Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

1111

Commissioning

the Apollo Solar Cabinets

Apollo Solar, Inc.23 F. J. Clarke Circle

Bethel, Connecticut 06801

USA

+1 203 790-6400

www.ApolloSolar.com

Page 2: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

2

SAFETY FIRST

WARNINGS:

The Apollo Solar Cabinet is energized by multiple sources.

Turn OFF all sources of power before working in the cabinet.

Lethal Voltages inside Cabinets.

Use insulated tools.

Wear insulating gloves.

Page 3: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

3

APOLLO SOLAR – REMOTE ENERGY SYSTEM – SYSTEM WIRING DIAGRAM

VOLTAGE SENSE +

VOLTAGE SENSE -

SYSTEM POWER +

SYSTEM POWER -

TEMPERATURE SENSEBATTERY +48V

BATTERY -48V

GSM ANTENNA

FOR MODEM

OUTSIDE OF

CABINET

6 ALARM OUTPUTS

PAIRS OF DRY

CONTACTS

EARTH

GROUND

PV THEFT ALARM

This wire is stitched through the frame

of every PV module. Breaking the wire

triggers the alarm.

End-of-Life switch on MOVs in the

Combiner Box are wired in series.

Any MOV can trigger an alarm.

PV INPUTSEXT ALARM

INPUTS

PV INPUTS TO THE T80HV CHARGE

CONTROLLERS ARE 75V TO 180V

AT 50 AMPS MAX EACH

GROUNDING NOTE:

The PV Array Frames and the Racking System

must be tied directly to Earth Ground.

The Combiner Box Ground should run with the

power wires back to the Charger Cabinet.

SYSTEM

EARTH

GROUND

48V DCESSENTIAL

LOADS 50A

NON-ESSENTIAL

LOADS 50A

AA

AB

AF

AG

PT

UV

AH

AI

AJ

AK

M N J K

GH

AD

AE

70

S1 S2S3 S4+ - + - + -

EC

FC

MOV EOL

PV THEFT ALARM

48 VOLT BATTERY BANK

WITH 2 STRINGS OF BATTERIES

BY OTHERS

APOLLO

IRRADIANCE

SENSOR AT

PV ARRAY

BATTERY BREAKER TRIPPED

LOAD BREAKER TRIPPED

LOW BATTERY VOLTAGEHIGH CABINET TEMPERATUREHIGH BATTERY VOLTAGEHIGH BATTERY TEMPERATURE

XS

+RED

-BLACK

GN

D

+ -P

AIR

OF

AW

G 4

/0

PA

IR O

F A

WG

4/0

+ - + -

APOLLO PVT

CABINET

+ -+ -+ - + -APOLLO TEMP

SENSOR ON

SIDE OF

BATTERY

250A

BATTERY

BREAKERS BK

48 VOLT 10kW

RECTIFIER

BY OTHERS48V DC

48V DC

+

-

+

-

+

-230VAC

NEUTRAL

GROUND

GROUND

230VAC 50Hz

DIESEL

GENERATOR

BY OTHERSBJ

CONTACT CLOSURE TO START GENERATORG

ND

PV ARRAY

APOLLO COMBINER

BOX WITH SURGE

PROTECTION DEVICE

PV ARRAY

APOLLO COMBINER

BOX WITH SURGE

PROTECTION DEVICE

PV ARRAY

APOLLO COMBINER

BOX WITH SURGE

PROTECTION DEVICE

PV ARRAY

APOLLO COMBINER

BOX WITH SURGE

PROTECTION DEVICE

23 F. J. Clarke Circle

Bethel, Connecticut 06801

USA +1 203 790 6400

www.ApolloSolar.com

27-MAR-2017 J. PFEIFER

ENERGY SYSTEM BLOCK DIAGRAM

REV 1

WITH HYBRID SOLAR / DIESEL OPTION

RECTIFIER

INPUT

GN

D

GN

D

GN

D

Page 4: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

4

Commissioning - Overview

Commissioning is the final and MOST CRITICAL Quality Control step for the Installation Company.

Thorough Commissioning assures Safety and Performance of the Tower Energy System.

The Commissioning Report is often the key deliverable to trigger payment from the Mobile Carrier.

