Community High School District 99
Master Facilities Plan Community Engagement
Spring 2017 Findings & Next Steps
Presented May 23, 2017
2
Community High School District 99 Master Facilities Plan Community Engagement
Spring 2017 Findings & Next Steps
Table of Contents
Overview 3 Phase I—Spring Meetings 4 Findings 6 Next Steps Appendix Survey Summary 11
Postcard 25 Self-Guided Tour (DGN) 26 Self-Guided Tour (DGS) 28
3
Overview Community High School District 99 is committed to providing facilities that are safe, cost-effective and conducive to student learning. The District is developing a Master Facility Plan to determine how its two buildings—North High School, which opened in 1928, and South High School, which opened in 1965—need to evolve to contribute to student achievement. An advisory team, which included architects and members of the administrative team was formed in 2013. They assessed the existing facilities and conducted brainstorming sessions with representatives of all departments and support staff. Findings were shared with the Board of Education in May 2014, and community members in December 2014. The plans were refined over the next 18 months and in late 2016, the Board of Education approved concepts to share with the community. A year-long, comprehensive community engagement plan and timetable was developed. Goals for 2017 include educating the community about the concepts and how they support current and future educational needs, gathering community feedback to refine the plans, and gauging support for the project.
4
Phase I—Spring Meetings The first staff and community meetings were held in April 2017. Both audiences heard a presentation by members of the administrative team and had the opportunity to ask questions. No data was collected at the staff meetings. The purpose of these meetings was to share the updated plans with faculty and support staff prior to the community meetings. District employees, especially those who reside in the community, are often asked questions by parents and residents and keeping them well informed is essential. The community meetings, which were held on April 19 and 20, featured self-guided building tours in addition to the presentation and Q&A. Attendees were provided with descriptive tour maps, which can be found in the Appendix. Staff members were stationed at each tour stop to offer information, answer questions, and note questions and comments. The purpose of these meetings was to share information, generate a list of residents interested in the Master Facilities Project, and gather feedback that will be used to create an FAQ document, refine the presentation, and inform additional research and communications. Feedback from community participants was collected in four ways. Tour guides took notes, attendees submitted written questions and comments, the Q&A following the presentations was recorded, and attendees were emailed an exit survey. The qualitative findings included in this report provide insight into the ideas and opinions of residents who were interested in/able to attend the meetings. It is not representative of all District residents.
5
Communication & Outreach All materials had multiple purposes—to alert residents about the meetings, to provide information about the District 99 Master Facilities Plan, and to begin branding the project. Outreach began immediately after the April 4, 2017, election. Every household in the District was sent a postcard in early April (see Appendix for a copy). Flyers with similar graphics were sent to the local feeder schools and a press release was prepared for local media outlets. Parents, and community members who supplied the District with an email address, received digital invitations and reminders in the weekly school newsletter. The meeting schedule was featured on the District website and social media feeds, including NextDoor. Attendance RSVPs were requested, but not required. Approximately 50% of those who registered attended. Seventy-two residents signed in to the meetings (including walk-ins who were registered on site). Attendance was split almost evenly over the two evenings. With no referendum or construction on the immediate horizon, this was a reasonable turnout for the first of many meetings. As momentum builds and more information is shared with the community, attendance at meetings should increase. Everyone who attended and/or registered will be added to the key influencer database. Seven attendees indicated that they were interested in serving on the Citizen Task Force and will be invited to do so.
6
Community Meeting & Exit Survey Findings Feedback from community participants was collected in four ways. Tour guides took notes, attendees submitted written questions and comments, the Q&A following the presentations was recorded, and attendees were emailed an exit survey. The qualitative findings included in this report provide insight into the ideas and opinions of residents who were interested in/able to attend the meetings. They are not representative of the all District residents. Approximately 175 questions and comments were generated at the meetings and in the 36 completed exit surveys (50% response rate). This qualitative feedback will be used to inform future work. It provides insights into topics of concern and factors that resonated with attendees, but not the full community. Several comments are over-weighted because a single respondent provided the same answer to multiple questions on the survey. A phone survey, which will yield quantitative data about perceptions across the broader community, will be administered to a statistically representative sample of registered voters next fall. Complete survey results are included in the Appendix. The topics raised most frequently at the meetings and in the open-ended survey questions were:
1. Can more budget specifics/details be made available? 2. How much would taxes go down if no new bonds are issued? 3. How much would taxes go up if the full project is funded? 4. What is the construction timeline? 5. How will “green ideas” be included (solar panels, LEED certification, etc.)
be included in the plans and construction?
