80
LE THY CONSTRUCTION., LTD Manufacturing concrete piles, piling work and bored pile work Renting and working sheet piles Renting plant and equipment in construction Providing solutions for weak foundation Constructional consultant Engineering survey Specialize in: lethycorp.com [email protected] COMPANY PROFILE ISO 9001:2015 CERTIFICATE OF CONSTRUCTION CAPACITY - LEVEL 1

COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

LE THY CONSTRUCTION., LTD

Manufacturing concrete piles, piling work and bored pile workRenting and working sheet pilesRenting plant and equipment in constructionProviding solutions for weak foundationConstructional consultantEngineering survey

Specialize in:

lethycorp.com [email protected]

COMPANY PROFILE

ISO 9001:2015

CERTIFICATE OF CONSTRUCTION CAPACITY - LEVEL 1

Page 2: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 3: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 4: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 5: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 6: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 7: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 8: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 9: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

I. INTRODUCTION

II. PICTURES ON SITE

III. CONTRACT LIST

IV. MANPOWER FILE

V. LIST OF PLANT AND EQUIPMENT

CONTENT

Page 10: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

Le Thy Construction Company is a highly-specialized construction company with core competence in manufacturing concrete piles, piling work and bored pile work; renting and working sheet piles; renting plant and equipment in construction; providing solutions for weak foundation; constructional consultant; engineering survey.Located at 606/38/9 Highway 13, Hiep Binh Phuoc Ward, Thu Duc District, Ho Chi Minh City, Viet Nam, Le Thy serves both government and private sectors with unparalleled engineering skill, professionalism and strong commitment for each and every project.

For over 10 years, Le Thy has built a reputation as the most valuable construction company in Viet Nam by delivering construction projects of varying sizes to the center and south of Viet Nam

COMPANY PROFILE

le thycorp .com

[email protected]

lethycorp.com

0274.366.2280

606/38/9 QL 13,P. Hiệp Bình Phước, Q. Thủ Đức, Tp. HCM

INTRODUCTION

Page 11: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

PRESSING/DRIVING SPUN AND CONCRETE PILES AND SHEET PILES BY ROBOTIn recent years, Le Thy has expanded its construction activity in using ROBOT to press/drive piles and sheet piles.

COMPANY PROFILE

le thycorp .com

Because of engineering excellence and project management expertise, Le Thy has been known as a “Grade I” company for foundation work in Viet Nam. Le Thy employees deliver outstanding work for their clients through unparalled engineering skills, professionalism, and strong commitment, while adhering to strict cost and time management. Le Thy has always demonstrated its capability to deliver large projects. Under the able leadership of all of LE THY’s management team, we deliver the highest quality construction projects with our slogan:

“BUILDING A STEADY FOUNDATION. PROMOTING SAFETY FOR LIFE”

Page 12: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

FIELD OF TRANSACTION BUSINESS - Manufacturing concrete piles, piling work and bored pile work- Renting and working sheet piles- Renting plant and equipment in construction- Providing solutions for weak foundation- Constructional consultant- Engineering survey

LIST OF PLANT AND EQUIPMENT :- Hydraulic equipment for pressing/ driving spun and concrete piles used - Robot for pressing piles - Robot for driving steel piles - Equipment for bored pile work - Kinds of crane- Diesel pile driver - Excavator, Bulldozer, Truck- Kinds of generator

concrete load and steel load : 10 pcs: 04 pcs: 04 pcs: 04 pcs: 14 pcs: 03 pcs

WORKSHOP AREA :Area Total: 20,400 m2, include:

- Area for processing steel frame with kinds of machine: 12000m2

- Area for manufacturing concrete piles with dimension from 250 x 250 x 12000 to 500 x 500 x 12000

LETHY CONSTRUCTION CO., LTD -Headoffice606/38/9Highway13,HiepBinhPhuoc,ThuDuc,HCMC - Phone (0274) 3662280 Fax (0274) 3662281 - E-mail [email protected] Website lethycorp.com - Workshop Vinh Phu No. 10 Road, Thuan An, Binh Duong Province

: : ::

: :

MAIN CLIENTS : - Construction Companies and Corporations in HCM City and provinces - Foreign companies in Viet Nam - State – owned enterprises

in Viet Nam.