The Commissioning Report establishes the baseline for all maintenance and support in the future.

Apollo Solar reserves the right to request copies of all Commissioning Reports to help us protect the

reputation of the equipment which we manufacture.

1. Verify that applicable equipment and systems are installed according to the contract

documents, manufacturer’s recommendations and industry accepted minimum standards.

2. Verify that the energy system meets the requirements of the end-user / customer.

3. Verify that installing team performs adequate operational checkout.

4. Verify and document proper performance of equipment and systems.

5. Verify that the operations and maintenance (O&M) documentation left on-site is complete.

6. Verify that the owner’s operating personnel are adequately trained.

COMMISSIONING TASKS:

These major categories must be verified in addition to the detailed checklist.

THE PURPOSE OF COMMISSIONING:

Page 5: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

5

Commissioning – Check List

1. Verify that the installation is complete, safe and done with good workmanship.

2. Verify that all components of the installation are robust and permanent.

3. Document as-built conditions including PV Module Outputs, Battery Voltages and Torques.

Suggested tables for these items and photos of test point locations are included in this presentation.

4. Verify system performance against established benchmarks.

5. Verify complete and proper system operation.

6. Complete all required acceptance documentation for the system owner.

The Commissioning should be done by someone other than those who wired the system.

The Commissioning party must have the authority to ask for errors to be corrected and retested.

Measurements of the PV Array should be done when there is irradiance of greater than 400 W/m2.

Allow enough time to do a complete job.

Do not try to squeeze the Commissioning in at the end of the day.

Now that the Purposes and Concepts are clear, we will go over the detailed checklist.

Each Installation Company will have an established Commissioning Procedure. Apollo Solar is not

trying to change that procedure, but simply highlighting details that are specific to the Apollo equipment.

GENERAL RULES:

Page 6: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

6

Commissioning – Tools RequiredA typical set of tools required for Commissioning of the Apollo Solar remote energy system includes:

Insulated Torque Wrench (1.5 to 22 N-m) with bits to fit the following bolts or screw heads:

Phillips head screws

Slotted head screws

8mm Allen head screws

½” and 9/16” Socket for hex head bolts

DC Voltmeter – Handheld digital multi-meter which can read up to 250 volts DC

Ammeter – Handheld digital multi-meter with a clamp-on DC current probe for up to 500Amps

Irradiance Meter – Handheld meter with readout in Watts/m2 See suggested meters below.

Both of these Irradiance meters are available on line from Tequipment.net.

The Seaward Solar Survey 100

Price: $345

In addition to Irradiance, it can

be used to measure ambient

temperature and PV module

temperature.

The TPI Solar Irradiance Meter

Price: $125 to $150

Low cost meter for Irradiance.

Knipex Electrician's Insulated

Torque Wrench $480.

Page 7: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

7

Commissioning

REMOTE ENERGY SYSTEM - COMMISSION REPORT

LOCATION:

DATE:

BATTERY TESTING - ALL CHARGING AND LOADS DISCONNECTED FOR AT LEAST 1 HOUR

INITIAL VOLTAGES OF CELLS

STRING NUMBER: 1 STRING NUMBER: 2 STRING NUMBER: 3 STRING NUMBER: 4

CELL

NUM

CELL

VOLTAGE

CELL

NUM

CELL

VOLTAGE

CELL

NUM

CELL

VOLTAGE

CELL

NUM

CELL

VOLTAGE

1 1 1 1

2 2 2 2

3 3 3 3

4 4 4 4

5 5 5 5

6 6 6 6

7 7 7 7

8 8 8 8

9 9 9 9

10 10 10 10

11 11 11 11

12 12 12 12

13 13 13 13

14 14 14 14

15 15 15 15

16 16 16 16

17 17 17 17

18 18 18 18

19 19 19 19

20 20 20 20

21 21 21 21

22 22 22 22

23 23 23 23

24 24 24 24

COMMISSION BY:INSTALLATION BY:

REMOTE ENERGY SYSTEM - COMMISSION REPORT

LOCATION:

DATE:

COMMISSION BY:

PV ARRAY TEST DATA

SUB-

ARRAY

STRING

NUMBER

STRING

VOLTAGE

IRRADIANCE

VALUE

ARRAY

TEMPERATURE

MODULE 1

VOLTAGE

MODULE 2

VOLTAGE

MODULE 3

VOLTAGE

1 1

1 2

1 3

1 4

1 5

1 6

2 1

2 2

2 3

2 4

2 5

2 6

3 1

3 2

3 3

3 4

3 5

3 6

4 1

4 2

4 3

4 4

4 5

4 6

INSTALLATION BY:

SUGGESTED COMMISSIONG FORMS FOR PV ARRAYS AND BATTERIES

Verify that the polarity is correct for every voltage measurement.

