COMMERCIAL PERMITS Expedited Permit Process The following submittals are required to qualify for expedited permit process SUBMITTAL REQUIREMENTS A permit application signed & notarized and 2 copies of the below stated documents must be submitted for review. PERMIT TYPES EXCLUSIONS - To following conditions must apply in order to qualify for the Expedited Permit Process 1. There can be no tree removal required or requested as part of the permit requirements. 2. The property must not be located in a Historic or NCD3 District, or have any existing code violations. 3. Does not apply to application in need of a Waiver, Warrant, Exception, Variance, or Replat. 4. A turnaround time of no more than 2 separate 7 day periods must be adhered to from the application design professional. Fence Flooring Replacement Waterproofing Window Replacements Storefronts Shutter Installation/Replacement Awning/Canopies/Trellis Roofing Burglar Alarm Access Control Devices (Less than 20) Interior Wiring Lights/Receptacles Any Hard Wired or Plug-in Electrical Equipment Service Upgrade or Repair Fire Alarm Devices (Less than 50) A/C Change-outs A/C Stand Replacement for a Re-roof Chiller & Cooling Tower Replacements Boiler Replacements Miscellaneous Piping Pool Heaters Temporary Toilet Sewer Cap Sewer Repair Plumbing Fixture Replacement Water Service Repair/Replacement Signed and sealed survey (no more than 1 year old) depicting location of fence and a detail of the fence up to 6 ft. in height. Up to 8 ft. in height, requires Architect/Engineer signed calculations and details. If fence is located within undedicated right of way, a complete temporary encroachment covenant application with supporting documents must be submitted for approval prior to permit application. Floor plan and Key plan. if flooring replacement is located on a 2nd floor or above, it must provide sound proofing specifications that comply with minimum FBC requirements. The Roofing Package which includes an Instruction Page with all required documents depending on the type of roof/waterproofing work being done. Floor plan showing location of windows, signed and sealed design pressures, and Miami-Dade County NOA or State of Florida Product Approval. Floor plan showing location, signed and sealed design pressures, and Miami-Dade County NOA or State of Florida Product Approval. Floor plan showing location of proposed shutters, signed and sealed design pressures, and Miami-Dade County NOA or State of Florida Product Approval. Signed and sealed survey (no more than 1 year old) and a plan with details and structural calculations depicting location of proposed awning/canopy. Trellis requires Architect/Engineer signed calculations, plan and details. The Roofing Package which includes an Instruction Page with all required documents depending on the type of roof work being done and the Roofing Considerations Form. Both can be found on our website at www.miamigov.com/building under the roofing dropdown list. Permit Application only, signed and notarized by owner and Electrical Contractor. Signed and sealed plans. Signed and sealed plans. Replacement only: Application only, signed and notarized by owner and Electrical Contractor. Signed and sealed plans. Cut sheets and signed and sealed plans showing location of devices. For Condos & Apartments: Application only, signed and notarized by owner and Mechanical contractor. For all other commercial property: Signed and sealed plans required. Plan showing roof layout and Miami-Dade County NOA for stand. Signed and sealed plans. Signed and sealed plans. Signed and sealed plans. Over $7,500 requires signed and sealed plans. Permit Application only, signed and notarized by owner and contractor. Permit Application only, signed and notarized by owner and contractor. Site plan showing location of repair. Floor plan showing location of fixture. Site plan showing location of repair/replacement.

COMMERCIAL PERMITS - ci.miami.fl.usci.miami.fl.us/Building/images/2014Images/Recent... · The Roofing Package which includes an Instruction Page with all required documents depending

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMMERCIAL PERMITS - ci.miami.fl.usci.miami.fl.us/Building/images/2014Images/Recent... · The Roofing Package which includes an Instruction Page with all required documents depending

COMMERCIALPERMITSExpedited Permit ProcessThe following submittals are required to

qualify for expedited permit process

SUBMITTAL REQUIREMENTSA permit application signed & notarized and 2 copies of the below stated documents must be submitted for review.

PERMIT TYPES

EXCLUSIONS - To following conditions must apply in order to qualify for the Expedited Permit Process 1. There can be no tree removal required or requested as part of the permit requirements. 2. The property must not be located in a Historic or NCD3 District, or have any existing code violations. 3. Does not apply to application in need of a Waiver, Warrant, Exception, Variance, or Replat. 4. A turnaround time of no more than 2 separate 7 day periods must be adhered to from the application design professional.

Fence

Flooring Replacement

Waterproofing

Window Replacements

Storefronts

Shutter Installation/Replacement

Awning/Canopies/Trellis

Roofing

Burglar Alarm

Access Control Devices (Less than 20)

Interior Wiring Lights/Receptacles

Any Hard Wired or Plug-in Electrical Equipment

Service Upgrade or Repair

Fire Alarm Devices (Less than 50)

A/C Change-outs

A/C Stand Replacement for a Re-roof

Chiller & Cooling Tower Replacements

Boiler Replacements

Miscellaneous Piping

Pool Heaters

Temporary Toilet

Sewer Cap

Sewer Repair

Plumbing Fixture Replacement

Water Service Repair/Replacement

Signed and sealed survey (no more than 1 year old) depicting location of fence and a detail of the fence up to 6 ft. in height. Up to 8 ft. in height, requires Architect/Engineer signed calculations and details. If fence is located within undedicated right of way, a complete temporary encroachment covenant application with supporting documents must be submitted for approval prior to permit application.

Floor plan and Key plan. if flooring replacement is located on a 2nd floor or above, it must provide sound proofing specifications that comply with minimum FBC requirements.

The Roofing Package which includes an Instruction Page with all required documents depending on the type of roof/waterproofing work being done.

Floor plan showing location of windows, signed and sealed design pressures, and Miami-Dade County NOA or State of Florida Product Approval.

Floor plan showing location, signed and sealed design pressures, and Miami-Dade County NOA or State of Florida Product Approval.

Floor plan showing location of proposed shutters, signed and sealed design pressures, and Miami-Dade County NOA or State of Florida Product Approval.

Signed and sealed survey (no more than 1 year old) and a plan with details and structural calculations depicting location of proposed awning/canopy. Trellis requires Architect/Engineer signed calculations, plan and details.

The Roofing Package which includes an Instruction Page with all required documents depending on the type of roof work being done and the Roofing Considerations Form. Both can be found on our website at www.miamigov.com/building under the roofing dropdown list.

Permit Application only, signed and notarized by owner and Electrical Contractor.

Signed and sealed plans.

Signed and sealed plans.

Replacement only: Application only, signed and notarized by owner and Electrical Contractor.

Signed and sealed plans.

Cut sheets and signed and sealed plans showing location of devices.

For Condos & Apartments: Application only, signed and notarized by owner and Mechanical contractor. For all other commercial property: Signed and sealed plans required.

Plan showing roof layout and Miami-Dade County NOA for stand.

Signed and sealed plans.

Signed and sealed plans.

Signed and sealed plans.

Over $7,500 requires signed and sealed plans.

Permit Application only, signed and notarized by owner and contractor.

Permit Application only, signed and notarized by owner and contractor.

Site plan showing location of repair.

Floor plan showing location of fixture.

Site plan showing location of repair/replacement.