COMPANY INFORMATION :

COMPANY PROFILE

le thycorp .com

Page 13: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

WASTE WATER TREATMENT STATION IN JOTUN FACTORYItem: Piling work D300APlace: Hiep Phuoc IZ, Nha Be, HCM city

COMPANY PROFILE

le thycorp .com

DISTRICT 4 POLICE HEADQUARTERSItem:Piling work (D300 & D400)Place: Doan Nhu Hai Street, Ward 12, District 4, Tp. HCM.

Page 14: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

BUILDING PEOPLE’S COMMITTEE HEADQUARTERS OF BEN THANH WARDItem: Shoring workPlace: 92 Nguyen Trai, Ben Thanh Ward, HCM city

COMPANY PROFILE

le thycorp .com

CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORKItem:Construction measure and installation of steel girders under package B3-63: Building Tan An bridge, National Place: Tan An City, Long An Province.

Page 15: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

THE GOLDEN HILL Item: Supply, erection, disassemble sheet pilesPlace: 87 Cong Quynh Street, Nguyen Cu Trinh Ward, District 1, HCM city

COMPANY PROFILE

le thycorp .com

THE 110KV TRANSMISSION SYSTEM - NAM SAI GON - NAM SAI GON 3 - PERIOD 2Item: Piling work for the foundations VT01, VT02, VT03, VT04, VT05, VT06, VT07, VT08, VT09, VT10, VT11, VT12, VT13, VT14, VT15, VT16, VT27 (35A)Place: Ho Chi Minh city.

Page 16: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

THE HAMPTONS - HO TRAM Item: Supply and construction of test piles, concrete piles DULPlace: Ho Tram hamlet, Phuoc Thuan commune, Xuyen Moc district, Ba Ria - Vung Tau

COMPANY PROFILE

le thycorp .com

STEEL WIRE & STEEL CORD MANUAFACT URING FACTORY OF BEKAERT VIET NAM - DUNG QUATItem: Supply and press concrete pile 300x300, 400x400Place: No.2, street 7, VSIP, Tinh Tho commune, Son Tinh district, Quang Ngai province, Viet

Page 17: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

HOME OFFICEItem: Supply & press D300APlace: 35-37-39 Cach Mang Thang 8 street , Ben Nghe Ward, District 1, HCM city.

COMPANY PROFILE

le thycorp .com

OFFICE BUILDINGItem: 2 BasementPlace: 452 Nguyen Thi Minh Khai, Ward 3, District 2, HCM city

Page 18: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

COMPANY PROFILE

le thycorp .com

BUILDING A ROAD CONNECTED ECONOMIC ZONE AND LINH PHONG PAGODA- Item: Supply and drive pile 400x400- Place: Cat Tien commune, Phu Cat district, Binh Dinh province

HAPPY FURNITURE FACTORY- Item: Supply and press concrete pile 300x300- Place: No. 5 dai lo Huu Nghi, Viet Nam Singapore Industrial Park (VSIP), Tinh Phong town, Son Tinh district, Quang Ngai province.