Page 8: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

8

Commissioning – Torque Values

Verify that each high current terminal is tightened to the torque value specified in the chart.

APOLLO SOLAR - PVT GEN4 PANELS - PRODUCTION QUALITY ASSURANCE - CRITICAL TERMINAL TORQUE TEST

The torque of all high current terminals are measured and must meet the specified torque +/- 10%.

DEVICE LOCATION TERMINALS TOOL NUMBER OF TORQUE TORQUE INSTALL CHECK

TERMINALS N-m in-lbs BY BY

DC Surge Protector Bottom edge of panel + and - Slotted Screw 2 1.5 13.3

DC Surge Protector Bottom edge of panel GND Slotted Screw 1 2.3 20

T80HV Charge Controller Master & 1 to 3 Slaves Ground Lugs on Heat Sink Slotted Screw 1 on each T80HV 2.3 20

Circuit Breakers 100A and 50A, 250V Both Ends Slotted Screw 4 to 8 2.3 20

Circuit Breakers All single pole breakers Both Ends Phillips Screw 6 to 12 2.3 20

T80HV Charge Controller 1 to 4 units Gnd Wire to Chassis Ring Phillips Screw 1 on each T80HV 2.3 20

PV Input Terminals Right side of panel Top Ends Slotted Screw 2 per PV string 4.5 40

Earth Ground Bus Bar Bottom edge of panel Slotted Screw 4.5 40

48 volt Bus Bars Positive & Negative Small gauge screws Slotted Screw Many 4.5 40

T80HV Charge Controller 1 to 4 units PV IN & BATT OUT Lugs Slotted Screw 4 on each T80HV 5.6 50

Contactor - 160A, Latching Center of panel M8 x 1.25 Studs 1/2" Socket 2 to 6 9.5 84

250A Battery Circuit Breakers Lower center of panel 8mm Hex drive box lugs 8mm Allen Hex 2, 4 or 6 20.3 180

500Amp Shunt Tied to Neg 48V bus bar 3/8" brass hex head bolts 9/16" Socket 2 21.7 192

48 volt Bus Bars Positive & Negative 3/8" brass hex head bolts 9/16" Socket 1 to 3 21.7 192

Shunt Bus Bar Bolted to Shunt 3/8" brass hex head bolts 9/16" Socket up to 4 21.7 192

SIGNATURES DATE PANEL S/N DATES:

SIGN-OFF BY PRODUCTION TECHNICIAN

SIGN-OFF BY QUALITY ASSURANCE SUPERVISIOR

Page 9: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

9

Commissioning Procedure – The PV Inputs

• CAUTION – During this procedure you will be working

around live conductors carrying lethal voltages.

Accuracy to +/- 1 volt is

sufficient. The PV Open

Circuit Voltages must be

between 75 volts and

180 volts.

PV ARRAY COMMISSIONING

1. Measure and record the Irradiance

before and after each step below.

2. In the Combiner Box, turn all the

Circuit Breakers ON. Measure and

record the Output Voltage of each

Combiner Box.

3. Turn all the Breakers OFF. Measure

the Open Circuit Voltage for each PV

string at the bottom of the circuit

breakers. Turn the breakers back ON.

4. In the Apollo cabinet, turn all the PV

Input Breakers OFF. With sun on the

PV array, carefully measure the DC

voltage at the PV Input Connectors.

Record each PV input separately.

PV-

AW

G 1

0

AW

G 6

AW

G 4

SU

RG

E

PR

OT

EC

T

ON

250V

16A

ON

250V

16A

ON

250V

16A

ON

250V

16A

ON

250V

16A

COMBINER BOX

Measure PV Open

Circuit Voltage for

each string with

Breakers OFF.