7
*Two respondents skipped this question and two staff members took the survey. ** Two DGS residents skipped this question.
2017 Spring Facility Meetings Exit Survey Results Total
Registered Attendees
North High Attendance
Area
South High Attendance
Area # Attended 72 35 37 # Completed Surveys* (50% response rate) 36 19 13
Took Building Tour 67% 58% 77% Were you aware that the District will be paying off existing facility bonds in two years?
32% Yes 32% Yes 23% Yes
Do you think it makes sense to address facility needs at this time? 74% Yes 74% Yes 69% Yes
Were you familiar with the concept of a Learning Commons before the meeting? 56% Yes 58% Yes 38% Yes**
How high a priority is installing air conditioning in all classrooms? (Sliding scale 1-100)
82 79 82
Six projects are proposed for both schools. How important is each one to you?
%Very Important/ %Important=Total
%Very Important/ %Important=Total
%Very Important/ %Important=Total
Create a Learning Commons 44/36=80 53/21=74 38/54=92 Enhance safety and security 47/36=83 53/21=74 46/46=92
Increase accessibility 37/40=77 39/28=57 38/46=84 Install air conditioning in all classrooms 51/37=88 53/32=87 42/50=92
Modernize classrooms 49/26=75 37/26=63 67/25=90 Complete outdoor renovations 17/34=51 17/33=50 15/31=46
Three school specific projects are being considered. How important is each one to you?
%Very Important/ %Important=Total
%Very Important/ %Important=Total
%Very Important/ %Important=Total
DGN–Relocate dock & build gym 47/26=73 58/16=74 31/38=69 DGN–Renovate cafeteria & kitchen 53/32=85 74/11=85 31/54=85
DGS–Enlarge auditorium 50/26=76 42/21=45 62/31=93
8
Next Steps Develop Numbers for FAQ and Presentations Inquiries about budgets and taxes were, and will continue to be, the most frequently asked questions. It is important to frame the answers to these questions thoughtfully and use the information consistently in all written materials, presentations, conversations, and future research. It would be prudent to confirm that all of the proposed work (except for items listed in bullet point #3), can be completed without impacting taxes and develop the following projections:
1. Tax savings if no new bonds are issued. 2. Project scope if taxes remain level. 3. Tax impact if the auditorium (South), and gym/loading dock (North) are
included. Citizen Task Force Potential members (45) need to be identified and invited to yield a working group of 25-30 community members. Members will be asked to attend four meetings this fall, which should be scheduled as follows: Late August—Presentation & Expectations Early September—Finalize Key Influencer Mailer Late October—Review polling and survey data November—Prepare recommendation for the Superintendent Community Meetings & Tours Set schedule so they can be publicized in all fall mailings. Additional qualitative data will be collected at these meetings. Develop meeting design. Staff Meetings Incorporate updates into existing meetings and communications (building newsletters, intranet, etc.). Develop a mechanism for capturing questions that staff is fielding from parents and community members so the data can be used to update FAQs, presentations, and additional research. Board of Education Updates Share monthly progress reports with the Board of Education. Legal Review The District’s attorney should review all written, electronic, research, and video materials.