Page 19: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

LAM DONG VIETTEL BUILDINGItem: Press pile D300Place: 39 Hung Vuong, ward 9, Da Lat city, Lam Dong province

COMPANY PROFILE

le thycorp .com

OBSERVATORY (BELONG TO SPACE OF SCIENCE)- Item: Supply and press concrete pile 300x300- Place: Ghenh Rang ward, Quy Nhon city, Binh Dinh province

Page 20: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

LIFE THAO DIEN HOTELItem: Supply and drive spun pile D400Place: 215 Nguyen Van Huong, Thao Dien Ward, District 2, Ho Chi Minh City

HOA HOI SOLAR POWER PLANT PROJECTItem: Drilling holes on slope of from 10° ~ 30° of inclinationPlace: Hoa Hoi commune, Phu Hoa district, Phu Yen province

COMPANY PROFILE

le thycorp .com

Page 21: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

BULDING ONG NGU BRIDGE, WARD 28Item: Construction (Building and General item)Place: ward 28, Binh Thanh district, HCMC

SYSTEM RENEW FOR THE FLAT GLASS FACTORY VGI3Item: Press pile D350Place: My Xuan A IZ, My Xuan commune, Tan Thanh district, Vung Tau Province

COMPANY PROFILE

le thycorp .com

Page 22: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

SOLAR POWER PLANT CONSTRUCTION IN LONG ANItem: Press pile 200x200Place: Duc Hue district, Long An province

HEADQUARTER AND OFFICES FOR RENTItem: Disassemble shoring kingpost systemPlace: 59-59A Phan Dinh Phung Street, Tan An ward, Ninh Kieu district, Can Tho City

COMPANY PROFILE

le thycorp .com

Page 23: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

HOUSE 215 NGUYEN VAN HUONGItem: Supply and press pile D400Place: 215 Nguyen Van Huong, district 2, HCMC

QUANG MINH HOTELItem: Assemble and disassemble shoring kingpost system & Place: 25 Le Thanh Ton, Ben Nghe ward, district 1, HCMC

COMPANY PROFILE

le thycorp .com

Page 24: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

BOT WATERWAY PROJECT IN HCMCItem: A Project to build Binh Loi rail bridge and upgrade the Saigon River section from Binh Loi bridge in HCMC to Ben Suc Port in Binh Duong ProvincePlace: Binh Loi Bridge, Binh Thanh district, HCMC

THAM LUONG 110 KV SUBSTATION AND UNDERGROUND TRANSMISSION LINEPlace: District 12 and Tan Phu district, HCMC

COMPANY PROFILE

le thycorp .com

Page 25: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

GREATER MEKONG SUBREGION BEN LUC - LONG THANH EXPRESSWAY PROJECT ( A7 PACKAGE - 52+400 KILOMETER EXPRESSWAY - 57 +700 KILOMETER EXPRESSWAY)Item: Drive spun pile 400x400Place: Phuoc An commune, Nhon Trach district & 2 Long Phuoc Thai commune, LongThanhdistrict,ĐongNaiProvince

COMPANY PROFILE

le thycorp .com

CAP SAINT JACQUES - PHASE IItem: Bored pile, Assemble and disassemble shoring kingpost systemPlace: 169 Thuy Van, ward 8, Vung Tau City

Page 26: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

SAIGON - MEKONG WATER PLANT - STAGE WITH CAPACITY UPGRADED TO 50.000 m3/ DAY NIGHTItem: Bore hole and press pile D700 - Assemble and disassemble shoring kingpost systemPlace: Binh Thuy District, Can Tho City

COMPANY PROFILE

le thycorp .com

EAFD RECYCLING PLANTItem: Assemble and disassemble shoring kingpost systemPlace: Phu My 3 Industrial zone, Ba Ria Vung Tau Province

Page 27: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

NPP POWERItem: Assemble and disassemble shoring kingpost systemPlace: Thanh Thanh Cong IZ, Trang Bang District, Tay Ninh Province

COMPANY PROFILE

le thycorp .com

COOLER SYSTEM IN HAU RIVER THER MOELECTRIC PLANTItem: Assemble and disassemble shoring kingpost systemPlace: Mai Dam Town, Chau Thanh District, Hau Giang Province

Page 28: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

PROJECT OF NHA TRANG CITY CENTER FOR SERVICES, FINANCE AND TOURISM.Item: Rent and drive steel sheet pilesPlace: Nha Trang City

COMPANY PROFILE

le thycorp .com

95 GO O MOIItem: Supply and drive steel aheet piles, press pile D350, Assemble and disassemble shoring kingpost systemPlace : 95 Go O Moi street, Phu Thuan ward, district 7, HCMC.