Measure Voltage

from each Combiner

with all Breakers ON.

+

+

-

-

Page 10: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

10

Apollo Solar Gen 4 Power-Up Procedure

Warning to Prevent Damage

ALWAYS TURN THE BATTERY POWER TO THE T80HV CHARGE CONTROLLERS

ON BEFORE TURNING ON THE PV INPUTS.

ALWAYS TURN THE PV INPUT OFF BEFORE TURNING THE BATTERY POWER

OR THE T80HV OUTPUT CIRCUIT BREAKERS OFF.

The T80HV Charge Controllers in this product operate from the battery power. The

microprocessors inside the T80HV must have voltage applied so they can control the

FETs which switch power from the PV input. If the PV input power is allowed into

these FETs without the T80HV circuitry running from battery power, the FETs can

be damaged. This damage is NOT covered by the warranty.

Page 11: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

Schematic Drawing of the

Apollo Hybrid Energy Cabinet

This Schematic represents a 2X

Cabinet. The 3rd and 4th T80HVs

are simply added to the space

between the other two.

This drawing shows the

reference designators for all the

parts and the numbers of each

wire.

EARTH GROUND BUS

Copyright 2015, 2016, 2017 Apollo Solar, Inc.

ALL INFORMATION ON THIS DRAWING

IS CONFIDENTIAL AND PROPRIETARY

TO APOLLO SOLAR, INC.

APOLLO SOLAR - GEN4 HYBRID SYSTEM – BLOCK DIAGRAM

EARTH

GROUND

PV ARRAY

FRAME SERIES

WIRE

APOLLO

BATTERY

TEMPERATURE

SENSOR

500A

SHUNT

AUX

CONTACTS

FOR MOV

END OF

LIFE

ESSENTIAL

LOADS

50A MAX

ALL CIRCUIT BREAKERS ARE

IEC / EN 60947-2 LISTED

NEG BUS

POS BUS

BU

S B

AR POSITIVE

GROUND POINT

A

71

CB

5

72

COM

N.C.

ANY PC

SERVER WITH

APOLLO

SOFTWARE AND

DATABASE

CB

2

BA

TT

ER

Y

HIG

H T

EM

P

EN

CL

OS

UR

E

HIG

H T

EM

P

DRY

CONTACT

ALARM

OUTPUTS

13

7

14

0

13

9

13

8

ASNET

CAT5

98

850 or

900MHz

EXT

ANTENNA

A2-

A1+

A2-A1+

12

24

14

2221

11

16

0A

LA

TC

HIN

G

CO

NT

AC

TO

R

RY6RY7

A

CB

18

LOAD

BKR

TRIP

ALARM

BATTERY

BREAKER

TRIP ALARM

BA

T T

RIP

AL

AR

M

1

2+

40

A2-

A1+

A2-A1+

12

24

14

2221

11

16

0A

LA

TC

HIN

G

CO

NT

AC

TO

R

RY4RY5 124

125

6869

70

144

145

146

155

154

149

SURGE PROTECTOR

DEVICES WITH AUX

CONTACTS ON MOVS IN

COMBINER BOXES

TO

AD

DIT

ION

AL

AL

AR

M O

UP

UT

S

PV ARRAY

EARTH

GROUND

MO

Vs

PV

AR

RA

Y

1

29

24V

24V

RETURN

A

C

CO

NN

EC

TIO

NS

TO

2N

D

CA

BIN

ET

IF

RE

QD

147

EARTH BUS

IRRADIANCE

SENSOR

X S

4/0

BU

S B

AR

95m

m2

APOLLO

SHUNT

BOARD

24V

RE

TU

RN

122

FE

68

69

5 A

MP

FU

SE

S

NON-ESSENTIAL

LOADS

50A MAX

13

51

36

CC

DO

OR

SW

ITC

H

TW

IST

ED

PA

IR

MO

Vs

PV

AR

RA

Y

5 VDC

REGULATOR

A

C

24V

5V

GSM +WiFi

GATEWAY

WiFi

ANT

A

C

24V

APOLLO SYSTEM CONROLLER

SD

US

B

US

B

RS

48

5

TW

IST

ED

PA

IR

BLUE

DATA-

FROM IRR

SENSOR

BLU/

WHT

DATA+

13

61

35

79A

79B

13

41

33

USB

ETHERNET

CAT5

24V A

D

A

C

RS

48

5

ALARM

INPUTS

EF CCJ K

M N

BATTERY

48 VOLTS

BATTERY

48 VOLTS

PARALLEL BATTERY STRINGS

AJ

AK U V

250A

BREAKER

ON EACH

BATTERY

STRING

47

2/0

CO

MN

.C.