9
Communication May Complete photography that includes students June Complete and post FAQ Update Website Script video Include update in Annual Report July/August Prepare Written Materials Select/Prepare Visuals Complete Video September Letter to Key Influencers (mailed) Newsletter to Full Community (mailed) October Mail Survey (mailed) Late Fall Letter/Postcard Update (mailed) Ongoing Earned Media Continue to promote “good news”
Press Releases/Invitations Interviews Financial Column
Quantitative Research A phone survey, which will yield quantitative data about perceptions across the broader community, will be administered to a statistically representative sample of registered voters in October 2017. Optional Items Costs and schedules will be provided if a Telephone Town Hall Meeting, Webinar, and/or a Robocall reminder for the Mail Survey are pursued.
10
Monthly Overview of Next Steps
June Confirm Costs & Tax Impact Identify/Contact potential Citizen Task Force Members Complete FAQ Update Website Script Video July/August Schedule Task Force Meetings Schedule Community Meetings & Tours Notify Task Force Prepare Mailings (Key Influencers, Newsletter, Survey) Select/Prepare Visuals Complete Video Design Community Meetings Prepare Task Force materials Task Force Meeting #1 Kick-off meeting with pollsters September Task Force Meeting #2 Key Influencer Mailing Newsletter Mailing Community Meetings Finalize Phone Survey October Community Meetings Mail Survey Phone Poll Task Force Meeting #3 Telephone Town Hall (Optional) Robocall Mail Survey Reminder (Optional) November Mail and Phone Survey Results presented Task Force Meeting #4 Draft Community Update December Task Force makes recommendation to Superintendent Community Update Note: A more detailed calendar, including responsibilities will be prepared and shared online. Dates may be adjusted to reflect BOE meetings, administrative priorities, and other deadlines.
50.00% 17
44.12% 15
5.88% 2
Q1 Which meeting did you attend?Answered: 34 Skipped: 2
Total 34
Wednesday,April 19 at...
Thursday,April 20 at...
Both meetings
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Wednesday, April 19 at North High School
Thursday, April 20 at South High School
Both meetings
Spring 2017 Master Facilities Plan Exit Survey
11
66.67% 24
33.33% 12
Q2 Did you tour the building(s)?Answered: 36 Skipped: 0
Total 36
Yes
No
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Yes
No
Spring 2017 Master Facilities Plan Exit Survey
12
55.56% 20
44.44% 16
Q3 As you learned, one of the priorities forboth buildings is reorganizing interior and
exterior spaces to create a LearningCommons. Were you familiar with the
concept of a Learning Commons before themeeting?
Answered: 36 Skipped: 0
Total 36
Yes
No
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Yes
No
Spring 2017 Master Facilities Plan Exit Surveyn
13
Q5 Please indicate how important each ofthe following projects is to you. These six
items would be completed at both schools. Answered: 36 Skipped: 0
44.44%16
36.11%13
11.11%4
5.56%2
2.78%1 36 1.86
47.22%17
36.11%13
11.11%4
2.78%1
2.78%1 36 1.78
37.14%13
40.00%14
14.29%5
0.00%0
8.57%3 35 2.03
51.43%18
37.14%13
5.71%2
5.71%2
0.00%0 35 1.66
48.57%17
25.71%9
14.29%5
2.86%1
8.57%3 35 1.97
17.14%6
34.29%12
34.29%12
11.43%4
2.86%1 35 2.49
Createcollaborativ...
Enhance safetyand security.
Increaseaccessibility.
Install airconditioning...
Modernizeclassrooms.
Completeoutdoor...
0 1 2 3 4 5 6 7 8 9 10
VeryImportant
Important SomewhatImportant
NotImportant
NoOpinion/NeedMoreInformation
Total WeightedAverage
Create collaborative learning spaces (Learning Commons).
Enhance safety and security.
Increase accessibility.
Install air conditioning in all classrooms at both schools.
Modernize classrooms.
Complete outdoor renovations identified in2011 (improvements to bleachers, squad rooms, and pressboxes).
Spring 2017 Master Facilities Plan Exit Survey
14
82 2,968 36
Q6 Approximately 55% of all classrooms arecurrently air conditioned. Using the slidingdot, please indicate how high a priority airconditioning all classrooms in both high
schools is to you.Answered: 36 Skipped: 0
Total Respondents: 36
0 10 20 30 40 50 60 70 80 90 100
Answer Choices Average Number Total Number Responses
SSpring 2017 Master Facilities Plan Exit Survey
15
47.06% 16
26.47% 9
11.76% 4
2.94% 1
11.76% 4
Q7 Do you support the following project,which is specific to Downers Grove North?