Page 29: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

JAMONA CITY PROJECTItem: Supply and press pile D400 and D500Place: Dao Tri Street, Phu Thuan Ward, District 7, HCMC

COMPANY PROFILE

le thycorp .com

GIA DINH OFFICE BUILDINGSItem: Supply and press pile D400, Rent and drive steel sheet piles and disassemble shoring kingpost systemPlace: Highway 13, Quarter 6, HBP Ward, Thu Duc District, HCMC

Page 30: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

THE WASTEWATER TREATMENT PLANT OF BAU BANG EXPANDED INDUSTRIAL ZONE Q = 4000 m3/dayItem: Assemble and disassemble shoring kingpost systemPlace: Binh Duong Province

UNDERGROUND WALKING ROAD IN 115 PEOPLE’S HOSPITALItem: Bore hole, Press concrete pile 300x300, Rent and drive steel sheet piles Disassemble shoring kingpost systemPlace: 818 Su Van Hanh, Ward 12, District 10, HCMC

COMPANY PROFILE

le thycorp .com

Page 31: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

220kV NAM SAI GON - DISTRICT 8 TRANSMISSIONItem: Supply and press pile 350x350Place: District 8 and Binh Chanh District, HCMC

BUILDING OFFICE OF PEOPLE COMMITTEE OFItem: Assemble and disassemble shoring kingpost systemPlace: 2 Hung Vuong Street, ward 5, Ca Mau City, Ca Mau Province

COMPANY PROFILE

le thycorp .com

Page 32: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

THE INTERNATIONAL SCHOOL UNITED KINGDOM ACADEMY (UKA)Item: Supply and press pile 350x350Place: D3 Street, Ward 25, Binh Thanh District, HCMC

BUILDING TUNNEL AT AN SUONG INTERSECTIONItem: Supply and press concrete pile 400x400Place: An Suong Crossroads, District 12, HCMC

COMPANY PROFILE

le thycorp .com

Page 33: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

HANOI FLAG TOWER TO BE BUILT IN CA MAUItem: Supply material, labour, machine for driving pilesPlace: Dat Mui Commune, Ngoc Hien District, Ca Mau Province

BREWERY EXTENTION PHASE 3Item: Borehole and press pile D400Place: Hoa Khanh Industrial, Lien Chieu District, Da Nang City

COMPANY PROFILE

le thycorp .com

Page 34: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

TANKS FOR WASTE WATER TREATMENT - THE DORMITORY OF RISE SUN TEXTILE CO.Item: Rent and drive steel sheet piles and assemble, disassemble shoring kingpost systemPlace: Thanh Thanh Cong Industrial - Trang Bang - Tay Ninh

NGOC HIEN GENERAL HOSPITALItem: Supply and press pile 250x250Place: Ngoc Hien town, Ngoc Hien District, Ca Mau Provice

COMPANY PROFILE

le thycorp .com

Page 35: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

CHU VAN AN HIGH SCHOOLItem: Press concrete pile 300x300Place: Hoa An Commune, Bien Hoa City, Dong Nai Province

EQUIPMENT STOREHOUSE AND STEEL FACTORY OF TOAN THINH PHAT CORP.Item: Supply and press pile D300Place: Tan Kim IZ, Can Giuoc District, Long An Province

COMPANY PROFILE

le thycorp .com

Page 36: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

EXPANDING THE DEPARTMENT OF VIETNAM STATE TREASURYIN CA MAU PROVINCEItem: Assemble and disassemble shoring kingpost systemPlace: 122-124 Phan Ngoc Hien, Ward 5, Ca Mau City, Cà Mau Province

NAM CAN - DAT MUI PROJECTItem: Supply and press pile D400, D500, D600Place: Ca Mau City.