AU

XC

OM

N.C

.T

RIP

CO

MN

.C.

TR

IPC

OM

N.C

.A

UX

67

CB

20

CB

21

6

163162

AA

AB

23 F. J. Clarke Circle

Bethel, Connecticut, 06801

USA +1 203 790-6400

www.ApolloSolar.com

6-MAR-2017 J. PFEIFER

REV 62

GEN4 POS GND HYBRID BLOCK DIAG

SOLENE – GUINEA CONAKRY

11

14

CIT

EL

48V

MO

V S

PD

150

AF

AG

15

7

15

6

44

ON

16A

ON

63A

ON

32A

UP

TO

5 L

OA

D

BR

EA

KE

RS

TO

TA

L

ON

16A

ON

63A

ON

32A

UP

TO

5 L

OA

D

BR

EA

KE

RS

TO

TA

L

DC

DISTRIBUTION

BREAKERS

ON

16AC

24V

RETURNC

8 CH

24BIT A/D

CONV

130 DATA-8

129 DATA+7

.1u

f

10

0o

hm

IN 0-

IN 0+12

1124V

141A

9PW+

24V

RETURN

142C

GND 10

IN 7+

IN 7- 6

5

IN 6+

IN 6- 4

3

IN 5+

IN 5-

1

2

IN 4+

IN 4- 19

20SPARE

AMBIENT

TEMP SENSOR

TO

LE

M C

UR

RE

NT

SE

NS

OR

S

PV ARRAY

APOLLO

COMBINERSPD

APOLLO SOLAR

T80HV MPPT

CHARGE

CONTROLLER

MASTER

CB

11

81

84 83

88

CB

10

82

87

85

ON

125VDC

100A

AP

OL

LO

50A

MP

SP

D

ON

63A

250V

PV ARRAY

APOLLO

COMBINERSPD

APOLLO SOLAR

T80HV MPPT

CHARGE

CONTROLLER

SLAVE 1

CB

13

91

94 93

88

CB

12

92

97

95

ON

125VDC

100A

AP

OL

LO

50

AM

P S

PD

ON

63A

250V

22

DIGITAL I/O

8 DRY CONTACT

INPUTS,

8 OPEN COLL

OUTPUTS

26

25

24

2117

16

15

27

DO 2

DO 3

DO 4

DI 0

DI 1

DO 0DO 1

DO 5

DI 4

DI 3

DI 2

DI 5

+VsDATA+ DATA-

GND

DO 6

DI 7

DO 7

DI 6

SPARES

D.GND

DO

COM

7

19131 132

23 126

C

24V

RETURN

22

18

INTERNET

INTERNET

LAPTOP

WiFi

LOCAL

GSM

TOWER

IN 3+18243

IN 3-17246

IN 2+16239

IN 2-242 15

IN 1+14235

IN 1-13238

41

LOAD1

LOAD2

DG INSPARE

DG V

SENSEZ

Y

63

A2-

A1+

A2-A1+

12

24

14

2221

11

16

0A

LA

TC

HIN

G

CO

NT

AC

TO

R

RYRY

ON

125VDC

100A

48VDC

INPUT FROM

RECTIFIER

100A MAX

2+

CIT

EL

48V

MO

V S

PD

TO A/D

CH6-

PIN4

19K

1K

A

2

1

43

ON

63A

250VOF

14

12

11

AU

X D

OF

14

12

11

AU

X C

ON

63A

250VOF

14

12

11

AU

X B

OF

14

12

11

AU

X A

35

621

C

22

4

3

HIGH BAT

VOLTAGE

LOW BAT

VOLTAGEALARM DRY CONTACTS

16

0

16

1

15

8

15

9

P T AH AI

AUX1 AUX2

TO AUX RELAYS

ON T80HV SLAVE 1

A2-A1+

12

24

14

2221

11

GEN START

A

24

7

24

8

249 250

BK

BJ

RY

10

255

256

257

260

259

258

230

231

123

261

261

26

2

263

23

2

234

ISO

LA

TE

D

24

V D

C

SU

PP

LY

233

233

A1+A1+

A2-A2-

2+

1

LEM 235

+5V

CA/D14

237

236LEM 243

244

245 +5V

CA/D18 LEM 239 A/D16

+5V

