18
Commercial Kitchens Dalhousie University Case Study With the financial support:

Commercial Kitchens Dalhousie University Case Study With the financial support:

Embed Size (px)

Citation preview

Page 1: Commercial Kitchens Dalhousie University Case Study With the financial support:

Commercial KitchensDalhousie University

Case Study

With the financial support:

Page 2: Commercial Kitchens Dalhousie University Case Study With the financial support:

Commercial Kitchens – How it started

• Proposed project to students in Campus as a Living Laboratory course – (Jan. – April 2011)• How much energy and water is used in one Dal

kitchen?

Page 3: Commercial Kitchens Dalhousie University Case Study With the financial support:

Answer

• A lot of energy and water is used in kitchens. • Everything is much larger than a home kitchen, staff

are cooking long hours, and for a lot of people.

3

Page 4: Commercial Kitchens Dalhousie University Case Study With the financial support:

Kitchens & Dining Hall – Sustainability target area

• Due to the volume of food production, commercial-sized foodservice facilities are more energy and water-use intensive than office and classroom spaces. In addition, foodservices utilize large quantities of food and material inputs and impact waste diversion rates of these resources.

4

Page 5: Commercial Kitchens Dalhousie University Case Study With the financial support:

Commercial Kitchen Project: 2011-2013

5

Page 6: Commercial Kitchens Dalhousie University Case Study With the financial support:

Commercial Kitchen Workshop and Kitchen walks

Page 7: Commercial Kitchens Dalhousie University Case Study With the financial support:

Auditing

• We have eight commercial kitchens and a number of smaller food serving areas!

• Consultant’s report – high level recommendations - no detail equipment audits.

• There are hundreds of pieces of equipment

7

Page 8: Commercial Kitchens Dalhousie University Case Study With the financial support:

Method

1. Reviewed existing information such as ENERGY STAR® Guide for Commercial Kitchens and Food Services Technology Centre – Self Site Survey

2. Worked with Dal Food Services to create an inventory sheet with all equipment

3. Expanded inventory sheet to include other information from tools such as ENERGY STAR® calculator

Page 9: Commercial Kitchens Dalhousie University Case Study With the financial support:

Method

4. Created an audit sheet for student auditors

5.Metered older equipment that had no published energy data – used watt meter, Watt’s UP power meter, and fluke 1750 meter

6.Created a detailed report with findings, GHG emissions, energy, and costs savings

9

Page 10: Commercial Kitchens Dalhousie University Case Study With the financial support:

Findings• No speed drives on hoods, no metal sides, and some equipment

outside the hoods – impacting ventilation and creating noise• Some low-flow pre-rinse but others not• Old equipment in some areas –fryers, ice machines,

refrigeration• Many old Walk-in fridge/freezer fan motors/compressors • Dishwasher and pre-rinse station – older• Leaky taps• Frost build up – door insulation strip – needed fixing• Opportunity to switch to natural gas• Behavioural opportunities • Redesign opportunity• Lighting upgrade potential, timers in walk-ins• Waste bin arrangement, education, and signs opportunities

Page 11: Commercial Kitchens Dalhousie University Case Study With the financial support:
Page 12: Commercial Kitchens Dalhousie University Case Study With the financial support:
Page 13: Commercial Kitchens Dalhousie University Case Study With the financial support:
Page 14: Commercial Kitchens Dalhousie University Case Study With the financial support:

Immediate Actions

• Replaced old Bakers Oven with new ENERGY STAR ovens – Projected 20% energy savings

• Replaced older dishwasher with new ENERGY STAR dishwasher

14

Page 15: Commercial Kitchens Dalhousie University Case Study With the financial support:

Actions

• Completed auditing report, thesis, refrigeration audit• Major retrofit of largest kitchen to address all

recommendations include major investment in new equipment from fryers, to fridges, ovens, …

Page 16: Commercial Kitchens Dalhousie University Case Study With the financial support:

Actions

• Follow-up audits to confirm work is done is resulting in need for more education and regular preventative maintenance checks. – Low flow pre-rinse head was initially leaking.

16

Page 17: Commercial Kitchens Dalhousie University Case Study With the financial support:

Conclusion

Costs

• Studies and student auditing• Thesis work• Time

Benefits• $ cost, GHG, energy, waste and

water savings identified – kitchen equipment, water, lighting, walk-in fridge-freezer compressors/motors, VSD for hoods and metal siding, waste management, pre-rinse station water, water leaks, water left on, flow heads

• Sustainability leadership• Education – Team building

17

Page 18: Commercial Kitchens Dalhousie University Case Study With the financial support:

Next Steps

• Finish developing education program with Food Services.

• Preventative maintenance checks for kitchens – every two months by utility service staff.

• Finish ventilation study designs (outside contractor).• Finance more equipment and other kitchen system

upgrades. $300,000 In ENERGY STAR kitchen equipment invested this year.

18