 3490 $1,610 $8,05085300 5.22E+08 3480 $1,600 $8,00085100 5.21E+08 3470 $1,600 $8,00085000 5.20E+08 3470 $1,600 $8,00084800 5.19E+08 3460 $1,590 $7,95084700 5.18E+08 3450 $1,590 $7,95084500 5.17E+08 3450 $1,590 $7,950

Page 34: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Known Values for Drag ModelKnown Values for Drag Model

Mass Flow Rate Mass Flow Rate

““a” = O.D. / 2a” = O.D. / 2

““b” = I.D. / 2b” = I.D. / 2

Page 35: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Drag ModelDrag Model

a (O.D./2) b (I.D./2) f duct friction head loss h f

0.5 0.4572 1.500 1.619E-03 2.0000.525 0.4572 1.500 1.660E-03 0.4900.55 0.4572 1.499 1.701E-03 0.1860.575 0.4572 1.499 1.744E-03 0.089

0.6 0.4572 1.498 1.786E-03 0.049

Page 36: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Drag ModelDrag Model

Sum of K values minor losses hm

0.25 6.1910.3 2.812

0.31 1.4750.35 0.9840.37 0.675

Page 37: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Drag Model CostsDrag Model Costs

specific energy loss (J/kg) power loss (W) kWh per year cost per year 5 year cost 80.3 363 2220 $133.2 $66632.4 146 890 $53.4 $26716.3 74 450 $27.0 $13510.5 47 290 $17.4 $877.1 32 200 $12.0 $60

Page 38: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Known Values for Radiation Known Values for Radiation

Inner and Outer DiametersInner and Outer Diameters

Emissivity of Steel Stack, εEmissivity of Steel Stack, ε1 1 = 0.87 = 0.87

Emissivity of Aluminum Duct, εEmissivity of Aluminum Duct, ε2 2 = 0.15= 0.15

Stack Surface AreaStack Surface AreaStefan- Boltzmann Constant Stefan- Boltzmann Constant σ = 5.67E –08 (W/(m2*Kσ = 5.67E –08 (W/(m2*K44))))Stack Temperature = 399.7 KStack Temperature = 399.7 KDuct Temperature = 322 KDuct Temperature = 322 K

Page 39: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Radiation ModelRadiation Model

variable

O.D. I.D. ε1 ε2 σ (W/(m2*K4)) stack surface area (m^2) T1 T2

1 0.9144 0.87 0.15 5.67E-08 12.26 399.7 3221.051.1

1.15

Page 40: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Radiation Model SavingsRadiation Model Savings

q (W) Btu/h Yearly Btu Savings Gallons per year saved Yearly monetary savings 5- year savings1620 5530 3.38E+07 225 $104 $5201690 5770 3.53E+07 235 $108 $5401750 5970 3.65E+07 243 $112 $5601820 6210 3.80E+07 253 $116 $580

Page 41: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Known Values for InsulationKnown Values for Insulation(Modeled as Fiberglass)(Modeled as Fiberglass)

R – Values:R – Values: Preheated Air = 0.559 (mPreheated Air = 0.559 (m2*2*K)/WK)/W Duct = 4.9E –04 (mDuct = 4.9E –04 (m2*2*K)/WK)/W Fiberglass Insulation = 16.78 (mFiberglass Insulation = 16.78 (m2*2*K)/W K)/W

(per inch)(per inch)

Average Temperature DifferenceAverage Temperature Difference

Page 42: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Insulation ModelInsulation Model

insulation thickness (inches) preheated air duct insulation0 R value 0.559 0.00041 0.001 0.559 0.00041 9.272 0.559 0.00041 18.534 0.559 0.00041 37.066 0.559 0.00041 55.59