C240

241

89

7989

ASNET CAT5 79

.1u

f

256

CF

CE

CD

LM35

25

3

+5V

252

251

+4

8V

BU

S-4

8V

BU

S 20

A2-A1+

12

24

14

2221

11

48V FANS

A

37

64

Q R

RY

3

66 FUSE

38

FANS AND GEN START

ARE OPTIONS

230

264

Page 12: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

Apollo Hybrid Energy System

Assembly Drawing

This drawing is the Panel in the Gen4 Cabinet

showing all available options. Your panel may be

simplified.

The key Voltage Measurement points are called

out.

12

A2

A1

LO

AD

2

12

A2

A1

LO

AD

1

12

A2

A1

RE

CT

IFIE

R

INP

UT

175

mm

ALARMS

ALARM OUTPUTS

DO

OR

CO

MM

ON

BA

T B

RE

AK

ER

16

21

63

AA

AB

LO

AD

BR

EA

KE

R1

57

15

6A

FA

G

LO

W B

AT

VO

LT

15

81

59

P T

CA

BIN

ET

TE

MP

13

91

40

U V

HIG

H B

AT

VO

LT

16

01

61

AH

AI

BA

T H

IGH

TE

MP

13

71

38

AJ

AK C

12

61

8D

DL

AH

-24

s

s

EQP

LINE

+ -IR

RA

DIA

NC

E

SE

NS

OR

X S13

613

5

DL

AH

-24

s

s

EQP

LINE

ALARM

INPUTS

CO

MM

ON

DL

AH

-24

s

s

EQP

LINE

F CP

V A

RR

AY

MO

Vs

CO

MM

ON

16

17

C C6 5

+ -

BA

TT

ER

YF

US

EF

US

E6

96

8NM

67

63

KJ

+ -

BA

TT

ER

Y

TEMP

SENSOR

25

22

51

CE

CF

25

3C

D

150

mm

150

mm

175

mm

12

0m

m

+ - + - + - + -

MA

ST

ER

T80

HV

SL

AV

E 3

T80

HV

SL

AV

E 2

T80

HV

SL

AV

E 1

T80

HV

UP TO AWG 0,

50mm20

.0m

m

DA

TU

M

BATTERY WIRES ARE 4/0 or 95mm2

EA

RT

H

GR

OU

ND

INPUTS FROM

PV COMBINER

BOXES

44

0m

m

71

AWG

#8

560mm

930mm

+ -

BAT 1

+ -

BAT 2+ -

BAT 3

24

VO

LT

2.1

AM

P

PO

WE

R S

UP

PL

Y

46

3

47

15

0

NON ESSENTIAL

LOADS

50A TOTAL

43

43

14

9

41

14

7

621

35

15

6

15

7

35

PV

IN

BAT

OUT GND

TurboCharger

T80HV

MASTER

79

82

83

71

88 PV

IN

BAT

OUT GND

TurboCharger

T80HV

SLAVE 1

PV

IN

BAT

OUT GND

TurboCharger

T80HV

SLAVE 2

10

8

10

5

10

4

PV

IN

BAT

OUT GND

TurboCharger

T80HV

SLAVE 3

11

8

+48V IN-48V IN

GND-24V OUT

+24V OUT

34

21

40

14

6

85

95

10

51

07

11

71

15 11

4

10

4

94

84

85

89

13

71

38

14

01

39

95

94

89

99

92

93

98

10

2

10

3

11

2

11

4

11

3

11

5

99

16

11

60

15

91

58

93103

113

83

81

82

91

92

10

2

10

1

11

1

11

2

TO 1, 2 OR 3 PARALLEL STRINGS

OF BATTERIES

450mm

14

9

GND

TO

BATTERY

10

9

10

9

GSM ANT WiFi ANT

44

38

A

NOTE: DLAH SURGE PROTECTORS

WILL TAKE AWG14 (2mm) WIRES.