Create separate areas for trucks andpedestrian traffic by relocating loading
dock to current White Gym space, whichwould improve safety. Project would
also add two classrooms and a moderngym, providing physical education space
for all students, accommodate gymnasticsand other athletic programs, and be
available for rentals by the community.Answered: 34 Skipped: 2
Total 34
Definitely Yes
Probably Yes
Probably No
Definitely No
Don'tKnow/Unsure
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Definitely Yes
Probably Yes
Probably No
Definitely No
Don't Know/Unsure
Spring 2017 Master Facilities Plan Exit Survey
16
52.94% 18
32.35% 11
5.88% 2
0.00% 0
8.82% 3
Q8 Do you support the following project,which is specific to Downers Grove North?Renovate the cafeteria and kitchen, which
were originally built in 1958.Answered: 34 Skipped: 2
Total 34
Definitely Yes
Probably Yes
Probably No
Definitely No
Don'tKnow/Unsure
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Definitely Yes
Probably Yes
Probably No
Definitely No
Don't Know/Unsure
Spring 2017 Master Facilities Plan Exit Survey
17
50.00% 17
26.47% 9
8.82% 3
0.00% 0
14.71% 5
Q9 Do you support the following project,which is specific to Downers Grove South?Increase the capacity of the auditorium to
seat 1,200 students, which is the capacity ofthe North High School auditorium. It
currently seats 800; current enrollment is2,700 students.Answered: 34 Skipped: 2
Total 34
Definitely Yes
Probably Yes
Probably No
Definitely No
Don'tKnow/Unsure
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Definitely Yes
Probably Yes
Probably No
Definitely No
Don't Know/Unsure
Spring 2017 Master Facilities Plan Exit Survey
18
32.35% 11
67.65% 23
Q10 Before this meeting, were you awarethat District 99 would be paying off itsexisting facility bonds in two years?
Answered: 34 Skipped: 2
Total 34
Yes
No
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Yes
No
Spring 2017 Master Facilities Plan Exit Survey
19
73.53% 25
17.65% 6
0.00% 0
2.94% 1
5.88% 2
Q11 Given the District’s current facilityneeds, and with outstanding facility bondsabout to be paid off, do you think it makes
sense for District 99 to consider addressingfacility updates at this time?
Answered: 34 Skipped: 2
Total 34
Definitely Yes
Probably Yes
Probably No
Definitely No
Don'tKnow/Unsure
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Definitely Yes
Probably Yes
Probably No
Definitely No
Don't Know/Unsure
Spring 2017 Master Facilities Plan Exit Survey
20
55.88% 19
38.24% 13
5.88% 2
0.00% 0
Q12 Do you reside in the North High orSouth High attendance area? (Click here to
enter your address to find out.)Answered: 34 Skipped: 2
Total 34
North HighSchool
South HighSchool
I am a staffmember who...
Unsure
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
North High School
South High School
I am a staff member who lives outside of District 99
Unsure
Spring 2017 Master Facilities Plan Exit Survey
21
38.24% 13
50.00% 17
26.47% 9
5.88% 2
8.82% 3
8.82% 3
0.00% 0
0.00% 0
5.88% 2
Q13 In addition to being a resident in ourdistrict, please describe your relationship to
District 99. (Check all that apply.)Answered: 34 Skipped: 2
Total Respondents: 34
Parent of acurrent student
Parent of afuture student
Parent of agraduate
I am agraduate of DGN
I am agraduate of DGS
District 99faculty member
District 99support staf...