Page 43: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

Insulation Model CostsInsulation Model Costs

q (watts) Btu/h yearly cost 5 year cost5.36 18.30 $0.34 $1.720.31 1.04 $0.02 $0.100.16 0.54 $0.01 $0.050.08 0.27 $0.01 $0.030.05 0.18 $0.00 $0.02

insulation thickness (inches)01246

Page 44: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

44444/25/034/25/03 Kofi CobbinahKofi Cobbinah

5 Year Savings Summary5 Year Savings Summary

Force ConvectionForce Convection $7980.00$7980.00

RadiationRadiation $540.00$540.00

Drag LossDrag Loss - $270.00- $270.00

Insulation LossInsulation Loss - $2.00- $2.00

Total Total $8250.00$8250.00

Page 45: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

45454/25/034/25/03 Kofi CobbinahKofi Cobbinah

Design EstimateDesign Estimate

Total implementation cost:Total implementation cost:

Materials--- $350Materials--- $350

Labor--- $1650 Labor--- $1650

Total of approximately: $2,000Total of approximately: $2,000Source: McGuire Construction Co.Source: McGuire Construction Co.

Page 46: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

46464/25/034/25/03 Kofi CobbinahKofi Cobbinah

Energy SavingsEnergy Savings

The energy added to the system was The energy added to the system was converted to kBtu’s per hour.converted to kBtu’s per hour.

Total kBtu’s per year saved = 553,000Total kBtu’s per year saved = 553,000

The evaporation rate will improve 1% for The evaporation rate will improve 1% for a daily average.a daily average.

Page 47: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

47474/25/034/25/03 Kofi CobbinahKofi Cobbinah

Financial SavingsFinancial Savings

The Financial Savings were based on fuel The Financial Savings were based on fuel oil at $0.46 per gallon and 150 kBtu/gallon.oil at $0.46 per gallon and 150 kBtu/gallon.

This provides a 5 year savings of $8,248.This provides a 5 year savings of $8,248.

Simple payback for the project is 1.3 Simple payback for the project is 1.3 years.years.

Page 48: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

48484/25/034/25/03 Kofi CobbinahKofi Cobbinah

Expenses Expenses

Total Expenses: $150.00Total Expenses: $150.00

Printing/Binding ---$100.00Printing/Binding ---$100.00

Photocopying --- $50.00Photocopying --- $50.00

Page 49: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

49494/25/034/25/03 Kofi CobbinahKofi Cobbinah

Time LogTime Log

Average individual Hours: 120.7Average individual Hours: 120.7

Total Team Hours: 482.8Total Team Hours: 482.8

Page 50: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

50504/25/034/25/03 Kofi CobbinahKofi Cobbinah

Our Appreciation Goes To:Our Appreciation Goes To:

Nestle Purina Company at Flagstaff.Nestle Purina Company at Flagstaff.

Mr. John Cain – Client Contact.Mr. John Cain – Client Contact.

Dr Peter Vadasz – Advisor.Dr Peter Vadasz – Advisor.

Dr. David Hartman – ME 486 Professor.Dr. David Hartman – ME 486 Professor.

Everyone at our presentation today.Everyone at our presentation today.

Page 51: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

51514/25/034/25/03 Kofi CobbinahKofi Cobbinah

Project WebsiteProject Website

http://www.cet.nau.edu/Academic/Design/http://www.cet.nau.edu/Academic/Design/D4P/EGR486/ME/02-Projects/Heat/index.D4P/EGR486/ME/02-Projects/Heat/index.htmhtm

Or go to Or go to www.cet.nau.eduwww.cet.nau.edu and click on and click on “Design 4 Practice” and follow links to “Design 4 Practice” and follow links to “Senior Project Websites” and click on our “Senior Project Websites” and click on our websitewebsite

Page 52: Combustion Air Pre- heater ME 486 4/25/03 Combustion Air Pre-heater ME 486 4/25/03 Final Design Presentation Photo courtesy of David Pedersen

52524/25/034/25/03 Kofi CobbinahKofi Cobbinah

ConclusionConclusion

The team has been able to prove that The team has been able to prove that adequate heat transfer is available to pay adequate heat transfer is available to pay for the design, reduce energy costs, and for the design, reduce energy costs, and improve the efficiency of the boiler.improve the efficiency of the boiler.