21T AWG8

21T AWG8

21T AWG8

21T AWG8

20

KA

MO

V

20KA

MOV

20

KA

MO

V

20

KA

MO

V

20

KA

MO

V

20KA

MOV

20

KA

MO

V

20

KA

MO

V

20KA

MOV

20

KA

MO

V

20

KA

MO

V

20KA

MOV

1222

1121

1424

A1A2

LO

AD

125

29

122

125

124

26

1222

1121

1424

A1A2

23

155

154

145

144

24 7

2

DS

23

0S

-

48

DC

SP

D

RE

CT

IFIE

R +

48V

DC

IN

-

12 22

11 21

14 24

A1 A2

RY3

FA

N

RE

LA

Y20

37

38

64

BA

T T

EM

P S

EN

SO

R

B/W BLU

E7

9ZY

131

132

79A

79B

133

134

129

130

TWISTED

PAIR

69

68

174 172 171 170 169173

41

147

144

5V

RE

G+

24

GN

D+

5V

12

3

66

235236237

239240241

12 22

11 21

14 24

A1 A2

RY10

GE

N

ST

AR

T

247

248

249

25

0

C C A AC A

15

27

B

155

29

154

37

2

141

B C

12

2

B

142

C

164

165

168

238

236

240

244

24

224

6

237

241

245

170

16

9169

16

77

19

166

168

17

0

A247

252

254

25

3

23

0

23

0

1222

1121

1424

A1A2

256

255

257

258

259

260

TO

A/D

243244245

97

255

257

259

258

264

126

1

LO

AD

2

RE

CT

IFIE

R

INP

UT

+ -

87

ON

125VDC

100A

ON

125VDC

100A

23

02

31

23

1

23

32

33

DS

23

0S

-

48

DC

SP

D

ESSENTIAL

LOADS

50A TOTAL

23

2

23

4

425

mmON

125VDC

100A

DG IN

72

ON

6A

80V

24V

CB2

HESSENTIAL

LOADS

ON ON ONON ON

63A

250V

63A

250V

32A

250V32A

250V16A

250V

H

ON ON ONON ON

63A

250V

63A

250V

32A

250V32A

250V16A

250V

NON-ESSENTIAL

LOADS

LEM

14

6

146

LEM

40

40

LE

M

AE

10 DC DISTRIBUTION BREAKERS

48

V F

AN

S6

6

64

Q RF

US

E

ON

63A

250V

ON

63A

250V

ON

125VDC

100A ON

63A

250V

ON

63A

250V

ON

125VDC

100A

OF

14

12

11

ON

63A

250VOF

14

12

11

CB5 OUT

OF

14

12

11

ON

63A

250VOF

14

12

11

CB18 OUT

12

3

A/D CONV IS UNDER THE ADAM

DIGITAL I/O

DI C

OM

DI

1

DI

0

D.G

ND

DO

7

DO

6

DO

5

DO

4

DO

3

DO

2

DO

1

DO

0

DO

CO

M

DI C

OM

DI 2

DI 3

DI 4

DI 5

DI 6

DI 7

N/A

INIT

*

DA

TA

+ (

Y)

DA

TA

- (G

)

+V

s R

GN

D (

B)

23

207

22

21

25

26

19

18

17

16

27

15

132

13

12

4

RS485

248

260

25

6

ETH

Apollo System Controller

SD

US

B

US

B

ETH

USB

5V

RS

48

5134

133

TW

IST

ED

PA

IR

201

GSM MODEMSIM

24V166167

164165

145

124

125

NEG

BUS8

4

500A

DG

ST

AR

T/S

TO

PB

JB

K2

50

24

9

POS BUS7

0

26

32

61

26

2

35

0V

A IN

VE

RT

ER

2/0

2/0

2/0

702/0

2/0

2/0

PV Input Voltage from Combiner Boxes

Battery Voltage at Panel

The PV Input Breakers must be turned OFF

until battery voltage is applied to the T80HV

Charge Controllers.