COMPANY PROFILE

le thycorp .com

Page 37: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

OFFICE OF TECHNOLOGY AND AIRCRAFT MANAGEMENT CO.Item: Rent and drive steel sheet piles, Bored pile D300 Place: 58 Truong Son, Tan Binh District, HCMC

FUCO STEEL FACTORYItem: Bored pile D600, Rent and drive steel sheet piles Assemble and disassemble shoring kingpost systemPlace: Tan Thanh District, Ba Ria Vung Tau Province

COMPANY PROFILE

le thycorp .com

Page 38: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

FACTORY OF SHANG ZHI VIET NAM CO.Item: Supply and press D350 - D400Place: Rach Bap Industrial, An Dien, Ben Cat, Binh Duong Province

K2-3 FACTORY Item: Press Spun pile D300Place: Tan Kim, Can Giuoc, Long An

COMPANY PROFILE

le thycorp .com

Page 39: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

GENERAL HOSPITAL - CHAU THANH - NAM TAN UYENItem: Supply and press D300, D400Place: Tan Hiep ward, Tan Uyen town, Binh Duong Province

TAX DEPARTMENT OF DISTRICT 6Item: Supply and press pile 350x350 Assemble and disassemble shoring kingpost, Place: 49 Ly Chieu Hoang, Ward 10, District 6, HCM

COMPANY PROFILE

le thycorp .com

Page 40: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

KHANH HOI CIGARETTE FACTORYItem: Press pile D300Place: Street 3, Tan Tao Industrial Park, Binh Tan District, HCMC

THANH PHUOC FACTORYItem: Supply and press pile 300x300, Press pile D300Place: Thanh Phuoc commune, Tan Uyen District, Binh Duong Province

COMPANY PROFILE

le thycorp .com

Page 41: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

HITECH 3 WORKSHOPItem: Press spun pile D400Place: Hi-tech Park, District 9, HCMC

APARTMENT IN HOSPITAL 175Item: Bore hole, press pile 300x300Place : 786 Nguyen Kiem street, Go Vap district, HCMC

COMPANY PROFILE

le thycorp .com

Page 42: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

HO CHI MINH UNIVERSITY OF ARTItem: Rent and drive steel sheet piles, Assemble and disassemble shoring kingpost systemPlace: No. 5 Phan Dang Luu, Binh Thanh District, HCMC

SCHNEIDERItem: Supply and press pile D300. D400Place: Hi-tech Park, District 9, HCMC

COMPANY PROFILE

le thycorp .com

Page 43: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

COMPANY PROFILE

le thycorp .com

VINA KRAFT PAPER FACTORYItem: Rent and drive steel sheet piles - Assemble and disassemble shoring kingpost systemPlace: D6A, My Phuoc 3 IZ, Ben Cat, Binh Duong

110kV LINES SOC TRANG - VINH CHAUItem: Build the foundationPlace: Soc Trang, Vinh Chau

Page 44: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

HOSPITAL 7A Item: Supply and press pile D400, Assemble and disassemble shoring kingpost systemPlace: 446 Nguyen Trai, Ward 8, District 5, HCMC

COMPANY PROFILE

le thycorp .com

MEISHENG TEXTILES VIET NAM FACTORYItem: Press Spun pile D400Place: Xuyen A IZ, Duc Hoa, Long An

Page 45: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

COMPANY PROFILE

le thycorp .com

SAUCE FACTORYS – CHOLIMEX FOOD JOINT STOCK COItem: Press pile D400, Assemble and disassemble shoring kingpost systemPlace: Road 7, Vinh Loc IZ, Binh Chanh, HCMC

SAIGON BEER FACTORYItem: Supply and press concrete pile 300x300Place: 187 Nguyen Chi Thanh, District 5, HCMC