None of theabove
Other (pleasespecify)
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Parent of a current student
Parent of a future student
Parent of a graduate
I am a graduate of DGN
I am a graduate of DGS
District 99 faculty member
District 99 support staff member
None of the above
Other (please specify)
Spring 2017 Master Facilities Plan Exit Survey
22
0.00% 0
2.94% 1
5.88% 2
35.29% 12
32.35% 11
14.71% 5
2.94% 1
2.94% 1
2.94% 1
Q14 What is your age?Answered: 34 Skipped: 2
Total 34
Under 18
19-25
26-39
40-49
50-59
60-69
70-79
80+
Prefer not toanswer
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Under 18
19-25
26-39
40-49
50-59
60-69
70-79
80+
Prefer not to answer
Spring 2017 Master Facilities Plan Exit Survey
23
44.12% 15
58.82% 20
14.71% 5
2.94% 1
17.65% 6
5.88% 2
8.82% 3
Q15 How did you learn about the MasterFacility Plan Meetings? (Check all that
apply.)Answered: 34 Skipped: 2
Total Respondents: 34
Postcard
Email fromDistrict
Districtwebsite
Local newspaper
Word of mouth
Social media
Other (pleasespecify)
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Answer Choices Responses
Postcard
Email from District
District website
Local newspaper
Word of mouth
Social media
Other (please specify)
Spring 2017 Master Facilities Plan Exit Survey
24
25
175
174
172B
172A
170 168 166 164
171 169
163
164A
161
153
153A
153
162 160
157
155
151
127
125
123122
113
115
117
119
121
128
130101
100
129
132
134136138
140
142
142D
131
144A
144
152
129I
129H
107
165
NORTH
North High SchoolAB
Tour Stops1. Proposed Learning Commons2
Legend
A. RegistrationB. Presentation
Tour Stops1. Proposed Learning Commons2. Stairs to Library and Food Lab3. Cafeteria4. Slide Show (Alumni Room 134)
-Prince Street Loading Dock-Outdoor Renovations
1
2
3
4
26
MasterFacilitiesPlanCommunityMeetingApril19,2017
NorthHighSchoolWearecrea'ngaMasterFacilityPlaninordertodeterminehowourschoolbuildingsneedtoevolvetocon'nuetopreparestudentsforsuccess.Technologyandeduca'onalprogramscon'nuetochange,whichimpactsteachingandlearning.
OurBoardofEduca'on,staff,students,andcommunitymembershaveiden'fiedpriori'esforchangeandmoderniza'on.Weareseekinginputfromthefullcommunitytorefinetheplans.Thisprocesswillcon'nuethroughthecomingyear.
ThankyouforsharingyourthoughtsthiseveningandhelpingtoshapethefutureofDistrict99.Pleasebeonthelookoutforanemailwithalinktoasurveyaswell.
TourStops
#1ProposedLearningCommonsCurrentSitua+on—Spacesforcollabora'velearningarelimitedandthelibraryandcafeteriahavefinitecapacity.Studentsdonotalwayshaveaccesstostudyareas,technology,andserviceswhentheyneedthemandtheyoJengatheronhallwayfloorsduetolackofspace.SuggestedSolu+on—Repurposeexis'ngoffices,classroomsandthecourtyardtocreateaLearningCommonswithnaturallightandflexibleopenspacethatwillfacilitatelearning,improvesupervision,andprovideacentralloca'onforservicesincludingcollegeandcareercounseling.
#2LibraryandFoodLabLibrary—Reconfiguringthelibrarywillcreatemorecollabora'onareasforteachersandstudentsandpromoteindependentstudyforstudents.FoodLab—Thesefacili'esreceivedminorrenova'onsin2007;theydonotfostertheskillsstudentsneedtobepreparedforemploymentintheculinaryarts.
#3CafeteriaThecafeteriaandkitchendatebackto1958.Thecafeteriaisundersizedforthecurrentpopula'on,requiringsix25-minutelunchperiodsthatspaneachdayfrom10:50a.m.to1:30p.m.Thetwo-'eredlayoutisawkwardandnotconducivetoamul'-purposespaceforextracurriculargroups.