Page 13: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

13

Inside the Apollo Solar Cabinet

SOLAR CHARGE CONTROLLERS

The cabinet will support up to 4 T80HVs

at 4kW of PV each.

APOLLO SYSTEM CONTROLER –

The ASC provides smart control of all

power sources and distribution along with

the Remote Monitoring.

CIRCUIT BREAKERS – Hydraulic-

Magnetic Circuit Breakers are immune to

ambient temperature.

BATTERY BREAKERS – Multiple poles

are provided for parallel battery stacks.

EXTERNAL WIRES AND GLANDS –

Easy field wiring to well labeled terminals.

Page 14: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

14

Apollo Solar Gen 4 Wiring Details

The DC Outputs to the

Essential Load and the

Non-Essential Load should

be measured at terminals

G/H and AD/AE.

The smaller terminals are used for

connecting the Irradiance Sensor,

the Alarm signals and the battery

voltage sense wires.

Terminals M and N from the battery

are fitted with 5 Amp automotive

type fuses.

The PV inputs have

screw type connectors

which will accept up to

AWG 2 wires from the

Combiner Boxes.

Torque the screws to

4.6 N-m (40 in-lbs).

The Earth Ground is a

single point with a

terminal strip to

connect to the

external Ground Rod.

Torque the screws to

4.6 N-m (40 in-lbs).

Page 15: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

15

Apollo Solar Gen 4 Installation Details

The POSITIVE battery

cables are to the

POSITIVE BUS BAR.

The NEGATIVE battery cables

are to the LOWER TERMINAL

ON THE SHUNT.

The battery cables must be AWG 4/0 or 95mm2 for minimum

voltage drop. The terminals MUST be tightened with a

calibrated torque wrench 20.2 N-m (180 in-lbs.).

The Bus Bars are shown above with their covers removed.

The arrows point to their locations on the Gen 4 Panel.

Page 16: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

16

Installation Details – Multi Cabinet Systems

The POSITIVE battery

cables terminate at the

POSITIVE BUS BAR.

The NEGATIVE battery cables

terminate at the lower terminals

on the Shunt Bus Bar.

The battery cables must be AWG 4/0 or 95mm2 for minimum voltage drop. The

terminals MUST be tightened with a calibrated torque wrench 20.2 N-m (180 in-lbs.).

The NEGATIVE BUS BAR

with terminals to connect to

additional cabinets

The 1000 Amp Shunt

Multiple Cabinet Systems are used when more then 4 T80HVs are required. The 1000 Amp

Shunt in the Master Cabinet provides high current terminals to connect to the Bus Bars in the

additional cabinets.

Page 17: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

17

Gen 4 Wiring – 4X T80HV, 3 Battery Breakers

The 4 PV Combiner Boxes are connected

through the glands at the lower right to the

screw terminals marked for PV Inputs.

Torque the screws to 4.6 N-m (40 in-lbs).

Cables from the Batteries are connected

into the bottom of the Battery Circuit

Breakers.

Double check the Positive + and the

Negative – are correct.

Torque the Allen head screws to 20.2

N-m (180 in-lbs.).

FOR SAFETY, IT IS RECOMMENDED

THAT THE BATTERY SHOULD BE THE

VERY LAST CONNECTION MADE.

AFTER THE CABLES ARE CONNECTED TO THE BREAKER, THEN THE CABLES CAN BE CONNECTED TO THE BATTERIES THEMSELVES.

Page 18: Commissioning the Apollo Solar Cabinetsapollosolar.com/wp-content/uploads/Apollo-Solar-Commissioning-th… · Commissioning is the final and MOST CRITICAL Quality Control step for

18

Inside the Mini Cabinet

One T80HV is shown with room for 2.

APOLLO SYSTEM CONTROLER – The ASC

provides smart control of all power sources and

distribution along with the Remote Monitoring.

BATTERY BREAKERS – A single pair of

250A breakers supports a single string of

batteries.

EXTERNAL WIRES AND GLANDS – Easy

field wiring to well labeled terminals.

GEN START RELAY – This is a HYBRID

system with a relay to start an external Diesel

Generator.

The Mini Cabinet provides the same features and

quality as the Standard Cabinet but with room for

only 2 Charge Controllers. It is designed for

systems with less than 10kW of PV array.