Page 46: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

COMPANY PROFILE

le thycorp .com

KENH DONG WATER PLANTItem: Press pile D350Place: Cu Chi, HCMC

SAI GON SOFEL FACTORYItem: Supply and press pile 350x350Place: Dong Xuyen Industrial Park, Rach Dua Ward, Vung Tau City

Page 47: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

COMPANY PROFILE

le thycorp .com

Q INDUSTRIES SHOWROOMItem: Supply and press pile D350Place: Road 7, District 2, HCMC

MY THUY BRIDGE PROJECTItem: Supply and press pile 350x350Place: District 2, HCMC

Page 48: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

COMPANY PROFILE

le thycorp .com

DAE MYUNG FACTORYItem: Pressing Spun piles D350Place: Road 7, Long Thanh, Dong Nai

APARTMENT FOR RENTItem: Supply and press pile D300 - Bored pile D300 mm Assemble and disassemble shoring kingpost systemPlace: 95 - 97 - 99 Tran Quang Dieu, District 3, HCMC

Page 49: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

COMPANY PROFILE

le thycorp .com

BINH THANH HOSPITAL Item: Supply and press pile 350x350 Assemble and disassemble shoring kingpost systemPlace: 112AB Dinh Tien Hoang, Binh Thanh District, HCMC

PERIOD 2 – TIEN GIANG BEER FACTORYItem: Supply and press pile D300 và D400Place: My Tho, Tien Giang

Page 50: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

COMPANY PROFILE

le thycorp .com

TAIYOSHA ELECTRIC VIET NAMItem: Supply and press spun pile D350Place: Long Duc commune, Long Thanh district, Dong Nai Province

SPACE OF SCIENCEItem: Supply and drive concrete pile 250x250Place: Ghenh Rang Ward, Quy Nhon City, Binh Dinh

Page 51: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

VINCOM CENTER AN GIANGItem: Press spun pile D500Place: Long Xuyen, An Giang

COMPANY PROFILE

le thycorp .com

VBL QUANG NAM BEER FACTORYItem: Press pile D300 Bore pile D300Place: Dien Ngoc, Quang Nam

Page 52: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

COMPANY PROFILE

le thycorp .com

EMERGENCY TANK CENTER Q = 3.500 m3/DAYItem: Supply and press D300, Bored pile work D400Place: Viet Nam – Singapore IZ, Thuan An, Binh Duong

CAMAU GAS POWER FERTILIZERItem: Press pile D400, Rent and drive steel sheet pilesPlace: Road 4, ward 5, Ca Mau city

Page 53: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

COMPANY PROFILE

le thycorp .com

PLAZA ANH QUANG COMMERCIAL CENTERItem: Rent and drive steel sheet piles Assemble and disassemble shoring kingpost system Place: Ton Duc Thang Street, Ward 1, Soc Trang

IML CONTAINERS VIET NAMItem: Press spun pile D350Place: Long Hau Hoa Binh, Thu Thua, Long An

Page 54: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 55: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 56: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 57: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 58: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 59: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 60: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 61: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 62: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 63: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 64: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 65: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 66: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 67: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 68: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 69: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 70: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 71: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 72: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 73: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 74: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 75: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 76: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 77: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 78: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 79: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders
Page 80: COMPANY PROFILE · COMPANY PROFILE lethycorp.com CREDIT OF THE TRANSPORT INDUSTRY TO RENOVATE THE 2ND NATIONAL ROAD NETWORK Item:Construction measure and installation of steel girders

Head office

Tel

Email

Workshop

: 606/38/9 Highway 13, Hiep Binh Phuoc, Thu Duc, HCMC

: (0274) 366 2280 Fax: (0274) 366 2281

: [email protected] Website: lethycorp.com

: Vinh Phu No. 10 Road, Vinh Phu, Thuan An, Binh Duong

LE THY CONSTRUCTION CO., LTD