Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
30% Design Community Meeting
Please sign in on your mobile device: http://communitymeeting.ocps.net/
January 16, 2020
Site 73-T-W-7: OTC @ Westside Campus
Site 73-T-W-7Meeting AgendaJanuary 16, 2020 at 6:00pm
• Welcome – Melissa Byrd, School Board Member, District 7• Introductions – Jessma Lambert, Facilities Director, Construction
Planning• Project Update – Architect: DLR Group
Contractor: Wharton Smith
• Questions and Answers• Adjournment
2
Orange Technical College Vision
3Site 73-T-W-7
Orange Technical College Programs
4
Westside Campus:• Construction Trades• Welding Technology• Apprenticeship• Human Services• Veterinary Assisting
Orlando Campus:• Health Science Focus
Mid-Florida Campus:• Industrial• Transportation• Manufacturing• Culinary• Hospitality• Adult Education
Winter Park Campus:• Information & Digital Technology
Site 73-T-W-7
Campus Programs• Proposed Career Pathways:
5
• Building Construction Trades• Welding• HVAC• Electrical• Building Construction• Carpentry
• Human Services / Personal Care• Cosmetology• Barbering• Esthetics• Massage Therapy• Salon Services
• Veterinary Assisting / Technician
Site 73-T-W-7
Site 73-T-W-7 6
Existing OTC Westside Campus
New OTC Westside Campus
Ocoee High SchoolSite Location
Site 73-T-W-7
Lake ApopkaOcoee Apopka Rd.
Fullers Cross Rd.
West Rd.
Ocoee High School
Hope Charter School
Glad Tidings Church
Retail Area
The Site
Road Extension
Main Access from 429
Traffic Light
Traffic Light
Main Access
Site Aerial
7
Community Engagement: Cultural Continuum
8
Priorities from the Community:
• Strong preference for College vs. High School feel • Strong preference for “Sustainable” and “High-
Tech”• Expressed balance for collaboration and self-
directed learning • Architectural Style important• Campus accessibility to the community• Safety & Security
Site 73-T-W-7
Community Engagement: Futurecasting
9
IN OUR NEW OTC WESTSIDE CAMPUS, STUDENTS WILL FEEL:
• We lead the way in technical training for Central Florida!
• Safe, Inspired, Welcoming• Serves local community• Empowered to reach goals and earn more
money• Current Westside campus, former Drew HS,
will be remembered• Proud to be part of a larger college system• Like they are on a college campus that will
help them achieve their goals• Meets needs of community and industry
Site 73-T-W-7
Vision Board
10
Big Ideas:
1. Safety& Security2. Natural Lighting3. Building as a Teaching Tool/
Outdoor Learning4. Flexibility – Future-proofing5. Identity & Brand6. Student Experience – Intuitive7. Welcoming
Site 73-T-W-7
LEGEND
Main Building Entrance
Bus Stop
Bike Trail Connection
Direction of Traffic on Campus
11Site 73-T-W-7
East Fuller’s Cross Road Extension
Turning Lane Improvements
PARKING600 parking spaces
OCPS BUS ACCESSSeparate access for buses and deliveries from East Fuller’s Cross road extension. 6 Bus Stacking at Drop-off (NW)
BIKE ACCESSBike access to West Orange Trail
TREE SAVE PLANDesign saves existing trees on-campus.
FUTURE EXPANSIONBuilding and campus area planned for growth.Future partners
Main Building Entrance
Student Entrance
Retention
Retention
Student Parking & Bus Loop
Bike Racks
Visitor & Staff Parking
City Bus Stop
Connection to Bike Trail & Ocoee High School
Bus & Service Entrance
Main Campus Entrance
Retention
Ocoee High School
Proposed Site Plan
Outdoor Learning
Future Expansion
Future Expansion
0 25 50 100 200
Planned Schedule
12
Planning Phase Start: Summer 2019
Design Phase Completion: Summer 2020
Construction Phase Start: Spring 2021
Project Opening: Fall 2022
Site 73-T-W-7
Questions & Answers
13