#4LoadingDockandOutdoorRenova+ons(SlideShow)PrinceStreetloadingdock—Reloca'ngthedockwillimprovesafetybycrea'ngseparateareasfortrucksandpedestrians.Itwillalsoprovidespacetoincreaseandmodernizephysicaleduca'onspaceswithanewgym.OutdoorRenova+ons—Renovatebleachers,squadroom,andpressbox.
27
E137
E135
E135B
E135C
E135A
E132
E134
E133
E138
E138D
E137E
B131
B129
B127
B127A
B128 B120
B125
B124 B120B
B116B118
B121
B117
E145
E137A
A17E136
B114
B112A B112
A115A109 A107
A110A106
A104 A102 A100A
A100
A100B
A100K A100M
A100D
A101
A103
D183D180
D181D178
D176
D174D179
D172D175
D171D170
C161 C163
C163AC163B
C165 C167
C168C166C164C162C160C158C156C152
C153C151C149
C147
C146 C148
B125
A36
E142
E140
E144
B123
E139
NORTH
1
2 A C
D
EF
South High School
Legend
1. Registration
2. Presentation
Tour StopsA. Proposed Main EntranceB. Proposed Learning CommonsC. Current Main EntranceD. Library (Slide Show)E. AuditoriumF. Food Lab (B123)G. Stairs to Study Hall
B
G
28
MasterFacilitiesPlan-CommunityMeetingApril20,2017
SouthHighSchool
Wearecrea'ngaMasterFacilityPlaninordertodeterminehowourschoolbuildingsneedtoevolvetocon'nuetopreparestudentsforsuccess.Technologyandeduca'onalprogramscon'nuetochange,whichimpactsteachingandlearning.OurBoardofEduca'on,staff,students,andcommunitymembershaveiden'fiedpriori'esforchangeandmoderniza'on.Weareseekinginputfromthefullcommunity.Thisprocesswillcon'nuethroughthecomingyear.ThankyouforsharingyourthoughtsthiseveningandhelpingtoshapethefutureofDistrict99.Pleasebeonthelookoutforanemailwithalinktoasurveyaswell.
TourStops
AProposedNewMainEntranceMovingtheentrancewillenhancesecurity;visitorswillnotbeallowedintobuildingun'lclearingsecurity.Securitywillbepartofmainofficeandadjacenttofrequentlyusedpublicspaces.Willalsoimprovetrafficflow.
BProposedLearningCommonsCurrentSitua+on—Spacesforcollabora'velearningarelimitedandthelibraryandstudyhallshavefinitecapacity.Studentsdonotalwayshaveaccesstostudyareas,technology,andserviceswhentheyneedthemandtheyoOengatheronhallwayfloorsduetolackofspace.SuggestedSolu+on—Repurposeexis'ngoffices,classroomsandthecourtyardtocreateaLearningCommonswithnaturallightandflexibleopenspacethatwillfacilitatelearning,improvesupervision,andprovideacentralloca'onforservicesincludingcollegeandcareercounseling.
CCurrentEntranceandLibraryReloca'ngthisentrancewillcreateaddi'onalspacesforthelibraryandbecomeanextensionofLearningCommons.Thelibraryisundersizedsostudentsareregularlyturnedaway,par'cularlywhenclassesareusingthespace.Addi'onally,theredesignedspacewillhousetheITdepartment,aresourceinincreasingdemandforourstudents.
DOutdoorRenova+ons(SlideShowinLibrary)Proposedoutdoorrenova'onsincludeasecondturffieldtomatchDGN’sameni'es,aswellasnewbleachers,newsquadroom,andfieldimprovements.
EAuditoriumTheauditoriumseats800andisundersizedforcurrentenrollmentof2,700students.
FCulinaryLabExis'ngfacili'esarefromthe“homeeconomics”era,anddonotfostertheskillsstudentsneedtobepreparedforemploymentintheculinaryarts.
GStudyHallRoomisnotconducivetocollabora'velearning.Studentsareassignedtocomeherewhenthelibraryandotherareasareatcapacity.HavingaLearningCommonswouldalleviatetheneedsforthisroom,andallowustousethespaceforwellnessac'vi'es.
29